US20110030374A1 - Steam turbine facility - Google Patents

Steam turbine facility Download PDF

Info

Publication number
US20110030374A1
US20110030374A1 US12/674,073 US67407309A US2011030374A1 US 20110030374 A1 US20110030374 A1 US 20110030374A1 US 67407309 A US67407309 A US 67407309A US 2011030374 A1 US2011030374 A1 US 2011030374A1
Authority
US
United States
Prior art keywords
pressure turbine
steam
turbine
temperature
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/674,073
Other languages
English (en)
Inventor
Shin Nishimoto
Yoshinori Tanaka
Tatsuaki Fujikawa
Ryuichi Yamamoto
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Power Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Assigned to MITSUBISHI HEAVY INDUSTRIES, LTD. reassignment MITSUBISHI HEAVY INDUSTRIES, LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: FUJIKAWA, TATSUAKI, NISHIMOTO, SHIN, TANAKA, YOSHINORI, YAMAMOTO, RYUICHI
Publication of US20110030374A1 publication Critical patent/US20110030374A1/en
Assigned to MITSUBISHI HITACHI POWER SYSTEMS, LTD. reassignment MITSUBISHI HITACHI POWER SYSTEMS, LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: MITSUBISHI HEAVY INDUSTRIES, LTD.
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D5/00Blades; Blade-carrying members; Heating, heat-insulating, cooling or antivibration means on the blades or the members
    • F01D5/02Blade-carrying members, e.g. rotors
    • F01D5/06Rotors for more than one axial stage, e.g. of drum or multiple disc type; Details thereof, e.g. shafts, shaft connections
    • F01D5/063Welded rotors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D13/00Combinations of two or more machines or engines
    • F01D13/003Combinations of two or more machines or engines with at least two independent shafts, i.e. cross-compound
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D13/00Combinations of two or more machines or engines
    • F01D13/02Working-fluid interconnection of machines or engines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • F01D25/24Casings; Casing parts, e.g. diaphragms, casing fastenings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K7/00Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
    • F01K7/16Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type
    • F01K7/22Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type the turbines having inter-stage steam heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05CINDEXING SCHEME RELATING TO MATERIALS, MATERIAL PROPERTIES OR MATERIAL CHARACTERISTICS FOR MACHINES, ENGINES OR PUMPS OTHER THAN NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES
    • F05C2201/00Metals
    • F05C2201/04Heavy metals
    • F05C2201/0433Iron group; Ferrous alloys, e.g. steel
    • F05C2201/0466Nickel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05DINDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
    • F05D2220/00Application
    • F05D2220/30Application in turbines
    • F05D2220/31Application in turbines in steam turbines

Definitions

  • the present invention relates to a steam turbine facility including a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine.
  • thermal power generation is safe, and its utility value is high as a power generation method with a high capacity to respond to load changes, it is expected that thermal power generation will also continue to play an important role in the power generation field in the future.
  • a steam turbine facility which is used in a coal-fired power station including steam turbines, is provided with a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine.
  • a steam turbine facility steam in the 600° C. class is used.
  • Patent Document 1 has disclosed a steam turbine facility capable of operating at a high temperature in which a reheat steam condition is 650° C. or higher.
  • FIG. 14 is a schematic system view illustrating a conventional steam turbine facility disclosed in Patent Document 1.
  • a intermediate-pressure turbine is separated into a first intermediate-pressure turbine 112 on a high-temperature and high-pressure side and a second intermediate-pressure turbine 114 on a low-temperature and low-pressure side.
  • the high-pressure turbine 116 and the second intermediate-pressure turbine 114 are integrated to form an integrated structure 122 .
  • the integrated structure 122 is connected together on the same axis as the first intermediate-pressure turbine 112 on the high-temperature and high-pressure side, the low-pressure turbine 124 , and the generator 126 .
  • Main steam superheated to a temperature in the 600° C. class by a boiler 132 is introduced into the high-pressure turbine 116 through a main steam pipe 134 .
  • the steam introduced into the high-pressure turbine 116 performs expansion work and is then exhausted and returned to the boiler 132 through a low-temperature reheat pipe 138 .
  • the steam returned to the boiler 132 is reheated by the boiler 132 such that the temperature thereof increases to the 700° C. class.
  • the reheated steam is sent to the first intermediate-pressure turbine 112 through a high-temperature reheat pipe 140 .
  • a rotor of the first intermediate-pressure turbine 112 is formed from a material (austenitic heat resisting steel) capable of withstanding steam heated to a high temperature class of 700° C.
  • the steam sent to the first intermediate-pressure turbine 112 performs expansion work and is then exhausted and sent to the second intermediate-pressure turbine 114 through an intermediate-pressure part connection pipe 142 in a state where the temperature thereof decreased to 550° C. class.
  • the steam sent to the second intermediate-pressure turbine 114 performs expansion work and is then exhausted and introduced to the low-pressure turbine 124 through a crossover pipe 144 .
  • the steam introduced into the low-pressure turbine 124 performs expansion work and is then exhausted and sent to a condenser 128 .
  • the steam sent to the condenser 128 is condensed by the condenser 128 , and is then returned to the boiler 132 in a state where the pressure thereof is raised by a water feed pump 130 .
  • the generator 126 is rotationally driven by the expansion work of the respective turbines to generate power.
  • the intermediate-pressure turbine is divided, and only the first intermediate-pressure turbine 112 is formed from a material capable of withstanding steam with a temperature of 650° C. or higher. Therefore, a steam condition of 650° C. or higher may be adopted, and the use amount of the material capable of withstanding steam with a temperature of 650° C. or higher may be reduced. Therefore, it is possible to reduce the manufacturing costs of the entire facility.
  • the high-pressure turbine is not formed from a material capable of withstanding steam with a temperature of 650° C. or higher. Therefore, it is difficult to apply the technique to a case where steam with a temperature of 650° C. or higher is used as main steam.
  • the facility illustrated in FIG. 14 is difficult to implement.
  • a material as Ni-based alloy capable of withstanding steam with a temperature of 650° C. or higher is used to form the first intermediate-pressure turbine 112 , it is difficult to manufacture a turbine rotor or casing weighing 10 t or more in terms of the limitation of material manufacturing, and it is impossible to manufacture a large-sized turbine rotor or casing.
  • the first intermediate-pressure turbine 112 may be further divided into the primary and secondary first intermediate-pressure turbines 112 and 113 .
  • the number of casings increases, and thus the number of buildings or pipes increases. Therefore, the manufacturing costs of the facility inevitably increase. Additionally, as the number of rotors (divided turbines) increases, it is highly likely that vibration occurs.
  • a ferrite-based material may be used instead of using the Ni-based alloy. In this case, however, a large amount of cooling steam needs to be introduced into the casings. As a result, the internal efficiency of the turbines decreases.
  • Patent Document 1 Japanese Patent No. 4074208
  • the invention was made in view of the problems of the conventional technique, and the object thereof is to provide a steam turbine facility capable of suppressing the possibility of vibration occurrence and a drastic increase in facility cost, thereby realizing an increase in size of the facility, even if steam conditions of 650° C. or higher are adopted.
  • the invention provides a steam turbine facility including a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine.
  • the high-pressure turbine is separated into a first high-pressure turbine part on a high-temperature and high-pressure side and a second high-pressure turbine part on a low-temperature and low-pressure side
  • the intermediate-pressure turbine is separated into a first intermediate-pressure turbine part on the high-temperature and high-pressure side and a second intermediate-pressure turbine part on the low-temperature and low-temperature side
  • the first high-pressure turbine part and the first intermediate-pressure turbine part are integrated to form a first integrated part
  • at least the second high-pressure turbine part and the second intermediate-pressure turbine part are integrated to form a second integrated part
  • at least any one of the rotors and casings of the first high-pressure turbine part and the first intermediate-pressure turbine part into which steam with a temperature of 650° C. or higher is introduced, are formed from Ni-based alloy, and at least any one of the overall rotor
  • At least any one of the rotors and the casings i.e., at least any one of the steam-introduction-side rotors and casings of the first high-pressure turbine and the first intermediate-pressure turbine
  • the (steam-introduction-side) turbines into which the steam with a temperature of 650° C. or higher is introduced are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of rotor members or casing members by welding. Therefore, even under the steam condition in which the steam with a temperature of 650° C. or higher is introduced into the high-pressure turbine and the intermediate-pressure turbine, it is possible to increase the size of the facility without increasing the numbers of casings, rotors (divided turbines), and blade stages.
  • steam with a temperature of 650° C. or higher is introduced into the first high-pressure turbine and the first intermediate-pressure turbine.
  • the first high-pressure turbine and the first intermediate-pressure turbine are integrated, and the second high-pressure turbine and the second intermediate-pressure turbine, into which steam with a temperature of less than 650° C. is introduced and which may be formed from a ferrite-based material, are integrated. Therefore, since the amount of high-grade Ni-based alloy materials used is reduced, it is possible to suppress a drastic increase in facility costs. Additionally, since at least any one of the rotors and the casings of the (steam-introduction-side) turbines into which the steam with a temperature of 650° C. or higher is introduced are formed from Ni-based alloy, it is possible to increase the internal efficiency of the turbines, without introducing a large amount of cooling steam into the turbines.
  • the steam turbine facility may further include an very-high-pressure turbine into which steam having a higher pressure than the steam introduced into the high-pressure turbine is introduced.
  • the very-high-pressure turbine, the first integrated part, the second integrated part, and the low-pressure turbine may be connected together on the same axis.
  • steam with a temperature of 650° C. or higher may be introduced into the first high-pressure turbine part and the first intermediate-pressure turbine part forming the first integrated part, and steam with a temperature of less than 650° C. may be introduced into the second high-pressure turbine part and the second intermediate-pressure turbine part forming the second integrated part.
  • the second integrated part and the low-pressure turbine may be connected on a different axis from the first integrated part, and the first integrated part may be arranged at a position closer to a boiler than the connection structure of the second integrated part and the low-pressure turbine, the boiler superheating the steam introduced into the high-pressure turbine and the intermediate-pressure turbine.
  • the first high-pressure turbine part and the first intermediate-pressure turbine part into which the steam with a temperature of 650° C. or higher is introduced are arranged close to the boiler, it is possible to shorten the pipe connecting the boiler to the first high-pressure turbine part and the pipe connecting the boiler to the first intermediate-pressure turbine part. Accordingly, it is possible to reduce the amount of material used in the pipes. Since the steam with a temperature of 650° C. or higher passes through the pipe connecting the boiler to the first high-pressure turbine part and the pipe connecting the boiler to the first intermediate-pressure turbine part, it is necessary to manufacture the pipes with Ni-based alloy that is a high-grade material. However, as the amount of high-grade material used is reduced by shortening the pipes, it is possible to reduce the manufacturing costs of the entire facility.
  • the steam turbine facility may further include an very-high-pressure turbine into which steam having a higher pressure than the steam introduced into the high-pressure turbine is introduced.
  • the first integrated part and the very-high-pressure turbine may be connected together on the same axis.
  • the second integrated part may be further integrated with the low-pressure turbine.
  • the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • the invention provides a steam turbine facility including a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine.
  • the high-pressure turbine is separated into a first high-pressure turbine part on a high-temperature and high-pressure side and a second high-pressure turbine part on a low-temperature and low-pressure side
  • the intermediate-pressure turbine is separated into a first intermediate-pressure turbine part on the high-temperature and high-pressure side and a second intermediate-pressure turbine part on the low-temperature and low-temperature side
  • the first high-pressure turbine part and the first intermediate-pressure turbine part are integrated to form a first integrated part, at least any one of the rotors and casings of the steam-introduction-side turbines of the first high-pressure turbine part and the first intermediate-pressure turbine part, into which steam with a temperature of 650° C.
  • the second intermediate-pressure turbine part and the low-pressure turbine may be integrated.
  • the second high-pressure turbine and the second intermediate-pressure turbine may not be integrated in order to easily cope with large capacity.
  • the number of casings and rotors may be reduced, which makes it possible to reduce the facility costs.
  • the invention provides a steam turbine facility including a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine.
  • the turbines into which steam with a temperature of 650° C. or higher is introduced are connected together on the same axis, the turbines into which steam with a temperature of less than 650° C. are connected together on the same axis different from that of the turbines into which the steam with a temperature of 650° C. or higher is introduced, the turbines into which the steam with a temperature of 650° C. or higher is introduced are arranged at positions closer to the boiler than the turbines into which the steam with a temperature of less than 650° C.
  • the boiler superheating the steam introduced into the high-pressure turbine and the intermediate-pressure turbine, at least any one of the rotors and casings of the (steam-introduction-side) turbines into which the steam with a temperature of 650° C. or higher is introduced are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of rotor members or casing members by welding.
  • All the turbines into which the steam with a temperature of 650° C. or higher is introduced are arranged close to the boiler, it is possible to shorten pipes connecting the boiler to the turbines into which the steam with a temperature of 650° C. or higher is introduced. Therefore, it is possible to reduce the amount of material used in the pipes. Since steam with a temperature of 650° C. or higher passes through the pipes connecting the boiler to the turbines into which the steam with a temperature of 650° C. or higher is introduced, it is necessary to manufacture the pipes with Ni-based alloy that is a high-grade material. However, since the amount of material used is reduced by shortening the pipes, it is possible to reduce the manufacturing costs of the entire facility.
  • rotors or casings of the (steam-introduction-side) turbines into which the steam with a temperature of 650° C. or higher is introduced are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of rotor members or casing members by welding. Therefore, even under the steam condition in which the steam with a temperature of 650° C. or higher is introduced into the first intermediate-pressure turbine part, it is possible to increase the size of the facility, without increasing the numbers of casings, rotors, and blade stages.
  • the invention provides a steam turbine facility including a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine. At least the high-pressure turbine and the intermediate-pressure turbine are integrated to form an integrated structure, the integrated structure and the low-pressure turbine are connected together on the same axis, at least any one of the rotors and casings of the (steam-introduction-side) turbines into which steam with a temperature of 650° C. or higher is introduced are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of rotor members or casing members by welding.
  • the high-pressure turbine, the intermediate-pressure turbine, and the low-pressure turbine may be integrated. In this case, since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • the steam turbine facility may further include an very-high-pressure turbine into which steam having a higher pressure than the steam introduced into the high-pressure turbine is introduced.
  • the first integrated part and the very-high-pressure turbine may be connected together on the same axis.
  • FIG. 1 is a view illustrating the configuration of a steam turbine power generation facility according to Example 1 of the invention.
  • FIG. 2 is a view illustrating the configuration of a steam turbine power generation facility formed by partially changing the configuration of the steam turbine power generation facility according to Example 1 of the invention.
  • FIG. 3 is a view illustrating the configuration of a steam turbine power generation facility formed by partially changing the configuration of the steam turbine power generation facility according to Example 1 of the invention.
  • FIG. 4 is a view illustrating the configuration of a steam turbine power generation facility formed by partially changing the configuration of the steam turbine power generation facility according to Example 1 of the invention.
  • FIG. 5 is a view illustrating the configuration of a steam turbine power generation facility according to Example 2 of the invention.
  • FIG. 6 is a view illustrating the configuration of a steam turbine power generation facility formed by partially changing the configuration of the steam turbine power generation facility according to Example 2 of the invention.
  • FIG. 7 is a view illustrating the configuration of a steam turbine power generation facility according to Example 3 of the invention.
  • FIG. 8 is a view illustrating the configuration of a steam turbine power generation facility formed by partially changing the configuration of the steam turbine power generation facility according to Example 3 of the invention.
  • FIG. 9 is a view illustrating the configuration of a steam turbine power generation facility according to Example 4 of the invention.
  • FIG. 10 is a view illustrating the configuration of a steam turbine power generation facility formed by partially changing the configuration of the steam turbine power generation facility according to Example 4 of the invention.
  • FIG. 11 is a view illustrating the configuration of a steam turbine power generation facility according to Example 5 of the invention.
  • FIG. 12 is a view illustrating the configuration of a steam turbine power generation facility according to Example 6 of the invention.
  • FIG. 13 is a view illustrating the configuration of a steam turbine power generation facility according to Example 7 of the invention.
  • FIG. 14 is a view illustrating the configuration of a conventional steam turbine facility.
  • FIG. 15 is a view illustrating the configuration of another conventional steam turbine facility.
  • FIG. 1 is a view illustrating the configuration of a steam turbine power generation facility according to Example 1 of the invention.
  • Example 1 of the invention As illustrated in FIG. 1 , the steam turbine power generation facility according to Example 1 of the invention will be described.
  • the steam turbine power generation facility 10 illustrated in FIG. 1 includes a high-pressure turbine separated into two as will be described later, an intermediate-pressure turbine separated into two as will be described later, a low-pressure turbine 24 , a generator 26 , a condenser 28 , and a boiler 32 as main components.
  • the high-pressure turbine is separated into a first high-pressure turbine 16 on a high-temperature and high-pressure side and a second high-pressure turbine 18 on a low-temperature and low-pressure side
  • the intermediate-pressure turbine is separated into a first intermediate-pressure turbine 12 on the high-temperature and high-pressure side and a second intermediate-pressure turbine 14 on the low-temperature and low-pressure side.
  • the first high-pressure turbine 16 and the first intermediate-pressure turbine 12 are integrated to form an integrated structure 20
  • the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 are integrated to form an integrated structure 22 .
  • the integrated structure 20 , the integrated structure 22 , the low-pressure turbine 24 , and the generator 26 are connected together on the same axis.
  • At least any one of the steam-introduction-side rotors and casings of the first high-pressure turbine 16 and the first intermediate-pressure turbine 12 are formed from a Ni-based alloy. At least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of rotor members or casing members by welding.
  • Main steam superheated to a temperature of 650° C. or higher by the boiler 32 is introduced into the first high-pressure turbine 16 through a main steam pipe 34 .
  • the steam introduced into the first high-pressure turbine 16 performs expansion work and is then exhausted.
  • the exhausted steam is introduced into the second high-pressure turbine 18 through a high-pressure part connection pipe 36 in a state where the temperature thereof decreased to less than 650° C.
  • the introduced heat performs expansion work in the second high-pressure turbine and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 38 .
  • the steam returned to the boiler 32 is reheated to 650° C. or higher by the boiler 32 , and sent to the first intermediate-pressure turbine 12 through a high-temperature reheat pipe 40 .
  • the sent steam performs expansion work in the first intermediate-pressure turbine 12 and is then exhausted in a state where the temperature thereof decreased to the class of 550° C.
  • the exhausted steam is sent to the second intermediate-pressure turbine 14 through an intermediate-pressure pipe 42 .
  • the steam sent to the second intermediate-pressure turbine 14 performs expansion work and is then exhausted and sent to the low-pressure turbine 24 through a crossover pipe 44 .
  • the steam sent to the low-pressure turbine 24 performs expansion work and is then exhausted and sent to the condenser 28 .
  • the steam sent to the condenser 28 is condensed by the condenser 28 and is returned to the boiler 32 in a state where the pressure thereof is raised by a water feed pump 30 .
  • the generator 26 is rotationally driven by the expansion work of the respective turbines to generate power.
  • At least any one of the rotors and the casings of the (steam-introduction-side) turbines (the first high-pressure turbine 16 and the first intermediate-pressure turbine 12 ), into which steam with a temperature of 650° C. or higher is introduced, is formed from Ni-based alloy and constructed by joining the plurality of members through welding as a whole. Therefore, it is possible to increase the size of the facility without increasing the numbers of casings, rotors, and blade stages in both the first high-pressure turbine 16 and the intermediate-pressure turbine 12 .
  • the steam with a temperature of 650° C. or higher is introduced into the first high-pressure turbine 16 and the first intermediate-pressure turbine 12 , and the steam with a temperature of less than 650° C. is introduced into the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 .
  • both the high-pressure turbine and the intermediate-pressure turbine are separated into two parts. Additionally, at least any one of the (steam-introduction-side) rotors and casings into which the steam with a temperature of 650° C. or higher is introduced is formed from Ni-based alloy, and the first high-pressure turbine 16 and the first intermediate-pressure turbine 12 are constructed by joining the plurality of members formed from Ni-based alloy through welding as a whole, are integrated to form the integrated structure 20 , and the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 , into which the steam with a temperature of less than 650° C. is introduced and which may be formed from a ferrite-based material as in the related art, are integrated to form the integrated structure.
  • the amount of high-grade Ni-based alloy materials used may be reduced, which makes it possible to suppress a drastic increase in facility cost.
  • welding structures formed from different materials for example, 12Cr steel and 2.25Cr steel; 12Cr steel and CrMoV steel
  • a high-grade material may be used only in portions requiring high-temperature strength, and a low-grade material may be used in portions which do not require high-temperature strength. Therefore, it is possible to minimize the amount of high-grade material used.
  • the second high-pressure turbine 18 , the second intermediate-pressure turbine 14 , and the low-pressure turbine 24 may be integrated to form an integrated structure 21 .
  • the numbers of casings and rotors may be reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure 21 , it is possible to minimize the amount of high-grade material used.
  • the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 may not be integrated due to increased capacity.
  • the second intermediate-pressure turbine 14 and the low-pressure turbine 24 may be integrated to form an integrated structure 23 .
  • the numbers of casings and rotors may be reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure 23 , it is possible to minimize the amount of high-grade material used.
  • FIG. 5 is a view illustrating the configuration of a steam turbine power generation facility according to Example 2 of the invention.
  • the steam turbine power generation facility 10 illustrated in FIG. 5 is constructed by partially changing the configuration of the steam turbine power generation facility according to Example 1 of the invention, which is illustrated in FIG. 1 . That is, the integrated structure 22 , the low-pressure turbine 24 , and the generator 26 are connected together on the same axis, and the integrated structure 20 and a generator 27 are connected together on the same axis so as to be arranged at positions close to the boiler 32 . The closer to the boiler 32 the integrated structure 20 is, the better.
  • the other components are the same as those of the steam turbine power generation facility according to Example 1 of the invention.
  • the first high-pressure turbine 16 and the first intermediate-pressure turbine 12 are arranged close to the boiler 32 . Therefore, since a pipe connecting the boiler 32 to the first high-pressure turbine 16 and a pipe connecting the boiler 32 to the first intermediate-pressure turbine 12 may be shortened, it is possible to reduce the amount of material used for the pipes. Since the steam with a temperature of 650° C.
  • the second high-pressure turbine 18 , the second intermediate-pressure turbine 14 , and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown).
  • the facility costs since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel
  • the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 may not be integrated due to increased capacity.
  • the second intermediate-pressure turbine 14 and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown).
  • the facility costs since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure 23 , it is possible to minimize the amount of high-grade material used.
  • FIG. 7 is a view illustrating the configuration of a steam turbine power generation facility according to Example 3 of the invention.
  • the steam turbine power generation facility 10 illustrated in FIG. 7 mainly includes an very-high-pressure turbine 19 , a high-pressure turbine separated into two as will be described later, an intermediate-pressure turbine separated into two as will be described later, a low-pressure turbine 24 , a generator 26 , a condenser 28 , and a boiler 32 .
  • the high-pressure turbine is separated into a first high-pressure turbine 16 on a high-temperature and high-pressure side and a second high-pressure turbine 18 on a low-temperature and low-pressure side
  • the intermediate-pressure turbine is separated into a first intermediate-pressure turbine 12 on the high-temperature and high-pressure side and a second intermediate-pressure turbine 14 on the low-temperature and low-pressure side.
  • the first high-pressure turbine 16 and the first intermediate-pressure turbine 12 are integrated to form an integrated structure 20
  • the second high-pressure turbine 18 and the second intermediate-structure turbine 14 are integrated to form an integrated structure 22 .
  • the very-high-pressure turbine 19 , the integrated structure 20 , the integrated structure 22 , the low-pressure turbine 24 , and the generator 26 are connected together on the same axis.
  • Rotors of the very-high-pressure turbine 19 , the first high-pressure turbine 16 , and the first intermediate-pressure turbine 12 are formed from Ni-based alloy on the steam introduction side, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of rotor members or casing members by welding.
  • Main steam superheated to a temperature of 650° C. or higher by the boiler 32 is introduced into the very-high-pressure turbine 19 through a main steam pipe 33 .
  • the steam introduced into the very-high-pressure turbine 19 performs expansion work and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 35 in a state where the temperature thereof decreased to less than 650° C.
  • the steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature thereof increases to 650° C. or higher.
  • the reheated steam is introduced into the first high-pressure turbine 16 through a high-temperature reheat pipe 34 .
  • the steam introduced into the first high-pressure turbine 16 performs expansion work and is then exhausted.
  • the exhausted steam is introduced into the second high-pressure turbine 18 through a high-pressure part connection pipe 36 in a state where the temperature thereof decreased to less than 650° C.
  • the introduced steam performs expansion work in the second high-pressure turbine and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 38 .
  • the steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature thereof increases to 650° C. or higher.
  • the reheated steam is sent to the first intermediate-pressure turbine 12 through a high-temperature reheat pipe 40 .
  • the sent steam performs expansion work in the first intermediate-pressure turbine 12 and is then exhausted and sent to the second intermediate-pressure turbine 14 through an intermediate-pressure part connection pipe 42 in a state where the temperature thereof decreased to 550° C.
  • the steam sent to the second intermediate-pressure turbine 14 performs expansion work and is then exhausted and sent to the low-pressure turbine 24 through a crossover pipe 44 .
  • the steam introduced into the low-pressure turbine 24 performs expansion work and is then exhausted and sent to the condenser 28 .
  • the steam sent to the condenser 28 is condensed by the condenser 28 and is then returned to the boiler 32 in a state where the pressure thereof is raised by a water feed pump 30 .
  • the generator 26 is rotationally driven by the expansion work of the respective turbines to generate power.
  • At least any one of the rotors and the casings of the turbines (the very-high-pressure turbine 19 , the first high-pressure turbine 16 , and the first intermediate-pressure turbine 12 ), into which the steam with a temperature of 650° C. or higher is introduced, are constructed by joining together a plurality of members formed from Ni-based alloy through welding. Therefore, it is possible to increase the size of the facility without increasing the numbers of casings, rotors, and blade stages in any one of the very-high-pressure turbine, the first high-pressure turbine 16 , and the intermediate-pressure turbine 12 . Additionally, as the very-high-pressure turbine 19 is provided, it is possible to use further high-pressure steam.
  • the steam with a temperature of 650° C. or higher is introduced into the very-high-pressure turbine 19 , the first high-pressure turbine 16 , and the first intermediate-pressure turbine 12 , and the steam with a temperature of less than 650° C. is introduced into the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 .
  • both the high-pressure turbine and the intermediate-pressure turbine are separated into two parts. Additionally, at least any one of the (steam-introduction-side) rotors and casings into which the steam with a temperature of 650° C. or higher is introduced is formed from Ni-based alloy, and the first high-pressure turbine 16 and the first intermediate-pressure turbine 12 are constructed by joining together a plurality of members formed from Ni-based alloy through welding as a whole, are integrated to form the integrated structure 20 to connect the very-high-pressure turbine 19 , and the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 , into which the steam with a temperature of less than 650° C.
  • the second high-pressure turbine 18 , the second intermediate-pressure turbine 14 , and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown).
  • the numbers of casings and rotors may be reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure, it is possible to minimize the amount of high-grade material used.
  • the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 may not be integrated due to increased capacity.
  • the second intermediate-pressure turbine 14 and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown).
  • the facility costs since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure, it is possible to minimize the amount of high-grade material used.
  • FIG. 9 is a view illustrating the configuration of a steam turbine power generation facility according to Example 4 of the invention.
  • the steam turbine power generation facility 10 illustrated in FIG. 9 is constructed by partially changing the configuration of the steam turbine power generation facility according to Example 3 of the invention, which is illustrated in FIG. 7 .
  • the integrated structure 22 , the low-pressure turbine 24 , and the generator 26 are connected together on the same axis, and the very-high-pressure turbine 19 , the integrated structure 20 , and the generator 27 are connected together on the same axis so as to be arranged at positions close to the boiler 32 .
  • the other components are the same as those of the steam turbine power generation facility according to Example 3 of the invention.
  • the very-high pressure turbine 19 , the first high-pressure turbine 16 , and the first intermediate-pressure turbine 12 , into which the steam with a temperature of 650° C. or higher is introduced are arranged close to the boiler 32 . Therefore, since a pipe connecting the boiler 32 to the very-high-pressure turbine 19 , a pipe connecting the boiler 32 to the first high-pressure turbine 16 , and a pipe connecting the boiler 32 to the first intermediate-pressure turbine 12 may be shortened, it is possible to reduce the amount of material used in the pipes. Since the steam with a temperature of 650° C.
  • the second high-pressure turbine 18 , the second intermediate-pressure turbine 14 , and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown).
  • the facility costs since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel
  • the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 may not be integrated due to increased capacity.
  • the second intermediate-pressure turbine 14 and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown).
  • the numbers of casings and rotors may be reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure, it is possible to minimize the amount of high-grade material used.
  • FIG. 11 is a view illustrating the configuration of a steam turbine power generation facility according to Example 5 of the invention.
  • the steam turbine power generation facility 10 illustrated in FIG. 11 includes a high-pressure turbine 16 , an intermediate-pressure turbine 12 , a low-pressure turbine 24 , generators 26 and 27 , a condenser 28 , and a boiler 32 as main components.
  • the high-pressure turbine 16 , the low-pressure turbine 24 , and the generator 26 are connected together on the same axis, and the intermediate-pressure turbine 12 and the generator 27 are connected together on the same axis so as to be arranged at positions close to the boiler 32 .
  • At least any one of a rotor and a casing (on the steam introduction side) of the intermediate-pressure turbine 12 is formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of rotor members or casing members by welding.
  • Main steam superheated to a temperature of less than 650 ° C. by the boiler 32 is introduced into the high-pressure turbine 16 through a main steam pipe 34 .
  • the steam introduced into the high-pressure turbine 16 performs expansion work and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 38 .
  • the steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature thereof increases to 650° C. or higher.
  • the reheated steam is sent to the intermediate-pressure turbine 12 through a high-temperature reheat pipe 40 .
  • the sent steam performs expansion work in the intermediate-pressure turbine 12 and is then exhausted and sent to the low-pressure turbine 24 through a crossover pipe 44 .
  • the steam sent to the low-pressure turbine 24 performs expansion work and is then exhausted and sent to the condenser 28 .
  • the steam sent to the condenser 28 is condensed by the condenser 28 and is then returned to the boiler 32 in a state where the pressure thereof is raised by a water feed pump 30 .
  • the generators 26 and 27 are rotationally driven by the expansion work of the respective turbines to generate power.
  • At least any one of the rotor and the casing of the intermediate-pressure turbine 12 into which the steam with a temperature of 650° C. or higher is introduced is formed from Ni-based alloy and constructed by joining together a plurality of members formed from Ni-based alloy through welding as a whole. Therefore, it is possible to increase the size of the facility, without increasing the numbers of casings, rotors, blade stages in the intermediate-pressure turbine 12 .
  • the intermediate-pressure turbine 12 into which the steam with a temperature of 650° C. or higher is introduced is arranged close to the boiler 32 , the pipe connecting the boiler 32 to the intermediate-pressure turbine 12 may be shortened, which makes it possible to reduce the amount of material used in the pipe. Since the steam with a temperature of 650° C. or higher passes through the pipe connecting the boiler 32 to the intermediate-pressure turbine 12 , it is necessary to manufacture the pipe with Ni-based alloy that is a high-grade material. However, since the amount of material used is reduced by shortening the pipe, it is possible to reduce the manufacturing costs of the entire facility.
  • FIG. 12 is a view illustrating the configuration of a steam turbine power generation facility according to Example 6 of the invention.
  • the steam turbine power generation facility 10 illustrated in FIG. 12 includes a high-pressure turbine 16 , an intermediate-pressure turbine 12 , a low-pressure turbine 24 , a generator 26 , a condenser 28 , and a boiler 32 as main components.
  • the high-pressure turbine 16 , the intermediate-pressure turbine 12 , the low-pressure turbine 24 , and the generator 26 are connected together on the same axis, and the high-pressure turbine 16 and the intermediate-pressure turbine are integrated to form an integrated structure 25 .
  • At least any one of the steam-introduction-side rotors and casings of the high-pressure turbine 16 and the intermediate-pressure turbine 12 are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of rotor members or casing members by welding.
  • Main steam superheated to a temperature of 650° C. or higher by the boiler 32 is introduced into the high-pressure turbine 16 through a main steam pipe 34 .
  • the steam introduced into the high-pressure turbine 16 performs expansion work and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 48 in a state where the temperature thereof decreased to less than 650° C.
  • the steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature thereof increases to 650° C. or higher.
  • the reheated steam is introduced into the intermediate-pressure turbine 12 through a high-temperature reheat pipe 40 .
  • the introduced steam performs expansion work in the intermediate-pressure turbine 12 and is then exhausted and sent to the low-pressure turbine 24 through a crossover pipe 44 .
  • the steam sent to the low-pressure turbine 24 performs expansion work and is then exhausted and sent to the condenser 28 .
  • the steam sent to the condenser 28 is condensed by the condenser 28 and is then returned to the boiler 32 in a state where the pressure thereof is raised by a water feed pump 30 .
  • the generator 26 is rotationally driven by the expansion work of the respective turbines to generate power.
  • At least any one of the rotors and the casings of the turbines (the high-pressure turbine 16 and the intermediate-pressure turbine 12 ), into which the steam with a temperature of 650° C. or higher is introduced, are formed from Ni-based alloy and constructed by joining together a plurality of members formed from Ni-based alloy through welding as a whole, and the high-pressure turbine 16 and the intermediate-pressure turbine 12 are integrated to form the integrated structure 25 . Therefore, it is possible to increase the size of the facility, without increasing the numbers of casings, rotors, and blade stages.
  • the high-pressure turbine 16 , the intermediate-pressure turbine 12 , and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown).
  • the facility costs since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure, it is possible to minimize the amount of high-grade material used.
  • FIG. 13 is a view illustrating the configuration of a steam turbine power generation facility according to Example 7 of the invention.
  • the steam turbine power generation facility 10 illustrated in FIG. 13 includes an very-high-pressure turbine 19 , a high-pressure turbine 16 , an intermediate-pressure turbine 12 , a low-pressure turbine 24 , a generator 26 , a condenser 28 , and a boiler 32 as main components.
  • the very-high-pressure turbine 19 , the high-pressure turbine 16 , the intermediate-pressure turbine 12 , the low-pressure turbine 24 , and the generator 26 are connected together on the same axis.
  • At least any one of the steam-introduction-side rotors and casings of the very-high-pressure turbine 19 , the high-pressure turbine 16 , and the intermediate-pressure turbine 12 are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of rotor members or casing members by welding.
  • Main steam superheated to a temperature of 650° C. or higher by the boiler 32 is introduced into the very-high-pressure turbine 19 through a main steam pipe 33 .
  • the steam introduced into the very-high-pressure turbine 19 performs expansion work and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 35 in a state where the temperature thereof decreased to less than 650° C.
  • the steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature thereof increases to 650° C. or higher.
  • the reheated steam is introduced into the high-pressure turbine 16 through a high-temperature reheat pipe 34 .
  • the steam introduced into the high-pressure turbine 16 performs expansion work and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 38 in a state where the temperature thereof decreased to less than 650° C.
  • the steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature increases to 650° C. or higher.
  • the reheated steam is sent to the intermediate-pressure turbine 12 through a high-temperature reheat pipe 40 .
  • the steam sent to the intermediate-pressure turbine 12 performs expansion work and is then exhausted to the low-pressure turbine 24 through a crossover pipe 44 .
  • the steam introduced into the low-pressure turbine 24 performs expansion work and is then exhausted and sent to the condenser 28 .
  • the steam sent to the condenser 28 is condensed by the condenser 28 and is then returned to the boiler 32 in a state where the pressure thereof is raised by a water feed pump 30 .
  • the generator 26 is rotationally driven by the expansion work of the respective turbines to generate power.
  • At least any one of the rotors and the casings of the turbines (the very-high-pressure turbine 19 , the high-pressure turbine 16 , and the intermediate-pressure turbine 12 ), into which the steam with a temperature of 650° C. or higher is introduced, are formed from Ni-based alloy and constructed by joining together a plurality of members formed from Ni-based alloy through welding as a whole. Therefore, it is possible to increase the size of the facility, without increasing the numbers of casings, rotors, and blade stages in any one of the very-high-pressure turbine 19 , the high-pressure turbine 16 , and the intermediate-pressure turbine 12 . Additionally, as the very-high-pressure turbine 19 is provided, it is possible to use further high-pressure steam.
  • the high-pressure turbine 16 , the intermediate-pressure turbine 12 , and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown).
  • the facility costs since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, Ni-based alloy, 12Cr steel, and 2.25Cr steel, 3.5Ni steel; Ni-based alloy, 9Cr steel, 2.25Cr steel, 3.5Ni steel; Ni-based alloy, 2.25Cr steel, and 3.5Ni steel
  • welding structures formed from different materials for example, Ni-based alloy, 12Cr steel, and 2.25Cr steel, 3.5Ni steel; Ni-based alloy, 9Cr steel, 2.25Cr steel, 3.5Ni steel; Ni-based alloy, 2.25Cr steel, and 3.5Ni steel
  • the invention even if steam conditions in the 650° C. class or 700° C. class are adopted, it is possible to utilize the invention as a steam turbine facility capable of suppressing the possibility of vibration occurrence and a drastic increase in facility cost, thereby realizing an increase in size of the steam turbine facility.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Turbine Rotor Nozzle Sealing (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)
  • Manufacture And Refinement Of Metals (AREA)
US12/674,073 2008-08-11 2009-07-30 Steam turbine facility Abandoned US20110030374A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2008-207499 2008-08-11
JP2008207499 2008-08-11
PCT/JP2009/063909 WO2010018775A1 (ja) 2008-08-11 2009-07-30 蒸気タービン設備

Publications (1)

Publication Number Publication Date
US20110030374A1 true US20110030374A1 (en) 2011-02-10

Family

ID=41668920

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/674,073 Abandoned US20110030374A1 (en) 2008-08-11 2009-07-30 Steam turbine facility

Country Status (6)

Country Link
US (1) US20110030374A1 (ja)
EP (1) EP2180149B1 (ja)
JP (1) JP4898956B2 (ja)
KR (1) KR101214420B1 (ja)
CN (1) CN101802349B (ja)
WO (1) WO2010018775A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130305719A1 (en) * 2012-05-21 2013-11-21 Alstom Technology Ltd High-temperature steam turbine power plant with double reheat

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9194246B2 (en) 2011-09-23 2015-11-24 General Electric Company Steam turbine LP casing cylindrical struts between stages
CN102705016A (zh) * 2012-06-21 2012-10-03 哈尔滨汽轮机厂有限责任公司 600mw等级供热抽汽超临界汽轮机
GB2541702A (en) * 2015-08-27 2017-03-01 Doosan Babcock Ltd Steam generation system and method

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2902831A (en) * 1958-08-22 1959-09-08 Gen Electric Governing system for reheat steam turbine powerplant
US5199256A (en) * 1989-01-26 1993-04-06 General Electric Company Overspeed protection for a gas turbine/steam turbine combined cycle
JPH07247806A (ja) * 1994-03-14 1995-09-26 Toshiba Corp 蒸気タービン発電プラント
US20020172595A1 (en) * 1998-04-21 2002-11-21 Kabushiki Kaisha Toshiba Steam turbine
JP2003343210A (ja) * 2002-05-23 2003-12-03 Toshiba Corp 溶接接合構造を有するタービンケーシング及びそれを適用した蒸気タービン並びにタービンケーシングの製造方法
US20050022529A1 (en) * 2003-07-30 2005-02-03 Kabushiki Kaisha Toshiba Steam turbine power plant
JP2005344527A (ja) * 2004-05-31 2005-12-15 Toshiba Corp 蒸気タービンロータおよびその製造方法
US20060217216A1 (en) * 2004-12-06 2006-09-28 Macgregor Golf Company Fairway wood with titanium face member
US20060245911A1 (en) * 2005-04-28 2006-11-02 Kabushiki Kaisha Toshiba Steam turbine power plant
WO2007045563A2 (de) * 2005-10-17 2007-04-26 Siemens Aktiengesellschaft Dampfkraftwerk sowie verfahren zum nachrüsten eines dampfkraftwerks
US20070166152A1 (en) * 2004-01-30 2007-07-19 Norbert Thamm Turbomachine
US20080085195A1 (en) * 2004-10-06 2008-04-10 Hallowell International, Llc Oil balance system and method for compressors connected in series
US20080250790A1 (en) * 2007-04-13 2008-10-16 Shinya Imano High-temperature steam turbine power plant

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6053415A (ja) 1983-08-31 1985-03-27 Mazda Motor Corp 自動車のサスペンション制御装置
JPH04209903A (ja) * 1990-12-03 1992-07-31 Toshiba Corp タ―ビン
JP3977546B2 (ja) * 1999-03-25 2007-09-19 株式会社東芝 蒸気タービン発電設備
JP2000282808A (ja) * 1999-03-26 2000-10-10 Toshiba Corp 蒸気タービン設備
JP4074208B2 (ja) * 2003-03-17 2008-04-09 株式会社東芝 蒸気タービン発電プラント
JP4794254B2 (ja) * 2005-09-26 2011-10-19 中国電力株式会社 蒸気タービンプラントおよびその運転方法
EP1895094B1 (de) * 2006-08-25 2010-09-29 Siemens Aktiengesellschaft Drallgekühlte Rotor-Schweissnaht
JP4908137B2 (ja) * 2006-10-04 2012-04-04 株式会社東芝 タービンロータおよび蒸気タービン

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2902831A (en) * 1958-08-22 1959-09-08 Gen Electric Governing system for reheat steam turbine powerplant
US5199256A (en) * 1989-01-26 1993-04-06 General Electric Company Overspeed protection for a gas turbine/steam turbine combined cycle
JPH07247806A (ja) * 1994-03-14 1995-09-26 Toshiba Corp 蒸気タービン発電プラント
US20020172595A1 (en) * 1998-04-21 2002-11-21 Kabushiki Kaisha Toshiba Steam turbine
JP2003343210A (ja) * 2002-05-23 2003-12-03 Toshiba Corp 溶接接合構造を有するタービンケーシング及びそれを適用した蒸気タービン並びにタービンケーシングの製造方法
US7238005B2 (en) * 2003-07-30 2007-07-03 Kabushiki Kaisha Toshiba Steam turbine power plant
US20050022529A1 (en) * 2003-07-30 2005-02-03 Kabushiki Kaisha Toshiba Steam turbine power plant
US20100251713A1 (en) * 2003-07-30 2010-10-07 Kabushiki Kaisha Toshiba Steam turbine power plant
US20070166152A1 (en) * 2004-01-30 2007-07-19 Norbert Thamm Turbomachine
JP2005344527A (ja) * 2004-05-31 2005-12-15 Toshiba Corp 蒸気タービンロータおよびその製造方法
US20080085195A1 (en) * 2004-10-06 2008-04-10 Hallowell International, Llc Oil balance system and method for compressors connected in series
US20060217216A1 (en) * 2004-12-06 2006-09-28 Macgregor Golf Company Fairway wood with titanium face member
US20060245911A1 (en) * 2005-04-28 2006-11-02 Kabushiki Kaisha Toshiba Steam turbine power plant
WO2007045563A2 (de) * 2005-10-17 2007-04-26 Siemens Aktiengesellschaft Dampfkraftwerk sowie verfahren zum nachrüsten eines dampfkraftwerks
US7975483B2 (en) * 2005-10-17 2011-07-12 Siemens Aktiengesellschaft Steam power plant and also method for retrofitting a steam power plant
US20080250790A1 (en) * 2007-04-13 2008-10-16 Shinya Imano High-temperature steam turbine power plant

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
JP 2003343210 A English Translation *
JP 2005344527 A English Translation *
JP,07-247806,A (1995) English translation by machine translation of JP 7247806 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130305719A1 (en) * 2012-05-21 2013-11-21 Alstom Technology Ltd High-temperature steam turbine power plant with double reheat

Also Published As

Publication number Publication date
WO2010018775A1 (ja) 2010-02-18
EP2180149A1 (en) 2010-04-28
CN101802349B (zh) 2014-11-05
JPWO2010018775A1 (ja) 2012-01-26
CN101802349A (zh) 2010-08-11
EP2180149B1 (en) 2016-12-21
JP4898956B2 (ja) 2012-03-21
KR101214420B1 (ko) 2012-12-21
EP2180149A4 (en) 2015-08-26
KR20100035171A (ko) 2010-04-02

Similar Documents

Publication Publication Date Title
JP6556807B2 (ja) 新型のタービン発電機ユニット
CN102325964B (zh) 蒸汽涡轮发电设备的冷却方法及装置
US8201410B2 (en) High-temperature steam turbine power plant
US20110088404A1 (en) Reheat gas turbine
US8603265B2 (en) Ni-based alloy high-chrome steel structure and manufacturing method of the same
US10927697B2 (en) Turbogenerator set
EP2180149B1 (en) Steam turbine equipment
US8794913B2 (en) Steam turbine facility
Ohji et al. Steam turbine cycles and cycle design optimization: the Rankine cycle, thermal power cycles, and integrated gasification-combined cycle power plants
JP4995317B2 (ja) 低圧タービン用ロータ
JP2010249050A (ja) 蒸気タービンおよび蒸気タービン設備
JP4074208B2 (ja) 蒸気タービン発電プラント
JP4322433B2 (ja) 蒸気タービンプラント
Bittermann et al. Turbine technologies for high performance light water reactors
Ceuca et al. Benchmarking Combined Cycle Power Plant Designs Employing 9-12% Cr CSEF Steels in Environments Prone to Steam Oxidation
Edelmann et al. The 700? C steam turbine power plant? status of development and outlook
JP4745129B2 (ja) 蒸気タービンおよび蒸気タービンプラント
JP4934738B2 (ja) 高温蒸気タービンプラント

Legal Events

Date Code Title Description
AS Assignment

Owner name: MITSUBISHI HEAVY INDUSTRIES, LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:NISHIMOTO, SHIN;TANAKA, YOSHINORI;FUJIKAWA, TATSUAKI;AND OTHERS;REEL/FRAME:024127/0949

Effective date: 20100317

AS Assignment

Owner name: MITSUBISHI HITACHI POWER SYSTEMS, LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:MITSUBISHI HEAVY INDUSTRIES, LTD.;REEL/FRAME:034909/0486

Effective date: 20150129

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION