US20180010303A1 - Method for track renewal - Google Patents

Method for track renewal Download PDF

Info

Publication number
US20180010303A1
US20180010303A1 US15/547,176 US201615547176A US2018010303A1 US 20180010303 A1 US20180010303 A1 US 20180010303A1 US 201615547176 A US201615547176 A US 201615547176A US 2018010303 A1 US2018010303 A1 US 2018010303A1
Authority
US
United States
Prior art keywords
track
ballast bed
deposited
new
wagons
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US15/547,176
Other versions
US10385517B2 (en
Inventor
Manfred Brunninger
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Plasser und Theurer Export Von Bahnbaumaschinen GmbH
Original Assignee
Plasser und Theurer Export Von Bahnbaumaschinen GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Plasser und Theurer Export Von Bahnbaumaschinen GmbH filed Critical Plasser und Theurer Export Von Bahnbaumaschinen GmbH
Assigned to PLASSER & THEURER EXPORT VON BAHNBAUMASCHINEN GESELLSCHAFT M.B.H. reassignment PLASSER & THEURER EXPORT VON BAHNBAUMASCHINEN GESELLSCHAFT M.B.H. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BRUNNINGER, MANFRED
Publication of US20180010303A1 publication Critical patent/US20180010303A1/en
Application granted granted Critical
Publication of US10385517B2 publication Critical patent/US10385517B2/en
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/04Removing the ballast; Machines therefor, whether or not additionally adapted for taking-up ballast
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/02Placing the ballast; Making ballastway; Redistributing ballasting material; Machines or devices therefor; Levelling means
    • E01B27/022Placing the ballast; Making ballastway; Redistributing ballasting material; Machines or devices therefor; Levelling means by devices moving on the track with or without spreading or levelling
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/08Renewing or cleaning the ballast in situ, with or without concurrent work on the track the track having been taken-up
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/11Renewing or cleaning the ballast in situ, with or without concurrent work on the track combined with concurrent renewal of track components
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/02Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/05Transporting, laying, removing, or renewing both rails and sleepers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/02Removing or re-contouring ballast
    • E01B2203/024Inclined chain
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/03Displacing or storing ballast
    • E01B2203/034Displacing or storing ballast using storing containers
    • E01B2203/036Displacing or storing ballast using storing containers fixed to vehicle
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/04Cleaning or reconditioning ballast or ground beneath
    • E01B2203/045Cleaning or reconditioning ballast or ground beneath the ballast having been taken up
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/06Placing ballast
    • E01B2203/065Re-use of ballast
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/08Levelling ballast or ground beneath
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/10Track-lifting or-lining devices or methods
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/14Way of locomotion or support
    • E01B2203/141Way of locomotion or support on the track to be treated
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/14Way of locomotion or support
    • E01B2203/145Way of locomotion or support on the ballast
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/17Devices for working the railway-superstructure continually advancing

Definitions

  • the invention relates to a method for renewing a track and cleaning a ballast bed.
  • a method for rehabilitation of a track subgrade in which, by means of a bridge-like first track maintenance vehicle, a track panel is lifted off a ballast bed and temporarily removed in the longitudinal direction of the track.
  • the old ballast bed is excavated by means of a second vehicle.
  • a formation protection layer as well as new ballast is introduced into the renewal gap.
  • the old track panel is laid or reinstalled, the panel having been stored on the first vehicle, suspended from the frame of the same, during the bedding rehabilitation process.
  • a track maintenance machine for partial renewal of a track is known from CH 657 649, said machine consisting of a carrying beam supported at its ends on two on-track undercarriages. This beam is placed above a track panel to be removed, which is lifted up and fixed to the beam. Then the machine is moved on crawler tracks along the track renewal gap, during which the old ballast bed is removed by means of a clearing chain provided at the end of the beam, and new ballast is brought in. Upon the latter, the old track panel is subsequently laid down again.
  • this object is achieved with a method of the specified kind by way of the features cited in the characterizing part of the main claim.
  • a method of this kind offers the advantage that a complete track renewal is possible which includes transporting away the old rails and, taking place parallel thereto, bringing on new rails. In an advantageous way, this renders unnecessary two additional track closures required for a removal of the old rails and a delivery of new rails which, as a rule, are pre-deposited laterally next to the track to be renewed.
  • FIG. 1 is a schematic side view (shown in two parts for reasons of space) of the front section of an installation for track renewal and ballast cleaning
  • FIG. 2 is an enlarged detail view of a part of the installation
  • FIG. 3 is a schematic side view of the rear section of the installation.
  • An installation 1 serves for renewal of a track 2 and for cleaning of a ballast bed 3 and consists essentially of a number of track maintenance vehicles, arranged one following the other in the longitudinal direction of the track, which are mobile in a working direction 4 on on-track undercarriages 5 and, in part, additionally on crawler tracks 6 .
  • the front section of the installation 1 shown in FIG. 1 , is dedicated to dismantling the old track 2 and is composed of a panel removing machine 7 and several track panel wagons 8 preceding the same in the working direction 4 .
  • Located at the front end of the installation 1 is a loading wagon 9 to which hopper cars 10 are coupled.
  • An independently mobile ballast bed cleaning machine 11 follows the panel removing machine 7 .
  • the rear section of the installation 1 serves for laying a new track 2 and includes a sleeper laying machine 12 , following the cleaning machine 11 in the working direction 4 , to which a motor wagon 13 as well as a number of sleeper wagons 14 are coupled.
  • the method of track renewal starts with the removal of the old track 2 in sections, in which a track panel 15 is in each case lifted off the ballast bed 3 by means of the panel removing machine 7 , thus creating a renewal gap 17 , and is transported towards the front in the working direction 4 with the aid of a gantry crane 16 ( FIG. 1 ), where the track panel 15 is deposited on one of the track panel wagons 8 riding on the old track 2 .
  • the front end of the panel removing machine 7 is supported via on-track undercarriages 5 on the old track 2 while the rear end of the machine 7 rests in the renewal gap 17 on the now exposed ballast bed 3 via a crawler track 6 lowered for this purpose.
  • the cleaning machine 11 following in the renewal gap 17 and also moving on lowered crawler tracks 6 , takes up the ballast bed 3 by means of a clearing chain 18 and cleans it in a screening plant 19 .
  • the cleaned ballast 20 is discharged right away again via a chute 21 and graded behind the rear crawler track 6 .
  • the spoil 32 accruing in the screening plant 19 is transported forward in the working direction 4 of the installation 1 via a conveyor belt road 23 underneath the track panels 15 deposited on the track panel wagons 8 , where it is discharged via the loading wagon 9 ( FIG. 1 ) into the hopper cars 10 for storage.
  • a conveyor belt 24 of the conveyor belt road 23 is designed to be vertically pivotable by means of a drive 25 . While the track panel 15 is shifted forward through the region of said conveyor belt 24 , the transporting of the spoil is briefly interrupted.
  • the forward motions of the panel removing machine 7 and the trailing cleaning machine 11 must be coordinated with one another in such a manner that a continuous transfer of the spoil 32 to a rear end 33 of the conveyor belt road 23 is possible.
  • the independently mobile sleeper laying machine 12 follows the cleaning machine 11 at a certain distance and, during this, is supported at its front end by a crawler track 6 in the renewal gap 17 on the new or cleaned ballast 20 .
  • new sleepers 27 which are brought on in layers with the aid of a gantry crane 28 are continuously laid down by means of a sleeper laying device 26 .
  • the new sleepers 27 are stored on sleeper wagons 14 (not shown in detail) arranged at the rear end of the installation 1 , wherein additionally new rails 29 are also stored underneath the new sleepers 27 .
  • these new rails 29 are gripped in pairs by means of a gripping device 30 with the aid of the gantry crane 28 and transported forward in the working direction 4 up to a front transfer position 31 .
  • the free ends of the new rails 29 are received by suitable rail tongs 34 —fastened to the cleaning machine 11 —and pulled forward into the renewal gap 17 and then temporarily deposited on the cleaned ballast 20 of the ballast bed 3 .
  • the pre-deposited new rails 29 are lifted from the ballast bed 3 , spread onto the new sleepers 27 and connected to the same to form the renewed track 2 .

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

In a method for renewing a track (2) and cleaning a ballast bed (3), the old track (2) is lifted off the ballast bed in sections as a track panel (15), transported forward in a working direction (4) and deposited on track panel wagons (8). The exposed ballast bed (3), forming a renewal gap (17), is cleaned by a cleaning machine (11), spoil (32) accruing in the process is transported forward underneath the track panels (15) deposited on the track panel wagons (8), and stored in hopper cars (10). New rails (29), pre-deposited underneath new sleepers (27) positioned on sleeper wagons (14), are pulled forward into the renewal gap (17) by the cleaning machine (11) and deposited on the cleaned ballast bed (3). The new sleepers (27) are laid down on the cleaned ballast bed and connected to the new rails (29) lifted off the ballast bed (3).

Description

  • The invention relates to a method for renewing a track and cleaning a ballast bed.
  • According to AT 368 217, a method for rehabilitation of a track subgrade is known in which, by means of a bridge-like first track maintenance vehicle, a track panel is lifted off a ballast bed and temporarily removed in the longitudinal direction of the track. In the renewal gap thus created, the old ballast bed is excavated by means of a second vehicle. Thereafter—again by means of the first vehicle—a formation protection layer as well as new ballast is introduced into the renewal gap. Upon this new bedding, the old track panel is laid or reinstalled, the panel having been stored on the first vehicle, suspended from the frame of the same, during the bedding rehabilitation process.
  • A track maintenance machine for partial renewal of a track is known from CH 657 649, said machine consisting of a carrying beam supported at its ends on two on-track undercarriages. This beam is placed above a track panel to be removed, which is lifted up and fixed to the beam. Then the machine is moved on crawler tracks along the track renewal gap, during which the old ballast bed is removed by means of a clearing chain provided at the end of the beam, and new ballast is brought in. Upon the latter, the old track panel is subsequently laid down again.
  • It is the object of the present invention to provide a method of the kind mentioned at the beginning with which a simplified complete track renewal is possible.
  • According to the invention, this object is achieved with a method of the specified kind by way of the features cited in the characterizing part of the main claim.
  • A method of this kind offers the advantage that a complete track renewal is possible which includes transporting away the old rails and, taking place parallel thereto, bringing on new rails. In an advantageous way, this renders unnecessary two additional track closures required for a removal of the old rails and a delivery of new rails which, as a rule, are pre-deposited laterally next to the track to be renewed.
  • Additional advantages of the invention become apparent from the dependent claim and the drawing description.
  • The invention will be described in more detail below with reference to an embodiment represented in the drawing in which FIG. 1 is a schematic side view (shown in two parts for reasons of space) of the front section of an installation for track renewal and ballast cleaning, FIG. 2 is an enlarged detail view of a part of the installation, and FIG. 3 is a schematic side view of the rear section of the installation.
  • An installation 1, visible in the drawings, serves for renewal of a track 2 and for cleaning of a ballast bed 3 and consists essentially of a number of track maintenance vehicles, arranged one following the other in the longitudinal direction of the track, which are mobile in a working direction 4 on on-track undercarriages 5 and, in part, additionally on crawler tracks 6. The front section of the installation 1, shown in FIG. 1, is dedicated to dismantling the old track 2 and is composed of a panel removing machine 7 and several track panel wagons 8 preceding the same in the working direction 4. Located at the front end of the installation 1 is a loading wagon 9 to which hopper cars 10 are coupled. An independently mobile ballast bed cleaning machine 11 follows the panel removing machine 7.
  • The rear section of the installation 1, visible in FIG. 3, serves for laying a new track 2 and includes a sleeper laying machine 12, following the cleaning machine 11 in the working direction 4, to which a motor wagon 13 as well as a number of sleeper wagons 14 are coupled.
  • The method of track renewal according to the invention starts with the removal of the old track 2 in sections, in which a track panel 15 is in each case lifted off the ballast bed 3 by means of the panel removing machine 7, thus creating a renewal gap 17, and is transported towards the front in the working direction 4 with the aid of a gantry crane 16 (FIG. 1), where the track panel 15 is deposited on one of the track panel wagons 8 riding on the old track 2. During this, the front end of the panel removing machine 7 is supported via on-track undercarriages 5 on the old track 2 while the rear end of the machine 7 rests in the renewal gap 17 on the now exposed ballast bed 3 via a crawler track 6 lowered for this purpose.
  • The cleaning machine 11, following in the renewal gap 17 and also moving on lowered crawler tracks 6, takes up the ballast bed 3 by means of a clearing chain 18 and cleans it in a screening plant 19. The cleaned ballast 20 is discharged right away again via a chute 21 and graded behind the rear crawler track 6. Additionally, there is also the alternative possibility to introduce new ballast, as needed, by way of a conveyor belt 22 via the chute 21 into the renewal gap 17, and to grade the same.
  • As can be seen in FIGS. 1 and 2, the spoil 32 accruing in the screening plant 19 is transported forward in the working direction 4 of the installation 1 via a conveyor belt road 23 underneath the track panels 15 deposited on the track panel wagons 8, where it is discharged via the loading wagon 9 (FIG. 1) into the hopper cars 10 for storage. In order to enable a removed track panel 15 to be shifted forward without obstruction on the panel removing machine 7 for being placed on the first track panel wagon 8, a conveyor belt 24 of the conveyor belt road 23 is designed to be vertically pivotable by means of a drive 25. While the track panel 15 is shifted forward through the region of said conveyor belt 24, the transporting of the spoil is briefly interrupted.
  • The forward motions of the panel removing machine 7 and the trailing cleaning machine 11 must be coordinated with one another in such a manner that a continuous transfer of the spoil 32 to a rear end 33 of the conveyor belt road 23 is possible.
  • In the rear section of the installation 1, shown in FIG. 3, the independently mobile sleeper laying machine 12 follows the cleaning machine 11 at a certain distance and, during this, is supported at its front end by a crawler track 6 in the renewal gap 17 on the new or cleaned ballast 20. Upon the latter, new sleepers 27 which are brought on in layers with the aid of a gantry crane 28 are continuously laid down by means of a sleeper laying device 26. The new sleepers 27 are stored on sleeper wagons 14 (not shown in detail) arranged at the rear end of the installation 1, wherein additionally new rails 29 are also stored underneath the new sleepers 27.
  • On the sleeper wagons 14, these new rails 29 are gripped in pairs by means of a gripping device 30 with the aid of the gantry crane 28 and transported forward in the working direction 4 up to a front transfer position 31. In this position, the free ends of the new rails 29 are received by suitable rail tongs 34—fastened to the cleaning machine 11—and pulled forward into the renewal gap 17 and then temporarily deposited on the cleaned ballast 20 of the ballast bed 3. After the new sleepers have been placed, the pre-deposited new rails 29 are lifted from the ballast bed 3, spread onto the new sleepers 27 and connected to the same to form the renewed track 2.

Claims (2)

1. A method for renewing a track (2) and cleaning a ballast bed (3), comprising the following features:
a) the old track (2) is lifted off the ballast bed (3) in sections as a track panel (15), transported forward in a working direction (4) and deposited on track panel wagons (8),
b) the exposed ballast bed (3), forming a renewal gap (17), is cleaned by a cleaning machine (11), spoil (32) accruing in the process is transported forward underneath the track panels (15) deposited on the track panel wagons (8), and stored in hopper cars (10),
c) new rails (29), pre-deposited underneath new sleepers (27) positioned on sleeper wagons (14), are pulled forward into the renewal gap (17) by the cleaning machine (11) and deposited on the cleaned ballast bed (3), and
d) the new sleepers (27) are laid down on the cleaned ballast bed (3) and connected to the new rails (29) lifted off the ballast bed (3).
2. The method according to claim 1, wherein, by means of a gantry crane (28) provided for transport of the new sleepers (27) in the working direction (4), the new rails (29) are pulled in pairs into a front transfer position (31) for being received by the cleaning machine (11).
US15/547,176 2015-02-06 2016-01-08 Method for track renewal Active 2036-03-05 US10385517B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
ATA55/2015A AT516628B1 (en) 2015-02-06 2015-02-06 Method of renewing a track
ATA55/2015 2015-02-06
PCT/EP2016/000024 WO2016124305A1 (en) 2015-02-06 2016-01-08 Method for track renewal

Publications (2)

Publication Number Publication Date
US20180010303A1 true US20180010303A1 (en) 2018-01-11
US10385517B2 US10385517B2 (en) 2019-08-20

Family

ID=55072647

Family Applications (1)

Application Number Title Priority Date Filing Date
US15/547,176 Active 2036-03-05 US10385517B2 (en) 2015-02-06 2016-01-08 Method for track renewal

Country Status (8)

Country Link
US (1) US10385517B2 (en)
EP (1) EP3253922B1 (en)
CN (1) CN107223172B (en)
AT (1) AT516628B1 (en)
ES (1) ES2715758T3 (en)
PL (1) PL3253922T3 (en)
TR (1) TR201903579T4 (en)
WO (1) WO2016124305A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10385517B2 (en) * 2015-02-06 2019-08-20 Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M.B.H. Method for track renewal

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108221513B (en) * 2017-12-26 2019-04-02 常州市瑞泰工程机械有限公司 A kind of railroad turnout steel rail construction Transport Machinery
CN110924244B (en) * 2019-12-27 2021-10-26 嘉兴德基机械设计有限公司 Multifunctional railway tamping car

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2259185B1 (en) * 1974-01-29 1976-12-31 Scheuchzer Fils Auguste
CH583822A5 (en) * 1974-07-11 1977-01-14 Scheuchzer Auguste Les Fils De
AT345878B (en) 1975-07-11 1978-10-10 Plasser Bahnbaumasch Franz METHOD AND DEVICE FOR CHANGING A TRACK IN SECTIONS
CH620005A5 (en) * 1978-04-19 1980-10-31 Scheuchzer Auguste Les Fils D
AT368217B (en) * 1980-01-15 1982-09-27 Plasser Bahnbaumasch Franz DRIVABLE PLANT FOR RENOVATING THE TRACK
AT372722B (en) * 1980-07-24 1983-11-10 Plasser Bahnbaumasch Franz DRIVABLE PLANT AND METHOD FOR RENOVATING THE SIDED BASE
CH657649A5 (en) 1984-05-02 1986-09-15 Matisa Materiel Ind Sa Railway site machine for the at least partial repair of a railway track portion
DE3664504D1 (en) * 1986-07-25 1989-08-24 Plasser Bahnbaumasch Franz Machine for replacing or renewing the rails and sleepers of an existing track
RU2059743C1 (en) * 1993-11-09 1996-05-10 Акционерное общество "Тулажелдормаш" Machine for renewal of railway ballast prism
AT3919U3 (en) * 2000-07-13 2001-08-27 Plasser Bahnbaumasch Franz MACHINE FOR DISMANTLING AN OLD AND LAYING A NEW TRACK
ES2302128T3 (en) * 2004-09-22 2008-07-01 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. PROCEDURE FOR EXPLORING THE MILK OF A VIA.
UA90526C2 (en) * 2005-08-11 2010-05-11 Франц Пляссер Банбаумашинен-Индустригезельшафт Мбг Machine for renewing a railway track
AT502187B1 (en) * 2005-11-14 2007-02-15 Plasser Bahnbaumasch Franz Method for cleaning of ballast bed of track, involves accomplishing of first and second working processes alternatively whereby first and second working processes depend on degree of contamination of ballast bed
CH700126B1 (en) * 2008-12-16 2013-01-31 Matisa Materiel Ind Sa Machine and method for renewing a track.
DE102012017997A1 (en) * 2012-09-12 2014-04-10 Zürcher Holding GmbH Method for creating and / or rehabilitating a railway line
AT516628B1 (en) * 2015-02-06 2016-07-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Method of renewing a track

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10385517B2 (en) * 2015-02-06 2019-08-20 Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M.B.H. Method for track renewal

Also Published As

Publication number Publication date
CN107223172B (en) 2019-06-14
WO2016124305A1 (en) 2016-08-11
TR201903579T4 (en) 2019-04-22
CN107223172A (en) 2017-09-29
ES2715758T3 (en) 2019-06-06
AT516628A4 (en) 2016-07-15
AT516628B1 (en) 2016-07-15
EP3253922A1 (en) 2017-12-13
PL3253922T3 (en) 2019-05-31
US10385517B2 (en) 2019-08-20
EP3253922B1 (en) 2018-12-12

Similar Documents

Publication Publication Date Title
US4479439A (en) Mobile arrangement and method for improving a track bed
US7966938B2 (en) Machine for picking up and storing rail fastenings of a track, and a method
US4307667A (en) Railroad track relaying train
US10385517B2 (en) Method for track renewal
KR101746895B1 (en) System for cleaning a ballast bed
AU776179B2 (en) A machine for renewing a track
EP0712961B1 (en) Method and arrangement for the subgrade-rehabilitation of the ballast of a railway track
CA2383161C (en) A cleaning machine and method of cleaning ballast
JP5216108B2 (en) How to refurbish the ballast of the track
CA1287261C (en) Mobile track renewal installation
AU5434701A (en) A machine for renewing a track
US9157194B2 (en) Machine for cleaning a ballast bed of a track
JPH1148966A (en) Ballast recovering work vehicle
CN108368679B (en) Method for renewing the ties of a track consisting of rails and ties and track-laying machine
RU2634059C1 (en) Frontal type machine for cutting out soil surface layer
EP0775780B1 (en) Method for renewing railway tracks
JPS626002A (en) Apparatus for re-laying gravel for tunnel
EP2067898A2 (en) Method and equipment for track renewal
US20180179709A1 (en) Method for stabilizing an earth formation
EA008636B1 (en) Method for replacing old sleepers of a railway track by new sleepers
RU38777U1 (en) Crushed stone cleaning machine
JP2005351074A (en) Method and machine arrangement for changing track into strong travel passage

Legal Events

Date Code Title Description
AS Assignment

Owner name: PLASSER & THEURER EXPORT VON BAHNBAUMASCHINEN GESE

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BRUNNINGER, MANFRED;REEL/FRAME:043129/0374

Effective date: 20170717

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS

STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED

STCF Information on status: patent grant

Free format text: PATENTED CASE

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 4