US20100193245A1 - System and method for testing drilling control systems - Google Patents

System and method for testing drilling control systems Download PDF

Info

Publication number
US20100193245A1
US20100193245A1 US12/595,625 US59562508A US2010193245A1 US 20100193245 A1 US20100193245 A1 US 20100193245A1 US 59562508 A US59562508 A US 59562508A US 2010193245 A1 US2010193245 A1 US 2010193245A1
Authority
US
United States
Prior art keywords
control system
drilling
integrated control
signals
dcs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/595,625
Other languages
English (en)
Inventor
Jon Arne Glomsrud
Anne Kiorsvik
Olve Mo
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Marine Cybernetics AS
Original Assignee
Marine Cybernetics AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Marine Cybernetics AS filed Critical Marine Cybernetics AS
Priority to US12/595,625 priority Critical patent/US20100193245A1/en
Assigned to MARINE CYBERNETICS AS reassignment MARINE CYBERNETICS AS ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GLOMSRUD, JON ARNE, KJORSVIK, ARNE, MO, OLVE
Assigned to MARINE CYBERNETICS AS reassignment MARINE CYBERNETICS AS ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GLOMSRUD, JON ARNE, KJORSVIK, ARNE, MO, OLVE
Publication of US20100193245A1 publication Critical patent/US20100193245A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B17/00Systems involving the use of models or simulators of said systems
    • G05B17/02Systems involving the use of models or simulators of said systems electric
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0218Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
    • G05B23/0256Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults injecting test signals and analyzing monitored process response, e.g. injecting the test signal while interrupting the normal operation of the monitored system; superimposing the test signal onto a control signal during normal operation of the monitored system

Definitions

  • the present invention pertains to a system and method for testing drilling control systems on vessels and fixed drilling units arranged for drilling operations.
  • Drilling control systems are influenced both by the vessel on which the drilling systems to be controlled are arranged, and also by the drilling operations to be performed.
  • Drilling systems require large amounts of power. There is thus an interconnection between power management systems of the drilling unit and the drilling control systems. All said systems must correctly interact so as for allowing the proper functioning of the drilling unit as a whole during drilling operations.
  • the individual drilling control subsystems, such as top drive, heave compensation, and mud pumps may operate independently their control systems will often need to interact, and there may arise failures from these interactions or from the breakdown of one or more of the components or interconnections therebetween.
  • Drilling operations are in this context considered to comprise any operation performed during the preparation, drilling and completion of a well from the initial positioning of the drilling unit until the well is ready for production.
  • a malfunction in one of the systems may influence the entirety of systems on the drilling units and may incur major failures, resulting in drilling unit damage or serious environmental consequences.
  • At present there are no test systems that allow testing of the interactions between Dynamic Positioning systems (DP), Power Management Systems (PMS) and Drilling Control Systems (DCS) while testing for situations that might incur potentially dangerous or hazardous situations. It is furthermore advantageous to test control systems while said systems are disconnected from the systems they are intended to control, firstly to avoid damaging the systems, secondly to be able to test for situations that rarely occur and which are highly undesirable as well as potentially destructive.
  • DP Dynamic Positioning systems
  • PMS Power Management Systems
  • DCS Drilling Control Systems
  • the present invention seeks to alleviate at least some of the aforementioned problems by simulating at least one or more of the real systems on the drilling unit and furnishing real and/or simulated signals to a plurality of control systems in order to ascertain whether the plurality of interdependent control systems may respond in an adequate manner when provided with different simulated and or real scenarios or a combination of real and simulated scenarios, said scenarios represented by signals.
  • the system according to the invention may also comprise a signal modifying computer arranged for modifying the flow of signals to and fro the real control systems and the simulated physical systems so as for inducing errors and modifications in the signals allowing functional and failure mode testing of a combination of control systems.
  • the control and safety systems of a drilling unit may comprise several control systems and safety systems for the different subsystems.
  • the control systems and the safety systems that comprise the top level control system, i.e. the drilling control system are tested individually one at the time.
  • each individual drilling control subsystem is tested in unit testing by arranging the test subject control subsystem in a hardware-in-the-loop simulation.
  • the control subsystem will output actuator control signals that are transmitted to the actuators of the respective drilling subsystem, and the control subsystem will input sensor signals from relevant subsystem sensors.
  • the control subsystem includes at least one computer in which an algorithm calculates output signals to the actuators based on input signals from the relevant sensors and possibly input command signals from an operator.
  • the drilling control subsystem is disconnected from the drilling system, and is instead connected to a drilling system simulator. In this arrangement the actuator signals that are output from the drilling control subsystem are transmitted to the drilling system simulator.
  • the drilling system simulator will include at least one computer running an algorithm that calculates the sensor signals that would result from the real drilling subsystem given appropriate initial conditions and the actuator output signals received from the control subsystem subject to the test.
  • the purpose of hardware-in-the-loop testing is to investigate whether the drilling control subsystem performs satisfactorily, e.g. with sufficient accuracy, robustness and bandwidth, and if the specified functions of the drilling control subsystem conform to its functional description when the drilling subsystem is controlled by the drilling control subsystem.
  • hardware-in-the-loop testing can be used to check whether the drilling control subsystem is capable of appropriately detecting and handling failure situations when controlling its corresponding drilling subsystem.
  • Marine Cybernetics AS has proposed systems for testing the interactions between dynamic positioning systems (DP) and power management systems (PMS) in a plurality of patent publications such as PCT/NO2005/000138 and PCT/NO2005/000122.
  • DP dynamic positioning systems
  • PMS power management systems
  • Aker Kvaerner has amongst others proposed simulators for simulating the functioning of the their proprietary Drilling Control And Management System as shown on (http://www.akerkvaerner.com/NR/rdonlyres/65BEFA6C-36EB-4520-8662-1ECC38CCD51A/14056/14DrillingControlMonitoringSystems.pdf).
  • the simulation method being able to test for possible interactions or errors, or faults or failures within the control system.
  • the present invention discloses a device for the testing of an integrated control system wherein said integrated control system is arranged for controlling a drilling unit, said drilling unit arranged for drilling operations, said integrated control system comprising
  • the invention further discloses a method for testing an integrated control system, said integrated control system for controlling a drilling unit during drilling operations, said integrated control system comprising
  • FIG. 1 illustrates an integrated control system ( 1 ) according to an embodiment of the invention, comprising a drilling control system ( 3 ), a power management system ( 4 ) and a DP control system ( 5 ).
  • the control systems are shown controlling various equipment and systems aboard drilling unit ( 2 ), here a vessel ( 2 ) on which said vessel ( 2 ) is arranged a power plant ( 6 ).
  • Actuators ( 21 ) for controlling the vessel position are also shown.
  • Various drilling operations and equipment for these operations are indicated, such as pipe handling, drill string heave compensation, draw works, travelling block, top drive, mud pump, heave compensator, the riser, the drill string and the BOP are shown schematically as being part of the drilling system ( 7 ).
  • FIG. 2 illustrates a proposed testing set-up, in which the integrated control system ( 1 ) is illustrated comprising the same components as in FIG. 1 .
  • the drilling unit ( 2 ), the power plant ( 6 ), and the drilling operations systems ( 7 ) are replaced by corresponding simulated units; simulated drilling unit ( 2 ’), simulated power plant ( 6 ′) and simulated drilling operations ( 7 ′) in a so-called hardware-in-the-loop HIL-test configuration.
  • FIG. 3 illustrates a proposed testing set-up, in which the integrated control system ( 1 ) is illustrated comprising the same components as in FIG. 1 .
  • the integrated control system ( 1 ) is illustrated comprising the same components as in FIG. 1 .
  • one or more of the drilling unit ( 2 ), the power plant ( 6 ), and the drilling operations systems ( 7 ) are replaced by corresponding simulated units; simulated drilling unit ( 2 ′), simulated power plant ( 6 ′) and simulated drilling operations ( 7 ′).
  • a break out box ( 8 ) arranged for routing one or more of the signals to and fro the integrated control system ( 1 ) to a signal modifying computer ( 80 ), where the signals may be modified before being transmitted.
  • FIG. 4 is an overview over the various equipments and parts of the drilling control system which are simulated according to the invention.
  • FIG. 5 is an overview of a generic set up for the HIL testing of a DCS according to the invention.
  • the present invention discloses a device for the testing of an integrated control system ( 1 ) wherein said integrated control system ( 1 ) is arranged for controlling a drilling unit ( 2 ).
  • the drilling unit ( 2 ) may be a floating drilling platform, a drilling ship, a moored floating unit, thruster and DP controlled floating units, semi-submersibles, or any kind of floating installation arranged for marine drilling operations.
  • the device according to the invention may further comprise a fixed installation on or offshore such as fixed platforms, land based drilling units or similar fixed systems wherein no DP system is required.
  • Said drilling unit ( 2 ) is arranged for drilling operations, for which operations a plurality of control systems controlling the different aspects of the operations is required.
  • This plurality of control systems may be called an integrated control system ( 1 ), and comprises at least a drilling control system DCS ( 3 ) for controlling a drilling system ( 7 ).
  • a power management system PMS ( 4 ) for controlling a power plant ( 6 ) may in some embodiments of the invention be considered as a part of the integrated control system ( 1 ).
  • the power plant ( 6 ) should provide sufficient power to the drilling systems ( 7 ) such that the drilling operations may be conducted in a satisfactory and safe manner.
  • the DCS ( 3 ) is arranged for receiving sensor signals ( 31 ) related to the drilling operations, and for furnishing drilling control signals ( 33 ) to the drilling systems ( 7 ) such that the required drilling operations are performed.
  • the DCS ( 3 ) should in an embodiment of the invention furnish drilling power control signals ( 32 ) to the PMS ( 4 ) stating the energy requirements of the drilling systems ( 7 ).
  • the device according to the invention is arranged for testing for errors in the integrated control system resulting from interactions between the components of the integrated control system ( 1 ).
  • Drilling control systems ( 3 ) may be installed on new generation drilling units ( 2 ) or retrofitted to existing drilling units ( 2 ).
  • the control systems are mainly software based and may be arranged in the proximity or inside the driller's dog house (driller cabin).
  • Some of the most common drilling control systems in use today are, “Cyberbase”, by National Oilwell Varco, “Digital Drilling Control System” (DDCS), by OEM, “Drilling Control and Monitoring System”(DCMS)/“Drillview” by Aker Kvaerner and “On Track”, by Sense EDM.
  • a further possibility according to the invention is to furnish a test system wherein the integrated control system ( 1 ) is tested after installation by furnishing a specified test sequence to it.
  • the responses may be stored and at a later point in time, the system may be retested to establish whether the integrated control system ( 1 ) responds in a similar manner as upon the first testing.
  • This test may be performed to establish whether unforeseen changes have occured in the system or upon having changed elements within the control system or the like.
  • Drilling control systems ( 3 ) control a plurality of functions of the drilling system ( 7 ) which is highly complex. A description of some of the main components of the drilling system is described in the following. The adequate functioning of all operations of the drilling systems, as well as all possible interactions between the drilling control sub systems are tested for and verified according to the invention.
  • the top drive is essentially a motor arranged for rotating the drill pipe, usually being electrically driven.
  • the top drive should provide rotational torque to the drill pipe in either direction. It should set drilling torque during drilling operations and also provide required make-up torque when joining pipe joints between adjoining pipe lengths. The rotating speed of the pipe during drilling should be set by the top drive.
  • the top drive should also run the top drive pipe handler where said top drive pipe handler controls a plurality of other drill string operations such as opening and closing the remote operated valve the I.BOP, opening and closing the elevator, swinging the elevator bails in and out, making and breaking the top drive swivel connection to and from the string, and may also comprise equipment for lifting or lowering, or affixing or detaching the top drive swivel from the string.
  • a plurality of other drill string operations such as opening and closing the remote operated valve the I.BOP, opening and closing the elevator, swinging the elevator bails in and out, making and breaking the top drive swivel connection to and from the string, and may also comprise equipment for lifting or lowering, or affixing or detaching the top drive swivel from the string.
  • the top drive control system should receive top drive sensor signals and furnish control signals to the top drive system, for the top drive system to provide amongst others correct rotation direction of the string, desired speed, to carefully control the rotational speed of the string, and to provide the desired drilling torque or make-up torque. In “stall out” situations, the top drive control system should provide control signals to ramp down torque setting automatically over approximately 10 second period after the driller sets torque down to 0. Further the top drive control system should not allow the rotation of the top drive when joining pipes or when braking using the torque wrench.
  • top drive control system furnishes a large amount of control signals, and receives a large amount of sensor signals, all of which should be adequately handled. Many incidents have occurred due to incorrect handling of signals, such as uncontrolled back-spin of the drill-string.
  • a drill string was stuck at 2300 metres true vertical depth (TVD). Before the string was to be pulled loose, the torque had to be released from the string. The torque was approximately 25000 lbs/ft. This action should be done fairly quickly. The torque was set to “0” in the drilling control system, which released the power immediately on the string, and the string rotated uncontrollably backward.
  • Heave compensating systems are mission critical components of the drilling systems ( 7 ).
  • the systems are arranged for keeping either a constant weight on bit, or keeping a constant tension on bit.
  • Active systems may be top or crown mounted or a part of the draw-work.
  • the active systems may use a vertical reference unit to sense heave, and react according to the sensed heave.
  • the passive systems are usually top-mounted or comprised in the draw work system.
  • Heave compensation systems may comprise either pneumatic or hydraulic compensation systems arranged for dampening the heave movements of both the drill string and equally importantly the riser.
  • the control system for the active heave compensation system should receive sensor signals from the vertical reference unit and should provide control signals controlling valves on the drill string compensator, increase or decrease the pressure in the drill string compensator, open and close air pressure vessels or hydraulic pressure vessels, activate and deactivate the drill string compensator.
  • the heave compensation control system may also control bypass valves in connection with the string.
  • the testing should ensure that the heave compensation control system reacts appropriately with respect to the opening and closing of all valves, in controlling the active drill string compensator, and also in operating the drill string compensator in emergency shutdown situations. If the hydraulic power or electrical power fails several undesirable situations may arise, ranging from nuisances to disasters. If the drilling bit is at the sea bed and there is loss in heave compensation, or if the heave compensation does not perform adequately, the drill string might get stuck which is problematic. If however one performs well head work, and the drill string gets stuck, the drill string could break resulting in drilling shutdown, and possibly drill string loss.
  • the draw works system comprises several brakes, gears and clutches arranged for increase and decrease hook speed. It should further control the operation of the main and emergency brakes. Optionally it should control an electrical brake, such as an induction brake from 0-100%. If the draw works have a plurality of gears, the draw works control system should controlling the shifting of gears, e.g. between low and high.
  • the draw work control systems may also comprise emergency stop systems for preventing the travelling block from colliding into the crown block. When functioning properly, the draw work control system should amongst others adequately control the speed of the draw-works, the brakes, the travelling block and the gear changes, and prevent the draw works from operating when emergency brakes are applied. An example of the results of a draw work brake failure is given below:
  • Mud pump systems are arranged for controlling the circulation and density of mud during drilling. A failure in the mud pump systems may result in the bit being damaged or in blow-out situations.
  • the mud pump control system should be able to control the mud pumps to ramp or down the pumping rate, or control the mud pressure.
  • the mud pump control system should also ensure that mud is pumped in the correct direction and also the mud pump rate. If certain pressure thresholds are reached the mud pump control system should not command a halt but automatically ramp down the pump speed.
  • a separate class of drilling operation control systems may be classified as the pipe handling control system equipment. There are several sub-systems that can be categorized under pipe-handling equipment:
  • control systems are all controlled by different control systems regulating the movement of the movable parts of the pipe handling equipment, and the control systems should in general control and verify the movements, the positioning and the torques required for the pipe handling operations.
  • the BOP and diverter are not controlled by the integrated drilling control system.
  • the BOP should be controlled at all times during drilling to prevent potentially dangerous situations from occurring.
  • the BOP control system should provide control signals for opening and closing valves and receiving signals indicating valve position, receiving pressure signals for providing command signals for adjusting pressure on manifold and annular preventers. The same applies for controlling the choke manifold.
  • BOP control is essential for avoiding potential blow-outs.
  • Anti-collision system are designed to prevent the travelling block with the top drive from colliding with other pipe handling equipment inside the derrick. These systems are provided with proximity sensors and/or the calculation of the position of the travelling block. Crown saver and floor saver systems are designed to prevent the travelling block from either, hitting the sheaves on top of derrick, or hitting the drill floor. These systems are based on calculations of height, weight and speed on block and top drive and proximity sensors.
  • the anti-collision control should system should also amongst others control the following brake systems:
  • a typical shut down draw work sequence might be to release the clutch, actuate the electrical brake and engage the emergency brake.
  • a failure in the proximity position sensors may result in components that may be operated in sectors where the top drive swivel travelling block may be run, without any warnings for the operators.
  • separate and independent sensor systems may be arranged, however if the control system incorrectly interprets the signals or failure alarms are not issued or neglected, collision may occur.
  • collisions may occur. Collisions may also occur when the travelling block and top drive systems are in the well center.
  • the drive work emergency brake is unable to stop the travelling block before collision with drilling floor, crown block or racking arms. This may evidently also occur when using conventional non-electrical drive work brakes.
  • the drive work emergency brake may break down resulting in that the travelling block and top drive swivel hitting the drill floor even after the emergency brake has been engaged. This will result in damage to the travelling block and top drive swivel.
  • the travelling block may hit the crown block.
  • a HIL-test package, for HIL-testing of the drilling control software and control systems has been developed.
  • This software comprises the main drilling equipment such that the drilling control systems and subsystems may be driven and tested.
  • the sub-systems with dynamics and failure modes that are included in the drilling simulator comprise:
  • the testing according to the invention comprises functional tests, that is verification of computer system functions and modes and failure tests, i.e. testing of computer system detection and handling of failure modes.
  • a possible HIL-configuration according to the invention is shown in FIG. 2 .
  • the invention is also embodied as a method for testing an integrated control system ( 1 ), said integrated control system ( 1 ) for controlling a drilling unit ( 2 ) during drilling operations, said integrated control system ( 1 ) comprising
  • a so-called FMEA Feilure mode and effect Analysis
  • An FMEA test procedure involves leaving at least some of the control systems in place in the control loop, but routing some of the signals to and from the integrated control system out of the system to a signal modifying computer ( 80 ) wherein said signal modifying computer modifies one or more of said signals routed thereto and transmitting said signals back to the required systems to be controlled.
  • the signals may be modified such that the real signals may be given bias, delays, changes in amplitude, changes in voltage and so forth.
  • This kind of testing is well-adapted when testing control systems having relatively slow responses.
  • a possible FMEA test type configuration is indicated in FIG. 3 .
  • the integrated control system ( 1 ) may comprise a power management system ( 4 ) for controlling a power plant ( 6 ), wherein said DCS ( 3 ) is arranged for receiving sensor signals ( 31 ) related to said drilling operations and providing control signals ( 32 ) to said PMS ( 4 ) stating the energy requirements of said drilling system ( 7 ), for testing said integrated control system ( 1 ) for errors resulting from interactions between said drilling control system DCS ( 3 ) and said power management system PMS ( 4 ).
  • a power management system ( 4 ) for controlling a power plant ( 6 )
  • said DCS ( 3 ) is arranged for receiving sensor signals ( 31 ) related to said drilling operations and providing control signals ( 32 ) to said PMS ( 4 ) stating the energy requirements of said drilling system ( 7 ), for testing said integrated control system ( 1 ) for errors resulting from interactions between said drilling control system DCS ( 3 ) and said power management system PMS ( 4 ).
  • Such errors may arise when said power plant ( 6 ) is not able to provide adequate power to the drilling operations ( 7 ), when there are errors in the transmission of signals, there is faulty wiring, there are incompatibilities between the signal DCS ( 3 ) and the PMS ( 3 ), there are faults or failures in either sensors, receivers, signal lines, the control systems and the like.
  • the integrated control system ( 1 ) may comprise a dynamic positioning control system DP ( 5 ), wherein said DP control system ( 5 ) is arranged for providing DP power control signals ( 51 ) to a power management system PMS ( 4 ), said DP control system ( 5 ) arranged for controlling the positioning of said drilling vessel ( 2 ) by furnishing positioning control signals ( 52 ) to actuators ( 21 ) of said drilling vessel ( 2 ), said DP power control signals ( 51 ) stating the energy requirements of said actuators ( 21 ), said actuators ( 21 ) arranged for receiving power from said power plant ( 6 ), said device for testing said integrated control system ( 1 ) for errors resulting from interactions between said drilling control system DCS ( 3 ), said power management system PMS ( 4 ), and/or said DP ( 5 ).
  • the PMS ( 4 ) and the DCS ( 3 ) may in many situations all be interconnected in order for assuring the required operation of the drilling vessel in an integrated control system ( 1 ).
  • the integrated control system ( 1 ) is in an embodiment of the invention tested with regard to all faults and failures that may occur while operating an integrated control system ( 1 ) comprising the three mentioned control systems.
  • the DP ( 5 ) and the DCS ( 3 ) both send power control signals to the PMS ( 3 ), and there may also be some interactions directly or indirectly between the DP( 5 ) and the DCS( 3 ).
  • the integrated control system ( 1 ) may comprise a dynamic positioning control system DP ( 5 ), wherein said DP ( 5 ) is arranged for controlling the position of said drilling vessel ( 2 ), and wherein said device is arranged for testing said integrated control system ( 1 ) for errors resulting from interactions between said drilling control system DCS ( 3 ) and said DP ( 5 ).
  • DP dynamic positioning control system
  • the integrated control system ( 1 ) may comprise a dynamic positioning control system DP ( 5 ), wherein said DP ( 5 ) is arranged for controlling the position of said drilling vessel ( 2 ), and wherein said device is arranged for testing said integrated control system ( 1 ) for errors resulting from interactions between said drilling control system DCS ( 3 ) and said DP ( 5 ).
  • said integrated control system ( 1 ) may be disconnected from the vessel ( 2 ) and connected to a vessel simulator ( 100 ) such that said system is tested in a hardware-in-the-loop configuration such as indicated in FIG. 1 .
  • At least one or more of the signals are received by said integrated control system ( 1 ) are real and wherein one or more of said real signals are modified in a signal modifying computer ( 80 ) before being furnished to said integrated control system ( 1 ), for the failure mode and functional mode testing of said integrated control system ( 1 ).
  • the system and device according to the invention is well-adapted to testing integrated control systems ( 1 ) after the entire control system ( 1 ) has been installed on location.
  • a particular problem with such systems is that there may be a plurality of sub-contractors who deliver different parts of the control structure for the DCS ( 3 ) or the integrated control system ( 1 ). Although each separate part of the integrated control system ( 1 ) may have been exhaustively tested before delivery, these tests are not able to disclose errors due to interactions between the various components in the system if they have been delivered by different vendors. It is an object of the invention to analyse the integrated control systems ability to detect and handle such errors.
  • the modification of parts of the integrated control system may comprise the updating or replacement of parts of the control software or hardware, or even entire portions of the control system itself.
  • the testing device may serve as a device for testing of each component of the integrated control system as well as serving as for the testing of the portions of the integrated control system as such.
  • the device may serve as a testing device for a single device within the integrated control systems.
  • the flexibility of the device is of major practical importance, and will furthermore easily allow the addition of further simulators to the system, for the simulation of additional parameters.
  • the simulators may be part of the testing device, wherein each simulator simulates different operations. This allows the distribution of the testing to several simulators, thus allowing the simulation to run in real time without risk of lag.
  • the simulators may be geographically distributed such that it is possible to connect a simulator to the control unit to be tested without moving the physical control unit.
  • the simulators will in this embodiment of the invention run concurrently such that the feedback signals and the control signals from the other simulators will correspond internally.
  • the device may be considered as being a distributed test system for an integrated control system ( 1 ), wherein portions of the test system are not located in the same area.
  • the intercommunication between the simulators may be controlled by a central communication unit, or the signals may be distributed by other known means.
  • test targets may be tested being isolated or connected to and controlling the real systems in an FMEA mode.
  • the different test modes allow different testing algorithms and thus should also encompass different functionalities.
  • the simulators for test of isolated systems should comprise functions for simulating the real systems such as drilling equipment, vessel power systems, vessel movements and the like, wherein these systems are arranged for taking commands from and giving feedback to the tested control systems.
  • the simulators for FMEA mode testing should simulate signal failures in signals, often command and feedback systems between controllers. This may be performed by manipulating one or more of the signals as described above.
  • control systems may also be operable for commands such that the system to some degree may test the human machine interface of the control systems.
  • This kind of testing allows more realistic testing of the faults and errors an operator may incur in the systems, and may prove very valuable. There are many situations which might be difficult to envisage happening in any normal circumstance that a human being inexperienced or unlucky might incur. There should be the possibility of testing for such errors as well, a possibility that the present invention thus allows.
  • the HIL simulator should test for the correct configuration of the Human Machine interface (HMI). This may typically include testing whether the control system presents correct feedback at the correct place in the HMI. This may also include testing whether the operator input results in the desired action.
  • HMI Human Machine interface
  • the HIL-simulator should fulfil a number of criteria.
  • the HIL-simulator should function in real time such that there is little lag in the signal treatment. This is of importance such that the testing occurs in a realistic manner.
  • the simulator should in an embodiment of the invention be the main signal hub such that the input and output signals from the test target should be routed to and from the HIL-simulator, and not to the real system.
  • the control system will respond to feedback signals directly from the HIL simulator or simulators.
  • the control system to be tested will command the HIL simulators such that it should not in principle be able to distinguish the HIL simulator from the real system.
  • the HIL simulator should furnish consistent feedback to all systems being connected to it also when simulating failure modes on signals and on equipment. This should include situations wherein signal failure modes affecting feedback or command signals to and from the test target are simulated. In effect this implies that when failure mode on one or more feedback signals are simulated the simulator should run unaffected of this simulated error. Thus solely the one or more signals being simulated as malfunctioning should be affected, whereas the other signals should remain unaffected.
  • the simulator being part of the testing device according to the invention is thus able to simulate how the failure affects the system, and further to furnish relevant feedback signals to the control system or systems being tested. This further implies that there should be consistency between the signals in order for allowing the realistic testing.
  • Examples of the necessary consistency between the signals may include
  • the signals to and from the simulator or simulators and the control system may be interfaced either by hardwire, by bus interface, by a combination thereof or by any other suitable signal transfer means as is known to a person skilled in the art.
  • the device for testing of the DCS may comprise a large number of subsystems wherein one or more may be used concurrently.
  • the system as such is modular such that features which have not been added as of yet may be added a later point in time.
  • FIG. 5 shows a generic test set up for HIL testing of a drilling system. The number of switches, PC's, interfaces and systems to be tested may evidently be varied according to need.
  • the invention thus presented will thus be able to test an integrated control system arranged for controlling a drilling unit ( 2 ).

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Drilling And Boring (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)
  • Earth Drilling (AREA)
US12/595,625 2007-04-16 2008-04-16 System and method for testing drilling control systems Abandoned US20100193245A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US12/595,625 US20100193245A1 (en) 2007-04-16 2008-04-16 System and method for testing drilling control systems

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
US91205707P 2007-04-16 2007-04-16
NO20071931 2007-04-16
NO20071931A NO326572B1 (no) 2007-04-16 2007-04-16 System og fremgangsmate for testing av borereguleringssystemer
US12/595,625 US20100193245A1 (en) 2007-04-16 2008-04-16 System and method for testing drilling control systems
PCT/NO2008/000136 WO2008127125A2 (en) 2007-04-16 2008-04-16 System and method for testing drilling control systems

Publications (1)

Publication Number Publication Date
US20100193245A1 true US20100193245A1 (en) 2010-08-05

Family

ID=39731291

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/595,625 Abandoned US20100193245A1 (en) 2007-04-16 2008-04-16 System and method for testing drilling control systems

Country Status (6)

Country Link
US (1) US20100193245A1 (no)
KR (1) KR20100031663A (no)
CN (1) CN101711304B (no)
BR (1) BRPI0810037A2 (no)
NO (1) NO326572B1 (no)
WO (1) WO2008127125A2 (no)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8793114B2 (en) 2010-12-29 2014-07-29 Athens Group Holdings Llc Method and system for drilling rig testing using virtualized components
US20140337003A1 (en) * 2008-09-17 2014-11-13 Accenture Global Services Limited Method And System For Simulating A Plurality Of Devices
US20150105912A1 (en) * 2012-07-12 2015-04-16 Halliburton Energy Services, Inc. Systems and methods of drilling control
CN104809851A (zh) * 2015-04-20 2015-07-29 中国石油化工股份有限公司 化工装置的关键安全参数报警方法
US20160306900A1 (en) * 2015-04-17 2016-10-20 Dspace Digital Signal Processing And Control Engineering Gmbh Apparatus and method for testing an automatic control device
WO2018039195A1 (en) * 2016-08-25 2018-03-01 Baker Hughes, A Ge Company, Llc Generating a script for performing a well operation job
CN110424941A (zh) * 2019-07-29 2019-11-08 宝鸡石油机械有限责任公司 一种双井架石油钻机冗余钻井包司钻集成控制系统
US10563497B2 (en) * 2016-02-18 2020-02-18 Halliburton Energy Services Method and system for smart resource allocation
EP3744945A1 (en) * 2019-05-27 2020-12-02 Shell Internationale Research Maatschappij B.V. Subsea bop control system
KR102189160B1 (ko) * 2020-07-01 2020-12-09 주식회사 유아이티 유한 상태 기계를 이용한 해양시추 기자재의 제어 방법 및 시스템
KR102189159B1 (ko) * 2020-07-01 2020-12-09 주식회사 유아이티 해양시추 탑사이드 기자재의 통합 운용 제어를 위한 시추 제어 시스템
US10914126B2 (en) 2018-06-14 2021-02-09 Allegiant Energy Services, LLC Drill string testing system
CN112727432A (zh) * 2020-12-24 2021-04-30 四川宏华电气有限责任公司 一种石油钻机自动化流程控制系统及机具模拟测试方法
US11066923B2 (en) * 2017-06-26 2021-07-20 Hrl Laboratories, Llc System and method for generating output of a downhole inertial measurement unit
KR102294385B1 (ko) * 2021-02-18 2021-08-27 주식회사 유아이티 해양시추 탑사이드 기자재의 통합 운용 제어 시스템

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO332485B1 (no) * 2010-07-18 2012-09-21 Marine Cybernetics As Fremgangsmate og system for a teste et reguleringssystem for en utblasningssikring
SE535475C2 (sv) * 2010-08-26 2012-08-21 Atlas Copco Rock Drills Ab Metod och system för styrning av en kraftkälla vid en bergborrningsanordning samt bergborrningsanordning
AU2011347490A1 (en) * 2010-12-22 2013-06-20 Shell Internationale Research Maatschappij B.V. Controlling vibrations in a drilling system
CA2861962C (en) * 2012-01-23 2017-08-15 Transocean Sedco Forex Ventures Limited High definition drilling rate of penetration for marine drilling
CN102606088B (zh) * 2012-04-01 2014-04-09 西南石油大学 一种浮式钻井平台齿轮齿条位移倍增式钻柱升沉补偿装置
CN105174104A (zh) * 2014-04-28 2015-12-23 上海杰臻电气技术有限公司 一种新型纯电动主动式波浪补偿控制系统及其控制方法
SG11201701404UA (en) * 2014-08-22 2017-04-27 Daewoo Shipbuilding & Marine Apparatus and method for controlling and monitoring auxiliary apparatus of drilling equipment in drill ship
EP3075946B1 (en) * 2015-03-30 2019-05-08 National Oilwell Varco Norway AS Draw-works and method for operating the same
CN105840093B (zh) * 2016-05-25 2018-03-30 三一重型能源装备有限公司 顶部驱动钻井设备及其控制系统
CN106337662B (zh) * 2016-09-13 2018-03-30 西南石油大学 一种用于天车升沉补偿的弹簧蓄能补偿装置
CN107355205A (zh) * 2017-08-08 2017-11-17 广州海洋地质调查局 一种半潜式钻井平台或钻井船的水力割缝方法
US20190368299A1 (en) * 2018-06-04 2019-12-05 Schlumberger Technology Corporation Blowout Preventer Control
CN110794790A (zh) * 2019-11-18 2020-02-14 福建福清核电有限公司 一种基于dcs的信号模拟方式优化系统及方法
KR102498333B1 (ko) * 2020-12-10 2023-02-10 동의대학교 산학협력단 해양 시추 장비들을 위한 충돌 방지 시스템용 시뮬레이터 구현을 위한 장치 및 방법
KR102604624B1 (ko) * 2021-04-27 2023-11-22 (주)씨앤에스아이 드릴십의 트리핑인(Tripping In) 제어시스템 및 제어방법

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6868906B1 (en) * 1994-10-14 2005-03-22 Weatherford/Lamb, Inc. Closed-loop conveyance systems for well servicing
US20050222772A1 (en) * 2003-01-29 2005-10-06 Koederitz William L Oil rig choke control systems and methods
US7062718B2 (en) * 2001-08-14 2006-06-13 National Instruments Corporation Configuration diagram which graphically displays program relationship
US7172037B2 (en) * 2003-03-31 2007-02-06 Baker Hughes Incorporated Real-time drilling optimization based on MWD dynamic measurements
US7467051B2 (en) * 2005-12-07 2008-12-16 Marine Cybernetics As Method and a system for testing of a power management system of a marine vessel

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB358032A (en) * 1930-03-25 1931-09-25 David Alexander Whyte Fairweat Improvements in and relating to the production of esters of anthrahydroquinones
GB348714A (en) * 1930-10-14 1931-05-21 John David Morgan Improvements in coal-scuttles and the like
JP4488547B2 (ja) * 1999-04-06 2010-06-23 三井造船株式会社 浮体式リグの位置保持制御方法および制御装置
GB2358032B (en) * 2000-01-05 2002-03-27 Sedco Forex Internat Inc Method and apparatus for drillig subsea wells
US6817425B2 (en) * 2000-11-07 2004-11-16 Halliburton Energy Serv Inc Mean strain ratio analysis method and system for detecting drill bit failure and signaling surface operator

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6868906B1 (en) * 1994-10-14 2005-03-22 Weatherford/Lamb, Inc. Closed-loop conveyance systems for well servicing
US7062718B2 (en) * 2001-08-14 2006-06-13 National Instruments Corporation Configuration diagram which graphically displays program relationship
US20050222772A1 (en) * 2003-01-29 2005-10-06 Koederitz William L Oil rig choke control systems and methods
US7172037B2 (en) * 2003-03-31 2007-02-06 Baker Hughes Incorporated Real-time drilling optimization based on MWD dynamic measurements
US7467051B2 (en) * 2005-12-07 2008-12-16 Marine Cybernetics As Method and a system for testing of a power management system of a marine vessel

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140337003A1 (en) * 2008-09-17 2014-11-13 Accenture Global Services Limited Method And System For Simulating A Plurality Of Devices
US8793114B2 (en) 2010-12-29 2014-07-29 Athens Group Holdings Llc Method and system for drilling rig testing using virtualized components
US20150105912A1 (en) * 2012-07-12 2015-04-16 Halliburton Energy Services, Inc. Systems and methods of drilling control
US9988880B2 (en) * 2012-07-12 2018-06-05 Halliburton Energy Services, Inc. Systems and methods of drilling control
US20160306900A1 (en) * 2015-04-17 2016-10-20 Dspace Digital Signal Processing And Control Engineering Gmbh Apparatus and method for testing an automatic control device
US10331804B2 (en) * 2015-04-17 2019-06-25 Dspace Digital Signal Processing And Control Engineering Gmbh Apparatus and method for testing an automatic control device
CN104809851A (zh) * 2015-04-20 2015-07-29 中国石油化工股份有限公司 化工装置的关键安全参数报警方法
US10563497B2 (en) * 2016-02-18 2020-02-18 Halliburton Energy Services Method and system for smart resource allocation
US10452794B2 (en) 2016-08-25 2019-10-22 Baker Hughes, A Ge Company, Llc Generating a script for performing a well operation job
WO2018039195A1 (en) * 2016-08-25 2018-03-01 Baker Hughes, A Ge Company, Llc Generating a script for performing a well operation job
US11066923B2 (en) * 2017-06-26 2021-07-20 Hrl Laboratories, Llc System and method for generating output of a downhole inertial measurement unit
US10914126B2 (en) 2018-06-14 2021-02-09 Allegiant Energy Services, LLC Drill string testing system
EP3744945A1 (en) * 2019-05-27 2020-12-02 Shell Internationale Research Maatschappij B.V. Subsea bop control system
WO2020239698A1 (en) * 2019-05-27 2020-12-03 Shell Internationale Research Maatschappij B.V. Subsea bop control system
CN110424941A (zh) * 2019-07-29 2019-11-08 宝鸡石油机械有限责任公司 一种双井架石油钻机冗余钻井包司钻集成控制系统
KR102189160B1 (ko) * 2020-07-01 2020-12-09 주식회사 유아이티 유한 상태 기계를 이용한 해양시추 기자재의 제어 방법 및 시스템
KR102189159B1 (ko) * 2020-07-01 2020-12-09 주식회사 유아이티 해양시추 탑사이드 기자재의 통합 운용 제어를 위한 시추 제어 시스템
CN112727432A (zh) * 2020-12-24 2021-04-30 四川宏华电气有限责任公司 一种石油钻机自动化流程控制系统及机具模拟测试方法
KR102294385B1 (ko) * 2021-02-18 2021-08-27 주식회사 유아이티 해양시추 탑사이드 기자재의 통합 운용 제어 시스템

Also Published As

Publication number Publication date
WO2008127125A3 (en) 2008-12-11
NO326572B1 (no) 2009-01-12
NO20071931L (no) 2008-10-17
CN101711304A (zh) 2010-05-19
CN101711304B (zh) 2014-06-18
BRPI0810037A2 (pt) 2014-10-14
WO2008127125A2 (en) 2008-10-23
KR20100031663A (ko) 2010-03-24

Similar Documents

Publication Publication Date Title
US20100193245A1 (en) System and method for testing drilling control systems
US9085948B2 (en) Method and system for testing a multiplexed BOP control system
EP2917460B1 (en) Blowout preventer system with three control pods
US10787877B2 (en) Blowout preventer control system and methods for controlling a blowout preventer
US20170284164A1 (en) Sil rated system for blowout preventer control
US20030006070A1 (en) Method for subsea pod retrieval
US8511388B2 (en) Devices and methods for transmitting EDS back-up signals to subsea pods
EP3947896B1 (en) Automated system and method for use in well control
US20130083627A1 (en) Remote communication with subsea running tools via blowout preventer
US20230145664A1 (en) Systems and methods for initiating an emergency disconnect sequence
US11982143B2 (en) Communicating with blowout preventer control system
US20200326375A1 (en) Determining Operational Health of a Top Drive
US9284808B2 (en) Chemical deepwater stimulation systems and methods
NO20191486A1 (en) Sil rated system for blowout preventer control
CA2822052A1 (en) Apparatus and method for clustered wellhead high integrity protection system
NO20191412A1 (en) Drilling systems and methods
US11053765B2 (en) Automatic well control
GB2587571A (en) Drilling systems and methods
GB2587734A (en) Drilling systems and methods

Legal Events

Date Code Title Description
AS Assignment

Owner name: MARINE CYBERNETICS AS, NORWAY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:GLOMSRUD, JON ARNE;KJORSVIK, ARNE;MO, OLVE;REEL/FRAME:023584/0031

Effective date: 20091127

AS Assignment

Owner name: MARINE CYBERNETICS AS, NORWAY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:GLOMSRUD, JON ARNE;KJORSVIK, ARNE;MO, OLVE;REEL/FRAME:024268/0654

Effective date: 20100416

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION