US3556480A - Arrangement for effecting uniform load distrubution on climbing jacks - Google Patents

Arrangement for effecting uniform load distrubution on climbing jacks Download PDF

Info

Publication number
US3556480A
US3556480A US708362A US3556480DA US3556480A US 3556480 A US3556480 A US 3556480A US 708362 A US708362 A US 708362A US 3556480D A US3556480D A US 3556480DA US 3556480 A US3556480 A US 3556480A
Authority
US
United States
Prior art keywords
load
jacks
climbing
balancing
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US708362A
Inventor
Rolf Gustaf Johansson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BYGGFORBATTRING AB
Original Assignee
BYGGFORBATTRING AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BYGGFORBATTRING AB filed Critical BYGGFORBATTRING AB
Application granted granted Critical
Publication of US3556480A publication Critical patent/US3556480A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/22Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor
    • E04G11/24Construction of lifting jacks or climbing rods for sliding forms
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/04Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
    • E02B17/08Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
    • E02B17/0836Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with climbing jacks
    • E02B17/0854Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with climbing jacks with clamping wedges, eccentric clamping devices and so on
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/163Jacks specially adapted for working-up building elements

Definitions

  • climbing jacks have also been utilized in other fields of operation, such as, for example in lifting and lowering heavy loads wherein the practical applicability in combination with hydraulics as a power source renders possible lightweight and simple lifting and lowering equipment in relation to the work volume being handled.
  • the present invention is an arrangement for eliminating a shortcoming which has limited the applicability of climbing jacks for the lifting and lowering of heavy nonelastic loads in cases when due to the weight and/or spread of the load, aplurality of climbing jacks are required.
  • the present invention can, for example, be applied to a group of four climbing jacks which are positioned on a load carrier and which together each by a separate climbing rod must lift or elevate a horizontal and very heavy load.
  • Associated with each climbing jack is at least one load transferring hydraulic balancing or equalizing jack including a'hydraulic pressure cylinder with the pressure cylinders of the balancing jacks associated with the group being hydraulically inter' connected preferably by hoses.
  • each balancing or equalizing jack is supplied with an amount of oil corresponding to approximately 50 percent of the total stroke volume thereof and each balancing jack is provided with a stop valve by means of which the jack can be connected to the other balancing jacks of the group.
  • the stop valves are maintained closed until the load is entirely carried or supported by the climbing jacks andthe system is now statically determined. All of the balancing jacks of the group are subsequently interconnected hydraulically by opening the stop valves.
  • the individually different climbing distance of a climbing jack of the group will not effect the climbing of the other jacks of the group whereby the'load will bedistributed uniformly by the common hydraulic pressure in the balancing jacks.
  • equalizing of the positions of the pistons and the cylinders may be necessary after the jacks climb a longer distance such as, for example, after climbing ten steps.
  • Such an equalizing or levelling is effected by manual or automatic levelling of the balancing jacks of the group which operation may be executed advantageously by interrupting movement of the climbing jacks after a distance of movement which is predetermined for each climbing jack.
  • FIG. I is a view partly in elevation and partly in cross section of a group which comprises two two-cylinder climbing jacks provided with balancing or equalizing jacks,
  • FIG. 2 is a diagrammatic view illustrating an embodiment in which four climbing jacks provided'with balancing jacks are connected in two groups for lifting or lowering a load suspended in climb rods,
  • FIG. 3 is a view generally similar to FIG. 2 of an embodiment in which the climb rods are fixed at an upper load carrier, and the climbing jacks with their balancing jacks are attached to the movable load, and
  • FIG. 4 is a diagrammatic-view of an embodiment in which the climbing jacks are placed at the movable load and the balancingjacks at the support of the climb rods.
  • two hydraulic climbing jacks generally designated 40 and 40' and each jack comprises two grip heads I, grip members 2, a climb rod 3, two pressure cylinders 4 provided with pistons 5, return springs 25, oil line 6 and a stopcock 7.
  • two hydraulic balancing jacks generally designated 80 and 80 and each jack comprises two pressure cylinders 8 provided with pistons 9, a base plate 10 resting on a load carrier 13, a stopcock II and a oil line 12.
  • the two climbing jacks 40 and 40' are connected by hoses 22 and 23 to a hydraulic pressure pump 20, which is provided with a pump handle 21.
  • the pump may also be driven in another way.
  • the two balancing jacks 80 and 80' are hydraulically interconnected by a hose 24.
  • FIGS. 2, 3 and 4 show the lifting/lowering of a load 14 in relation to a load carrier 13.
  • the load is attached to a load support 15, and the climbing jacks 40 and 40' as well as thebalancing jacks 80 and'80' are mounted on the lower surface of a carrier member 26 which is connected by rods 27 with the load support 15.
  • the climb rods 3 and 3" are suspended on the balancing jacks80 and 80' by nuts 28 threaded onto the ends of the climb rods jacks and rest on washers 29.
  • the climbing may advantageously be constructed in accordance with US. Pat. No. 3,203,669.
  • the load carrier 13 may, have its location in different load situation above or below the load I4 and load support 15 respectively.
  • the invention may, for example, .be applied to the lifting or lowering of a load of 300 tons by using climbing jacks each having a lifting power of 15 tons.
  • four groups can be applied, each of which comprises five climbing jacks cooperating with each other, with associated balancing jacks according to the invention.
  • the stroke length of such a climbing jack may be, for example, at maximum 100mm. the stroke length in practice then being for every climbing step, for example, 95 mm. 98 mm. etc.
  • the invention can be employed with a group of four claiming jacks placed on a load carrier and which together in conjunction with a separate climbing rod must elevate a horizontal and very heavy load.
  • At least one load transferring hydraulic balancing or equalizing jacks 80 is associated with each climbing jack 40, 40' and the pressure cylinders of the balancing jacks associated with the group are hydraulically interconnected.
  • each balancing jack Prior to loading of the climbing jacks with a load, each balancing jack is supplied ,with an amount of ,oil which corresponds to approximately 50 percent of the' total stroke volume thereof and each balancing jack is equipped with a stop valve whereby the jack can be connected to the other balancing jacks of the group.
  • the stop valves When the climbing jacks are operated to elevate the load, the stop valves are maintained closed until the load is carried entirely by the climbing jacks and the system is now statically determined.
  • All of the balancing jacks of the group are subsequently hydraulically interconnected by opening the stop valves.
  • each climbing jack in the group acts on a separate, smooth climb rod
  • each climbing jack in the group including a load transferring base, a stepwise lifting means, said lifting means being connected to said base by at least one continuously acting hydraulic balancing jack transferring the load and comprising a hydraulic pressure cylinder, and means hydraulically interconnecting the pres sure cylinders of the balancing jacks connected to the climbingjacks of said group.
  • said climbing jacks being connected with the load support and said balancing jacks being connected with the load carrier.
  • each climbing jack in the group has at least one l oad transferring means operably connected thereto, a load carrier with respect to which the load is lifted or lowered, each climbing jack including upper and lower heads, grip means for the rod carried by each head a pair of cylinders mounted o'n'the upper head, a piston movable in each cylinder.
  • eachpiston having a piston rod mounted on the lower head a return spring within each cylinder cooperable with the piston and cylinder a-source of pressure fluid, conduit means leading-to each'cylinder and said source.
  • said load transferring means beingdefined by a balancing jack including a pair of cylinders mounted on the lower gripping head of the climbing jack, a piston slidably mounted in each cylinder, a load transferring base on the load carrier, each piston having a piston rod mounted on said load transferring base, a return spring for each piston within each cylinder cooper'able with the piston and cylinder, conduit means interconnecting the cylinders of the balancing jacks connected to the climbing jacks of said group and stop valves in the conduit means.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
  • Jib Cranes (AREA)
  • Fluid-Pressure Circuits (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

An arrangement for a uniform load distribution and a group of cooperating climbing jacks in which each jack in the group acts on a separate climb rod and includes one or more lifting means. Each climbing jack has associated therewith at least one load transferring hydraulic balancing jack embodying a hydraulic pressure cylinder and hose means hydraulically interconnecting the pressure cylinders of the balancing jacks associated with the group.

Description

United States Patent [72] lnventor Rolf GustafJohansson Saltsjo-Duvnas, Sweden [2]] App]. No. 708,362
[22 Filed Feb. 26, 1968 [45] Patented Jan. 19, 1971 [73] Assignee A B Byggforbattring Stockholm, Sweden a Swedish joint stock Company [32] Priority Mar. 3, 1967 [33] Sweden [54] ARRANGEMENT FOR EFFECTING UNIFORM LOAD DISTRUBUTION ON CLIMBING JACKS 6 Claims, 4 Drawing Figs.
[52] US. Cl 254/89, 254/105 [51] Int. Cl B66f7/l2 [50] Field of Search 254/89, 105,106,107. 110
[56] References Cited UNITED STATES PATENTS 2,946,557 7/1960 Suderow 254/ l 06X 2,947,148 8/1960 Young 254/11OX Primary Examiner-Andrew R. J uhasz Assistant ExaminerDavid R. Melton Att0rneyHolman and Stern ABSTRACT: An arrangement for a uniform load distribution and a group of cooperating climbing jacks in which each jack in the group acts on a separate climb rod and includes one or more lifting means. Each climbing jack has associated therewith at least one load transferring hydraulic balancing jack embodying a hydraulic pressure cylinder and hose means hydraulically interconnecting the pressure cylinders of the balancing jacks associated with the group.
PATENTEU JAN 1 919m SHEET 3 [1F 4 ARRANGEMENT FOR EFFECTING UNIFORM LOAD DISTRUBUTION ON CLIMBING .IACKS BACKGROUND OF THE INVENTION Climbing jacks adapted to be moved along a smooth rod are well known particularly in the field of sliding form casting.
Of recent date, climbing jacks have also been utilized in other fields of operation, such as, for example in lifting and lowering heavy loads wherein the practical applicability in combination with hydraulics as a power source renders possible lightweight and simple lifting and lowering equipment in relation to the work volume being handled.
The present invention is an arrangement for eliminating a shortcoming which has limited the applicability of climbing jacks for the lifting and lowering of heavy nonelastic loads in cases when due to the weight and/or spread of the load, aplurality of climbing jacks are required.
This shortcoming is due to the fact that all known climbing jacks which operate on smooth rods have a tendency ,of climbing different distances and which tendency is summarizing. On employing such a number of climbing rods that the nonelastic load and the rods and climbing jacks constitute a statically undetermined system, a very unequal load distribution will develop among the climbing jacks following a number of climbing steps.
This disadvantage is eliminated by the present invention. 1
SUMMARY OF THE INVENTION- The present invention, can, for example, be applied to a group of four climbing jacks which are positioned on a load carrier and which together each by a separate climbing rod must lift or elevate a horizontal and very heavy load. Associated with each climbing jack is at least one load transferring hydraulic balancing or equalizing jack including a'hydraulic pressure cylinder with the pressure cylinders of the balancing jacks associated with the group being hydraulically inter' connected preferably by hoses.
Before the loading of the climbing jacks with the load, each balancing or equalizing jack is supplied with an amount of oil corresponding to approximately 50 percent of the total stroke volume thereof and each balancing jack is provided with a stop valve by means of which the jack can be connected to the other balancing jacks of the group. As the climbing jacks are operated to elevate the load, the stop valves are maintained closed until the load is entirely carried or supported by the climbing jacks andthe system is now statically determined. All of the balancing jacks of the group are subsequently interconnected hydraulically by opening the stop valves.
Hence, the individually different climbing distance of a climbing jack of the group will not effect the climbing of the other jacks of the group whereby the'load will bedistributed uniformly by the common hydraulic pressure in the balancing jacks. By virtue of the limited length of the stroke of the balancing jack, equalizing of the positions of the pistons and the cylinders may be necessary after the jacks climb a longer distance such as, for example, after climbing ten steps. Such an equalizing or levelling is effected by manual or automatic levelling of the balancing jacks of the group which operation may be executed advantageously by interrupting movement of the climbing jacks after a distance of movement which is predetermined for each climbing jack.
Further objects and advantages of the present invention will become more readily apparent from the following detailed description and annexed drawings and in which drawings:
BRIEF DESCRIPTION OF THE DRAWINGS FIG. I is a view partly in elevation and partly in cross section of a group which comprises two two-cylinder climbing jacks provided with balancing or equalizing jacks,
FIG. 2 is a diagrammatic view illustrating an embodiment in which four climbing jacks provided'with balancing jacks are connected in two groups for lifting or lowering a load suspended in climb rods,
FIG. 3 is a view generally similar to FIG. 2 of an embodiment in which the climb rods are fixed at an upper load carrier, and the climbing jacks with their balancing jacks are attached to the movable load, and
FIG. 4 is a diagrammatic-view of an embodiment in which the climbing jacks are placed at the movable load and the balancingjacks at the support of the climb rods.
In FIG. 1 two hydraulic climbing jacks generally designated 40 and 40' and each jack comprises two grip heads I, grip members 2, a climb rod 3, two pressure cylinders 4 provided with pistons 5, return springs 25, oil line 6 and a stopcock 7. In FIG. 1 two hydraulic balancing jacks generally designated 80 and 80 and each jack comprises two pressure cylinders 8 provided with pistons 9, a base plate 10 resting on a load carrier 13, a stopcock II and a oil line 12.
The two climbing jacks 40 and 40' are connected by hoses 22 and 23 to a hydraulic pressure pump 20, which is provided with a pump handle 21. The pump, of course, may also be driven in another way. The two balancing jacks 80 and 80' are hydraulically interconnected by a hose 24.
FIGS. 2, 3 and 4 show the lifting/lowering of a load 14 in relation to a load carrier 13. In FIG. 3, the load is attached to a load support 15, and the climbing jacks 40 and 40' as well as thebalancing jacks 80 and'80' are mounted on the lower surface of a carrier member 26 which is connected by rods 27 with the load support 15.
In FIG. 4, the climb rods 3 and 3" are suspended on the balancing jacks80 and 80' by nuts 28 threaded onto the ends of the climb rods jacks and rest on washers 29. The climbing may advantageously be constructed in accordance with US. Pat. No. 3,203,669.
The load carrier 13 may, have its location in different load situation above or below the load I4 and load support 15 respectively.
The invention may, for example, .be applied to the lifting or lowering of a load of 300 tons by using climbing jacks each having a lifting power of 15 tons. In this situation four groups can be applied, each of which comprises five climbing jacks cooperating with each other, with associated balancing jacks according to the invention.
The stroke length of such a climbing jack may be, for example, at maximum 100mm. the stroke length in practice then being for every climbing step, for example, 95 mm. 98 mm. etc.
From the foregoing it will be appreciated that the invention can be employed with a group of four claiming jacks placed on a load carrier and which together in conjunction with a separate climbing rod must elevate a horizontal and very heavy load. At least one load transferring hydraulic balancing or equalizing jacks 80, is associated with each climbing jack 40, 40' and the pressure cylinders of the balancing jacks associated with the group are hydraulically interconnected.
The operation of the assemblage is as follows:
Prior to loading of the climbing jacks with a load, each balancing jack is supplied ,with an amount of ,oil which corresponds to approximately 50 percent of the' total stroke volume thereof and each balancing jack is equipped with a stop valve whereby the jack can be connected to the other balancing jacks of the group. When the climbing jacks are operated to elevate the load, the stop valves are maintained closed until the load is carried entirely by the climbing jacks and the system is now statically determined.
All of the balancing jacks of the group are subsequently hydraulically interconnected by opening the stop valves.
I claim:
l. Arrangement for a uniform load distribution at a group of cooperating climbing jacks, in which each climbing jack in the group acts on a separate, smooth climb rod, and each climbing jack in the group including a load transferring base, a stepwise lifting means, said lifting means being connected to said base by at least one continuously acting hydraulic balancing jack transferring the load and comprising a hydraulic pressure cylinder, and means hydraulically interconnecting the pres sure cylinders of the balancing jacks connected to the climbingjacks of said group.
2. The arrangement according to claim 1, characterized in that at least two balancing jacks are disposed symmetrically in relation to the respective climb rod.
3. The arrangement according to claim 1 including a load carrier with respect to which the load is lifted or lowered, said climbing jacks being supported on the balancing jacks, and said balancingjacks being supported on the load carrier.
4i The arrangement according to claim 1, including a load carrier with respect to which the load is lifted or lowered, a load support for the load, a carrier member connected with anddisposed above the load support, and said climbing jacks and balancingjacks being mounted on the carrier member.
5. The arrangement according to claim 1 including a load carrier with respect to which the load is lifted or lowered, a
- load support for the load, said climbing jacks being connected with the load support and said balancing jacks being connected with the load carrier.
6. An arrangement for a uniform load distribution at a group of cooperating climbingjacks in which eaeh'jack in the group acts on a separate, smooth climb rod, and each climbing jack in the group has at least one l oad transferring means operably connected thereto, a load carrier with respect to which the load is lifted or lowered, each climbing jack including upper and lower heads, grip means for the rod carried by each head a pair of cylinders mounted o'n'the upper head, a piston movable in each cylinder. eachpiston having a piston rod mounted on the lower head a return spring within each cylinder cooperable with the piston and cylinder a-source of pressure fluid, conduit means leading-to each'cylinder and said source. said load transferring means beingdefined by a balancing jack including a pair of cylinders mounted on the lower gripping head of the climbing jack, a piston slidably mounted in each cylinder, a load transferring base on the load carrier, each piston having a piston rod mounted on said load transferring base, a return spring for each piston within each cylinder cooper'able with the piston and cylinder, conduit means interconnecting the cylinders of the balancing jacks connected to the climbing jacks of said group and stop valves in the conduit means.

Claims (6)

1. Arrangement for a uniform load distribution at a group of cooperating climbing jacks, in which each climbing jack in the group acts on a separate, smooth climb rod, and each climbing jack in the group including a load transferring base, a stepwise lifting means, said lifting means being connected to said base by at least one continuously acting hydraulic balancing jack transferring the load and comprising a hydraulic pressure cylinder, and means hydraulically interconnecting the pressure cylinders of the balancing jacks connected to the climbing jacks of said group.
2. The arrangement according to claim 1, characterized in that at least two balancing jacks are disposed symmetrically in relation to the respective climb rod.
3. The arrangement according to claim 1 including a load carrier with respect to which the load is lifted or lowered, said climbing jacks being supported on the balancing jacks, and said balancing jacks being supported on the load carrier.
4. The arrangement according to claim 1, including a load carrier with respect to which the load is lifted or lowered, a load support for the load, a carrier member connected with and disposed above the load support, and said climbing jacks and balancing jacks being mounted on the carrier member.
5. The arrangement according to claim 1 including a load carrier with respect to which the load is lifted or lowered, a load support for the load, said climbing jacks being connected with the load support and said balancing jacks being connected with the load carrier.
6. An arrangement for a uniform load distribution at a group of cooperating climbing jacks in which each jack in the group acts on a separate, smooth climb rod, and each climbing jack in the group has at least one load transferring means operably connected thereto, a load carrier with respect to which the load is lifted or lowered, each climbing jack including upper and lower heads, grip means for the rod carried by each head, a pair of cylinders mounted on the upper head, a piston movable in each cylinder, each piston having a piston rod mounted on the lower head, a return spring within each cylinder cooperable with the piston and cylinder, a source of pressure fluid, conduit means leading to each cylinder and said source, said load transferring means being defined by a balancing jack including a pair of cylinders mounted on the lower gripping head of the climbing jack, a piston slidably mounted in each cylinder, a load transferring base on the load carrier, each piston having a piston rod mounted on said load transferring base, a return spring for each piston within each cylinder cooperable with the piston and cylinder, conduit means interconnecting the cylinders of the balancing jacks connected to the climbing jacks of said group and stop valves in the conduit means.
US708362A 1967-03-03 1968-02-26 Arrangement for effecting uniform load distrubution on climbing jacks Expired - Lifetime US3556480A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SE292667 1967-03-03

Publications (1)

Publication Number Publication Date
US3556480A true US3556480A (en) 1971-01-19

Family

ID=20261020

Family Applications (1)

Application Number Title Priority Date Filing Date
US708362A Expired - Lifetime US3556480A (en) 1967-03-03 1968-02-26 Arrangement for effecting uniform load distrubution on climbing jacks

Country Status (7)

Country Link
US (1) US3556480A (en)
DE (1) DE1556787C3 (en)
DK (1) DK117384B (en)
ES (1) ES351184A1 (en)
FI (1) FI46943C (en)
GB (1) GB1216418A (en)
NL (1) NL154467B (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3845934A (en) * 1971-05-28 1974-11-05 Anderson Ind Ab Paul Climbing pole for climbing jacks
US3876181A (en) * 1973-04-23 1975-04-08 Marine Engineering Company C A Method and apparatus for quickly erecting off-shore platforms
US3889926A (en) * 1973-11-19 1975-06-17 Ahlgren Nils H Methods for shifting loads
US3940109A (en) * 1974-01-30 1976-02-24 Ahlgren Nils H Lifting device for raising, lowering and suspending heavy loads
US4041711A (en) * 1973-04-23 1977-08-16 Marine Engineering Co., C.A. Method and apparatus for quickly erecting off-shore platforms
US4497591A (en) * 1983-09-06 1985-02-05 Gillis Don A Advancing mechanism and system utilizing same for raising and lowering a work platform
US6299137B1 (en) 1999-04-28 2001-10-09 Wesley Allen Bainter Hydraulic grain storage bin lifting system
US6763916B2 (en) 2002-04-12 2004-07-20 Delaware Capital Formation, Inc. Method and apparatus for synchronizing a vehicle lift
US20050235460A1 (en) * 2004-04-27 2005-10-27 Jason Stewart Hinge pin
US20070074627A1 (en) * 2005-09-30 2007-04-05 Hitachi Plant Engineering & Construction Co., Ltd. Load balance adjusting method and equipment of lifting jacks, and jack-up equipment
US20100281818A1 (en) * 2009-05-07 2010-11-11 Southworth George L Method for building wind turbine tower
JP2016097991A (en) * 2014-11-19 2016-05-30 株式会社Ihi Method for synchronization of jack-up system and method for construction of cylinder type tank
JP2017040069A (en) * 2015-08-19 2017-02-23 太平電業株式会社 Traveling heavy load lifting device
US9718656B2 (en) 2013-07-08 2017-08-01 Bainter Construction Services, Llc Jack with two masts
US10087958B2 (en) 2012-04-19 2018-10-02 Cascade Corporation Fluid power control system for mobile load handling equipment
US10227222B2 (en) 2015-07-31 2019-03-12 Vehicle Service Group, Llc Precast concrete pit
US10246313B2 (en) 2015-07-31 2019-04-02 Vehicle Service Group, Llc Precast concrete pit
CN112897419A (en) * 2021-02-04 2021-06-04 陈林 Multifunctional lifting protection device for high-altitude operation

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3911044A1 (en) * 1989-04-05 1990-10-11 Gleitbau Gmbh LIFTING DEVICE

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2946557A (en) * 1958-05-08 1960-07-26 De Long Corp Jacking mechanism
US2947148A (en) * 1954-06-28 1960-08-02 Sun Oil Co Jacking mechanism for seadrome

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2947148A (en) * 1954-06-28 1960-08-02 Sun Oil Co Jacking mechanism for seadrome
US2946557A (en) * 1958-05-08 1960-07-26 De Long Corp Jacking mechanism

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3845934A (en) * 1971-05-28 1974-11-05 Anderson Ind Ab Paul Climbing pole for climbing jacks
US3876181A (en) * 1973-04-23 1975-04-08 Marine Engineering Company C A Method and apparatus for quickly erecting off-shore platforms
US4041711A (en) * 1973-04-23 1977-08-16 Marine Engineering Co., C.A. Method and apparatus for quickly erecting off-shore platforms
US3889926A (en) * 1973-11-19 1975-06-17 Ahlgren Nils H Methods for shifting loads
US3940109A (en) * 1974-01-30 1976-02-24 Ahlgren Nils H Lifting device for raising, lowering and suspending heavy loads
US4497591A (en) * 1983-09-06 1985-02-05 Gillis Don A Advancing mechanism and system utilizing same for raising and lowering a work platform
US6299137B1 (en) 1999-04-28 2001-10-09 Wesley Allen Bainter Hydraulic grain storage bin lifting system
US6641115B1 (en) 1999-04-28 2003-11-04 Wesley Allen Bainter Bin lifting system
US6964322B2 (en) 2002-04-12 2005-11-15 Delaware Capital Formation, Inc. Method and apparatus for synchronizing a vehicle lift
US6763916B2 (en) 2002-04-12 2004-07-20 Delaware Capital Formation, Inc. Method and apparatus for synchronizing a vehicle lift
US20040163894A1 (en) * 2002-04-12 2004-08-26 Delaware Capital Formation Method and apparatus for synchronizing a vehicle lift
US7150073B2 (en) 2004-04-27 2006-12-19 Delaware Capital Formation, Inc. Hinge pin
US20050235460A1 (en) * 2004-04-27 2005-10-27 Jason Stewart Hinge pin
US20070074627A1 (en) * 2005-09-30 2007-04-05 Hitachi Plant Engineering & Construction Co., Ltd. Load balance adjusting method and equipment of lifting jacks, and jack-up equipment
US7503251B2 (en) * 2005-09-30 2009-03-17 Hitachi Plant Technologies, Ltd. Load balance adjusting method and equipment of lifting jacks, and jack-up equipment
CN1939836B (en) * 2005-09-30 2010-09-22 株式会社日立工业设备技术 Load balance adjusting method and equipment of lifting jacks, and jack-up equipment
US20100281818A1 (en) * 2009-05-07 2010-11-11 Southworth George L Method for building wind turbine tower
US10087958B2 (en) 2012-04-19 2018-10-02 Cascade Corporation Fluid power control system for mobile load handling equipment
US9718656B2 (en) 2013-07-08 2017-08-01 Bainter Construction Services, Llc Jack with two masts
JP2016097991A (en) * 2014-11-19 2016-05-30 株式会社Ihi Method for synchronization of jack-up system and method for construction of cylinder type tank
US10227222B2 (en) 2015-07-31 2019-03-12 Vehicle Service Group, Llc Precast concrete pit
US10246313B2 (en) 2015-07-31 2019-04-02 Vehicle Service Group, Llc Precast concrete pit
JP2017040069A (en) * 2015-08-19 2017-02-23 太平電業株式会社 Traveling heavy load lifting device
CN112897419A (en) * 2021-02-04 2021-06-04 陈林 Multifunctional lifting protection device for high-altitude operation

Also Published As

Publication number Publication date
NL6802801A (en) 1968-09-04
FI46943C (en) 1973-08-10
DE1556787C3 (en) 1973-10-18
ES351184A1 (en) 1969-06-01
GB1216418A (en) 1970-12-23
DK117384B (en) 1970-04-20
FI46943B (en) 1973-05-02
NL154467B (en) 1977-09-15
DE1556787B2 (en) 1973-03-22
DE1556787A1 (en) 1971-11-18

Similar Documents

Publication Publication Date Title
US3556480A (en) Arrangement for effecting uniform load distrubution on climbing jacks
US5975496A (en) Multiple pump transmission jack
US2891765A (en) Jack
US3486583A (en) Arrangement at vertically adjustable stands
US3002639A (en) Stacked bricks lifter
US2261870A (en) Counterweight for hoisting machinery
US3259351A (en) Loading balancer assembly
GB2063210A (en) Lifting device
GB770638A (en) Hydraulically operated machine
GB724273A (en) Improvements in or relating to hydraulic jacking systems
US4227679A (en) Hoist with two or more hoisting units
CN108100801A (en) Hydraulic elevator safety device
US3552183A (en) Hydraulically operated power press
CN207029137U (en) A kind of engineering truck parting supporting leg
GB1244538A (en) Multi-stage telescopic hoist
GB803066A (en) Improvements in or relating to mast lift trucks
US2734597A (en) pelouch
US3889926A (en) Methods for shifting loads
US189424A (en) Improvement in hydraulic elevators
GB1453714A (en) Load handling equipment
GB1187163A (en) Improvements in Load-Lifting Apparatus.
US2479422A (en) Balanced multiple ram accumulator and intensifier
US2968154A (en) Hydraulic system for a boom structure
US2677880A (en) Drill pipe protector applicator
CN221459753U (en) Buffer jack