US20080075571A1 - Construction Equipment with Excavation and Loading Function - Google Patents

Construction Equipment with Excavation and Loading Function Download PDF

Info

Publication number
US20080075571A1
US20080075571A1 US11/597,605 US59760505A US2008075571A1 US 20080075571 A1 US20080075571 A1 US 20080075571A1 US 59760505 A US59760505 A US 59760505A US 2008075571 A1 US2008075571 A1 US 2008075571A1
Authority
US
United States
Prior art keywords
predetermined position
arm
fixed
boom
rotatably
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/597,605
Inventor
Il-Hwan Joo
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of US20080075571A1 publication Critical patent/US20080075571A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/30Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom
    • E02F3/32Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom working downwardly and towards the machine, e.g. with backhoes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/30Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom
    • E02F3/301Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom with more than two arms (boom included), e.g. two-part boom with additional dipper-arm
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/38Cantilever beams, i.e. booms;, e.g. manufacturing processes, forms, geometry or materials used for booms; Dipper-arms, e.g. manufacturing processes, forms, geometry or materials used for dipper-arms; Bucket-arms

Definitions

  • the present invention relates to a construction equipment, and more particularly, to a construction equipment in which excavation and loading functions can be performed by one equipment.
  • a construction equipment such as an excavator and a loader is used to excavate, convey, and load earth and sand in the construction site.
  • the excavator is to excavate or load earth and sand or rock during earthwork.
  • the loader is to load excavated earth and sand, aggregate, crushed rock into a conveyer.
  • the excavator and the loader work differently from each other in view of kinematics. In other words, since the excavator acts using pulling power while the loader acts using pushing power, they have different structures from each other. Therefore, both the excavator and the loader are used for excavation and conveyance of earth and sand in the construction site.
  • multi-functional construction equipments that can carry out various functions using single equipment.
  • the multi-functional construction equipments fail to satisfy workers for some reasons. In other words, most of the multi-functional construction equipments are respectively provided with an excavator, a loader, and a forklift truck at the front and the rear.
  • the weight of the construction equipment greatly increases and also the size of the main body that supports the excavator, the loader, and the forklift truck relatively increases. For these reasons, a problem essentially occurs with respect to unnecessary increase of the volume of the construction equipment or its balance. Problems occur in that the respective equipments such as the excavator, the loader, and the forklift truck do not work satisfactorily because they have different structures in view of kinematics.
  • the present invention is directed to a construction equipment having excavation and loading functions, which substantially obviates one or more problems due to limitations and disadvantages of the related art.
  • An object of the present invention is to provide a construction equipment in which excavation and loading functions can be performed by one equipment without any degradation of performance to remarkably reduce the expenses of the equipment and its size.
  • FIG. 1 is a perspective view illustrating a construction equipment having excavation and loading functions according to the present invention
  • FIG. 2 is a side view illustrating a construction equipment having excavation and loading functions according to the present invention
  • FIG. 3 is a side view illustrating a construction equipment having excavation and loading functions, used as an excavator according to one embodiment of the present invention
  • FIG. 4 is an enlarged perspective view illustrating a second fixed pin hole of the construction equipment having excavation and loading functions of FIG. 3 ;
  • FIG. 5 is a state view illustrating use of the construction equipment having excavation and loading functions of FIG. 3 ;
  • FIG. 6 is a side view illustrating a construction equipment having excavation and loading functions, used as a loader according to other embodiment of the present invention.
  • FIG. 7 is an enlarged perspective view illustrating a first fixed pin hole of the construction equipment having excavation and loading functions of FIG. 6 ;
  • FIG. 8 is an enlarged perspective view illustrating a third fixed pin hole of the construction equipment having excavation and loading functions of FIG. 6 ;
  • FIG. 9 is a state view illustrating use of the construction equipment having excavation and loading functions of FIG. 6 .
  • a construction equipment having excavation and loading functions is characterized in that a work equipment comprised of at least one link member, the link member being connected by a hinge and provided with fixed pin holes, is provided at a predetermined position above a main equipment traveled by a crawler or a wheel, so as to be used as an excavator and a loader.
  • the work equipment includes a pivot portion rotatably provided at an upper portion of the main equipment, a boom rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the pivot portion, a boom cylinder provided to rotate the boom within a stroke of a predetermined length as its one end is fixed to a predetermined position of the pivot portion and its other end is rotatably fixed to a predetermined position of the boom, a first arm rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the boom, a first arm cylinder provided to rotate the first arm within a stroke of a predetermined length as its one end is rotatably fixed to a predetermined position of the boom and its other end is rotatably fixed to a predetermined position of the first arm, a second arm rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the first arm, a second arm cylinder provided to rotate the second arm within a stroke of
  • the work equipment includes a pivot portion rotatably provided at an upper portion of the main equipment, a boom rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the pivot portion, a boom cylinder provided to rotate the boom within a stroke of a predetermined length as its one end is fixed to a predetermined position of the pivot portion and its other end is rotatably fixed to a predetermined position of the boom, a first arm rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the boom, a first arm cylinder provided to rotate the first arm within a stroke of a predetermined length as its one end is rotatably fixed to a predetermined position of the boom and its other end is rotatably fixed to a predetermined position of the first arm, a second arm rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the first arm, a second arm cylinder provided to rotate the second arm within a stroke of
  • FIG. 1 is a perspective view illustrating a construction equipment having excavation and loading functions according to the present invention
  • FIG. 2 is a side view illustrating the construction equipment having excavation and loading functions according to the present invention.
  • a pivot portion 20 is rotatably provided at an upper portion of a main equipment 10 traveled by a crawler or a wheel.
  • a boom 30 is rotatably provided up and down within a stroke of a predetermined length as its one end is rotatably fixed to a predetermined position of the pivot portion 20 .
  • a boom cylinder 31 is provided to rotate the boom 30 within a stroke of a predetermined length as its one end is fixed to a predetermined position of the pivot portion 20 and its other end is rotatably fixed to a predetermined position of the boom 30 .
  • a first arm 40 is rotatably provided up and down within a stroke of a predetermined length as its one end is rotatably fixed to a predetermined position of the boom 30 .
  • a first arm cylinder 41 is provided to rotate the first arm 40 within a stroke of a predetermined length as its one end is rotatably fixed to a predetermined position of the boom 30 and its other end is rotatably fixed to a predetermined position of the first arm 40 .
  • a second arm 50 is rotatably provided up and down within a stroke of a predetermined length as its one end is rotatably fixed to a predetermined position of the first arm 40 .
  • a second arm cylinder 51 is provided to rotate the second arm 50 within a stroke of a predetermined length as its one end is fixed to a predetermined position of the first arm 40 and its other end is rotatably fixed to a predetermined position of the second arm 50 .
  • a bucket holder 60 is rotatably provided up and down within a stroke of a predetermined length as its one end is rotatably fixed to a predetermined position of the second arm 50 and its other end is rotatably fixed to the second arm cylinder 51 .
  • a bucket cylinder 61 is provided to rotate the bucket holder 60 within a stroke of a predetermined length as its one end is fixed to a predetermined position of the second arm 50 and its other end is fixed to the bucket holder 60 .
  • a first fixed pin hole 32 is formed to communicate with a predetermined position of the pivot portion 20 and a predetermined position below the boom 30 .
  • a second fixed pin hole 42 is formed to communicate with a predetermined position above the boom 30 and a predetermined position below the first arm 40 .
  • a third fixed pin hole 52 is formed to communicate with a predetermined position above the first arm 40 and a predetermined position below the second arm 50 .
  • FIG. 3 is a side view illustrating the construction equipment having excavation and loading functions, used as an excavator according to one embodiment of the present invention
  • FIG. 4 is an enlarged perspective view illustrating the second fixed pin hole of the construction equipment having excavation and loading functions of FIG. 3
  • FIG. 5 is a state view illustrating use of the construction equipment having excavation and loading functions of FIG. 3 .
  • the same description of the same reference numerals will be omitted to avoid unnecessarily repeated description.
  • a construction equipment 2 having excavation and loading functions, used as an excavator is constructed as follows. That is, as shown in FIG. 3 and FIG. 4 , an excavating bucket 62 is rotatably fixed to the bucket holder 60 at a predetermined angle, and a first fixed pin 70 is inserted into the second fixed pin hole 42 (see FIG. 2 ) to control the operation of the first cylinder 41 , the second fixed pin hole 42 being formed at a predetermined position above the boom 30 and below the first arm 50 .
  • the first fixed pin 70 is provided to fix the operation of the first cylinder 41 , thereby fixing the first arm 40 when the pulling power is required for excavation work using the excavator as shown in FIG. 5 .
  • the boom 30 , the second arm 50 , and the excavating bucket 62 are respectively rotated up and down by the operation of the boom cylinder 31 , the second arm cylinder 51 , and the bucket cylinder 61 to perform an excavation function.
  • FIG. 6 is a side view illustrating the construction equipment having excavation and loading functions, used as a loader according to other embodiment of the present invention
  • FIG. 7 is an enlarged perspective view illustrating the first fixed pin hole of the construction equipment having excavation and loading functions of FIG. 6
  • FIG. 8 is an enlarged perspective view illustrating the third fixed pin hole of the construction equipment having excavation and loading functions of FIG. 6
  • FIG. 9 is a state view illustrating use of the construction equipment having excavation and loading functions of FIG. 6 .
  • a construction equipment 3 having excavation and loading functions, used as a loader is constructed as follows. That is, as shown in FIG. 6 to FIG. 8 , a loading bucket 63 is rotatably fixed to the bucket holder 60 at a predetermined angle, and a second fixed pin 80 that controls the operation of the boom cylinder 31 is inserted into the first fixed pin hole 32 (see FIG. 2 ) formed to communicate with the predetermined position of the pivot portion 20 and the predetermined position below the boom 30 . Also, a third fixed pin 90 that controls the operation of the second arm cylinder 51 is inserted into the third fixed pin hole 52 formed to communicate with the predetermined position above the first arm 40 and the predetermined position below the second arm 50 .
  • the second fixed pin 80 is provided to fix the operation of the boom cylinder 31 , thereby fixing the boom 30 when the pushing power is required for conveyance of earth and sand or hardening work of earth and sand using the loader as shown in FIG. 9 .
  • the third fixed pin 90 is provided to fix the operation of the second arm cylinder 51 , thereby fixing the second arm 50 .
  • the first arm 40 and the loading bucket 63 are respectively rotated up and down by the operation of the first arm cylinder 41 and the bucket cylinder 61 to perform a loading function.
  • the construction equipment can be provided, in which the excavation and loading functions can easily be performed using single equipment depending on the work type such as excavation and conveyance of earth and sand by overcoming the difference in view of kinematics between the excavator and the loader.
  • the construction equipment having excavation and loading functions according to the present invention has the following advantages.

Abstract

Disclosed is a construction equipment in which excavation and loading functions can be performed by one work equipment without any degradation of performance to remarkably reduce the expenses of the equipment and its size. The construction equipment having excavation and loading functions is constructed in such a manner that a work equipment comprised of at least one link member, the link member being connected by a hinge and provided with fixed pin holes, is provided at a predetermined position above a main equipment traveled by a crawler or a wheel, so as to be used as an excavator and a loader.

Description

    TECHNICAL FIELD
  • The present invention relates to a construction equipment, and more particularly, to a construction equipment in which excavation and loading functions can be performed by one equipment.
  • BACKGROUND ART
  • Generally, a construction equipment such as an excavator and a loader is used to excavate, convey, and load earth and sand in the construction site. The excavator is to excavate or load earth and sand or rock during earthwork. The loader is to load excavated earth and sand, aggregate, crushed rock into a conveyer. The excavator and the loader work differently from each other in view of kinematics. In other words, since the excavator acts using pulling power while the loader acts using pushing power, they have different structures from each other. Therefore, both the excavator and the loader are used for excavation and conveyance of earth and sand in the construction site.
  • DISCLOSURE OF INVENTION Technical Problem
  • However, if such equipments, the excavator and the loader are used together, drawbacks occur in that the excessive expenses are required and the volume of the equipments occupied in the working field becomes great. Therefore, there are suggested multi-functional construction equipments that can carry out various functions using single equipment. However, the multi-functional construction equipments fail to satisfy workers for some reasons. In other words, most of the multi-functional construction equipments are respectively provided with an excavator, a loader, and a forklift truck at the front and the rear. Since the excavator, the loader, and the forklift truck are all provided in one main body of the construction equipment, the weight of the construction equipment greatly increases and also the size of the main body that supports the excavator, the loader, and the forklift truck relatively increases. For these reasons, a problem essentially occurs with respect to unnecessary increase of the volume of the construction equipment or its balance. Problems occur in that the respective equipments such as the excavator, the loader, and the forklift truck do not work satisfactorily because they have different structures in view of kinematics.
  • Technical Solution
  • Accordingly, the present invention is directed to a construction equipment having excavation and loading functions, which substantially obviates one or more problems due to limitations and disadvantages of the related art.
  • An object of the present invention is to provide a construction equipment in which excavation and loading functions can be performed by one equipment without any degradation of performance to remarkably reduce the expenses of the equipment and its size.
  • Advantageous Effects
  • Since excavation and loading functions can be performed using single equipment, it is possible to remarkably reduce the expenses of the equipment and its size. Also, it is possible to easily perform excavation, hardening and conveyance of earth and sand without any degradation of performance of the equipment.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The above aspects and features of the present invention will be more apparent by describing certain embodiments of the present invention with reference to the accompanying drawings, in which:
  • FIG. 1 is a perspective view illustrating a construction equipment having excavation and loading functions according to the present invention;
  • FIG. 2 is a side view illustrating a construction equipment having excavation and loading functions according to the present invention;
  • FIG. 3 is a side view illustrating a construction equipment having excavation and loading functions, used as an excavator according to one embodiment of the present invention;
  • FIG. 4 is an enlarged perspective view illustrating a second fixed pin hole of the construction equipment having excavation and loading functions of FIG. 3;
  • FIG. 5 is a state view illustrating use of the construction equipment having excavation and loading functions of FIG. 3;
  • FIG. 6 is a side view illustrating a construction equipment having excavation and loading functions, used as a loader according to other embodiment of the present invention;
  • FIG. 7 is an enlarged perspective view illustrating a first fixed pin hole of the construction equipment having excavation and loading functions of FIG. 6;
  • FIG. 8 is an enlarged perspective view illustrating a third fixed pin hole of the construction equipment having excavation and loading functions of FIG. 6; and
  • FIG. 9 is a state view illustrating use of the construction equipment having excavation and loading functions of FIG. 6.
  • BEST MODE FOR CARRYING OUT THE INVENTION
  • To achieve these objects and other advantages and in accordance with the purpose of the invention, as embodied and broadly described herein, a construction equipment having excavation and loading functions is characterized in that a work equipment comprised of at least one link member, the link member being connected by a hinge and provided with fixed pin holes, is provided at a predetermined position above a main equipment traveled by a crawler or a wheel, so as to be used as an excavator and a loader.
  • Preferably, the work equipment includes a pivot portion rotatably provided at an upper portion of the main equipment, a boom rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the pivot portion, a boom cylinder provided to rotate the boom within a stroke of a predetermined length as its one end is fixed to a predetermined position of the pivot portion and its other end is rotatably fixed to a predetermined position of the boom, a first arm rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the boom, a first arm cylinder provided to rotate the first arm within a stroke of a predetermined length as its one end is rotatably fixed to a predetermined position of the boom and its other end is rotatably fixed to a predetermined position of the first arm, a second arm rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the first arm, a second arm cylinder provided to rotate the second arm within a stroke of a predetermined length as its one end is fixed to a predetermined position of the first arm and its other end is rotatably fixed to a predetermined position of the second arm, a bucket holder rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the second arm, a bucket cylinder provided to rotate the bucket holder within a stroke of a predetermined length as its one end is fixed to a predetermined position of the second arm and its other end is fixed to the bucket holder, an excavating bucket of which one end is fixed to a predetermined position of the bucket holder and the other end is rotatably fixed to the bucket cylinder at a predetermined angle, a first fixed pin hole formed to communicate with a predetermined position of the pivot portion and a predetermined position below the boom, a second fixed pin hole formed to communicate with a predetermined position above the boom and a predetermined position below the first arm, a third fixed pin hole formed to communicate with a predetermined position above the first arm and a predetermined position below the second arm, and a first fixed pin inserted into the second fixed pin hole to control the operation of the first cylinder.
  • More preferably, the work equipment includes a pivot portion rotatably provided at an upper portion of the main equipment, a boom rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the pivot portion, a boom cylinder provided to rotate the boom within a stroke of a predetermined length as its one end is fixed to a predetermined position of the pivot portion and its other end is rotatably fixed to a predetermined position of the boom, a first arm rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the boom, a first arm cylinder provided to rotate the first arm within a stroke of a predetermined length as its one end is rotatably fixed to a predetermined position of the boom and its other end is rotatably fixed to a predetermined position of the first arm, a second arm rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the first arm, a second arm cylinder provided to rotate the second arm within a stroke of a predetermined length as its one end is fixed to a predetermined position of the first arm and its other end is rotatably fixed to a predetermined position of the second arm, a bucket holder rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the second arm, a bucket cylinder provided to rotate the bucket holder within a stroke of a predetermined length as its one end is fixed to a predetermined position of the second arm and its other end is fixed to the bucket holder, a loading bucket of which one end is fixed to a predetermined position of the bucket holder and the other end is rotatably fixed to the bucket cylinder at a predetermined angle, a first fixed pin hole formed to communicate with a predetermined position of the pivot portion and a predetermined position below the boom, a second fixed pin hole formed to communicate with a predetermined position above the boom and a predetermined position below the first arm, a third fixed pin hole formed to communicate with a predetermined position above the first arm and a predetermined position below the second arm, a second fixed pin inserted into the first fixed pin hole to control the operation of the boom cylinder, and a third fixed pin inserted into the third fixed pin hole to control the operation of the second arm cylinder.
  • MODE FOR THE INVENTION
  • Reference will now be made in detail to the preferred embodiments of the present invention, examples of which are illustrated in the accompanying drawings.
  • FIG. 1 is a perspective view illustrating a construction equipment having excavation and loading functions according to the present invention, and FIG. 2 is a side view illustrating the construction equipment having excavation and loading functions according to the present invention.
  • As shown in FIG. 1 and FIG. 2, a pivot portion 20 is rotatably provided at an upper portion of a main equipment 10 traveled by a crawler or a wheel. A boom 30 is rotatably provided up and down within a stroke of a predetermined length as its one end is rotatably fixed to a predetermined position of the pivot portion 20. A boom cylinder 31 is provided to rotate the boom 30 within a stroke of a predetermined length as its one end is fixed to a predetermined position of the pivot portion 20 and its other end is rotatably fixed to a predetermined position of the boom 30. A first arm 40 is rotatably provided up and down within a stroke of a predetermined length as its one end is rotatably fixed to a predetermined position of the boom 30. A first arm cylinder 41 is provided to rotate the first arm 40 within a stroke of a predetermined length as its one end is rotatably fixed to a predetermined position of the boom 30 and its other end is rotatably fixed to a predetermined position of the first arm 40. A second arm 50 is rotatably provided up and down within a stroke of a predetermined length as its one end is rotatably fixed to a predetermined position of the first arm 40. A second arm cylinder 51 is provided to rotate the second arm 50 within a stroke of a predetermined length as its one end is fixed to a predetermined position of the first arm 40 and its other end is rotatably fixed to a predetermined position of the second arm 50. A bucket holder 60 is rotatably provided up and down within a stroke of a predetermined length as its one end is rotatably fixed to a predetermined position of the second arm 50 and its other end is rotatably fixed to the second arm cylinder 51. A bucket cylinder 61 is provided to rotate the bucket holder 60 within a stroke of a predetermined length as its one end is fixed to a predetermined position of the second arm 50 and its other end is fixed to the bucket holder 60. Meanwhile, a first fixed pin hole 32 is formed to communicate with a predetermined position of the pivot portion 20 and a predetermined position below the boom 30. A second fixed pin hole 42 is formed to communicate with a predetermined position above the boom 30 and a predetermined position below the first arm 40. A third fixed pin hole 52 is formed to communicate with a predetermined position above the first arm 40 and a predetermined position below the second arm 50.
  • Hereinafter, a use state and a structure of the construction equipment having excavation and loading functions, used to perform an excavation function according to one embodiment of the present invention will be described in detail with reference to the accompanying drawings.
  • FIG. 3 is a side view illustrating the construction equipment having excavation and loading functions, used as an excavator according to one embodiment of the present invention, FIG. 4 is an enlarged perspective view illustrating the second fixed pin hole of the construction equipment having excavation and loading functions of FIG. 3, and FIG. 5 is a state view illustrating use of the construction equipment having excavation and loading functions of FIG. 3. The same description of the same reference numerals will be omitted to avoid unnecessarily repeated description.
  • In the aforementioned construction equipment 1 (see FIG. 2) having excavation and loading functions, a construction equipment 2 having excavation and loading functions, used as an excavator is constructed as follows. That is, as shown in FIG. 3 and FIG. 4, an excavating bucket 62 is rotatably fixed to the bucket holder 60 at a predetermined angle, and a first fixed pin 70 is inserted into the second fixed pin hole 42 (see FIG. 2) to control the operation of the first cylinder 41, the second fixed pin hole 42 being formed at a predetermined position above the boom 30 and below the first arm 50.
  • In the use state of the aforementioned construction equipment 2 having excavation and loading functions as the excavator, the first fixed pin 70 is provided to fix the operation of the first cylinder 41, thereby fixing the first arm 40 when the pulling power is required for excavation work using the excavator as shown in FIG. 5. The boom 30, the second arm 50, and the excavating bucket 62 are respectively rotated up and down by the operation of the boom cylinder 31, the second arm cylinder 51, and the bucket cylinder 61 to perform an excavation function.
  • Meanwhile, a use state and a structure of the construction equipment having excavation and loading functions, used to perform a loading function according to other embodiment of the present invention will be described in detail with reference to the accompanying drawings. The same description of the same reference numerals will be omitted to avoid unnecessarily repeated description.
  • FIG. 6 is a side view illustrating the construction equipment having excavation and loading functions, used as a loader according to other embodiment of the present invention, FIG. 7 is an enlarged perspective view illustrating the first fixed pin hole of the construction equipment having excavation and loading functions of FIG. 6, FIG. 8 is an enlarged perspective view illustrating the third fixed pin hole of the construction equipment having excavation and loading functions of FIG. 6, and FIG. 9 is a state view illustrating use of the construction equipment having excavation and loading functions of FIG. 6.
  • In the aforementioned construction equipment 1 (see FIG. 2) having excavation and loading functions, a construction equipment 3 having excavation and loading functions, used as a loader is constructed as follows. That is, as shown in FIG. 6 to FIG. 8, a loading bucket 63 is rotatably fixed to the bucket holder 60 at a predetermined angle, and a second fixed pin 80 that controls the operation of the boom cylinder 31 is inserted into the first fixed pin hole 32 (see FIG. 2) formed to communicate with the predetermined position of the pivot portion 20 and the predetermined position below the boom 30. Also, a third fixed pin 90 that controls the operation of the second arm cylinder 51 is inserted into the third fixed pin hole 52 formed to communicate with the predetermined position above the first arm 40 and the predetermined position below the second arm 50.
  • In the use state of the aforementioned construction equipment 3 having excavation and loading functions as the loader, the second fixed pin 80 is provided to fix the operation of the boom cylinder 31, thereby fixing the boom 30 when the pushing power is required for conveyance of earth and sand or hardening work of earth and sand using the loader as shown in FIG. 9. The third fixed pin 90 is provided to fix the operation of the second arm cylinder 51, thereby fixing the second arm 50. The first arm 40 and the loading bucket 63 are respectively rotated up and down by the operation of the first arm cylinder 41 and the bucket cylinder 61 to perform a loading function.
  • In the aforementioned embodiments of the present invention, the construction equipment can be provided, in which the excavation and loading functions can easily be performed using single equipment depending on the work type such as excavation and conveyance of earth and sand by overcoming the difference in view of kinematics between the excavator and the loader.
  • As described above, the construction equipment having excavation and loading functions according to the present invention has the following advantages.
  • Since excavation and loading functions can be performed using single equipment, it is possible to remarkably reduce the expenses of the equipment and its size. Also, it is possible to easily perform excavation, hardening and conveyance of earth and sand without any degradation of performance of the equipment.
  • The foregoing embodiment and advantages are merely exemplary and are not to be construed as limiting the present invention. The present teaching can be readily applied to other types of apparatuses. Also, the description of the embodiments of the present invention is intended to be illustrative, and not to limit the scope of the claims, and many alternatives, modifications, and variations will be apparent to those skilled in the art.

