FR2246181A5
(en)
*
|
1973-10-02 |
1975-04-25 |
Sefi |
|
US3924414A
(en)
*
|
1974-08-22 |
1975-12-09 |
Union Oil Co |
Pile for use in offshore areas having a shifting layer of mud
|
US3972198A
(en)
*
|
1974-08-22 |
1976-08-03 |
Union Oil Company Of California |
Method of protecting a pile imbedded in offshore areas having a shifting layer of mud
|
US4278363A
(en)
*
|
1979-06-21 |
1981-07-14 |
Conoco, Inc. |
Rock bolt and installation system
|
JPS56100906A
(en)
*
|
1980-01-08 |
1981-08-13 |
Masaya Nagashima |
Temporarily built bridge
|
US4637758A
(en)
*
|
1982-03-11 |
1987-01-20 |
Kabushiki Kaisha Komatsu Seisakusho |
Method of driving hollow piles into the ground
|
US4474243A
(en)
*
|
1982-03-26 |
1984-10-02 |
Exxon Production Research Co. |
Method and apparatus for running and cementing pipe
|
US4533279A
(en)
*
|
1983-05-12 |
1985-08-06 |
Fundemantum B.V. |
Method for making a foundation pile
|
DE3507732A1
(en)
*
|
1985-03-05 |
1986-09-18 |
Dyckerhoff & Widmann AG, 8000 München |
TIE LINK FOR A ROCK BOLT OR THE LIKE
|
DE3617025A1
(en)
*
|
1986-05-21 |
1987-11-26 |
Delmag Maschinenfabrik |
PRE-PREPARED CONCRETE PILE AND METHOD AND DEVICE FOR ITS PLACING INTO THE GROUND
|
DE3624943A1
(en)
*
|
1986-07-23 |
1988-01-28 |
Delmag Maschinenfabrik |
PRE-PREPARED CONCRETE PART AND METHOD FOR PUTTING IT INTO THE GROUND
|
FR2610652B1
(en)
*
|
1987-02-09 |
1991-09-06 |
Soletanche |
METHOD FOR REINFORCING A TUBULAR BATTERY PILE, PIE OBTAINED BY THIS PROCESS, DEVICE FOR IMPLEMENTING THE PROCESS
|
KR940004906B1
(en)
*
|
1987-10-05 |
1994-06-04 |
가와사끼세이떼쓰 가부시끼가이샤 |
Hollow steel pile, manufacturing method and pipe driving method
|
US4958962A
(en)
*
|
1989-06-28 |
1990-09-25 |
Halliburton Company |
Methods of modifying the structural integrity of subterranean earth situs
|
DE59208049D1
(en)
*
|
1991-11-14 |
1997-03-27 |
Isolink Inc |
Device for anchoring components in the ground
|
GB9212936D0
(en)
*
|
1992-06-18 |
1992-07-29 |
Elle Holdings Limited Van |
Pile
|
US5396964A
(en)
*
|
1992-10-01 |
1995-03-14 |
Halliburton Company |
Apparatus and method for processing soil in a subterranean earth situs
|
CN1039502C
(en)
*
|
1992-12-04 |
1998-08-12 |
张平潮 |
Reinforced concrete pile and its construction method
|
US5575593A
(en)
*
|
1994-07-11 |
1996-11-19 |
Atlas Systems, Inc. |
Method and apparatus for installing a helical pier with pressurized grouting
|
US5586417A
(en)
*
|
1994-11-23 |
1996-12-24 |
Henderson; Allan P. |
Tensionless pier foundation
|
AU2001296896A1
(en)
|
2000-09-27 |
2002-04-08 |
Allan P. Henderson |
Perimeter weighted foundation for wind turbines and the like
|
NL1018702C2
(en)
*
|
2001-08-03 |
2003-02-04 |
Verstraeten Funderingstech Bv |
Method for installing a foundation pile in the soil, as well as a foundation pile and a chuck for this method, and a soil displacement drill.
|
US20030190195A1
(en)
*
|
2002-04-03 |
2003-10-09 |
Liberty Offshore Limited |
Drilled pile
|
US7533505B2
(en)
|
2003-01-06 |
2009-05-19 |
Henderson Allan P |
Pile anchor foundation
|
US7267510B2
(en)
*
|
2003-07-29 |
2007-09-11 |
Cable Lock, Inc. |
Foundation pile having a spiral ridge
|
US7618217B2
(en)
*
|
2003-12-15 |
2009-11-17 |
Henderson Allan P |
Post-tension pile anchor foundation and method therefor
|
EA008306B1
(en)
*
|
2004-06-02 |
2007-04-27 |
Альберт Иванович Архипов |
Design of screw metal pile
|
US8206064B2
(en)
*
|
2005-10-20 |
2012-06-26 |
University Of South Florida |
Voided drilled shafts
|
US20070286687A1
(en)
*
|
2006-06-12 |
2007-12-13 |
Cesare Melegari |
Method and equipment for constructing micropiles in soil
|
US20080008539A1
(en)
*
|
2006-07-05 |
2008-01-10 |
Con-Tech Systems Ltd. |
Void form for constructing post-tensioned foundation piles
|
US7517174B2
(en)
*
|
2007-05-03 |
2009-04-14 |
Lrm Industries, Llc |
Molded pile
|
US8496410B2
(en)
*
|
2009-06-01 |
2013-07-30 |
Massachusetts Institute Of Technology |
Method and apparatus for penetrating particulate substrates
|
RU2468148C2
(en)
*
|
2011-01-21 |
2012-11-27 |
Государственное образовательное учреждение высшего профессионального образования "Саратовский государственный технический университет" (СГТУ) |
Device for formation of wells for filling piles
|
RU2456408C1
(en)
*
|
2011-02-17 |
2012-07-20 |
Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" |
Method to erect pile foundation
|
CN102445362B
(en)
*
|
2011-09-28 |
2013-07-24 |
中国水电顾问集团华东勘测设计研究院 |
Method for sampling jointed rock mass
|
RU2489548C2
(en)
*
|
2011-11-01 |
2013-08-10 |
Юрий Семенович Флягин |
Screw injection anchor pile
|
RU2569654C1
(en)
*
|
2014-06-23 |
2015-11-27 |
Юрий Анатольевич Бровцин |
Syringe-type screw pile
|
RU2571873C1
(en)
*
|
2014-06-23 |
2015-12-27 |
Юрий Анатольевич Бровцин |
Screw pile in soil
|
RU2570584C1
(en)
*
|
2014-06-23 |
2015-12-10 |
Юрий Анатольевич Бровцин |
Screw pile
|
RU2558832C1
(en)
*
|
2014-06-23 |
2015-08-10 |
Юрий Анатольевич Бровцин |
Method to erect screw pile in soil
|
RU2571869C1
(en)
*
|
2014-06-23 |
2015-12-27 |
Юрий Анатольевич Бровцин |
Screw pile in soil with detachable tip
|
RU2603314C1
(en)
*
|
2015-07-29 |
2016-11-27 |
Общество с ограниченной ответственностью "НПП СК МОСТ" |
Erection method of pile foundation for reinforcement
|
DE102017121760A1
(en)
*
|
2017-09-20 |
2019-03-21 |
Innogy Se |
Method of installing a pile and pile
|
RU2706499C1
(en)
*
|
2018-07-26 |
2019-11-19 |
Публичное акционерное общество "Татнефть" имени В.Д. Шашина |
Pile structure of pumping units foundation
|
US10738436B1
(en)
|
2019-02-15 |
2020-08-11 |
Montana Systems Inc. |
Tubular foundation for onshore wind turbine generators
|
RU192324U1
(en)
*
|
2019-05-07 |
2019-09-12 |
Федеральное государственное бюджетное образовательное учреждение образования "Владимирский Государственный Университет имени Александра Григорьевича и Николая Григорьевича Столетовых" (ВлГУ) |
Screw pile
|