GB2277766A - Method of constructing a roadway - Google Patents

Method of constructing a roadway Download PDF

Info

Publication number
GB2277766A
GB2277766A GB9410072A GB9410072A GB2277766A GB 2277766 A GB2277766 A GB 2277766A GB 9410072 A GB9410072 A GB 9410072A GB 9410072 A GB9410072 A GB 9410072A GB 2277766 A GB2277766 A GB 2277766A
Authority
GB
United Kingdom
Prior art keywords
piles
roadway
slabs
pile cap
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB9410072A
Other versions
GB2277766B (en
GB9410072D0 (en
Inventor
Heng Beng Lam
Say Kiat Ong
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority claimed from GB9108272A external-priority patent/GB2243637B/en
Publication of GB9410072D0 publication Critical patent/GB9410072D0/en
Publication of GB2277766A publication Critical patent/GB2277766A/en
Application granted granted Critical
Publication of GB2277766B publication Critical patent/GB2277766B/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/06Pavings made of prefabricated single units made of units with cement or like binders
    • E01C5/08Reinforced units with steel frames
    • E01C5/10Prestressed reinforced units ; Prestressed coverings from reinforced or non-reinforced units
    • E01C5/105Prestressed reinforced units ; Prestressed coverings from reinforced or non-reinforced units on prefabricated supporting structures or prefabricated foundation elements, except coverings made of layers of similar elements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/006Foundations for pavings made of prefabricated single units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/06Pavings made of prefabricated single units made of units with cement or like binders
    • E01C5/08Reinforced units with steel frames
    • E01C5/085Reinforced units with steel frames on prefabricated supporting structures or prefabricated foundation elements except coverings made of layers of similar elements

Abstract

A method of constructing a roadway involves placing piles 8 in the ground G and installing pile cap beams 6 so that each beam 6 extends across a plurality of the piles 8. Slabs 4 are supported on the pile cap beams such that the slabs are disposed on the ground surface and an asphaltic layer 10 may be laid over the slabs. The pile cap beams 6 have openings (32, Fig. 8) in which the piles 6 freely fit, concrete being poured into the openings when the pile cap beams are installed over the piles. <IMAGE>

Description

METHOD OF CONSTRUCTING A ROADWAY The present invention relates to a method of constructing a roadway. A roadway in this specification means a highway or other paved surface (e.g. a runway).
Conventional methods for constructing a roadway involve the excavation of large volumes of material, so that a complicated system of supporting strata can be laid and compacted beneath the paved surface, to provide a sufficiently stable foundation.
In regions where the ground is soft, even greater volumes of material must be removed, and replaced by foundation material. To ensure that settlement of the eventual paved surface is not excessive, extensive soil investigations are required before work can proceed.
Where it is necessary to raise the level of the roadway, this has previously been achieved by compacting earth fill or by constructing a multi-span bridge structure onto which was laid a road surface. A common problem with earth filled embankments is to find a suitable source of earth. Often the earth must be transported a considerable distance to the required site. The cost of construction is therefore very high.
In addition, the earth fill method requires the imported earth to be properly compacted to the required level and this normally takes a considerable time since the compaction procedure requires the compaction of many individual layers of fill. A further complication is the need to provide culverts to maintain the natural water flow underneath the embankment. Despite these many disadvantages the earth fill method of embankment construction is the most common, since the "bridge" type method of embankment construction is even more expensive.
According to the present invention there is provided a method of constructing a roadway comprising placing piles in the ground and supporting preformed slabs on the piles, such that the slabs are disposed on the surface of the ground.
Pile caps may be installed on the piles, the preformed slabs being supported on the pile caps. The pile caps may comprise beams which extend across a plurality of the piles.
The preformed slabs may be made from precast concrete and may be reinforced and may also be prestressed. A large supply of slabs can be assembled on site before work begins, and so considerable time can be saved during construction, since the amount of in situ casting may be substantially reduced or eliminated.
In addition, extensive soil investigations are not necessary to ensure that the settlement of the paved surface will be within acceptable limits, since the piles may be arranged to transfer load over a greater depth than known paving methods. The use of a Mackintosh probe to determine the soil conditions has been found sufficient. The length and spacing of the piles can be adjusted to suit the particular strata encountered, to ensure that the load is transferred to stronger deeper lying strata, and to minimise differential settlement Preferably each slab is short in length and is supported directly on respective low bearing capacity piles at the ends only of the slab.
It is possible to create a roadway with a smooth gradually changing gradient using flat slabs, provided that the slabs are short in length. If necessary, curved slabs could be used to enhance the ride quality.
The amount of excavation required using a piled foundation system is greatly reduced and backfill does not require the same degree of compaction. The cost of construction is therefore further reduced, as is the likelihood of work being suspended due to adverse weather conditions.
Since the span between supports is kept short, the piles, pile cap beams, and slabs are all easily manageable and transportable and, since these elements are all preformed, construction can be made a continuous process which does not suffer from delays whilst large volumes of newly cast concrete cure on site. The overall speed of construction is therefore greater than by a conventional system.
A particular advantage of using precast concrete slabs is that quality control at the casting and curing stages is extremely good, whilst the unit cost of the precast slabs is kept low. The high quality and dimensional accuracy of the precast slabs makes assembly of the roadway and the laying of asphaltic road surfacing easier, and hence improves the ride quality of the finished roadway.
The preformed slabs may be provided with ducts or may be hollow, so that the requirement for providing additional culverts is effectively eliminated. Indeed, the natural flow of surface water present before construction, is hardly effected by a roadway according to the present invention.
For a better understanding of the present invention, and to show how it may be carried into effect, reference will now be made, by way of example, to the accompanying drawings, in which: Figure 1 is a plan view of a roadway; Figure 2 is a side view of the roadway taken along line AA in Figure 1; Figure 3 is a cross-section through the roadway taken on line BB in Figure 1; Figure 4 shows the layout of piles beneath a pile cap beam; Figure 5 is an enlarged fragmentary view of the pile cap beam; Figure 6 shows the pile cap beam positioned over the piles; Figure 7 is a detailed side view of the roadway; Figure 8 is an elevation of another form of roadway.
Referring to Figures 1 to 3, a roadway 2 comprises precast reinforced concrete slabs 4 supported on precast reinforced concrete pile cap beams 6. The beams 6 are connected to the tops of precast reinforced concrete piles 8 driven into the ground G by means of a conventional jack-in piling system. An asphaltic layer 10 is laid over the slabs 4 by a known process and provides a smooth continuous road surface.
Figure 4 shows the distribution of piles 8 beneath a pile cap beam 6. In the embodiment shown, piles 8 are disposed in pairs at equal intervals along the length of the pile cap beam 6.
As shown in Figure 5, the pile cap beam 6 is provided with openings 32 when it is cast. The size and spacing of the openings 32 corresponds to the size and spacing of the piles 8, so that the pile cap beams 6 fit freely over exposed ends 44 of the piles 8.
Figure 6 shows a pile cap beam 6 in place over a pair of piles 8. A tapered opening 46 is cast into the pile cap beam 6 to accommodate a fixing nut 48.
Figure 7 shows in detail the assembled structure of the roadway 2. After positioning the pile cap beam 6 over the piles 8, concrete is poured into the openings 32 and is compacted by vibration. Laminated elastomeric bearing strips 30 are then laid onto the pile cap beams 6 and the slabs 4 are laid end to end on top of the strips 30. The strips 30 are used to ensure that the slabs 4 rest evenly on the pile cap beams 6.
A bolt 42, provided with a washer 24, is inserted between the end of the slabs 4 into the fixing nut 48, and is tightened to secure the slabs 4 relative to the pile cap beams 6.
The pile cap beam 6 may be set at ground level or a trench may be excavated and the pile cap beam 6 set in the trench. Where back filling is necessary, the back-fill does not have to be compacted as much as in conventional roadway construction.
Once the slabs 4 are in place and have been properly aligned, the asphaltic concrete road surface 10 is laid on top of the slabs 4 in a known manner.
Figure 8 illustrates a roadway with an even or gradually changing gradient in an area of weak soil strata SG. For example, the roadway may be the approach to a bridge or elevated highway section.
Soft ground piles 34 are driven into the soft ground SG at regular intervals and are then capped.
Fill material F is then deposited over the ground SG, is compacted, and the correct gradient established, by known earth moving equipment.
Piles 8 are then driven through the newly formed embankment into the original ground SG. The roadway 2 is then constructed as described above.
Where the loading on the roadway will be very large and where it is desirable for the slabs 4 and beams 6 to be slender they may be made from prestressed concrete.
Ducts may be cast through the slabs 4 so that cables and pipes may be passed under the roadway. If hollow slabs 4 are used, no special ducts are required since the pipes and cables may be passed through the hollow interior of the slabs 4.
It should be noted that any combination of size, shape and distribution of piles, pile cap beams 6, and slabs 4 is contemplated, depending on the particular soil conditions encountered and the type of roadway required.
A method of constructing an elevated roadway is described and claimed in our copending Application No.
9108272.7 (Serial No. 2243637).

Claims (8)

1. A method of constructing a roadway comprising placing piles in the ground and supporting preformed slabs on the piles, such that the slabs are disposed on the surface of the ground.
2. A method as claimed in claim 1, in which pile caps are installed on the piles, the preformed slabs being supported on the pile caps.
3. A method as claimed in claim 2, in which the pile caps comprise beams which extend across a plurality of the piles.
4. A method as claimed in claim 3, in which the pile cap beams extend transversely of the roadway.
5. A method as claimed in any one of the preceding claims, in which each slab is supported on respective piles at opposite edges only of the slab.
6. A method as claimed in any one of the preceding claims, in which the piles are placed in the ground over their full length.
7. A method as claimed in any one of the preceding claims, in which the piles are placed in the ground over only part of their length, the ground level then being raised by infill placed between the piles up to the level of the slabs.
8. A method substantially as described herein, with reference to Figures 1 to 7 or Figure 8 of the accompanying drawings.
8. A method as claimed in any one of the preceding claims, in which successive slabs in a longitudinal direction of the roadway are set at a successively greater angle to the horizontal, to form a curved roadway.
9. A method as claimed in of claim 8, in which the preformed slabs are curved.
10. A roadway constructed according to a method as claimed in any one of the preceding claims.
11. A method substantially as described herein, with reference to Figures 1 to 7 or Figure 8 of the accompanying drawings.
Amendments to the claims have been filed as follows CLAIMS
1. A method of constructing a roadway comprising placing piles in the ground, installing pile cap beams on the piles, each pile cap beam extending across a plurality of the piles, and supporting preformed slabs on the pile cap beams, such that the slabs are disposed on the surface of the ground, the pile cap beams having openings in which the piles fit freely, concrete being poured into the openings when the pile cap beans are installed over the piles.
2. A method as claimed in claim 1, in which the pile cap beams extend transversely of the roadway.
3. A method as claimed in any one of the preceding claims, in which each slab is supported on respective pile cap beams at opposite edges only of the slab.
4. A method as claimed in any one of the preceding claims, in which the piles are placed in the ground over their full length.
5. A method as claimed in any one of the preceding claims, in which successive slabs in a longitudinal direction of the roadway are set at a successively greater angle to the horizontal, to form a curved roadway.
6. A method as claimed in claim 5, in which the preformed slabs are curved.
7. A roadway constructed according to a method as claimed in any one of the preceding claims.
GB9410072A 1990-04-30 1991-04-18 Method of constructing a roadway Expired - Fee Related GB2277766B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
MYPI9000703 1990-04-30
MYPI9002280 1990-12-27
GB9108272A GB2243637B (en) 1990-04-30 1991-04-18 Method of constructing an elevated roadway

Publications (3)

Publication Number Publication Date
GB9410072D0 GB9410072D0 (en) 1994-07-06
GB2277766A true GB2277766A (en) 1994-11-09
GB2277766B GB2277766B (en) 1995-01-25

Family

ID=27265600

Family Applications (1)

Application Number Title Priority Date Filing Date
GB9410072A Expired - Fee Related GB2277766B (en) 1990-04-30 1991-04-18 Method of constructing a roadway

Country Status (2)

Country Link
CN (1) CN1062940A (en)
GB (1) GB2277766B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2350636A (en) * 1999-06-05 2000-12-06 Alan William Wayman A road construction method using an H beam
AT412734B (en) * 1996-07-10 2005-06-27 Bernard Ing Douet TRAFFIC AREA
CN111424481A (en) * 2020-03-10 2020-07-17 西南交通大学 Expansive soil cutting structure and construction method thereof

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320120B (en) * 2016-08-31 2019-04-30 安徽省经工建设集团有限公司 A kind of peg board formula is without dirt road base construction of the highway technique
CN112411294B (en) * 2020-11-25 2022-04-01 安徽百年基业建设工程有限公司 Construction method of highway asphalt pavement
CN113882353B (en) * 2021-11-01 2022-12-13 中国建筑第二工程局有限公司 Multi-pile type conversion disposal structure under complex geology of extreme racetrack and construction method thereof
CN114808581A (en) * 2022-05-13 2022-07-29 保利长大工程有限公司 Construction method for deep soft foundation low embankment shallow layer

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US776419A (en) * 1903-10-21 1904-11-29 Charles H Platt Pavement.
US3213768A (en) * 1960-07-27 1965-10-26 Jensen Jens Lauritz Road construction

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US776419A (en) * 1903-10-21 1904-11-29 Charles H Platt Pavement.
US3213768A (en) * 1960-07-27 1965-10-26 Jensen Jens Lauritz Road construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT412734B (en) * 1996-07-10 2005-06-27 Bernard Ing Douet TRAFFIC AREA
GB2350636A (en) * 1999-06-05 2000-12-06 Alan William Wayman A road construction method using an H beam
GB2350636B (en) * 1999-06-05 2003-09-17 Alan William Wayman The anchor beam construction system
CN111424481A (en) * 2020-03-10 2020-07-17 西南交通大学 Expansive soil cutting structure and construction method thereof

Also Published As

Publication number Publication date
GB2277766B (en) 1995-01-25
GB9410072D0 (en) 1994-07-06
CN1062940A (en) 1992-07-22

Similar Documents

Publication Publication Date Title
US5255996A (en) Method of constructing a roadway
US6962462B2 (en) Method of forming, installing and a system for attaching a pre-fabricated pavement slab to a subbase and the pre-fabricated pavement slab so formed
CN108678000B (en) U-shaped retaining structure for roadbed underpass highway and construction method thereof
US4909662A (en) Roadway and method of construction
US7004674B2 (en) Pre-fabricated warped pavement slab, forming and pavement systems, and methods for installing and making same
CN110438914B (en) Water passing box culvert on soft soil foundation and construction method thereof
CN111778941A (en) High-standard farmland channel construction method and structure
GB2277766A (en) Method of constructing a roadway
US4124963A (en) Method for forming a continuous footing
GB2243637A (en) Method of constructing a roadway
CN109082961B (en) Road construction method with steep slope
US20110110717A1 (en) Structure for Supporting Vehicular Traffic
CN111997030B (en) Soft soil reinforcing and curing method
US5189855A (en) Foundation raft for supporting a structure
US5551798A (en) Culvert end wall retainer system
WO2010104234A1 (en) Structural steel casing, retaining wall, construction method thereof, and construction method for levee maintenance and road expansion
RU2509841C2 (en) Monolithic system of base with resistant composite coating from homopolymer having semi-continuous configuration
Topolnicki Case history of a geogrid-reinforced embankment supported on vibro concrete columns
CN114318991B (en) Highway bench back structure in plain area, highway structure and construction method
CN109629592A (en) A kind of production method of ground logistics transportation pipeline
CN213114587U (en) Slope soft foundation reinforcing structure
US3191387A (en) Method for making permeable conduits in subterranean lines of drainage
JP3041323B2 (en) Septic tank equipment and septic tank installation method
JP2003147712A (en) Road surface lining execution method
RU2160340C2 (en) Method for laying underground service lines

Legal Events

Date Code Title Description
PCNP Patent ceased through non-payment of renewal fee

Effective date: 19990418