Claims (3)

1. A construction equipment having excavation and loading functions characterized in that a work equipment comprised of at least one link member, the link member being connected by a hinge and provided with fixed pin holes, is provided at a predetermined position above a main equipment traveled by a crawler or a wheel, so as to be used as an excavator and a loader.
2. The construction equipment according to claim 1, wherein the work equipment includes:
a pivot portion rotatably provided at an upper portion of the main equipment;
a boom rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the pivot portion;
a boom cylinder provided to rotate the boom within a stroke of a predetermined length as its one end is fixed to a predetermined position of the pivot portion and its other end is rotatably fixed to a predetermined position of the boom;
a first arm rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the boom;
a first arm cylinder provided to rotate the first arm within a stroke of a predetermined length as its one end is rotatably fixed to a predetermined position of the boom and its other end is rotatably fixed to a predetermined position of the first arm;
a second arm rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the first arm;
a second arm cylinder provided to rotate the second arm within a stroke of a predetermined length as its one end is fixed to a predetermined position of the first arm and its other end is rotatably fixed to a predetermined position of the second arm;
a bucket holder rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the second arm;
a bucket cylinder provided to rotate the bucket holder within a stroke of a predetermined length as its one end is fixed to a predetermined position of the second arm and its other end is fixed to the bucket holder;
an excavating bucket of which one end is fixed to a predetermined position of the bucket holder and the other end is rotatably fixed to the bucket cylinder at a predetermined angle;
a first fixed pin hole formed to communicate with a predetermined position of the pivot portion and a predetermined position below the boom;
a second fixed pin hole formed to communicate with a predetermined position above the boom and a predetermined position below the first arm;
a third fixed pin hole formed to communicate with a predetermined position above the first arm and a predetermined position below the second arm; and
a first fixed pin inserted into the second fixed pin hole to control the operation of the first cylinder.
3. The construction equipment according to claim 1, wherein the work equipment includes:
a pivot portion rotatably provided at an upper portion of the main equipment;
a boom rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the pivot portion;
a boom cylinder provided to rotate the boom within a stroke of a predetermined length as its one end is fixed to a predetermined position of the pivot portion and its other end is rotatably fixed to a predetermined position of the boom;
a first arm rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the boom;
a first arm cylinder provided to rotate the first arm within a stroke of a predetermined length as its one end is rotatably fixed to a predetermined position of the boom and its other end is rotatably fixed to a predetermined position of the first arm;
a second arm rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the first arm;
a second arm cylinder provided to rotate the second arm within a stroke of a predetermined length as its one end is fixed to a predetermined position of the first arm and its other end is rotatably fixed to a predetermined position of the second arm;
a bucket holder rotatably provided up and down as its one end is rotatably fixed to a predetermined position of the second arm;
a bucket cylinder provided to rotate the bucket holder within a stroke of a predetermined length as its one end is fixed to a predetermined position of the second arm and its other end is fixed to the bucket holder;
a loading bucket of which one end is fixed to a predetermined position of the bucket holder and the other end is rotatably fixed to the bucket cylinder at a predetermined angle;
a first fixed pin hole formed to communicate with a predetermined position of the pivot portion and a predetermined position below the boom;
a second fixed pin hole formed to communicate with a predetermined position above the boom and a predetermined position below the first arm;
a third fixed pin hole formed to communicate with a predetermined position above the first arm and a predetermined position below the second arm;
a second fixed pin inserted into the first fixed pin hole to control the operation of the boom cylinder; and
a third fixed pin inserted into the third fixed pin hole to control the operation of the second arm cylinder.
US11/597,605 2004-05-21 2005-05-20 Construction Equipment with Excavation and Loading Function Abandoned US20080075571A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
KR10-2004-0036541 2004-05-21
KR1020040036541A KR100606506B1 (en) 2004-05-21 2004-05-21 Construction Equipment with excavation and loading function
PCT/KR2005/001483 WO2005113903A1 (en) 2004-05-21 2005-05-20 Construction equipment with excavation and loading function

Publications (1)

Publication Number Publication Date
US20080075571A1 true US20080075571A1 (en) 2008-03-27

Family

ID=35428437

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/597,605 Abandoned US20080075571A1 (en) 2004-05-21 2005-05-20 Construction Equipment with Excavation and Loading Function

Country Status (5)

Country Link
US (1) US20080075571A1 (en)
EP (1) EP1756371A4 (en)
KR (1) KR100606506B1 (en)
AU (1) AU2005245747B2 (en)
WO (1) WO2005113903A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015113577A (en) * 2013-12-09 2015-06-22 日本車輌製造株式会社 Earth drill machine
JP2017122373A (en) * 2016-01-08 2017-07-13 コベルコ建機株式会社 Work machine
JP2018071259A (en) * 2016-11-01 2018-05-10 日立建機株式会社 Demolition machine
WO2022032398A1 (en) * 2020-08-14 2022-02-17 Ece Henrichon Inc. Excavator-to-loader multi-boom system, vehicle including such a system, kit for assembling the same, and corresponding methods of manufacturing, assembling and operating associated thereto

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042234B (en) * 2019-12-19 2021-04-09 中国地质大学(武汉) Face shovel excavating mechanism capable of increasing horizontal pushing driving force and lifting force of movable arm of bucket

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3465904A (en) * 1966-11-18 1969-09-09 Massey Ferguson Services Nv Adjustable boom for material handling equipment
US4850298A (en) * 1984-02-03 1989-07-25 Mcglew John J Energy saving boat davit and article placement device
US5161191A (en) * 1990-11-27 1992-11-03 Gupta Shanti S Encryption system for time division multiplexed networks

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB777442A (en) * 1952-06-07 1957-06-26 John Clark Improvements relating to material shifting apparatus
CA1030109A (en) * 1975-05-12 1978-04-25 Elton B. Long Overcenter backhoe
JPS57140435A (en) 1981-02-20 1982-08-31 Youshichirou Aoyanagi Boom for oil-pressure type shovel-based excavator
DE3366984D1 (en) 1983-10-14 1986-11-20 Cordes Hugo Attachment for hydraulic excavators and cranes
KR890014844A (en) * 1988-03-07 1989-10-25 정회승 Multi-purpose all-in-one heavy equipment
JP2682722B2 (en) * 1990-03-23 1997-11-26 新キャタピラー三菱株式会社 Arm member rotation device
US5165191A (en) * 1992-02-25 1992-11-24 William G. Davis Front end loader attachment convertible between loading bucket and side-shift-angle dozer configurations
JPH0674651A (en) * 1992-08-24 1994-03-18 Mitsubishi Heavy Ind Ltd Recorder controller for container refrigeration unit
JPH0674651U (en) * 1993-03-31 1994-10-21 コベルコ建機エンジニアリング株式会社 Short loader
KR19990023816U (en) * 1997-12-09 1999-07-05 김기홍 Combined automatic and manual inverters for loaders
KR100310003B1 (en) * 1998-09-15 2001-11-24 한철호 Exchanging Work Equipment of Excavator
FR2840368B1 (en) * 2002-05-30 2004-09-10 Groupe Mecalac ELECTRO-HYDRAULIC DEVICE AND PUBLIC WORKS MACHINE THUS EQUIPPED

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3465904A (en) * 1966-11-18 1969-09-09 Massey Ferguson Services Nv Adjustable boom for material handling equipment
US4850298A (en) * 1984-02-03 1989-07-25 Mcglew John J Energy saving boat davit and article placement device
US5161191A (en) * 1990-11-27 1992-11-03 Gupta Shanti S Encryption system for time division multiplexed networks

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015113577A (en) * 2013-12-09 2015-06-22 日本車輌製造株式会社 Earth drill machine
JP2017122373A (en) * 2016-01-08 2017-07-13 コベルコ建機株式会社 Work machine
JP2018071259A (en) * 2016-11-01 2018-05-10 日立建機株式会社 Demolition machine
WO2022032398A1 (en) * 2020-08-14 2022-02-17 Ece Henrichon Inc. Excavator-to-loader multi-boom system, vehicle including such a system, kit for assembling the same, and corresponding methods of manufacturing, assembling and operating associated thereto

Also Published As

Publication number Publication date
KR100606506B1 (en) 2006-08-02
KR20050111296A (en) 2005-11-24
AU2005245747A1 (en) 2005-12-01
EP1756371A1 (en) 2007-02-28
EP1756371A4 (en) 2009-10-21
WO2005113903A1 (en) 2005-12-01
AU2005245747B2 (en) 2009-03-19

Similar Documents

Publication Publication Date Title
US20080075571A1 (en) Construction Equipment with Excavation and Loading Function
AU2017202342B2 (en) Rope shovel with non-linear digging assembly
US5595471A (en) Linkage arrangement
US20050193598A1 (en) Bucket and rigging assembly for an excavating bucket
WO2010053276A2 (en) Excavating and loading apparatus
JP2004092191A (en) Working device for hydraulic shovel, and revolving mechanism for the same
KR20100074515A (en) Bucket loadage confirmable structure of construction equipment
WO2008053779A1 (en) Boom and front attachment for working machine
CN211773981U (en) Digging machine
JP2013217067A (en) Excavation bucket
KR100990884B1 (en) Gripper for a excavator
JP2003096810A (en) Offset boom type construction machinery
KR200279890Y1 (en) Attschments lank AS
JPH10195912A (en) Simplified type holding device for hydraulic shovel
US20070028488A1 (en) Bracket and Method for Transport of Articulated Arm Attachment
CN201933520U (en) Superlong operation device for excavators
KR0184969B1 (en) Multifunction construction heavy equipment
KR20170136103A (en) A boom for tractor loader
KR100488207B1 (en) Connection structure of boom and arm of heavy equipment
JP2021155971A (en) Construction machine
JP2005188157A (en) Bucket turning angle adjusting device of hydraulic excavator
JPH11323999A (en) Slide bucket
US20080267755A1 (en) Hydraulically cushioned backhoe boom bumper and travel limiter
RU2117110C1 (en) Loading equipment
RU2072017C1 (en) Shovel-loader

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION