US20100281818A1 - Method for building wind turbine tower - Google Patents

Method for building wind turbine tower Download PDF

Info

Publication number
US20100281818A1
US20100281818A1 US12/437,092 US43709209A US2010281818A1 US 20100281818 A1 US20100281818 A1 US 20100281818A1 US 43709209 A US43709209 A US 43709209A US 2010281818 A1 US2010281818 A1 US 2010281818A1
Authority
US
United States
Prior art keywords
section
tower
foundation
sections
steps
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/437,092
Other languages
English (en)
Inventor
George L. Southworth
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US12/437,092 priority Critical patent/US20100281818A1/en
Priority to PCT/US2010/033674 priority patent/WO2010129642A2/fr
Publication of US20100281818A1 publication Critical patent/US20100281818A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2240/00Components
    • F05B2240/90Mounting on supporting structures or systems
    • F05B2240/91Mounting on supporting structures or systems on a stationary structure
    • F05B2240/912Mounting on supporting structures or systems on a stationary structure on a tower

Definitions

  • This invention relates, generally, to methods for erecting tall structures. More particularly, it relates to a method for building a tower that supports a wind turbine.
  • Wind turbines are very heavy and they operate best at high elevations. They are usually mounted atop steel or concrete towers that are not stayed by guy wires. Both types of towers are typically built from the ground up.
  • the improved method would not expose workers to dangerous heights nor would it expose workers to inclement weather.
  • the improved method would also enable towers to be built throughout the year with no winter, poor weather, or high-winds interruptions.
  • the inventive method for erecting a tower includes the steps of providing a first pre-cast section of concrete having a generally tubular construction and positioning the first pre-cast section at ground level on a previously constructed foundation capable of supporting great weights such as twenty-five hundred tons.
  • the first pre-cast section may be a monolithic section having a hollow, cylindrical shape or a hollow, tapered cylindrical shape where its diameter at its lower end exceeds its diameter at its upper end.
  • the first pre-cast section may also be formed of independently formed arcuate parts that collectively form a pre-cast section when assembled and secured to one another.
  • the longitudinal axis of the pre-cast section is normal to the weight-bearing foundation.
  • a radially-inwardly extending ledge member, or “haunch,” is detachably secured to an interior wall of the first pre-cast section and at least one jack is positioned below the radially-inwardly extending haunch in circumferentially spaced apart relation to one another if more than one (1) jack is employed so that operating the jacks in an ascending mode raises the ledge member and therefore the first pre-cast section.
  • a second pre-cast section of concrete is positioned directly below the first pre-cast section after the first pre-cast section is lifted to a first predetermined height.
  • the first pre-cast section is then lowered onto the second pre-cast section by operating the jacks in a descending mode.
  • the jacks maintain the first section at its first predetermined height and hydraulic or other suitable means are used to lift the second pre-cast section into engagement with the elevated first pre-cast section. This avoids the surrendering of elevation and the subsequent re-gaining of said elevation required by the first embodiment, i.e., the second embodiments avoids operating the jacks in the descending mode when the jacks are under load.
  • the hydraulic means of the second embodiment includes a plurality of hydraulic cylinders positioned below a platform that is vertically movable in relation to the weight-bearing foundation. When fully retracted, the platform is disposed in a cavity formed in the foundation and the top surface of the platform is flush with the top surface of the foundation. The distance over which such hydraulic cylinders must operate is substantially equal to a clearance distance between the bottom or trailing end of the first pre-cast concrete section and the top or leading end of the second pre-cast concrete section that is positioned beneath the first section when said first section has been elevated to its first predetermined height. When fully extended, the platform lifts the second section so that the clearance space is closed, i.e., so that the top of the second section abuts the bottom of the first section. The platform remains elevated until the first and second sections have been secured to one another. It then returns to its fully retracted position of repose and its cycle is repeated for each individual pre-cast section until the tower is completed.
  • the jacks are lowered to their initial, lowermost position after the first section has been lowered onto the second section and said sections have been secured to one another. All materials that need to cure are substantially cured before any further lifting is performed.
  • the jacks are lowered to their initial, lowermost position while the hydraulic cylinders continue to support the platform in its elevated position and hence the first and second sections in their respective elevated positions.
  • the haunches are then placed onto the second section and the jacks are lifted to support said haunches and hence said first and second sections.
  • the hydraulic cylinders are then retracted back into their position of repose, thereby returning the platform to its fully retracted position where its top surface is flush with the top surface of the weight-bearing foundation.
  • the cavity that receives the platform has the same depth as the height dimension of the platform so that when the platform is in its fully retracted position of repose, it is flush with the foundation.
  • the movable platform is eliminated. Instead, a plurality of jacks are positioned in cavities formed in the foundation The jacks are aligned with the pre-cast concrete sections and lift them directly as needed to close the clearance space between an elevated pre-cast section and the pre-cast section disposed directly below it on the foundation.
  • the pre-cast sections are off-loaded at the assembly building from a railroad car onto a wheeled cart and the wheeled cart or other such vehicle positions the pre-cast section directly below an elevated section.
  • a pre-cast section has three (3) parts that are assembled to create the section, then three (3) carts would be employed.
  • each cart is equipped with jacks to lift its load upwardly until the lower pre-cast section abuts the elevated one, i.e., until the clearance space is eliminated.
  • jacks in the foundation lift the load from the carts.
  • the radially-inwardly extending haunches may be detached from the first pre-cast section and attached to the second pre-cast section after the first and second sections are disposed in abutting end-to-end relation to one another and after said first and second sections have been joined together at said abutting ends.
  • the haunches may also be provided with clearance spaces through which the jacks may travel so that the haunches need not be detached.
  • the jacks are then operated in their ascending mode to lift the first and second pre-cast sections to a predetermined height sufficient to enable insertion of a third pre-cast section below the second pre-cast section, in the first embodiment, the jacks are again operated in their descending mode to lower the first and second pre-cast sections in surmounting relation to the third section. In the second embodiment, the hydraulic cylinders are again operated to lift the platform so that the top or leading end of the third section enters into abutting relation to the bottom or trailing end of the second section.
  • the tower is completed by repeating the same steps for as many sections of pre-cast concrete as needed.
  • the jacks are preferably equidistantly spaced apart from one another so that they share a common load. They are operated slowly in both their ascending and descending modes and they are operated so that each jack performs lifting and lowering at a rate in common with the other jacks.
  • the climbing jacks may or may not be used in a fifth embodiment.
  • a frusto-conical lift plug having the same shape and size as the hollow interior of the top section of the tower is snugly inserted into said hollow interior of said top section of the tower when said top section is at ground level.
  • the wind turbine is preferably placed into surmounting relation to the first section before said first section is elevated.
  • the nacelle not be lifted into its operable position until the tower is completed.
  • the lift plug and hence the first section with the turbine there atop are hydraulically lifted to a first elevation as in the first two embodiments to provide clearance for the second section.
  • the elevated first section may be lowered as in the first embodiment or the second section may be lifted into mating engagement with the first, elevated section as disclosed in connection with the second, third, or fourth embodiments.
  • the two sections are interconnected in the same way as in the first two embodiments. That procedure is repeated until the tower is completed.
  • Guy wires are preferably used during construction of the tower. They are preferably mounted on computer-controlled reels so that they remain taught at all times, whether the tower is rising or descending as in the first embodiment or rising only as in the other embodiments.
  • the novel method also includes the steps of erecting an assembly building that surrounds a base of the tower to protect workers, parts, equipment, and materials from inclement weather and temperature extremes.
  • An opening in a roof of the assembly building is provided to accommodate erection of the tower and closure means for said opening may be provided.
  • the assembly building provides a controlled environment not just for worker comfort but also so that multiple materials may be used even if outdoor conditions would prevent their use. For example, welding is problematic in extreme cold, as is concrete pouring and curing. With a controlled environment within the confines of the assembly building, many routine construction procedures that are interrupted by inclement weather can continue without interruption throughout the year.
  • the assembly building also has utility in enhancing the stability of the tower in the same way that a boss helps stabilize an upstanding post.
  • the assembly building has further utility in connection with the deployment of guy wires.
  • Construction details include the step of embedding respective first ends of a plurality of vertically oriented rebars in the second pre-cast section so that respective second ends of said rebars extend from a top or leading horizontal end wall of the second pre-cast section.
  • a plurality of mating sockets is formed in a horizontal bottom or trailing end wall of the first pre-cast section so that the respective second ends of the vertically oriented rebars are received within the respective sockets when the first pre-cast section surmounts the second pre-cast section.
  • the first section of the tower is the only section that does not require rebars protruding from its top horizontal end wall unless such rebars are useful in securing a turbine to said top horizontal end wall.
  • the final, bottom section of the tower is the only tower section that does not require sockets formed in its bottom or trailing horizontal end wall.
  • the connecting structure just disclosed could also be reversed, i.e., the rebars could extend downwardly from the upper section and the rebar-receiving sockets could be formed in the lower section.
  • the invention is not limited to any particular connection.
  • the abutting ends of contiguous sections could be welded, bolted, or otherwise connected to one another. Post-tensioned connections could also be used.
  • each pre-cast section can be formed in tubular form, i.e., as a monolithic unit, with each section except the top section having upwardly extending rebars protruding from its horizontal top end wall and each section except the bottom section having sockets formed in its horizontal bottom end wall.
  • pre-cast sections may be too large to transport to the construction site if manufactured in tubular, monolithic form. It may be practical, however, to manufacture two (2) pre-cast sections, each of which forms a semicircle, and to transport such semicircular sections to the construction site. Very tall towers may require three (3) or more pre-cast sections to make one (1) tubular section when the three (3) or more sections are assembled together. Short towers can also be manufactured in easily-transportable sub-sections that are assembled at a construction site into the generally tubular form of a tower section.
  • each arcuate sub-section is provided with at least one rebar having a first end embedded within the pre-cast arcuate sub-section so that a second end protrudes in a horizontal plane from said vertical edge.
  • a second vertical edge of each arcuate sub-section is provided with at least one horizontally disposed mating socket for accommodating a rebar projecting from a contiguous sub-section.
  • All rebar/socket connections are filled with grout, epoxy, or the like after the rebars and sockets are fully coupled to one another and the grout or epoxy is allowed to substantially cure before a pre-cast tubular section is lifted to make room for the next pre-cast section.
  • the parts may also be joined together by welding, various mechanical couplings, and so on. This invention is not limited to any particular fastening or coupling means.
  • the sub-sections may be bolted or welded to one another along their abutting vertical edges, or by other suitable connections, such as post-tensioned connections, just as the abutting horizontal ends of the respective sections may be joined to one another.
  • the preferred jacks used in the first two embodiments are climbing jacks of the type that climb steel poles.
  • Each steel pole is positioned radially inwardly of the radially-inwardly extending ledge or haunch member that is attached to each pre-cast section.
  • the steel poles are braced with reinforcing poles or other bracing means that may be positioned radially inwardly of the steel poles in parallel or other supporting relation thereto.
  • the reinforcing poles are braced with horizontally disposed braces that interconnect opposed reinforcing poles.
  • the braces are positioned at a predetermined height so that they do not interfere with movement of workers within the hollow interior of the pre-cast section that is at ground level.
  • the weight of the tower can be reduced by making one or more sections out of a non-cementitous material such as steel.
  • the first section of the tower i.e., the one surmounted by the nacelle, could be formed of steel, for example.
  • the second section could also be formed of steel, and so on. Any percentage of the tower may be formed of materials other than concrete. It is therefore understood that this invention is not limited in scope to all-concrete towers.
  • An important object of this invention is to enable construction of tall wind turbine towers, or towers for other purposes, without requiring construction workers to climb to unsafe heights.
  • Another important object is to disclose a construction procedure whereby a turbine weighing three hundred fifty to five hundred tons or more is elevated to the top of a tower while the top section of the tower is supported by a ground level foundation so that the heavy weight is erected at an elevation where wind is not as large a factor as when lifting a turbine to the top of a conventional tower after the tower has reached its maximum height.
  • Another important object is to enable construction workers to erect a tall tower while the workers and parts, equipment, materials and the like are protected from inclement weather and temperature extremes by an assembly building.
  • An object closely related to the preceding object is to provide a construction method that can follow a predetermined schedule without regard to weather conditions so that such towers can be installed on a dependable time schedule.
  • Another object is to provide a tower made from concrete or other suitable materials so that the tower is very stable and can resist high winds.
  • Yet another object is to provide a tower made from modular parts so that the modular parts can be made on or off site in a controlled manufacturing environment and transported to a construction site for assembly in a controlled manufacturing environment.
  • Another important object is to employ guy wires to stabilize the tower as its height increases.
  • An object closely related to the foregoing object is to provide guy wires that are mounted on computer-controlled reels so that the guy wires remain taut during all phases of the construction process, including upward and downward travel of the pre-cast sections if the first embodiment is used and including upward travel only if the other embodiments are used.
  • FIG. 1A is a side elevational view of the novel assembly shop and a tower near the beginning of the construction process
  • FIG. 1B is a side elevational view of the novel assembly shop and the tower after completion of about a fourth of the construction process
  • FIG. 1C is a top plan view of the structures depicted in FIGS. 1A and 1B ;
  • FIG. 1D is a side elevational view of the novel assembly shop and the tower after completion of about half of the construction process
  • FIG. 1E is a side elevational view of the novel assembly shop and the tower after completion of about three-fourths of the construction process
  • FIG. 1F is a side elevational view of the novel assembly shop and a tower after completion of the construction process
  • FIG. 2A is a top plan view of three (3) pre-cast concrete parts having a common height and a common curvature prior to their attachment to one another;
  • FIG. 2B is a top plan view like that of FIG. 2A , depicting said three (3) pre-cast concrete parts in their assembled configuration;
  • FIG. 3A is a perspective view of a pre-cast concrete section, depicting a radially-inwardly extending ledge or haunch detachably secured thereto;
  • FIG. 3B is an exploded perspective view of the pre-cast concrete section depicted in FIG. 3A ;
  • FIG. 4A is a sectional view depicting a climbing jack disposed beneath a ledge or haunch prior to lifting of a first pre-cast concrete section;
  • FIG. 4B is a sectional view depicting the first pre-cast section when lifted about half way to its maximum elevation
  • FIG. 4C is a sectional view depicting the first pre-cast concrete section in its fully elevated position
  • FIG. 4D is a sectional view depicting a second pre-cast concrete section that has been placed into position beneath the first pre-cast concrete section and depicting the clearance space between the trailing end of the top section and the leading end of the bottom section;
  • FIG. 4E is a sectional view depicting the first pre-cast concrete section when it has been lowered into surmounting relation to the second pre-cast concrete section;
  • FIG. 5A is a sectional view in five (5) animations depicting the use of a cart in a trench to carry the sub-sections from a delivery station to the assembly station;
  • FIG. 5B is the second view of said five views
  • FIG. 5C is the third view of said five views
  • FIG. 5D is the fourth view of said five views
  • FIG. 5E is the fifth view of said five views
  • FIG. 6A is a side elevational sectional view of the second embodiment depicting the first tower section in its first elevated position and depicting the clearance space between the trailing end of the top section and the leading end of the bottom section and depicting the platform of the second embodiment in its fully retracted position;
  • FIG. 6B is a side elevational sectional view depicting the second tower section positioned in abutting relation to said first tower section and depicting the platform in its fully elevated position;
  • FIG. 6C is a side elevational sectional view like that of FIG. 5B but depicting the installation of the haunches when the climbing jacks are returned to their respective lowermost positions;
  • FIG. 6D is a side elevational sectional view depicting the climbing jacks at their respective uppermost positions to provide clearance for the next pre-cast section to be moved into position under the elevated section;
  • FIG. 7A is the first side elevational view of an animation of four views depicting the lifting of a sub-section into abutting relation to a previously elevated section to close a clearance gap between the two sections;
  • FIG. 7B is the second view in said animation
  • FIG. 7C is the third view in said animation
  • FIG. 7D is the fourth view in said animation
  • FIG. 8A is the first side elevational view of an animation of three views depicting use of a cart in lifting a sub-section into abutting relation to a previously elevated sub-section to close a clearance gap between the two sections;
  • FIG. 8B is the second view in said animation
  • FIG. 8C is the third view in said animation
  • FIG. 9A is the first side elevational view of an animation of three views depicting the use of a cart in lifting a sub-section into abutting relation to a previously elevated section to close a clearance gap between the two sections;
  • FIG. 9B is the second view in said animation
  • FIG. 9C is the third view in said animation
  • FIG. 10A is a perspective view of a wheeled vehicle carrying no load and positioned near the position of the wheeled vehicle depicted in FIG. 9A ;
  • FIG. 10B is a perspective view of a wheeled vehicle carrying no load and positioned near the position of the wheeled vehicle depicted in FIGS. 9B and 9C ;
  • FIG. 10C is a perspective view of a wheeled vehicle carrying a load and positioned near the position of the wheeled vehicle depicted in FIG. 9A ;
  • FIG. 11 is a top plan view depicting the braces that support the steel poles of the climbing jacks
  • FIG. 12A is the first side elevational, diagrammatic view in a series of seven views that animate the steps of a third embodiment, up to the assembly of the first three sections of the novel tower;
  • FIG. 12B is the second view in said series of seven views
  • FIG. 12C is the third view in said series
  • FIG. 12D is the fourth view in said series
  • FIG. 12E is the fifth view in said series
  • FIG. 12F is the sixth view in said series
  • FIG. 12G is the seventh view in said series
  • FIG. 13 is a cross-sectional view taken along line 13 - 13 in FIG. 12G ;
  • FIG. 14 is a side elevational view of a completed third embodiment tower prior to retraction of the lift plug
  • FIG. 15 is a diagrammatic view depicting subterranean access into the hollow interior of the tower.
  • FIG. 16 is a perspective view of a completed tower with a nacelle wind turbine in surmounting relation to the tower.
  • FIGS. 1A-F it will there be seen that an illustrative embodiment of the invention is denoted as a whole by the reference numeral 10 .
  • Structure 10 includes wind turbine 12 that surmounts first section 14 a of tower 14 .
  • the first section, and any other section, may be made of pre-cast concrete, concrete prepared at the site, or a non-cementitious material such as steel.
  • Assembly building 16 at the base of the tower protects the workers, parts, materials, supplies and equipment used to erect the tower from the elements and temperature extremes during construction. It can be taken down and moved to a new construction site when the work is completed or it can be left in place to provide shelter.
  • Guy wires 18 a, 18 b are conventional and radiate outwardly in at least three directions as depicted in the plan view of FIG. 1C .
  • This invention includes a novel method for guy wire usage as the tower is erected as best indicated by the arrows in FIGS. 1D and 1E . More particularly, since the guy wires must remain taut as the tower sections are elevated, the unreeling of the guy wires from their respective reels must be coordinated with the lifting motion of the jacks. In the first embodiment, where the tower is lowered a small distance with each new section, the reeling in of the guy wires must be coordinated with the lowering motion. The coordination of reeling guy wires in or out at a rate to match the lifting or lowering rate of the jacks is preferably computer-controlled.
  • the blades connected to wind turbine 12 are not depicted to simplify the drawing.
  • the blades and turbine 12 are not a part of the invention per se.
  • Tower 14 is formed of multiple sections which are referred to primarily as pre-cast concrete sections for convenience, with the understanding that the invention is not limited to pre-cast concrete sections as aforesaid.
  • the sections are denoted 14 a - h.
  • This invention is not limited to any particular number, size or shape of sections.
  • the pre-cast sections could form a generally triangular structure in horizontal cross-section where three (3) straight sides of a triangle are interconnected by arcuate corners or where three (3) arcuate sides of a triangle include straight sections at each end.
  • Tower 14 is hollow and each section is therefore generally tubular in configuration in a preferred embodiment of the invention.
  • the tower is preferably tapered to have a diameter that gradually reduces with height.
  • Each pre-cast section therefore has a diameter at its top or leading end that is less than its diameter at its lowermost or trailing end.
  • Towers that are not tapered are also within the scope of this invention.
  • the turbine that surmounts the tower must be cantilevered to a greater extent than is required with a tapered tower because the blades must not strike the tower.
  • the increased overhang of the turbine relative to its support as required by an untapered tower increases the stresses on the structure.
  • an untapered tower could be much heavier than a tapered tower.
  • FIGS. 2A and 2B are top plan views depicting how each section 14 is assembled inside building 16 .
  • three (3) railroad tracks 11 a, 11 b, and 11 c are positioned in equidistantly, circumferentially spaced relation to one another so that first section 14 a may be assembled from three (3) arcuate sub-sections 1 , 2 , 3 , each of which is small and light enough to be transported over public highways or railways to the construction site.
  • the sub-sections could be reduced to only two (2) semicircular parts or the number of sub-sections could be greater than three (3).
  • a pre-cast concrete section having a diameter sufficiently small so as not to require assembly is also within the scope of this invention.
  • the top section of a tower may have a diameter sufficiently small to avoid any need for making said top section in sub-sections, and the same may be true for other highly elevated sections.
  • each arcuate part has recess or socket 19 a formed therein and a second vertical end wall has rebar 19 b formed therein.
  • the confronting rebars and recesses thus mate with one another when sub-sections 1 , 2 , and 3 are displaced radially inwardly from their respective FIG. 2A positions to their respective FIG. 2B positions.
  • Grout or other bonding material is then introduced into each recess and allowed to cure to create a solid joint.
  • each pre-cast section of tower 14 when fully assembled has a structural integrity substantially similar to what it would be if the section were integrally formed.
  • the tower is never lifted nor lowered until all connections are completely finished and all materials that need to cure have been cured to the required strength.
  • the climate-controlled assembly building facilitates the making of all connections and the curing of all materials because said connections and curing processes are made within said building.
  • Section 14 a the section at the top of the tower, is the first section assembled.
  • Turbine 12 is placed atop said section by any suitable means, including a conventional crane, after the grout has cured. This is an important feature of the invention because it eliminates the dangerous and difficult prior art practice of lifting the turbine to the top of the tower as the final step in the tower construction process.
  • each arcuate pre-cast sub-section includes a pair of radially-inwardly extending ledges or haunches 15 .
  • Each haunch 15 may be formed of pre-cast concrete, steel, or other strong material.
  • each haunch may be integrally formed with its pre-cast sub-section or it may be detachably secured to its associated sub-section.
  • a bore or socket, denoted 15 a is formed in each pre-cast sub-section on their respective radially inwardly facing surfaces as depicted in FIG.
  • each haunch is formed in the respective radially outwardly facing surfaces of each haunch as also depicted in FIG. 3B .
  • the haunches are much lighter in weight than the sub-sections to which they are attached so the plugs are inserted into the sockets by any feasible means. No grout is added in applications where the plugs are disengaged from their associated sockets after each section lifting operation is performed.
  • the climbing jacks are returned to their respective lowermost positions after each sub-section is lifted to a height that allows a subsequent sub-section to be positioned beneath it.
  • a passageway is formed in them so that the climbing jacks may pass through such passageway, thereby eliminating the need to remove the haunches after each lift.
  • a conventional crane such as a traveling crane
  • a traveling crane is preferably used to lift the nacelle to the top of the first pre-cast concrete section at the beginning of the construction process.
  • placing the nacelle atop a completed tower near the end of the construction process is also within the scope of this invention.
  • each climbing jack 20 requires a vertical steel pole 22 to climb.
  • Each jack includes a first pair of upper opposed plates and a second pair of lower opposed plates; said first and second pairs of opposed plates are vertically spaced apart from one another.
  • the upper plates converge toward one another to engage the steel pole, the lower plates diverge away from one another so as not to engage said steel pole.
  • the upper plates tightly engage the steel pole, the vertical distance between the upper opposed plates and the lower opposed plate is reduced, i.e., the lower opposed plates travel upwardly under hydraulic power to a point on the steel pole directly under the upper opposed plates. The lower plates then tightly engage the steel pole.
  • the upper plates release their grip on the steel pole and the upper plates are raised under hydraulic power until they are a predetermined distance above the lower plates. Upon reaching said predetermined distance, the upper plates again engage the steel pole. After said upper plates have fully engaged the steel pole, the lower plates release their grip on said steel pole and the above-recited steps are repeated.
  • the tower is lifted when the upper plates are raised; they engage the bottom surface of their respective haunches.
  • the climbing jacks and their associated steel poles are positioned radially inwardly of the pre-cast concrete sub-sections.
  • uppermost end 20 a of each climbing jack is at an elevation slightly lower than an underside of each haunch or ledge 15 .
  • Climbing jacks 20 are hydraulically powered and operate in synchronization with each other and with the guy cables so that each pre-cast concrete section is held level as it is lifted.
  • section 14 a (turbine 12 being omitted to simplify the drawing) attains a height greater than the combined height of section 14 b of tower 14 and the needed clearance space
  • the sub-sections of section 14 b of which there are three in this particular example, are brought together and secured to one another in the manner recited above.
  • the climbing jacks then climb down their respective steel poles at a common rate of descent, gently lowering the turbine atop said assembled section 14 a.
  • the climbing jacks continue climbing down their respective steel poles until they reach their respective initial position of repose as depicted in FIG. 4A as aforesaid.
  • FIG. 4B depicts section 14 a after it has been lifted a short distance and FIG. 4C depicts section 14 a after it has been lifted to a height sufficient to receive section 14 b beneath it.
  • FIG. 4D depicts section 14 b after it has been moved into position beneath said section 14 a and
  • FIG. 4E depicts section 14 a after it has been lowered into surmounting relation to section 14 b.
  • Each pre-cast sub-section 1 , 2 , 3 has a plurality of rebars, collectively denoted 13 a, extending from its uppermost horizontal end wall and a corresponding number of rebar-receiving sockets, collectively denoted 13 b, formed in its lowermost horizontal end wall.
  • each climbing jack is positioned below its associated haunch.
  • the climbing jacks are operated until the bottom or trailing of section 14 a is positioned above the floor of building 16 by a distance equal to the height of section 14 b, including the height of rebars 13 a projecting upwardly therefrom, and a further preselected clearance distance to ensure that said bottom of section 14 a will not interfere with the interlocking of sub-sections 1 , 2 , and 3 of section 14 b when said section 14 b is assembled in the same manner as section 14 a.
  • section 14 b When section 14 b is fully assembled and the grout or other bonding material around the rebars has substantially cured, the climbing jacks are lowered so that rebars 13 a projecting upwardly from section 14 b enter into their associated sockets 13 b formed in the bottom end wall of section 14 a as section 14 a is lowered into overlying relation to section 14 b.
  • Haunches 15 are then removed from section 14 a and said haunches are lowered so that they can be detachably secured to section 14 b.
  • haunches 15 are formed integrally with their respective pre-cast sections, the climbing jacks travel through a clearance space or passageway formed in the haunches to enable the climbing jacks to descend without being blocked by the haunches.
  • FIGS. 4A-E do not depict a means for bringing second section 14 b from its FIG. 4C position to its FIG. 4D position. Theoretically, if friction forces are not too high, the sub-sections resting atop the support surface could simply be pushed or pulled by any means until they converge with one another and line up underneath elevated first sub-section 14 a.
  • FIGS. 5A-5E depict an embodiment where the support surface of the tower is a thick concrete pad or platform 32 .
  • a trench or ditch 32 a is formed in concrete platform 32 and a cart, preferably supported by railroad tracks, is adapted to travel in said ditch.
  • Each cart 17 a includes a platform 30 that can be hydraulically lifted and lowered.
  • a pre-cast sub-section of the tower is taken from a railroad car and deposited atop platform 30 when platform 30 is slightly elevated as depicted in FIG. 5A .
  • the depth of the ditch or trench and the height of the cart are predetermined so that when the cart travels away from the railroad car to the position of FIG. 5B , the bottom edge of the pre-cast section will clear the top surface of platform 32 by a short distance.
  • FIGS. 6A-D depict a second embodiment of the invention. This embodiment eliminates the need to lower the tower to join the horizontal trailing wall of an upper section to the horizontal leading wall of its contiguous lower section.
  • hydraulic cylinders 30 are mounted in thick concrete foundation 32 that overlies ground 34 .
  • Concrete platform 36 is mounted within a cavity formed in foundation 32 so that the top surface of said platform is flush with the top surface of foundation 32 when platform 36 is in its fully retracted position as depicted in FIG. 6A .
  • first section 14 a has been elevated by the climbing jacks and second section 14 b has been positioned directly below said first section. Accordingly, there is a clearance space between the bottom of section 14 a and the top of section 14 b.
  • Activation of a hydraulic motor or motors causes cylinders 30 to rise upwardly to lift platform 36 and second section 14 b to their respective positions depicted in FIG. 6B .
  • This closes the clearance space and sections 14 a and 14 b are then connected to one another by the various connections means disclosed above, or any other suitable connection means.
  • a control signal sent to the climbing jacks enables them to climb downwardly from their respective elevated FIG. 6A positions to their respective lowered FIG. 6B positions.
  • Haunches 15 are then installed onto section 14 b as depicted in FIG. 6C and another control signal again activates the climbing jacks to lift pre-cast section 14 b a distance to enable the next pre-cast section or sub-sections to be positioned under it as depicted in FIG. 6D .
  • platform With the full weight of the tower bearing upon the climbing jacks, platform retracts 36 to its initial position of repose, flush with foundation 32 , to enable said next pre-cast section or sub-sections to be moved into place as depicted in said FIG. 6D .
  • each steel pole 22 Due to the weight of the tower, it is desirable to reinforce each steel pole 22 . As depicted in FIGS. 5A-E and FIG. 6A-D , one way of doing that is to position a second reinforcing steel pole 23 radially inwardly of each climbing jack steel pole 22 and to interconnect said poles to one another at vertically spaced intervals as at 25 .
  • Plural braces, denoted 27 a - d are then positioned in horizontally-disposed, bracing relation to opposed steel poles 23 as depicted. Braces 27 a are positioned about seven feet (7′) above the floor of building 16 so as not to interfere with movement of workers in the building. At least one additional set of braces may also be provided above the first set of braces.
  • FIGS. 7A-D depict a third embodiment where movable platform 36 is eliminated.
  • Hydraulic jacks 30 are positioned within cavities 30 a formed within concrete foundation 32 so that their respective lifting surfaces are flush with the top surface of foundation 32 when the jacks are fully retracted as depicted in FIGS. 7A and 7D .
  • a pre-cast section is lifted by a distance sufficient to close the clearance gap between the bottom edge of an elevated pre-cast concrete section and a top edge of a pre-cast section supported by said foundation.
  • jacks 30 are then retracted and the process continues as before.
  • FIG. 7C depicts the attachment of a haunch while a jack means 30 is extended but the jacks may also be employed in haunch-less embodiments.
  • FIGS. 8A-C depict a fourth embodiment.
  • Each pre-cast section or sub-section is transferred from a railroad car or other delivery vehicle to a wheeled cart 17 a or other suitable vehicle and the cart or carts travel a short distance from the delivery vehicle to the tower erection site as depicted in FIG. 8A .
  • Carts 17 a are preferably self-propelled but may be pushed or pulled.
  • Each cart 17 a travels to a position where the concrete section or sub-section it carries is aligned directly below the elevated section as depicted in FIG. 8B .
  • Hydraulic jacks 30 are built-in to each cart and when activated lift the section or sub-section upwardly into abutting relation to the elevated section as depicted in FIG. 8C .
  • FIGS. 9A-C depict a variation of the fourth embodiment.
  • said jacks 30 are mounted in concrete foundation 32 , just as in the third embodiment. They extend through openings formed in cart 17 a and lift the load as needed, holding the section or sub-section in place until the lifted section is secured to the elevated section.
  • FIG. 10A depicts a cart 17 a in a position similar to the position of FIG. 9A , but when carrying no load.
  • FIG. 10B depicts a cart 17 a in a position similar to the position of FIGS. 9B and 9C , but when carrying no load.
  • FIG. 10C depicts a cart 17 a in a position similar to the position of FIG. 9A , and when carrying a load.
  • the carts could be much wider than the carts that are depicted so as to provide a more stable support for the concrete sections or subsections. Moreover, additional jacks could be provided in flanking relation to the depicted jacks, whether or not the carts are provided in a wider form.
  • FIG. 11 is a top plan view depicting six (6) climbing jacks 20 and therefore six (6) steel poles 22 , six (6) reinforcing steel poles 23 and three (3) sets of diametrically extending braces 27 .
  • the number and spacing of said jacks and poles is changed for differing applications, it being understood that the number of jacks and associated steel poles may increase as the height and weigh of the pre-cast concrete tower increases.
  • section 14 a The lifting of section 14 a to accommodate section 14 b therebeneath lifts the bottom end wall of said section 14 a above the roof of building 16 , or nearly so, depending upon the selected height of building 16 and the overall height of section 14 b. Due to the relatively short extent of the combined heights of sections 14 a and 14 b, guy wires may not be required as depicted to help secure said section 14 a against swaying. However, guy wires will be required as the tower increases in height.
  • FIGS. 12A-G , 13 and 14 A fifth embodiment is depicted in FIGS. 12A-G , 13 and 14 . Wind turbine 12 and assembly building 16 are deleted from these Figs. to simplify them.
  • frusto-conical lift plug 40 having the same shape and size as the hollow interior of top section 14 a of the tower is centered on platform 36 and the sub-sections of section 14 a are installed around it and secured to one another. Accordingly, lift plug 40 is snugly received within the hollow interior of top section 14 a when said top section is at ground level.
  • the turbine is not depicted to simplify the drawing but said turbine is lifted and deposited atop section 14 a after said first section has been assembled but before said first section is elevated.
  • Lift plug 40 and hence first section 14 a with the turbine thereatop are hydraulically lifted to a first elevation as in the first two embodiments to provide clearance for second section 14 b as best understood in connection with FIG. 11B .
  • Hydraulic shaft 42 is centered within the interior of lift plug 40 and is driven upwardly by a hydraulic motor, not depicted.
  • Platform 36 remains in its fully retracted position as depicted in FIG. 11B or said platform is eliminated as in the third and fourth embodiments.
  • Hydraulic shaft 42 could be provided in relatively short sections so that it would not need to extend downwardly into the earth as drawn.
  • a new section of shaft could be positioned directly under an elevated shaft by a revolving mechanism such as provided in revolver-type pistols, for example.
  • the revolving mechanism would rotate atop concrete foundation 32 and its chambers would be re-loaded as needed.
  • the ends of the shaft sections would be coupled together by any suitable means to collectively form shaft 42 .
  • Such short sections could also be positioned in alignment with main shaft 42 and connected thereto in many ordinary ways. They could be carried into position by carts, they could be slid atop foundation 32 while in an upright configuration, they could be rolled to the center of the structure and then stood up to enter into alignment with the main shaft, and so on.
  • first tower section 14 a is such that a clearance space is provided between sections 14 a and 14 b, just as in the first two embodiments.
  • foundation 36 is raised by hydraulic cylinders 30 as in the second embodiment and as depicted in FIG. 12D to lift second section 14 b into mating engagement with first section 14 a and the two sections are interconnected in the same way as in the first two embodiments. Said elevation of second section 14 b eliminates the clearance space depicted in FIG. 12C .
  • Hydraulic cylinders 30 then retract and platform 36 is lowered to its position of repose as depicted in FIG. 12E .
  • hydraulic cylinder or shaft 42 is then extended further so that second section 14 b attains an elevation sufficient to move the sub-sections of tower section 14 c into position directly below section 14 b.
  • Hydraulic cylinders 30 then lift section 14 c into mating engagement with section 14 b by elevating platform 36 as depicted in FIG. 12G .
  • FIG. 13 is a transverse sectional view of section 14 b as indicated in FIG. 12G .
  • FIG. 15 diagrammatically depicts subterranean tunnel 44 that provides ingress and egress into and out of the hollow interior of tower 14 .
  • a center shaft such as hydraulic cylinder 42
  • the entrance to the tunnel would not be centered in the building as depicted.
  • a centered entrance is suitable for the embodiments that employ climbing jacks.
  • FIG. 16 A completed tower having eight (8) sections, each made of three (3) sub-sections, surmounted by nacelle 12 , is depicted in FIG. 16 .
  • Building 16 protects all participants in the tower-construction project from inclement weather, and the novel method eliminates the need for any worker to be exposed to heights. This enables tower construction to continue unabated in inclement weather.
  • the use of guy wires also enables tower construction to continue even in relatively high wind conditions.
  • Building 16 also provides a temperature-controlled environment that enables the making of connections that include grout, epoxy, or other temperature-sensitive materials. These features enable a tower to be raised much faster than a tower built by conventional from bottom to top methods.
  • the use of pre-cast concrete sections and the novel from top to bottom method speeds the process even more, thereby significantly reducing labor and other costs associated with building pre-cast towers.
  • the use of multiple climbing jacks that are reinforced as disclosed herein enables the building of pre-cast concrete towers that may exceed three hundred feet in height and which may have weights in excess of two thousand (2000) tons.
  • the lift plug embodiment can do the same but it is disclosed primarily to indicate that the invention is not limited to the use of climbing jacks.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Wind Motors (AREA)
US12/437,092 2009-05-07 2009-05-07 Method for building wind turbine tower Abandoned US20100281818A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US12/437,092 US20100281818A1 (en) 2009-05-07 2009-05-07 Method for building wind turbine tower
PCT/US2010/033674 WO2010129642A2 (fr) 2009-05-07 2010-05-05 Procédé de construction d'une tour d'éolienne

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US12/437,092 US20100281818A1 (en) 2009-05-07 2009-05-07 Method for building wind turbine tower

Publications (1)

Publication Number Publication Date
US20100281818A1 true US20100281818A1 (en) 2010-11-11

Family

ID=43050839

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/437,092 Abandoned US20100281818A1 (en) 2009-05-07 2009-05-07 Method for building wind turbine tower

Country Status (2)

Country Link
US (1) US20100281818A1 (fr)
WO (1) WO2010129642A2 (fr)

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561714A (zh) * 2012-03-21 2012-07-11 长春工程学院 预制墙板安装调整平台
US20120304588A1 (en) * 2010-02-09 2012-12-06 Von Ahn Patrik Method for Erecting a Wind Turbine Tower
US8413405B2 (en) * 2008-12-19 2013-04-09 Repower Systems Se Tower of a wind power plant
US20150167342A1 (en) * 2012-05-18 2015-06-18 Structural Research, S.L. Self-Climbing Telescopic Crane and Method for Mounting Pre-Fabricated Concrete Towers
US20150176299A1 (en) * 2013-12-20 2015-06-25 Acciona Windpower, S.A. Method for the Assembly of Frustoconical Concrete Towers and Concrete Tower Assembled using said Method
US9091095B2 (en) * 2010-06-14 2015-07-28 Max Bogl Bauunternehmung Gmbh & Co. Kg Tower of a wind power plant and method for producing a tower of a wind power plant
WO2015200787A1 (fr) * 2014-06-27 2015-12-30 Tindall Corporation Procédé et appareil permettant d'ériger une tour avec des vérins hydrauliques
US20160194896A1 (en) * 2013-09-06 2016-07-07 Walter Pondorfer Tower Construction
US20160215761A1 (en) * 2013-09-06 2016-07-28 youWINenergy GmbH Tower assembly for a wind turbine installation
US20160376807A1 (en) * 2015-06-26 2016-12-29 General Electric Company System and method for assembling tower sections of a wind turbine lattice tower structure
US20170247901A1 (en) * 2016-02-26 2017-08-31 Acciona Windpower, S.A. Concrete towers manufacturing method for wind turbines and concrete tower for wind turbine
US20170321659A1 (en) * 2016-05-06 2017-11-09 General Electric Company Hybrid tubular lattice tower assembly for a wind turbine
US20180080222A1 (en) * 2016-09-21 2018-03-22 Skyrise Global, Llc Structure and method of making the same
US20180251997A1 (en) * 2015-09-15 2018-09-06 Max Bögl Wind AG Wind Turbine Tower Made Of Prefabricated Concrete Parts in the Shape of Annular Segments
US20180305938A1 (en) * 2015-10-07 2018-10-25 Ingecid Investigación Y Desarrollo De Proyectos S.L. Concrete tower and climbing or self-climbing formwork device for its building onsite
US10113327B2 (en) * 2014-12-01 2018-10-30 Lafarge Section of concrete
US20190063030A1 (en) * 2016-02-29 2019-02-28 Innogy Se Foundation pile for a wind turbine
US20190186166A1 (en) * 2017-12-19 2019-06-20 Nordex Energy Spain, S.A.U. Wind turbine tower with reinforcing elements
US10364800B2 (en) * 2014-05-19 2019-07-30 Soletanche Freyssinet Assembly system and method for assembling a tower for a wind generator
US10494830B2 (en) * 2014-10-31 2019-12-03 Soletanche Freyssinet Method for manufacturing concrete construction blocks for a wind-turbine tower and associated system
US10794365B2 (en) 2016-08-08 2020-10-06 Wobben Properties Gmbh Tower segment, tower section, tower, wind turbine, and method for producing a tower segment and for connecting tower segments
CN112554636A (zh) * 2020-12-09 2021-03-26 中国电建集团贵阳勘测设计研究院有限公司 一种非岩石地质条件下的拉线型测风塔快速施工方法
US20220259882A1 (en) * 2019-06-14 2022-08-18 Balfour Beatty Plc Modular tube and method of manufacturing
US11454218B2 (en) * 2017-12-13 2022-09-27 Anker Foundations GmbH Foundation for a wind turbine
EP4098867A1 (fr) * 2021-06-02 2022-12-07 Soletanche Freyssinet Système pour ériger une tour et procédé correspondant
US20220412321A1 (en) * 2019-11-21 2022-12-29 Vestas Wind Systems A/S Method of retrofitting a wind turbine
US20230010802A1 (en) * 2019-12-05 2023-01-12 Rwe Renewables Gmbh Wind turbine foundation structure, and method for producing a wind turbine foundation structure

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI122698B (fi) * 2010-12-28 2012-05-31 Easywind Oy Menetelmä ja laitteisto tuulivoimalan asentamiseksi korkeaan perustusrakennelmaan
EP2712985B1 (fr) * 2012-09-28 2015-11-25 HOCHTIEF Solutions AG Procédé de création d'une tour, notamment une tour d'éolienne
CN105089327B (zh) * 2015-08-06 2017-07-14 国网山东宁津县供电公司 一种分段式电杆组装装置、加工工艺及使用方法

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2857994A (en) * 1954-03-08 1958-10-28 Patent Scaffolding Co Inc Erection frames for sectional towers
US3203669A (en) * 1961-05-17 1965-08-31 Byggforbattring Ab Climbing jack
US3211427A (en) * 1961-01-03 1965-10-12 Jr William T Bristow Erection apparatus
US3237295A (en) * 1963-09-05 1966-03-01 Peter A Konzak Means and methods of erecting storage bins
US3556480A (en) * 1967-03-03 1971-01-19 Byggforbattring Ab Arrangement for effecting uniform load distrubution on climbing jacks
US3828513A (en) * 1971-02-11 1974-08-13 Research Corp Method of erecting a multi-story building and apparatus therefor
US3973885A (en) * 1973-03-07 1976-08-10 Enor Nominees Pty. Limited Apparatus for progressively constructing a wall of cementitious material
US3974618A (en) * 1974-03-18 1976-08-17 Pablo Ortega Cortina Method of and means for multi-story building construction
US4099360A (en) * 1975-05-13 1978-07-11 Ccl Systems, Ltd. Method and device for joining concrete bodies and method of constructing a multi-story building
US4935639A (en) * 1988-08-23 1990-06-19 Yeh Dong An Revolving power tower
US5490364A (en) * 1994-08-30 1996-02-13 Dreco, Inc. Telescopic flare pipe tower
US5980160A (en) * 1997-02-19 1999-11-09 Vanderklaauw; Peter M. Apparatus and method for a modular lifting and shoring system
US6299137B1 (en) * 1999-04-28 2001-10-09 Wesley Allen Bainter Hydraulic grain storage bin lifting system
US6425712B1 (en) * 2000-09-07 2002-07-30 Liftplate International Method and apparatus for providing lateral support to a post
US6513789B2 (en) * 1999-04-30 2003-02-04 Kawasaki Steel Corporation Method and apparatus for short-term relining or construction of blast furnace
US20030089073A1 (en) * 2001-11-15 2003-05-15 Enns Jerry Gordon Utility pole erection
US6782667B2 (en) * 2000-12-05 2004-08-31 Z-Tek, Llc Tilt-up and telescopic support tower for large structures
US20090087311A1 (en) * 2007-09-29 2009-04-02 Gavin Raymond Wyborn Vertically Adjustable Horizontal Axis Type Wind Turbine And Method Of Construction Thereof
US7739843B2 (en) * 2007-08-03 2010-06-22 Alejandro Cortina-Cordero Pre-stressed concrete tower for wind power generators

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4012974B2 (ja) * 2000-03-09 2007-11-28 東京電力株式会社 風力発電タワーの組立装置及び組立方法
JP2005042313A (ja) * 2003-07-22 2005-02-17 Mitsubishi Heavy Ind Ltd 塔型構造物の組立方法及び組立装置
ES2246734B1 (es) * 2005-04-21 2007-04-16 STRUCTURAL CONCRETE & STEEL, S.L. Torre modular prefabricada.
JP4701047B2 (ja) * 2005-09-07 2011-06-15 株式会社竹中工務店 風力発電タワーの構築方法

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2857994A (en) * 1954-03-08 1958-10-28 Patent Scaffolding Co Inc Erection frames for sectional towers
US3211427A (en) * 1961-01-03 1965-10-12 Jr William T Bristow Erection apparatus
US3203669A (en) * 1961-05-17 1965-08-31 Byggforbattring Ab Climbing jack
US3237295A (en) * 1963-09-05 1966-03-01 Peter A Konzak Means and methods of erecting storage bins
US3556480A (en) * 1967-03-03 1971-01-19 Byggforbattring Ab Arrangement for effecting uniform load distrubution on climbing jacks
US3828513A (en) * 1971-02-11 1974-08-13 Research Corp Method of erecting a multi-story building and apparatus therefor
US3973885A (en) * 1973-03-07 1976-08-10 Enor Nominees Pty. Limited Apparatus for progressively constructing a wall of cementitious material
US3974618A (en) * 1974-03-18 1976-08-17 Pablo Ortega Cortina Method of and means for multi-story building construction
US4099360A (en) * 1975-05-13 1978-07-11 Ccl Systems, Ltd. Method and device for joining concrete bodies and method of constructing a multi-story building
US4935639A (en) * 1988-08-23 1990-06-19 Yeh Dong An Revolving power tower
US5490364A (en) * 1994-08-30 1996-02-13 Dreco, Inc. Telescopic flare pipe tower
US5980160A (en) * 1997-02-19 1999-11-09 Vanderklaauw; Peter M. Apparatus and method for a modular lifting and shoring system
US6299137B1 (en) * 1999-04-28 2001-10-09 Wesley Allen Bainter Hydraulic grain storage bin lifting system
US6513789B2 (en) * 1999-04-30 2003-02-04 Kawasaki Steel Corporation Method and apparatus for short-term relining or construction of blast furnace
US6425712B1 (en) * 2000-09-07 2002-07-30 Liftplate International Method and apparatus for providing lateral support to a post
US6782667B2 (en) * 2000-12-05 2004-08-31 Z-Tek, Llc Tilt-up and telescopic support tower for large structures
US20030089073A1 (en) * 2001-11-15 2003-05-15 Enns Jerry Gordon Utility pole erection
US7739843B2 (en) * 2007-08-03 2010-06-22 Alejandro Cortina-Cordero Pre-stressed concrete tower for wind power generators
US20090087311A1 (en) * 2007-09-29 2009-04-02 Gavin Raymond Wyborn Vertically Adjustable Horizontal Axis Type Wind Turbine And Method Of Construction Thereof

Cited By (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8413405B2 (en) * 2008-12-19 2013-04-09 Repower Systems Se Tower of a wind power plant
US20120304588A1 (en) * 2010-02-09 2012-12-06 Von Ahn Patrik Method for Erecting a Wind Turbine Tower
US9091095B2 (en) * 2010-06-14 2015-07-28 Max Bogl Bauunternehmung Gmbh & Co. Kg Tower of a wind power plant and method for producing a tower of a wind power plant
CN102561714A (zh) * 2012-03-21 2012-07-11 长春工程学院 预制墙板安装调整平台
US20150167342A1 (en) * 2012-05-18 2015-06-18 Structural Research, S.L. Self-Climbing Telescopic Crane and Method for Mounting Pre-Fabricated Concrete Towers
AU2013399904B2 (en) * 2013-09-06 2018-04-26 Mirfin, Brian Tower construction
US20160194896A1 (en) * 2013-09-06 2016-07-07 Walter Pondorfer Tower Construction
US20160215761A1 (en) * 2013-09-06 2016-07-28 youWINenergy GmbH Tower assembly for a wind turbine installation
RU2657890C2 (ru) * 2013-09-06 2018-06-18 Вальтер ПОНДОРФЕР Монтаж и демонтаж передвижных аттракционов
US9702163B2 (en) * 2013-09-06 2017-07-11 Walter Pondorfer Tower construction
US20150176299A1 (en) * 2013-12-20 2015-06-25 Acciona Windpower, S.A. Method for the Assembly of Frustoconical Concrete Towers and Concrete Tower Assembled using said Method
US9624687B2 (en) * 2013-12-20 2017-04-18 Acciona Windpower, S.A. Method for the assembly of frustoconical concrete towers and concrete tower assembled using said method
US10364800B2 (en) * 2014-05-19 2019-07-30 Soletanche Freyssinet Assembly system and method for assembling a tower for a wind generator
US10577819B2 (en) 2014-06-27 2020-03-03 Tindall Corporation Method and apparatus for erecting tower with hydraulic cylinders
WO2015200787A1 (fr) * 2014-06-27 2015-12-30 Tindall Corporation Procédé et appareil permettant d'ériger une tour avec des vérins hydrauliques
US9556636B2 (en) 2014-06-27 2017-01-31 Tindall Corporation Method and apparatus for erecting tower with hydraulic cylinders
US10494830B2 (en) * 2014-10-31 2019-12-03 Soletanche Freyssinet Method for manufacturing concrete construction blocks for a wind-turbine tower and associated system
US10113327B2 (en) * 2014-12-01 2018-10-30 Lafarge Section of concrete
US9845612B2 (en) * 2015-06-26 2017-12-19 General Electric Company System and method for assembling tower sections of a wind turbine lattice tower structure
US20160376807A1 (en) * 2015-06-26 2016-12-29 General Electric Company System and method for assembling tower sections of a wind turbine lattice tower structure
US10538936B2 (en) * 2015-09-15 2020-01-21 Max Bögl Wind AG Wind turbine tower made of prefabricated concrete parts in the shape of annular segments
US20180251997A1 (en) * 2015-09-15 2018-09-06 Max Bögl Wind AG Wind Turbine Tower Made Of Prefabricated Concrete Parts in the Shape of Annular Segments
US20180305938A1 (en) * 2015-10-07 2018-10-25 Ingecid Investigación Y Desarrollo De Proyectos S.L. Concrete tower and climbing or self-climbing formwork device for its building onsite
US20170247901A1 (en) * 2016-02-26 2017-08-31 Acciona Windpower, S.A. Concrete towers manufacturing method for wind turbines and concrete tower for wind turbine
US10738499B2 (en) * 2016-02-26 2020-08-11 Acciona Windpower, S.A. Concrete towers manufacturing method for wind turbines and concrete tower for wind turbine
US20190063030A1 (en) * 2016-02-29 2019-02-28 Innogy Se Foundation pile for a wind turbine
US10724203B2 (en) * 2016-02-29 2020-07-28 Innogy Se Foundation pile for a wind turbine
US10451043B2 (en) * 2016-05-06 2019-10-22 General Electric Company Hybrid tubular lattice tower assembly for a wind turbine
US20170321659A1 (en) * 2016-05-06 2017-11-09 General Electric Company Hybrid tubular lattice tower assembly for a wind turbine
US10794365B2 (en) 2016-08-08 2020-10-06 Wobben Properties Gmbh Tower segment, tower section, tower, wind turbine, and method for producing a tower segment and for connecting tower segments
US10392794B2 (en) 2016-09-21 2019-08-27 Skyrise Global, Llc Structure and method of making the same
US20180080222A1 (en) * 2016-09-21 2018-03-22 Skyrise Global, Llc Structure and method of making the same
US10731327B2 (en) 2016-09-21 2020-08-04 Skyrise Global, Llc Structure and method of making the same
US10550566B2 (en) 2016-09-21 2020-02-04 Skyrise Global, Llc Structure and method of making the same
US11454218B2 (en) * 2017-12-13 2022-09-27 Anker Foundations GmbH Foundation for a wind turbine
US20190186166A1 (en) * 2017-12-19 2019-06-20 Nordex Energy Spain, S.A.U. Wind turbine tower with reinforcing elements
US10895089B2 (en) * 2017-12-19 2021-01-19 Nordex Energy Spain, S.A.U. Wind turbine tower with reinforcing elements
EP3502466B1 (fr) * 2017-12-19 2021-10-13 Nordex Energy Spain, S.A.U. Tour de turbine éolienne comportant des éléments de renfort
US20220259882A1 (en) * 2019-06-14 2022-08-18 Balfour Beatty Plc Modular tube and method of manufacturing
US20220412321A1 (en) * 2019-11-21 2022-12-29 Vestas Wind Systems A/S Method of retrofitting a wind turbine
US20230010802A1 (en) * 2019-12-05 2023-01-12 Rwe Renewables Gmbh Wind turbine foundation structure, and method for producing a wind turbine foundation structure
CN112554636A (zh) * 2020-12-09 2021-03-26 中国电建集团贵阳勘测设计研究院有限公司 一种非岩石地质条件下的拉线型测风塔快速施工方法
EP4098867A1 (fr) * 2021-06-02 2022-12-07 Soletanche Freyssinet Système pour ériger une tour et procédé correspondant

Also Published As

Publication number Publication date
WO2010129642A2 (fr) 2010-11-11
WO2010129642A3 (fr) 2011-03-03

Similar Documents

Publication Publication Date Title
US20100281818A1 (en) Method for building wind turbine tower
AU2015247515B2 (en) Automated construction of towers and columns
CN107155336B (zh) 混凝土塔和相关模架及相关构造方法
EP2215320B1 (fr) Procédé de montage d'une tour segmentée en béton précontraint pour générateur éolien et tour
US10519685B2 (en) Hybrid concrete-composite tower for a wind turbine and method of manufacturing
US7845121B2 (en) Facility used for the production and/or assembly of goods
CA2735625C (fr) Procede de construction d'une tour hybride pour une eolienne
JP4701047B2 (ja) 風力発電タワーの構築方法
US10012005B2 (en) Crane system incorporated into a tower
US20100139181A1 (en) Method for mounting in sections an annular tower for wind power generator, heliostatic power generator or chimney composed from three concrete segments or more
CN104520521B (zh) 高层建筑物抬高概念
CN109154278B (zh) 用于自动提升风轮机的塔架段及其自动提升方法
WO2014079602A1 (fr) Tour en béton réalisée par coffrage coulissant
WO2005028781A2 (fr) Pylone composite d'eolienne et son procede d'assemblage
EP2563994B1 (fr) Procédé permettant d'assembler une tour d'éolienne sur des fondations d'édification, et dispositif associé
US10060087B2 (en) Fully adjustable suspended post and panel modules and installation methods
JP4722630B2 (ja) 塔状構造物の構築方法および同方法に使用されるスリップフォーム装置
CN113389695A (zh) 用于风力发电机的塔架组件及其施工方法和风力发电机
WO2011081599A1 (fr) Procédé pour la construction d'une unité d'énergie éolienne et dispositif pour mettre en œuvre le procédé
KR20220165039A (ko) 관형지지물의 설치방법
CN117306846A (zh) 一种高空大跨度大空间支撑体系

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION