EP2180149A1 - Steam turbine equipment - Google Patents

Steam turbine equipment Download PDF

Info

Publication number
EP2180149A1
EP2180149A1 EP09806667A EP09806667A EP2180149A1 EP 2180149 A1 EP2180149 A1 EP 2180149A1 EP 09806667 A EP09806667 A EP 09806667A EP 09806667 A EP09806667 A EP 09806667A EP 2180149 A1 EP2180149 A1 EP 2180149A1
Authority
EP
European Patent Office
Prior art keywords
pressure turbine
steam
turbine
temperature
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP09806667A
Other languages
German (de)
French (fr)
Other versions
EP2180149A4 (en
EP2180149B1 (en
Inventor
Shin Nishimoto
Yoshinori Tanaka
Tatsuaki Fujikawa
Ryuichi Yamamoto
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Power Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Publication of EP2180149A1 publication Critical patent/EP2180149A1/en
Publication of EP2180149A4 publication Critical patent/EP2180149A4/en
Application granted granted Critical
Publication of EP2180149B1 publication Critical patent/EP2180149B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D5/00Blades; Blade-carrying members; Heating, heat-insulating, cooling or antivibration means on the blades or the members
    • F01D5/02Blade-carrying members, e.g. rotors
    • F01D5/06Rotors for more than one axial stage, e.g. of drum or multiple disc type; Details thereof, e.g. shafts, shaft connections
    • F01D5/063Welded rotors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D13/00Combinations of two or more machines or engines
    • F01D13/003Combinations of two or more machines or engines with at least two independent shafts, i.e. cross-compound
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D13/00Combinations of two or more machines or engines
    • F01D13/02Working-fluid interconnection of machines or engines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • F01D25/24Casings; Casing parts, e.g. diaphragms, casing fastenings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K7/00Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
    • F01K7/16Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type
    • F01K7/22Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type the turbines having inter-stage steam heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05CINDEXING SCHEME RELATING TO MATERIALS, MATERIAL PROPERTIES OR MATERIAL CHARACTERISTICS FOR MACHINES, ENGINES OR PUMPS OTHER THAN NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES
    • F05C2201/00Metals
    • F05C2201/04Heavy metals
    • F05C2201/0433Iron group; Ferrous alloys, e.g. steel
    • F05C2201/0466Nickel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05DINDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
    • F05D2220/00Application
    • F05D2220/30Application in turbines
    • F05D2220/31Application in turbines in steam turbines

Definitions

  • the present invention relates to a steam turbine facility including a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine.
  • thermal power generation is safe, and its utility value is high as a power generation method with a high capacity to respond to load changes, it is expected that thermal power generation will also continue to play an important role in the power generation field in the future.
  • a steam turbine facility which is used in a coal-fired power station including steam turbines, is provided with a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine.
  • a steam turbine facility steam in the 600°C class is used.
  • Patent Document 1 has disclosed a steam turbine facility capable of operating at a high temperature in which a reheat steam condition is 650°C or higher.
  • FIG. 14 is a schematic system view illustrating a conventional steam turbine facility disclosed in Patent Document 1.
  • a intermediate-pressure turbine is separated into a first intermediate-pressure turbine 112 on a high-temperature and high-pressure side and a second intermediate-pressure turbine 114 on a low-temperature and low-pressure side.
  • the high-pressure turbine 116 and the second intermediate-pressure turbine 114 are integrated to form an integrated structure 122.
  • the integrated structure 122 is connected together on the same axis as the first intermediate-pressure turbine 112 on the high-temperature and high-pressure side, the low-pressure turbine 124, and the generator 126.
  • Main steam superheated to a temperature in the 600°C class by a boiler 132 is introduced into the high-pressure turbine 116 through a main steam pipe 134.
  • the steam introduced into the high-pressure turbine 116 performs expansion work and is then exhausted and returned to the boiler 132 through a low-temperature reheat pipe 138.
  • the steam returned to the boiler 132 is reheated by the boiler 132 such that the temperature thereof increases to the 700°C class.
  • the reheated steam is sent to the first intermediate-pressure turbine 112 through a high-temperature reheat pipe 140.
  • a rotor of the first intermediate-pressure turbine 112 is formed from a material (austenitic heat resisting steel) capable of withstanding steam heated to a high temperature class of 700°C.
  • the steam sent to the first intermediate-pressure turbine 112 performs expansion work and is then exhausted and sent to the second intermediate-pressure turbine 114 through an intermediate-pressure part connection pipe 142 in a state where the temperature thereof decreased to 550°C class.
  • the steam sent to the second intermediate-pressure turbine 114 performs expansion work and is then exhausted and introduced to the low-pressure turbine 124 through a crossover pipe 144.
  • the steam introduced into the low-pressure turbine 124 performs expansion work and is then exhausted and sent to a condenser 128.
  • the steam sent to the condenser 128 is condensed by the condenser 128, and is then returned to the boiler 132 in a state where the pressure thereof is raised by a water feed pump 130.
  • the generator 126 is rotationally driven by the expansion work of the respective turbines to generate power.
  • the intermediate-pressure turbine is divided, and only the first intermediate-pressure turbine 112 is formed from a material capable of withstanding steam with a temperature of 650°C or higher. Therefore, a steam condition of 650°C or higher may be adopted, and the use amount of the material capable of withstanding steam with a temperature of 650°C or higher may be reduced. Therefore, it is possible to reduce the manufacturing costs of the entire facility.
  • the high-pressure turbine is not formed from a material capable of withstanding steam with a temperature of 650°C or higher. Therefore, it is difficult to apply the technique to a case where steam with a temperature of 650°C or higher is used as main steam.
  • the facility illustrated in FIG. 14 is difficult to implement.
  • a material as Ni-based alloy capable of withstanding steam with a temperature of 650°C or higher is used to form the first intermediate-pressure turbine 112
  • the first intermediate-pressure turbine 112 may be further divided into the primary and secondary first intermediate-pressure turbines 112 and 113.
  • the number of casings increases, and thus the number of buildings or pipes increases. Therefore, the manufacturing costs of the facility inevitably increase. Additionally, as the number of rotors (divided turbines) increases, it is highly likely that vibration occurs.
  • a ferrite-based material may be used instead of using the Ni-based alloy. In this case, however, a large amount of cooling steam needs to be introduced into the casings. As a result, the internal efficiency of the turbines decreases.
  • the invention was made in view of the problems of the conventional technique, and the object thereof is to provide a steam turbine facility capable of suppressing the possibility of vibration occurrence and a drastic increase in facility cost, thereby realizing an increase in size of the facility, even if steam conditions of 650°C or higher are adopted.
  • the invention provides a steam turbine facility including a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine.
  • the high-pressure turbine is separated into a first high-pressure turbine part on a high-temperature and high-pressure side and a second high-pressure turbine part on a low-temperature and low-pressure side
  • the intermediate-pressure turbine is separated into a first intermediate-pressure turbine part on the high-temperature and high-pressure side and a second intermediate-pressure turbine part on the low-temperature and low-temperature side
  • the first high-pressure turbine part and the first intermediate-pressure turbine part are integrated to form a first integrated part
  • at least the second high-pressure turbine part and the second intermediate-pressure turbine part are integrated to form a second integrated part
  • at least any one of the rotors and casings of the first high-pressure turbine part and the first intermediate-pressure turbine part, into which steam with a temperature of 650°C or higher is introduced are formed from Ni-based alloy, and at least any one of the overall rotor
  • At least any one of the rotors and the casings of the turbines into which the steam with a temperature of 650°C or higher is introduced are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding. Therefore, even under the steam condition in which the steam with a temperature of 650°C or higher is introduced into the high-pressure turbine and the intermediate-pressure turbine, it is possible to increase the size of the facility without increasing the numbers of casings, rotors (divided turbines), and blade stages.
  • steam with a temperature of 650°C or higher is introduced into the first high-pressure turbine and the first intermediate-pressure turbine. Additionally, the first high-pressure turbine and the first intermediate-pressure turbine are integrated, and the second high-pressure turbine and the second intermediate-pressure turbine, into which steam with a temperature of less than 650°C is introduced and which may be formed from a ferrite-based material, are integrated. Therefore, since the amount of high-grade Ni-based alloy materials used is reduced, it is possible to suppress a drastic increase in facility costs.
  • At least any one of the rotors and the casings of the turbines into which the steam with a temperature of 650°C or higher is introduced are formed from Ni-based alloy, it is possible to increase the internal efficiency of the turbines, without introducing a large amount of cooling steam into the turbines.
  • the steam turbine facility may further include an very-high-pressure turbine into which steam having a higher pressure than the steam introduced into the high-pressure turbine is introduced.
  • the very-high-pressure turbine, the first integrated part, the second integrated part, and the low-pressure turbine may be connected together on the same axis.
  • steam with a temperature of 650°C or higher may be introduced into the first high-pressure turbine part and the first intermediate-pressure turbine part forming the first integrated part, and steam with a temperature of less than 650°C may be introduced into the second high-pressure turbine part and the second intermediate-pressure turbine part forming the second integrated part.
  • the second integrated part and the low-pressure turbine may be connected on a different axis from the first integrated part, and the first integrated part may be arranged at a position closer to a boiler than the connection structure of the second integrated part and the low-pressure turbine, the boiler superheating the steam introduced into the high-pressure turbine and the intermediate-pressure turbine.
  • the first high-pressure turbine part and the first intermediate-pressure turbine part into which the steam with a temperature of 650°C or higher is introduced are arranged close to the boiler, it is possible to shorten the pipe connecting the boiler to the first high-pressure turbine part and the pipe connecting the boiler to the first intermediate-pressure turbine part. Accordingly, it is possible to reduce the amount of material used in the pipes. Since the steam with a temperature of 650°C or higher passes through the pipe connecting the boiler to the first high-pressure turbine part and the pipe connecting the boiler to the first intermediate-pressure turbine part, it is necessary to manufacture the pipes with Ni-based alloy that is a high-grade material. However, as the amount of high-grade material used is reduced by shortening the pipes, it is possible to reduce the manufacturing costs of the entire facility.
  • the steam turbine facility may further include an very-high-pressure turbine into which steam having a higher pressure than the steam introduced into the high-pressure turbine is introduced.
  • the first integrated part and the very-high-pressure turbine may be connected together on the same axis.
  • the second integrated part may be further integrated with the low-pressure turbine.
  • the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • the invention provides a steam turbine facility including a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine.
  • the high-pressure turbine is separated into a first high-pressure turbine part on a high-temperature and high-pressure side and a second high-pressure turbine part on a low-temperature and low-pressure side
  • the intermediate-pressure turbine is separated into a first intermediate-pressure turbine part on the high-temperature and high-pressure side and a second intermediate-pressure turbine part on the low-temperature and low-temperature side
  • the first high-pressure turbine part and the first intermediate-pressure turbine part are integrated to form a first integrated part
  • at least any one of the rotors and casings of the steam-introduction-side turbines of the first high-pressure turbine part and the first intermediate-pressure turbine part, into which steam with a temperature of 650°C or higher is introduced are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a
  • the second high-pressure turbine and the second intermediate-pressure turbine may not be integrated in order to easily cope with large capacity.
  • the number of casings and rotors may be reduced, which makes it possible to reduce the facility costs.
  • the invention provides a steam turbine facility including a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine.
  • the turbines into which steam with a temperature of 650°C or higher is introduced are connected together on the same axis, the turbines into which steam with a temperature of less than 650°C are connected together on the same axis different from that of the turbines into which the steam with a temperature of 650°C or higher is introduced, the turbines into which the steam with a temperature of 650°C or higher is introduced are arranged at positions closer to the boiler than the turbines into which the steam with a temperature of less than 650°C is introduced, the boiler superheating the steam introduced into the high-pressure turbine and the intermediate-pressure turbine, at least any one of the rotors and casings of the turbines into which the steam with a temperature of 650°C or higher is introduced are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together
  • All the turbines into which the steam with a temperature of 650°C or higher is introduced are arranged close to the boiler, it is possible to shorten pipes connecting the boiler to the turbines into which the steam with a temperature of 650°C or higher is introduced. Therefore, it is possible to reduce the amount of material used in the pipes. Since steam with a temperature of 650°C or higher passes through the pipes connecting the boiler to the turbines into which the steam with a temperature of 650°C or higher is introduced, it is necessary to manufacture the pipes with Ni-based alloy that is a high-grade material. However, since the amount of material used is reduced by shortening the pipes, it is possible to reduce the manufacturing costs of the entire facility.
  • rotors or casings of the turbines into which the steam with a temperature of 650°C or higher is introduced are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding. Therefore, even under the steam condition in which the steam with a temperature of 650°C or higher is introduced into the first intermediate-pressure turbine part, it is possible to increase the size of the facility, without increasing the numbers of casings, rotors, and blade stages.
  • the invention provides a steam turbine facility including a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine. At least the high-pressure turbine and the intermediate-pressure turbine are integrated to form an integrated structure, the integrated structure and the low-pressure turbine are connected together on the same axis, at least any one of the rotors and casings of the turbines into which steam with a temperature of 650°C or higher is introduced are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  • the high-pressure turbine, the intermediate-pressure turbine, and the low-pressure turbine may be integrated. In this case, since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • the steam turbine facility may further include an very-high-pressure turbine into which steam having a higher pressure than the steam introduced into the high-pressure turbine is introduced.
  • the first integrated part and the very-high-pressure turbine may be connected together on the same axis.
  • FIG. 1 is a view illustrating the configuration of a steam turbine power generation facility according to Example 1 of the invention.
  • Example 1 of the invention As illustrated in FIG. 1 , the steam turbine power generation facility according to Example 1 of the invention will be described.
  • the steam turbine power generation facility 10 illustrated in FIG. 1 includes a high-pressure turbine separated into two as will be described later, an intermediate-pressure turbine separated into two as will be described later, a low-pressure turbine 24, a generator 26, a condenser 28, and a boiler 32 as main components.
  • the high-pressure turbine is separated into a first high-pressure turbine 16 on a high-temperature and high-pressure side and a second high-pressure turbine 18 on a low-temperature and low-pressure side
  • the intermediate-pressure turbine is separated into a first intermediate-pressure turbine 12 on the high-temperature and high-pressure side and a second intermediate-pressure turbine 14 on the low-temperature and low-pressure side.
  • the first high-pressure turbine 16 and the first intermediate-pressure turbine 12 are integrated to form an integrated structure 20
  • the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 are integrated to form an integrated structure 22.
  • the integrated structure 20, the integrated structure 22, the low-pressure turbine 24, and the generator 26 are connected together on the same axis.
  • At least any one of the rotors and casings of the first high-pressure turbine 16 and the first intermediate-pressure turbine 12 are formed from a Ni-based alloy. At least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  • Main steam superheated to a temperature of 650°C or higher by the boiler 32 is introduced into the first high-pressure turbine 16 through a main steam pipe 34.
  • the steam introduced into the first high-pressure turbine 16 performs expansion work and is then exhausted.
  • the exhausted steam is introduced into the second high-pressure turbine 18 through a high-pressure part connection pipe 36 in a state where the temperature thereof decreased to less than 650°C.
  • the introduced heat performs expansion work in the second high-pressure turbine and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 38.
  • the steam returned to the boiler 32 is reheated to 650°C or higher by the boiler 32, and sent to the first intermediate-pressure turbine 12 through a high-temperature reheat pipe 40.
  • the sent steam performs expansion work in the first intermediate-pressure turbine 12 and is then exhausted in a state where the temperature thereof decreased to the class of 550°C.
  • the exhausted steam is sent to the second intermediate-pressure turbine 14 through an intermediate-pressure pipe 42.
  • the steam sent to the second intermediate-pressure turbine 14 performs expansion work and is then exhausted and sent to the low-pressure turbine 24 through a crossover pipe 44.
  • the steam sent to the low-pressure turbine 24 performs expansion work and is then exhausted and sent to the condenser 28.
  • the steam sent to the condenser 28 is condensed by the condenser 28 and is returned to the boiler 32 in a state where the pressure thereof is raised by a water feed pump 30.
  • the generator 26 is rotationally driven by the expansion work of the respective turbines to generate power.
  • At least any one of the rotors and the casings of the turbines (the first high-pressure turbine 16 and the first intermediate-pressure turbine 12), into which steam with a temperature of 650°C or higher is introduced, is constructed by joining the plurality of members formed from Ni-based alloy through welding. Therefore, it is possible to increase the size of the facility without increasing the numbers of casings, rotors, and blade stages in both the first high-pressure turbine 16 and the intermediate-pressure turbine 12.
  • the steam with a temperature of 650°C or higher is introduced into the first high-pressure turbine 16 and the first intermediate-pressure turbine 12, and the steam with a temperature of less than 650°C is introduced into the second high-pressure turbine 18 and the second intermediate-pressure turbine 14.
  • both the high-pressure turbine and the intermediate-pressure turbine are separated into two parts. Additionally, the first high-pressure turbine 16 and the first intermediate-pressure turbine 12, into which the steam with a temperature of 650°C or higher is introduced and in which at least any one of the rotors and the casings constructed by joining the plurality of members formed from Ni-based alloy through welding are used, are integrated to form the integrated structure 20, and the second high-pressure turbine 18 and the second intermediate-pressure turbine 14, into which the steam with a temperature of less than 650°C is introduced and which may be formed from a ferrite-based material as in the related art, are integrated to form the integrated structure.
  • the amount of high-grade Ni-based alloy materials used may be reduced, which makes it possible to suppress a drastic increase in facility cost.
  • welding structures formed from different materials for example, 12Cr steel and 2.25Cr steel; 12Cr steel and CrMoV steel
  • a high-grade material may be used only in portions requiring high-temperature strength, and a low-grade material may be used in portions which do not require high-temperature strength. Therefore, it is possible to minimize the amount of high-grade material used.
  • the second high-pressure turbine 18, the second intermediate-pressure turbine 14, and the low-pressure turbine 24 may be integrated to form an integrated structure 21.
  • the numbers of casings and rotors may be reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure 21, it is possible to minimize the amount of high-grade material used.
  • the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 may not be integrated due to increased capacity.
  • the second intermediate-pressure turbine 14 and the low-pressure turbine 24 may be integrated to form an integrated structure 23.
  • the numbers of casings and rotors may be reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure 23, it is possible to minimize the amount of high-grade material used.
  • FIG. 5 is a view illustrating the configuration of a steam turbine power generation facility according to Example 2 of the invention.
  • the steam turbine power generation facility 10 illustrated in FIG. 5 is constructed by partially changing the configuration of the steam turbine power generation facility according to Example 1 of the invention, which is illustrated in FIG. 1 . That is, the integrated structure 22, the low-pressure turbine 24, and the generator 26 are connected together on the same axis, and the integrated structure 20 and a generator 27 are connected together on the same axis so as to be arranged at positions close to the boiler 32. The closer to the boiler 32 the integrated structure 20 is, the better.
  • the other components are the same as those of the steam turbine power generation facility according to Example 1 of the invention.
  • the first high-pressure turbine 16 and the first intermediate-pressure turbine 12 into which steam with a temperature of 650°C or higher is introduced, are arranged close to the boiler 32. Therefore, since a pipe connecting the boiler 32 to the first high-pressure turbine 16 and a pipe connecting the boiler 32 to the first intermediate-pressure turbine 12 may be shortened, it is possible to reduce the amount of material used for the pipes. Since the steam with a temperature of 650°C or higher passes through the pipe connecting the boiler 32 to the first high-pressure turbine 16 and the pipe connecting the boiler 32 to the first intermediate-pressure turbine 12, it is necessary to manufacture the pipes with Ni-based alloy that is a high-grade material. However, since the amount of material used is reduced by shortening the pipes, it is possible to reduce the manufacturing costs of the entire facility.
  • the second high-pressure turbine 18, the second intermediate-pressure turbine 14, and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown).
  • the facility costs since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure 21, it is possible to minimize the amount of high-grade material used.
  • the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 may not be integrated due to increased capacity.
  • the second intermediate-pressure turbine 14 and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown).
  • the facility costs since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure 23, it is possible to minimize the amount of high-grade material used.
  • FIG. 7 is a view illustrating the configuration of a steam turbine power generation facility according to Example 3 of the invention.
  • the steam turbine power generation facility 10 illustrated in FIG. 7 mainly includes an very-high-pressure turbine 19, a high-pressure turbine separated into two as will be described later, an intermediate-pressure turbine separated into two as will be described later, a low-pressure turbine 24, a generator 26, a condenser 28, and a boiler 32.
  • the high-pressure turbine is separated into a first high-pressure turbine 16 on a high-temperature and high-pressure side and a second high-pressure turbine 18 on a low-temperature and low-pressure side
  • the intermediate-pressure turbine is separated into a first intermediate-pressure turbine 12 on the high-temperature and high-pressure side and a second intermediate-pressure turbine 14 on the low-temperature and low-pressure side.
  • the first high-pressure turbine 16 and the first intermediate-pressure turbine 12 are integrated to form an integrated structure 20
  • the second high-pressure turbine 18 and the second intermediate-structure turbine 14 are integrated to form an integrated structure 22.
  • the very-high-pressure turbine 19 the integrated structure 20, the integrated structure 22, the low-pressure turbine 24, and the generator 26 are connected together on the same axis.
  • Rotors of the very-high-pressure turbine 19, the first high-pressure turbine 16, and the first intermediate-pressure turbine 12 are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  • Main steam superheated to a temperature of 650°C or higher by the boiler 32 is introduced into the very-high-pressure turbine 19 through a main steam pipe 33.
  • the steam introduced into the very-high-pressure turbine 19 performs expansion work and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 35 in a state where the temperature thereof decreased to less than 650°C.
  • the steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature thereof increases to 650°C or higher.
  • the reheated steam is introduced into the first high-pressure turbine 16 through a high-temperature reheat pipe 34.
  • the steam introduced into the first high-pressure turbine 16 performs expansion work and is then exhausted.
  • the exhausted steam is introduced into the second high-pressure turbine 18 through a high-pressure part connection pipe 36 in a state where the temperature thereof decreased to less than 650°C.
  • the introduced steam performs expansion work in the second high-pressure turbine and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 38.
  • the steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature thereof increases to 650°C or higher.
  • the reheated steam is sent to the first intermediate-pressure turbine 12 through a high-temperature reheat pipe 40.
  • the sent steam performs expansion work in the first intermediate-pressure turbine 12 and is then exhausted and sent to the second intermediate-pressure turbine 14 through an intermediate-pressure part connection pipe 42 in a state where the temperature thereof decreased to 550°C.
  • the steam sent to the second intermediate-pressure turbine 14 performs expansion work and is then exhausted and sent to the low-pressure turbine 24 through a crossover pipe 44.
  • the steam introduced into the low-pressure turbine 24 performs expansion work and is then exhausted and sent to the condenser 28.
  • the steam sent to the condenser 28 is condensed by the condenser 28 and is then returned to the boiler 32 in a state where the pressure thereof is raised by a water feed pump 30.
  • the generator 26 is rotationally driven by the expansion work of the respective turbines to generate power.
  • At least any one of the rotors and the casings of the turbines (the very-high-pressure turbine 19, the first high-pressure turbine 16, and the first intermediate-pressure turbine 12), into which the steam with a temperature of 650°C or higher is introduced, are constructed by joining together a plurality of members formed from Ni-based alloy through welding. Therefore, it is possible to increase the size of the facility without increasing the numbers of casings, rotors, and blade stages in any one of the very-high-pressure turbine, the first high-pressure turbine 16, and the intermediate-pressure turbine 12. Additionally, as the very-high-pressure turbine 19 is provided, it is possible to use further high-pressure steam.
  • the steam with a temperature of 650°C or higher is introduced into the very-high-pressure turbine 19, the first high-pressure turbine 16, and the first intermediate-pressure turbine 12, and the steam with a temperature of less than 650°C is introduced into the second high-pressure turbine 18 and the second intermediate-pressure turbine 14.
  • both the high-pressure turbine and the intermediate-pressure turbine are separated into two parts.
  • the first high-pressure turbine 16 and the first intermediate-pressure turbine 12 into which the steam with a temperature of 650°C or higher is introduced and in which at least any one of the rotors and the casings constructed by joining together a plurality of members formed from Ni-based alloy through welding are used, are integrated to form the integrated structure 20 to connect the very-high-pressure turbine 19, and the second high-pressure turbine 18 and the second intermediate-pressure turbine 14, into which the steam with a temperature of less than 650°C is introduced and which may be formed from a ferrite-based material as in the related art, are integrated to form the integrated structure 22.
  • the second high-pressure turbine 18, the second intermediate-pressure turbine 14, and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown).
  • the numbers of casings and rotors may be reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure, it is possible to minimize the amount of high-grade material used.
  • the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 may not be integrated due to increased capacity.
  • the second intermediate-pressure turbine 14 and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown).
  • the facility costs since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure, it is possible to minimize the amount of high-grade material used.
  • FIG. 9 is a view illustrating the configuration of a steam turbine power generation facility according to Example 4 of the invention.
  • the steam turbine power generation facility 10 illustrated in FIG. 9 is constructed by partially changing the configuration of the steam turbine power generation facility according to Example 3 of the invention, which is illustrated in FIG. 7 .
  • the integrated structure 22, the low-pressure turbine 24, and the generator 26 are connected together on the same axis, and the very-high-pressure turbine 19, the integrated structure 20, and the generator 27 are connected together on the same axis so as to be arranged at positions close to the boiler 32. The closer to the boiler 32 the very-high-pressure turbine 19 and the integrated structure 20 are, the better.
  • the other components are the same as those of the steam turbine power generation facility according to Example 3 of the invention.
  • the very-high pressure turbine 19, the first high-pressure turbine 16, and the first intermediate-pressure turbine 12, into which the steam with a temperature of 650°C or higher is introduced are arranged close to the boiler 32. Therefore, since a pipe connecting the boiler 32 to the very-high-pressure turbine 19, a pipe connecting the boiler 32 to the first high-pressure turbine 16, and a pipe connecting the boiler 32 to the first intermediate-pressure turbine 12 may be shortened, it is possible to reduce the amount of material used in the pipes.
  • the second high-pressure turbine 18, the second intermediate-pressure turbine 14, and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown).
  • the facility costs since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure, it is possible to minimize the amount of high-grade material used.
  • the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 may not be integrated due to increased capacity.
  • the second intermediate-pressure turbine 14 and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown).
  • the numbers of casings and rotors may be reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure, it is possible to minimize the amount of high-grade material used.
  • FIG. 11 is a view illustrating the configuration of a steam turbine power generation facility according to Example 5 of the invention.
  • the steam turbine power generation facility 10 illustrated in FIG. 11 includes a high-pressure turbine 16, an intermediate-pressure turbine 12, a low-pressure turbine 24, generators 26 and 27, a condenser 28, and a boiler 32 as main components.
  • the high-pressure turbine 16, the low-pressure turbine 24, and the generator 26 are connected together on the same axis, and the intermediate-pressure turbine 12 and the generator 27 are connected together on the same axis so as to be arranged at positions close to the boiler 32. The closer to the boiler 32 the intermediate-pressure turbine 12 is, the better.
  • At least any one of a rotor and a casing of the intermediate-pressure turbine 12 is formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  • Main steam superheated to a temperature of less than 650°C by the boiler 32 is introduced into the high-pressure turbine 16 through a main steam pipe 34.
  • the steam introduced into the high-pressure turbine 16 performs expansion work and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 38.
  • the steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature thereof increases to 650°C or higher.
  • the reheated steam is sent to the intermediate-pressure turbine 12 through a high-temperature reheat pipe 40.
  • the sent steam performs expansion work in the intermediate-pressure turbine 12 and is then exhausted and sent to the low-pressure turbine 24 through a crossover pipe 44.
  • the steam sent to the low-pressure turbine 24 performs expansion work and is then exhausted and sent to the condenser 28.
  • the steam sent to the condenser 28 is condensed by the condenser 28 and is then returned to the boiler 32 in a state where the pressure thereof is raised by a water feed pump 30.
  • the generators 26 and 27 are rotationally driven by the expansion work of the respective turbines to generate power.
  • At least any one of the rotor and the casing of the intermediate-pressure turbine 12 into which the steam with a temperature of 650°C or higher is introduced is constructed by joining together a plurality of members formed from Ni-based alloy through welding. Therefore, it is possible to increase the size of the facility, without increasing the numbers of casings, rotors, blade stages in the intermediate-pressure turbine 12.
  • the pipe connecting the boiler 32 to the intermediate-pressure turbine 12 may be shortened, which makes it possible to reduce the amount of material used in the pipe. Since the steam with a temperature of 650°C or higher passes through the pipe connecting the boiler 32 to the intermediate-pressure turbine 12, it is necessary to manufacture the pipe with Ni-based alloy that is a high-grade material. However, since the amount of material used is reduced by shortening the pipe, it is possible to reduce the manufacturing costs of the entire facility.
  • FIG. 12 is a view illustrating the configuration of a steam turbine power generation facility according to Example 6 of the invention.
  • the steam turbine power generation facility 10 illustrated in FIG. 12 includes a high-pressure turbine 16, an intermediate-pressure turbine 12, a low-pressure turbine 24, a generator 26, a condenser 28, and a boiler 32 as main components.
  • the high-pressure turbine 16, the intermediate-pressure turbine 12, the low-pressure turbine 24, and the generator 26 are connected together on the same axis, and the high-pressure turbine 16 and the intermediate-pressure turbine are integrated to form an integrated structure 25.
  • At least any one of the rotors and casings of the high-pressure turbine 16 and the intermediate-pressure turbine 12 are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  • Main steam superheated to a temperature of 650°C or higher by the boiler 32 is introduced into the high-pressure turbine 16 through a main steam pipe 34.
  • the steam introduced into the high-pressure turbine 16 performs expansion work and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 48 in a state where the temperature thereof decreased to less than 650°C.
  • the steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature thereof increases to 650°C or higher.
  • the reheated steam is introduced into the intermediate-pressure turbine 12 through a high-temperature reheat pipe 40.
  • the introduced steam performs expansion work in the intermediate-pressure turbine 12 and is then exhausted and sent to the low-pressure turbine 24 through a crossover pipe 44.
  • the steam sent to the low-pressure turbine 24 performs expansion work and is then exhausted and sent to the condenser 28.
  • the steam sent to the condenser 28 is condensed by the condenser 28 and is then returned to the boiler 32 in a state where the pressure thereof is raised by a water feed pump 30.
  • the generator 26 is rotationally driven by the expansion work of the respective turbines to generate power.
  • At least any one of the rotors and the casings of the turbines (the high-pressure turbine 16 and the intermediate-pressure turbine 12), into which the steam with a temperature of 650°C or higher is introduced, are constructed by joining together a plurality of members formed from Ni-based alloy through welding, and the high-pressure turbine 16 and the intermediate-pressure turbine 12 are integrated to form the integrated structure 25. Therefore, it is possible to increase the size of the facility, without increasing the numbers of casings, rotors, and blade stages.
  • the high-pressure turbine 16, the intermediate-pressure turbine 12, and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown).
  • the facility costs since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure, it is possible to minimize the amount of high-grade material used.
  • FIG. 13 is a view illustrating the configuration of a steam turbine power generation facility according to Example 7 of the invention.
  • the steam turbine power generation facility 10 illustrated in FIG. 13 includes an very-high-pressure turbine 19, a high-pressure turbine 16, an intermediate-pressure turbine 12, a low-pressure turbine 24, a generator 26, a condenser 28, and a boiler 32 as main components.
  • the very-high-pressure turbine 19 the high-pressure turbine 16, the intermediate-pressure turbine 12, the low-pressure turbine 24, and the generator 26 are connected together on the same axis.
  • At least any one of the rotors and casings of the very-high-pressure turbine 19, the high-pressure turbine 16, and the intermediate-pressure turbine 12 are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  • Main steam superheated to a temperature of 650°C or higher by the boiler 32 is introduced into the very-high-pressure turbine 19 through a main steam pipe 33.
  • the steam introduced into the very-high-pressure turbine 19 performs expansion work and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 35 in a state where the temperature thereof decreased to less than 650°C.
  • the steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature thereof increases to 650°C or higher.
  • the reheated steam is introduced into the high-pressure turbine 16 through a high-temperature reheat pipe 34.
  • the steam introduced into the high-pressure turbine 16 performs expansion work and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 38 in a state where the temperature thereof decreased to less than 650°C.
  • the steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature increases to 650°C or higher.
  • the reheated steam is sent to the intermediate-pressure turbine 12 through a high-temperature reheat pipe 40.
  • the steam sent to the intermediate-pressure turbine 12 performs expansion work and is then exhausted to the low-pressure turbine 24 through a crossover pipe 44.
  • the steam introduced into the low-pressure turbine 24 performs expansion work and is then exhausted and sent to the condenser 28.
  • the steam sent to the condenser 28 is condensed by the condenser 28 and is then returned to the boiler 32 in a state where the pressure thereof is raised by a water feed pump 30.
  • the generator 26 is rotationally driven by the expansion work of the respective turbines to generate power.
  • At least any one of the rotors and the casings of the turbines (the very-high-pressure turbine 19, the high-pressure turbine 16, and the intermediate-pressure turbine 12), into which the steam with a temperature of 650°C or higher is introduced, are constructed by joining together a plurality of members formed from Ni-based alloy through welding. Therefore, it is possible to increase the size of the facility, without increasing the numbers of casings, rotors, and blade stages in any one of the very-high-pressure turbine 19, the high-pressure turbine 16, and the intermediate-pressure turbine 12. Additionally, as the very-high-pressure turbine 19 is provided, it is possible to use further high-pressure steam.
  • the high-pressure turbine 16, the intermediate-pressure turbine 12, and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown).
  • the facility costs since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • welding structures formed from different materials for example, Ni-based alloy, 12Cr steel, and 2.25Cr steel, 3.5Ni steel; Ni-based alloy, 9Cr steel, 2.25Cr steel, 3.5Ni steel; Ni-based alloy, 2.25Cr steel, and 3.5Ni steel
  • welding structures formed from different materials for example, Ni-based alloy, 12Cr steel, and 2.25Cr steel, 3.5Ni steel; Ni-based alloy, 9Cr steel, 2.25Cr steel, 3.5Ni steel; Ni-based alloy, 2.25Cr steel, and 3.5Ni steel
  • the invention even if steam conditions in the 650°C class or 700°C class are adopted, it is possible to utilize the invention as a steam turbine facility capable of suppressing the possibility of vibration occurrence and a drastic increase in facility cost, thereby realizing an increase in size of the steam turbine facility.

Abstract

Provided is a steam turbine facility capable of suppressing the possibility of vibration occurrence and a drastic increase in facility cost, thereby realizing an increase in size of the facility, even if steam conditions of 650°C or higher are adopted. In a steam turbine facility including a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine, the high-pressure turbine is separated into a first high-pressure turbine part on a high-temperature and high-pressure side and a second high-pressure turbine part on a low-temperature and low-pressure side, the intermediate-pressure turbine is separated into a first intermediate-pressure turbine part on the high-temperature and high-pressure side and a second intermediate-pressure turbine part on the low-temperature and low-temperature side, the first high-pressure turbine part and the first intermediate-pressure turbine part are integrated to form a first integrated part, the second high-pressure turbine part and the second intermediate-pressure turbine part are integrated to form a second integrated part, at least any one of the rotors and casings of the turbines into which steam with a temperature of 650°C or higher is introduced are constructed by joining together a plurality of members formed from Ni-based alloy through welding.

Description

    Technical Field
  • The present invention relates to a steam turbine facility including a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine.
  • Background Art
  • Three methods of atomic power, thermal power, and hydraulic power generation, are now used as main power generation methods, and from the viewpoint of resource quantity and energy density, the three power generation methods are also expected to be used as main power generation methods in the future. Especially, since thermal power generation is safe, and its utility value is high as a power generation method with a high capacity to respond to load changes, it is expected that thermal power generation will also continue to play an important role in the power generation field in the future.
  • In general, a steam turbine facility, which is used in a coal-fired power station including steam turbines, is provided with a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine. In such a steam turbine facility, steam in the 600°C class is used. A rotor and a casing of the high-pressure turbine or the intermediate-pressure turbine, which is exposed to high temperatures, are formed from a ferrite-based material which has thermal resistance to 600°C steam and excellent manufacturability and is economically competitive.
  • Recently, however, a technique which adopts steam conditions of 650°C class or 700°C class is being demanded, in order to reduce emissions of CO2 and improve thermal efficiency. Patent Document 1 has disclosed a steam turbine facility capable of operating at a high temperature in which a reheat steam condition is 650°C or higher.
  • FIG. 14 is a schematic system view illustrating a conventional steam turbine facility disclosed in Patent Document 1. In a steam turbine facility 110 illustrated in FIG. 14, a intermediate-pressure turbine is separated into a first intermediate-pressure turbine 112 on a high-temperature and high-pressure side and a second intermediate-pressure turbine 114 on a low-temperature and low-pressure side. Additionally, the high-pressure turbine 116 and the second intermediate-pressure turbine 114 are integrated to form an integrated structure 122. The integrated structure 122 is connected together on the same axis as the first intermediate-pressure turbine 112 on the high-temperature and high-pressure side, the low-pressure turbine 124, and the generator 126.
  • Main steam superheated to a temperature in the 600°C class by a boiler 132 is introduced into the high-pressure turbine 116 through a main steam pipe 134. The steam introduced into the high-pressure turbine 116 performs expansion work and is then exhausted and returned to the boiler 132 through a low-temperature reheat pipe 138. The steam returned to the boiler 132 is reheated by the boiler 132 such that the temperature thereof increases to the 700°C class. The reheated steam is sent to the first intermediate-pressure turbine 112 through a high-temperature reheat pipe 140. A rotor of the first intermediate-pressure turbine 112 is formed from a material (austenitic heat resisting steel) capable of withstanding steam heated to a high temperature class of 700°C. The steam sent to the first intermediate-pressure turbine 112 performs expansion work and is then exhausted and sent to the second intermediate-pressure turbine 114 through an intermediate-pressure part connection pipe 142 in a state where the temperature thereof decreased to 550°C class. The steam sent to the second intermediate-pressure turbine 114 performs expansion work and is then exhausted and introduced to the low-pressure turbine 124 through a crossover pipe 144. The steam introduced into the low-pressure turbine 124 performs expansion work and is then exhausted and sent to a condenser 128. The steam sent to the condenser 128 is condensed by the condenser 128, and is then returned to the boiler 132 in a state where the pressure thereof is raised by a water feed pump 130. The generator 126 is rotationally driven by the expansion work of the respective turbines to generate power.
  • In such a steam turbine facility, the intermediate-pressure turbine is divided, and only the first intermediate-pressure turbine 112 is formed from a material capable of withstanding steam with a temperature of 650°C or higher. Therefore, a steam condition of 650°C or higher may be adopted, and the use amount of the material capable of withstanding steam with a temperature of 650°C or higher may be reduced. Therefore, it is possible to reduce the manufacturing costs of the entire facility.
  • In the technique disclosed in Patent Document 1, however, the high-pressure turbine is not formed from a material capable of withstanding steam with a temperature of 650°C or higher. Therefore, it is difficult to apply the technique to a case where steam with a temperature of 650°C or higher is used as main steam.
  • Moreover, considering a steam turbine facility with a large capacity, the facility illustrated in FIG. 14 is difficult to implement. When such a material as Ni-based alloy capable of withstanding steam with a temperature of 650°C or higher is used to form the first intermediate-pressure turbine 112, it is difficult to manufacture a turbine rotor or casing weighing 10t or more in terms of the limitation of material manufacturing, and it is impossible to manufacture a large-sized turbine rotor or casing.
  • Therefore, as illustrated in FIG. 15, the first intermediate-pressure turbine 112 may be further divided into the primary and secondary first intermediate- pressure turbines 112 and 113. In this case, however, the number of casings increases, and thus the number of buildings or pipes increases. Therefore, the manufacturing costs of the facility inevitably increase. Additionally, as the number of rotors (divided turbines) increases, it is highly likely that vibration occurs.
  • Additionally, a ferrite-based material may be used instead of using the Ni-based alloy. In this case, however, a large amount of cooling steam needs to be introduced into the casings. As a result, the internal efficiency of the turbines decreases.
  • Prior Art Document Patent Document
    • [Patent Document 1] Japanese Patent No. 4074208
    Summary of the Invention
  • Accordingly, the invention was made in view of the problems of the conventional technique, and the object thereof is to provide a steam turbine facility capable of suppressing the possibility of vibration occurrence and a drastic increase in facility cost, thereby realizing an increase in size of the facility, even if steam conditions of 650°C or higher are adopted.
  • In order to solve these problems, the invention provides a steam turbine facility including a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine. The high-pressure turbine is separated into a first high-pressure turbine part on a high-temperature and high-pressure side and a second high-pressure turbine part on a low-temperature and low-pressure side, the intermediate-pressure turbine is separated into a first intermediate-pressure turbine part on the high-temperature and high-pressure side and a second intermediate-pressure turbine part on the low-temperature and low-temperature side, the first high-pressure turbine part and the first intermediate-pressure turbine part are integrated to form a first integrated part, at least the second high-pressure turbine part and the second intermediate-pressure turbine part are integrated to form a second integrated part, at least any one of the rotors and casings of the first high-pressure turbine part and the first intermediate-pressure turbine part, into which steam with a temperature of 650°C or higher is introduced, are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  • In such a configuration, at least any one of the rotors and the casings of the turbines into which the steam with a temperature of 650°C or higher is introduced are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding. Therefore, even under the steam condition in which the steam with a temperature of 650°C or higher is introduced into the high-pressure turbine and the intermediate-pressure turbine, it is possible to increase the size of the facility without increasing the numbers of casings, rotors (divided turbines), and blade stages.
  • Additionally, in the steam turbine facility, steam with a temperature of 650°C or higher is introduced into the first high-pressure turbine and the first intermediate-pressure turbine. Additionally, the first high-pressure turbine and the first intermediate-pressure turbine are integrated, and the second high-pressure turbine and the second intermediate-pressure turbine, into which steam with a temperature of less than 650°C is introduced and which may be formed from a ferrite-based material, are integrated. Therefore, since the amount of high-grade Ni-based alloy materials used is reduced, it is possible to suppress a drastic increase in facility costs. Additionally, since at least any one of the rotors and the casings of the turbines into which the steam with a temperature of 650°C or higher is introduced are formed from Ni-based alloy, it is possible to increase the internal efficiency of the turbines, without introducing a large amount of cooling steam into the turbines.
  • Additionally, the steam turbine facility may further include an very-high-pressure turbine into which steam having a higher pressure than the steam introduced into the high-pressure turbine is introduced. The very-high-pressure turbine, the first integrated part, the second integrated part, and the low-pressure turbine may be connected together on the same axis.
  • Accordingly, it is possible to use further high-pressure steam.
  • Additionally, steam with a temperature of 650°C or higher may be introduced into the first high-pressure turbine part and the first intermediate-pressure turbine part forming the first integrated part, and steam with a temperature of less than 650°C may be introduced into the second high-pressure turbine part and the second intermediate-pressure turbine part forming the second integrated part. The second integrated part and the low-pressure turbine may be connected on a different axis from the first integrated part, and the first integrated part may be arranged at a position closer to a boiler than the connection structure of the second integrated part and the low-pressure turbine, the boiler superheating the steam introduced into the high-pressure turbine and the intermediate-pressure turbine.
  • As the first high-pressure turbine part and the first intermediate-pressure turbine part into which the steam with a temperature of 650°C or higher is introduced are arranged close to the boiler, it is possible to shorten the pipe connecting the boiler to the first high-pressure turbine part and the pipe connecting the boiler to the first intermediate-pressure turbine part. Accordingly, it is possible to reduce the amount of material used in the pipes. Since the steam with a temperature of 650°C or higher passes through the pipe connecting the boiler to the first high-pressure turbine part and the pipe connecting the boiler to the first intermediate-pressure turbine part, it is necessary to manufacture the pipes with Ni-based alloy that is a high-grade material. However, as the amount of high-grade material used is reduced by shortening the pipes, it is possible to reduce the manufacturing costs of the entire facility.
  • Additionally, the steam turbine facility may further include an very-high-pressure turbine into which steam having a higher pressure than the steam introduced into the high-pressure turbine is introduced. The first integrated part and the very-high-pressure turbine may be connected together on the same axis.
  • Accordingly, it is possible to use further high-pressure steam.
  • Additionally, in the steam turbine facility, the second integrated part may be further integrated with the low-pressure turbine. In this case, since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • Moreover, the invention provides a steam turbine facility including a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine. The high-pressure turbine is separated into a first high-pressure turbine part on a high-temperature and high-pressure side and a second high-pressure turbine part on a low-temperature and low-pressure side, the intermediate-pressure turbine is separated into a first intermediate-pressure turbine part on the high-temperature and high-pressure side and a second intermediate-pressure turbine part on the low-temperature and low-temperature side, the first high-pressure turbine part and the first intermediate-pressure turbine part are integrated to form a first integrated part, at least any one of the rotors and casings of the steam-introduction-side turbines of the first high-pressure turbine part and the first intermediate-pressure turbine part, into which steam with a temperature of 650°C or higher is introduced, are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding. The second intermediate-pressure turbine part and the low-pressure turbine may be integrated.
  • The second high-pressure turbine and the second intermediate-pressure turbine may not be integrated in order to easily cope with large capacity.
  • Additionally, when the second intermediate-pressure turbine part and the low-pressure turbine are integrated, the number of casings and rotors may be reduced, which makes it possible to reduce the facility costs.
  • Moreover, the invention provides a steam turbine facility including a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine. The turbines into which steam with a temperature of 650°C or higher is introduced are connected together on the same axis, the turbines into which steam with a temperature of less than 650°C are connected together on the same axis different from that of the turbines into which the steam with a temperature of 650°C or higher is introduced, the turbines into which the steam with a temperature of 650°C or higher is introduced are arranged at positions closer to the boiler than the turbines into which the steam with a temperature of less than 650°C is introduced, the boiler superheating the steam introduced into the high-pressure turbine and the intermediate-pressure turbine, at least any one of the rotors and casings of the turbines into which the steam with a temperature of 650°C or higher is introduced are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  • All the turbines into which the steam with a temperature of 650°C or higher is introduced are arranged close to the boiler, it is possible to shorten pipes connecting the boiler to the turbines into which the steam with a temperature of 650°C or higher is introduced. Therefore, it is possible to reduce the amount of material used in the pipes. Since steam with a temperature of 650°C or higher passes through the pipes connecting the boiler to the turbines into which the steam with a temperature of 650°C or higher is introduced, it is necessary to manufacture the pipes with Ni-based alloy that is a high-grade material. However, since the amount of material used is reduced by shortening the pipes, it is possible to reduce the manufacturing costs of the entire facility.
  • Additionally, rotors or casings of the turbines into which the steam with a temperature of 650°C or higher is introduced are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding. Therefore, even under the steam condition in which the steam with a temperature of 650°C or higher is introduced into the first intermediate-pressure turbine part, it is possible to increase the size of the facility, without increasing the numbers of casings, rotors, and blade stages.
  • Moreover, the invention provides a steam turbine facility including a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine. At least the high-pressure turbine and the intermediate-pressure turbine are integrated to form an integrated structure, the integrated structure and the low-pressure turbine are connected together on the same axis, at least any one of the rotors and casings of the turbines into which steam with a temperature of 650°C or higher is introduced are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding. The high-pressure turbine, the intermediate-pressure turbine, and the low-pressure turbine may be integrated. In this case, since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs.
  • Additionally, the steam turbine facility may further include an very-high-pressure turbine into which steam having a higher pressure than the steam introduced into the high-pressure turbine is introduced. The first integrated part and the very-high-pressure turbine may be connected together on the same axis.
  • Accordingly, it is possible to use further high-pressure steam.
  • According to the aspects of the invention, even if steam conditions in the 650°C or 700°C class are adopted, it is possible to provide a steam turbine facility capable of suppressing the possibility of vibration occurrence and a drastic increase in facility cost, thereby realizing an increase in size of the facility.
  • Brief Description of the Drawings
    • [FIG. 1] FIG. 1 is a view illustrating the configuration of a steam turbine power generation facility according to Example 1 of the invention.
    • [FIG. 2] FIG. 2 is a view illustrating the configuration of a steam turbine power generation facility formed by partially changing the configuration of the steam turbine power generation facility according to Example 1 of the invention.
    • [FIG. 3] FIG. 3 is a view illustrating the configuration of a steam turbine power generation facility formed by partially changing the configuration of the steam turbine power generation facility according to Example 1 of the invention.
    • [FIG. 4] FIG. 4 is a view illustrating the configuration of a steam turbine power generation facility formed by partially changing the configuration of the steam turbine power generation facility according to Example 1 of the invention.
    • [FIG. 5] FIG. 5 is a view illustrating the configuration of a steam turbine power generation facility according to Example 2 of the invention.
    • [FIG. 6] FIG. 6 is a view illustrating the configuration of a steam turbine power generation facility formed by partially changing the configuration of the steam turbine power generation facility according to Example 2 of the invention.
    • [FIG. 7] FIG. 7 is a view illustrating the configuration of a steam turbine power generation facility according to Example 3 of the invention.
    • [FIG. 8] FIG. 8 is a view illustrating the configuration of a steam turbine power generation facility formed by partially changing the configuration of the steam turbine power generation facility according to Example 3 of the invention.
    • [FIG. 9] FIG. 9 is a view illustrating the configuration of a steam turbine power generation facility according to Example 4 of the invention.
    • [FIG. 10] FIG. 10 is a view illustrating the configuration of a steam turbine power generation facility formed by partially changing the configuration of the steam turbine power generation facility according to Example 4 of the invention.
    • [FIG. 11] FIG. 11 is a view illustrating the configuration of a steam turbine power generation facility according to Example 5 of the invention.
    • [FIG. 12] FIG. 12 is a view illustrating the configuration of a steam turbine power generation facility according to Example 6 of the invention.
    • [FIG. 13] FIG. 13 is a view illustrating the configuration of a steam turbine power generation facility according to Example 7 of the invention.
    • [FIG. 14] FIG. 14 is a view illustrating the configuration of a conventional steam turbine facility.
    • [FIG. 15] FIG. 15 is a view illustrating the configuration of another conventional steam turbine facility.
    Detailed Description of the Preferred Embodiment
  • Preferred examples of the invention will be illustratively described below in detail with reference to the drawings. Here, the dimensions, materials, shapes, relative arrangements, etc. of component parts described in this example are not meant to limit the scope of the invention, but are merely simple explanatory examples, as long as there is no specific description of limitations.
  • [Example 1]
  • FIG. 1 is a view illustrating the configuration of a steam turbine power generation facility according to Example 1 of the invention.
  • As illustrated in FIG. 1, the steam turbine power generation facility according to Example 1 of the invention will be described.
  • The steam turbine power generation facility 10 illustrated in FIG. 1 includes a high-pressure turbine separated into two as will be described later, an intermediate-pressure turbine separated into two as will be described later, a low-pressure turbine 24, a generator 26, a condenser 28, and a boiler 32 as main components. The high-pressure turbine is separated into a first high-pressure turbine 16 on a high-temperature and high-pressure side and a second high-pressure turbine 18 on a low-temperature and low-pressure side, and the intermediate-pressure turbine is separated into a first intermediate-pressure turbine 12 on the high-temperature and high-pressure side and a second intermediate-pressure turbine 14 on the low-temperature and low-pressure side. The first high-pressure turbine 16 and the first intermediate-pressure turbine 12 are integrated to form an integrated structure 20, and the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 are integrated to form an integrated structure 22.
  • Additionally, the integrated structure 20, the integrated structure 22, the low-pressure turbine 24, and the generator 26 are connected together on the same axis.
  • At least any one of the rotors and casings of the first high-pressure turbine 16 and the first intermediate-pressure turbine 12 are formed from a Ni-based alloy. At least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  • Main steam superheated to a temperature of 650°C or higher by the boiler 32 is introduced into the first high-pressure turbine 16 through a main steam pipe 34. The steam introduced into the first high-pressure turbine 16 performs expansion work and is then exhausted. The exhausted steam is introduced into the second high-pressure turbine 18 through a high-pressure part connection pipe 36 in a state where the temperature thereof decreased to less than 650°C. The introduced heat performs expansion work in the second high-pressure turbine and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 38. The steam returned to the boiler 32 is reheated to 650°C or higher by the boiler 32, and sent to the first intermediate-pressure turbine 12 through a high-temperature reheat pipe 40. The sent steam performs expansion work in the first intermediate-pressure turbine 12 and is then exhausted in a state where the temperature thereof decreased to the class of 550°C. The exhausted steam is sent to the second intermediate-pressure turbine 14 through an intermediate-pressure pipe 42. The steam sent to the second intermediate-pressure turbine 14 performs expansion work and is then exhausted and sent to the low-pressure turbine 24 through a crossover pipe 44. The steam sent to the low-pressure turbine 24 performs expansion work and is then exhausted and sent to the condenser 28. The steam sent to the condenser 28 is condensed by the condenser 28 and is returned to the boiler 32 in a state where the pressure thereof is raised by a water feed pump 30. The generator 26 is rotationally driven by the expansion work of the respective turbines to generate power.
  • According to the above-described steam turbine power generation facility 10 of Example 1 of the invention, at least any one of the rotors and the casings of the turbines (the first high-pressure turbine 16 and the first intermediate-pressure turbine 12), into which steam with a temperature of 650°C or higher is introduced, is constructed by joining the plurality of members formed from Ni-based alloy through welding. Therefore, it is possible to increase the size of the facility without increasing the numbers of casings, rotors, and blade stages in both the first high-pressure turbine 16 and the intermediate-pressure turbine 12.
  • Additionally, in the steam turbine power generation facility, the steam with a temperature of 650°C or higher is introduced into the first high-pressure turbine 16 and the first intermediate-pressure turbine 12, and the steam with a temperature of less than 650°C is introduced into the second high-pressure turbine 18 and the second intermediate-pressure turbine 14.
  • In the steam turbine power generation facility, both the high-pressure turbine and the intermediate-pressure turbine are separated into two parts. Additionally, the first high-pressure turbine 16 and the first intermediate-pressure turbine 12, into which the steam with a temperature of 650°C or higher is introduced and in which at least any one of the rotors and the casings constructed by joining the plurality of members formed from Ni-based alloy through welding are used, are integrated to form the integrated structure 20, and the second high-pressure turbine 18 and the second intermediate-pressure turbine 14, into which the steam with a temperature of less than 650°C is introduced and which may be formed from a ferrite-based material as in the related art, are integrated to form the integrated structure. Therefore, the amount of high-grade Ni-based alloy materials used may be reduced, which makes it possible to suppress a drastic increase in facility cost. When the temperature of the steam introduced into the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 exceeds 650°C, welding structures formed from different materials (for example, 12Cr steel and 2.25Cr steel; 12Cr steel and CrMoV steel) may be adopted for the rotors and the casings. In this case, a high-grade material may be used only in portions requiring high-temperature strength, and a low-grade material may be used in portions which do not require high-temperature strength. Therefore, it is possible to minimize the amount of high-grade material used.
  • Additionally, as illustrated in FIG. 2, the second high-pressure turbine 18, the second intermediate-pressure turbine 14, and the low-pressure turbine 24 may be integrated to form an integrated structure 21. In this case, since the numbers of casings and rotors may be reduced, it is possible to reduce the facility costs. In addition, as welding structures formed from different materials (for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure 21, it is possible to minimize the amount of high-grade material used.
  • On the other hand, as illustrated in FIG. 3, the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 may not be integrated due to increased capacity.
  • Additionally, in contrast to the example illustrated in Fig. 3, as illustrated in FIG. 4, the second intermediate-pressure turbine 14 and the low-pressure turbine 24 may be integrated to form an integrated structure 23. In this case, since the numbers of casings and rotors may be reduced, it is possible to reduce the facility costs. In addition, as welding structures formed from different materials (for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure 23, it is possible to minimize the amount of high-grade material used.
  • [Example 2]
  • FIG. 5 is a view illustrating the configuration of a steam turbine power generation facility according to Example 2 of the invention.
  • The steam turbine power generation facility 10 illustrated in FIG. 5 is constructed by partially changing the configuration of the steam turbine power generation facility according to Example 1 of the invention, which is illustrated in FIG. 1. That is, the integrated structure 22, the low-pressure turbine 24, and the generator 26 are connected together on the same axis, and the integrated structure 20 and a generator 27 are connected together on the same axis so as to be arranged at positions close to the boiler 32. The closer to the boiler 32 the integrated structure 20 is, the better.
  • The other components are the same as those of the steam turbine power generation facility according to Example 1 of the invention.
  • In the above-described steam turbine power generation facility 10 according to Example 2 of the invention, in addition to the effects of Example 1, the first high-pressure turbine 16 and the first intermediate-pressure turbine 12, into which steam with a temperature of 650°C or higher is introduced, are arranged close to the boiler 32. Therefore, since a pipe connecting the boiler 32 to the first high-pressure turbine 16 and a pipe connecting the boiler 32 to the first intermediate-pressure turbine 12 may be shortened, it is possible to reduce the amount of material used for the pipes. Since the steam with a temperature of 650°C or higher passes through the pipe connecting the boiler 32 to the first high-pressure turbine 16 and the pipe connecting the boiler 32 to the first intermediate-pressure turbine 12, it is necessary to manufacture the pipes with Ni-based alloy that is a high-grade material. However, since the amount of material used is reduced by shortening the pipes, it is possible to reduce the manufacturing costs of the entire facility.
  • Additionally, similar to the example illustrated in FIG. 2, the second high-pressure turbine 18, the second intermediate-pressure turbine 14, and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown). In this case, since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs. In addition, as welding structures formed from different materials (for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure 21, it is possible to minimize the amount of high-grade material used.
  • On the other hand, as illustrated in FIG. 6, the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 may not be integrated due to increased capacity.
  • Additionally, in contrast to the example illustrated in Fig. 6, similar to the example illustrated in FIG. 4, the second intermediate-pressure turbine 14 and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown). In this case, since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs. In addition, as welding structures formed from different materials (for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure 23, it is possible to minimize the amount of high-grade material used.
  • [Example 3]
  • FIG. 7 is a view illustrating the configuration of a steam turbine power generation facility according to Example 3 of the invention.
  • As illustrated in FIG. 7, the steam turbine power generation facility according to Example 3 of the invention will be described.
  • The steam turbine power generation facility 10 illustrated in FIG. 7 mainly includes an very-high-pressure turbine 19, a high-pressure turbine separated into two as will be described later, an intermediate-pressure turbine separated into two as will be described later, a low-pressure turbine 24, a generator 26, a condenser 28, and a boiler 32. The high-pressure turbine is separated into a first high-pressure turbine 16 on a high-temperature and high-pressure side and a second high-pressure turbine 18 on a low-temperature and low-pressure side, and the intermediate-pressure turbine is separated into a first intermediate-pressure turbine 12 on the high-temperature and high-pressure side and a second intermediate-pressure turbine 14 on the low-temperature and low-pressure side. The first high-pressure turbine 16 and the first intermediate-pressure turbine 12 are integrated to form an integrated structure 20, and the second high-pressure turbine 18 and the second intermediate-structure turbine 14 are integrated to form an integrated structure 22.
  • Additionally, the very-high-pressure turbine 19, the integrated structure 20, the integrated structure 22, the low-pressure turbine 24, and the generator 26 are connected together on the same axis.
  • Rotors of the very-high-pressure turbine 19, the first high-pressure turbine 16, and the first intermediate-pressure turbine 12 are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  • Main steam superheated to a temperature of 650°C or higher by the boiler 32 is introduced into the very-high-pressure turbine 19 through a main steam pipe 33. The steam introduced into the very-high-pressure turbine 19 performs expansion work and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 35 in a state where the temperature thereof decreased to less than 650°C. The steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature thereof increases to 650°C or higher. The reheated steam is introduced into the first high-pressure turbine 16 through a high-temperature reheat pipe 34. The steam introduced into the first high-pressure turbine 16 performs expansion work and is then exhausted. The exhausted steam is introduced into the second high-pressure turbine 18 through a high-pressure part connection pipe 36 in a state where the temperature thereof decreased to less than 650°C. The introduced steam performs expansion work in the second high-pressure turbine and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 38. The steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature thereof increases to 650°C or higher. The reheated steam is sent to the first intermediate-pressure turbine 12 through a high-temperature reheat pipe 40. The sent steam performs expansion work in the first intermediate-pressure turbine 12 and is then exhausted and sent to the second intermediate-pressure turbine 14 through an intermediate-pressure part connection pipe 42 in a state where the temperature thereof decreased to 550°C. The steam sent to the second intermediate-pressure turbine 14 performs expansion work and is then exhausted and sent to the low-pressure turbine 24 through a crossover pipe 44. The steam introduced into the low-pressure turbine 24 performs expansion work and is then exhausted and sent to the condenser 28. The steam sent to the condenser 28 is condensed by the condenser 28 and is then returned to the boiler 32 in a state where the pressure thereof is raised by a water feed pump 30. The generator 26 is rotationally driven by the expansion work of the respective turbines to generate power.
  • According to the above-described steam turbine power generation facility 10 of Example 3 of the invention, at least any one of the rotors and the casings of the turbines (the very-high-pressure turbine 19, the first high-pressure turbine 16, and the first intermediate-pressure turbine 12), into which the steam with a temperature of 650°C or higher is introduced, are constructed by joining together a plurality of members formed from Ni-based alloy through welding. Therefore, it is possible to increase the size of the facility without increasing the numbers of casings, rotors, and blade stages in any one of the very-high-pressure turbine, the first high-pressure turbine 16, and the intermediate-pressure turbine 12. Additionally, as the very-high-pressure turbine 19 is provided, it is possible to use further high-pressure steam.
  • Additionally, in the steam turbine power generation facility, the steam with a temperature of 650°C or higher is introduced into the very-high-pressure turbine 19, the first high-pressure turbine 16, and the first intermediate-pressure turbine 12, and the steam with a temperature of less than 650°C is introduced into the second high-pressure turbine 18 and the second intermediate-pressure turbine 14.
  • Accordingly, both the high-pressure turbine and the intermediate-pressure turbine are separated into two parts. Additionally, the first high-pressure turbine 16 and the first intermediate-pressure turbine 12, into which the steam with a temperature of 650°C or higher is introduced and in which at least any one of the rotors and the casings constructed by joining together a plurality of members formed from Ni-based alloy through welding are used, are integrated to form the integrated structure 20 to connect the very-high-pressure turbine 19, and the second high-pressure turbine 18 and the second intermediate-pressure turbine 14, into which the steam with a temperature of less than 650°C is introduced and which may be formed from a ferrite-based material as in the related art, are integrated to form the integrated structure 22. Therefore, since the amount of high-grade Ni-based alloy materials used is reduced, it is possible to suppress a drastic increase in facility cost. Additionally, when the temperature of the steam introduced into the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 exceeds 650°C, welding structures formed from different materials (for example, 12Cr steel and 2.25 Cr; 12 Cr and CrMoV steel) may be adopted for the rotors and the casings. Therefore, it is possible to minimize the amount of high-grade material used.
  • Additionally, similar to the example illustrated in FIG. 2, the second high-pressure turbine 18, the second intermediate-pressure turbine 14, and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown). In this case, since the numbers of casings and rotors may be reduced, it is possible to reduce the facility costs. Additionally, since welding structures formed from different materials (for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure, it is possible to minimize the amount of high-grade material used.
  • On the other hand, as illustrated in FIG. 8, the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 may not be integrated due to increased capacity.
  • Additionally, in contrast to the example illustrated in FIG. 8, similar to the example illustrated in FIG. 4, the second intermediate-pressure turbine 14 and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown). In this case, since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs. In addition, as welding structures formed from different materials (for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure, it is possible to minimize the amount of high-grade material used.
  • [Example 4]
  • FIG. 9 is a view illustrating the configuration of a steam turbine power generation facility according to Example 4 of the invention.
  • The steam turbine power generation facility 10 illustrated in FIG. 9 is constructed by partially changing the configuration of the steam turbine power generation facility according to Example 3 of the invention, which is illustrated in FIG. 7. The integrated structure 22, the low-pressure turbine 24, and the generator 26 are connected together on the same axis, and the very-high-pressure turbine 19, the integrated structure 20, and the generator 27 are connected together on the same axis so as to be arranged at positions close to the boiler 32. The closer to the boiler 32 the very-high-pressure turbine 19 and the integrated structure 20 are, the better.
  • The other components are the same as those of the steam turbine power generation facility according to Example 3 of the invention.
  • According to the steam turbine power generation facility 10 of Example 4 of the invention, in addition to the effects of Example 3, the very-high pressure turbine 19, the first high-pressure turbine 16, and the first intermediate-pressure turbine 12, into which the steam with a temperature of 650°C or higher is introduced, are arranged close to the boiler 32. Therefore, since a pipe connecting the boiler 32 to the very-high-pressure turbine 19, a pipe connecting the boiler 32 to the first high-pressure turbine 16, and a pipe connecting the boiler 32 to the first intermediate-pressure turbine 12 may be shortened, it is possible to reduce the amount of material used in the pipes. Since the steam with a temperature of 650°C or higher passes through the pipe connecting the boiler 32 to the very-high-pressure turbine 19, the pipe connecting the boiler 32 to the first high-pressure turbine 16, and the pipe connecting the boiler 32 to the first intermediate-pressure turbine 12, it is necessary to manufacture the pipes with Ni-based alloy that is a high-grade material. However, since the amount of material used is reduced by shortening the pipes, it is possible to reduce the manufacturing costs of the entire facility.
  • Additionally, similar to the example illustrated in FIG. 2, the second high-pressure turbine 18, the second intermediate-pressure turbine 14, and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown). In this case, since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs. In addition, as welding structures formed from different materials (for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure, it is possible to minimize the amount of high-grade material used.
  • On the other hand, as illustrated in FIG. 10, the second high-pressure turbine 18 and the second intermediate-pressure turbine 14 may not be integrated due to increased capacity.
  • Additionally, in contrast to the example illustrated in FIG. 10, similar to the example illustrated in FIG. 4, the second intermediate-pressure turbine 14 and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown). In this case, since the numbers of casings and rotors may be reduced, it is possible to reduce the facility costs. In addition, as welding structures formed from different materials (for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure, it is possible to minimize the amount of high-grade material used.
  • [Example 5]
  • FIG. 11 is a view illustrating the configuration of a steam turbine power generation facility according to Example 5 of the invention.
  • As illustrated in FIG. 11, the steam turbine power generation facility according to Example 5 of the invention will be described.
  • The steam turbine power generation facility 10 illustrated in FIG. 11 includes a high-pressure turbine 16, an intermediate-pressure turbine 12, a low-pressure turbine 24, generators 26 and 27, a condenser 28, and a boiler 32 as main components.
  • Additionally, the high-pressure turbine 16, the low-pressure turbine 24, and the generator 26 are connected together on the same axis, and the intermediate-pressure turbine 12 and the generator 27 are connected together on the same axis so as to be arranged at positions close to the boiler 32. The closer to the boiler 32 the intermediate-pressure turbine 12 is, the better.
  • Additionally, at least any one of a rotor and a casing of the intermediate-pressure turbine 12 is formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  • Main steam superheated to a temperature of less than 650°C by the boiler 32 is introduced into the high-pressure turbine 16 through a main steam pipe 34. The steam introduced into the high-pressure turbine 16 performs expansion work and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 38. The steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature thereof increases to 650°C or higher. The reheated steam is sent to the intermediate-pressure turbine 12 through a high-temperature reheat pipe 40. The sent steam performs expansion work in the intermediate-pressure turbine 12 and is then exhausted and sent to the low-pressure turbine 24 through a crossover pipe 44. The steam sent to the low-pressure turbine 24 performs expansion work and is then exhausted and sent to the condenser 28. The steam sent to the condenser 28 is condensed by the condenser 28 and is then returned to the boiler 32 in a state where the pressure thereof is raised by a water feed pump 30. The generators 26 and 27 are rotationally driven by the expansion work of the respective turbines to generate power.
  • According to the above-described steam turbine power generation facility 10 of Example 5 of the invention, at least any one of the rotor and the casing of the intermediate-pressure turbine 12 into which the steam with a temperature of 650°C or higher is introduced is constructed by joining together a plurality of members formed from Ni-based alloy through welding. Therefore, it is possible to increase the size of the facility, without increasing the numbers of casings, rotors, blade stages in the intermediate-pressure turbine 12.
  • Moreover, since the intermediate-pressure turbine 12 into which the steam with a temperature of 650°C or higher is introduced is arranged close to the boiler 32, the pipe connecting the boiler 32 to the intermediate-pressure turbine 12 may be shortened, which makes it possible to reduce the amount of material used in the pipe. Since the steam with a temperature of 650°C or higher passes through the pipe connecting the boiler 32 to the intermediate-pressure turbine 12, it is necessary to manufacture the pipe with Ni-based alloy that is a high-grade material. However, since the amount of material used is reduced by shortening the pipe, it is possible to reduce the manufacturing costs of the entire facility.
  • [Example 6]
  • FIG. 12 is a view illustrating the configuration of a steam turbine power generation facility according to Example 6 of the invention.
  • As illustrated in FIG. 12, the steam turbine power generation facility according to Example 6 of the invention will be described.
  • The steam turbine power generation facility 10 illustrated in FIG. 12 includes a high-pressure turbine 16, an intermediate-pressure turbine 12, a low-pressure turbine 24, a generator 26, a condenser 28, and a boiler 32 as main components.
  • Additionally, the high-pressure turbine 16, the intermediate-pressure turbine 12, the low-pressure turbine 24, and the generator 26 are connected together on the same axis, and the high-pressure turbine 16 and the intermediate-pressure turbine are integrated to form an integrated structure 25.
  • Additionally, at least any one of the rotors and casings of the high-pressure turbine 16 and the intermediate-pressure turbine 12 are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  • Main steam superheated to a temperature of 650°C or higher by the boiler 32 is introduced into the high-pressure turbine 16 through a main steam pipe 34. The steam introduced into the high-pressure turbine 16 performs expansion work and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 48 in a state where the temperature thereof decreased to less than 650°C. The steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature thereof increases to 650°C or higher. The reheated steam is introduced into the intermediate-pressure turbine 12 through a high-temperature reheat pipe 40. The introduced steam performs expansion work in the intermediate-pressure turbine 12 and is then exhausted and sent to the low-pressure turbine 24 through a crossover pipe 44. The steam sent to the low-pressure turbine 24 performs expansion work and is then exhausted and sent to the condenser 28. The steam sent to the condenser 28 is condensed by the condenser 28 and is then returned to the boiler 32 in a state where the pressure thereof is raised by a water feed pump 30. The generator 26 is rotationally driven by the expansion work of the respective turbines to generate power.
  • According to the above-described steam turbine power generation facility 10 of Example 6 of the invention, at least any one of the rotors and the casings of the turbines (the high-pressure turbine 16 and the intermediate-pressure turbine 12), into which the steam with a temperature of 650°C or higher is introduced, are constructed by joining together a plurality of members formed from Ni-based alloy through welding, and the high-pressure turbine 16 and the intermediate-pressure turbine 12 are integrated to form the integrated structure 25. Therefore, it is possible to increase the size of the facility, without increasing the numbers of casings, rotors, and blade stages.
  • Additionally, the high-pressure turbine 16, the intermediate-pressure turbine 12, and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown). In this case, since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs. In addition, as welding structures formed from different materials (for example, 12Cr steel, 2.25Cr steel, and 3.5Ni steel; 9Cr steel, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure, it is possible to minimize the amount of high-grade material used.
  • [Example 7]
  • FIG. 13 is a view illustrating the configuration of a steam turbine power generation facility according to Example 7 of the invention.
  • As illustrated in FIG. 13, the steam turbine power generation facility according to Example 7 of the invention will be described.
  • The steam turbine power generation facility 10 illustrated in FIG. 13 includes an very-high-pressure turbine 19, a high-pressure turbine 16, an intermediate-pressure turbine 12, a low-pressure turbine 24, a generator 26, a condenser 28, and a boiler 32 as main components.
  • Additionally, the very-high-pressure turbine 19, the high-pressure turbine 16, the intermediate-pressure turbine 12, the low-pressure turbine 24, and the generator 26 are connected together on the same axis.
  • At least any one of the rotors and casings of the very-high-pressure turbine 19, the high-pressure turbine 16, and the intermediate-pressure turbine 12 are formed from Ni-based alloy, and at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  • Main steam superheated to a temperature of 650°C or higher by the boiler 32 is introduced into the very-high-pressure turbine 19 through a main steam pipe 33. The steam introduced into the very-high-pressure turbine 19 performs expansion work and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 35 in a state where the temperature thereof decreased to less than 650°C. The steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature thereof increases to 650°C or higher. The reheated steam is introduced into the high-pressure turbine 16 through a high-temperature reheat pipe 34. The steam introduced into the high-pressure turbine 16 performs expansion work and is then exhausted and returned to the boiler 32 through a low-temperature reheat pipe 38 in a state where the temperature thereof decreased to less than 650°C. The steam returned to the boiler 32 is reheated by the boiler 32 such that the temperature increases to 650°C or higher. The reheated steam is sent to the intermediate-pressure turbine 12 through a high-temperature reheat pipe 40. The steam sent to the intermediate-pressure turbine 12 performs expansion work and is then exhausted to the low-pressure turbine 24 through a crossover pipe 44. The steam introduced into the low-pressure turbine 24 performs expansion work and is then exhausted and sent to the condenser 28. The steam sent to the condenser 28 is condensed by the condenser 28 and is then returned to the boiler 32 in a state where the pressure thereof is raised by a water feed pump 30. The generator 26 is rotationally driven by the expansion work of the respective turbines to generate power.
  • According to the steam turbine power generation facility 10 of Example 7 of the invention, at least any one of the rotors and the casings of the turbines (the very-high-pressure turbine 19, the high-pressure turbine 16, and the intermediate-pressure turbine 12), into which the steam with a temperature of 650°C or higher is introduced, are constructed by joining together a plurality of members formed from Ni-based alloy through welding. Therefore, it is possible to increase the size of the facility, without increasing the numbers of casings, rotors, and blade stages in any one of the very-high-pressure turbine 19, the high-pressure turbine 16, and the intermediate-pressure turbine 12. Additionally, as the very-high-pressure turbine 19 is provided, it is possible to use further high-pressure steam.
  • Meanwhile, the high-pressure turbine 16, the intermediate-pressure turbine 12, and the low-pressure turbine 24 may be integrated to form an integrated structure (not shown). In this case, since the numbers of casings and rotors are reduced, it is possible to reduce the facility costs. In addition, as welding structures formed from different materials (for example, Ni-based alloy, 12Cr steel, and 2.25Cr steel, 3.5Ni steel; Ni-based alloy, 9Cr steel, 2.25Cr steel, 3.5Ni steel; Ni-based alloy, 2.25Cr steel, and 3.5Ni steel) are adopted for the rotor and the casing of the integrated structure, it is possible to minimize the amount of high-grade material used.
  • Industrial Applicability
  • According to the examples of the invention, even if steam conditions in the 650°C class or 700°C class are adopted, it is possible to utilize the invention as a steam turbine facility capable of suppressing the possibility of vibration occurrence and a drastic increase in facility cost, thereby realizing an increase in size of the steam turbine facility.

