US3213768A - Road construction - Google Patents

Road construction Download PDF

Info

Publication number
US3213768A
US3213768A US126978A US12697861A US3213768A US 3213768 A US3213768 A US 3213768A US 126978 A US126978 A US 126978A US 12697861 A US12697861 A US 12697861A US 3213768 A US3213768 A US 3213768A
Authority
US
United States
Prior art keywords
slabs
beams
roadway
extending
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US126978A
Inventor
Jensen Jens Lauritz
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of US3213768A publication Critical patent/US3213768A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/06Pavings made of prefabricated single units made of units with cement or like binders
    • E01C5/08Reinforced units with steel frames
    • E01C5/085Reinforced units with steel frames on prefabricated supporting structures or prefabricated foundation elements except coverings made of layers of similar elements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/24Methods or arrangements for preventing slipperiness or protecting against influences of the weather
    • E01C11/26Permanently installed heating or blowing devices ; Mounting thereof
    • E01C11/265Embedded electrical heating elements ; Mounting thereof

Definitions

  • pre-manufactured slabs were placed directly on the ground as the slab distributes the load of the vehicles to such an extent that the specific pressure on the ground is not so big that the slabs are pressed down in it. These slabs have, however, been used only for provisional airports as a more intensive trafiic will soon bring the individual slabs out of position and especially out of level.
  • the purpose of the invention is to remedy these drawbacks by ridding the touchy parts of the road completely of the freezable stratum.
  • the road construction according to the invention is characterized in that the pro-manufactured slabspossibly by means of girdersrest on the rows of frost-proof piles or pillars (e.g. of concrete) placed there in advance and reaching down through the freezable stratum and anchored in solid and frost-free strata whereas the slabs are kept free of the freezable stratum. Therefore, they will not be displaced when the frozen stratum thaws and the other parts of the road are not in contact with the frozen stratum and will, consequently, not be offset by it.
  • Each slab can be supported at three or more points, or along the sides, as it rests on girders which again rest on the piles or the pillars, and in order to prevent the slabs from being displaced horizontally they may each, according to the invention, have supporting projections along the vertical sides of the pillars, such as arms or collars.
  • the slabs may, according to the invention, have, further to the faces bearing against the pillars, at least one projection turning downwards and e.g. being calotte-shaped and resting on the ground.
  • the last-mentioned projection contributes in the support of the slabs, but resting on the surface of the ground it will not freeze together with the freezable stratum but will in the lateral direction be secured by the pillars.
  • they may, according to the invention, have bracing ribs from one of the two kinds of projections to the other.
  • bracing ribs can be placed in such a manner that they can also transfer the main part of the horizontal forces in the slabs as, according to the invention, the ribs are positioned so that they stretch mainly from horizontal supporting projections along the edge of the slabs to a centrally positioned vertical supporting projection under the centre of the slabs.
  • each slab may have an electric heating element built-in and connected to electric cables in the side of the road.
  • the road can be kept frost-free, and snow and ice covering the road will thaw without the assistance of any snow-clearing service. It is often impossible for such a service to do its work fast enough, and in many countries it does not operate on Sundays and holidays. Ditches and other measures for drainage of the road are superfluous, as its underside will always be kept dry by the wind which may pass freely under it.
  • the narrow space between the slabs, the so-called expansion joints, may be filled in some known way with asphalt or other water-tight substances or organs so that precipitation will drain off over the lateral edge of the slightly curved roadway.
  • each slab may during the manufacturing process be furnished with a wearing surface insulating against moisture, and this insulating layer may be applied with greater care and under more ideal conditions at a factory where this preparation can take place indoors and more conveniently by the aid of the requisite machinery than on site. Furthermore, the preparation as well as the finishing preparation can take place without the usual pressure of the traffic which leaves the least possible time for road works.
  • the slabs should, according to the invention, meet this demand by the trafiic fully, as they are not repaired but renewed.
  • road side fences may, according to the invention, be clamped to the sides of the slabs or be made as constituent parts of the roadway element.
  • the individual roadway element may be assembled to larger units, e.g. by means of cables passed through cable ducts in the roadway elements so that the cables run parallel with or diagonal to the longitudinal direction of the roadway, by means of spigot-and-socket joining of steel reinforcement, by means of bolting, or in some other known manner.
  • FIG. 1 shows part of a road construction in perspective
  • FIG. 2 shows, also in perspective, a slab forming part of the same construction and FIG. 3 shows the same slab seen from below in a slanting position.
  • Each slab has a hole 7 in the centre of its overside in which there is a ring 8 by means of which the slab can be lifted from its place.
  • the underside of the slab is equipped with a number of ribs 9 for bracing. These ribs stretch from the edge of the slab towards a calotte-shaped projection 10 in the centre of the slab.
  • the slab can rest on the ground by the aid of this projection, but this must not necessarily be so.
  • the slab which is finished at the factory, has an electric heating element built into its surface coating, consisting of a material insulating against moisture, or immediately under this coating, and the heating element is connected electrically with cables 11 in an external cable box 12 on the fence 4.
  • Such pre-manufactured slabs can be richly varied with regard to surface equipment.
  • they can be equipped with grouted in road stripes, marking of pedestrian crossings, acoustic road marking in the form of transverse grooves of varying size, etc., just as it will be possible to make the surface granulated or grooved or in some other way skid-proof.
  • the advantage of the road construction is, according to the invention, first and foremost that the nature of the ground is of no importance and that generally it will not be necessary to move any earth before the road is constructed.
  • the road can be constructed across areas fiooded part of the year. Drainage or sewerage is not necessary.
  • the water runs off the roadway at the side fence 4 which has vertical grooves 13 on its inside to ensure the drainage.
  • the road is easy to repair. Repairs are effected simply by renewing one or more slabs 3. Thus the periods during which the roadway is blocked to the trafiic are limited to a minimum.
  • the underside of the road is kept dry by the wind and is therefore not exposed to decomposition.
  • Rainwater may, furthermore, drain off through the intervals 14 between the slabs 3, but generally it will be preferred to fill the expansion joints with asphalt so that the overside of the roadway forms a water-tight whole.
  • the piles 1 are introduced in holes in the transverse supports 2. Instead these supports can be laid in grooves on top of the piles 1 or the piles may have vertical guide pins introduced in holes in the supports 2.
  • each slab 3 Under the middle of each slab 3 sand or pebble gravel can be spread over the ground in advance in support of the calotte-shaped part of the slab.
  • a roadway construction comprising piles extending into the ground sufficiently below the frost line to provide road support and having upper end portions extending above the ground surface, beams supported on the upper ends of said piles and extending transversely of the roadway at selected spaced intervals, said beams having a rectangular cross section with fiat upper surfaces and opposed vertical side surfaces, a plurality of rectangular premanufactured concrete slabs each having a length slightly less than the center-to-center spacing of said beams and a width which is a unit fraction of the width of the roadway, each of said slabs extending between and being supported by two successive beams and having end portions which are notched to provide fiat lower surfaces resting on the flat upper surfaces of said beams and vertically downwardly extending shoulders engagable with said side surfaces of said beams, a plurality of said slabs being laid side-by-side to make up the desired width of the roadway, said slabs having on their under sides downwardly projecting integral ribs extending generally lengthwise of said slabs and having vertical end faces which are coplan
  • said means for confining said slabs at the sides of the roadway comprises curbs extending longitudinally of the roadway at each side thereof and projecting above said slabs and piles supporting said curbs above the ground and extending into the ground sufficiently below the frost line to provide permanent support.
  • each slab is formed in its upper face with a central recess and in which a lifting ring for said slab is anchored in said recess.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Description

2 Sheets-Sheet 1 Filed July 26, 1961 Oct. 26, 1965 J, JENSEN 3,213,768
ROAD CONSTRUCTION Filed July 26, 1961 2 Sheets-Sheet 2 United States Patent 3,213,768 ROAD CONSTRUCTION Jens Lauritz Jensen, Meilgade 47, Aarhus, Denmark Filed July 26, 1961, Ser. No. 126,978 Claims priority, application Denmark, July 27, 1960, 2,965/60 4 (Ilaims. (Cl. 94-14) The invention relates to a road construction for roadways, runways, and the like, and it consists of pre-manufactured concrete or reinforced concrete slabs placed on supports. It is easy to make as usually it needs no preceding preparation of the ground. It will imply special advantages, especially in the case of soft ground or ground frozen solid in the winter.
Previously, pre-manufactured slabs were placed directly on the ground as the slab distributes the load of the vehicles to such an extent that the specific pressure on the ground is not so big that the slabs are pressed down in it. These slabs have, however, been used only for provisional airports as a more intensive trafiic will soon bring the individual slabs out of position and especially out of level.
It has been proposed to raise the slabs over the ground level by placing them in a line, side by side, on two heavy concrete rails or walls, one in each side of the road, and if necessary on intermediate rows of supports. As in the case of the slabs directly on the ground it is also in this instance a drawback that the stratum frozen in the winter brings slabs and rails, or supports, out of position in relation to one another which happens especially during the thawing of the freezable stratum and then results in such influence that considerable and lasting damage is caused.
The purpose of the invention is to remedy these drawbacks by ridding the touchy parts of the road completely of the freezable stratum. To that end the road construction according to the invention is characterized in that the pro-manufactured slabspossibly by means of girdersrest on the rows of frost-proof piles or pillars (e.g. of concrete) placed there in advance and reaching down through the freezable stratum and anchored in solid and frost-free strata whereas the slabs are kept free of the freezable stratum. Therefore, they will not be displaced when the frozen stratum thaws and the other parts of the road are not in contact with the frozen stratum and will, consequently, not be offset by it.
Each slab can be supported at three or more points, or along the sides, as it rests on girders which again rest on the piles or the pillars, and in order to prevent the slabs from being displaced horizontally they may each, according to the invention, have supporting projections along the vertical sides of the pillars, such as arms or collars. The slabs may, according to the invention, have, further to the faces bearing against the pillars, at least one projection turning downwards and e.g. being calotte-shaped and resting on the ground.
The last-mentioned projection contributes in the support of the slabs, but resting on the surface of the ground it will not freeze together with the freezable stratum but will in the lateral direction be secured by the pillars.
In order to increase the strength of the individual slabs, they may, according to the invention, have bracing ribs from one of the two kinds of projections to the other.
These bracing ribs can be placed in such a manner that they can also transfer the main part of the horizontal forces in the slabs as, according to the invention, the ribs are positioned so that they stretch mainly from horizontal supporting projections along the edge of the slabs to a centrally positioned vertical supporting projection under the centre of the slabs.
"ice
According to the invention each slab may have an electric heating element built-in and connected to electric cables in the side of the road. Thus the road can be kept frost-free, and snow and ice covering the road will thaw without the assistance of any snow-clearing service. It is often impossible for such a service to do its work fast enough, and in many countries it does not operate on Sundays and holidays. Ditches and other measures for drainage of the road are superfluous, as its underside will always be kept dry by the wind which may pass freely under it.
The narrow space between the slabs, the so-called expansion joints, may be filled in some known way with asphalt or other water-tight substances or organs so that precipitation will drain off over the lateral edge of the slightly curved roadway.
Whereas road markings must be renewed often owing to wear as they are made on the spot and as it must be possible to wipe them out in case of alterations to the road or trafiic regulations, it is, according to the invention, possible in the case of this road construction to build in or furnish the surface of the road with e.g. road stripes, skidding stripes, and acoustic danger signals at the factory, thus ensuring long durability. In case the above equipment is to be removed from the road, the entire slab is renewed.
According to the invention, each slab may during the manufacturing process be furnished with a wearing surface insulating against moisture, and this insulating layer may be applied with greater care and under more ideal conditions at a factory where this preparation can take place indoors and more conveniently by the aid of the requisite machinery than on site. Furthermore, the preparation as well as the finishing preparation can take place without the usual pressure of the traffic which leaves the least possible time for road works. The slabs should, according to the invention, meet this demand by the trafiic fully, as they are not repaired but renewed.
Moreover, road side fences may, according to the invention, be clamped to the sides of the slabs or be made as constituent parts of the roadway element.
In order to absorb stresses in the longitudinal direction of the roadway, caused e.g. by braking, over a great number of piles, the individual roadway element may be assembled to larger units, e.g. by means of cables passed through cable ducts in the roadway elements so that the cables run parallel with or diagonal to the longitudinal direction of the roadway, by means of spigot-and-socket joining of steel reinforcement, by means of bolting, or in some other known manner. By this also a reduction of the groove problem is obtained. This problem is also reduced by the fact that after a suitable storage period the pro-manufactured roadway elements will have gotten over the usual setting contraction before the installation.
On the drawing an example of a road construction made in accordance with the invention is shown.
FIG. 1 shows part of a road construction in perspective,
FIG. 2 shows, also in perspective, a slab forming part of the same construction and FIG. 3 shows the same slab seen from below in a slanting position.
On a number of piles 1 of concrete or some other material, which may either be rammed down or poured in holes in the ground, a number of transverse supports 2 made of reinforced concrete and with a curvature corresponding to the shape of the roadway have been positioned. Rows of slabs 3 have been placed on these supports and are held in position in the longitudinal direction by these supports 2 whereas they are held in position in the lateral direction by a detached road side fence 4 consisting of a horizontal concrete beam placed on a number of piles 5 which have been rammed so deep in the ground, as is also the case with the piles 1, that they have passed through the strata 6 frozen in the winter, and are solidly anchored in the strata below.
Each slab has a hole 7 in the centre of its overside in which there is a ring 8 by means of which the slab can be lifted from its place.
The underside of the slab is equipped with a number of ribs 9 for bracing. These ribs stretch from the edge of the slab towards a calotte-shaped projection 10 in the centre of the slab. The slab can rest on the ground by the aid of this projection, but this must not necessarily be so.
The slab, which is finished at the factory, has an electric heating element built into its surface coating, consisting of a material insulating against moisture, or immediately under this coating, and the heating element is connected electrically with cables 11 in an external cable box 12 on the fence 4.
It is assumed that the upper layer of steel reinforcement in the slab can be used as heating element.
By electric heating it is not only possible to thaw snow and ice covering the road so that clearing away of snow and gravelling are made superfluous, but it is also possible to dry the road comparatively quickly after precipitation.
Such pre-manufactured slabs can be richly varied with regard to surface equipment. Thus they can be equipped with grouted in road stripes, marking of pedestrian crossings, acoustic road marking in the form of transverse grooves of varying size, etc., just as it will be possible to make the surface granulated or grooved or in some other way skid-proof.
The advantage of the road construction is, according to the invention, first and foremost that the nature of the ground is of no importance and that generally it will not be necessary to move any earth before the road is constructed.
Besides, the road can be constructed across areas fiooded part of the year. Drainage or sewerage is not necessary. The water runs off the roadway at the side fence 4 which has vertical grooves 13 on its inside to ensure the drainage.
The road is easy to repair. Repairs are effected simply by renewing one or more slabs 3. Thus the periods during which the roadway is blocked to the trafiic are limited to a minimum.
The underside of the road is kept dry by the wind and is therefore not exposed to decomposition. Rainwater may, furthermore, drain off through the intervals 14 between the slabs 3, but generally it will be preferred to fill the expansion joints with asphalt so that the overside of the roadway forms a water-tight whole.
In the same way as the piles are introduced in holes in the underside of the fence 4 the piles 1 are introduced in holes in the transverse supports 2. Instead these supports can be laid in grooves on top of the piles 1 or the piles may have vertical guide pins introduced in holes in the supports 2.
' Under the middle of each slab 3 sand or pebble gravel can be spread over the ground in advance in support of the calotte-shaped part of the slab.
Even if each slab can be made with a considerable thickness and strength so as to be able to carry the traffic for which the road is destined, it will be possible to save substantial amounts during the construction, according to the invention, as excavation and sewerage are avoided, and the result is a road which is not exposed to the well known frost injuries occurring every year when the frozen stratum thaws.
What I claim and desire to secure by Letters Patent is:
1. A roadway construction comprising piles extending into the ground sufficiently below the frost line to provide road support and having upper end portions extending above the ground surface, beams supported on the upper ends of said piles and extending transversely of the roadway at selected spaced intervals, said beams having a rectangular cross section with fiat upper surfaces and opposed vertical side surfaces, a plurality of rectangular premanufactured concrete slabs each having a length slightly less than the center-to-center spacing of said beams and a width which is a unit fraction of the width of the roadway, each of said slabs extending between and being supported by two successive beams and having end portions which are notched to provide fiat lower surfaces resting on the flat upper surfaces of said beams and vertically downwardly extending shoulders engagable with said side surfaces of said beams, a plurality of said slabs being laid side-by-side to make up the desired width of the roadway, said slabs having on their under sides downwardly projecting integral ribs extending generally lengthwise of said slabs and having vertical end faces which are coplanar with said shoulders and abut said vertical side surfaces of the beams at the ends of the respective slabs, means confining said slabs at the sides of said roadway against laterally outward movement, said slabs being spaced from adjacent slabs in both a longitudinal and a transverse direction to provide narrow spaces between adjacent slabs, and compressible material filling said spaces to provide water tightness while permitting limited movement in both longitudinal and transverse directions arising from expansion and contraction of said slabs.
2. A roadway according to claim 1, in which said means for confining said slabs at the sides of the roadway comprises curbs extending longitudinally of the roadway at each side thereof and projecting above said slabs and piles supporting said curbs above the ground and extending into the ground sufficiently below the frost line to provide permanent support.
3. A roadway according to claim 1, in which each slab is formed in its upper face with a central recess and in which a lifting ring for said slab is anchored in said recess.
4. A roadway according to claim 1, in which said beams are arched in a direction longitudinal of the beams and transverse of the roadway.
References Cited by the Examiner UNITED STATES PATENTS 510,831 12/93 Beeching 9427 663,199 12/00 Shepard 9427 776,419 11/04 Platt 94-11 930,153 8/09 Butz 94-11 1,254,401 1/18 Cole et a1. 94-11 1,331,265 2/20 Kelly 94-31 1,426,003 8/22 Orrock. 1,435,618 11/22 Newell 9411 1,726,222 8/29 Gregg 94 31 X 1,729,256 9/29 Honberger 94-19 X 1,891,595 12/32 Grierson 52173 XR 2,042,377 5/36 Bamber 9419 2,042,964 6/36 Rinehart 945 3,023,986 3/62 Nallinger 244-114 FOREIGN PATENTS 818,983 6/37 France.
226,057 12/24 Great Britain.
290,091 5/28 Great Britain.
310,131 4/29 Great Britain.
CHARLES E. OCONNELL, Primary Examiner.
JACOB L. NACKENOFF, Examiner.

Claims (1)

1. A ROADWAY CONSTRUCTION COMPRISING PILES EXTENDING INTO THE GROUND SUFFICIENTLY BELOW THE FROST LINE TO PROVIDE ROAD SUPPORT AND HAVING UPPER END PORTIONS EXTENDING ABOVE THE GROUND SURFACE, BEAMS SUPPORTED ON THE UPPER ENDS OF SAID PILES AND EXTENDING TRANSVERSELY OF THE ROADWAY AT SELECTED SPACED INTERVALS, SAID BEAMS HAVING A RECTANGULAR CROSS SEFCTION WITH FLAT UPPER SURFACES AND OPPOSED VERTICAL SIDE SURFACES, A PLURALITY OF RECTANGULAR PERMANUFACTURED CONCRETE SLABS EACH HAVING A LENGTH SLIGHTLY LESS THAN THE CENTER-TO-CENTER SPACING OF SAID BEAMS AND WIDTH WHICH IS A UNIT FRACTION OF THE WIDTH OF THE ROADWAY, EACH OF SAID SLABS EXTENDING BETWEEN AND BEING SUPPORTED BY TWO SUCCESSIVE BEAMS AND HAVING END PORTIONS WHICH ARE NOTCHED TO PROVIDE FLAT LOWER SURFACES RESTING ON THE FLAT UPPER SURFACES OF SAID BEAMS AND VERTICALLY DOWNWARDLY EXTENDING SHOULDERS ENGAGABLE WITH SAID SIDE SURFACES OF SAID BEAMS, A PLURALITY OF SAID SLABS BEING LAID SIDE-BY-SIDE TO MAKE UP THE DESIRED WIDTH OF THE ROADWAY, SAID SLABS HAVING ON THEIR UNDER SIDES DOWNWARDLY PROJECTING INTEGRAL RIBS EXTENDING GENERALLY LENGTHWISE OF SAID SLABS AND HAVING VERTICAL END FACES WHICH ARE COPLANAR WITH SAID SHOULDERS AND ABUT SAID VERTICAL SIDE SURFACES OF THE BEAMS AT THE ENDS OF THE RESPECTIVE SLABS, MEANS CONFINING SAID SLABS AT THE SIDES OF SAID ROADWAY AGASINST LATERALLY OUTWARD MOVEMENT, SAID SLABS BEING SPACED FROM ADJACENT SLABS IN BOTH A LONGITUDINAL AND A TRANSVERSE DIRECTION TO PROVIDE NARROW SPACES BETWEEN ADJACENT SLABS, AND COMPRSSIBLE MATERIAL FILLING SAID SPACES TO PROVIDE WATER TIGHTNESS WHILE PERMITTING LIMITED M OVEMENT IN BOTH LONGITUDINAL AND TRANSVERSE DIRECTIONS ARISING FROM EXPANSION AND CONTRACTION OF SAID SLABS.
US126978A 1960-07-27 1961-07-26 Road construction Expired - Lifetime US3213768A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DK296560 1960-07-27

Publications (1)

Publication Number Publication Date
US3213768A true US3213768A (en) 1965-10-26

Family

ID=8117626

Family Applications (1)

Application Number Title Priority Date Filing Date
US126978A Expired - Lifetime US3213768A (en) 1960-07-27 1961-07-26 Road construction

Country Status (4)

Country Link
US (1) US3213768A (en)
AT (1) AT246768B (en)
DE (1) DE1409848A1 (en)
GB (1) GB945999A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4145153A (en) * 1978-03-22 1979-03-20 The Port Authority Of New York And New Jersey Method of replacing a roadway
USD253491S (en) 1977-10-07 1979-11-20 A - Betong AB Sealing stripe for a level crossing between a road and a railroad
US4628645A (en) * 1984-05-14 1986-12-16 Tafelski Jr Roman J Portable deck
US4918777A (en) * 1987-12-07 1990-04-24 Ashley Eddie L Slab-stem unit forming a trafficway
US5255996A (en) * 1990-12-27 1993-10-26 Kiat Ong S Method of constructing a roadway
GB2277766A (en) * 1990-04-30 1994-11-09 Say Kiat Ong Method of constructing a roadway
US5771518A (en) * 1989-06-16 1998-06-30 Roberts; Michael Lee Precast concrete bridge structure and associated rapid assembly methods
US5863148A (en) * 1996-08-27 1999-01-26 Shivaram; Mukundan Prefabricated highway with end supports
US6825444B1 (en) * 1999-01-29 2004-11-30 Board Of Regents Of University Of Nebraska Heated bridge deck system and materials and method for constructing the same
US20110052318A1 (en) * 2008-05-01 2011-03-03 Steven George Smith Method of installing a paving system
CN103343501A (en) * 2013-06-26 2013-10-09 中国建筑股份有限公司 Bridge type pavement structure system with prefabricated reinforced concrete trough plate and construction method
US9011036B2 (en) * 2009-03-04 2015-04-21 Cpg International Llc Methods for installing a bounded paving system
US20170073903A1 (en) * 2015-09-15 2017-03-16 Incubator Industries, L.P. Mat
CN106522052A (en) * 2016-12-15 2017-03-22 福州幻科机电科技有限公司 Urban road structure with rainwater collecting and solar power generation functions

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH667679A5 (en) * 1985-06-11 1988-10-31 St Fritz Und Ch Fahrni Fa FLOOR COVERING ARRANGEMENT FOR WALK-ON AND DRIVE-ON COVERING OF TREE PANES.
CH674034A5 (en) * 1987-03-17 1990-04-30 Cewag Duedingen Tree trunk base surrounding slab - comprises concrete or stone panels with recesses for trunk and air circulation-water drain holes
FR2637624A1 (en) * 1988-10-07 1990-04-13 Carbonatto Andre Modular curbstone for providing a passage for the handicapped
GB2310223A (en) * 1996-02-14 1997-08-20 Hugh Christopher Frost Constructing an area of hard standing; piles and slabs therefor
BE1014508A3 (en) * 2002-02-14 2003-11-04 Echo Draining ROAD SURFACE.
CN104947561A (en) * 2015-06-17 2015-09-30 天津住宅集团建设工程总承包有限公司 Precast concrete assembling road construction method

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US510831A (en) * 1893-12-12 David g
US663199A (en) * 1899-11-22 1900-12-04 T H Brooks & Co Vault-light construction.
US776419A (en) * 1903-10-21 1904-11-29 Charles H Platt Pavement.
US930153A (en) * 1909-02-17 1909-08-03 Samuel Butz Paving-block.
US1254401A (en) * 1915-10-23 1918-01-22 Dwight S Cole Road construction.
US1331265A (en) * 1919-01-15 1920-02-17 Thomas W Kelly Reinforced-concrete curb structure
US1426003A (en) * 1920-12-06 1922-08-15 John M R Fairbairn Weather cover for track scales
US1435618A (en) * 1921-12-16 1922-11-14 Alfred T Newell Roadway
GB226057A (en) * 1924-01-21 1924-12-18 Cesar Jean Marie Lancette Improved method of covering roads with reinforced concrete
GB290091A (en) * 1927-09-17 1928-05-10 Tom Hilton Improvements in and relating to road and footpath construction
GB310131A (en) * 1928-02-23 1929-04-25 Granwood Flooring Company Ltd Improvements in, or relating to, floors, roads, pavements and the like
US1726222A (en) * 1927-05-27 1929-08-27 Frank L Shidler Method and means for forming concrete pavements, etc.
US1729256A (en) * 1926-09-13 1929-09-24 Frank S Honberger Protected concrete block for paving and the like
US1891595A (en) * 1929-02-25 1932-12-20 Grierson Ronald Electric wall heater
US2042377A (en) * 1935-03-29 1936-05-26 Bamber Arthur Kelway Paving of tennis courts and the like
US2042964A (en) * 1932-11-02 1936-06-02 Johns Manville Preformed semirigid unit and method of making the same
FR818983A (en) * 1937-03-10 1937-10-07 Light strips for reserved passages
US3023986A (en) * 1956-06-12 1962-03-06 Friedrich K H Nallinger Runway construction

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US510831A (en) * 1893-12-12 David g
US663199A (en) * 1899-11-22 1900-12-04 T H Brooks & Co Vault-light construction.
US776419A (en) * 1903-10-21 1904-11-29 Charles H Platt Pavement.
US930153A (en) * 1909-02-17 1909-08-03 Samuel Butz Paving-block.
US1254401A (en) * 1915-10-23 1918-01-22 Dwight S Cole Road construction.
US1331265A (en) * 1919-01-15 1920-02-17 Thomas W Kelly Reinforced-concrete curb structure
US1426003A (en) * 1920-12-06 1922-08-15 John M R Fairbairn Weather cover for track scales
US1435618A (en) * 1921-12-16 1922-11-14 Alfred T Newell Roadway
GB226057A (en) * 1924-01-21 1924-12-18 Cesar Jean Marie Lancette Improved method of covering roads with reinforced concrete
US1729256A (en) * 1926-09-13 1929-09-24 Frank S Honberger Protected concrete block for paving and the like
US1726222A (en) * 1927-05-27 1929-08-27 Frank L Shidler Method and means for forming concrete pavements, etc.
GB290091A (en) * 1927-09-17 1928-05-10 Tom Hilton Improvements in and relating to road and footpath construction
GB310131A (en) * 1928-02-23 1929-04-25 Granwood Flooring Company Ltd Improvements in, or relating to, floors, roads, pavements and the like
US1891595A (en) * 1929-02-25 1932-12-20 Grierson Ronald Electric wall heater
US2042964A (en) * 1932-11-02 1936-06-02 Johns Manville Preformed semirigid unit and method of making the same
US2042377A (en) * 1935-03-29 1936-05-26 Bamber Arthur Kelway Paving of tennis courts and the like
FR818983A (en) * 1937-03-10 1937-10-07 Light strips for reserved passages
US3023986A (en) * 1956-06-12 1962-03-06 Friedrich K H Nallinger Runway construction

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
USD253491S (en) 1977-10-07 1979-11-20 A - Betong AB Sealing stripe for a level crossing between a road and a railroad
US4145153A (en) * 1978-03-22 1979-03-20 The Port Authority Of New York And New Jersey Method of replacing a roadway
US4628645A (en) * 1984-05-14 1986-12-16 Tafelski Jr Roman J Portable deck
US4918777A (en) * 1987-12-07 1990-04-24 Ashley Eddie L Slab-stem unit forming a trafficway
US5771518A (en) * 1989-06-16 1998-06-30 Roberts; Michael Lee Precast concrete bridge structure and associated rapid assembly methods
GB2277766A (en) * 1990-04-30 1994-11-09 Say Kiat Ong Method of constructing a roadway
GB2277766B (en) * 1990-04-30 1995-01-25 Say Kiat Ong Method of constructing a roadway
US5255996A (en) * 1990-12-27 1993-10-26 Kiat Ong S Method of constructing a roadway
US5863148A (en) * 1996-08-27 1999-01-26 Shivaram; Mukundan Prefabricated highway with end supports
US5978998A (en) * 1996-08-27 1999-11-09 Shivaram; Mukundan Prefabricated highway with end supports
US6825444B1 (en) * 1999-01-29 2004-11-30 Board Of Regents Of University Of Nebraska Heated bridge deck system and materials and method for constructing the same
US20110052318A1 (en) * 2008-05-01 2011-03-03 Steven George Smith Method of installing a paving system
US8747018B2 (en) 2008-05-01 2014-06-10 Vast Enterprises, Llc Method of installing a paving system
US9194085B2 (en) 2008-05-01 2015-11-24 Cpg International Llc Method of installing a paving system
US9011036B2 (en) * 2009-03-04 2015-04-21 Cpg International Llc Methods for installing a bounded paving system
US9175445B2 (en) 2009-03-04 2015-11-03 Cpg International Llc Methods for installing a bounded paving system
CN103343501A (en) * 2013-06-26 2013-10-09 中国建筑股份有限公司 Bridge type pavement structure system with prefabricated reinforced concrete trough plate and construction method
CN103343501B (en) * 2013-06-26 2015-10-28 中国建筑股份有限公司 Bridge-type prefabricated reinforced concrete trough slab road structural system and construction method
US20170073903A1 (en) * 2015-09-15 2017-03-16 Incubator Industries, L.P. Mat
US10060079B2 (en) * 2015-09-15 2018-08-28 Medencentive, Llc Mat
CN106522052A (en) * 2016-12-15 2017-03-22 福州幻科机电科技有限公司 Urban road structure with rainwater collecting and solar power generation functions

Also Published As

Publication number Publication date
DE1409848A1 (en) 1968-10-24
GB945999A (en) 1964-01-08
AT246768B (en) 1966-05-10

Similar Documents

Publication Publication Date Title
US3213768A (en) Road construction
US9689116B2 (en) Rail track sleeper support
CN205116217U (en) Height is filled and is prefabricated cast -in -place combination formula stake siding wall protective structure
US4909662A (en) Roadway and method of construction
US2174035A (en) Sidewalk, floor, or roadway construction
KR20210108262A (en) Road side ditch repair method
US3125009A (en) Figure
RU2755102C1 (en) Auto-road
US3295276A (en) Bridge
EP1336688A1 (en) Draining road surface
JP2017008619A (en) Repair method of driving lane with swollen road bed of mountain tunnel of expressway, and suspension pier used therewith
CN111501459B (en) Roadbed structure of mountain road and construction method thereof
CN211772506U (en) Sponge urban concrete road roadbed structure
CA2288731A1 (en) Concrete surface
RU2812390C1 (en) Method for constructing reinforced concrete road surface from reinforced concrete sleepers and reinforced concrete road surface from reinforced concrete sleepers laid in this way (embodiments)
CN215051703U (en) road pavement repair structure
RU200809U1 (en) Sectional road surface
WO2025080166A1 (en) Method for installing a reinforced concrete pavement
CA2187041C (en) Construction for railways supports without ties and ballast
KR100967904B1 (en) Non-blocking railway bridge expansion method using propellant
KR100229213B1 (en) Prefab highway construction method
CN119507283A (en) A bridgehead section roadbed for weakening differential settlement and a construction method thereof
RU88685U1 (en) DIRT ROAD WITH REINFORCED ROAD CLOTHING
CN203834314U (en) Transverse water intercepting ditch for road
CN117051625A (en) Ballasted track roadbed structure containing ballasting measures and construction method thereof