RU2456408C1 RU2011106080/03A RU2011106080A RU2456408C1 RU 2456408 C1 RU2456408 C1 RU 2456408C1 RU 2011106080/03 A RU2011106080/03 A RU 2011106080/03A RU 2011106080 A RU2011106080 A RU 2011106080A RU 2456408 C1 RU2456408 C1 RU 2456408C1
Authority
RU
Russia
Prior art keywords
pile
well
piles
soil
solution
Prior art date
Application number
RU2011106080/03A
Other languages
Russian (ru)
Inventor
Олег Михайлович Преснов (RU)
Олег Михайлович Преснов
Сергей Павлович Ереско (RU)
Сергей Павлович Ереско
Семен Владимирович Логинов (RU)
Семен Владимирович Логинов
Original Assignee
Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" filed Critical Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет"
Priority to RU2011106080/03A priority Critical patent/RU2456408C1/en
Priority to EA201101511A priority patent/EA020732B1/en
Application granted granted Critical
Publication of RU2456408C1 publication Critical patent/RU2456408C1/en

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

FIELD: construction.
SUBSTANCE: method to erect a pile foundation includes installation of piles and reinforcement of a near-pile soil by means of its reinforcement with a solution of a hardening material. Prior to installation of a pile a well is drilled with a diameter of not more than 1/3 of the pile diameter. The well is filled with a strengthening solution. The pile is submerged into the well filled with the strengthening solution to form a strengthened and a compacted zones under a foot and around the pile shaft, and such zones are shaped as a hemisphere below with a truncated cone above, besides, the strengthened zone reinforced with the strengthening solution and arranged in the volume of the compacted zone is adjacent to the pile.
EFFECT: increased efficiency of soil strengthening around a pile, higher bearing capacity of piles, reduced labour intensiveness and material intensity.
3 cl, 2 dwg

Description

Изобретение относится к области строительства, а именно к способам возведения свайных фундаментов зданий и сооружений преимущественно на просадочных грунтах.The invention relates to the field of construction, and in particular to methods of construction of pile foundations of buildings and structures mainly on subsiding soils.

Известен способ возведения свайного фундамента на просадочных грунтах, включающий образование скважин на всю глубину просадочного грунта с заглублением в подстилающий непросадочный грунт, заполнение скважин дренирующим материалом, обваловывание территории по периметру сооружения, замачивание путем заливки воды на обвалованную территорию с выдерживанием в течение 15-30 дней и погружение свай в скважины (Авторское свид. СССР №885446, дата приоритета 19.03.1980, дата публикации 30.11.1981, авторы Руденко Л.К. и др.).There is a method of constructing a pile foundation on subsidence soils, including the formation of wells to the entire depth of subsidence soil with deepening in the underlying non-subsidence soil, filling wells with drainage material, bunding the area around the perimeter of the structure, soaking by pouring water on the bunded area with holding for 15-30 days and immersion of piles into wells (Author's certificate. USSR No. 8855446, priority date 03/19/1980, publication date 11/30/1981, authors Rudenko L.K. et al.).

Недостатком известного способа является ограниченная область применения в связи с возможностью его эффективной реализации только при положительных температурах.The disadvantage of this method is the limited scope in connection with the possibility of its effective implementation only at positive temperatures.

Известен способ возведения свайного фундамента, принятый в качестве прототипа, в котором осуществляют установку свай с последующим их укреплением путем подачи в грунт в два этапа твердеющего раствора под давлением, причем сначала подачу твердеющего раствора осуществляют по периферии укрепляемых свай, а после затвердения раствора по периферийному контуру осуществляют подачу твердеющего раствора в зону, ограниченную периферийным контуром, в том числе и межсвайное пространство, при этом на обоих этапах введение в грунт укрепляющего раствора осуществляют либо с помощью инъекторов, которые забивают в грунт на глубину уплотнения, либо предварительно по периферии группы укрепляемых свай и внутри межсвайного пространства бурят скважины, в которые подают твердеющий раствор под давлением (Патент РФ №2379419, дата приоритета 27.11.2007, дата публикации 10.06.2009, авторы Лубягин А.В. и др., прототип).A known method of construction of a pile foundation, adopted as a prototype, in which the installation of piles is carried out, followed by their strengthening by feeding into the soil in two stages of a hardening mortar under pressure, and first, the supply of a hardening mortar is carried out on the periphery of the reinforced piles, and after hardening the solution along the peripheral contour hardening mortar is supplied into the zone limited by the peripheral contour, including the inter-pile space, at the same time, at both stages, the introduction of a strengthening solution into the soil thieves are carried out either with the help of injectors that are driven into the ground to a depth of compaction, or wells are first drilled around the periphery of the group of reinforced piles and inside the inter-pile space, into which hardening solution is supplied under pressure (RF Patent No. 2379419, priority date 11.27.2007, publication date 06/10/2009, authors A. Lubyagin et al., Prototype).

Недостатком прототипа является неоднородное укрепление грунта вокруг сваи, обусловленное тем, что при гидроразрыве под действием подаваемого в грунт под давлением твердеющего раствора за счет изменения напряженного состояния траектория трещины при подходе к зоне уплотнения вокруг сваи будет искривляться и огибать это препятствие, находя более слабые участки в межсвайном пространстве, к тому же, способ может оказаться экономически невыгодным из-за большого расхода неэффективно используемого твердеющего раствора и трудозатрат по осуществлению его введения в грунт.The disadvantage of the prototype is the heterogeneous strengthening of the soil around the pile, due to the fact that during hydraulic fracturing under the action of a hardening solution supplied to the soil under pressure due to a change in the stress state, the crack path will bend and bend around this obstacle, finding weaker sections in inter-pile space, in addition, the method may be economically disadvantageous due to the high consumption of inefficiently hardening mortar and labor costs along the axis estvleniyu its introduction into the soil.

Задачей изобретения является повышение эффективности укрепления грунта вокруг сваи при снижении трудозатрат и сокращении расхода твердеющего материала.The objective of the invention is to increase the effectiveness of strengthening the soil around the pile while reducing labor costs and reducing the consumption of hardening material.

Для решения поставленной задачи в способе возведения свайного фундамента, включающем установку свай и укрепление околосвайного грунта путем армирования его раствором твердеющего материала, согласно изобретению перед установкой сваи бурят скважину диаметром не более 1/3 диаметра сваи, заполняют скважину закрепляющим раствором, погружают сваю в заполненную закрепляющим раствором скважину с образованием под пятой и вокруг ствола сваи закрепленной и уплотненной зон в форме полусферы снизу и усеченного конуса над ней, причем к свае примыкает закрепленная зона, армированная закрепляющим раствором и расположенная в объеме уплотненной зоны.To solve the problem in a method of constructing a pile foundation, including installing piles and strengthening the near-pile soil by reinforcing it with a solution of hardening material, according to the invention, before installing the piles, they drill a well with a diameter of not more than 1/3 of the diameter of the pile, fill the well with a fixing solution, immerse the pile in a filled fixing well solution with the formation under the fifth and around the trunk piles of fixed and compacted zones in the form of a hemisphere below and a truncated cone above it, and adjacent to the pile There is a fixed zone reinforced with a fixing solution and located in the volume of the compacted zone.

Согласно изобретению при погружении сваи может быть использована устанавливаемая по месту забивки сваи направляющая шайба.According to the invention, when immersing the piles, a guide washer installed at the place of driving the piles can be used.

Согласно изобретению в качестве закрепляющего раствора используют жидкое стекло.According to the invention, liquid glass is used as the fixing solution.

Способ поясняется чертежами, на которых показана схема уплотнения грунта вокруг сваи: на фиг.1 - продольный разрез сваи; на фиг.2 - поперечный разрез А-А на фиг.1.The method is illustrated by drawings, which shows a diagram of the compaction of soil around the pile: figure 1 is a longitudinal section of the pile; figure 2 is a cross section aa in figure 1.

Способ возведения свайного фундамента осуществляют следующим образом. По месту установки каждой сваи 1 в грунте бурят скважину диаметром не более 1/3 диаметра сваи (условно не показано). В пробуренную скважину нагнетают закрепляющий раствор, обладающий сцепляемостью с грунтом, в качестве которого используют, например, жидкое стекло (силикат натрия). В заполненную жидким стеклом скважину погружают вдавливанием или забивкой сваю 1. При этом в результате воздействия на сваю соответственно статической или динамической нагрузки под пятой и вокруг ствола сваи образуются две зоны в форме полусферы под сваей снизу и усеченного конуса над полусферой сверху, а именно примыкающая к стволу сваи закрепленная зона 2, армированная жидким стеклом, и уплотненная зона 3. Объемы закрепленной 2 и уплотненной 3 зон определяются расчетным путем и зависят в основном от пористости грунта, его реологических свойств и других технологических параметров процесса. Примыкающая к стволу сваи закрепленная зона 2, образованная в результате заполнения пор под давлением жидким стеклом и схватывания его с грунтом, характеризуется тем, что радиус ее полусферы не будет превышать радиуса уплотненной зоны 3, охватывающей укрепленную зону 2, и будет зависеть от величины заполнения пор закрепляющим раствором, которая в основном зависит от пористости грунта и других факторов. Одним из них является, например, использование направляющей шайбы 4 при погружении свай для центрирования нагрузки и предотвращения вытекания закрепляющего раствора из скважины. Особенно актуально использование направляющей шайбы 4 при погружении свай забивкой, т.е. при динамическом погружении. При этом над скважиной после ее заполнения жидким стеклом по месту забивки сваи устанавливают в качестве направляющей шайбы съемную металлическую обойму с отверстием для сваи. Далее предварительно изготовленную и замоченную 1%-м раствором соляной кислоты железобетонную сваю погружают забивкой, вдавливанием или вибропогружением на заданную глубину, образуя под ее пятой уплотненную полусферическую зону радиусом, составляющим не менее 2,75 диаметра сваи, и уплотненную зону вокруг ствола сваи в виде усеченного конуса с диаметрами оснований, равными соответственно в нижней части двум радиусам полусферы, а в верхней части диаметру сваи. При этом уплотненная зона армируется непосредственно под пятой и вокруг ствола сваи жидким стеклом и тем самым закрепляется, образуя внутри примыкающую к свае закрепленную зону 2.The method of construction of the pile foundation is as follows. At the location of each pile 1 in the soil, a well is drilled with a diameter of not more than 1/3 of the diameter of the pile (not shown conditionally). Fixing solution having adhesion to the soil is injected into the drilled well, for example, using liquid glass (sodium silicate). Pile 1 is immersed in the well filled with liquid glass by indentation or driving. As a result of exposure to the pile, respectively, of a static or dynamic load under the fifth and around the trunk of the pile, two zones are formed in the form of a hemisphere under the pile below and a truncated cone above the hemisphere above, namely, adjacent to the pile shaft, fixed zone 2, reinforced with liquid glass, and compacted zone 3. The volumes of fixed 2 and compacted 3 zones are determined by calculation and depend mainly on the porosity of the soil, its rheological properties and other technological process parameters. The fixed zone 2 adjacent to the pile shaft, formed as a result of filling pores under pressure with liquid glass and setting it with soil, is characterized by the fact that the radius of its hemisphere will not exceed the radius of the compacted zone 3, covering the fortified zone 2, and will depend on the amount of pore filling fixing solution, which mainly depends on the porosity of the soil and other factors. One of them is, for example, the use of a guide washer 4 when immersing piles to center the load and prevent the outflow of fixing solution from the well. The use of the guide washer 4 is especially important when diving piles by driving, i.e. with dynamic immersion. At the same time, above the well after filling it with liquid glass at the place of pile driving, a removable metal clip with a hole for the pile is installed as a guide washer. Next, a reinforced concrete pile prefabricated and soaked with a 1% hydrochloric acid solution is immersed by driving, indenting or vibration dipping to a predetermined depth, forming under its fifth a compacted hemispherical zone with a radius of at least 2.75 of the diameter of the pile, and a compacted area around the pile shaft in the form a truncated cone with base diameters equal respectively in the lower part to two hemisphere radii, and in the upper part to the diameter of the pile. In this case, the sealed zone is reinforced directly under the fifth and around the pile shaft with liquid glass and is thereby fixed, forming inside the adjacent zone 2 adjacent to the pile.

Преимуществом предлагаемого способа возведения свайного фундамента является высокая его эффективность, обусловленная высокой несущей способностью свай, снижением трудозатрат и сокращением расхода твердеющего материала за счет более технологичного армирования твердеющим материалом, обеспечивающего однородность закрепляемого грунта вокруг сваи в объеме уплотненного грунта, а также снижение трудозатрат и сокращение расхода твердеющего материала в связи с исключением операций укрепления грунта по периферии группы укрепляемых свай и внутри межсвайного пространства.The advantage of the proposed method of construction of the pile foundation is its high efficiency, due to the high bearing capacity of the piles, reducing labor costs and reducing the consumption of hardening material due to more technological reinforcement with hardening material, ensuring uniformity of the fixed soil around the pile in the volume of compacted soil, as well as reducing labor costs and reducing consumption hardening material due to the exclusion of soil strengthening operations on the periphery of the group of reinforced piles and inside the interspace.

Claims (3)

1. Способ возведения свайного фундамента, включающий установку свай и укрепление околосвайного грунта путем армирования его раствором твердеющего материала, отличающийся тем, что перед установкой сваи бурят скважину диаметром не более 1/3 диаметра сваи, заполняют скважину закрепляющим раствором, погружают сваю в заполненную закрепляющим раствором скважину с образованием под пятой и вокруг ствола сваи закрепленной и уплотненной зон в форме полусферы снизу и усеченного конуса над ней, причем к свае примыкает закрепленная зона, армированная закрепляющим раствором и расположенная в объеме уплотненной зоны.1. A method of constructing a pile foundation, including installing piles and strengthening the near-pile soil by reinforcing it with a solution of hardening material, characterized in that before installing the piles, they drill a well with a diameter of not more than 1/3 of the diameter of the pile, fill the well with a fixing solution, immerse the pile in a filled with fixing solution a well with the formation under the fifth and around the trunk of a pile of fixed and compacted zones in the form of a hemisphere below and a truncated cone above it, and a fixed zone reinforced with adjacent to the pile secured with a fixing solution and located in the volume of the densified zone. 2. Способ возведения свайного фундамента по п.1, отличающийся тем, что погружение сваи осуществляют с использованием направляющей шайбы.2. The method of construction of the pile foundation according to claim 1, characterized in that the pile is immersed using a guide washer. 3. Способ возведения свайного фундамента по п.1, отличающийся тем, что в качестве закрепляющего раствора используют жидкое стекло. 3. The method of construction of the pile foundation according to claim 1, characterized in that liquid glass is used as the fixing solution.
RU2011106080/03A 2011-02-17 2011-02-17 Method to erect pile foundation RU2456408C1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
RU2011106080/03A RU2456408C1 (en) 2011-02-17 2011-02-17 Method to erect pile foundation
EA201101511A EA020732B1 (en) 2011-02-17 2011-11-16 Method to erect pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2011106080/03A RU2456408C1 (en) 2011-02-17 2011-02-17 Method to erect pile foundation

Publications (1)

Publication Number Publication Date
RU2456408C1 true RU2456408C1 (en) 2012-07-20

Family

ID=46827020

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2011106080/03A RU2456408C1 (en) 2011-02-17 2011-02-17 Method to erect pile foundation

Country Status (2)

Country Link
EA (1) EA020732B1 (en)
RU (1) RU2456408C1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2535556C1 (en) * 2013-08-20 2014-12-20 Михаил Борисович Пермяков Pile and its erection method
RU2640059C1 (en) * 2016-12-28 2017-12-26 Федеральное государственное бюджетное учреждение науки Институт прикладной механики Российской академии наук (ИПРИМ РАН) Method of manufacturing drill-driven pile
RU2678251C2 (en) * 2017-07-17 2019-01-24 Государственное автономное образовательное учреждение Астраханской области высшего образования Астраханский Государственный Архитектурно-Строительный Университет Method of creating broadening at end of screw pile
RU2753295C1 (en) * 2020-11-10 2021-08-12 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Method for pile construction in macro-porous soils
RU2787049C1 (en) * 2022-06-30 2022-12-28 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Method for erection of driven pile

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3842608A (en) * 1972-11-28 1974-10-22 L Turzillo Method and means for installing load bearing piles in situ
SU730935A1 (en) * 1977-06-13 1980-04-30 Строительное Управление N28 Тираспольского Стройтреста Method of erecting pile foundation
SU885446A1 (en) * 1980-03-19 1981-11-30 Трест "Николаевсельстрой" Method of constructing pile foundation on sagging soil
SU1481331A1 (en) * 1986-09-09 1989-05-23 Ростовский государственный университет им.М.А.Суслова Method of setting a pile in loess soil
RU2163281C1 (en) * 2000-05-22 2001-02-20 Дубина Михаил Михайлович Pile-slab foundation and method of its construction
RU2379419C2 (en) * 2007-11-27 2010-01-20 Общество с ограниченной ответственностью промышленно-строительная компания "Фундамент" Method of increasing bearing strength of piling

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU489846A1 (en) * 1973-05-08 1975-10-30 Одесский Филиал Всесоюзного Института По Проектированию Организации Энергетического Строительства "Оргэнергострой" Zabivna sva
RU2150549C1 (en) * 1997-01-06 2000-06-10 Новосибирская государственная академия строительства Method and device for moulding of cast-in- place pile in ground

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3842608A (en) * 1972-11-28 1974-10-22 L Turzillo Method and means for installing load bearing piles in situ
SU730935A1 (en) * 1977-06-13 1980-04-30 Строительное Управление N28 Тираспольского Стройтреста Method of erecting pile foundation
SU885446A1 (en) * 1980-03-19 1981-11-30 Трест "Николаевсельстрой" Method of constructing pile foundation on sagging soil
SU1481331A1 (en) * 1986-09-09 1989-05-23 Ростовский государственный университет им.М.А.Суслова Method of setting a pile in loess soil
RU2163281C1 (en) * 2000-05-22 2001-02-20 Дубина Михаил Михайлович Pile-slab foundation and method of its construction
RU2379419C2 (en) * 2007-11-27 2010-01-20 Общество с ограниченной ответственностью промышленно-строительная компания "Фундамент" Method of increasing bearing strength of piling

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2535556C1 (en) * 2013-08-20 2014-12-20 Михаил Борисович Пермяков Pile and its erection method
RU2640059C1 (en) * 2016-12-28 2017-12-26 Федеральное государственное бюджетное учреждение науки Институт прикладной механики Российской академии наук (ИПРИМ РАН) Method of manufacturing drill-driven pile
RU2678251C2 (en) * 2017-07-17 2019-01-24 Государственное автономное образовательное учреждение Астраханской области высшего образования Астраханский Государственный Архитектурно-Строительный Университет Method of creating broadening at end of screw pile
RU2753295C1 (en) * 2020-11-10 2021-08-12 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Method for pile construction in macro-porous soils
RU2787049C1 (en) * 2022-06-30 2022-12-28 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Method for erection of driven pile
RU2800801C1 (en) * 2022-11-23 2023-07-28 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Method of installation of piles on macroporous soils

Also Published As

Publication number Publication date
EA020732B1 (en) 2015-01-30
EA201101511A1 (en) 2012-08-30

Similar Documents

Publication Publication Date Title
RU2456408C1 (en) Method to erect pile foundation
CN110397057B (en) Self-sinking type steel open caisson supporting system and method for soft soil area
RU2331736C1 (en) Method for improving massive of loessial collapsible soil in base of buildings and structures
CN103243740A (en) Construction method of rotary excavating and long spiral combination bored concrete pressure grouting secant pile continuous wall
CN102220764B (en) Construction method of deep foundation pit bracing system
RU2556588C1 (en) Pile foundation for arrangement of supports of overhead power transmission line
CN112482367A (en) Foundation pit support pile for replacing cast-in-place pile rock-socketed with steel pipe pile
CN106245641A (en) PHC pile tube post grouting construction technique and PHC pile tube composite pile
RU2492294C1 (en) Pipe concrete pile with reinforced base and method of its erection
CN102286971A (en) Concrete-filled steel tube core column socketed pile
RU2275470C1 (en) Method of floating pile load-bearing capacity increase
CN204780943U (en) H type precast concrete pile and excavation supporting device
CN110528549B (en) Tensile crack resistant UHPC concrete open caisson structure and construction method thereof
CN209636780U (en) Composite pile
RU2441115C1 (en) Pile with increased resistance to swelling
RU2619964C1 (en) Method for increasing bearing capacity of pile pier
RU2089706C1 (en) Pile frozen into permafrost and method of erection of pile frozen into permafrost
RU2819680C1 (en) Method of increasing bearing capacity and durability of piles
RU2807350C1 (en) Constructive and technological solution for foundation of intermediate support of high pile work type constructed in temporary enclosing structure
CN207919586U (en) A kind of large span arch bridge basis
RU2753295C1 (en) Method for pile construction in macro-porous soils
RU100529U1 (en) PILED BRACKET WITH INCREASED RESISTANCE TO TURNS
RU2722901C1 (en) Method for reinforcement of pile foundation
RU2325483C1 (en) Technique for erecting solid core foundation slab
RU2296837C2 (en) Method for construction of foundation carrying heavy loads