Claims (16)

  1. A steam turbine facility comprising a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine,
    wherein the high-pressure turbine is separated into a first high-pressure turbine part on a high-temperature and high-pressure side and a second high-pressure turbine part on a low-temperature and low-pressure side,
    the intermediate-pressure turbine is separated into a first intermediate-pressure turbine part on a high-temperature and high-pressure side and a second intermediate-pressure turbine part on a low-temperature and low-temperature side,
    the first high-pressure turbine part and the first intermediate-pressure turbine part are integrated to form a first integrated part,
    at least the second high-pressure turbine part and the second intermediate-pressure turbine part are integrated to form a second integrated part,
    at least any one of the rotors and casings of steam-introduction-side turbines of the first high-pressure turbine part and the first intermediate-pressure turbine part, into which steam with a temperature of 650°C or higher is introduced, are formed from Ni-based alloy, and
    at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  2. The steam turbine facility according to claim 1, wherein the first integrated part, the second integrated part, and the low-pressure turbine are connected together on the same axis.
  3. The steam turbine facility according to claim 1, further comprising an very-high-pressure turbine into which steam having a higher pressure than the steam introduced into the high-pressure turbine is introduced,
    wherein the very-high-pressure turbine, the first integrated part, the second integrated part, and the low-pressure turbine are connected together on the same axis.
  4. The steam turbine facility according to claim 1, wherein steam with a temperature of 650°C or higher is introduced into the first high-pressure turbine part and the first intermediate-pressure turbine part forming the first integrated part,
    steam with a temperature of less than 650° is introduced into the second high-pressure turbine part and the second intermediate-pressure turbine part forming the second integrated part,
    the second integrated part and the low-pressure turbine are connected on a different axis from the first integrated part, and
    the first integrated part is arranged at a position closer to a boiler than the connection structure of the second integrated part and the low-pressure turbine, the boiler superheating the steam introduced into the high-pressure turbine and the intermediate-pressure turbine.
  5. The steam turbine facility according to claim 4, further comprising an very-high-pressure turbine into which steam having a higher pressure than the steam introduced into the high-pressure turbine is introduced,
    wherein the first integrated part and the very-high-pressure turbine are connected together on the same axis.
  6. The steam turbine facility according to any one of claims 1 to 5, wherein the second integrated part is further integrated with the low-pressure turbine.
  7. A steam turbine facility comprising a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine,
    wherein the high-pressure turbine is separated into a first high-pressure turbine part on a high-temperature and high-pressure side and a second high-pressure turbine part on a low-temperature and low-pressure side,
    the intermediate-pressure turbine is separated into a first intermediate-pressure turbine part on the high-temperature and high-pressure side and a second intermediate-pressure turbine part on the low-temperature and low-temperature side,
    the first high-pressure turbine part and the first intermediate-pressure turbine part are integrated to form a first integrated part,
    at least any one of the rotors and casings of steam-introduction-side turbines of the first high-pressure turbine part and the first intermediate-pressure turbine part, into which steam with a temperature of 650°C or higher is introduced, are formed from Ni-based alloy, and
    at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  8. The steam turbine facility according to claim 7, wherein the first integrated part, the second high-pressure turbine, the second intermediate-pressure turbine, and the low-pressure turbine are connected together on the same axis.
  9. The steam turbine facility according to claim 7, wherein the second high-pressure turbine, the second intermediate-pressure turbine, and the low-pressure turbine are connected to form a connection structure,
    the connection structure is connected on a different axis from the first integrated part, and
    the first integrated part is arranged at a position closer to a boiler than the connection structure, the boiler superheating the steam introduced into the high-pressure turbine and the intermediate-pressure turbine.
  10. The steam turbine facility according to claim 7, further comprising an very-high-pressure turbine into which steam having a higher pressure than the steam introduced into the high-pressure turbine is introduced,
    wherein the very-high-pressure turbine, the first integrated part, the second intermediate-pressure turbine, and the low-pressure turbine are connected together on the same axis.
  11. The steam turbine facility according to claim 9, further comprising an very-high-pressure turbine into which steam having a higher pressure than the steam introduced into the high-pressure turbine is introduced,
    wherein the first integrated part and the very-high-pressure turbine are connected together on the same axis.
  12. The steam turbine facility according to any one of claims 7 to 11, wherein the second intermediate-pressure turbine part and the low-pressure turbine are integrated.
  13. A steam turbine facility comprising a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine,
    wherein the turbines into which steam with a temperature of 650°C or higher is introduced are connected together on the same axis,
    the turbines into which steam with a temperature of less than 650°C are connected together on the same axis different from that of the turbines into which the steam with a temperature of 650°C or higher is introduced,
    the turbines into which the steam with a temperature of 650°C or higher is introduced are arranged at positions closer to the boiler than the turbines into which the steam with a temperature of less than 650°C is introduced, the boiler superheating the steam introduced into the high-pressure turbine and the intermediate-pressure turbine,
    at least any one of the rotors and casings of the turbines into which the steam with a temperature of 650°C or higher is introduced are formed from Ni-based alloy, and
    at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  14. A steam turbine facility comprising a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine,
    wherein at least the high-pressure turbine and the intermediate-pressure turbine are integrated to form an integrated structure,
    the integrated structure and the low-pressure turbine are connected together on the same axis,
    at least any one of the rotors and casings of the turbines into which steam with a temperature of 650°C or higher is introduced are formed from Ni-based alloy, and
    at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  15. The steam turbine facility according to claim 14, further comprising an very-high-pressure turbine into which steam having a higher pressure than the steam introduced into the high-pressure turbine is introduced,
    wherein an integrated structure formed by integrating the very-high-pressure turbine with the high-pressure turbine and the intermediate-pressure turbine is connected to the low-pressure turbine on the same axis,
    at least any one of the rotors and casings of the very-high-pressure turbine and the high-pressure turbine are formed from Ni-based alloy, and
    at least any one of the overall rotors and the overall casings of the turbines are constructed by joining together a plurality of materials of rotor members or casing members by welding.
  16. The steam turbine facility according to claim 14 or 15, wherein the integrated structure is further integrated with the low-pressure turbine.
EP09806667.3A 2008-08-11 2009-07-30 Steam turbine equipment Active EP2180149B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2008207499 2008-08-11
PCT/JP2009/063909 WO2010018775A1 (en) 2008-08-11 2009-07-30 Steam turbine equipment

Publications (3)

Publication Number Publication Date
EP2180149A1 true EP2180149A1 (en) 2010-04-28
EP2180149A4 EP2180149A4 (en) 2015-08-26
EP2180149B1 EP2180149B1 (en) 2016-12-21

Family

ID=41668920

Family Applications (1)

Application Number Title Priority Date Filing Date
EP09806667.3A Active EP2180149B1 (en) 2008-08-11 2009-07-30 Steam turbine equipment

Country Status (6)

Country Link
US (1) US20110030374A1 (en)
EP (1) EP2180149B1 (en)
JP (1) JP4898956B2 (en)
KR (1) KR101214420B1 (en)
CN (1) CN101802349B (en)
WO (1) WO2010018775A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102705016A (en) * 2012-06-21 2012-10-03 哈尔滨汽轮机厂有限责任公司 Supercritical 600MW heat supplying extraction steam turbine
EP2666977A1 (en) * 2012-05-21 2013-11-27 Alstom Technology Ltd High-temperature steam turbine power plant with double reheat
US9194246B2 (en) 2011-09-23 2015-11-24 General Electric Company Steam turbine LP casing cylindrical struts between stages
WO2017033028A1 (en) * 2015-08-27 2017-03-02 Doosan Babcock Limited Steam generation system and method

Family Cites Families (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2902831A (en) * 1958-08-22 1959-09-08 Gen Electric Governing system for reheat steam turbine powerplant
JPS6053415A (en) 1983-08-31 1985-03-27 Mazda Motor Corp Control device for car suspension
US5199256A (en) * 1989-01-26 1993-04-06 General Electric Company Overspeed protection for a gas turbine/steam turbine combined cycle
JPH04209903A (en) * 1990-12-03 1992-07-31 Toshiba Corp Turbine
JP3582848B2 (en) * 1994-03-14 2004-10-27 株式会社東芝 Steam turbine power plant
JP3772019B2 (en) * 1998-04-21 2006-05-10 株式会社東芝 Steam turbine
JP3977546B2 (en) * 1999-03-25 2007-09-19 株式会社東芝 Steam turbine power generation equipment
JP2000282808A (en) * 1999-03-26 2000-10-10 Toshiba Corp Steam turbine facility
JP2003343210A (en) * 2002-05-23 2003-12-03 Toshiba Corp Turbine casing having weldbonding structure, steam turbine making use thereof and manufacturing method of turbine casing
JP4074208B2 (en) * 2003-03-17 2008-04-09 株式会社東芝 Steam turbine power plant
JP4509664B2 (en) * 2003-07-30 2010-07-21 株式会社東芝 Steam turbine power generation equipment
EP1559872A1 (en) * 2004-01-30 2005-08-03 Siemens Aktiengesellschaft Turbomachine
JP2005344527A (en) * 2004-05-31 2005-12-15 Toshiba Corp Steam turbine rotor and method for manufacturing the same
US20060073026A1 (en) * 2004-10-06 2006-04-06 Shaw David N Oil balance system and method for compressors connected in series
US20060217216A1 (en) * 2004-12-06 2006-09-28 Macgregor Golf Company Fairway wood with titanium face member
JP4783053B2 (en) * 2005-04-28 2011-09-28 株式会社東芝 Steam turbine power generation equipment
JP4794254B2 (en) * 2005-09-26 2011-10-19 中国電力株式会社 Steam turbine plant and operation method thereof
EP1775430A1 (en) * 2005-10-17 2007-04-18 Siemens Aktiengesellschaft Steam power plant and method for retrofitting a steam power plant
DE502006007968D1 (en) * 2006-08-25 2010-11-11 Siemens Ag Swirl-cooled rotor weld seam
JP4908137B2 (en) * 2006-10-04 2012-04-04 株式会社東芝 Turbine rotor and steam turbine
JP4520481B2 (en) * 2007-04-13 2010-08-04 株式会社日立製作所 High temperature steam turbine plant

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9194246B2 (en) 2011-09-23 2015-11-24 General Electric Company Steam turbine LP casing cylindrical struts between stages
EP2666977A1 (en) * 2012-05-21 2013-11-27 Alstom Technology Ltd High-temperature steam turbine power plant with double reheat
CN102705016A (en) * 2012-06-21 2012-10-03 哈尔滨汽轮机厂有限责任公司 Supercritical 600MW heat supplying extraction steam turbine
WO2017033028A1 (en) * 2015-08-27 2017-03-02 Doosan Babcock Limited Steam generation system and method

Also Published As

Publication number Publication date
WO2010018775A1 (en) 2010-02-18
EP2180149A4 (en) 2015-08-26
KR20100035171A (en) 2010-04-02
JPWO2010018775A1 (en) 2012-01-26
US20110030374A1 (en) 2011-02-10
KR101214420B1 (en) 2012-12-21
CN101802349B (en) 2014-11-05
EP2180149B1 (en) 2016-12-21
JP4898956B2 (en) 2012-03-21
CN101802349A (en) 2010-08-11

Similar Documents

Publication Publication Date Title
JP6556807B2 (en) New turbine generator unit
CN102325964B (en) Method and device for cooling steam turbine generating equipment
US8603265B2 (en) Ni-based alloy high-chrome steel structure and manufacturing method of the same
US20080250790A1 (en) High-temperature steam turbine power plant
US20100296938A1 (en) Rotor of rotating machine and method of manufacturing the rotor
EP2180149B1 (en) Steam turbine equipment
US8794913B2 (en) Steam turbine facility
US10927697B2 (en) Turbogenerator set
JP4074208B2 (en) Steam turbine power plant
JP2010249050A (en) Steam turbine and steam turbine installation
CN101772622A (en) Rotor for low pressure turbine
Bittermann et al. Turbine technologies for high performance light water reactors
JP4322433B2 (en) Steam turbine plant
Ceuca et al. Benchmarking Combined Cycle Power Plant Designs Employing 9-12% Cr CSEF Steels in Environments Prone to Steam Oxidation
JP4745129B2 (en) Steam turbine and steam turbine plant
Edelmann et al. The 700? C steam turbine power plant? status of development and outlook
Kloss-Grote et al. Advanced Steam Turbine Technology for Unique Double Reheat Steam Power Plant Layout
JP4934738B2 (en) High temperature steam turbine plant
Shibli Performance of P 91 steel under steady and cyclic loading conditions- research and power plant experience.
Phillips et al. The US Department of Energy’s Project on Advanced Materials for Boilers & Steam Turbines
Rao et al. Erratum:" A Thermodynamic Analysis of Tubular Solid Oxide Fuel Cell Based Hybrid Systems"[ASME Journal of Engineering for Gas Turbines and Power, 2003, 125 (1), pp. 59-66]

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20100219

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

AX Request for extension of the european patent

Extension state: AL BA RS

DAX Request for extension of the european patent (deleted)
RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: MITSUBISHI HITACHI POWER SYSTEMS, LTD.

RA4 Supplementary search report drawn up and despatched (corrected)

Effective date: 20150727

RIC1 Information provided on ipc code assigned before grant

Ipc: F01D 25/00 20060101ALI20150721BHEP

Ipc: F01D 13/00 20060101ALI20150721BHEP

Ipc: F01K 13/00 20060101ALI20150721BHEP

Ipc: F01D 5/06 20060101ALI20150721BHEP

Ipc: F01D 25/24 20060101AFI20150721BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20160708

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAR Information related to intention to grant a patent recorded

Free format text: ORIGINAL CODE: EPIDOSNIGR71

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

INTC Intention to grant announced (deleted)
AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

INTG Intention to grant announced

Effective date: 20161115

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 855697

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170115

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602009043275

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20161221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170321

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170322

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 855697

Country of ref document: AT

Kind code of ref document: T

Effective date: 20161221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170421

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170421

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170321

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602009043275

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20170922

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20170730

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20180330

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170731

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170731

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170730

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170730

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170730

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170730

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20090730

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20161221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 602009043275

Country of ref document: DE

Representative=s name: CBDL PATENTANWAELTE, DE

Ref country code: DE

Ref legal event code: R081

Ref document number: 602009043275

Country of ref document: DE

Owner name: MITSUBISHI POWER, LTD., YOKOHAMA-SHI, JP

Free format text: FORMER OWNER: MITSUBISHI HITACHI POWER SYSTEMS, LTD., YOKOHAMA, KANAGAWA, JP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 602009043275

Country of ref document: DE

Representative=s name: CBDL PATENTANWAELTE GBR, DE

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20230607

Year of fee payment: 15