US20120133510A1 - Physical infrastructure management system having an integrated cabinet - Google Patents

Physical infrastructure management system having an integrated cabinet Download PDF

Info

Publication number
US20120133510A1
US20120133510A1 US13/306,606 US201113306606A US2012133510A1 US 20120133510 A1 US20120133510 A1 US 20120133510A1 US 201113306606 A US201113306606 A US 201113306606A US 2012133510 A1 US2012133510 A1 US 2012133510A1
Authority
US
United States
Prior art keywords
cabinet
data
data center
electrically conductive
physical infrastructure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/306,606
Other languages
English (en)
Inventor
Alfred Pierce
Brendan F. Doorhy
David C. Kilinskis
Donald J. Beran
Mark J. Donnell
Robert Bambic
Robert J. Pflaum
Sambodhi Chatterjee
James F. Wiemeyer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panduit Corp
Original Assignee
Panduit Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panduit Corp filed Critical Panduit Corp
Priority to US13/306,606 priority Critical patent/US20120133510A1/en
Priority to JP2013542119A priority patent/JP5911885B2/ja
Priority to KR1020177014660A priority patent/KR101875818B1/ko
Priority to BR112013013426A priority patent/BR112013013426A2/pt
Priority to PCT/US2011/062530 priority patent/WO2012075077A2/en
Priority to CN201180057372.2A priority patent/CN103229457B/zh
Priority to KR1020137015866A priority patent/KR101743462B1/ko
Priority to CN201810059750.4A priority patent/CN108038952A/zh
Priority to EP11802822.4A priority patent/EP2647160B1/en
Assigned to PANDUIT CORP. reassignment PANDUIT CORP. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: WIEMEYER, JAMES F., BAMBIC, ROBERT, BERAN, DONALD J., CHATTERJEE, SAMBODHI, DONNELL, MARK J., DOORHY, BRENDAN F., KILINSKIS, DAVID K., PFLAUM, ROBERT J., PIERCE, ALFRED
Assigned to PANDUIT CORP. reassignment PANDUIT CORP. CORRECTIVE ASSIGNMENT TO CORRECT THE MIDDLE INITIAL OF INVENTOR DAVID K. KILINSKIS TO DAVID C. KILINSKIS PREVIOUSLY RECORDED ON REEL 027657 FRAME 0803. ASSIGNOR(S) HEREBY CONFIRMS THE RECORDATION OF THE ASSIGNMENT LISTS AN INCORRECT MIDDLE INITIAL OF INVENTOR DAVID KILINSKIS.. Assignors: WIEMEYER, JAMES F., BAMBIC, ROBERT, BERAN, DONALD J., CHATTERJEE, SAMBODHI, DONNELL, MARK J., DOORHY, BRENDAN F., KILINSKIS, DAVID C., PFLAUM, ROBERT J., PIERCE, ALFRED
Publication of US20120133510A1 publication Critical patent/US20120133510A1/en
Priority to US14/324,525 priority patent/US9337555B2/en
Priority to JP2016065270A priority patent/JP6144381B2/ja
Priority to US15/090,815 priority patent/US20160218934A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0896Bandwidth or capacity management, i.e. automatically increasing or decreasing capacities
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/20Network management software packages
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C9/00Individual registration on entry or exit
    • G07C9/00174Electronically operated locks; Circuits therefor; Nonmechanical keys therefor, e.g. passive or active electrical keys or other data carriers without mechanical keys
    • G07C9/00896Electronically operated locks; Circuits therefor; Nonmechanical keys therefor, e.g. passive or active electrical keys or other data carriers without mechanical keys specially adapted for particular uses
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R13/00Details of coupling devices of the kinds covered by groups H01R12/70 or H01R24/00 - H01R33/00
    • H01R13/66Structural association with built-in electrical component
    • H01R13/665Structural association with built-in electrical component with built-in electronic circuit
    • H01R13/6683Structural association with built-in electrical component with built-in electronic circuit with built-in sensor
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R4/00Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
    • H01R4/28Clamped connections, spring connections
    • H01R4/48Clamped connections, spring connections utilising a spring, clip, or other resilient member
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R4/00Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
    • H01R4/58Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation characterised by the form or material of the contacting members
    • H01R4/64Connections between or with conductive parts having primarily a non-electric function, e.g. frame, casing, rail
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R4/00Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
    • H01R4/58Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation characterised by the form or material of the contacting members
    • H01R4/66Connections with the terrestrial mass, e.g. earth plate, earth pin
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/04Network management architectures or arrangements
    • H04L41/045Network management architectures or arrangements comprising client-server management architectures
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/22Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks comprising specially adapted graphical user interfaces [GUI]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/24Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks using dedicated network management hardware
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q1/00Details of selecting apparatus or arrangements
    • H04Q1/02Constructional details
    • H04Q1/025Cabinets
    • H04Q1/026Cabinets characterized by door details
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q1/00Details of selecting apparatus or arrangements
    • H04Q1/02Constructional details
    • H04Q1/04Frames or mounting racks for selector switches; Accessories therefor, e.g. frame cover
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K7/00Constructional details common to different types of electric apparatus
    • H05K7/14Mounting supporting structure in casing or on frame or rack
    • H05K7/1485Servers; Data center rooms, e.g. 19-inch computer racks
    • H05K7/1498Resource management, Optimisation arrangements, e.g. configuration, identification, tracking, physical location

Definitions

  • IPLM Intelligent Physical Layer Management
  • environmental control reduces unnecessary operational risk, along with its associated potential negative impacts to the organization and its customers.
  • Information technology staff must also determine existing, new and planned equipment venues quickly and accurately. Such timely determinations save operational expense, facilitate uninterrupted continuity of business operations, and increase the return on the ongoing investment in data centers.
  • a data center physical infrastructure capacity management system that is managed by IT personnel.
  • the system includes a server cabinet having rack spaces and a sensor.
  • a data communication arrangement propagates communications signals from the sensor to a management database that receives information from the communications signals, the received information being stored.
  • a data processor determines algorithmically the need for intervention to the data center physical infrastructure, which may take the form of changes to the physical infrastructure, and issuance of alerts to IT personnel.
  • a human interface enables human interaction with the data center management system.
  • the received information corresponds to environmental data.
  • the intervention that may be required by the data processor is determined to be a selectable one of human and automated intervention.
  • the intervention determined by said data processor may take the additional form of changes to the representative underlying data center system management database.
  • the human interface employs a graphical user interface that displays icons representative of predetermined condition states of the data center.
  • the data processor in an advantageous embodiment of the invention includes a computer, and the algorithmic determination of the need for intervention is responsive to any combination of temperature data; humidity data; a sensor address; a device serial number; the adequacy of a system ground connection; and the number of occupied rack spaces.
  • a cabinet for holding removable electronic assets.
  • a cabinet body having a plurality of rack spaces, each rack space accommodating one of the removable electronic assets.
  • a plurality of identifier tags are attached to respectively associated ones of the removable electronic assets, and an identifier tag reader that is installed on the cabinet body communicates with at least one of the identifier tags, providing a tag reader electrical signal responsive to the communication with the at least one of said plurality of identifier tags.
  • a cabinet door is attached to the cabinet body, and a door sensor provides an electrical signal responsive to closed, open, locked, and unlocked states of the cabinet door.
  • a data output for providing data responsive to the tag reader electrical signal.
  • a database stores asset information responsive to the presence of the removable electronic assets in respective ones of the rack spaces. The asset information is obtained from the tag reader electrical signal, which is itself derived from the identifier tag reader.
  • the identifier tag reader is an elongated antenna element that is affixed to the cabinet body and extends proximal to a plurality of the rack spaces.
  • the database is maintained in a remote server that can be accessed wirelessly or over the interne.
  • the cabinet of an embodiment of the invention additionally has an integrated cabinet hub disposed in the server cabinet for coordinating respective data signals from any combination of: a power monitoring arrangement; a physical layer management system; an environmental control system; an asset tracking system; a grounding monitoring system; and a security system.
  • a wireless communication arrangement for delivering data from the integrated cabinet hub to a physical infrastructure management system.
  • a monitoring arrangement has a graphical user interface that displays icons representative of predetermined condition states of the cabinet.
  • an environmental sensor installed on the cabinet door.
  • an electrical contact arrangement having a cabinet door portion and a cabinet body portion conducts signals from the environmental sensor that contain environmental information to the cabinet body.
  • a credentials monitoring arrangement for controlling the state of the cabinet door.
  • a secure contact arrangement that has a base terminal formed of electrically conductive material and first and second electrically conductive elements.
  • a resilient non-conductive element is interposed between the first and second electrically conductive elements.
  • a compression element applies an axial force through the first electrically conductive element, the resilient non-conductive element, the second electrically conductive element, and the base terminal. The applied axial force compresses the resilient non-conductive element to cause the first and second electrically conductive elements to communicate electrically with one another.
  • an electrical contact monitoring arrangement that determines whether adequate axial force has been applied by the compression element so as to compress the resilient non-conductive element and thereby cause the first and second electrically conductive elements to communicate electrically with one another.
  • the electrical contact monitoring arrangement additionally serves to determine whether adequate axial force has been applied by the compression element to urge the first and second electrically conductive elements into electrical communication with the base terminal.
  • at least one of said first and second electrically conductive elements is provided with a resilient contact element for communicating electrically with the other of the first and second electrically conductive elements.
  • FIG. 1 a depicts a physical infrastructure capacity management system & integrated cabinet architecture according to one embodiment of the present invention
  • FIG. 1 b depicts a variant of the system architecture for an integrated cabinet, wherein one of the functional modules also serves as the intelligent cabinet hub;
  • FIG. 1 c depicts yet another variant showing a wireless Ethernet network uplink to save data center switch ports
  • FIG. 2 a depicts a graphical representation of a data center layout
  • FIG. 2 b depicts a magnified excerpt of the data center layout
  • FIG. 3 a depicts a server installation process, facilitated and enforced by Physical Infrastructure Management (PIM) software and by the integrated cabinet;
  • PIM Physical Infrastructure Management
  • FIG. 3 b sets forth the legends for the PIM software graphical user interface symbols
  • FIG. 4 a depicts an integrated cabinet intelligent door arrangement according to the invention
  • FIG. 4 b depicts details of the intelligent door connector and of the temperature, and optionally humidity, sensor boards
  • FIG. 5 a depicts a physical structural representation of one embodiment of the integrated cabinet
  • FIG. 5 b depicts an excerpted portion of FIG. 5 a that has been magnified to show greater detail
  • FIG. 6 depicts a connected series of eight data center integrated cabinets
  • FIG. 7 depicts an alternative connection configuration for a series of eight integrated cabinets
  • FIG. 8 depicts a prior art connection of disparate functional modules as implemented within a physical infrastructure management system
  • FIG. 9 is a graphical representation that illustrates resource savings that are achieved with the use of a physical infrastructure management system according to the present invention.
  • FIG. 10 depicts a simplified representation of an integrated cabinet equipped with a ground bond sensor
  • FIG. 11 a depicts a specific illustrative embodiment of the invention
  • FIG. 11 b depicts two principal parts of the invention represented in FIG. 11 a ;
  • FIG. 12 depicts a schematic diagram of a circuit that is included within the hub for processing ground bond sensor signals.
  • FIG. 1 a depicts a physical infrastructure capacity management system & integrated cabinet architecture according to one embodiment of the present invention. It contains top level data center network management software 110 , such as IBM Tivoli, Physical Infrastructure Management (PIM) software 115 , and a physical intelligent cabinet (enclosure not shown), the cabinet containing an integrated intelligent cabinet hub 120 and a collection of functional modules: A power module which is a block representing a modular power outlet unit 121 ; an intelligent physical layer management module (IPLM) 122 , an example of which appears in Panduit's current PViQ product line; an environmental sensors module 123 , wherein examples of sensed parameters include temperature, humidity, air flow, differential pressure, vibration, and ambient light level, and automated temperature measurements can provide data to PIM software to simplify computational fluid dynamic (CFD) analysis of data center facilities; an asset tracking or asset location module 124 ; a cabinet security module 125 for determination of cabinet door position and lock status, the cabinet security module 125 may also include a credential reader or a security camera link; display and beacon modules which
  • FIG. 1 a shows all of these modules 121 - 127 connected to integrated intelligent cabinet hub 120 through a serial data sub-network 130 .
  • the sub-network may employ an RS485 physical topology or other serial data sub-network, as shown.
  • serial data sub-network 130 preferably resides within a single integrated cabinet, designated generally as 135 , it may also span multiple cabinets (not shown).
  • the RS485 subnet includes additional power conductors, for example 12VDC, so that each module can operate from a single power supply (not shown) contained as part of the hub. The figure implies the presence of these additional power conductors, but does not show them explicitly.
  • the multiplicity of sub-network conductors may take the form of multi-conductor cables (not shown), or alternately, a physical backplane (not shown) that accepts plug-in functional modules.
  • the function modules 121 - 127 communicate with integrated intelligent cabinet hub 120 via a communications link 131 .
  • a communications link 131 In some embodiments of the invention, there is provided an optional redundant communications link 132 .
  • Integrated intelligent cabinet hub 120 communicates upward in the diagram through an Ethernet connection 140 to Physical Infrastructure Management (PIM) software 115 .
  • PIM Physical Infrastructure Management
  • Other connection protocols can be used in the practice of the invention.
  • PIM software 115 provides data aggregation, visualization, capacity planning functionality, and issuance of alerts to physical infrastructure issues that can potentially affect information technology uptime.
  • Integrated intelligent cabinet hub 120 contains in some embodiments of the invention multiple communication ports (not shown) in order to allow daisy chaining of hubs. This feature reduces the number of data center switch ports (not shown) that would be required to support the physical infrastructure capacity management system to less than one per cabinet. Ports placed on the front of the cabinet hub may be offset from the front of the cabinet.
  • Some embodiments of the present invention comprise PIM software 115 that uses its functionality to process and consolidate information for further use by top-level data center network management software, such as IBM Tivoli 110 , HP OpenView, Microsoft System Center, or the like.
  • top-level data center network management software such as IBM Tivoli 110 , HP OpenView, Microsoft System Center, or the like.
  • the collection of functional modules 121 - 127 , the integrated intelligent cabinet hub 120 , and the physical cabinet (not shown) constitute integrated cabinet 135 .
  • the combination of the integrated cabinet appliances along with PIM software constitutes the physical infrastructure capacity management system.
  • the physical infrastructure capacity management system optionally includes top level data center network management software 110 , which in this specific illustrative embodiment of the invention is IBM Tivoli.
  • FIG. 1 b depicts a variant of the system architecture depicted in FIG. 1 a , for an integrated cabinet. Elements of structure that have previously been discussed are similarly designated.
  • one of the functional modules specifically power module 121 , also serves as part of an overall intelligent cabinet hub 150 . More specifically, overall intelligent cabinet hub 150 constitutes a cabinet hub and power supply functionality combined within a single appliance.
  • power module 121 performs the dual roles of a power outlet unit and of a hub.
  • any of the other functional modules can incorporate the additional hub functionality.
  • FIG. 1 c conveys yet another embodiment of the invention that is provided with a wireless Ethernet network uplink 155 .
  • the use of wireless Ethernet network uplink 155 serves to reduce the number of otherwise required data center switch ports (not shown). Elements of structure that have previously been discussed are similarly designated.
  • This figure also shows an alternate serial data subnet topology, consisting of multiple sections. In addition to the foregoing, the topology represented in this figure reduces the number of otherwise required module connections, and increases system reliability. Moreover, the particular subnet topology of this specific illustrative embodiment of the invention allows for detachment of intelligent doors (not shown) without affecting the communicability of other functional modules.
  • modular power outlet unit 121 intelligent physical layer management module 122 , asset location module 124 , user interface modules 126 , and ground bond sensor and electrostatic discharge (ESD) policy enforcement module 127 constitute one section, that is generally designated as section 160 .
  • Section 160 communicates with integrated intelligent cabinet hub 120 via a communications link 161 .
  • an optional redundant communications link 162 There is optionally provided in this specific illustrative embodiment of the invention an optional redundant communications link 162 .
  • environmental sensors module 123 and cabinet security module 125 constitute a further section, identified as section 165 .
  • Section 165 communicates with integrated intelligent cabinet hub 120 via a communications link 166 .
  • an optional redundant communications link 167 There is optionally provided in this specific illustrative embodiment of the invention an optional redundant communications link 167 .
  • the coordination and synergy of the physical infrastructure capacity management system elements as hereinabove described affords the following advantages: 1) the network and sub-network connection topology achieves a reduction in IT switch port usage; 2) elimination of redundant power supplies; 3) reduction of module-borne Ethernet ports, associated computing power and memory requirements; 4) requires but a single PIM software-borne graphical user interface (GUI) in lieu of multiple independent software GUIs; 5) supports top-level data center network management software, by providing physical infrastructure management information.
  • GUI graphical user interface
  • the integrated cabinet, together with PIM software automates physical infrastructure data collection; 6) the system supports data center capacity planning; and 7) issuance of alerts relating to physical infrastructure issues that can potentially affect information technology uptime.
  • the PIM system such as Physical Infrastructure Management (PIM) software 115
  • PIM Physical Infrastructure Management
  • an integrated rack-unit-level RFID tracking system not specifically designated
  • FIG. 2 a depicts graphically the layout of a data center 200
  • FIG. 2 b represents a portion of the layout of data center 200 , the portion represented in this figure being enlarged to facilitate comprehension of these figures.
  • each of the grid squares such as grid square 210
  • each of the grid squares represents a 2 foot by 2 foot square of floor space.
  • Rows of server cabinets appear, most of which manifest the number 00, except for server cabinet icon 215 located at CX 120 , which shows the number 24. In this diagram, these numbers represent the number of servers contained within each of the cabinets.
  • a row of switch cabinets 220 bisects the layout of data center 200 , dividing it into a left side 230 , and a right side 231 that is not shown in FIG. 2 b.
  • FIG. 3 a is a simplified schematic representation of that is useful in describing a process of installing one or more servers into the data center, which is not specifically designated in this figure.
  • the installation is facilitated by, and is performed in conformance with, PIM software (not shown in this figure), and by the integrated intelligent cabinet hub (not shown in this figure).
  • FIG. 3 b depicts the legend for the PIM software graphical user interface symbols.
  • the following description of the installation in accordance with the system of the present invention demonstrates a substantial reduction in the time and effort required to memorize and display moves, additions, or changes within a data center, as compared with prior art methods the involve the manual entry of data into spreadsheet files (not shown).
  • frame ( 1 ) shows a technician 310 inventorying a server asset 315 with the aid of an asset tag 320 .
  • Asset tags that can be used in the various embodiments of the present invention include bar code and RFID (radio frequency identification) types of labels.
  • the PIM system will associate the labeled equipment with associated data including, for example, model and serial numbers, purchase dates, warranty, physical size, nameplate power consumption, location, and other useful information.
  • Technician 310 transports server asset 315 to an installation site while executing the required procedure for PIM system tracking of the asset location.
  • a frame ( 2 ) the PIM system illuminates a beacon icon 327 , as well as a physical beacon 525 (see, FIGS. 5A and 5B ) that directs technician 310 to a targeted physical cabinet 325 to conduct scheduled work.
  • Physical cabinet 325 is represented in the PIM system graphical view of data center 200 as server cabinet icon 215 , described above.
  • Technician 310 presents an access credential (not shown) to a credential reader (not shown) mounted on or near physical cabinet 325 .
  • the credential reader is of a known type, and is capable of accepting any of several known types of identification information, such as a finger print, an access control identification card, key fob data, or any other type of credential information. If the PIM software contains a work order (not shown) for technician 310 that requires access to physical cabinet 325 , the system unlocks physical cabinet door 326 .
  • a remotely located PIM workstation makes available the physical cabinet status from within the data center view.
  • PIM floor plan excerpt 340 appearing to the right of frame ( 2 ) provides visual indication of the status of physical cabinet 325 after physical cabinet door 326 is unlocked.
  • the visual indication os status is made manifest with the use of icons that symbolize the following: Door CLOSED (icon 342 ); Door UNLOCKED (icon 343 ); and Beacon ON (icon 327 ).
  • the PIM system recognizes that 24 servers are installed/consumed within cabinet CX 120 (i.e., physical cabinet 325 , which is represented in PIM floor plan excerpt 340 as server cabinet icon 215 ).
  • Technician 310 is shown to present his or her access credential, and door 326 is unlocked.
  • technician 310 opens physical cabinet door 326 and executes the scheduled work, such as the installation of a server (not shown) that is reflected in server asset icon 215 , blanking panel installation and removal, and patching activities.
  • scheduled work may also include manually scanning all of the installed or removed assets' bar codes or RFID labels with a hand held scanner/reader (not shown) to record new location information.
  • PIM floor plan excerpt 340 now shows the following: Door OPEN (icon 345 ); Door UNLOCKED (icon 343 ); and Beacon ON (icon 327 ).
  • the PIM system recognizes that 24 servers are installed/consumed within cabinet CX 120 .
  • the PIM floor plan excerpt 340 shows the current count for a cabinet that lacks an integrated RFID asset tracking module.
  • PIM floor plan excerpt 340 depicts: Door CLOSED (icon 342 ); Door UNLOCKED (icon 343 ); and Beacon ON (icon 327 ).
  • the PIM system at this point recognizes that 24 servers are installed/consumed within cabinet CX 120 .
  • the excerpt shows the current count for a cabinet that lacks an integrated RFID asset tracking module.
  • FIG. 3 a frame ( 5 ) illustrates the cabinet status after the system has locked physical cabinet door 326 and extinguished the beacon. This is represented in PIM floor plan excerpt 340 , which depicts: 1) Door CLOSED (icon 342 ); 2) Door LOCKED (icon 344 ); and 3) Beacon OFF (icon 328 ).
  • the PIM system recognizes that 24 servers are installed/consumed within cabinet CX 120 .
  • the PIM floor plan excerpt 340 shows at server cabinet icon 215 that the current count for physical cabinet 325 lacks an integrated RFID asset tracking module. If the cabinet indeed lacks an integrated RFID asset tracking module, technician 310 must then upload the new asset location information into the PIM system manually. This may be accomplished with the data stored inside of a hand-held bar code scanner, a hand held RFID reader, or some other portable data medium, generally designated as handheld reader 311 (see, frame ( 5 a )).
  • FIG. 3 a frame ( 6 ) represents the PIM's current recognition of 25 servers that are installed/consumed within cabinet CX 120 .
  • the PIM software now displays an updated location tree.
  • the PIM floor plan excerpt 340 in frame ( 6 ) conveys that all such associated views and the underlying data have been updated.
  • the system arrives at the database content shown in frame ( 6 ) from two differing routes, depending upon the asset tracking method.
  • the manual data entry step depicted in frame ( 5 a ) is not required.
  • FIG. 3 b depicts some of the software icons and structural elements that are employed in the specific illustrative embodiment of the invention. These include: icon 344 designating door locked; icon 343 designating door unlocked; icon 328 designating beacon OFF; icon 327 designating beacon ON; icon 342 designating door closed; icon 345 designating door open; icon 215 designating the server cabinet; icon 220 designating a switch cabinet; icon 351 designating power and maximum usage; PIM screen 352 designating the PIM screen; PIM report 353 designating the PIM report; and server asset 315 designating the physical tagged asset.
  • FIG. 4 a depicts the integrated cabinet intelligent door system of the present invention. Elements of structure that have previously been discussed are similarly designated.
  • physical cabinet door 326 is provided with a perforated door panel 410 that provides a suitable mounting location for temperature (and optionally humidity and pressure) sensors 415 .
  • the door mounting location for sensors 415 is advantageously less cluttered with cabling, and provides safety from damage resulting from ongoing appliance relocation within physical cabinet 325 (not shown in this figure).
  • these sensors 415 are part of a containment/cooling/control system (not shown).
  • commercially available electronic swing handle door locks with one or more integrated credential readers shown as integrated door lock and credential reader 420 , are mounted on physical cabinet door 326 via standardized panel cutout dimensions (not specifically designated).
  • the use of physical cabinet door 326 as a venue for electronic devices presents the challenge of delivering serial data sub-network conductors 450 across the junction between physical cabinet 325 and perforated door panel 410 of physical cabinet door 326 .
  • the door panel may incorporate in some a dual-hinged feature (not shown), that impedes the use of a cable loop solution at one of the hinges (not shown).
  • a plurality of contacts 455 is disposed at the top of physical cabinet door 326 , which contacts communicate electrically with contacts (not shown) that are attached to the cabinet body (not shown in this figure) upon closure of physical cabinet door 326 .
  • These contacts may, in some embodiments, take the form of a conductor-to-conductor interface (not shown), or of magnetic elements (not shown) that engage when physical cabinet door 326 is closed. Such an arrangement of magnetic elements effectively forms a corresponding plurality of transformers (not shown), that are suitable for both, signaling and power delivery.
  • microprocessors 460 i.e., a programmable integrated circuit that runs algorithms
  • serial communications not shown in this figure
  • a nonvolatile memory within sensors 415 may store information indicative of a device type (e.g., temperature sensor); and a device address (e.g., a unique code such as a serial number).
  • the serial communications sub-network may also contain a daisy chain line, that is usable to determine the relative position of each of the module elements.
  • a daisy chain line that is usable to determine the relative position of each of the module elements.
  • PViQ patch panels available from Panduit Corp., use this methodology to deduce the relative position of each device.
  • the relative position information provides the spatial coordinates for the location of each sensor.
  • Automated collection of temperature data significantly simplifies and improves computational fluid dynamic (CFD) analysis of the data center facility.
  • CFD computational fluid dynamic
  • the greater distribution of environmental measurement points with the data being collected continually replaces the laborious prior art method of manual temperature data collection. This provides more thorough, timely, and current information, as well as visibility of variations over time. More accurate data increases confidence in the calculation of the maximum thermal capacity of a data center. Such increased confidence more accurately identifies current operational margins, as well as the trigger points for build-out of new data center facilities, including the provision of data for cooling, power, connectivity, device location, and the amount of space available.
  • FIG. 4 b shows details of a module 457 that bears a serial sub-network and power connector 455 .
  • Module 457 further includes individual sub-network and power circuits contacts 458 for physical cabinet door 326 .
  • a module 459 formed of a printed circuit board 456 that bears, in this embodiment, temperature sensors 415 and microprocessor 460 .
  • This module 459 additionally is provided with serial sub-network and power connectors 465 and 466 .
  • FIG. 5 a depicts a physical, structural view of one embodiment of physical cabinet 325 and physical cabinet door 326 .
  • FIG. 5 b depicts an excerpted portion of the embodiment of FIG. 5 a , specifically of physical cabinet 325 , that has been magnified to show greater detail.
  • integrated intelligent cabinet hub 120 resides within a space provided at the top of physical cabinet 325 . In other embodiments, however, integrated intelligent cabinet hub 120 is installed into one or more of the horizontal or vertical rack unit (RU) slots (not specifically designated).
  • RU rack unit
  • a first portion of the asset management functional module specifically RU-level RFID reader 515 , assumes a dual role as integrated intelligent cabinet hub 120 .
  • a second portion of the asset management functional module, the RU-level RFID asset tag reader strip 520 mounts vertically alongside assets deployed inside the cabinet.
  • RU-level RFID asset tag reader strip 520 is shown to be connected in this embodiment to a reader coaxial port 521 .
  • the asset tag reader strip facilitates communication with tags placed upon the assets, such as intelligent physical layer management modules 122 , which in some embodiments are PViQ patch panels, available from Panduit Corp., that are installed in the racks.
  • each such PViQ patch panel in this embodiment is provided with a respective asset tag 320 .
  • Physical cabinet door 326 which in this embodiment incorporates a plurality of environmental monitoring and security functions, is shown to be in the open position, within the left portion of FIG. 5 a .
  • a collection of Power Outlet Units (POUs) 536 with associated power metering functionality, occupy vertical columns on the right and left sides of the cabinet body. As previously discussed, the opening of physical cabinet door 326 will result in the continued illumination of physical beacon 525 .
  • POUs Power Outlet Units
  • physical beacon 525 is illuminated concurrently with the display of beacon icon 327 , and since it is located on the top of the cabinet body in this embodiment of the invention, it can be illuminated prior to the opening of physical cabinet door 326 to direct technician 310 (not shown in this figure) to the particular cabinet (e.g., physical cabinet 325 ) that requires servicing.
  • IPLM Intelligent Physical Layer Management
  • the functional modules each connect to integrated intelligent cabinet hub 120 via one or more sections of serial data sub-network 130 , as previously described.
  • squares labeled with “R” correspond to RS485 connection points (or another communication connection for the serial data sub-network).
  • the squares that are labeled with “E” designate respective Ethernet connection points 535 .
  • RU-level RFID asset tag reader strip 520 communicates with reader coaxial port 521 of RU level RFID reader 515 through a coaxial cable (shown, but not specifically designated).
  • the coaxial borne communications include separable RF messaging, in addition to serial data sub-network messaging.
  • the physical cabinet 325 communicates through an Ethernet channel 540 to a PIM server 545 .
  • the depicted Ethernet cloud 550 abstracts a collection of switches, routers, structured cabling, and other required network elements, which are not specifically shown for sake of clarity and to avoid immaterial detail.
  • a PIM workstation, database 555 , and PIM server 545 constitute other elements of the physical infrastructure capacity management system. Such physical infrastructure is available at a PIM workstation 560 .
  • FIG. 6 depicts a simplified schematic representation of a connected series of eight data center integrated cabinets 611 , 612 , 613 , . . . 618 .
  • the integrated cabinet hub (not specifically designated) contained by first physical data center integrated cabinet 611 connects to the other integrated hubs through the serial data sub-network 625 , optionally including, in this specific illustrative embodiment of the invention, dedicated daisy chain and power conductors as earlier described.
  • the series of eight physical data center integrated cabinet 611 , 612 , 613 , . . . 618 then requires just a single power supply 630 to operate all of the associated management functional modules and hubs.
  • the power supply connection may mate with a power source available within or near first physical data center integrated cabinet 611 .
  • the depicted power supply 630 provides operating energy only for the physical infrastructure management functional modules and hubs, and not for the relatively heavy server and switch loads that derive operating power from the Power Outlet Units (POUs) 536 shown in FIG. 5 a . Those heavy loads require dedicated, often redundant, power feeds (not shown) through the load outlet connectors of Power Outlet Units (POUs) 536 .
  • FIG. 7 depicts an alternative connection configuration for a series of eight physical data center integrated cabinet 611 , 612 , 613 , . . . 618 . Elements of structure that have previously been discussed are similarly designated.
  • a dedicated plurality of coaxial connectors 710 on the first cabinet connects with each of the other cabinet coaxial connectors through a coaxial cable, resulting in a “star” connection scheme.
  • the coaxial-borne communications may again include separable RF messaging, in addition to serial data sub-network messaging.
  • connection topologies offer a limited sample of connection topologies. It is to be understood that in the practice of the invention, any of these connection topologies can be employed, including a combination of these and other topologies.
  • the hub incorporates Ethernet switch functionality in support of functional modules equipped with Ethernet communication ports.
  • the hub's multiple Ethernet ports reduce the relatively costly cloud-borne (network) Ethernet switch ports to less than one per cabinet.
  • FIGS. 5 a and 5 b show the hub's multiple Ethernet ports most explicitly. The Ethernet ports have been omitted in some of the figures for the sake of clarity in presenting the preferred embodiments.
  • FIG. 8 illustrates a prior art connection of disparate functional modules (not shown in this figure) as implemented within a physical infrastructure management system, and using a disintegrated cabinet concept.
  • These functional modules include: 1) power metering; 2) IPLM (Intelligent Physical Layer Management); 3) environmental monitoring; 4) asset management; and security.
  • FIG. 8 represents the upper portions of eight physical cabinets 811 . . . 818 , without an integrated cabinet hub.
  • the Ethernet connection points in this embodiment constitute a portion of respectively associated patch panels 801 . . . 808 , that are suitable for the connection of internal Ethernet patch cords (not shown) between internal functional module appliances (not shown) and an Ethernet switch, represented by Ethernet Cloud 550 .
  • Ethernet Cloud 550 an Ethernet switch
  • Each of the eight physical cabinets 811 . . . 818 requires separate Ethernet ports for power metering, IPLM, environmental monitoring, asset management, and security. All of these except for the power metering modules also require dedicated power supplies, since power metering modules often derive operating power from the power feeds (not shown) that primarily energize their associated heavy loads.
  • a disintegrated physical infrastructure management system will require separate servers, illustratively including: a power metering server 830 ; an IPLM server 831 ; an environmental server 832 ; an asset management server 833 ; and a security server 834 .
  • disintegrated physical infrastructure management system will require separate databases, such as databases 840 and 841 .
  • databases 840 and 841 separate graphical user interfaces (not shown) are available through user workstation 560 .
  • FIG. 9 is a graphical illustration of resource savings that are enabled by methods using a physical infrastructure management system incorporating features described herein.
  • the vertical axis of the illustration shows the physical infrastructure capacity for an enterprise, and the horizontal axis shows time.
  • the physical infrastructure capacity is a summary term combining a number of factors such as physical space, thermal capacity, power availability, connectivity, and rack space.
  • the effective physical infrastructure capacity can be considered as being bounded by the “most limiting” of these factors. For example, if there is plenty of space and power for expansion, but not enough cooling available for expansion, thermal capacity is the most liming physical infrastructure factor.
  • a first plot 10 illustrates the measured consumption of physical infrastructure resources under a prior art method of determining capacity expansion.
  • a second plot 12 illustrates the measured consumption of physical infrastructure resources using a method according to the present invention.
  • a number of horizontal lines are used to indicate the physical infrastructure capacity over time.
  • the horizontal lines 14 and 16 represent a guardbanded initial amount of physical infrastructure capacity in a data center.
  • the horizontal lines 18 and 20 indicate a guardbanded amount of physical infrastructure capacity that results from expanding the data center.
  • the horizontal lines 22 and 24 represent a guardbanded physical infrastructure capacity that results from building a new data center following the expansion.
  • An arrow 26 represents a time at which a decision is made that an expansion of physical infrastructure capacity will be needed for an existing system. This decision is made due to the understanding of the physical infrastructure needs at that time, which under known systems is flawed due to infrequent and inaccurate measurement of current capacity, consumption, and needs. For example, early in the graph of FIG. 9 , plot 10 has a steeper slope than plot 12 , which presents more accurate information regarding the consumed physical infrastructure capacity. In prior art systems, the decision to expand the data center is being made too early, and the needed additional capacity appears to be much larger than the actual needs of the enterprise.
  • arrow 28 represents a time at which a decision is made that a new data center will be needed under a prior art decision-making system.
  • this decision is made too early in the life of the enterprise, in comparison to the actual amount of physical infrastructure capacity needed, resulting in a capital expenditure misallocation.
  • the CAPEX savings resulting from a more correctly timed decision are indicated on the graph.
  • an incorrect understanding of the environmental data in a data center can result in operational expenditures that grow at an unnecessarily fast rate.
  • the fast growth in apparently used physical infrastructure capacity under the prior art plot 10 may reflect an overcooling scenario, which may have been the result of faulty temperature readings, which may have been taken infrequently.
  • OPEX operational expenditure
  • Embodiments of the present invention will lead to proper allocation of operational expenses, leading to the OPEX savings indicated in FIG. 9 .
  • Systems according to embodiments of the present invention enable accurate measurements to be aggregated and presented to a user in the form of actionable information, allowing the user to make resource planning decisions more accurately and efficiently.
  • decisions that can be facilitated under the present invention include: 1) Allocation of the proper amount of cooling resources; 2) Allocation of physical space to need the computational and connectivity requirements of the enterprise; 3) Determining whether to expand an existing datacenter or to build a new one; 4) The provision of an appropriate amount of power over the life cycle of a datacenter; 5) Identification of the limiting resource in an enterprises' physical infrastructure capacity and an understanding of the amount of that resource that needs to be added (for example, switching capacity may be the limiting factor, such that more switches should be added but not necessarily more rack unit (RU) space); and 6) Identification of locations within a data center that meet requirements for new hardware (such requirements may include connectivity type and speed.
  • Grounding and bonding of equipment and infrastructure within data centers fulfills at least 2 significant needs: (a) safety of users and maintenance personnel; and (b) increased reliability of sensitive electronic appliances through mitigation of electrostatic discharge potentials carried upon the bodies of users and maintenance personnel.
  • ground bond schemes While existing ground bond schemes have the capability to fulfill these safety and ESD mitigation needs, they offer no method of verifying or monitoring the electrical connection and bonding of the ground conductors to the Mesh Common Bonding Network (MCBN).
  • MCBN Mesh Common Bonding Network
  • a data center's infrastructure may completely lack the required grounding and bonding, and owners, users, and maintenance personnel may remain completely unaware of this status with its associated risks.
  • FIG. 10 depicts a simplified representation of physical cabinet 325 equipped with a ground bond sensor 1010 . Elements of structure that have previously been discussed are similarly designated.
  • Physical cabinet 325 undergoes ground bonding to mesh common bonding network (MCBN) 1020 through ground bond sensor 1010 that, in turn, connects to a dedicated ground bond sensor port 1030 on integrated cabinet hub 120 .
  • MCBN mesh common bonding network
  • Integrated intelligent cabinet hub 120 in combination with ground bond sensor 1010 , verifies the presence of a ground connection to the cabinet, and verifies that the installer (not shown) has bonded the ground connection to mesh common bonding network (MCBN) 1020 .
  • MCBN mesh common bonding network
  • FIG. 11 a depicts a specific illustrative embodiment of the invention of a ground bond sensor 1010 .
  • FIG. 11 b illustrates that ground bond sensor 1010 consists of two main portions, specifically: 1) A Ground Sensor, for example, a ground terminal lug 1041 with a heavy-gauge ground conductor 1043 leading to mesh common bonding network (MCBN) 1020 (not shown in this figure), plus a smaller-gauge ground sense pilot wire 1045 leading to the hub's dedicated ground bond sensor port 1030 (not shown in this figure); and 2) A donut or flat-washer shaped Bonding Sensor 1050 , with an isolated, normally open contact (not shown), and signal wires 1051 that lead to the hub's dedicated ground bond sensor port 1030 (not shown in this figure). Bonding Sensor 1050 provides an electrically isolated contact closure indication that the installer has tightened the ground fastener, that it remains snug, and that the fastener's clamping force exceeds a minimum specified value.
  • a Ground Sensor for example, a ground terminal lug
  • An isolated, normally open contact prevents the sensor function from easily being defeated by merely tying the appropriate gateway sensor port terminals to ground. This form of contact also enables connection of multiple signals together, either physically with wire, or logically through electronic processor algorithms.
  • Ground Bond Sensor arrangement depicted in FIG. 11 a consists of two one-sided printed circuit boards (PCBs) 1061 and 1062 , respectively, separated by a spring element 1065 in the form of a stiff wave washer or O-ring, and sandwiched between two metallic flat washers 1068 and 1069 .
  • metallic washer 1068 is a metallic stepped washer that is urged toward, and is stopped against, metallic washer 1069 upon the tightening of fastener 1070 , which in this embodiment is a #10-32 screw.
  • Fastener 1070 engages threadedly with a threaded hole in (not shown), or nut on (not specifically designated), cabinet surface 1075 .
  • PCBs 1061 and 1062 are, in this specific illustrative embodiment of the invention, somewhat donut shaped.
  • Optional spring contacts mounted to the PCBs, such as spring contact 1073 mate with etched pads (not shown) on the opposite PCB.
  • a simple disc will bridge the two PCBs together upon application of sufficient torque to fastener 1070 .
  • a plastic cover ring 1071 captivates the sensor parts such that the cover ring suffers no compression during application of torque to the ground fastener.
  • a second spring element a stiff wave washer or O-ring, provides enough reactive force to preclude contact closure by merely tightening the screw by hand. This assures that the installer has used a tool to apply torque, or otherwise bond, the connection.
  • the top washer has a stepped geometry in order to provide a solid stop against the bottom metal washer during the application of torque to the screw. This limits the compression of the spring element and the PCB contacts to tolerable levels. In the case where a simple disc bridges the two PCBs together, the disc thickness limits the compression of the spring element.
  • Ring terminal 1041 preferably resides directly adjacent to the grounded cabinet surface 1075 , the cabinet surface being provided with a conductive pad (not shown) (for example, a copper pad), free of paint or other insulating materials.
  • a conductive pad for example, a copper pad
  • the field application of the present sensor can include a paint-piercing tooth washer, and optionally a tri-lobular screw to cut through paint coated threads, with satisfactory grounding results.
  • the screw will incorporate, in some embodiments, a binding type head or other locking mechanisms, such as various types of lock washers (not shown).
  • an internal tooth metallic star washer (not specifically designated) to enhance engagement between ring terminal 1041 and cabinet surface 1075 .
  • FIG. 11 c illustrates an embodiment of a ground bond sensor 1080 integrated with a ground bond wire 1081 .
  • This embodiment reduces the number of parts to handle during installation.
  • the wires that egress the right side of the assembly break out to their associated hub port and MCBN destinations.
  • the embodiment optionally incorporates an indicator LED 1083 , and a screw captivation feature (not shown).
  • bonded ground connections such as directly at the MCBN, can also utilize the ground bond sensor.
  • Preferred embodiments require that fastener schemes employ a headed screw or bolt under tensile load, a torqued nut, or a similar application of compressive force to the Sensor.
  • FIG. 12 is a schematic representation of a specific illustrative embodiment of the invention.
  • This circuitry which in some embodiments is included within the hub, processes the ground bond sensor signals.
  • the hub dedicated ground bond sensor port circuit contains a signal reference, shown as the earth ground symbol, representing an equal potential connection from the hub to: 1) the cabinet chassis ground, by means of the hub's chassis mounting fasteners; or 2) the ground wire, taken from an AC power feed to the cabinet; or 3) the MCBN.
  • the circuitry functions as follows.
  • the ground sense pilot wire connects the SLEEVE terminal of connector J 11 .
  • the sensor cable ground sense pilot wire
  • signal voltage at GND_DET 1 goes to 0V.
  • Low pass filtering and transient protection protect this node from noise and other energetic transients. If the cabinet lacks a ground lug, or if the installer has not plugged the sensor cable into the hub sensor port (J 11 ), the GND_DET 1 signal level goes to 3.3V.
  • GND_DET 1 connects to a microprocessor input (not shown), such as an input of Microchip part number PIC24FJ256GA110-IPF.
  • Programmatic algorithms contained within the microprocessor memory report the status of this signal upstream to the PIM Server to notify personnel responsible for the data center.
  • the bonding sensor signal wires connect to the TIP and RING terminals of J 11 .
  • An open contact signifying UNBONDED sensor status, causes the GND_DET 2 signal voltage to remain low.
  • GND_DET 2 connects to a microprocessor input (not shown), such as an input of microchip part number PIC24FJ256GA110-IPF.
  • Programmatic algorithms contained within the microprocessor memory report the status of this signal upstream to the PIM Server to notify personnel responsible for the data center.
  • the bond sensor (or integrated ground bond sensor) could incorporate a visible LED across its normally open contacts to visually indicate, at the sensor, a loose or disconnected termination. In this case the identification and remediation of the incorrect connection becomes much less troublesome and time consuming, especially in large data centers.
  • the hub circuitry incorporates a digital communication stream between the sensor and the hub.
  • the sensor incorporates an intelligent device such as Microchip PIC10F283 or Maxim/Dallas DS2401X1.
  • These intelligent devices contain, in some embodiments, a code that uniquely identifies each sensor, and further includes the capability to memorize data communicated through the serial digital communications. A difference in the information communicated from these sensor devices indicates the status of the sensor.
  • each sensor can uniquely identify itself when deployed with a plurality of such sensors, within a multi-drop serial data subnetwork.
  • a data center physical infrastructure capacity management system including an intelligent/integrated server cabinet provisioned with a plurality of sensors (at least one sensor) or actuators, a means of data communication from sensors to one or more datacenter system management databases, and a datacenter system management database for receiving communications from the cabinets and for storing the received information.
  • the cabinet periodically providing the datacenter system management database with ongoing environmental data representative of various ongoing states of the data center's physical infrastructure.
  • the data center physical infrastructure capacity management system also includes data processing means to determine algorithmically human or automated intervention to the data center's physical infrastructure, the intervention taking the form of: 1) moves, additions, or changes to the physical infrastructure; 2) moves, additions, or changes to the representative underlying datacenter system management database; 3) alerts to IT personnel; and 4) at least one human interface, enabling human interaction with the data center management system.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Signal Processing (AREA)
  • Computer Hardware Design (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Human Computer Interaction (AREA)
  • Small-Scale Networks (AREA)
  • Lock And Its Accessories (AREA)
  • Alarm Systems (AREA)
  • Debugging And Monitoring (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Selective Calling Equipment (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)
  • Computer And Data Communications (AREA)
  • Burglar Alarm Systems (AREA)
US13/306,606 2008-12-11 2011-11-29 Physical infrastructure management system having an integrated cabinet Abandoned US20120133510A1 (en)

Priority Applications (12)

Application Number Priority Date Filing Date Title
US13/306,606 US20120133510A1 (en) 2010-11-30 2011-11-29 Physical infrastructure management system having an integrated cabinet
CN201810059750.4A CN108038952A (zh) 2010-11-30 2011-11-30 被配置成与顶层网络管理软件对接的系统
EP11802822.4A EP2647160B1 (en) 2010-11-30 2011-11-30 Cabinet for holding removable electronic assets
BR112013013426A BR112013013426A2 (pt) 2010-11-30 2011-11-30 arranjo de contato seguro, e, gabinete para conter recursos eletrônicos removíveis.
PCT/US2011/062530 WO2012075077A2 (en) 2010-11-30 2011-11-30 Physical infrastructure management system having an integrated cabinet
CN201180057372.2A CN103229457B (zh) 2010-11-30 2011-11-30 具有集成机柜的物理基础设施管理系统
KR1020137015866A KR101743462B1 (ko) 2010-11-30 2011-11-30 통합된 캐비넷을 가진 물리적 기반시설 관리 시스템
JP2013542119A JP5911885B2 (ja) 2010-11-30 2011-11-30 安全接触構成及びキャビネット
KR1020177014660A KR101875818B1 (ko) 2010-11-30 2011-11-30 통합된 캐비넷을 가진 물리적 기반시설 관리 시스템
US14/324,525 US9337555B2 (en) 2008-12-11 2014-07-07 Physical infrastructure management system having an integrated cabinet
JP2016065270A JP6144381B2 (ja) 2010-11-30 2016-03-29 統合キャビネットを有する物的インフラストラクチャ管理システム
US15/090,815 US20160218934A1 (en) 2008-12-11 2016-04-05 Physical Infrastructure Management System Having an Integrated Cabinet

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US41818910P 2010-11-30 2010-11-30
US13/306,606 US20120133510A1 (en) 2010-11-30 2011-11-29 Physical infrastructure management system having an integrated cabinet

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US14/324,525 Division US9337555B2 (en) 2008-12-11 2014-07-07 Physical infrastructure management system having an integrated cabinet

Publications (1)

Publication Number Publication Date
US20120133510A1 true US20120133510A1 (en) 2012-05-31

Family

ID=46126240

Family Applications (3)

Application Number Title Priority Date Filing Date
US13/306,606 Abandoned US20120133510A1 (en) 2008-12-11 2011-11-29 Physical infrastructure management system having an integrated cabinet
US14/324,525 Active US9337555B2 (en) 2008-12-11 2014-07-07 Physical infrastructure management system having an integrated cabinet
US15/090,815 Abandoned US20160218934A1 (en) 2008-12-11 2016-04-05 Physical Infrastructure Management System Having an Integrated Cabinet

Family Applications After (2)

Application Number Title Priority Date Filing Date
US14/324,525 Active US9337555B2 (en) 2008-12-11 2014-07-07 Physical infrastructure management system having an integrated cabinet
US15/090,815 Abandoned US20160218934A1 (en) 2008-12-11 2016-04-05 Physical Infrastructure Management System Having an Integrated Cabinet

Country Status (7)

Country Link
US (3) US20120133510A1 (enrdf_load_stackoverflow)
EP (1) EP2647160B1 (enrdf_load_stackoverflow)
JP (2) JP5911885B2 (enrdf_load_stackoverflow)
KR (2) KR101875818B1 (enrdf_load_stackoverflow)
CN (2) CN103229457B (enrdf_load_stackoverflow)
BR (1) BR112013013426A2 (enrdf_load_stackoverflow)
WO (1) WO2012075077A2 (enrdf_load_stackoverflow)

Cited By (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130169815A1 (en) * 2011-12-29 2013-07-04 Mark Douglas Carney Equipment enclosures with remote logging, authorization and monitoring
US20130297345A1 (en) * 2012-05-03 2013-11-07 Medical Records Systems Electronic Medical Record Hosting System and Method
US20140088979A1 (en) * 2012-09-24 2014-03-27 Matthew S. Garman Providing system resources with secure containment units
US8901418B2 (en) 2012-06-25 2014-12-02 Panduit Corp. Server cabinet
WO2015095584A1 (en) 2013-12-19 2015-06-25 Panduit Corp. Methods and systems for identifying stranded capacity
CN104765673A (zh) * 2014-01-08 2015-07-08 纬创资通股份有限公司 存放空间管理系统及存放空间管理的方法
US9144175B2 (en) 2012-06-25 2015-09-22 Panduit Corp. Electronics cabinet
US20150325069A1 (en) * 2014-05-08 2015-11-12 Key Systems, Inc. Security asset management system, method, and receptacle therefor
US20150356846A1 (en) * 2014-06-04 2015-12-10 Key Systems, Inc. Security asset management system, method, and fob retention arrangement therefor
US20150359144A1 (en) * 2012-10-15 2015-12-10 Tencent Technology (Shenzhen) Company Limited Data center micro-module and data center formed by micro-modules
CN105205887A (zh) * 2014-06-30 2015-12-30 硕天科技股份有限公司 具环境量测功能的机柜
CN105225286A (zh) * 2015-10-14 2016-01-06 郭裴哲 一种考勤管理系统及方法
WO2017015398A1 (en) * 2015-07-20 2017-01-26 Accuride International Inc. Electronically controlled drawer slide locking for cabinets and hub for same
WO2017023867A1 (en) * 2015-07-31 2017-02-09 Chatsworth Products, Inc. Systems and methods for controlling an electronic lock for a remote device
US20170103629A1 (en) * 2015-10-08 2017-04-13 Rfid Innovation Research Limited Intelligent display system and method
CN106570989A (zh) * 2015-10-08 2017-04-19 Rfid研创有限公司 智能展示系统及方法
US9642186B1 (en) * 2016-01-20 2017-05-02 Das Worldwide Stealth wireless pole system and platform
US9723382B2 (en) 2015-02-27 2017-08-01 Panduit Corp. Door module and uses thereof
US20170237146A1 (en) * 2016-01-20 2017-08-17 Manish K. Dureja Wireless Pole System and Platform
US20170359922A1 (en) * 2016-06-14 2017-12-14 Dell Products L.P. Modular data center with passively-cooled utility module
US9851726B2 (en) 2013-09-04 2017-12-26 Panduit Corp. Thermal capacity management
US9943003B2 (en) 2012-06-25 2018-04-10 Panduit Corp. Electronics cabinet
US20190109773A1 (en) * 2013-08-14 2019-04-11 Commscope Technologies Llc Inferring physical layer connection status of generic cables from planned single-end connection events
EP3360290A4 (en) * 2015-10-08 2019-04-17 Commscope Technologies LLC COMMUNICATION MEDIA AND METHOD FOR PROVIDING AN INDICATION OF A SIGNAL POWER TO A NETWORK UNIT
US10289184B2 (en) 2008-03-07 2019-05-14 Sunbird Software, Inc. Methods of achieving cognizant power management
US10296131B2 (en) * 2016-03-30 2019-05-21 Kabushiki Kaisha Toshiba Monitoring and controlling apparatus
CN110503170A (zh) * 2019-08-26 2019-11-26 兰州海红技术股份有限公司 一种数据中心机房智能资产管理系统
CN110661110A (zh) * 2018-06-29 2020-01-07 中国电力科学研究院有限公司 一种复合材料接地模组及其制作模具
US10820444B2 (en) 2016-08-31 2020-10-27 Commscope Technologies Llc Systems and methods for monitoring the presence of rack mounted equipment
CN112035556A (zh) * 2020-09-01 2020-12-04 北京世纪互联宽带数据中心有限公司 数据中心机柜管理方法、装置和电子设备
US10916889B1 (en) 2019-07-29 2021-02-09 International Business Machines Corporation Management of securable computing resources
WO2021026149A1 (en) * 2019-08-08 2021-02-11 Commscope Technologies Llc Alarm verification system for electronics cabinet
CN113297865A (zh) * 2021-05-21 2021-08-24 贵州电网有限责任公司 一种基于rfid温度标签的开关柜数据管理方法及系统
US11210427B2 (en) 2019-07-29 2021-12-28 International Business Machines Corporation Management of securable computing resources
EP3961522A1 (en) * 2020-08-24 2022-03-02 Bull SAS Device identification system and process in a datacenter
US11341278B2 (en) 2019-07-29 2022-05-24 International Business Machines Corporation Management of securable computing resources
US11341279B2 (en) 2019-07-29 2022-05-24 International Business Machines Corporation Management of securable computing resources
CN115470171A (zh) * 2022-10-17 2022-12-13 南京艾泰克物联网科技有限公司 一种柜体内部机架容量资源的管理系统
US11531787B2 (en) 2019-07-29 2022-12-20 International Business Machines Corporation Management of securable computing resources
US11669602B2 (en) 2019-07-29 2023-06-06 International Business Machines Corporation Management of securable computing resources

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103955716B (zh) * 2014-05-09 2018-03-13 国家电网公司 具有可自动识别服务器的机柜电子标牌装置
US10199715B2 (en) * 2016-01-21 2019-02-05 Rf Code, Inc. Systems and methods for locating rack-based assets
CN107331987B (zh) * 2017-08-25 2019-06-04 郑州云海信息技术有限公司 一种集装箱数据中心的接地装置
WO2019079354A1 (en) 2017-10-16 2019-04-25 Richard Mei SYSTEM FOR MEASURING, MONITORING AND MANAGING LAN CABLE DRIVER ENERGY
CN108960367B (zh) * 2018-06-29 2021-02-12 华为技术有限公司 设备管理方法、装置、系统及存储介质
CN111350421A (zh) * 2018-12-20 2020-06-30 夏敬懿 具有拉锁的装置
KR102069567B1 (ko) * 2019-01-11 2020-01-23 주식회사 에버정보기술 생체 인증을 이용한 통합배선시스템
DE102020112713A1 (de) 2020-05-11 2021-11-11 Reichle & De-Massari Ag Geräteaufnahmesystem
KR102503776B1 (ko) 2022-09-29 2023-02-24 주식회사 이온 고밀도 데이터센터 서버를 위한 스마트 캐비닛 및 그 동작 방법
CN116006029A (zh) * 2022-11-03 2023-04-25 国网北京市电力公司 安全机柜、安全管理系统及安全控制方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020091824A1 (en) * 2001-01-10 2002-07-11 Center 7, Inc. Intermediate systems for enterprise management from a central location
US20030205953A1 (en) * 2002-05-01 2003-11-06 Fox Robert N. Electromagnetic locking system for cabinet doors and drawers
US20080122615A1 (en) * 2006-11-28 2008-05-29 S&S X-Ray Products, Inc. Controlled access supply cabinet and system
US20090189767A1 (en) * 2008-01-29 2009-07-30 Rf Code, Inc. Asset tracking system for electronic equipment
US20100045464A1 (en) * 2007-08-07 2010-02-25 Kevin Michael Knopf System and methods for ensuring proper use of personal protective equipment for work site hazards
US20120086314A1 (en) * 2010-10-12 2012-04-12 Spacesaver Corporation Electronically controlled security cabinet
US8525674B2 (en) * 2010-06-12 2013-09-03 Imicrodata Corporation Collective objects management system with object identification using addressable decoder units

Family Cites Families (41)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3736394A (en) * 1971-09-14 1973-05-29 D Rumbaugh Condition sensing assembly positioned as washer
US4823290A (en) 1987-07-21 1989-04-18 Honeywell Bull Inc. Method and apparatus for monitoring the operating environment of a computer system
US5737193A (en) * 1995-07-21 1998-04-07 Emc Corporation Eletrical chassis storage cabinet
DE29512145U1 (de) * 1995-07-27 1995-10-19 Industrial Technology Research Institute, Chutung, Hsinchu Erdungsklemme mit einer Funktionsanzeige
US6224396B1 (en) * 1997-07-23 2001-05-01 International Business Machines Corporation Compliant, surface-mountable interposer
US6691766B1 (en) * 2000-09-15 2004-02-17 Lucent Technologies Inc. Cabinet cooling with heat pipe
US6456504B1 (en) * 2000-10-31 2002-09-24 3Com Corporation Surface mounted grounding clip for shielded enclosures
WO2002045474A2 (en) * 2000-12-05 2002-06-13 Aprion Digital Ltd. Board integrated resilient contact elements array and method of fabrication
JP2002319082A (ja) * 2001-04-23 2002-10-31 Chuo Seisakusho:Kk データセンター用管理装置
US20030046339A1 (en) * 2001-09-05 2003-03-06 Ip Johnny Chong Ching System and method for determining location and status of computer system server
US6912599B2 (en) * 2001-10-19 2005-06-28 Hewlett-Packard Development Company, L.P. Method and apparatus for sensing positions of device enclosures within multi-shelf cabinets
JP4023164B2 (ja) * 2002-01-24 2007-12-19 松下電工株式会社 電源制御装置
US7394394B2 (en) * 2002-06-19 2008-07-01 Tarma, L.L.C. Battery monitor with wireless remote communication
US20050141431A1 (en) * 2003-08-06 2005-06-30 Caveney Jack E. Network managed device installation and provisioning technique
US6985357B2 (en) * 2003-08-28 2006-01-10 Galactic Computing Corporation Bvi/Bc Computing housing for blade server with network switch
US7753272B2 (en) * 2004-04-23 2010-07-13 Winware, Inc. Object tracking in an enclosure
US7383691B2 (en) * 2005-01-26 2008-06-10 Hewlett-Packard Development Company, L.P. Modular networked sensor assembly
US7178729B2 (en) * 2005-02-25 2007-02-20 Cisco Technology, Inc. Methods and devices for providing alerts for spoilage and hazardous combinations
US20060228922A1 (en) * 2005-03-30 2006-10-12 Morriss Jeff C Flexible PCB connector
JP2006349011A (ja) * 2005-06-14 2006-12-28 Chugoku Electric Power Co Inc:The 締め忘れ防止締結具、これを備えた電気接続具および電気接続具の接続状態確認装置
US8266272B2 (en) * 2005-11-07 2012-09-11 Hewlett-Packard Development Company, L.P. Methods for IT network representation and associated computer program products
US8095435B2 (en) * 2005-11-08 2012-01-10 American Airlines, Inc. Method to effectuate point of use control and accountability of monitored articles
US7886439B2 (en) * 2005-12-15 2011-02-15 The Boeing Company Ground stud installation on composite structures for electrostatic charges
US7568871B2 (en) * 2006-01-27 2009-08-04 Panduit Corp. Data center cabinet bonding stud
JP2007226582A (ja) * 2006-02-24 2007-09-06 Hitachi Ltd ラックマウント型機器の構成管理方式
US7436303B2 (en) * 2006-03-27 2008-10-14 Hewlett-Packard Development Company, L.P. Rack sensor controller for asset tracking
JP4805020B2 (ja) * 2006-05-23 2011-11-02 日本ケーブル株式会社 接地用端子装置
US7936266B2 (en) * 2006-10-27 2011-05-03 Maritime Container Security, Inc. Shipping container seal monitoring device, system and method
DE102006055929A1 (de) * 2006-11-27 2008-05-29 Siemens Ag Anordnung zur Überwachung einer Schraubverbindung
US7685820B2 (en) 2006-12-08 2010-03-30 United Technologies Corporation Supercritical CO2 turbine for use in solar power plants
JP2008159977A (ja) 2006-12-26 2008-07-10 Dainippon Screen Mfg Co Ltd 基板処理装置
CN101212345A (zh) * 2006-12-31 2008-07-02 联想(北京)有限公司 一种刀片服务器管理系统
JP2008287111A (ja) * 2007-05-18 2008-11-27 Fujitsu Ltd プラガブルモジュール
US8280550B2 (en) * 2008-06-17 2012-10-02 Omnicell, Inc. Cabinet with remote integration
US7894944B2 (en) * 2007-07-06 2011-02-22 Microsoft Corporation Environmental monitoring in data facilities
US8369679B2 (en) * 2008-05-27 2013-02-05 Emerson Network Power, Energy Systems, North America, Inc. Switched grounding assemblies
US8537516B1 (en) * 2008-12-05 2013-09-17 Musco Corporation Apparatus, method, and system for monitoring of equipment and earth ground systems
US8306935B2 (en) 2008-12-22 2012-11-06 Panduit Corp. Physical infrastructure management system
GB0904006D0 (en) * 2009-03-09 2009-04-22 Airbus Uk Ltd Bonding lead
US8681479B2 (en) * 2009-05-29 2014-03-25 Rosendin Electric, Inc. Various methods and apparatuses for an integrated power distribution platform
TWI378766B (en) * 2010-01-07 2012-12-01 Transcend Information Inc Electronic device and emi/esd protection module thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020091824A1 (en) * 2001-01-10 2002-07-11 Center 7, Inc. Intermediate systems for enterprise management from a central location
US20030205953A1 (en) * 2002-05-01 2003-11-06 Fox Robert N. Electromagnetic locking system for cabinet doors and drawers
US20080122615A1 (en) * 2006-11-28 2008-05-29 S&S X-Ray Products, Inc. Controlled access supply cabinet and system
US20100045464A1 (en) * 2007-08-07 2010-02-25 Kevin Michael Knopf System and methods for ensuring proper use of personal protective equipment for work site hazards
US20090189767A1 (en) * 2008-01-29 2009-07-30 Rf Code, Inc. Asset tracking system for electronic equipment
US8525674B2 (en) * 2010-06-12 2013-09-03 Imicrodata Corporation Collective objects management system with object identification using addressable decoder units
US20120086314A1 (en) * 2010-10-12 2012-04-12 Spacesaver Corporation Electronically controlled security cabinet

Cited By (53)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10289184B2 (en) 2008-03-07 2019-05-14 Sunbird Software, Inc. Methods of achieving cognizant power management
US20130169815A1 (en) * 2011-12-29 2013-07-04 Mark Douglas Carney Equipment enclosures with remote logging, authorization and monitoring
US20130297345A1 (en) * 2012-05-03 2013-11-07 Medical Records Systems Electronic Medical Record Hosting System and Method
US8901418B2 (en) 2012-06-25 2014-12-02 Panduit Corp. Server cabinet
US9648778B2 (en) 2012-06-25 2017-05-09 Panduit Corp. Electronics cabinet
US9144175B2 (en) 2012-06-25 2015-09-22 Panduit Corp. Electronics cabinet
US9943003B2 (en) 2012-06-25 2018-04-10 Panduit Corp. Electronics cabinet
US9510471B2 (en) 2012-06-25 2016-11-29 Panduit Corp. Electronics cabinet
WO2014047635A3 (en) * 2012-09-24 2014-06-12 Amazon Technologies, Inc. Providing system resources with secure containment units
US20140088979A1 (en) * 2012-09-24 2014-03-27 Matthew S. Garman Providing system resources with secure containment units
US11521139B2 (en) 2012-09-24 2022-12-06 Amazon Technologies, Inc. Providing system resources with secure containment units
US9814162B2 (en) * 2012-10-15 2017-11-07 Tencent Technology (Shenzhen) Company Limited Data center micro-module and data center formed by micro-modules
US20150359144A1 (en) * 2012-10-15 2015-12-10 Tencent Technology (Shenzhen) Company Limited Data center micro-module and data center formed by micro-modules
US20190109773A1 (en) * 2013-08-14 2019-04-11 Commscope Technologies Llc Inferring physical layer connection status of generic cables from planned single-end connection events
US10819602B2 (en) * 2013-08-14 2020-10-27 Commscope Technologies Llc Inferring physical layer connection status of generic cables from planned single-end connection events
US9851726B2 (en) 2013-09-04 2017-12-26 Panduit Corp. Thermal capacity management
WO2015095584A1 (en) 2013-12-19 2015-06-25 Panduit Corp. Methods and systems for identifying stranded capacity
TWI502340B (zh) * 2014-01-08 2015-10-01 Wistron Corp 存放空間管理系統及其存放空間管理之方法
CN104765673A (zh) * 2014-01-08 2015-07-08 纬创资通股份有限公司 存放空间管理系统及存放空间管理的方法
US20150325069A1 (en) * 2014-05-08 2015-11-12 Key Systems, Inc. Security asset management system, method, and receptacle therefor
US20150356846A1 (en) * 2014-06-04 2015-12-10 Key Systems, Inc. Security asset management system, method, and fob retention arrangement therefor
CN105205887A (zh) * 2014-06-30 2015-12-30 硕天科技股份有限公司 具环境量测功能的机柜
US9723382B2 (en) 2015-02-27 2017-08-01 Panduit Corp. Door module and uses thereof
US10733816B2 (en) 2015-07-20 2020-08-04 Accuride International Inc. Electronically controlled drawer slide locking for cabinets and hub for same
WO2017015398A1 (en) * 2015-07-20 2017-01-26 Accuride International Inc. Electronically controlled drawer slide locking for cabinets and hub for same
WO2017023867A1 (en) * 2015-07-31 2017-02-09 Chatsworth Products, Inc. Systems and methods for controlling an electronic lock for a remote device
US9865109B2 (en) 2015-07-31 2018-01-09 Chatsworth Products, Inc. Systems and methods for controlling an electronic lock for a remote device
US10062257B2 (en) * 2015-10-08 2018-08-28 Shenzhen Wale Intelligent System Limited Intelligent display system and method
US20170103629A1 (en) * 2015-10-08 2017-04-13 Rfid Innovation Research Limited Intelligent display system and method
EP3360290A4 (en) * 2015-10-08 2019-04-17 Commscope Technologies LLC COMMUNICATION MEDIA AND METHOD FOR PROVIDING AN INDICATION OF A SIGNAL POWER TO A NETWORK UNIT
CN106570989A (zh) * 2015-10-08 2017-04-19 Rfid研创有限公司 智能展示系统及方法
US10374920B2 (en) 2015-10-08 2019-08-06 Commscope Technologies Llc Communication media and methods for providing indication of signal power to a network entity
CN105225286A (zh) * 2015-10-14 2016-01-06 郭裴哲 一种考勤管理系统及方法
US20170237146A1 (en) * 2016-01-20 2017-08-17 Manish K. Dureja Wireless Pole System and Platform
US9642186B1 (en) * 2016-01-20 2017-05-02 Das Worldwide Stealth wireless pole system and platform
US10296131B2 (en) * 2016-03-30 2019-05-21 Kabushiki Kaisha Toshiba Monitoring and controlling apparatus
US10736231B2 (en) * 2016-06-14 2020-08-04 Dell Products L.P. Modular data center with passively-cooled utility module
US20170359922A1 (en) * 2016-06-14 2017-12-14 Dell Products L.P. Modular data center with passively-cooled utility module
US10820444B2 (en) 2016-08-31 2020-10-27 Commscope Technologies Llc Systems and methods for monitoring the presence of rack mounted equipment
CN110661110A (zh) * 2018-06-29 2020-01-07 中国电力科学研究院有限公司 一种复合材料接地模组及其制作模具
US11669602B2 (en) 2019-07-29 2023-06-06 International Business Machines Corporation Management of securable computing resources
US10916889B1 (en) 2019-07-29 2021-02-09 International Business Machines Corporation Management of securable computing resources
US11531787B2 (en) 2019-07-29 2022-12-20 International Business Machines Corporation Management of securable computing resources
US11210427B2 (en) 2019-07-29 2021-12-28 International Business Machines Corporation Management of securable computing resources
US11341278B2 (en) 2019-07-29 2022-05-24 International Business Machines Corporation Management of securable computing resources
US11341279B2 (en) 2019-07-29 2022-05-24 International Business Machines Corporation Management of securable computing resources
WO2021026149A1 (en) * 2019-08-08 2021-02-11 Commscope Technologies Llc Alarm verification system for electronics cabinet
CN110503170A (zh) * 2019-08-26 2019-11-26 兰州海红技术股份有限公司 一种数据中心机房智能资产管理系统
EP3961522A1 (en) * 2020-08-24 2022-03-02 Bull SAS Device identification system and process in a datacenter
US11844189B2 (en) 2020-08-24 2023-12-12 Bull Sas Device identification system and process in a datacenter
CN112035556A (zh) * 2020-09-01 2020-12-04 北京世纪互联宽带数据中心有限公司 数据中心机柜管理方法、装置和电子设备
CN113297865A (zh) * 2021-05-21 2021-08-24 贵州电网有限责任公司 一种基于rfid温度标签的开关柜数据管理方法及系统
CN115470171A (zh) * 2022-10-17 2022-12-13 南京艾泰克物联网科技有限公司 一种柜体内部机架容量资源的管理系统

Also Published As

Publication number Publication date
EP2647160B1 (en) 2020-06-24
BR112013013426A2 (pt) 2016-10-11
KR20140003444A (ko) 2014-01-09
JP2014506347A (ja) 2014-03-13
EP2647160A2 (en) 2013-10-09
JP6144381B2 (ja) 2017-06-07
CN103229457B (zh) 2018-02-16
JP2016167277A (ja) 2016-09-15
CN103229457A (zh) 2013-07-31
EP2647160A4 (en) 2017-12-20
WO2012075077A3 (en) 2013-04-04
KR101743462B1 (ko) 2017-06-05
KR101875818B1 (ko) 2018-07-06
US20160218934A1 (en) 2016-07-28
JP5911885B2 (ja) 2016-04-27
KR20170065669A (ko) 2017-06-13
US20140363992A1 (en) 2014-12-11
US9337555B2 (en) 2016-05-10
CN108038952A (zh) 2018-05-15
WO2012075077A2 (en) 2012-06-07

Similar Documents

Publication Publication Date Title
US9337555B2 (en) Physical infrastructure management system having an integrated cabinet
US8723653B2 (en) Asset identification and management method and system
US8094020B2 (en) Data center server location and monitoring system
US9400726B2 (en) Power usage monitoring of power feed circuits using power distribution units
US20080265722A1 (en) Intelligent track system for mounting electronic equipment
CN102165644B (zh) 电源插座和it设备之间的物理连通性的自动发现
CN102369415B (zh) 用于将传感器数据与组件位置相关联的组件、系统和方法
US20140253289A1 (en) Data center server location and monitoring system
US9374928B2 (en) Intelligent rack enclosure
US20110248823A1 (en) Asset identification and tracking system and method
CN102081567B (zh) 服务器
CN113283779A (zh) 一种窃电损耗定位的精准分析算法
CN206322201U (zh) 变电站接地线实时监测系统
CN110061532A (zh) 一种用于小型设备的无人值守智能充电柜
CN205080592U (zh) 数据机房资源管理系统
KR101369933B1 (ko) 스마트 러닝 교탁 장치와 시스템 및 스마트 러닝 교탁 장치의 관리 방법
CN203337766U (zh) 防静电用品监测装置及系统
CN107529099A (zh) 一种基于rfid的电子配线架控制系统
CN209233501U (zh) 一种用于小型设备的无人值守智能充电柜
CN216118759U (zh) 管理设备的监测系统
CN113791958A (zh) 管理设备的监测系统
CN206039615U (zh) 医院高值耗材智能存取与监管设备
WO2004083877A1 (en) Fault tracking apparatus
CN102385352A (zh) 通信行业空调节电率智能监控系统

Legal Events

Date Code Title Description
AS Assignment

Owner name: PANDUIT CORP., ILLINOIS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:PIERCE, ALFRED;DOORHY, BRENDAN F.;KILINSKIS, DAVID K.;AND OTHERS;SIGNING DATES FROM 20111213 TO 20120106;REEL/FRAME:027657/0803

AS Assignment

Owner name: PANDUIT CORP., ILLINOIS

Free format text: CORRECTIVE ASSIGNMENT TO CORRECT THE MIDDLE INITIAL OF INVENTOR DAVID K. KILINSKIS TO DAVID C. KILINSKIS PREVIOUSLY RECORDED ON REEL 027657 FRAME 0803. ASSIGNOR(S) HEREBY CONFIRMS THE RECORDATION OF THE ASSIGNMENT LISTS AN INCORRECT MIDDLE INITIAL OF INVENTOR DAVID KILINSKIS.;ASSIGNORS:PIERCE, ALFRED;DOORHY, BRENDAN F.;KILINSKIS, DAVID C.;AND OTHERS;SIGNING DATES FROM 20111213 TO 20120106;REEL/FRAME:027674/0908

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION