TWI289644B - Method and apparatus for treating waste - Google Patents

Method and apparatus for treating waste Download PDF

Info

Publication number
TWI289644B
TWI289644B TW092124500A TW92124500A TWI289644B TW I289644 B TWI289644 B TW I289644B TW 092124500 A TW092124500 A TW 092124500A TW 92124500 A TW92124500 A TW 92124500A TW I289644 B TWI289644 B TW I289644B
Authority
TW
Taiwan
Prior art keywords
furnace
waste
gas
discharge port
furnace body
Prior art date
Application number
TW092124500A
Other languages
Chinese (zh)
Other versions
TW200419109A (en
Inventor
Takaiku Yamamoto
Hirotaka Sato
Yoshinori Matsukura
Original Assignee
Sumitomo Metal Ind
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Metal Ind filed Critical Sumitomo Metal Ind
Publication of TW200419109A publication Critical patent/TW200419109A/en
Application granted granted Critical
Publication of TWI289644B publication Critical patent/TWI289644B/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/08Incineration of waste; Incinerator constructions; Details, accessories or control therefor having supplementary heating
    • F23G5/085High-temperature heating means, e.g. plasma, for partly melting the waste
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/24Incineration of waste; Incinerator constructions; Details, accessories or control therefor having a vertical, substantially cylindrical, combustion chamber
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J15/00Arrangements of devices for treating smoke or fumes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J3/00Removing solid residues from passages or chambers beyond the fire, e.g. from flues by soot blowers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/40Valorisation of by-products of wastewater, sewage or sludge processing

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • Gasification And Melting Of Waste (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The present invention provides a method and apparatus for treating waste, capable of solving problems of (a) stoppage of a duct, (b) time for charging waste in a furnace, (c) discharging of unused carbon, (d) controlling of a waste upper-face position, (e) recycling of halogen class materials, (f) charging of harmful waste materials, and (g) rising in internal pressure in a basin chamber. A waste treatment furnace comprises a furnace body, a gas outlet provided in the upper part of the furnace body, an outlet for molten slag and/or molten metal, located in the lower part of the furnace body, a waste inlet provided between the outlet for molten slag and/or molten metal and the gas outlet, a furnace center lance provided in the upper part of the furnace body along the furnace axis and for blowing a burn-assisting gas downward into the furnace, an upper tuyere arranged in more than one step in the furnace wall between the waste inlet and the gas outlet, and a tuyere arranged in more than one step in the furnace wall between the waste inlet and the outlet for molten slag and/or molten metal. When the waste is charged into the waste treatment furnace to perform at least one of the treatments of burning, gasification, and melting, discharge gas generated in the at least one of the treatments is cooled in the furnace in the vicinity of the inlet of a duct that is connected to the furnace body of the waste treatment furnace and guides discharge gas to outside the furnace body.

Description

1289644 (1) 玖、發明說明 【發明所屬之技術領域】 本發明是關於針對一般廢棄物或產業廢棄物(以下, 本發明說明書中總稱爲「廢棄物」)進行燃燒、氣化或熔 融的至少其中之一處理用的廢棄物之處理方法及處理裝置 。尤其,本發明是將廢棄物含有的有機物氣化回收可作爲 燃料使用的氣體(以下,同時只稱爲「能源氣體」),將該 等廢棄物含有的低沸點金屬作爲粉塵回收,並以該等廢棄 物含有的灰量即有價金屬(以下,亦僅單純稱「金屬」)作 爲熔渣及熔融金屬分別回收的同時,可以商業規模長期穩 定實現該等處理用的廢棄物處理方法及處理裝置。 此外’本發明中,廢棄物是表示,例如以廚餘爲代表 的都市垃圾爲主體,塑膠屑或鐵屑,含廢棄後的汽車或家 電製品的粉碎粉塵、焚灰、砂土的翻土垃圾、污泥、淤渣 、製鐵粉塵、醫療廢棄物及廢木材等。 【先前技術】 生活垃圾等的一般廢棄物或產業廢棄物等的部分廢棄 物,以往幾乎是全數予以焚化處理。但是,在焚化處理該 等廢棄物時,在200〜600°c,尤其是300°c左右的處理溫 度會產生戴奧辛類。並且,焚灰的最終處分場所的確保困 難,同時從資源有效利用的觀點來看更需要可以有效地加 以回收。因此,不能充分因應以往焚化產生廢棄物的處理 -5 - 1289644 (2) 鑒於上述的問題,本發明人藉由國際公開第 WO00/45090號,提出一種使用沿著爐軸朝著下方將助燃 性氣體噴入爐內的可升降爐中心缺口、將噴入助燃性氣體 的角度從爐軸方向偏離配置的1段以上的上部風口、助燃 性氣體或助燃性氣體及燃料朝著爐軸噴射配置,具有突出 爐內配置的1段以上的下部風口,可防止氣化熔爐爐體內 部的低溫區域的產生,並可集中進行廢棄物的燃燒處理用 火點的氣化熔爐及氣化熔融方法的發明。根據此一發明, 可以穩定回收附加價値高的熔爐渣及各種金屬與能源氣體 〔發明說明〕 但是,本發明人根據國際公開第WO 00/45090號所 提出的氣化熔爐(以下,稱「基本的氣化熔爐」),爲了 獲得更進一步發展而反覆進行深刻檢討後的結果,基本的 氣化熔爐具有以下列具的課題(a )〜(g ),爲了解決該 等課題(a ) ~ ( g ),提供可以使基本的氣化熔爐更具有 高性能化,可運用於難處理性廢棄物的處理方法及處理裝 置。 (管路的堵塞) 近年來,多數利用廢棄物的燃燒、氣化或熔融的廢棄 物的處理爐。但是,該等的處理爐會因爲廢棄物的種類而 在隨著處理產生排氣流動的管路內壁附著及堆積粉塵’導 -6 - 1289644 (3) 致管路堵塞之虞。例如,廢棄物中含有多量的低沸點物質 時,該等在爐內蒸發,使蒸發的一部份附著在管路的內壁 面,隨後成長而將管路堵塞。以上的場合,會有不得不停 止處理爐的運轉,而有不能長期間穩定作業的可能性。 基本的氣化熔爐爲了抑制戴奧辛類的排出,以存在爐 體上部的氣體溫度爲1000°C以上140(TC以下,將氣體從 氣體排出口排出,以後段的排出氣體的冷卻裝置急冷至 200 °C以下。尤其在完全抑制戴奧辛類的產生上,以高於 爐體上部的溫度爲佳。但是,由於爐內的氣體溫度高,因 此在爐內蒸發含有廢棄物的低沸點物質,其一部份附著在 管路的內面成長,會有堵塞管路的疑慮。 至今爲止,作爲防止相關管路堵塞用的技術有朝著管 路的內部噴射水或噴霧等的冷媒來冷卻固化排氣中的低沸 點氣狀物質,防止附著管路上的發明(日本專利特開 2001-33027號公報、同2002-349841號公報、特開平7-197046號公報及同8-2 19436號公報)或者以機械式方法 刮除管路附著物的發明(特開2002-168433號公報)。但 是,該等發明會有以下列記的問題。 即,冷媒一旦噴入管路的內部時,會因爲廢棄物的種 類或冷媒的噴射位置不能獲得充分的堵塞抑制效果。例如 ,即使將冷媒噴入管路的內部,在管路的入口附近排氣溫 度會維持著高的狀態’因此排氣中的低沸點氣狀物質會附 著·管路的入口附近,最後會有導致堵塞管路之虞。並且’ 將噴霧噴入管路的內部時’對於管路的內徑如未設定適當 1289644 (4) 之噴入噴霧的擴開角度時,噴霧等的冷媒會與管路的內壁 衝突或附著形成未蒸發水,可能會造成設置在氣化熔爐下 游的氣體冷卻裝置控制上的困難。 另一方面,低沸點氣狀物質附著在管路的內壁而堵塞 管路時,以使用機械式除去手段將此除去最爲有效。例如 ,特開2002- 168433號公報中,揭示具備有插入管路內部 的刮除羽片的驅動軸,及轉動該驅動軸並朝其軸向往返運 動的驅動手段所構成的管路清掃裝置。 此時,由於驅動軸一邊轉動一邊進行往返運動,因此 會有爐內產生的氣體從氣封部洩漏或造成外部空氣的吸入 管路內之虞。尤其是隨著運轉產生的CO氣體的爐中會有 CO氣體漏出外部等的危險性。並且,以CO氣體作爲能 源再利用時,吸入外部空氣與所獲得的氣體熱量的降低關 連。又,另外在驅動軸的中心軸附近有驅動軸冷卻用的空 氣流動,但是管路內部形成高溫的場合驅動軸的外表面可 能受到熱性損傷。尤其明顯堵塞管路的內部時,不得不增 大對於驅動軸的負載,因而使得堵塞物除去所需的時間形 成長時間化,更增大熱性損傷,而使得裝置的損傷或氣體 的洩漏更加顯著。 (b )爐內充塡時間 利用基本的氣化熔爐處理廢棄物時,將裝入爐內廢棄 物的上端面高度控制在預定的位準是運轉穩定化的重要因 素。而該氣化熔爐的上升是利用噴燃器使爐內溫度到達預 -8 - 1289644 (5) 定溫度之後開始進行廢棄物的裝入’隨後緩緩堆積廢棄物 ,調整廢棄物上端面的高度至目標位準。但是’使廢棄物 的上端面高度提高至預定的位準需要相當的長時間。 並且,在升溫的途中,爐內的燃燒溫度會不可避免的 通過容易產生戴奧辛類的所謂200〜600°C的溫度區域,因 此將戴奧辛類的構成元素的含氯等鹵素類含量高的廢棄物 從爐升溫的階段裝入,堆積時,在該氣化熔爐的上升時產 生戴奧辛。 (c )未利用碳的排出 基本的氣化熔爐的運轉是投入廢棄物含碳的一部份在 未利用狀態下飛散通過管路之後,利用除塵裝置以粉塵回 收。爲了降低未利用碳,可利用水性移位反應(C + H20 = C0 + H2)將未利用碳轉換爲CO氣體)。 進行該水性移位反應時需要H2o。其中,廢棄物中含 水分的含於廢棄物的水份多數是在較廢棄物上端面下方的 位置消耗於熱分解殘渣碳的氣化反應上。因此會減少下部 風口前燃燒的熱分解殘渣碳的量,形成維持高的下部風口 前的燃燒溫度困難,而有不能穩定進行含於廢棄物內的灰 量及金屬類熔融,及熔渣或熔融金屬的排出之虞。並且, 廢棄物中含多量水分時,形成投入廢棄物後大的瞬間氣體 變動,不能穩定運轉,又因爲水的蒸發導致產生氣體熱量 的降低。因此,廢棄物中含多量的水分並非理想。 特開平8-152118號公報中,揭示一種藉著從設置在 1289644 (6) 廢棄物塡充層內的上部風口供給蒸氣,以灰量的熔融溫度 作爲上部風口位準的燃燒溫度,可藉此抑制上部風口位準 的熱分解殘渣或可燃性氣體燃燒之半熔融物的產生,因此 可抑制半熔融物附著爐內壁的發明。亦即,從設置在塡充 層內的上部風口噴入的蒸氣可以將設置於上部風口高度的 燃燒溫度抑制在低的溫度,抑制該位準的半熔融物的產生 。又,隨著蒸氣噴入塡充層內,進行水性移位反應,同時 可獲得炭氣化的進行。 但是,一旦將蒸氣噴入廢棄物的塡充層內進行炭氣化 時,熱分解殘渣中含有的碳與蒸氣的反應而被消耗。因此 減少從下部封口供給助燃性氣體燃燒的碳量,維持高的下 部風口前的燃燒溫度困難。因此有不能穩定進行含於廢棄 物內的灰量及金屬的熔融,及熔渣或熔融金屬的排出之虞 (d)廢棄物的上端面位置的控制 基本的氣化熔爐是燃燒廢棄物將廢棄物中的有機物氣 化後作爲能源氣體回收,同時以廢棄物中的灰量及金屬作 爲熔融物回收的立式爐。該氣化熔爐,分別具備:設置在 爐體上部的氣體排出口;設置在爐體下部的融渣及熔融金 屬排出口;設置在融渣及熔融金屬排出口與氣體排出口之 間的廢棄物裝入口;爐體上部沿著爐軸向下方設置將助燃 性氣體噴入爐內可自由升降的爐中心塊;廢棄物裝入口與 氣體排出口之間的爐壁設置1段以上噴入助燃性氣體用的 -10- 1289644 (7) 上部風口;及廢棄物裝入口與融渣及熔融金屬排出口間的 爐壁設置1段以上朝著爐內,將助燃性氣體或助燃性氣體 及燃料朝爐軸方向噴灑的下部風口。並且,該氣化熔爐藉 著在裝入爐內廢棄物的上端面燃燒高溫加熱後廢棄物的熱 分解殘渣中的碳量,即使不使用昂貴的焦炭以可以熔解殘 渣中的.灰量或金屬。 但是,廢棄物的成分並非一定多數爲不均質的場合, 而有可能在熱分解殘渣中幾乎沒有碳量的存在。例如,塑 膠屑及切碎機粉塵等的含碳幾乎爲熱分解反應所氣化,因 此熱分解殘渣的含碳量極少。因此在維持裝入爐內廢棄物 上端面的位置時,必須要頻繁進行從下部風口及爐中心塊 噴入助燃性氣體量的調整運轉,必須要有熟練的運轉。 (e )鹵素類的原料再生 含於廢棄物中的氯或溴等的鹵素類除了形成戴奧辛類 的產生源之外,並爲附加價値極高的物質,期待可以有效 地進行原料再生。但是,並未確立氯含有率高的廢棄物的 有效處理方法及再生方法。現在,含氯等鹵素類的廢棄物 雖是以焚化爐焚化處理,但是由於燃燒溫度低,在抑制戴 奧辛類的排出必須要高度的氣體處理技術。 基本的氣化熔爐是藉著高濃度氧氣的噴入以高溫將廢 棄物氣化熔融,以氣體冷卻裝置使產生的高溫氣體急冷, 因此幾乎不會排出戴奧辛,同時可以無害化處理大量的含 鹵素類廢棄物。含於廢棄物的氯在爐內形成氯化氫氣體等 -11 - 1289644 (8) 的鹵化氫氣,設置在氣體冷卻設備後段的除塵設備噴入熟 石灰等的助劑,從生成氣體中分離除去。此時,爲了抑制 戴奧辛類的再合成及鹵素等的腐蝕,氣體冷卻裝置的出口 溫度設定在120°C以上2〇〇°C以下,並同時設定除塵設備 內部的溫度爲100°c以上。 但是,以含有多量鹵素類的廢棄物爲對象時,爲了有 效回收氯或溴的鹵素,在該氣化熔爐中以氯化鈣使鹵素固 定化進行原料再生困難。並且,所產生的鹵化氫氣體形成 高濃度,同時容易造成設備的腐蝕。 另外,特開2001-162248號公報中,揭示一種含氯乙 烯的廢塑膠以250〜500°C熱分解,以燃燒裝置燃燒含氯的 排氣,以其燃燒氣體爲熱源在鍋爐產生蒸氣的同時,將產 生蒸氣後的燃燒氣體供給冷卻裝置冷卻,利用氯回收裝置 、回收冷卻後氣體中的氯化氫,冷卻裝置前的排氣溫度爲了 抑制氯化氫導致的腐飩而維持在200°C以上。 但是,200 °C以上的溫度條件會有戴奧辛再合成之虞 。並且,含鹵素的塑膠廢棄物在500 °C以下的低溫進行熱 分解氣化時產生焦油,會有使得配管路堵塞之虞。 並且,特開2000-202419號公報中,揭示以氣體水洗 裝置除去產生的氯化氫,處理包含鹵素含耐燃材的廢棄物 的處理方法,但是並未記載憶至設備腐蝕用的詳細溫度管 路理條件等,爲不明的狀態。 (f )有害廢棄物的裝置 -12- (9) 1289644 根據基本的氣化熔爐,除醫療類廢棄物及污染土壤, 並可以進行聚氯聯苯(PCB )等的有害廢棄物的無害化處 理。 該等的有害廢棄物在裝入爐內後落下至爐內,到達廢 棄物塡充層的上端面,但是裝入爐內的廢棄物在到達塡充 層的上端面之前,會使得低沸點的有害成份氣化,會有將 氣化的有害成分未充分分解之前即從氣體排出口排出爐外 之虞。 (g)熔漿室的內部壓力上升 國際公開第W000/45090中,揭示基本氣化熔爐所期 待的樣態爲具備在排出熔塊及熔融金屬之前,具有內部可 以將該等一旦儲存的空間的熔漿室。設置該熔漿室可以使 爐內經常在爐底形成不囤積熔塊或熔融金屬狀態的乾處理 槽,可穩定爐的運轉。 但是,爲了進行設備的維修等,會有在爐內殘留廢棄 物的殘渣或熔渣的狀態下暫時滯留此氣化熔爐的場合。隨 後的上升操作中,會有使殘留氣化熔爐內部的廢棄物或冷 卻熔渣堵塞爐與熔漿室間的接觸部之虞,而可能導致熔漿 室內部產生的氣體在爐體內不容易流動的問題,此時會使 熔漿室內的壓力上升,有氣體從熔渣及熔融金屬排出口露 出之虞。 【發明內容】 -13- (10) 1289644 本發明相對於上述基本氣化熔爐相關課題(a )〜(g )提供以下的解決手段。 (1 )相對於課題(a )的解決手段 本發明將爐內產生的高溫排氣,例如存在於基本氣化 熔爐等廢棄物處理爐的爐體流入管路內之前的爐內的階段 冷卻。具體而言,例如在爐出口的附近(管路的入口附近 的爐內)噴入水、惰性氣體、生產用氣體或蒸氣的至少其 中之一所構成的冷媒,將排氣於管路入口附近的爐內冷卻 。藉此,使管路入口附近的排氣中低沸點氣狀物質的表面 溫度確實降低至不附著管路內壁的溫度。 流入管路內的排氣溫度位的抑制管路的堵塞而以溫度 低側爲佳,但是爲了抑制戴奧辛類的再合成,管路內部的 排氣溫度以維持80(TC以上爲佳,最好是850°C以上。並 且,一旦將冷媒噴入爐體出口附近時,可以降低設置在後 段附近的氣體冷卻裝置入口的溫度,因此也可以降低氣體 冷卻裝置中使用的噴霧量減低其負擔,獲得氣體冷卻裝置 的小巧化。 並且,本發明提出一種當以內壁附著低沸點氣狀物質 將管路堵塞時,可在短時間進行堵塞物機械式除去的堵塞 物除去裝置作爲廢棄物的處理裝置。 首先,由於短時間進行堵塞物機械式除去作業,可以 在管路堵塞程度小的階段有效地進行堵塞物除去裝置的運 轉。因此,本發明在管路的入口及出口設置可監視管路進 -14- 1289644 (11) 入側及排出側差壓的差壓計,該差壓顯示較運轉開始時間 具有上升傾向時判斷爲開始堵塞使得堵塞物除去裝置運轉 。此外,也可以與此不同時即不論管路有無堵塞,使堵塞 物的除去裝置定期運轉。 (2 )相對於課題(b )的解決手段 爲儘早將裝入基本的氣化熔爐爐內的裝入物的上端面 高度提高至運轉時的控制位準爲止,可以有效地從爐的升 溫階段裝置炭材。並且,爲了提高裝入物上端面的位準而 裝入炭材所含鹵素類的總濃度在〇. 1 %以下時,可以在不 產生戴奧辛類的狀態下升溫。根據本發明,基本氣化熔爐 的升溫中,進行噴燃器燃燒的同時,可以將鹵素類的總濃 度低的炭材投入使裝入物上端面的高度上升至預定位準, 縮短爐內的塡充時間。 (3 )相對於課題(c )的解決手段 本發明提出將蒸氣從塡充層噴入上方部分以降低未利 用的碳。藉此,使蒸氣在爐上部只與未利用碳接觸使其氣 化。噴入的蒸氣由於不與塡充層內的熱分解殘渣碳接觸, 因此可穩定進行廢棄物包含的灰成份及金屬類的熔化,更 可穩定進行熔渣及/或熔融金屬的排出。 即使廢棄物中的碳不能完全氣化而作爲未利用碳以除 塵設備回收粉麈時,只需再次投入氣化熔爐內即可。此時 ,粉塵的粒徑形成及小的1 mm以下,因此該狀態下投入 -15- (12) 1289644 時會有在爐內飛散之虞,但是只要在投入時將含未利用碳 的粉麈與廢棄物同時混合壓實後裝入,即可防止粉塵的飛 散。 (4 )相對於課題(d )的解決手段 本發明中,以熱分解殘渣碳少的廢棄物爲對象時,可 以投入炭材容易進行塡充層上端面位置的控制。即使是基 本的氣化熔爐,也可以將炭材混合廢棄物後壓實形成一塊 體裝入爐內。此時,即使使用細粒徑的炭材也不會有飛散 導致通氣性不良的虞慮。並且,基本的氣化熔爐由於火點 集中爐的中心部也不會有熔融物導液性惡化不能穩定將熔 渣排出的虞慮。因此,炭材完全不限於昂貴的焦炭,也可 以使用木材等含熱分解殘渣碳的炭材。 並且,裝入預先篩選後粒徑大的炭材時,以使用具有 並聯配置將廢棄物裝入爐內用的廢棄物裝入路徑的2個閥 的裝入裝置爲佳。此一裝入裝置在開啓外部側閥的同時, 在關閉內部側閥的狀態下供給外部側的閥與內部側閥之間 的空間,關閉外部側閥後開啓內部側的閥,可以將炭材裝 入爐內。該裝入裝置之外部側的閥或內部側閥的其中之一 是經常維持著關閉狀態,因此可以防止大量爐內氣體通過 裝入裝置漏出爐外,或者將爐外的空氣大量吸入爐內。並 且,解決該課題(d)用所投入的炭材是在爐內的溫度條 件升溫至可以使戴奧辛類完全熱分解的條件下投入’因此 炭材中鹵素類濃度即使再高也不會有問題。 -16- (13) 1289644 (5)相對於課題(e)的解決手段 本發明是將經由連接基本氣化熔爐爐體的氣體排出口 之管路所引導的排氣,(i )以除麈後除塵的排氣中所含 的鹵化氫氣體作爲酸而利用酸回收裝置回收,將回收後的 酸轉換爲鹵素,及/或(ii)使冷卻至l〇(TC以下冷卻後排 氣中所含的鹵化氫氣體凝結,以排氣中所含鹵化氫作爲酸 而回收,將回收的酸轉換爲鹵素。藉此,可一邊抑制戴奧 辛類的排出或設備的腐蝕,並可進行廢棄物中所含鹵素的 原料再生。 (6)相對於課題(f)的解決手段 含有醫療類廢棄物、污染土壤或聚氯聯苯等有害廢棄 物裝入基本的氣化熔爐時,將該等有害廢棄物封入密閉容 器內,可有效地從具有並聯配置在廢棄物裝入通路的2個 閥體的裝入裝置投入該密閉容器內。藉此,使產生的有害 氣體在爐內經過充分高溫條件下的滯留時間,完全分解後 排出爐外。 (7 )相對於課題(g )的解決手段 爐一旦停止後在上升時爲了使殘留爐內的廢棄物或冷 卻溶渣等導致爐與熔漿室的連接部堵塞等起因而使得熔漿 室內部壓力過度上升’在熔漿室內的壓力上升時,可有效 設置排出熔漿室產生氣體用的配管路。 -17· (14) 1289644 【實施方式】 參閱添附圖示詳細說明本發明涉及廢棄物的處理方法 及處理裝置的實施形態如下。 第1爲實施形態所使用廢棄物的氣化熔爐的詳細說明 用的槪略圖。 同圖所示,苯實施形態的氣化熔爐1的爐床1 a是以 內襯耐火物2內襯其中。並且,爐體la具有排出裝入廢 棄物3用的廢棄物裝入口 4與產生能源氣體(以下,僅稱 爲「排氣」)及排出粉麈用的氣體排出口,及經此氣體排 出口 5連通爐體la內部空間的管路6。廢棄物裝入口 4 安裝有推桿7,裝入的炭材8與廢棄物3同時以壓實的狀 態從廢棄物裝入口 4裝入。 第1圖的符號9是沿著爐軸(爐中心軸)向下方使助 燃性氣體9a朝著爐內噴入形成可自由升降的中心塊。符 號10是在爐體la的爐壁上配置1段以上(本例爲2段) 使助燃性氣體1 〇a朝著爐軸方向偏離方向噴入的上部風口 。此外,符號1 1是突出爐內在爐壁上配置1段以上(本 例爲2段)使助燃性氣體1 1 a或者助燃性氣體1 1 a及燃料 lib朝著爐軸的方向噴入的下部風口。 第1圖的管路6的跟前,即爐體la上部的排氣出口 的附近,例如設置1支以上噴入惰性氣體、生產用氣體或 者蒸氣的至少其中之一所構成的冷媒12用的噴嘴13。 氣化熔爐1的爐體1 a的內部中,產生後的氣體一旦 -18- 1289644 (15) 加熱至l〇〇〇t以上時,以2秒鐘以上保持使戴奧辛類分 解。加熱至l〇〇〇°C以上在爐內產生的產生氣體藉著從設 置在爐體1 a上部的排氣出口附近的冷媒噴入噴嘴1 3所噴 入的冷媒1 2加以冷卻。 流入管路6內部的排氣溫度爲了抑制管路6的堵塞以 低溫側爲佳,但是爲了抑制戴奧辛類的再合成管路6內的 排氣溫度爲800°C、最好是維持著850°C以上。管路6內 維持著800°C以上的氣體利用後段的排氣冷卻裝置(未圖 示)急冷至200 °C以下。藉此,抑制戴奧辛類的再合成, 可顯著抑制來自過程整體之戴奧辛類的排出量。 從噴嘴13噴入爐體1 a內部的冷媒1 2以水、惰性氣 體、生產用氣體或者蒸氣的至少其中之一構成時,雖然可 抑制對於管路6內面的低沸點氣狀物質的附著,但是以使 用水爲佳。使用惰性氣體作爲冷媒1 2時,會發生爐內產 生高熱量氣體的熱量降低。並且,蒸氣與水比較不具蒸發 潛熱,產生後氣體的冷卻原單位高。因此排氣時進入多量 不需要的水,不利於含後處理步驟等的經濟性。因此,以 提高冷卻效率,以可和後段步驟產生的高熱量氣體分離的 水(尤其式霧狀的水)作爲冷媒爲佳。由於水的霧化藉著 氣體將水霧狀化時,以使用生產用氣體而非惰性氣體,抑 制產生氣體熱量的降低爲佳。 又,管路6上堆積固體粉塵時,從可噴入高壓氣體的 1個以上的噴嘴14將氣體15噴入管路6內,將固體粉塵 吹至爐體1 a的內部側及/或後段的氣體冷卻裝置側,清掃 -19- (16) 1289644 管路6的內側。 如上述,根據本實施形態將冷媒噴入管路6跟前側, 可防止管路6的堵塞。 第2圖是模式表示在本實施形態的氣化熔爐1中,以 機械方法除去對於管路6內壁的附著物而構成廢棄物處理 裝置的附著物除去裝置1 6的說明圖。 對管路6內部附著物的堵塞程度可以從管路6的入口 部6a的壓力與出口部6b的壓力間的差壓變化加以預測。 差壓變化是利用差壓測定裝置1 8進行連續性監視。即, 以差壓測定裝置1 8所測定的差壓的絕對値與初期(運轉 開始時)的値比較顯示有增加傾向時,可預測出進行管路 內的堵塞。 本實施形態在以上的場合使用附著霧除去裝置16進 行附著物的除去。首先,使驅動軸19-1前進及後退,隨 後進行驅動軸19-2的前進及後退的動作,可以將附著物 17從管路16的內壁剝離除去。藉著升降裝置20使驅動 軸19-1及19-2沿著管路6延伸出的方向動作。 又,驅動軸19-1及19-2例用水冷方式,冷卻至其前 端附近爲止。藉此,抑制驅動軸19-1及19-2因熱負載導 致的曲損或損傷。驅動軸19-1及19-2設有冷卻水21供 水及排水用的供排水管路(未圖示),也可以對應高溫條 件下的使用.。又,驅動軸19-1及19-2的驅動部分設置地 密方式的漏氣防止裝置22,藉此在驅動軸19-1及19-2的 動作時防止系統內氣體洩漏系統外。 1289644 (17) 使驅動軸19-1及19-2動作的時間以在管路6內壁堵 塞程度小的時候進行爲佳。堵塞程度小時,驅動軸19-1 及19-2不需進行如特開昭2002-1 68433號公報轉動,並 且對於驅動軸19-1及19-2不需施以除去堵塞物用的大負 載,可以短時間除去堵塞物。因此,不會從漏氣防止裝置 22產生氣體洩漏,同時可提高裝置的壽命。例如,與差 壓測定裝置1 8的値從運轉開始2小時爲止的平均値比較 ,以增加20mmH2O以上400mmH20以下的時點進行爲佳 〇 並且,管路6未堵塞,進行一般氣化熔融運轉的期間 ,使驅動軸19-1、19-2後退至袋機位至24爲止,使閥23 形成關閉的狀態,藉此可完全防止爐內氣體的洩漏。關閉 閥23在氣化熔爐1的運轉中可同時進行附著物除去裝置 1 6的維修等。 此外,驅動軸19-1、19-2未運轉時,驅動軸19-1、 19-2至待機位置24待機,關閉設置在待機位置24跟前 的閥23時,可防止氣體的洩漏及空氣的吸入。設置閥23 在驅動軸19-1、19-2不動的一般運轉中,漏氣防止裝置 22幾乎不受管路6內的熱影響,因此可同時增長漏氣防 止裝置22的壽命。並且,驅動軸19-1、19-2的凹陷部分 25與漏氣防止裝置22接觸時同樣進行氣體的密封。 驅動軸19-1、19-2的直徑最大部分的外徑d設定以 管路6的內徑D的50 %以上爲佳。並且驅動軸19-1、19-2目U端的刮除構件1 9 -1 a、1 9 - 2 a的角度α以1 0度以上 -21 - (18) 1289644 150度以下爲佳。 並且,設置升降裝置20等的設備,且爲了除去附著 物1 7雖然應該使用足夠長度的驅動軸1 9 -1、1 9 - 2,但是 驅動軸19-1、19-2的長度過長時建築的高度必須要提高 至必要以上的高度。因此,驅動軸19-1、19-2的長度以 驅動軸19-1、19-2的待機位置至驅動軸19-1、19-2前進 極限爲止長度L的3倍以爲佳。驅動軸19-1、19-2的前 進極限26是如第2圖的驅動軸19-2,以朝著爐內前進時 從氣體排出口 5前進至10mm〜300mm左右下的位置爲佳 。並且,如第2圖的驅動軸19-1朝著與管路交叉的方向 前進時,以相對於交叉之管路的中心軸線前進:t50mm的 位置爲佳。 另外,驅動軸19-1、19-2的前端部設置如第3圖的 光纖觀察鏡27,可一邊監視管路6內的堵塞狀況,並可 使驅動軸19-1、19-2有效地運轉。基本上,雖可藉著管 路6內的差壓推定堵塞狀況,但是附著物1 7極少量的場 合,差壓的測定結果會形成不顯著傾向的可能。在清掃管 路6內時,僅殘留此一些微附著物17時,會有以該等爲 核而使得堵塞物再度成長的可能。因此,可以光纖觀察鏡 27等一邊觀察管路6的內部有效進行作業。可經常藉著 光纖觀察鏡27觀察管路6內時,沒有進行差壓測定的必 要性,但必須將驅動軸19-1、19-2經常性地插入管路6 內,以至有使得驅動軸19-1、19-2受熱性損傷的可能。 並且,光纖觀察鏡27會附著粉塵等不能進行長時間的觀 -22- 1289644 (19) 察。又,閥23必須要呈開啓的狀態,導致密封裝置22壽 命的縮短。前端部分19-la、19_2a的更換或修理可以回 到待機位置2 4,關閉待機位置2 4跟前的閥2 3即使在運 轉中也可以進行。 其次,參閱表示本實施形態使用之廢棄物的氣化熔爐 1的第1圖,說明在該氣化熔爐1的升溫中,將爐內裝入 物的上端面高度迅速升高至運轉時的控制位準爲止以縮短 爐內塡充時間的方法如下。 本實施形態是從氣化熔爐1的升溫開始前的階段,將 氯等鹵素濃度0.1 %以下的炭材32裝入至氣化熔爐1內的 預定高度。其中,預定的高度是表示廢棄物裝入口 4或者 裝入裝置28,及與下部風口 1 1之間的高度。 升溫是形成,例如從配置雙重閘閥29的裝入裝置26 裝入爐內,在預先堆積的炭材32的上端面投入火種後關 閉閥29 a及/或閥29b的狀態,從中心塊9送入助燃性氣 體9a使預先裝入的炭材32燃燒的即爲簡單的順序開始。 炭材32的燃燒狀況可以經常從設置在爐體la上部的爐內 監視窗30進行。 並且,也可以從下部風口 1 1送入助燃性氣體1 1 a, 也可以在下部風口 1 1附近燃燒炭材32。而在下部風口 1 1 前面燃燒的確認可以目視確認。逐一測定炭材32的塡充 層的上端面位準,調整供給爐內炭材32的量維持著以上 端面位準爲目標的位準。 如上述,可以在爐的升溫階段使爐內裝入物上端面的 -23- (20) 1289644 高度上升至運轉時的控制位準爲止,可藉此縮短爐內塡充 時間。 其次,針對本實施形態中降低未利用碳的手段說明如 下。 第1圖表示的氣化熔爐1中,從管路6飛散至爐外的 粉塵同時含有未利用碳。而降低未利用碳的方法,本實施 形態中以蒸氣噴入爐內。 從設置在第1圖表示的氣化熔爐1內的廢棄物上端面 與氣體排出口 5之間的噴嘴33、爐中心塊9或者上部風 口 1 〇的任意其中至少之一噴入蒸氣,藉水性移位反應( c + h2o = co + h2)將未利用的碳轉換爲CO氣體。 其中,蒸氣34的噴入量可容易利用流量計控制,因 此可以正確供給該水性移位反應必要量的水蒸氣。並且, 藉著噴入的蒸氣34可有效地將未利用碳轉換爲CO氣體 ,因此蒸氣34是以廣角噴入爲佳。可藉此將蒸氣34均勻 噴入爐體1 a的周圍方向,有效地進行上述的水性移位反 應。 即使廢棄物中的碳仍未完全氣化而未利用碳爲除塵設 備以粉麈所回收時,可以再次投入氣化熔爐1內。此時’ 粉塵的粒徑在極小的1 mm以下雖然有在爐內飛散之虞’ 但是本例中,藉著第1圖表示的推桿7與廢棄物3可同時 混合壓實含未利用碳的粉麈後裝入,可抑制爐內粉麈的飛 散。 其次,第1圖表示的氣化熔爐1中,針對以熱分解殘 -24- (21) 1289644 渣碳少的廢棄物爲對象時,投入炭材8及/或炭材36,可 容易進行塡充層高度的控制,即廢棄物上端面位置的控制 說明如下。 如上述,第1圖表示的氣化熔爐1設有安裝推桿7的 廢棄物裝入口 4,炭材8是與廢棄物3同時混合壓實裝入 爐內。可藉此抑制粒徑細的炭材8在爐內的飛散。 又,裝入預先選取粒徑5mm以上的炭材36時,使用 裝入雙重閘閥29爲佳。此時,可以只將炭材36從具有雙 重閘閥29的獨立裝入裝置28投入。具備雙重閘閥29的 裝入裝置28藉著上部閘閥29 a的開啓,使炭材36在上部 閘閥29a與下部閘閥29b之間自由落下,隨後關閉上部閘 閥29a,開啓下部閘閥29b將炭材36裝入爐內。 根據此一裝入手段,經常在上部閘閥29a或下部閘閥 29b的其中之一關閉的狀態下動作,因此可防止大量的爐 內氣體通過該裝入裝置28漏出至爐外,或將爐外的空氣 大量吸入爐內。、/1289644 (1) Technical Field of the Invention The present invention relates to at least combustion, gasification or melting of general waste or industrial waste (hereinafter, collectively referred to as "waste" in the specification of the present invention). One of the treatment methods and treatment devices for waste disposal. In particular, in the present invention, the organic matter contained in the waste gas is recovered and recovered as a fuel (hereinafter, simply referred to as "energy gas"), and the low-boiling metal contained in the waste is recovered as dust. The amount of ash contained in the waste, that is, the valuable metal (hereinafter simply referred to as "metal") is recovered as the slag and the molten metal, and the waste treatment method and treatment device for the treatment can be stably realized on a commercial scale for a long period of time. . In addition, in the present invention, the waste is represented by, for example, municipal waste represented by kitchen waste, plastic scraps or iron filings, and pulverized dust, ash, and sand dumped waste of discarded automobile or home appliance products. , sludge, sludge, iron dust, medical waste and waste wood. [Prior Art] Some wastes such as general waste such as domestic garbage and industrial waste have been incinerated in the past. However, when these wastes are incinerated, the treatment temperature is about 200 to 600 ° C, especially about 300 ° C. Moreover, the final disposal location of the ash is difficult to ensure, and from the point of view of efficient use of resources, it needs to be effectively recycled. Therefore, it is not possible to fully cope with the treatment of waste generated by incineration in the past. - 5,896, 546. (2) In view of the above problems, the inventors of the present invention have proposed to use a combustion-promoting property toward the lower side along the furnace axis by International Publication No. WO00/45090. The gas is injected into the center of the liftable furnace in the furnace, and the upper air outlet, the combustion-supporting gas, the combustion-supporting gas, and the fuel, which are disposed at an angle from the furnace axis, are separated from the arrangement of the combustion-supporting gas, and the fuel is sprayed toward the furnace shaft. The invention relates to a gasification furnace and a gasification melting method which can prevent the generation of a low temperature region inside the gasification furnace body by the lower tuyere of the one or more stages arranged in the furnace, and can collectively carry out the combustion treatment of the waste. . According to the invention, it is possible to stably recover the furnace slag having a high additional price and various metals and energy gases. [Invention] The inventors of the present invention have the gasification furnace proposed in the International Publication No. WO 00/45090 (hereinafter, referred to as "basic" In the gasification furnace, the basic gasification furnace has the following problems (a) to (g) in order to solve these problems (a) ~ ( g), providing a treatment method and a treatment device that can make the basic gasification furnace more high-performance and can be applied to refractory waste. (Clogged clogging) In recent years, many processing furnaces that use waste, burn, vaporize, or melt waste. However, these treatment furnaces may adhere to the inner wall of the pipeline which flows with the exhaust gas due to the type of waste, and may accumulate dust after the pipeline is blocked. For example, when the waste contains a large amount of low-boiling substances, the evaporation in the furnace causes a part of the evaporation to adhere to the inner wall surface of the pipe, and then grows to block the pipe. In the above case, there is a possibility that the operation of the treatment furnace has to be stopped, and there is a possibility that the operation cannot be stabilized for a long period of time. In order to suppress the discharge of the dioxin in the basic gasification furnace, the gas temperature in the upper part of the furnace body is 1000 ° C or more and 140 (TC or less, the gas is discharged from the gas discharge port, and the cooling device of the exhaust gas in the subsequent stage is quenched to 200 °. C or less. Especially in the case of completely suppressing the generation of dioxin, it is preferable to be higher than the temperature of the upper part of the furnace. However, since the temperature of the gas in the furnace is high, a low-boiling substance containing waste is evaporated in the furnace. The adhesion of the inner surface of the pipe to the inner surface of the pipe may cause clogging of the pipe. As a technique for preventing clogging of the relevant pipe, a refrigerant such as water or spray is sprayed toward the inside of the pipe to cool and solidify the exhaust gas. The low-boiling-point gas-like substance and the invention for preventing the adhesion of the pipe (Japanese Patent Laid-Open Publication No. 2001-33027, the same as JP-A-2002-349841, JP-A-7-197046 The invention discloses a method of scraping off a pipe attachment (JP-A-2002-168433). However, these inventions have the following problems: that is, when the refrigerant is injected into the inside of the pipe, Because the type of waste or the injection position of the refrigerant does not provide sufficient clogging suppression effect. For example, even if the refrigerant is injected into the inside of the pipeline, the exhaust gas temperature will remain high near the inlet of the pipeline. Low-boiling gaseous substances will adhere to the vicinity of the inlet of the pipeline, and finally there will be a flaw that will block the pipeline. And 'When the spray is sprayed into the inside of the pipeline', the inner diameter of the pipeline is not set as appropriate 1289644 (4) When the spread angle of the spray is sprayed, the refrigerant such as spray may collide with the inner wall of the pipe or adhere to form unvaporized water, which may cause difficulty in controlling the gas cooling device disposed downstream of the gasification furnace. When the low-boiling-point gas substance adheres to the inner wall of the pipe and blocks the pipe, it is most effective to use a mechanical removal means. For example, JP-A-2002-168433 discloses that the inside of the inserted pipe is provided. a pipe cleaning device that scrapes off a drive shaft of the vane and a drive means that rotates the drive shaft and reciprocates in the axial direction. At this time, the drive shaft rotates while rotating The reciprocating motion is carried out, so that the gas generated in the furnace leaks from the gas seal portion or causes a blow in the suction line of the outside air. In particular, there is a danger that CO gas leaks to the outside in the furnace of the CO gas generated by the operation. Moreover, when CO gas is used as an energy source, the intake of outside air is related to the reduction of the heat of the obtained gas. Further, in addition to the central axis of the drive shaft, there is air flow for cooling the drive shaft, but the inside of the pipe is formed. In the case of high temperature, the outer surface of the drive shaft may be thermally damaged. Especially when the inside of the pipeline is obviously blocked, the load on the drive shaft has to be increased, so that the time required for the plug to be removed is prolonged and the heat is increased. Damage, so that the damage of the device or the leakage of gas is more significant. (b) When the filling time of the furnace is used to treat the waste by the basic gasification furnace, the height of the upper end surface of the waste discharged into the furnace is controlled to a predetermined level. It is an important factor in the stabilization of operations. The rise of the gasification furnace is to start the waste charging after the temperature in the furnace reaches the pre--8 - 1289644 (5) constant temperature by the burner. Then the waste is slowly accumulated and the height of the upper end surface of the waste is adjusted. To the target level. However, it takes a considerable amount of time to raise the height of the upper end face of the waste to a predetermined level. In addition, in the middle of the temperature rise, the combustion temperature in the furnace is inevitably passed through a temperature range of 200 to 600 ° C which is likely to generate dioxin, so that the halogen-containing waste such as chlorine is a constituent element of the dioxin-like component. It is loaded from the stage of the temperature rise of the furnace, and when it is stacked, the dioxin is generated when the gasification furnace rises. (c) Exhaust of carbon is not used. The operation of the basic gasification furnace is such that a part of the carbon contained in the waste is scattered through the pipeline in an unused state, and is then recovered by dust using a dust removing device. In order to reduce unused carbon, an aqueous shift reaction (C + H20 = C0 + H2) can be used to convert unused carbon to CO gas. H2o is required to carry out the aqueous shift reaction. Among them, the moisture contained in the waste containing most of the waste is consumed in the gasification reaction of the carbon of the thermal decomposition residue at a position lower than the upper end surface of the waste. Therefore, the amount of carbon of the thermal decomposition residue burned before the lower tuyere is reduced, and the combustion temperature before the lower lower tuyere is maintained is difficult, and the amount of ash contained in the waste and the melting of the metal, and slag or melting are not stably performed. The discharge of metal. In addition, when a large amount of water is contained in the waste, a large instantaneous gas change occurs after the waste is introduced, and the operation cannot be stably performed, and the heat generation of the gas is lowered due to evaporation of water. Therefore, it is not ideal to contain a large amount of moisture in the waste. Japanese Laid-Open Patent Publication No. Hei 8-152118 discloses a combustion temperature by using a melting temperature of ash amount as an upper tuyere level by supplying steam from an upper tuyere provided in the 1289644 (6) waste charging layer. The generation of the thermal decomposition residue of the upper tuyere level or the semi-melt of the combustion of the combustible gas is suppressed, so that the invention in which the semi-molten adheres to the inner wall of the furnace can be suppressed. In other words, the steam injected from the upper tuyere provided in the sump can suppress the combustion temperature set at the height of the upper vent to a low temperature, and suppress the generation of the semi-melt at the level. Further, as the vapor is injected into the entangled layer, the aqueous shift reaction is carried out, and the progress of carbon gasification can be obtained. However, when steam is injected into the charging layer of the waste gas for carbonization, the reaction between the carbon contained in the thermally decomposed residue and the vapor is consumed. Therefore, it is difficult to reduce the amount of carbon to be supplied from the lower seal to the combustion of the combustion-supporting gas, and to maintain the combustion temperature before the high lower tuyere. Therefore, there is a possibility that the amount of ash contained in the waste and the melting of the metal, and the discharge of the slag or the molten metal are not stably performed. (d) The control of the upper end position of the waste is basically controlled. The organic matter in the product is gasified and recovered as an energy gas, and the vertical furnace in which the amount of ash in the waste and the metal are recovered as a melt. Each of the gasification furnaces includes: a gas discharge port disposed at an upper portion of the furnace body; a slag and a molten metal discharge port disposed at a lower portion of the furnace body; and a waste disposed between the slag and the molten metal discharge port and the gas discharge port The upper part of the furnace body is arranged along the axial direction of the furnace to spray the combustion-supporting gas into the furnace center block which can be freely raised and lowered; the furnace wall between the waste charging inlet and the gas discharge port is set to be sprayed into the combustion-supporting property. -10- 1289644 for gas (7) Upper tuyere; and the wall between the waste inlet and the slag and molten metal discharge outlet is set to be more than one stage toward the furnace, and the combustion-supporting gas or combustion-supporting gas and fuel are directed toward The lower tuyere sprayed in the direction of the furnace shaft. Moreover, the gasification furnace can melt the amount of carbon in the residue of the thermal decomposition of the waste after being heated at a high temperature by the upper end surface of the waste placed in the furnace, so that the amount of ash or metal in the residue can be melted without using expensive coke. . However, the composition of the waste is not necessarily a large number of inhomogeneities, and there is a possibility that almost no carbon is present in the thermal decomposition residue. For example, carbonaceous materials such as plastic chips and chopper dust are almost vaporized by thermal decomposition reaction, so that the thermal decomposition residue has a very small carbon content. Therefore, when maintaining the position of the upper end surface of the waste in the furnace, it is necessary to frequently perform the adjustment operation of injecting the amount of the combustion-supporting gas from the lower tuyere and the furnace center block, and it is necessary to have skilled operation. (e) Regeneration of halogen-based raw materials In addition to the source of dioxin, the halogens such as chlorine or bromine contained in the waste are highly expensive, and it is expected that the raw materials can be efficiently regenerated. However, an effective treatment method and a regeneration method for waste having a high chlorine content rate have not been established. At present, halogen-containing wastes such as chlorine are incinerated in an incinerator, but because of the low combustion temperature, it is necessary to have a high gas treatment technology for suppressing the discharge of dioxin. The basic gasification furnace is to vaporize and melt the waste at a high temperature by the injection of high-concentration oxygen, and the high-temperature gas generated by the gas cooling device is quenched, so that the dioxin is hardly discharged, and a large amount of halogen-containing can be treated harmlessly. Waste. The chlorine contained in the waste forms a hydrogen chloride gas such as hydrogen chloride gas in the furnace, and the halogenated hydrogen gas is placed in a dust removal device in the latter stage of the gas cooling device to be sprayed with an auxiliary agent such as slaked lime, and is separated and removed from the generated gas. In this case, in order to suppress the re-synthesis of dioxin and the corrosion of halogen, the outlet temperature of the gas cooling device is set to be 120 ° C or more and 2 ° C or less, and the temperature inside the dust removing device is set to 100 ° C or more. However, in the case of waste containing a large amount of halogens, in order to efficiently recover chlorine or bromine halogen, it is difficult to regenerate the halogen by fixing the halogen with calcium chloride in the gasification furnace. Moreover, the hydrogen halide gas generated forms a high concentration and is liable to cause corrosion of equipment. In addition, Japanese Laid-Open Patent Publication No. 2001-162248 discloses that a waste plastic containing vinyl chloride is thermally decomposed at 250 to 500 ° C, and a chlorine-containing exhaust gas is burned by a combustion device, and a combustion gas is used as a heat source to generate steam in the boiler. The combustion gas after the generation of the vapor is supplied to the cooling device for cooling, and the chlorine recovery device is used to recover the hydrogen chloride in the cooled gas. The exhaust gas temperature before the cooling device is maintained at 200 ° C or higher in order to suppress the corrosion caused by hydrogen chloride. However, temperatures above 200 °C will result in the re-synthesis of dioxin. In addition, when halogen-containing plastic waste is thermally decomposed and vaporized at a low temperature of 500 ° C or lower, tar is generated, which may cause blockage of the piping. Further, JP-A-2000-202419 discloses a method of treating a waste containing a halogen-containing flame-resistant material by removing hydrogen chloride generated by a gas water washing apparatus, but does not describe a detailed temperature piping condition for recalling equipment corrosion. Wait, for an unknown state. (f) Hazardous waste device-12- (9) 1289644 According to the basic gasification furnace, in addition to medical waste and contaminated soil, it can be used for the harmless treatment of hazardous waste such as polychlorinated biphenyl (PCB). . The harmful waste falls into the furnace after being placed in the furnace and reaches the upper end surface of the waste charging layer, but the waste contained in the furnace reaches a low boiling point before reaching the upper end surface of the charging layer. When the harmful components are vaporized, the harmful components that have been vaporized will be discharged from the gas discharge port before they are completely decomposed. (g) Internal Pressure Rise of the Melting Chamber In International Publication No. W000/45090, it is disclosed that the basic gasification furnace is expected to have a space in which it can be stored once before discharging the frit and molten metal. Melting chamber. The provision of the melt chamber allows the furnace to form a dry treatment tank in the furnace bottom without accumulating frit or molten metal, thereby stabilizing the operation of the furnace. However, in order to perform maintenance of the equipment or the like, the gasification furnace may be temporarily retained in a state where the residue or slag of the waste remains in the furnace. In the subsequent ascending operation, there is a possibility that the waste inside the residual gasification furnace or the cooling slag blocks the contact portion between the furnace and the melting chamber, and the gas generated inside the molten chamber may not easily flow in the furnace body. The problem is that the pressure in the molten chamber rises and the gas is exposed from the slag and the molten metal discharge port. SUMMARY OF THE INVENTION -13- (10) 1289644 The present invention provides the following solutions to the problems (a) to (g) of the above basic gasification furnace. (1) Solution to the problem (a) The present invention cools the high-temperature exhaust gas generated in the furnace, for example, in a furnace before the furnace body of the waste gas treatment furnace such as the basic gasification furnace flows into the pipeline. Specifically, for example, a refrigerant composed of at least one of water, an inert gas, a production gas, or a vapor is injected in the vicinity of the furnace outlet (in the furnace near the inlet of the pipeline), and the exhaust gas is exhausted near the inlet of the pipeline. Cooling in the furnace. Thereby, the surface temperature of the low-boiling gas-like substance in the exhaust gas near the inlet of the pipe is surely lowered to the temperature at which the inner wall of the pipe is not attached. It is preferable that the temperature of the exhaust gas flowing into the pipeline is blocked by the exhaust pipe, and the temperature is low. However, in order to suppress the re-synthesis of the dioxin, the exhaust temperature inside the pipeline is maintained at 80 (TC or more is preferable, preferably It is 850 ° C or higher, and when the refrigerant is sprayed into the vicinity of the furnace outlet, the temperature of the inlet of the gas cooling device provided in the vicinity of the rear portion can be lowered, so that the amount of the spray used in the gas cooling device can be reduced, and the burden can be reduced. Further, the present invention proposes a treatment device for a waste plugging device which can mechanically remove a plug in a short time when a pipe is clogged with a low-boiling gas substance adhered to an inner wall. First, since the mechanical removal operation of the clogging is performed for a short period of time, the operation of the clogging device can be effectively performed at a stage where the degree of clogging of the pipe is small. Therefore, the present invention can monitor the pipeline at the inlet and outlet of the pipeline - 14- 1289644 (11) The differential pressure gauge on the inlet side and the discharge side differential pressure is judged as being inclined when the differential pressure display has a tendency to rise from the operation start time. The clogging is started to operate the clogging device. Alternatively, the clogging device may be periodically operated regardless of the clogging of the pipe. (2) The solution to the problem (b) is to load as early as possible. The height of the upper end surface of the charge in the basic gasification furnace is increased to the control level at the time of operation, and the carbon material can be efficiently installed from the temperature rising stage of the furnace, and in order to improve the level of the upper end surface of the load. When the total concentration of the halogens contained in the carbon material is less than or equal to 1%, the temperature can be raised without causing the dioxin. In accordance with the present invention, the burner is burned while the temperature of the basic gasification furnace is being raised. It is possible to increase the height of the upper end of the load to a predetermined level and to shorten the charging time in the furnace. (3) Solution to the problem (c) The present invention proposes The vapor is sprayed from the enthalpy layer into the upper portion to reduce the unused carbon, whereby the vapor is vaporized only by contact with the unused carbon in the upper portion of the furnace. The injected vapor does not disintegrate with the thermal decomposition in the enthalpy layer. The slag is in contact with the carbon, so that the ash component and the metal contained in the waste can be stably melted, and the slag and/or the molten metal can be stably discharged. Even if the carbon in the waste cannot be completely vaporized, it is used as the unused carbon. When the dust removal equipment recovers the whitefly, it only needs to be put into the gasification furnace again. At this time, the particle size of the dust is less than 1 mm, so when it is put into the -15- (12) 1289644, there will be a furnace. In the meantime, it is possible to prevent the dust from scattering by mixing and compacting the powder containing unused carbon and the waste at the time of input. (4) The present invention is solved with respect to the problem (d) In the case of wastes having a small amount of carbon which is thermally decomposed, the carbon material can be easily controlled to control the position of the upper end surface of the smelting layer. Even in a basic gasification furnace, the carbon material can be mixed and then compacted. A piece is placed in the furnace. At this time, even if a carbon material having a fine particle diameter is used, there is no fear that the air permeability is poor. Further, in the basic gasification furnace, since the center portion of the fire point concentration furnace does not deteriorate the liquid conductivity of the melt, the molten slag cannot be stably discharged. Therefore, the carbon material is not limited to expensive coke at all, and a carbon material containing carbon which thermally decomposes residual carbon such as wood can also be used. Further, in the case of charging a carbon material having a large particle diameter after the pre-screening, it is preferable to use a charging device having two valves having a waste charging path for charging the waste into the furnace. When the external side valve is opened, the loading device supplies the space between the external side valve and the internal side valve while closing the internal side valve, and closes the external side valve and opens the internal side valve to open the carbon material. Loaded into the furnace. One of the valves on the outer side of the charging device or the inner side valve is constantly maintained in a closed state, so that a large amount of gas in the furnace can be prevented from leaking out of the furnace through the charging device, or a large amount of air outside the furnace can be sucked into the furnace. Further, in order to solve the problem (d), the carbon material to be charged is heated under the temperature conditions in the furnace so that the dioxin can be completely thermally decomposed. Therefore, there is no problem even if the halogen concentration in the carbon material is high. . -16- (13) 1289644 (5) Solution to Problem (e) The present invention is an exhaust gas guided by a pipe connecting a gas discharge port of a basic gasification furnace body, (i) The hydrogen halide gas contained in the exhaust gas after the dust removal is recovered as an acid by an acid recovery device, and the recovered acid is converted into a halogen, and/or (ii) cooled to 1 Torr (after cooling in TC or lower) The hydrogen halide gas contained therein is condensed, and the hydrogen halide contained in the exhaust gas is recovered as an acid, and the recovered acid is converted into a halogen. Thereby, the discharge of the dioxin or the corrosion of the equipment can be suppressed, and the waste can be carried out. Recycling of halogen-containing raw materials. (6) Resolving harmful wastes such as medical waste, contaminated soil, or polychlorinated biphenyls into basic gasification furnaces The sealed container can be efficiently inserted into the sealed container from the loading device having the two valve bodies arranged in parallel in the waste charging passage, thereby causing the generated harmful gas to pass through the furnace under a sufficiently high temperature condition. Residence time, complete decomposition (7) Resolving the problem with the problem (g), when the furnace is stopped, it is caused to cause clogging of the connection portion between the furnace and the melting chamber due to waste or cooling slag in the residual furnace. When the pressure in the refining chamber rises, the piping for discharging the gas generated in the refining chamber can be effectively provided. -17· (14) 1289644 [Embodiment] The present invention will be described in detail with reference to the accompanying drawings. The embodiment of the treatment method and the treatment apparatus relating to the waste is as follows. The first embodiment is a schematic diagram for the detailed description of the gasification furnace of the waste used in the embodiment. The same as the furnace of the gasification furnace 1 of the benzene embodiment is shown. The bed 1a is lined with the lining refractory 2, and the furnace body 1a has a waste charging port 4 for discharging the waste 3 and generating energy gas (hereinafter, simply referred to as "exhaust gas") and discharged. a gas discharge port for powder meal, and a pipe 6 through which the gas discharge port 5 communicates with the inner space of the furnace body la. The waste inlet 4 is provided with a push rod 7, and the charged carbon material 8 and the waste 3 are simultaneously pressed. Real state from waste The waste material inlet 4 is installed. The reference numeral 9 in Fig. 1 is such that the combustion-supporting gas 9a is sprayed downward into the furnace along the furnace shaft (the furnace center axis) to form a center block which can be lifted and lowered. The symbol 10 is in the furnace. One or more stages (two stages in this example) are disposed on the furnace wall of the body la, and the upper tuyere in which the combustion-supporting gas 1 〇a is sprayed in the direction away from the furnace axis direction is provided. Further, the symbol 1 1 is disposed on the furnace wall in the protruding furnace. One stage or more (in this example, two stages) is a lower tuyere in which the combustion-supporting gas 11 a or the combustion-supporting gas 1 1 a and the fuel lib are injected in the direction of the furnace shaft. In the vicinity of the exhaust gas outlet of the upper portion of the furnace body la, for example, one or more nozzles 13 for the refrigerant 12 which are formed by injecting at least one of an inert gas, a production gas or a vapor are provided. In the inside of the furnace body 1a of the gasification furnace 1, when the generated gas is heated to l〇〇〇t or more, -18-1289644 (15) is maintained for 2 seconds or longer to decompose the dioxin. The generated gas generated in the furnace heated to l 〇〇〇 ° C or higher is cooled by the refrigerant 1 2 injected from the refrigerant injection nozzle 13 provided in the vicinity of the exhaust outlet provided in the upper portion of the furnace body 1 a. The temperature of the exhaust gas flowing into the inside of the line 6 is preferably a low temperature side in order to suppress the clogging of the line 6, but the temperature of the exhaust gas in the resynthesis line 6 of the dioxin-like line is 800 ° C, preferably 850 °. Above C. The gas in the line 6 is maintained at 800 °C or higher, and the exhaust gas cooling device (not shown) in the rear stage is quenched to 200 °C or lower. Thereby, the re-synthesis of the dioxin is suppressed, and the discharge amount of the dioxin from the whole process can be remarkably suppressed. When the refrigerant 12 injected into the inside of the furnace body 1a from the nozzle 13 is composed of at least one of water, an inert gas, a production gas or a vapor, adhesion to a low-boiling gas substance on the inner surface of the pipe 6 can be suppressed. However, it is better to use water. When an inert gas is used as the refrigerant 12, the heat generation of the high-calorie gas in the furnace is lowered. Moreover, steam does not have latent heat of vaporization compared with water, and the original unit of cooling of the produced gas is high. Therefore, a large amount of unneeded water is introduced during the exhaust, which is disadvantageous for the economics including the post-treatment steps and the like. Therefore, in order to increase the cooling efficiency, it is preferred to use water (especially water-like water) which can be separated from the high-calorie gas generated in the subsequent step as the refrigerant. Since the atomization of water is atomized by a gas, it is preferable to use a production gas instead of an inert gas to suppress a decrease in heat generation gas. Further, when solid dust is deposited on the pipe 6, the gas 15 is injected into the pipe 6 from one or more nozzles 14 into which the high-pressure gas can be injected, and the solid dust is blown to the inside and/or the rear of the furnace body 1a. On the side of the gas cooling unit, clean the inside of the line -19- (16) 1289644. As described above, according to the present embodiment, the refrigerant is injected into the front side of the line 6, and clogging of the line 6 can be prevented. Fig. 2 is an explanatory view showing a deposit removing device 16 which constitutes a waste disposal device by mechanically removing the deposit on the inner wall of the pipe 6 in the gasification furnace 1 of the present embodiment. The degree of clogging of the deposits inside the pipe 6 can be predicted from the difference in pressure between the pressure of the inlet portion 6a of the pipe 6 and the pressure of the outlet portion 6b. The differential pressure change is performed by the differential pressure measuring device 18 for continuity monitoring. In other words, when the absolute enthalpy of the differential pressure measured by the differential pressure measuring device 18 is compared with the enthalpy at the initial stage (at the start of the operation), it is predicted that the clogging in the conduit is performed. In the present embodiment, in the above case, the attached mist removing device 16 is used to remove the attached matter. First, the drive shaft 19-1 is advanced and retracted, and then the forward and backward movement of the drive shaft 19-2 is performed, whereby the deposit 17 can be peeled off from the inner wall of the pipe 16. The drive shafts 19-1 and 19-2 are moved in the direction in which the line 6 extends by the lifting device 20. Further, the drive shafts 19-1 and 19-2 are cooled to the vicinity of the front end by water cooling. Thereby, the loss or damage of the drive shafts 19-1 and 19-2 due to the heat load is suppressed. The drive shafts 19-1 and 19-2 are provided with water supply and drainage pipes (not shown) for supplying water and water to the cooling water 21, and can also be used under high temperature conditions. Further, the drive portions of the drive shafts 19-1 and 19-2 are provided with the air leakage preventing means 22 in a dense manner, thereby preventing the gas in the system from leaking out of the system during the operation of the drive shafts 19-1 and 19-2. 1289644 (17) It is preferable to operate the drive shafts 19-1 and 19-2 at a time when the inner wall of the pipe 6 is blocked to a small extent. When the degree of clogging is small, the drive shafts 19-1 and 19-2 do not need to be rotated as disclosed in Japanese Laid-Open Patent Publication No. 2002-1 68433, and a large load for removing the clogging is not required for the drive shafts 19-1 and 19-2. , the plug can be removed in a short time. Therefore, gas leakage is not generated from the air leakage preventing device 22, and the life of the device can be improved. For example, it is preferable to increase the average enthalpy of the enthalpy of the differential pressure measuring device 18 from the start of the operation for 2 hours, and increase the time from 20 mmH2O to 400 mmH20, and the pipe 6 is not clogged, and the general gasification and melting operation is performed. The drive shafts 19-1, 19-2 are retracted to the bag position to 24, and the valve 23 is closed, whereby the leakage of the gas in the furnace can be completely prevented. The shut-off valve 23 can simultaneously perform maintenance of the deposit removing device 16 and the like during the operation of the gasification furnace 1. Further, when the drive shafts 19-1, 19-2 are not operating, the drive shafts 19-1, 19-2 are in standby to the standby position 24, and when the valve 23 provided at the standby position 24 is closed, gas leakage and air are prevented. Inhalation. The valve 23 is provided in the normal operation in which the drive shafts 19-1, 19-2 are not moved, and the air leakage preventing means 22 is hardly affected by the heat in the pipe 6, so that the life of the air leakage preventing means 22 can be increased at the same time. Further, when the recessed portion 25 of the drive shafts 19-1, 19-2 comes into contact with the air leakage preventing means 22, the gas is sealed as well. The outer diameter d of the largest diameter portion of the drive shafts 19-1, 19-2 is preferably set to 50% or more of the inner diameter D of the pipe 6. Further, the angle α of the scraping members 1 9 -1 a and 1 9 - 2 a at the U end of the drive shafts 19-1 and 19-2 is preferably 10 degrees or more - 21 - (18) 1289644 150 degrees or less. Further, a device such as the elevating device 20 is provided, and in order to remove the attached matter 17, the drive shafts 1 9 -1, 1 9 - 2 of sufficient length should be used, but the lengths of the drive shafts 19-1, 19-2 are too long. The height of the building must be raised to a height above necessary. Therefore, the lengths of the drive shafts 19-1, 19-2 are preferably three times the length L of the drive shafts 19-1, 19-2 from the standby position to the drive shafts 19-1, 19-2. The advancement limit 26 of the drive shafts 19-1, 19-2 is a drive shaft 19-2 as shown in Fig. 2, and it is preferable to advance from the gas discharge port 5 to a position of about 10 mm to 300 mm when advancing toward the inside of the furnace. Further, when the drive shaft 19-1 of Fig. 2 advances in the direction intersecting the pipe line, it is preferable to advance with respect to the center axis of the intersecting pipe: a position of t50 mm. Further, the front end portions of the drive shafts 19-1 and 19-2 are provided with the optical fiber observation mirror 27 of Fig. 3, and the clogging condition in the pipe 6 can be monitored while the drive shafts 19-1, 19-2 can be effectively Running. Basically, the clogging condition can be estimated by the differential pressure in the pipe 6, but the amount of the attached matter 7 is extremely small, and the measurement result of the differential pressure may not be noticeable. When the micro-adhesions 17 remain in the cleaning pipe 6, there is a possibility that the plugs are re-growth with these as the core. Therefore, it is possible to efficiently perform the work while observing the inside of the pipe 6 by the optical fiber observation mirror 27 or the like. When the inside of the pipe 6 is often observed by the optical fiber observation mirror 27, the necessity of differential pressure measurement is not required, but the drive shafts 19-1, 19-2 must be regularly inserted into the pipe 6, so that the drive shaft is made 19-1, 19-2 may be damaged by heat. Further, the optical fiber observation mirror 27 adheres to dust and the like and cannot be observed for a long time. -22-1289644 (19). Also, the valve 23 must be in an open state, resulting in a shortened life of the sealing device 22. The replacement or repair of the front end portions 19-la, 19_2a can be returned to the standby position 24, and the standby position 2 4 is closed, and the valve 2 3 can be performed even during operation. Next, referring to the first diagram of the gasification furnace 1 showing the waste used in the present embodiment, the control of the height of the upper end surface of the furnace charge during the temperature rise of the gasification furnace 1 is rapidly increased to the control during operation. The method of shortening the charging time in the furnace as follows is as follows. In the present embodiment, the carbon material 32 having a halogen concentration of 0.1% or less such as chlorine is charged to a predetermined height in the gasification furnace 1 from the stage before the temperature rise of the gasification furnace 1 is started. Here, the predetermined height is the height between the waste loading port 4 or the loading device 28 and the lower tuyere 11 . The temperature rise is formed, for example, from the loading device 26 in which the double gate valve 29 is disposed, into the furnace, and the state in which the valve 29a and/or the valve 29b are closed after the fire is applied to the upper end surface of the previously deposited carbon material 32, and is sent from the center block 9 The entry of the combustion-supporting gas 9a to start the combustion of the previously charged carbon material 32 is a simple sequence. The combustion condition of the carbon material 32 can often be carried out from the furnace monitoring window 30 provided at the upper portion of the furnace body la. Further, the combustion-supporting gas 1 1 a may be supplied from the lower tuyere 1 1 or the carbon material 32 may be burned in the vicinity of the lower tuyere 1 1 . The confirmation of burning in front of the lower tuyere 1 1 can be confirmed visually. The upper end surface level of the enthalpy layer of the carbon material 32 was measured one by one, and the amount of the carbon material 32 supplied to the furnace was adjusted to maintain the level of the above end surface level. As described above, the -23-(20) 1289644 height of the upper end surface of the furnace can be raised to the control level during operation in the heating stage of the furnace, thereby shortening the furnace charging time. Next, the means for reducing the unused carbon in the present embodiment will be described below. In the gasification furnace 1 shown in Fig. 1, the dust scattered from the pipe 6 to the outside of the furnace contains unused carbon. In the present embodiment, steam is injected into the furnace to reduce the amount of unused carbon. At least one of the nozzle 33, the furnace center block 9 or the upper tuyere 1 〇 between the upper end surface of the waste and the gas discharge port 5 provided in the gasification furnace 1 shown in Fig. 1 is sprayed with steam. The shift reaction (c + h2o = co + h2) converts unused carbon to CO gas. Among them, the amount of the vapor 34 to be injected can be easily controlled by the flow meter, so that the amount of water vapor necessary for the aqueous shift reaction can be correctly supplied. Further, since the injected steam 34 can effectively convert the unused carbon into CO gas, it is preferable that the vapor 34 is sprayed at a wide angle. Thereby, the vapor 34 can be uniformly sprayed into the peripheral direction of the furnace body 1a, and the above-described aqueous displacement reaction can be efficiently performed. Even if the carbon in the waste is not completely vaporized and the carbon is not recovered by the dust removing device, it can be put into the gasification furnace 1 again. At this time, the particle size of the dust is as small as 1 mm or less, although it is scattered in the furnace. However, in this example, the push rod 7 and the waste 3 shown in Fig. 1 can be mixed and compacted with unused carbon. After the powder is loaded, it can suppress the scattering of the powder in the furnace. In the gasification furnace 1 shown in Fig. 1, when the waste material having a small amount of carbon is thermally decomposed, the carbonaceous material 8 and/or the carbon material 36 are introduced, and the gas can be easily produced. The control of the filling level, that is, the control of the upper end position of the waste, is explained below. As described above, the gasification furnace 1 shown in Fig. 1 is provided with a waste charging inlet 4 to which the pusher 7 is attached, and the carbon material 8 is mixed and compacted in the furnace together with the waste 3. This can suppress scattering of the carbon material 8 having a fine particle diameter in the furnace. Further, when the carbon material 36 having a particle diameter of 5 mm or more is previously selected, it is preferable to use the double gate valve 29. At this time, only the carbon material 36 can be put in from the independent loading device 28 having the double gate valve 29. The loading device 28 having the double gate valve 29 freely drops the carbon material 36 between the upper gate valve 29a and the lower gate valve 29b by opening the upper gate valve 29a, then closes the upper gate valve 29a, and opens the lower gate valve 29b to load the carbon material 36. Into the furnace. According to this loading means, it is often operated in a state where one of the upper gate valve 29a or the lower gate valve 29b is closed, so that a large amount of furnace gas can be prevented from leaking out of the furnace through the loading device 28, or outside the furnace. A large amount of air is drawn into the furnace. , /

V 如上述,將炭材8及/或炭材36投入爐內,即使熱分 解殘渣碳少的廢棄物爲對象時,仍然可以容易進行塡充層 高度的控制。 炭材8及/或炭材36是在爐內溫度幾乎不產生戴奧辛 類的條件下升溫後投入。因此,尤其不加以限定含炭材8 及/或炭材36內的鹵素類的濃度。 其次,本實施形態中,說明進行鹵素的原料再生的狀 況如下。 -25- (22) 1289644 第4〜7圖是表示本實施形態回收鹵素用的系統流程的 說明圖。首先’針對第4圖及第5圖表示的系統說明後, 並針對第6圖及第7圖表示的系統說明如下。 第4圖中,廢棄物3投入本實施形態的氣化熔爐i。 產生使廢棄物3包含的有機物氣化作爲燃料使用的高熱量 氣體40。使灰量及有價金屬轉換爲熔渣38及熔融金屬39 。由於在氣化熔爐1內降低戴奧辛類的排出,其上部的溫 度可抑制在l〇〇〇°C以上1400°C以下,將廢棄物3直接投 入5 00〜1200 °C以上的高溫區域的熱分解氣化帶,在爐內 l〇〇〇°C以上的高溫保持2秒以上之後,排出爐外高溫的高 熱量氣體40藉著經過管路41以冷卻裝置42從噴嘴43噴 出的噴霧44急冷至120°C以上200°C以下。 藉此,即使處理鹵素含量多的廢棄物時,可確實抑制 戴奧辛類的再合成及排出,可抑制過程整體的戴奧辛類的 低排出量。並且,含有鹵素的塑膠類在低溫熱分解中產生 焦油,會造成對配管路等附著等問題,但是該氣化熔爐1 是進行高溫的熱分解氣化,不會產生焦油。 通過氣冷裝置42出口的管路45的氣體與一氧化碳及 氫等同時含有鹵化氫氣體等。該等的氣體以除塵裝置46 除去所含的粉麈47之後,導入鹵素回收裝置48。 鹵素回收裝置48是以噴嘴50噴入水後將高熱量氣體 冷卻至100 °C以下,使含有鹵化氫氣體凝結形成凝結水51 與鹽酸等的酸5 2的混合液’分離其他的能源氣體5 3與鹵 素。酸52與凝結水51的混合液是通過噴嘴54在鹵素回 -26 - 1289644 (23) 收裝置4 8內循環,濃縮回收酸5 2。酸5 2與凝結水的混 合液不使用噴嘴54,也可以從噴嘴50混合水49後循環 。回收的酸52以幽化裝置55轉換成鹵素56。 另外,以除塵裝置46、氣冷裝置42分別與氣體分離 除去的粉塵47與重新裝入的廢棄物3同時再投入氣化熔 爐1內。其中,氣冷裝置42所冷卻的氣體流入鹵素回收 裝至48爲止的期間,從鹵化氫氣體對於腐蝕防止的觀點 來看以100°C以上,最好是120 °C以上。尤其是形成低溫 的除塵裝置46以後,可有效地使用耐鹽酸鎳基合金等的 耐酸性材料。並且鹵素回收裝置4 8使用的材料可舉例如 即使l〇(TC以下也不容易產生酸腐蝕的FRP等。 並且,酸的回收方法也可以舉例如第5圖所示通過氣 冷裝置42後回收的方法。第5圖是以氣化熔爐1產生的 1 〇〇〇°C以上140 0°C以下的高溫,並以氣冷裝置42將高熱 量氣體40急冷至100°C以下,回收能源氣體40中含有鹵 素的方式。該方式中,在氣冷裝置42的內部使氣體40所 含的水分及氣冷裝置42所噴射的噴霧凝結,從氣冷裝置 42的下部回收。回收後的凝結水58中雖含有酸及淤渣59 ,但是回收後的凝結水5 8以過濾裝置60分離除去淤渣 5 9之後,形成含酸的凝結水6 2,以鹵化裝置5 5轉換爲鹵 素56。 氣冷裝置42的出口氣體的溫度雖然在100°C以下, 但是鹵素幾乎已轉換爲氣冷裝置42下回收的凝結水58 ’ 因此不會腐蝕氣冷裝置42後段的設備。但是,由由含有 -27- (24) 1289644 若干的鹵化氫氣體,含有苛性納7 1的水供給分離塔6 5回 收酸66’與氣冷裝置42下部回收的酸61同時以鹵化裝 置55使其鹵化。並且可將淤渣59再投入氣化熔爐1氣化 熔融。 並且,廢棄物中了鹵素濃度爲較廣範圍,但是鹵素濃 度高的採樣側形成高的回收酸濃度。此外,單位廢棄物處 理量的鹵素回收量增大,具有回收率高等的優點。因此, 在處理鹵素濃度低的廢棄物時,添加鹵素濃度高的廢棄物 可有效地使回收酸濃縮。 另外,廢棄物所含鹵素類的濃度低時,將消石灰噴入 除塵設備46除去_素爲佳。以除塵設備46使_素固定化 時,不需要水洗處理鹵素類的鹵素回收裝置55,即不需 要進行排出水的處理。 其次,針對第6圖及第7圖表示的系統說明如下。此 外,以後的說明中,僅說明與上述第4圖表示的系統不同 的部分,並省略共同部分的說明。 第6圖中,將通過氣冷裝置42出口的粉塵45的氣體 除去除麈裝置46所含的粉塵後,導入至鹵素回收裝至48 爲止與上述第4圖所示的系統相同。 本例中,鹵素冷卻裝置48從噴嘴50噴入水49將高 熱量氣體40冷卻至100°C以下,使含有鹵化氫氣體凝結 ’作爲凝結水5 1與酸52的混合液,將其他能源氣體53 與鹵素分別。酸52與凝結水51的混合液通過噴嘴43在 氣冷裝置42內循環,濃縮成以鹵素回收裝置48回收的酸 -28- (25) 1289644 5 2的濃度。 將回收後的酸52以鹵化裝置55轉換成鹵素56。使 酸52與凝結水51的混合液在氣冷裝置42內循環,可降 低氣冷裝置42使用的水44的量。並且,以除麈裝置46 、氣冷裝置42與氣體分離除去的粉麈47、57是與廢棄物 3同時再投入氣化熔爐1內。 本例中,氣冷裝置42所冷卻的能源氣體流入至鹵素 φ 回收裝置48爲止的期間,從鹵化氫氣體對於腐蝕防止的 觀點來看以100 °C以上,最好是120 °C以上。尤其是形成 低溫的除塵裝置46以後,可有效使用耐鹽酸鎳基合金等 耐酸性材料。並且鹵素回收裝置48使用的材料可舉例即 使在100°C以下也不容易發生酸腐蝕的FRP等。 並且,第7圖是採用氣體冷卻方式作爲酸回收方法的 例。此外,以後的說明是說明與上述第6圖表示系統不同 的部分,省略共同部分的說明。 φ 第7圖中,通過氣冷裝置42出口的粉塵45的氣體除 去除塵裝置46所含的粉塵47之後,導入鹵素回收裝置 48爲止是與上述第6圖表示的系統相同。 本例中,鹵素回收裝置48是利用氣體冷卻方式將高 熱量氣體40冷卻至100°C以下,使所含的鹵化氫氣體凝 結,作爲凝結水5 1與酸5 2的混合液,分離其他的能源氣 體53與鹵素。酸52爲鹵化裝置5轉換成鹵素56。並且 ,以除塵裝置46、氣冷裝置42所分離除去的粉塵47、57 與新裝入的廢棄物3同時再投入氣化熔爐1。 -29 - (26) 1289644 本例中,同樣以氣冷裝置42所冷卻的能源氣體流入 鹵素回收裝至48的期間,從鹵化氫氣體對於腐鈾防止的 觀點來看以100°C以上,最好是120°C以上。尤其是形成 低溫的除塵裝置46以後,可有效地使用耐鹽酸鎳基合金 等的耐酸性材料。 其次,說明使用本實施形態的氣化熔爐1處理醫療類 廢棄物、污染土壤或者PCB等的有害廢棄物的狀況如下 〇 封入密閉容器的有害廢棄物可以使用第1圖表示的氣 化熔爐1進行無害化處理。對爐體1 a的裝入可以從雙重 閘閥方式的裝入裝置29投入。雙重閘閥上的裝入裝置29 藉著上部閘閥29a的開啓使密閉容器在上部閘閥29a與下 部閘閥29b之間自由落下,隨後關閉上部閘閥29a後開啓 下部閘閥29b將密閉容器裝入爐內。藉此,可經常維持著 上部閘閥29a或下部閘閥29b其中之一的封閉狀態,因此 可以防止大量的爐內氣體通過裝入裝置洩漏至爐外,或者 爐外空氣大量吸入爐內。此外,爐內的壓力以在下游設置 引風機等抑制在大氣壓以下爲佳。 藉此,封入密閉容器裝入爐內的有害廢棄物產生的有 害熱分解氣體不會從密閉容器排出,可以使有害廢棄物到 達塡充層的上端面。有害廢棄物到達塡充層的上端面之後 ,藉著熱在密閉容器開口,可以將熱分解後的熱分解氣體 從密閉容器排出。從密閉容器排出的有害氣體在高溫條件 下由於經過充分的滯留時間在爐內完全分解,排出爐外。 -30- (27) 1289644 該密閉容器的材質及厚度適當決定在密閉容器到達塡充層 上端面爲止之間不開設孔。 另外,說明本實施形態中,解除熔漿室內部的壓力上 升的手段如下。 第8圖是模式表示部分簡化第1圖所示氣化熔爐1設 置熔漿室73的氣化熔爐1-1的說明圖。並且,以後的氣 化熔爐1-1的說明只說明與氣化熔爐1不同的部分,省略 共同部分的說明。 如第8圖表示,該氣化熔爐1-1設有連通爐體la下 部內部的熔漿室73。該熔漿室73是爲了回收從氣化熔爐 1-1所排出的灰量及有價金屬,暫時預先存放產生的熔渣 及熔融金屬等熔漿之用。從溶漿室風口 81噴入助燃性氣 體8 1a及燃料81b,維持著熔漿室內溫度。 本例是在熔漿室73的上部設置氣體排出用的配管路 74,連接爐體la內部的廢棄物的上端面76與氣體排出口 5之間。其間配置閥75,一般是在關閉閥75的狀態下進 行運轉。 熔漿室73的內部壓力可以壓力測定裝置77進行連續 測定。一般的運轉中,壓力測定裝置77的値設定在熔漿 室73的設計壓力的0.5倍以下的運轉,但是該値一旦超 過設計壓力的0.5倍時,可開啓閥75從氣體排出口 5將 熔漿室73內部產生的氣體排出爐體la的外部。 藉此,使暫時停止氣化.熔爐1後上升時殘留爐內的廢 棄物或冷卻熔渣等堵塞爐體la與熔漿室73的連接部78 -31 - (28) 1289644 ,藉以防止熔漿室78內部壓力過度上升。 如上述,藉本實施形態可解決基本氣化熔爐具有的課 題,(a)管路6的堵塞、(b)爐內塡充時間、(〇未 利用碳的排出、(d ) 有害廢棄物上端面位置的控制、 (e)鹵素類的原料再生、(f)有害廢棄物的裝入、(g )熔漿是73內部的壓力上升,藉以獲得基本氣化熔爐的 高性能化。因此,可藉由本實施形態長期間穩定地以商業 規模持續進行氣化熔融運轉,提供確實具有高實用性的廢 棄物的處理方法及處理裝置。 實施例 另外,參閱實施例具體說明本發明如下。並且,以後 的說明中,噴入量的單位(Nm3/hr )是表示m3 (標準狀 態)/hr 〇 使用第1圖表示的氣化熔爐1,進行廢棄物的氣化熔 融試驗。氣化熔爐1的各部尺寸、上部風口 10、下部風 口 11其他安裝組件的數量及配置如下。此外,熔渣及/或 熔融金屬的排出口略記爲熔漿排出口。 尺寸 爐徑:2.0m (但是,內襯耐火物2後的內徑) 爐高:6.0m (但是,內襯耐火物2後之內徑從爐底至 爐頂的高度) 從熔漿排出口 78的上端至廢棄物裝入口 4下端爲止 的高度:2.8m • 32 - (29) 1289644 從熔漿排出口 78的上端至下段的下部風口 11下端爲 止的局度:〇 · 8 m 從熔紫排出口 7 8的上端至上段的下部風口 n下端爲 止的高度:1.6m 從熔漿排出口 7 8的上端至下段的上部風口 i 1爲止的 高度:3.9m 從熔漿排出口 78的上端至上段的上部風口 11爲止的 高度:4.7m (2) 數量 下部風口 11:圓周方向3個、爐高方向1段 上部風口 10:圓周方向3個、爐高方向2段 蒸氣噴入風口 33_圓周方向3個、爐筒方向1段 爐中心塊9 : 1個 熔漿排出口 : 1個 測量裝入廢棄物上端面位置的位置測量裝置79 ·· 1個 (3) 配置 下部風口 1 1 :圓周方向各120度等間隔,從前端內 襯耐火材2的表面向爐內側突出100mm設置 上部風口 10:圓周方向各120度等間隔,從爐軸方 向偏移45度設置 爐中心塊9 :配置在爐中心(爐軸上) 熔漿排出口 78:配置在爐底端 位置測量裝置79 :爐中心塊9與側壁之間 試驗所使用的廢棄物3爲切碎機粉塵及高濃度含氯塑 (30) 1289644 膠屑,其組成表示於表1至表3。 即,表1是表示廢棄物3及輔助原料的工業分析値( 質量% )、表2是表示廢棄物3及輔助原料中可燃量組成 (質量%)、表3是表示除去廢棄物3及輔助原料中金屬 量的不燃量組成(質量% )。V As described above, when the carbon material 8 and/or the carbon material 36 are put into the furnace, even if the waste having less carbon residue is thermally decomposed, the height of the burring layer can be easily controlled. The carbon material 8 and/or the carbon material 36 are heated after the temperature in the furnace is hardly generated by the dioxin. Therefore, the concentration of the halogen in the carbon-containing material 8 and/or the carbon material 36 is not particularly limited. Next, in the present embodiment, the state in which the raw material of the halogen is regenerated will be described below. -25- (22) 1289644 Fig. 4 to Fig. 7 are explanatory views showing the flow of the system for recovering halogen in the present embodiment. First, the system shown in Figs. 4 and 5 will be described below, and the systems shown in Figs. 6 and 7 will be described below. In Fig. 4, the waste 3 is charged into the gasification furnace i of the present embodiment. A high-calorie gas 40 that vaporizes the organic matter contained in the waste 3 as a fuel is produced. The amount of ash and the valuable metal are converted into slag 38 and molten metal 39. Since the discharge of the dioxin in the gasification furnace 1 is reduced, the temperature of the upper portion can be suppressed to be less than 1 〇〇〇 ° C to 1400 ° C, and the waste 3 can be directly charged into the high temperature region of 500 1200 ° C or higher. After the gasification zone is decomposed and maintained at a high temperature of 1 ° C or higher in the furnace for 2 seconds or more, the high-calorie gas 40 which is discharged from the outside of the furnace is quenched by the spray 44 sprayed from the nozzle 43 by the cooling device 42 through the line 41. To 120 ° C or more and 200 ° C or less. Thereby, even when the waste having a large halogen content is treated, the re-synthesis and discharge of the dioxin can be suppressed, and the low discharge amount of the dioxin can be suppressed as a whole. Further, the halogen-containing plastics generate tar during low-temperature thermal decomposition, which causes problems such as adhesion to piping and the like. However, the gasification furnace 1 is subjected to high-temperature thermal decomposition and gasification, and tar is not generated. The gas passing through the line 45 at the outlet of the air-cooling device 42 contains hydrogen halide gas or the like together with carbon monoxide, hydrogen, and the like. These gases are removed by the dust removing device 46 and then introduced into the halogen recovery device 48. The halogen recovery device 48 cools the high-calorie gas to 100 ° C or lower after the nozzle 50 is sprayed with water, and condenses the hydrogen halide gas to form a mixed liquid of the condensed water 51 and the acid 5 such as hydrochloric acid, and separates the other energy gas 5 3 . With halogen. The mixture of acid 52 and condensate 51 is circulated through a nozzle 54 in a halogen return -26 - 1289644 (23) receiving unit 48 to concentrate the recovered acid 52. The mixture of the acid 52 and the condensed water does not use the nozzle 54, but may be circulated by mixing the water 49 from the nozzle 50. The recovered acid 52 is converted to a halogen 56 by a denaturing device 55. Further, the dust 47 separated from the gas by the dust removing device 46 and the air cooling device 42 and the refilled waste 3 are simultaneously introduced into the gasification furnace 1. Here, the period in which the gas cooled by the air-cooling device 42 flows into the halogen recovery to 48 is 100 ° C or higher, preferably 120 ° C or higher, from the viewpoint of preventing corrosion of the hydrogen halide gas. In particular, after the low-temperature dust removing device 46 is formed, an acid-resistant material such as a nickel-hydrochloride-resistant alloy can be effectively used. Further, the material used in the halogen recovery device 48 may be, for example, FRP or the like which is less likely to cause acid corrosion under TC. Further, the acid recovery method may be recovered by the air cooling device 42 as shown in Fig. 5, for example. The fifth method is a high temperature of 1 〇〇〇 ° C or more and 140 ° ° C or less generated by the gasification furnace 1 , and the high-heat gas 40 is quenched to 100 ° C or less by the air cooling device 42 to recover the energy gas. A method in which a halogen is contained in 40. In this embodiment, the moisture contained in the gas 40 and the spray sprayed from the air-cooling device 42 are condensed inside the air-cooling device 42, and are collected from the lower portion of the air-cooling device 42. The recovered condensed water Although the acid and the sludge 59 are contained in the 58, the recovered condensed water 58 is separated and removed by the filtering device 60 to form the acid-containing condensed water 6 2, and is converted into a halogen 56 by the halogenating device 5 5 . Although the temperature of the outlet gas of the cooling device 42 is below 100 ° C, the halogen has almost been converted into the condensed water 58 ' recovered under the air cooling device 42 and thus does not corrode the device in the latter stage of the air cooling device 42. However, by containing - 27- (24) 1289644 Several halogenations The gas, the water supply separation column 6 containing caustic 715, the recovered acid 66' and the acid 61 recovered in the lower portion of the air cooling device 42 are simultaneously halogenated by the halogenation device 55. The sludge 59 can be reintroduced into the gasification furnace 1 gas. In addition, the halogen concentration in the waste is wide, but the sampling side with a high halogen concentration forms a high recovery acid concentration. In addition, the halogen recovery amount per unit waste treatment amount is increased, and the recovery rate is high. Therefore, when the waste having a low halogen concentration is treated, the waste having a high halogen concentration can be effectively concentrated to concentrate the recovered acid. When the concentration of the halogen contained in the waste is low, the slaked lime is sprayed into the dust removing device 46 to remove _ When the dust removing device 46 is used to immobilize the halogen, it is not necessary to wash the halogen-based halogen recovery device 55, that is, it is not necessary to perform the process of discharging the water. Next, the system descriptions shown in Figs. 6 and 7 In the following description, only the differences from the system shown in Fig. 4 will be described, and the description of the common portions will be omitted. In Fig. 6, the air cooling unit 42 will be used. The gas of the dust 45 is removed from the halogen contained in the crucible device 46, and is introduced into the halogen recovery unit 48 to be the same as the system shown in Fig. 4. In this example, the halogen cooling device 48 sprays water 49 from the nozzle 50. The high-calorie gas 40 is cooled to 100 ° C or lower, and the hydrogen halide-containing gas is condensed as a mixture of the condensed water 51 and the acid 52, and the other energy gas 53 and the halogen are separated. The mixture of the acid 52 and the condensed water 51 passes through the nozzle. 43 is circulated in the air cooling unit 42 and concentrated to a concentration of acid -28-(25) 1289644 5 2 recovered by the halogen recovery unit 48. The recovered acid 52 is converted into a halogen 56 by a halogenating unit 55. The mixture of the acid 52 and the condensed water 51 is circulated in the air cooling unit 42, and the amount of the water 44 used in the air cooling unit 42 can be reduced. Further, the powders 47 and 57 which are separated from the gas by the removing device 46 and the air cooling device 42 are simultaneously charged into the gasification furnace 1 together with the waste 3. In the present embodiment, the period during which the energy gas cooled by the air-cooling device 42 flows into the halogen φ recovery device 48 is 100 ° C or higher, preferably 120 ° C or higher, from the viewpoint of preventing corrosion of the hydrogen halide gas. In particular, after the low-temperature dust removing device 46 is formed, an acid-resistant material such as a nickel-hydrochloride-resistant alloy can be effectively used. Further, the material used in the halogen recovery device 48 can be, for example, FRP or the like which is less likely to cause acid corrosion at 100 ° C or lower. Further, Fig. 7 is an example in which a gas cooling method is employed as an acid recovery method. In the following description, the differences from the system shown in Fig. 6 will be described, and the description of the common portions will be omitted. In Fig. 7, the gas of the dust 45 passing through the outlet of the air-cooling device 42 is the same as the system shown in Fig. 6 except that the dust 47 contained in the dust removing device 46 is introduced into the halogen recovery device 48. In this example, the halogen recovery device 48 cools the high-calorie gas 40 to 100 ° C or lower by a gas cooling method, and condenses the contained hydrogen halide gas to form a mixed liquid of the condensed water 5 1 and the acid 5 2, and separates the other. Energy gas 53 with halogen. Acid 52 is converted to halogen 56 by halogenation unit 5. Then, the dusts 47 and 57 separated and removed by the dust removing device 46 and the air cooling device 42 are simultaneously supplied to the gasification furnace 1 at the same time as the newly charged waste 3. -29 - (26) 1289644 In this example, the energy gas cooled by the air-cooling device 42 flows into the halogen recovery unit 48, and the hydrogen halide gas is 100 ° C or more from the viewpoint of preventing uranium gas. Good is above 120 °C. In particular, after the low-temperature dust removing device 46 is formed, an acid-resistant material such as a nickel-hydrochloride-resistant alloy can be effectively used. Next, a description will be given of a state in which hazardous waste such as medical waste, contaminated soil, or PCB is treated by the gasification furnace 1 of the present embodiment. The hazardous waste sealed in the sealed container can be used in the gasification furnace 1 shown in Fig. 1 . Harmless treatment. The charging of the furnace body 1a can be carried out from the double gate valve type loading device 29. The loading device 29 on the double gate valve freely drops the hermetic container between the upper gate valve 29a and the lower gate valve 29b by opening the upper gate valve 29a, and then closes the upper gate valve 29a and then opens the lower gate valve 29b to load the sealed container into the furnace. Thereby, the closed state of one of the upper gate valve 29a or the lower gate valve 29b can be constantly maintained, so that a large amount of furnace gas can be prevented from leaking out of the furnace through the charging device, or a large amount of outside air can be sucked into the furnace. Further, it is preferable that the pressure in the furnace is suppressed to be lower than atmospheric pressure by providing an air blower or the like downstream. Thereby, the harmful pyrolysis gas generated by the hazardous waste enclosed in the sealed container and filled into the furnace is not discharged from the sealed container, and the harmful waste can be reached to the upper end surface of the sputum layer. After the harmful waste reaches the upper end surface of the filling layer, the thermally decomposed thermal decomposition gas can be discharged from the sealed container by heat in the closed container opening. The harmful gas discharged from the closed container is completely decomposed in the furnace under high temperature conditions due to sufficient residence time, and is discharged outside the furnace. -30- (27) 1289644 The material and thickness of the sealed container are appropriately determined so that no holes are formed between the sealed container and the upper end surface of the squeezing layer. Further, in the present embodiment, the means for releasing the pressure rise inside the refining chamber will be described as follows. Fig. 8 is an explanatory view showing, in a simplified manner, a gasification furnace 1-1 in which the vaporizing chamber 73 is disposed in the gasification furnace 1 shown in Fig. 1. Further, the description of the subsequent gasification furnace 1-1 will be described only with respect to portions different from the gasification furnace 1, and the description of the common portions will be omitted. As shown in Fig. 8, the gasification furnace 1-1 is provided with a refining chamber 73 that communicates with the inside of the lower portion of the furnace body la. The pulverization chamber 73 is used for recovering the amount of ash discharged from the gasification furnace 1-1 and the valuable metal, and temporarily storing the generated slag and molten metal such as molten metal. The combustion-supporting gas 81a and the fuel 81b are injected from the slurry chamber tuyere 81 to maintain the temperature in the refining chamber. In this example, a gas discharge line 74 is provided in the upper portion of the melt chamber 73, and is connected between the upper end surface 76 of the waste inside the furnace body 1a and the gas discharge port 5. The valve 75 is disposed therebetween, and is normally operated while the valve 75 is closed. The internal pressure of the melting chamber 73 can be continuously measured by the pressure measuring device 77. In the normal operation, the crucible of the pressure measuring device 77 is set to operate at 0.5 times or less of the design pressure of the refining chamber 73. However, once the crucible exceeds 0.5 times the design pressure, the valve 75 can be opened from the gas discharge port 5 to be melted. The gas generated inside the slurry chamber 73 is discharged to the outside of the furnace body la. Thereby, the vaporization is temporarily stopped. When the furnace 1 rises, the waste in the furnace or the cooling slag, etc., blocks the connection portion 78 - 31 - (28) 1289644 of the furnace body la and the melt chamber 73, thereby preventing the melt from being melted. The internal pressure of chamber 78 rises excessively. As described above, the present embodiment can solve the problems of the basic gasification furnace, (a) clogging of the piping 6, (b) charging time in the furnace, (discharging of unused carbon, and (d) hazardous waste. Control of the position of the end face, (e) regeneration of the raw material of the halogen type, (f) loading of the hazardous waste, and (g) the increase of the pressure inside the melt 73 to obtain the high performance of the basic gasification furnace. According to the present embodiment, the gasification and melting operation is continuously carried out on a commercial scale for a long period of time, and a treatment method and a treatment apparatus for waste having high practicality are provided. EXAMPLES Further, the present invention will be specifically described below with reference to examples. In the description, the unit of the injection amount (Nm3/hr) is m3 (standard state) / hr. The gasification melting furnace 1 shown in Fig. 1 is used to carry out the gasification melting test of the waste. The number and arrangement of other mounting components of the size, upper tuyere 10, and lower tuyere 11 are as follows. In addition, the discharge port of molten slag and/or molten metal is abbreviated as a melt discharge port. Size furnace diameter: 2.0 m (however, the inner liner is resistant The inner diameter after the fire object 2) The height of the furnace: 6.0 m (however, the inner diameter of the lining after the refractory 2 is from the bottom of the furnace to the height of the furnace top) from the upper end of the melt discharge port 78 to the lower end of the waste charging inlet 4 Height: 2.8m • 32 - (29) 1289644 The degree from the upper end of the melt discharge port 78 to the lower end of the lower tuyere 11 of the lower section: 〇· 8 m from the upper end of the fume discharge port 7 8 to the lower end of the upper section Height from the lower end of n: 1.6 m Height from the upper end of the melt discharge port 7 8 to the upper tuyere i 1 of the lower stage: 3.9 m The height from the upper end of the melt discharge port 78 to the upper tuyere 11 of the upper stage: 4.7 m (2) Quantity lower tuyere 11: 3 in the circumferential direction, 1 in the furnace height direction, 1 in the circumferential direction, 3 in the furnace direction, 2 in the furnace direction, 3 in the circumferential direction, and 1 in the furnace direction Block 9: 1 melt discharge port: 1 position measuring device for measuring the position of the upper end face of the waste. ··1 (3) Configuring the lower air vent 1 1 : 120 degrees at equal intervals in the circumferential direction, lining from the front end The surface of the refractory material 2 is protruded to the inside of the furnace by 100 mm to set the upper tuyere 10: circumferential direction Each of the 120 degrees is equally spaced, and the furnace center block 9 is disposed offset from the furnace axis by 45 degrees: disposed at the furnace center (on the furnace shaft). The melt discharge port 78 is disposed at the bottom end position measuring device 79: the furnace center block 9 and The waste 3 used in the test between the side walls is chopper dust and high-concentration chlorine-containing plastic (30) 1289644, and its composition is shown in Tables 1 to 3. That is, Table 1 shows waste 3 and auxiliary materials. Industrial analysis 质量 (% by mass), Table 2 shows the composition (% by mass) of the combustible amount in the waste 3 and the auxiliary raw materials, and Table 3 shows the composition (% by mass) of the non-combustible amount of the metal in the waste 3 and the auxiliary raw material. .

-34- (31) 1289644 表1 可燃量(%) ()內爲固定碳 不燃量 (%) 水分 (%) 乾燥垃圾 8 1.2 (19.0) 9.8 9.0 切碎機粉塵 5 1.0 (5.4) 36.8 12.2 塑膠屑*1 96.5 (11.9) 3.3 0.2 廢木材 79.1 (40.0) 0.9 20.0 石灰石 0.0 98.3 1.7-34- (31) 1289644 Table 1 Flammability (%) () Fixed carbon non-combustible amount (%) Moisture (%) Dry waste 8 1.2 (19.0) 9.8 9.0 Chopper dust 5 1.0 (5.4) 36.8 12.2 Plastic Chips*1 96.5 (11.9) 3.3 0.2 Waste wood 79.1 (40.0) 0.9 20.0 Limestone 0.0 98.3 1.7

*1 :塑膠屑使用高濃度含氯塑膠 表2 C Η 0 Ν S T.C1 水分 乾燥垃圾 40. .0 6. ,3 33.2 0_ 9 0.1 0.7 9.0 切碎機粉塵 40 .3 5_ .1 2.1 1 . ,7 0.5 1.3 12.2 塑膠屑*1 37, .6 4. ,7 6.2 0. ,1 0.1 47.8 0.2 廢木材 40 .0 4. .8 34.2 0. .1 20.0 石灰石 0. 0 0· ,0 0.0 0. ,0 0.0 1.7*1: High-concentration chlorine-containing plastics for plastic chips Table 2 C Η 0 Ν S T.C1 Moisture-drying garbage 40. .0 6. ,3 33.2 0_ 9 0.1 0.7 9.0 Chopper dust 40 .3 5_ .1 2.1 1 , 7 0.5 1.3 12.2 Plastic shavings*1 37, .6 4. ,7 6.2 0. ,1 0.1 47.8 0.2 Waste wood 40 .0 4. .8 34.2 0. .1 20.0 Limestone 0. 0 0· ,0 0.0 0. , 0 0.0 1.7

*1:塑膠屑使用高濃度含氯塑膠 •35- (32) 1289644 袠3*1: High-concentration chlorine-containing plastic for plastic chips •35- (32) 1289644 袠3

Si〇2 CaO Al2〇3 Fe2〇3 N a 2 Ο K〇 0 CaCO^ 乾燥垃圾 2.7 1.8 1.2 0.25 0.5 〇. 3 〇.〇 切碎機粉塵 9.6 8.3 1.6 1.8 1.2 0 7 〇 0 塑膠屑*1 0.4 0.9 0.1 一 — 0.1 \J · L· 〇 1 〇 0 廢木材 0.02 0.35 0.03 0.03 0.08 \J · 1 0 08 0.0 石灰石 0.5 0.0 〇.0 0.5 〇.〇 i V/ · V/ 0.0 97.3 1 :塑膠屑使用高濃度含氯塑gSi〇2 CaO Al2〇3 Fe2〇3 N a 2 Ο K〇0 CaCO^ Dry garbage 2.7 1.8 1.2 0.25 0.5 〇. 3 〇.〇Chopper dust 9.6 8.3 1.6 1.8 1.2 0 7 〇0 Plastic chips*1 0.4 0.9 0.1 一— 0.1 \J · L· 〇1 〇0 Waste wood 0.02 0.35 0.03 0.03 0.08 \J · 1 0 08 0.0 Limestone 0.5 0.0 〇.0 0.5 〇.〇i V/ · V/ 0.0 97.3 1 : Plastic shavings Use high concentration of chlorine-containing plastic g

(處理條件的設定順序) 將炭材32從裝入裝釐28裝入爐內,堆積至高度 1.5m爲止。 將火種投入炭材32的墳充層上端面,藉來自爐中心 塊9的助燃性热體9a點者堆積爐內的炭材32。 下部風口 11、上部風口 1〇依序流入氧氣。 癱 調整助燃性氣體的送風量及炭材32的裝入量使爐內 升溫至預定的溫度爲止。 開始進行廢棄物3的投入,停止炭材32的裝入。 下降至隨廢棄物3的燃燒所裝入廢棄物3上端面的位 置,因此依序裝入廢棄物3使其位置維持著i.5m。 調整從爐中心塊9、上部風口 1 0及下部風口 1 1噴入 的氧氣量使裝入之廢棄物3上端面附近的熱電耦所測定的 溫度經常維持在600°C以上,且干舷空間的熱電耦所測定 的溫度經常維持在1000°C以上i4〇〇°c以下。 -36 - 1289644 (33) 即,廢棄物下降速度加快,預定廢棄物3的處理量使 裝入的廢棄物3上端面的位置不能維持預定的位置時,根 據下部風口 1 1及場合減少從爐中心塊9的氧氣噴入量。 廢棄物3上端面附近的溫度小於600°C時,增加從爐中心 塊9的氧氣噴入量。並且,干舷空間的溫度低於1000艺 時,增加從上部風口 1 〇的氧氣噴入量。相反地,干舷空 間的溫度超過1400 °C時,根據上部風口 10及場合減少從 爐中心塊9的氧氣噴入量。 測定從熔漿排出口 7 8所排出的熔渣及熔融金屬的溫 度,低於預定溫度(至少爲熔渣及熔融金屬其中之一不硬 化、的溫度,本實施例爲1400°C以上1 600°C以下。)時, 增加從下部風口 1 1的助燃性氣體1 1 a的供給量。並且, 分析熔渣及熔融金屬的成分,調整投入的石灰石量使其形 成預定的熔渣鹼度。 重複進行上述(f)至(h )的操作。 以下,將本實施例的(i )管路6的堵塞、(ii )爐內 塡充時間、(iii )未利用碳的減少、(iv )廢棄物上端面 位置的控制、(v )鹵素的原料再生的試驗結果,列計如 下。 (〇對排氣之冷媒12的噴入 爲取得管路6內的堵塞物除去裝置16及堵塞防止裝 置的效果,在切碎機粉塵中分別添加20kg/hr的鉛及鋅等 的低沸點物質,以容易堵塞管路6的條件進行試驗。將運 轉諸元素及試驗結果彙整於表4。 -37- (34) 1289644 (34)(Setting procedure of processing conditions) The carbon material 32 was placed in the furnace from the loading set 28 and piled up to a height of 1.5 m. The fire is put into the upper end surface of the grave filling layer of the carbon material 32, and the charcoal material 32 in the furnace is deposited by the combustion-supporting hot body 9a from the furnace center block 9. The lower tuyere 11 and the upper tuyere 1 inflow oxygen.瘫 The air supply amount of the combustion-supporting gas and the amount of the carbon material 32 are adjusted so that the temperature in the furnace is raised to a predetermined temperature. The introduction of the waste 3 is started, and the charging of the carbon material 32 is stopped. It is lowered to the position where the upper end surface of the waste 3 is loaded with the combustion of the waste 3, so that the waste 3 is sequentially loaded so that the position is maintained at i.5 m. Adjusting the amount of oxygen injected from the furnace center block 9, the upper tuyere 10 and the lower tuyere 1 1 so that the temperature measured by the thermocouple near the upper end surface of the charged waste 3 is often maintained above 600 ° C, and the freeboard space The temperature measured by the thermocouple is often maintained below 1000 ° C and below i4 ° ° c. -36 - 1289644 (33) That is, the waste descending speed is increased, and the amount of the predetermined waste 3 is such that the position of the upper end surface of the loaded waste 3 cannot be maintained at a predetermined position, and the furnace is reduced according to the lower tuyere 1 1 and the occasion. The amount of oxygen injected into the center block 9. When the temperature near the upper end surface of the waste 3 is less than 600 °C, the amount of oxygen injected from the furnace center block 9 is increased. Also, when the temperature of the freeboard space is less than 1000 art, the amount of oxygen injected from the upper tuyere is increased. Conversely, when the temperature of the freeboard space exceeds 1400 °C, the amount of oxygen injected from the center block 9 of the furnace is reduced according to the upper tuyere 10 and the occasion. The temperature of the slag and the molten metal discharged from the melt discharge port 7 is measured, and is lower than a predetermined temperature (at least a temperature at which one of the slag and the molten metal is not hardened, and in this embodiment, 1400 ° C or more and 1 600 When the temperature is below °C, the supply amount of the combustion-supporting gas 1 1 a from the lower tuyeres 1 is increased. Further, the components of the molten slag and the molten metal are analyzed, and the amount of the input limestone is adjusted to form a predetermined slag basicity. The operations of (f) to (h) above are repeated. Hereinafter, (i) clogging of the line 6 of the present embodiment, (ii) furnace charging time, (iii) reduction of unused carbon, (iv) control of the upper end position of the waste, and (v) halogen The test results of the raw material regeneration are listed below. (Injection of the refrigerant 12 for exhaust gas is an effect of obtaining the plugging device 16 and the clogging preventing device in the pipe 6, and adding 20 kg/hr of low-boiling substances such as lead and zinc to the chopper dust. Tests are carried out under conditions that tend to block the line 6. The elements of the operation and the test results are summarized in Table 4. -37- (34) 1289644 (34)

表4 比較例1 本發明例1 本發明例2 裝入物 粉碎粉塵 400 400 400 (kg/hr) 鉛 20 20 20 鋅 20 20 20 爐壓,管6之入-出差壓的變化 圖9 (產生堵塞) 圖10 (不產生堵塞) 圖11 (不產生堵塞) 供給爐出口部的冷 噴霧(kg/hr) 0 0 40 媒12 N2 氣體(Nm3/hr) 0 90 0 送風氧氣 爐中心塊9 80 80 80 (Nm3/hr) 上部風口 10 80 80 80 下部風口 11 60 60 60 從下部風口 11之LPG(Nm3/h) 8 8 8 爐內清除N2(Nm3/h) 40 40 40 爐上部溫度(。C,測定裝置80) 1150 1150 1150 管路ό入口溫度(°C,測定裝置81) 1100 950 950 排氣量(wet-Nm3/hr〕 1 643 733 691 CO 32.5 28.5 30.3 C〇2 14.9 13.1 13.9 h2 21.9 19.2 20.4 排氣(%) h2o 23.4 20.5 28.6 n2 6.2 17.7 5.8 h2s 0.1 0.1 0.1 HC1 1.0 0.9 0.9 管路ό出口氣體熱量(kcal/dry-Nm3) 2019 1706 2019 -38 - (35) 1289644 (比較例1 ) 比較例1是未進行第1圖所示從冷媒噴入噴嘴13噴 入冷媒1 2之例。表示產生能源氣體的溫度以爐上部的溫 度測定裝置8 0爲1 1 5 0 °C,以管路6的入口溫度測定裝置 81爲1100°C左右。 第9圖中以圖表顯示管路6的入口與出口部的差壓測 定結果。並且,第9圖以後的各圖(第9圖~第14圖)中 ,縱軸P是表示壓力(mmH20 ),縱軸d是表示運轉日數 (日),並且符號〇是表示管路6的進入側及出側間的差 壓,.△印表示爐內壓。 如第9圖所示,此一差壓是從運轉開始20日後開始 增加。管路6的差壓形成300mmH20時將爐下降,觀察管 路6的內部。其結果,在管路6的內壁全周圍觀察附著物 (本發明例1 ) 本發明例1是噴入來自冷媒噴氣噴嘴1 3而作爲冷媒 12的氮氣,使產生能源氣體在流入管路6之前冷卻。能 源氣體的溫度在溫度測定裝置80爲1150°C,管路6入口 的溫度測定裝置81爲95CTC左右。並且,流入後段的氣 冷裝置瞬間前的能源氣體溫度爲850°C左右。所回收能源 氣體的熱量藉著氮氣的噴入,與比較例1比較有若干的降 低。 第10圖是以圖表顯示管路6的入口部與出口部差壓 -39- (36) 1289644 的測定結果。如第1 〇圖所示,未產生管路6的入口部與 出口部差壓的上升。並且,運轉停止後觀察管路6的內部 ,並未觀察出附著物。 (本發明例2) 本發明例2是從第1圖表示的冷媒噴射噴嘴13噴入 粒徑200 // m以下的霧狀化水(噴霧)之例。能源氣體的 溫度在溫度測定裝置80爲1150°C,管路9入口的溫度測 定裝置81爲950 °C。並且,流入後段的氣冷裝置瞬間前 的能源氣體溫度爲8 5 0 °C左右。 第11圖中以圖表顯示管路6的入口部與出口部差壓 的測定結果。如第1 1圖所示,運轉中未產生管路6的入 口部與出口部差壓的上升,運轉停止後即使觀察管路6的 內部,也無法觀察出附著物。此外,回收的能源氣體的熱 量是與比較例1相同的値,冷媒1 2顯示相對於噴入惰性 氣體的本發明例1的優先性。 並且,後段的氣冷裝置中所使用的噴霧量只減少與噴 嘴1 3所噴入噴霧量大致相同的量。 (2 )堵塞物的機械式除去 比較例2及本發明例3〜4是說明本發明涉及的堵塞物 除去裝置16的效果,將運轉諸元素及試驗結果表示於表 5中。 -40- (37)1289644 表5 比較例2 本發明例3 本發明例4 裝入物 粉麵粉塵 400 400 400 (kg/hr) 錯 20 20 20 鋅 20 20 20 爐壓,管6路之入-出差壓 圖12 圖13 圖14 驅動軸19-U9-2之動作條件 爐內壓g 50mm 管路入-出差壓2 每8小時 以h2o作動 50mm以H20作動 定期作動 送風氧氣 爐中心塊9 80 80 80 (Nm3/hr) 上部風口 10 80 80 80 下部風口 11 60 60 60 從下部風口 11之LPG(Nm3/h) 8 8 8 爐內清除N2(Nm3/h) 40 40 40 爐出氣量(wet-Nm3/hr) 643 643 643 CO 32.5 32.5 32.5 C〇2 14.9 14.9 14.9 h2 21.9 21.9 21.9 氣體組成(%) h2o 23.4 23.4 23.4 n2 6.2 6.2 6.2 h2s 0.1 0.1 0.1 HC1 1.0 1.0 1.0 運轉時間 約1小時 約3分鐘 約3分鐘 結果 驅動軸19-1, 1次操作之 即使進行300次以上 即使進行300次以上 19一2耐久性 驅動軸變形 的操作也不會變形 的操作也不會變形 氣密性 運轉中從密封 使進行300次以上 使進行300次以上 部產生漏氣 的操作也沒有問題 的操作也沒有問題Table 4 Comparative Example 1 Inventive Example 1 Inventive Example 2 Charge pulverized dust 400 400 400 (kg/hr) Lead 20 20 20 Zinc 20 20 20 Furnace pressure, change in the inlet-outlet differential pressure of the tube 6 Figure 9 Fig. 10 (no clogging) Fig. 11 (no clogging) Cold spray (kg/hr) at the outlet of the furnace 0 0 40 Medium 12 N2 Gas (Nm3/hr) 0 90 0 Air supply oxygen furnace center block 9 80 80 80 (Nm3/hr) Upper tuyere 10 80 80 80 Lower tuyere 11 60 60 60 Remove the upper temperature of the N2 (Nm3/h) 40 40 40 furnace from the LPG (Nm3/h) 8 8 8 furnace in the lower tuyere 11 (. C, measuring device 80) 1150 1150 1150 Pipeline inlet temperature (°C, measuring device 81) 1100 950 950 Discharge (wet-Nm3/hr) 1 643 733 691 CO 32.5 28.5 30.3 C〇2 14.9 13.1 13.9 h2 21.9 19.2 20.4 Exhaust (%) h2o 23.4 20.5 28.6 n2 6.2 17.7 5.8 h2s 0.1 0.1 0.1 HC1 1.0 0.9 0.9 Pipe ό outlet gas heat (kcal/dry-Nm3) 2019 1706 2019 -38 - (35) 1289644 (Comparative example 1) Comparative Example 1 is an example in which the refrigerant 12 is injected from the refrigerant injection nozzle 13 as shown in Fig. 1. The temperature at which the energy gas is generated is in the upper part of the furnace. The temperature measuring device 80 is 1 150 ° C, and the inlet temperature measuring device 81 of the line 6 is about 1100 ° C. The differential pressure measurement result of the inlet and outlet portions of the line 6 is shown in a graph in FIG. 9 . Further, in each of the drawings (Fig. 9 to Fig. 14) of the ninth and subsequent figures, the vertical axis P indicates the pressure (mmH20), the vertical axis d indicates the number of days of operation (day), and the symbol 〇 indicates the pipe 6 The differential pressure between the entry side and the exit side, the Δ mark indicates the furnace pressure. As shown in Fig. 9, this differential pressure is increased from the 20th day after the start of the operation. The differential pressure of the line 6 is 300mmH20. When the inside of the pipe 6 is observed, the inside of the pipe 6 is observed. (Example 1 of the present invention) In the first example of the present invention, the nitrogen gas as the refrigerant 12 is injected from the refrigerant jet nozzle 13 . The generated energy gas is cooled before flowing into the line 6. The temperature of the energy gas is 1150 ° C in the temperature measuring device 80, and the temperature measuring device 81 at the inlet of the line 6 is about 95 CTC. Further, the temperature of the energy gas immediately before the air-cooling device flowing into the rear stage is about 850 °C. The heat of the recovered energy gas was reduced by a small amount compared with Comparative Example 1 by the injection of nitrogen gas. Fig. 10 is a graph showing the measurement results of the differential pressure of the inlet portion and the outlet portion of the pipe 6 - 39 - (36) 1289644. As shown in Fig. 1, the differential pressure between the inlet portion and the outlet portion of the line 6 is not increased. Further, after the operation was stopped, the inside of the pipe 6 was observed, and no deposit was observed. (Inventive Example 2) The second embodiment of the present invention is an example in which mist-like water (spray) having a particle diameter of 200 // m or less is sprayed from the refrigerant jet nozzle 13 shown in Fig. 1 . The temperature of the energy gas was 1150 °C in the temperature measuring device 80, and the temperature measuring device 81 at the inlet of the pipe 9 was 950 °C. Further, the temperature of the energy gas immediately before the air-cooling device flowing into the rear stage is about 850 °C. Fig. 11 is a graph showing the measurement results of the differential pressure between the inlet portion and the outlet portion of the line 6. As shown in Fig. 1, the differential pressure between the inlet portion and the outlet portion of the conduit 6 was not increased during the operation, and even after the operation was stopped, the deposit was not observed even when the inside of the conduit 6 was observed. Further, the heat of the recovered energy gas was the same as that of Comparative Example 1, and the refrigerant 12 showed the preference of Inventive Example 1 in which the inert gas was injected. Further, the amount of spray used in the air-cooling device in the latter stage is reduced by substantially the same amount as the amount of spray injected into the nozzle 13. (2) Mechanical removal of the plugged material Comparative Example 2 and Examples 3 to 4 of the present invention are effects of explaining the plugging device 16 according to the present invention, and the elements of the operation and the test results are shown in Table 5. -40- (37) 1289644 Table 5 Comparative Example 2 Inventive Example 3 Inventive Example 4 Fume powder dust 400 400 400 (kg/hr) Wrong 20 20 20 Zinc 20 20 20 Furnace pressure, tube 6 way - Travel pressure chart 12 Figure 13 Figure 14 Operating conditions of the drive shaft 19-U9-2 In-furnace pressure g 50mm Line in-outside differential pressure 2 Every 5 hours, operate at 50° with h2o, operate with H20, and periodically operate the air supply oxygen furnace center block 9 80 80 80 (Nm3/hr) Upper tuyere 10 80 80 80 Lower tuyere 11 60 60 60 Remove N2 (Nm3/h) 40 40 40 furnace gas output from the LPG (Nm3/h) 8 8 8 furnace in the lower tuyere 11 (wet -Nm3/hr) 643 643 643 CO 32.5 32.5 32.5 C〇2 14.9 14.9 14.9 h2 21.9 21.9 21.9 Gas composition (%) h2o 23.4 23.4 23.4 n2 6.2 6.2 6.2 h2s 0.1 0.1 0.1 HC1 1.0 1.0 1.0 Running time approx. 1 hour approx. 3 In about 3 minutes, the drive shaft 19-1 is driven, and even if it is performed 300 times or more, even if it is performed 300 times or more, the operation of the 19-2 durability drive shaft deformation will not be deformed, and the operation will not be deformed. The operation of making a leak from 300 times or more from the sealing There is no problem of operation is not a problem

-41 - (38) 1289644 (比較例2) 比較例2中,無視於第2圖表示差壓預測裝置丨8的 値,根據爐內壓力預測堵塞程度。並且,使驅動軸19-1 、19-2升降,除去堵塞物。 管路6的入口部與出口部差壓的測定結果以圖表顯示 於第12圖。第12圖的圖表的A點中使驅動軸19-1、19-2升降,除去堵塞物。 如第12圖所示,管路6的入口與出口的差壓即使相 對於基底(0mmH2O )增力卩100mmH2〇以上,仍不會產生 爐內壓力的上升。即,爐內壓力的變化與此差壓比較,可 獲知相對於管路6堵塞的反應遲鈍。而爐內壓力顯著增加 是由於相對於基底(0mmH2O)差壓測定裝置18的値增加 300mmH20以上的原因。 在此時雖然使得驅動軸19-1、19-2動作,除去堵塞 物大約需耗費1小時。並且,持續長時間作業的結果,可 從差壓測定裝置1 8的氣密部22確認出爐內氣體的洩漏。 •爲了提高堵塞物除去裝置16的壽命,重要的是考慮 在管路6堵塞的程度輕時使驅動軸19-1、19-2動作。因 此,與其觀察爐內壓力,倒不如連續觀察管路6的入口與 出口的差壓相對於管路6內部的堵塞可有效地儘速獲得對 應。 (本發明例3 ) 本發明例3是根據差壓測定裝置18的値,使第2圖 1289644 (39) 表示的驅動軸19-1、19-2升降,除去堵塞物。 將管路6的入口部與出口部差壓的測定結果以圖表顯 示於第13圖。第13的圖表的B點中使驅動軸19-1、19-2升降,除去堵塞物。 如第1 3圖表示,差壓測定裝置1 8的値在相對於基底 (0mmH2O )增加50mmH2O以上使驅動軸19-1、19-2運 轉時,進行大約3分鐘作業的差壓測定裝置18的値恢復 基底値(0mmH2O ),隨後可進行穩定的運轉。此一操作 ,即使進行300次以上也不會形成驅動軸19-1、19-2的 變形,及從氣密部22的爐內氣體漏洩。 即,觀察管路6的差壓,有效地使差壓測定裝置1 8 動作以儘速檢測管路6堵塞的徵兆。 (本發明例4 ) 本發明例4中,與差壓測定裝置1 8及爐內壓的値無 關,每8個小時使第1圖表示的驅動軸19-1、19-2定期 地升降一次。 第14圖中以圖表顯示管路6入口部與出口部差壓的 測定結果。如第14圖表示,差壓測定裝置1 8的値不致形 成10mmH2O以上,即使1〇〇曰間連續運轉也不會使管路 6堵塞,不會產生驅動軸19-1、19-2的變形及從氣密部 22的氣體漏洩。 (ii)爐內塡充時間 -43- (40) 1289644 表6顯示的比較例3及本發明例5都是針對使用炭材 使爐升溫的說明。 表6 比較例3 本發明例5 使用燃料 LPG 焦炭 塡充完成+升溫完 成時間 96小時 48小時 升溫時帶奧辛類排 出量 <0.01ng-TEQ/Nm3 <0.01ng-TEQ/Nm3-41 - (38) 1289644 (Comparative Example 2) In Comparative Example 2, the degree of clogging was predicted from the pressure in the furnace, regardless of the enthalpy of the differential pressure predicting device 丨8 in Fig. 2 . Further, the drive shafts 19-1 and 19-2 are moved up and down to remove the blockage. The measurement result of the differential pressure between the inlet portion and the outlet portion of the line 6 is shown in Fig. 12 as a graph. At point A of the graph of Fig. 12, the drive shafts 19-1 and 19-2 are moved up and down to remove the blockage. As shown in Fig. 12, the differential pressure between the inlet and the outlet of the line 6 does not increase the pressure in the furnace even if the force is increased by more than 100 mmH2 Torr with respect to the substrate (0 mmH2O). That is, the change in the pressure in the furnace is compared with this differential pressure, and it is known that the reaction with respect to the clogging of the line 6 is sluggish. The reason why the pressure in the furnace is remarkably increased is that the enthalpy of the differential pressure measuring device 18 is increased by 300 mmH20 or more with respect to the substrate (0 mmH2O). At this time, although the drive shafts 19-1, 19-2 are operated, it takes about one hour to remove the clogging. Further, as a result of continuing the long-term work, the leak of the gas in the furnace can be confirmed from the airtight portion 22 of the differential pressure measuring device 18. • In order to increase the life of the clogging device 16, it is important to operate the drive shafts 19-1 and 19-2 when the clogging of the conduit 6 is light. Therefore, instead of observing the pressure in the furnace, it is better to continuously observe that the differential pressure between the inlet and the outlet of the line 6 relative to the blockage inside the line 6 can be effectively obtained as quickly as possible. (Example 3 of the invention) In the third example of the present invention, the drive shafts 19-1 and 19-2 shown in Fig. 1289644 (39) are moved up and down according to the enthalpy of the differential pressure measuring device 18 to remove the clogging. The measurement result of the differential pressure between the inlet portion and the outlet portion of the conduit 6 is shown in Fig. 13 as a graph. At point B of the 13th graph, the drive shafts 19-1 and 19-2 are moved up and down to remove the blockage. As shown in Fig. 1, the differential pressure measuring device 18 of the differential pressure measuring device 18 is operated by the differential pressure measuring device 18 which is operated for about 3 minutes when the driving shafts 19-1 and 19-2 are operated by 50 mm H2O or more with respect to the base (0 mmH2O).値Recover the substrate 値 (0mmH2O) and then operate stably. In this operation, even if the operation is performed 300 times or more, the deformation of the drive shafts 19-1 and 19-2 is not formed, and the gas in the furnace from the airtight portion 22 leaks. That is, the differential pressure of the line 6 is observed, and the differential pressure measuring device 18 is effectively operated to detect the sign of the blockage of the line 6 as quickly as possible. (Inventive Example 4) In the fourth example of the present invention, the drive shafts 19-1 and 19-2 shown in Fig. 1 are periodically raised and lowered once every eight hours regardless of the differential pressure measuring device 18 and the internal pressure of the furnace. . Fig. 14 is a graph showing the results of measurement of the differential pressure between the inlet portion and the outlet portion of the line 6. As shown in Fig. 14, the pressure of the differential pressure measuring device 18 does not form 10 mmH2O or more, and even if the operation is continuously performed for one turn, the pipe 6 is not clogged, and the deformation of the drive shafts 19-1, 19-2 does not occur. And the gas leaking from the airtight portion 22. (ii) Furnace filling time -43- (40) 1289644 The comparative example 3 shown in Table 6 and the example 5 of the present invention are all descriptions for heating the furnace using a carbon material. Table 6 Comparative Example 3 Inventive Example 5 Use of fuel LPG coke Charge completion + temperature rise completion time 96 hours 48 hours With octane discharge at temperature rise <0.01 ng-TEQ/Nm3 <0.01 ng-TEQ/Nm3

(比較例3) 藉燃燒器的燃燒使爐升溫的比較例3升溫需要4 8小 時。隨後,雖然開始進行廢棄物3的裝入,但是使裝入物 的上端面高度位準上升至目標値(控制値)的l.5m爲止 更必須要48小時。亦即,開始升溫後至裝入物上端面的 高度位準的調整完成時間(爐內塡充時間)需要9 6小時 (本發明例5 ) 本發明例5中,從升溫前的階段裝入炭材,一邊測量 升溫途中裝入物上端面的高度位準,依序調整炭材的裝入 量。因此’升溫完成時裝入物上端面的高度位準到達目標 位準(控制位準)。因此,形成廢棄物裝入開始爲止所需 -44- (41) 1289644 的時間爲4 8小時,可以減少比較例3的一半。並且,使 用作爲炭材的鹵素濃度0.1 %以下的結果,同樣可以將升 溫途中的待奧辛類的排出量抑制在極低的位準。 (iii)未利用碳的降低 表7是表示比較例4及本發明例6的試驗結果。(Comparative Example 3) The temperature rise of Comparative Example 3 in which the temperature of the furnace was raised by the combustion of the burner was 48 hours. Subsequently, although the loading of the waste 3 was started, it took more than 48 hours to raise the height of the upper end surface of the load to 1.5 m of the target enthalpy (control enthalpy). That is, the adjustment completion time (in-furnace charging time) of the height level after the start of the temperature rise to the upper end surface of the load is required to be 96 hours (Inventive Example 5) In the fifth example of the present invention, the stage before the temperature rise is loaded. In the carbon material, the height level of the upper end surface of the load during the heating is measured, and the amount of the carbon material is adjusted in order. Therefore, the height level of the upper end surface of the load at the completion of the temperature rise reaches the target level (control level). Therefore, the time required to form -44-(41) 1289644 for the start of waste charging is 48 hours, and half of Comparative Example 3 can be reduced. Further, as a result of using a halogen concentration of 0.1% or less as a carbon material, it is possible to suppress the discharge amount of the oxin-like substance in the middle of the temperature rise to an extremely low level. (iii) Reduction of Unutilized Carbon Table 7 shows the test results of Comparative Example 4 and Inventive Example 6.

-45- (42) 1289644 表7 比較例4 本發明例6 切碎機粉塵(kg/hr) 400 400 送風氧氣 爐中心塊9 80 80 (Nm3/hr) 上部風口 10 75 84 下部風口 11 60 60 蒸氣噴入(kg/hr) 0 18 從下部風口 11之LPG(Nm3/h) 8 8 爐內清除N2(Nm3/h) 40 40 爐頂氣體量(wet-Nm3/hr) 643 688 爐頂氣體溫度(。〇 1150 1150 CO 33.3 33.4 C〇2 14· 1 14.2 h2 22.8 22.9 氣體(%) h2o 22.5 22.7 n2 6.2 5.8 h2s 0.1 0.1 HC1 1.0 0.9 金屬 實量(kg/hr) 3.2 3.2 溫度(°c ) 1480 1480 淤渣 實量(kg/hr) 142 142 溫度(。C ) 1480 1480 未利用C量(kg-C/h〇 15 3 產生氣體熱量(kcal/dry-Nm3) 2058 2070 (43) 1289644 (比較例4 ) 比較例4是從第1圖表示蒸氣噴入噴嘴33噴入 18kg/hr蒸氣時的試驗結果。未利用碳量減少至3kg-C/hr 。並且,隨著未利用碳的減少,增加CO氣體產生量’及 蒸氣轉換爲氫,可以增加廢棄物3單位處理量的產生氣體 發熱量。並且,氣體每INm3 (乾空氣)的氣體發熱量同 樣從2058kcal/Nm3增加至2070kcal/Nm3。又’從爐中心 塊9或者上部風口 33與柱燃性氣體同時噴入蒸氣’可獲 得相同的結果。 (本發明例6) 本發明例6是表示第1圖所示蒸氣噴入噴嘴33噴入 18kg/hr蒸氣時的試驗結果。未利用碳量減少至3kg_c/hr 。並且,隨著未利用碳的減少,增加CO氣體產生量’及 蒸氣轉換爲氫,可以增加廢棄物3單位處理量的產生氣體 鲁 發熱量。並且,氣體每INm3 (乾空氣)的氣體發熱量同樣 從2058kcal/Nm3增加至2070kcal/Nm3。又,從爐中心塊 9或者上部風口 33與柱燃性氣體同時噴入蒸氣,可獲得 相同的結果。 (iv )廢棄物上端面位置的控制 比較例5及本發明例7是表示炭材投入控制塡充層高 度位準的結果。將各個結果彙整於表8中。 -47- (44) 1289644 (44)-45- (42) 1289644 Table 7 Comparative Example 4 Inventive Example 6 Chopper dust (kg/hr) 400 400 Air supply oxygen furnace center block 9 80 80 (Nm3/hr) Upper tuyere 10 75 84 Lower tuyere 11 60 60 Vapor injection (kg/hr) 0 18 Remove N2 (Nm3/h) from the LPG (Nm3/h) 8 8 furnace of the lower tuyere 11 40 40 top gas volume (wet-Nm3/hr) 643 688 top gas Temperature (.〇1150 1150 CO 33.3 33.4 C〇2 14· 1 14.2 h2 22.8 22.9 Gas (%) h2o 22.5 22.7 n2 6.2 5.8 h2s 0.1 0.1 HC1 1.0 0.9 Metal solid (kg/hr) 3.2 3.2 Temperature (°c) 1480 1480 Sludge solids (kg/hr) 142 142 Temperature (.C) 1480 1480 Unutilized C (kg-C/h〇15 3 gas heat generation (kcal/dry-Nm3) 2058 2070 (43) 1289644 ( Comparative Example 4) Comparative Example 4 is a test result when 18 kg/hr of steam was injected from the steam injection nozzle 33 in Fig. 1. The amount of unused carbon was reduced to 3 kg-C/hr, and the amount of unused carbon was decreased. , Increasing the amount of CO gas generated and converting steam into hydrogen, which can increase the calorific value of the generated gas by 3 units of waste. Moreover, the gas is heated per INm3 (dry air). The same result is obtained from 2058 kcal/Nm3 to 2070 kcal/Nm3. The same result can be obtained by simultaneously injecting steam from the furnace center block 9 or the upper tuyere 33 with the column flammable gas. (Inventive Example 6) Inventive Example 6 shows Fig. 1 shows the test results when the steam injection nozzle 33 is sprayed with 18 kg/hr of steam. The amount of unused carbon is reduced to 3 kg_c/hr. And, as the amount of unused carbon is reduced, the amount of CO gas generated is increased' and the vapor conversion is increased. For hydrogen, it can increase the heat generated by 3 units of waste gas. Moreover, the gas heat per INm3 (dry air) is also increased from 2058kcal/Nm3 to 2070kcal/Nm3. Also, from the furnace center block 9 or The upper tuyere 33 is sprayed with steam at the same time as the column flammable gas, and the same result can be obtained. (iv) Control of the upper end position of the waste Comparative Example 5 and Example 7 of the present invention indicate that the carbon material is put into the control level of the filling layer. The results are summarized in Table 8. -47- (44) 1289644 (44)

表8 比較例5 本發明例7 裝入物(kg/hr) 切碎機粉塵 400 400 廢木材 0 80 送風氧氣 (Nm3/hr) 爐中心塊9 80 80 上部風口 10 75 83 下部風口 11 60 60 下部風口 11之氧氣量操作次數(次/日) 20 2 上部風口 10之氧氣量操作次數(次/日) 35 3 從下部風口 11之LPG(Nm3/h) 8 8 爐內清除N2(Nm3/h) 40 40 廢棄物上端位準(mm) 1450〜1550 1450〜1550 爐頂氣體量(wet-Nm3/hr) 643 766 爐頂氣體溫度(。C) 1150 1150 氣體組成(%) CO 33.3 35.5 C〇2 14.1 12.1 h2 22.8 25.8 h2o 22.5 20.5 n2 6.2 5.2 h2s 0.1 0.1 HC1 1.0 0.8 金屬 實量(kg/hr) 3.1 3.2 溫度(。C ) 1470 1480 淤渣 實量(kg/hr) 142 145 溫度(。C ) 1470 1480 -48- (45) 1289644 (比較例5 ) 比較例5是氣化熔融處理切碎機粉塵,燃料不進行廢 材等炭材的投入而是從下部風口 11噴入8Nm3/hr的LPG 。如表1所示切碎機粉塵所含的熱分解殘渣中的炭量(固 定碳)爲5.4%,與乾燥後的都市垃圾比較少。 比較例5中,控制廢棄物3上端面高度位準的方法式 從控制下部風口 1 1送出的柱燃性氣體的量。即,上端面 的高度位準低於目標時會降低柱燃性氣體的量,相反地高 於目標値會增加柱燃性氣體的量。並且,隨著下部風口 1 1之助燃性氣體的降低,即使熔渣及熔融金屬排出量降 低時仍會增加從下部風口 1 1的助燃性氣體的量。 如表8所示,比較例5中,爲了使廢棄物3上端面的 位準維持在目標値的1450mm~1550mm,必須要頻繁操作 來自下部風口 11的助燃性氣體量及來自上部風口 10的助 燃性氣體的量,以來自下部風口 11的助燃性氣體量爲20 次/日,來自上部風口 10的助燃性氣體量爲35次/日爲基 準。 (本發明例7 ) 本發明例7是以廢木材爲炭材投入的例。從下部風口 1 1及上部風口 1 〇的助燃性氣體的量幾乎沒有變化,可以 將廢棄物3上端的位置控制在目標控制範圍內。 即’尤其是以固定炭少的廢棄物3爲對象時,炭材8 及/或藉著炭材36的投入可容易進行廢棄物3上端位置的 -49- (46) 1289644 控制。 (v)鹵素的元素再生 表9是表示根據第4圖及第5圖所示流程進行鹵素回 收試驗的諸元素及結果。其中,是以鹵素的代表性物質之 氯的回收爲例說明如下。Table 8 Comparative Example 5 Inventive Example 7 Charge (kg/hr) Chopper dust 400 400 Waste wood 0 80 Air supply oxygen (Nm3/hr) Furnace center block 9 80 80 Upper tuyere 10 75 83 Lower tuyere 11 60 60 The number of oxygen operation times of the lower tuyere 11 (time/day) 20 2 The number of oxygen operation times of the upper tuyere 10 (time/day) 35 3 Remove N2 from the LPG (Nm3/h) 8 8 furnace of the lower tuyere 11 (Nm3/ h) 40 40 Waste upper level (mm) 1450~1550 1450~1550 Top gas quantity (wet-Nm3/hr) 643 766 Top gas temperature (.C) 1150 1150 Gas composition (%) CO 33.3 35.5 C 〇2 14.1 12.1 h2 22.8 25.8 h2o 22.5 20.5 n2 6.2 5.2 h2s 0.1 0.1 HC1 1.0 0.8 Metal solids (kg/hr) 3.1 3.2 Temperature (.C) 1470 1480 Slag solids (kg/hr) 142 145 Temperature (. C) 1470 1480 -48- (45) 1289644 (Comparative Example 5) In Comparative Example 5, the chopper dust was gasified and melted, and the fuel was not injected into the carbon material such as waste materials, but was sprayed from the lower tuyere 11 to 8 Nm 3 /hr. LPG. As shown in Table 1, the amount of carbon (fixed carbon) in the thermal decomposition residue contained in the chopper dust was 5.4%, which was less than that of the municipal waste after drying. In Comparative Example 5, the method of controlling the height level of the upper end surface of the waste 3 is the amount of the column flammable gas sent from the lower tuyere 1 1 . That is, when the height level of the upper end surface is lower than the target, the amount of the column flammable gas is lowered, and conversely, higher than the target enthalpy increases the amount of the column flammable gas. Further, as the combustion-supporting gas of the lower tuyeres 1 is lowered, the amount of the combustion-supporting gas from the lower tuyeres 1 is increased even when the amount of slag and molten metal discharged is lowered. As shown in Table 8, in Comparative Example 5, in order to maintain the level of the upper end surface of the waste 3 at 1450 mm to 1550 mm of the target crucible, the amount of combustion-supporting gas from the lower tuyere 11 and the combustion assist from the upper tuyere 10 must be frequently operated. The amount of the gas was such that the amount of the combustion-supporting gas from the lower tuyere 11 was 20 times/day, and the amount of the combustion-supporting gas from the upper tuyere 10 was 35 times/day. (Inventive Example 7) Inventive Example 7 is an example in which waste wood is used as a carbon material. The amount of combustion-supporting gas from the lower tuyere 1 1 and the upper tuyere 1 几乎 is hardly changed, and the position of the upper end of the waste 3 can be controlled within the target control range. In other words, when the waste material 3 having a small amount of carbon is targeted, the carbon material 8 and/or the carbon material 36 can be easily controlled by -49-(46) 1289644 at the upper end position of the waste 3. (v) Element regeneration of halogen Table 9 shows the elements and results of the halogen recovery test performed in accordance with the flow shown in Figs. 4 and 5. Among them, the recovery of chlorine as a representative substance of halogen is exemplified as follows.

-50· (47)1289644 表9 本發明例8 本發明例9 鹽酸回收方法 除塵後(圖4) 氣體冷卻後(圖5) 塑膠屑(kg/h〇 400 400 送風氣總量(N m3 / h r) 191 191 從下部風口 11 2LPG(Nm3/h) 18 18 爐內清除N2(Nm3/h) 60 60 爐頂氣體量(wet-Nm3/hr) 771 771 爐頂氣體溫度(。〇 1150 1150 CO 42.2 42.2 C〇2 3.4 3.4 h2 25.6 25.6 氣體組成(%) h2o 5.3 5.3 n2 7.8 7.8 h2s 0.1 0.1 HC1 15.6 15.6 金屬. 實量(kg/hr) 0.1 0.1 溫度(°c ) 1460 1460 淤渣 實量(kg/hr) 13 13 溫度(。C ) 1460 1460 爐內投入氯(kg-Cl/hr) 191 191 回收氯量(kg-Cl/hr) 189 189-50· (47) 1289644 Table 9 Inventive Example 8 Inventive Example 9 Hydrochloric acid recovery method After dust removal (Fig. 4) After gas cooling (Fig. 5) Plastic chips (kg/h 〇 400 400 total amount of supplied air (N m3 / Hr) 191 191 From the lower tuyere 11 2LPG (Nm3 / h) 18 18 furnace to remove N2 (Nm3 / h) 60 60 top gas volume (wet-Nm3 / hr) 771 771 top gas temperature (. 〇 1150 1150 CO 42.2 42.2 C〇2 3.4 3.4 h2 25.6 25.6 Gas composition (%) h2o 5.3 5.3 n2 7.8 7.8 h2s 0.1 0.1 HC1 15.6 15.6 Metal. Solid (kg/hr) 0.1 0.1 Temperature (°c) 1460 1460 Solids ( Kg/hr) 13 13 Temperature (.C) 1460 1460 Chlorine (kg-Cl/hr) in the furnace 191 191 Chlorine recovery (kg-Cl/hr) 189 189

-51 - (48) 1289644 (本發明例8 ) 本發明例8是根據第4圖所示的流程圖進行氯回收試 驗。即,氣化熔爐1的爐內產生的高熱量氣體4〇以氣冷 裝置42冷卻,並將粉麈57在氣冷裝置42的下部,粉麈 47以除塵裝置46分別除塵後,進行鹽酸回收。 其中使用的塑膠屑是如表2所示含有高濃度氯的塑膠 屑。如表9所示,投入氣化熔爐1內部的全部氯爲 191kg-Cl/hr,但是189kg-Cl/hr的氯通過鹵素回收裝置48 及鹵化裝置55之後,回收。並且,在氣化熔爐1的內部 以1000 °C以上將裝入的塑膠屑熱分解氣化,使產生的氣 體以氣冷裝置42急冷至170°C的結果,將排氣53所含的 戴奧辛類濃度抑制在極低的低位準。並且,從氣冷裝置 42所排出的氣體在導入鹵素回收裝置48爲止的期間,維 持在13〇°C以上。此外,除塵裝置46及隨後的配管路使 用耐蝕耐熱鎳基合金,使用FRP作爲鹵素回收裝置48的 材料。其結果,不會呈現使用設備的腐鈾。 (本發明例9 ) 本發明例9是根據第5圖表示的流程圖進行氯回收試 驗。即,以冷卻裝置42將爐內產生的高能量氣體40冷卻 至l〇〇°C以下,使含氯化氫氣體凝結進行鹽酸回收。 如第9圖所示投入氣化熔爐1內部的氯爲i 9 1 kg-Cl/hr,但是在氣冷裝置42的下部以鹽酸回收,隨後以鹵 化裝置55轉換成氯,回收189kg-Cl/hr的氯。並且,與本 -52- (49) 1289644 發明例8同樣將裝入的塑膠屑在氣化熔爐1的內部以 100(TC以上加以熱分解氣化,以冷卻裝置42將產生的氣 體急冷至l〇〇°C以下的結果,將排氣70所含的戴奧辛類 濃度抑制在低位準。 (產業上的可利用性) 根據本發明,可提供一種解決基本之氣化熔融具有的 課題,具體而言(a)管路的堵塞、(b)爐內塡充時間、 (c )未利用碳的排出、(d )廢棄物上端面位置的控制、 (e)鹵素類的原料再生、(f)有害廢棄物的裝入,或( g )熔漿室的內部壓力上升,藉此可以使基本的氣化熔爐 更爲高性能化。因此,根據本發明,可持續地長期間穩定 地持續進行商用規模的氣化熔爐運轉,確實具有實用性高 的廢棄物處理方法及處理裝置。 【圖式簡單說明】 第1圖爲實施形態所使用廢棄物的氣化熔爐的詳細說 明用的槪略圖。 第2圖是以模式表示在實施形態的氣化熔爐中,以機 械式方法除去管路內壁附著物的廢棄物的處理裝置之附著 物除去裝置的說明圖。 第3圖表示在前端部設置纖維鏡之驅動軸的說明圖。 第4圖表示回收實施形態的鹵素用的系統流程說明圖 -53- (50) 1289644 第5圖表示回收實施形態的鹵素用的系統流程說明圖 〇 第6圖表示回收實施形態的鹵素用的系統流程說明圖 〇 第7圖表示回收實施形態的鹵素用的系統流程說明圖 〇 第8圖是模式表示將第1圖表示氣化熔爐內設置熔漿 室的氣化熔爐部分簡化的說明圖。 第9圖表示管路的入口部與出口部的差壓測定結果的 圖表。 第1 0圖表示管路的入口部與出口部的差壓測定結果 的圖表。 第1 1圖表示管路的入口部與出口部的差壓測定結果 的圖表。 第1 2圖表示管路的入口部與出口部的差壓測定結果 的圖表。 第1 3圖表示管路的入口部與出口部的差壓測定結果 的圖表。 第14圖表示管路的入口部與出口部的差壓測定結果 的圖表。 元件對照表 1 :氣化熔爐 1 :爐體 -54- (51) 1289644 2 :內襯耐火物 3 :廢棄物 4 :廢棄物裝入口 5 :氣體排出口 6 :管路 6a :入口部 6b :出口部 7 :推桿 8 :炭材 9 ·爐中心、塊 9a :助燃性氣體 10 :上部風口 l〇a :助燃性氣體 1 1 :下部風口 1 1 a :助燃性氣體 lib :燃料 1 2 :冷媒 13,14 :噴嘴 15 :氣體 1 6 :附著物除去裝置 17 :附著物 1 8 :差壓測定裝置 19-1,19— 2:驅動軸 20 :升降裝置 -55- (52) 1289644 21 :冷卻水 22 :漏氣防止裝置 23 :閥 24 :待機位置 28 :裝入裝置-51 - (48) 1289644 (Inventive Example 8) Inventive Example 8 was a chlorine recovery test according to the flow chart shown in Fig. 4. That is, the high-calorie gas 4〇 generated in the furnace of the gasification furnace 1 is cooled by the air cooling device 42, and the powder crucible 57 is placed in the lower portion of the air cooling device 42, and the powder crucible 47 is dedusted by the dust removing device 46, respectively, and hydrochloric acid recovery is performed. . The plastic chips used therein are plastic chips containing a high concentration of chlorine as shown in Table 2. As shown in Table 9, all of the chlorine introduced into the inside of the gasification furnace 1 was 191 kg-Cl/hr, but 189 kg-Cl/hr of chlorine was passed through the halogen recovery unit 48 and the halogenation unit 55, and recovered. Further, in the inside of the gasification furnace 1, the loaded plastic chips are thermally decomposed and vaporized at 1000 ° C or higher, and the generated gas is quenched to 170 ° C by the air cooling device 42 , and the dioxin contained in the exhaust gas 53 is contained. The concentration of the class is suppressed at an extremely low level. Further, the gas discharged from the air-cooling device 42 is maintained at 13 °C or higher while being introduced into the halogen recovery device 48. Further, the dust removing device 46 and the subsequent piping are made of a corrosion-resistant nickel-base alloy, and FRP is used as the material of the halogen recovery device 48. As a result, the uranium used in the equipment will not be presented. (Example 9 of the invention) Inventive Example 9 is a chlorine recovery test according to the flowchart shown in Fig. 5. That is, the high-energy gas 40 generated in the furnace is cooled to not more than 10 °C by the cooling device 42, and the hydrogen chloride-containing gas is condensed to recover hydrochloric acid. The chlorine introduced into the inside of the gasification furnace 1 as shown in Fig. 9 is i 9 1 kg-Cl/hr, but is recovered by hydrochloric acid in the lower portion of the air cooling device 42, and then converted into chlorine by the halogenation device 55 to recover 189 kg-Cl/ Chlorine of hr. Further, in the same manner as in Inventive Example No. 52-(49) 1289644, the plastic chips charged therein are thermally decomposed and vaporized in the inside of the gasification furnace 1 by 100 (TC or more, and the gas generated by the cooling device 42 is quenched to l. As a result of the 〇〇 ° C or lower, the concentration of the dioxin contained in the exhaust gas 70 is suppressed to a low level. (Industrial Applicability) According to the present invention, it is possible to provide a problem of solving the basic vaporization and melting, specifically (a) clogging of the pipeline, (b) charging time in the furnace, (c) discharge of unused carbon, (d) control of the position of the upper end surface of the waste, (e) regeneration of raw materials of halogens, (f) The charging of the hazardous waste, or (g) the internal pressure of the melting chamber is increased, whereby the basic gasification furnace can be further improved in performance. Therefore, according to the present invention, the commercial operation can be stably continued for a long period of time. In the gasification furnace operation of a large scale, it is a highly practical waste treatment method and treatment device. [Simplified description of the drawings] Fig. 1 is a schematic diagram for explaining the detailed description of the gasification furnace of the waste used in the embodiment. 2 is represented by a pattern in the implementation form In the gasification furnace of the present invention, an explanatory view of the attachment removing device of the processing device for removing the waste of the inner wall of the pipe by a mechanical method is shown in Fig. 3. Fig. 3 is an explanatory view showing a drive shaft in which the fiber mirror is provided at the tip end portion. Fig. 4 is a flow chart showing the system for recycling the halogen of the embodiment. Fig. 53-(50) 1289644 Fig. 5 is a flow chart showing the system for recovering the halogen of the embodiment. Fig. 6 is a view showing the system for recovering the halogen according to the embodiment. BRIEF DESCRIPTION OF THE DRAWINGS FIG. 7 is a flow chart for explaining a system for recycling a halogen according to an embodiment. FIG. 8 is a schematic view showing a simplified portion of a gasification furnace in which a melting chamber is provided in a gasification furnace in a first embodiment. Fig. 9 is a graph showing the results of the differential pressure measurement at the inlet and outlet of the pipe. Fig. 10 is a graph showing the results of the differential pressure measurement at the inlet and outlet of the pipe. Fig. 1 shows the inlet of the pipe. A graph showing the results of the differential pressure measurement at the outlet portion. Fig. 1 is a graph showing the results of the differential pressure measurement at the inlet and outlet of the pipeline. Fig. 1 3 shows the differential pressure measurement at the inlet and outlet of the pipeline. Fig. 14 is a graph showing the results of the differential pressure measurement at the inlet and outlet of the pipeline. Component comparison table 1: gasification furnace 1: furnace body-54- (51) 1289644 2: lining refractory 3 : Waste 4 : Waste charging inlet 5 : Gas discharge port 6 : Pipe 6a : Inlet portion 6b : Outlet portion 7 : Push rod 8 : Charcoal material 9 · Furnace center, block 9a : Combustible gas 10 : Upper tuyere l 〇a : combustion-supporting gas 1 1 : lower tuyere 1 1 a : combustion-supporting gas lib : fuel 1 2 : refrigerant 13 , 14 : nozzle 15 : gas 1 6 : deposit removal device 17 : attachment 1 8 : differential pressure measurement Device 19-1, 19-2: Drive shaft 20: Lifting device - 55- (52) 1289644 21: Cooling water 22: Air leakage preventing device 23: Valve 24: Standby position 28: Loading device

29 :雙重閘閥 29a :上部閘閥 29b :下部閘閥 3 0 :爐內監視窗 3 2 :炭材 3 3 :噴嘴 34 :蒸氣 35 :未利用碳 36 :炭材29: Double gate valve 29a: Upper gate valve 29b: Lower gate valve 3 0 : Furnace monitoring window 3 2 : Charcoal material 3 3 : Nozzle 34 : Vapor 35 : Unutilized carbon 36 : Charcoal

3 8 :熔渣 39 :熔融金屬 40 :高熱量氣體 41 :管路 42 :氣冷裝置 43 :噴嘴 44 :噴霧 4 5 :管路 46 :除塵裝置 47 :管路 -56- (53) 1289644 48:鹵素回收裝置 49 :水 50 :噴嘴 5 1 :凝結水 52 :酸 53 :能源氣體3 8 : slag 39 : molten metal 40 : high heat gas 41 : line 42 : air cooling device 43 : nozzle 44 : spray 4 5 : line 46 : dust removal device 47 : line -56- (53) 1289644 48 : Halogen recovery unit 49: Water 50: Nozzle 5 1 : Condensate 52: Acid 53: Energy gas

54 :噴嘴 55 :鹵化裝置 56 :鹵素 5 8 :凝結水 5 9 :淤渣 60 :過濾裝置 61 :酸 62 :凝結水54 : Nozzle 55 : Halogenation unit 56 : Halogen 5 8 : Condensate 5 9 : Sludge 60 : Filtration device 61 : Acid 62 : Condensate

65 :分離塔 66 :酸 7 1 :苛性蘇打 72 :水 d :外徑 -57-65: Separation Tower 66: Acid 7 1 : Caustic soda 72: Water d: Outside diameter -57-

Claims (1)

1289644 附件:第92124500號專利申請案1289644 Annex: Patent Application No. 92124500 中文申請專利範圍修正‘民國95年3月6曰修正 拾、申請專利範一 一一 1· 一種廢棄物之處理方法,其特徵爲: 將廢棄物裝入廢棄物處理爐,對於該廢棄物進行燃燒 、热化或熔融的至少其中之一處理時,將該至少其中之一 處理產生的排氣,連接該廢棄物處理爐的爐體而在該排氣 導出該爐體外部之管路的入口附近的爐內冷卻。 2· —種廢棄物之處理方法,其特徵爲: 將廢棄物裝入具備:爐體;配置在該爐體上部的氣體 排出口;配置在該爐體下部的熔渣及/或熔融金屬的排出 口;配置在該熔渣及/或熔融金屬的排出口與上述氣體排 出口之間的廢棄物裝入口;在上述爐體上部沿著鍾、軸配置 使助燃性氣體向下方噴入爐內用的爐中心塊;上述廢棄物 裝入口與上述氣體排出口之間的爐壁配置1段以上的上部 風口;及上述廢棄物裝入口與上述熔渣及/或熔融金屬的 排出口之間的爐壁配置1段以上的風口所構成的廢棄物處 理爐內,對於該廢棄物進行燃燒、氣化或熔融的至少其中 之一處理時,使該至少其中之一處理產生的排氣,連接該 廢棄物處理爐的爐體而在該排氣導出該爐體外部之管路的 入口附近的爐內冷卻。. 3.如申請專利範圍第1項或第2項記載的廢棄物之 處理方法,其中,上述排氣在上述管路的入口附近,噴入 水、生產用氣體、惰性氣體或蒸氣的至少其中之一所構成 的冷媒冷卻。 4. 一種廢棄物之處理方法,其特徵爲:Chinese patent application scope revision 'Revised by the Republic of China on March 6th, 1995. Patent application model 1-11. A waste disposal method, characterized in that waste is charged into a waste treatment furnace for the waste When at least one of the combustion, the heating, or the melting is processed, the exhaust gas generated by the at least one of the treatments is connected to the furnace body of the waste treatment furnace, and the exhaust gas is led to the inlet of the pipeline outside the furnace body. Cooling in the nearby furnace. 2. A method for treating waste, characterized in that: the waste is charged with: a furnace body; a gas discharge port disposed at an upper portion of the furnace body; and slag and/or molten metal disposed at a lower portion of the furnace body a discharge port; a waste charging port disposed between the slag and/or the discharge port of the molten metal and the gas discharge port; and the combustion chamber is sprayed downward into the furnace along the clock and the shaft in the upper portion of the furnace body a furnace center block; an upper tuyere in which one or more stages are disposed on the furnace wall between the waste charging inlet and the gas discharge port; and between the waste charging inlet and the slag and/or the molten metal discharge port When at least one of combustion, vaporization, or melting is performed in the waste treatment furnace including the tuyere having one or more stages of the furnace wall, the exhaust gas generated by the at least one of the treatments is connected The furnace body of the waste treatment furnace is cooled in a furnace near the inlet of the piping from which the exhaust gas is led out of the furnace body. 3. The method for treating waste according to the first or second aspect of the invention, wherein the exhaust gas is injected into at least one of water, a production gas, an inert gas or a vapor in the vicinity of an inlet of the pipeline. A constituent refrigerant is cooled. 4. A method of treating waste characterized by: 1289644 (2)1289644 (2) 將廢棄物裝入具備:爐體;配置在該爐體上部的氣體 排出口;配置在該爐體下部的熔渣及/或熔融金屬排出口 :配置在該熔渣及/或熔融金屬的排出口與上述氣體排出 口之間的廢棄物裝入口;在上述爐體上部沿著爐軸配置使 助燃性氣體向下方噴入爐內用的爐中心塊;上述廢棄物裝 入口與上述氣體排出口之間的爐壁配置1段以上的上部風 口;及上述廢棄物裝入口與上述熔渣及/或熔融金屬的排 出口之間的爐壁配置1段以上的風口所構成的廢棄物處理 爐內,對於該廢棄物進行燃燒、氣化或熔融的至少其中之 一處理時,自由往返移動配置在連接上述爐體可將該至少 其中之一處理產生的排氣引導至該爐體外部之管路的至少 其中之一直線形部分的內部,根據該管路的入口部及出口 部之間的差壓測定結果所推定之該管路內部的堵塞狀況使 刮除該管路內面附著物用的圓錐狀外形所構成的至少一個 刮除構件動作。The waste is charged with: a furnace body; a gas discharge port disposed at an upper portion of the furnace body; and a slag and/or a molten metal discharge port disposed at a lower portion of the furnace body: disposed in the row of the slag and/or molten metal a waste charging port between the outlet and the gas discharge port; and a furnace center block for discharging the combustion-supporting gas downward into the furnace along the furnace shaft in the upper portion of the furnace body; the waste charging inlet and the gas discharge port An upper air outlet of one or more stages is disposed between the furnace walls; and a waste treatment furnace comprising one or more air outlets between the waste inlet and the discharge port of the molten slag and/or the molten metal; When the waste is subjected to at least one of combustion, gasification or melting, the free reciprocating movement is configured to connect the exhaust gas generated by the at least one of the treatments to the pipeline outside the furnace body. The inside of at least one of the linear portions, the clogging condition inside the pipeline estimated by the differential pressure measurement result between the inlet portion and the outlet portion of the pipeline causes the inner surface of the pipeline to be scraped off At least one scraping member constituted by a conical shape is used. 5 ·如申請專利範圍第4項記載的廢棄物之處理方法 ,其中,上述差壓的測定結果顯示與運轉開始時比較有增 加傾向時,使上述至少一個刮除構件動作。 6 ·如申請專利範圍第4項記載的廢棄物之處理方法 ,其中,在1小時以上24小時以下的範圍以預定時期定 期地使上述上述至少一個刮除構件動作。 7· —種廢棄物之處理方法,其特徵爲: 使具備爐體;配置在該爐體上部的氣體排出口;配置 在該爐體下部的熔渣及/或熔融金屬排出口;配置在該熔 -2- i 1289644 (3)The method for treating waste according to the fourth aspect of the invention, wherein the measurement result of the differential pressure indicates that the at least one scraping member is operated when there is a tendency to increase as compared with the start of the operation. The method for treating waste according to the fourth aspect of the invention, wherein the at least one scraping member is continuously operated for a predetermined period of time in a range of from 1 hour to 24 hours. A method for treating wastes, comprising: a furnace body; a gas discharge port disposed at an upper portion of the furnace body; and a slag and/or a molten metal discharge port disposed at a lower portion of the furnace body; Melt-2-i 1289644 (3) 渣及/或熔融金屬的排出口與上述氣體排出口之間的廢棄 物裝入口;在上述爐體上部沿著爐軸配置使助燃性氣體向 下方噴入爐內用的爐中心塊;上述廢棄物裝入口與上述氣 體排出口之間的爐壁配置1段以上的上部風口;及上述廢 棄物裝入口與上述熔渣及/或熔金屬的排出口之間的爐壁 配置1段以上的風口所構成的廢棄物處理爐升溫時’將含 有鹵素類的總濃度〇·〗質量%以下的炭材裝入廢棄物處理 爐內,從升溫階段調整該廢棄物處理爐內部裝入物的上端 面高度位準。 8. 如申請專利範圍第7項記載的廢棄物之處理方法 ,其中,上述廢棄物處理爐升溫前,在上述爐體的內部預a waste charging port between the discharge port of the slag and/or the molten metal and the gas discharge port; and a furnace center block for discharging the combustion-supporting gas downward into the furnace along the furnace shaft in the upper portion of the furnace body; One or more upper tuyères are disposed on the furnace wall between the object inlet and the gas discharge port; and a tuyere of one or more stages is disposed between the waste inlet and the discharge port of the slag and/or the molten metal. When the temperature of the waste treatment furnace is increased, the carbon material containing the total concentration of halogens is less than or equal to 9% by mass in the waste treatment furnace, and the upper end surface of the internal charge of the waste treatment furnace is adjusted from the temperature rise stage. High level. 8. The method for treating waste according to the seventh aspect of the invention, wherein the waste treatment furnace is preheated in the interior of the furnace body before heating 先裝入含有鹵素類的總濃度0.1質量%以下的炭材,將廢 棄物裝入爐內用的廢棄物裝入通路具有並聯配置的2個閥 ,在開啓外部側閥的同時關閉內部側閥的狀態下,將炭材 供給該外部側閥與該內部側閥之間的空間,關閉該外部側 閥後開啓該內部側閥,從炭材裝入爐內的裝入裝置將火種 投入裝入後該炭材的上端面,隨後,關閉該外部側及/或 內部側的閥,從上述爐中心塊送入助燃性氣體,藉裝入之 該炭材的燃燒,開始該廢棄物處理爐的升溫。 9. 一種廢棄物之處理方法,其特徵爲: 將廢棄物裝入具備:爐體;配置在該爐體上部的氣體 排出口;配置在該爐體下部的熔渣及/或熔融金屬的排出 口;配置在該熔渣及/或熔融金屬的排出口與上述氣體排 出口之間的廢棄物裝入口;在上述爐體上部沿著爐軸配置 -3- 1289644 n / (4) 使助燃性氣體向下方噴入爐內用的爐中心塊;上述廢棄物 裝入口與上述氣體排出口之間的爐壁配置1段以上的上部 風口;及上述廢棄物裝入口與上述熔渣及/或熔融金屬的 排出口之間的爐壁配置1段以上的風口所構成的廢棄物處 理爐內,對於該廢棄物進行燃燒、氣化或熔融的至少其中 之一處理時,從設置在上述爐中心塊、上述上部風口或者 上述廢棄物裝入口與上述氣體排出口之間的爐壁的1個以 上噴嘴中的至少其中之一,將蒸氣朝著上述爐體下部的方 向、從上述側壁朝著爐軸方向或從上述側壁朝著爐軸方向 偏離方向的至少其中之一方向噴入。 10· —種廢棄物之處理方法,其特徵爲: 將廢棄物裝入具備:爐體;配置在該爐體上部的氣體 排出口;配置在該爐體下部的熔渣及/或熔融金屬的排出 口;配置在該熔渣及/或熔融金屬的排出口與上述氣體排 出口之間的廢棄物裝入口;在上述爐體上部沿著爐軸配置 使助燃性氣體向下方噴入爐內用的爐中心塊;上述廢棄物 裝入口與上述氣體排出口之間的爐壁配置1段以上的上部 風口;及上述廢棄物裝入口與上述熔渣及/或熔融金屬的 排出口之間的爐壁配置1段以上的風口所構成的廢棄物處 理爐內,對於該廢棄物進行燃燒、氣化或熔融的至少其中 之一處理時,上述至少其中之一的處理中,將未利用狀態 的上述廢棄物處理爐所排出的碳與廢棄物混合壓實後,再 次裝入該廢棄物處理爐中。 11. 一種廢棄物之處理方法,其特徵爲: -4- 1289644 (5)First, a carbon material containing a total concentration of halogens of 0.1% by mass or less is charged, and the waste charging passage for charging the waste into the furnace has two valves arranged in parallel, and the internal side valve is closed while the external side valve is opened. In a state where the carbon material is supplied to the space between the outer side valve and the inner side valve, the outer side valve is closed, the inner side valve is opened, and the charging device is loaded from the charging material into the furnace. After the upper end surface of the carbon material, and then closing the valve on the outer side and/or the inner side, the combustion-supporting gas is fed from the center block of the furnace, and the combustion of the carbon material is started to start the waste treatment furnace. Warm up. A method for treating waste, characterized in that: the waste is charged with: a furnace body; a gas discharge port disposed at an upper portion of the furnace body; and a slag and/or a row of molten metal disposed at a lower portion of the furnace body An outlet; a waste charging port disposed between the slag and/or the discharge port of the molten metal and the gas discharge port; and -3- 1289644 n / (4) in the upper portion of the furnace body to provide combustion support a gas is sprayed downward into a furnace center block for furnace use; an upper tuyere of one or more stages is disposed on a furnace wall between the waste charging inlet and the gas discharge port; and the waste charging inlet and the slag and/or melting When the furnace wall of the metal discharge port is disposed in a waste treatment furnace composed of one or more air outlets, at least one of combustion, gasification, or melting of the waste is disposed in the center block of the furnace At least one of the upper tuyeres or one or more nozzles of the furnace wall between the waste charging inlet and the gas discharge port, the steam is directed toward the lower portion of the furnace body, toward the side wall Wherein at least one axis direction or the direction offset from a direction toward the side wall from the furnace into the axial direction of the jet. A method for treating wastes, comprising: charging a furnace body; a gas discharge port disposed at an upper portion of the furnace body; and slag and/or molten metal disposed at a lower portion of the furnace body a discharge port; a waste charging port disposed between the slag and/or the discharge port of the molten metal and the gas discharge port; and the combustion furnace gas is sprayed downward into the furnace along the furnace shaft in the upper portion of the furnace body a furnace center block; an upper tuyere having one or more stages disposed on the furnace wall between the waste charging inlet and the gas discharge port; and a furnace between the waste charging inlet and the slag and/or the molten metal discharge port When at least one of the waste is subjected to combustion, vaporization, or melting in the waste treatment furnace including the tuyeres having one or more air outlets, the at least one of the treatments described above is in an unused state. The carbon discharged from the waste treatment furnace is mixed with the waste and then refilled into the waste treatment furnace. 11. A method of treating waste characterized by: -4- 1289644 (5) 將廢棄物裝入具備:爐體;配置在該爐體上部的氣體 排出口;配置在該爐體下部的熔渣及/或熔融金屬的排出 口;配置在該熔渣及/或熔融金屬的排出口與上述氣體排 出口之間的廢棄物裝入口;在上述爐體上部沿著爐軸配置 使助燃性氣體向下方噴入爐內用的爐中心塊;上述廢棄物 裝入口與上述氣體排出口之間的爐壁配置1段以上的上部 風口;及上述廢棄物裝入口與上述熔渣及/或熔融金屬的 排出口之間的爐壁配置1段以上的風口所構成的廢棄物處 理爐內,對於該廢棄物進行燃燒、氣化或熔融的至少其中 之一處理時,將炭材與廢棄物混合壓實後,裝入該廢棄物 處理爐中。The waste is installed in a furnace body; a gas discharge port disposed in an upper portion of the furnace body; a discharge port of molten slag and/or molten metal disposed in a lower portion of the furnace body; and a slag and/or a molten metal disposed in the slag and/or molten metal a waste charging port between the discharge port and the gas discharge port; and a furnace center block for discharging the combustion-supporting gas downward into the furnace along the furnace shaft in the upper portion of the furnace body; the waste charging inlet and the gas row The upper tuyere of one or more stages is disposed in the furnace wall between the outlets; and the waste treatment furnace comprising one or more air outlets between the waste inlet and the discharge port of the molten slag and/or the molten metal is disposed When the waste is subjected to at least one of combustion, gasification, or melting, the carbon material and the waste are mixed and compacted, and then charged into the waste treatment furnace. 1 2.如申請專利範圍第1 1項記載的廢棄物之處理方 法,其中,上述炭材具有並聯配置在廢棄物裝入爐內用的 廢棄物裝入通路的2個閥,開啓外部側閥的同時,關閉內 部側閥的狀態下,將炭材供給該外部側的閥與該內部側閥 之間的空間,關閉該外部側的閥後開啓內部側的閥,使裝 入爐內的炭材經由裝入裝置而裝入。 13. —種廢棄物之處理方法,其特徵爲: 將廢棄物裝入具備:爐體;配置在該爐體上部的氣體 排出口;配置在該爐體下部的熔渣及/或熔融金屬的排出 口;配置在該熔渣及/或熔融金屬的排出口與上述氣體排 出口之間的廢棄物裝入口;在上述爐體上部沿著爐軸配置 使助燃性氣體向下方噴入爐內用的爐中心塊;上述廢棄物 裝入口與上述氣體排出口之間的爐壁配置1段以上的上部 -5- 12896441. The method of treating waste according to the above-mentioned aspect of the invention, wherein the carbon material has two valves arranged in parallel in a waste charging passage for charging waste into a furnace, and the external side valve is opened. At the same time, in the state where the internal side valve is closed, the carbon material is supplied to the space between the valve on the outer side and the inner side valve, and the valve on the outer side is closed, and the valve on the inner side is opened to convert the charcoal charged into the furnace. The material is loaded via a loading device. A method for treating waste, characterized in that: the waste is charged with: a furnace body; a gas discharge port disposed at an upper portion of the furnace body; and slag and/or molten metal disposed at a lower portion of the furnace body a discharge port; a waste charging port disposed between the slag and/or the discharge port of the molten metal and the gas discharge port; and the combustion furnace gas is sprayed downward into the furnace along the furnace shaft in the upper portion of the furnace body The center block of the furnace; the upper part of the furnace wall between the waste charging inlet and the gas discharge port is arranged in one or more sections - 5 - 1289644 ^ . 1 滅抓— (6)^ . 1 灭抓— (6) 風口;及上述廢棄物裝入口與上述熔渣及/或熔融金屬的 排出口之間的爐壁配置1段以上的風口所構成的廢棄物處 理爐內,對於該廢棄物進行燃燒、氣化或熔融的至少其中 之一處理時,具有並聯配置在廢棄物裝入爐內用的廢棄物 裝入通路的2個閥,開啓外部側閥的同時,關閉內部側閥 的狀態下,將炭材供給該外部側的閥與該內部側閥之間的 空間,關閉該外部側的閥後開啓內部側的閥,使裝入爐內 的炭材經由裝入裝置裝入炭材。 14. 一種廢棄物之處理方法,其特徵爲:a tuyere; and a waste treatment furnace comprising a tuyere having one or more stages of a furnace wall between the waste inlet and the discharge port of the molten slag and/or the molten metal; the waste is burned, vaporized, or When at least one of the melts is processed, the two valves having the waste charging passages placed in the furnace in parallel are placed in parallel, and the external side valve is opened, and the carbon gas is supplied while the internal side valve is closed. The space between the valve on the outer side and the inner side valve closes the valve on the outer side and opens the valve on the inner side, so that the carbon material charged into the furnace is loaded into the carbon material via the loading device. 14. A method of treating waste characterized by: 將廢棄物裝入具備:爐體;配置在該爐體上部的氣體 排出口;配置在該爐體下部的熔渣及/或熔融金屬的排出 口;配置在該熔渣及/或熔融金屬的排出口與上述氣體排 出口之間的廢棄物裝入口;在上述爐體上部沿著爐軸配置 使助燃性氣體向下方噴入爐內用的爐中心塊;上述廢棄物 裝入口與上述氣體排出口之間的爐壁配置1段以上的上部 風口;上述廢棄物裝入口與上述熔渣及/或熔融金屬的排 出口之間的爐壁配置1段以上的風口;及暫時儲留配置在 上述爐體底部所產生的熔渣及熔融金屬等的熔漿用的熔漿 室所構成的廢棄物處理爐內,對於該廢棄物進行燃燒、氣 化或熔融的至少其中之一處理時,上述熔漿室內部的氣體 壓力形成該熔漿室設計壓力的0.5倍以上時,使儲留在該 熔漿室內部的氣體經由上述氣體排出口排出。 15. —種廢棄物之.處理方法,其特徵爲: 將廢棄物裝入具備:爐體;配置在該爐體上部的氣體 -6- 1289644 (7) 年3月The waste is installed in a furnace body; a gas discharge port disposed in an upper portion of the furnace body; a discharge port of molten slag and/or molten metal disposed in a lower portion of the furnace body; and a slag and/or a molten metal disposed in the slag and/or molten metal a waste charging port between the discharge port and the gas discharge port; and a furnace center block for discharging the combustion-supporting gas downward into the furnace along the furnace shaft in the upper portion of the furnace body; the waste charging inlet and the gas row One or more upper tuyères are disposed in the furnace wall between the outlets; the tuyere between the waste inlet and the discharge port of the molten slag and/or the molten metal is disposed at one or more outlets; and the temporary storage is disposed in the above When the waste is subjected to at least one of combustion, vaporization, or melting in a waste treatment furnace composed of a slag generated by the bottom of the furnace body and a molten metal for molten metal, the fusion When the gas pressure inside the slurry chamber is 0.5 times or more of the design pressure of the melt chamber, the gas stored in the interior of the slurry chamber is discharged through the gas discharge port. 15. A waste treatment method characterized by: charging waste into a furnace body; gas disposed in the upper part of the furnace body -6-1289644 (7) March 排出口;配置在該爐體下部的熔渣及/或熔融金屬的排出 口:配置在該熔渣及/或熔融金屬的排出D與上述氣體排 出口之間的廢棄物裝入口;在上述爐體上部沿著爐軸配置 使助燃性氣體向下方噴入爐內用的爐中心塊;上述廢棄物 裝入口與上述氣體排出口之間的爐壁配置1段以上的上部 風口;及上述廢棄物裝入口與上述熔渣及/或熔融金屬的 排出口之間的爐壁配置1段以上的風口所構成的廢棄物處 理爐內,對於該廢棄物進行燃燒、氣化或熔融的至少其中 之一處理時,將經由連接上述氣體排出口的管路導出上述 爐體外部的排氣,利用酸回收裝置而以除塵後之該排氣所 含的鹵化氫氣體作爲酸回收後,將回收後的酸轉換爲鹵素 ,或經由連接上述氣體排出口的管路導出上述爐體外部的 排氣冷卻至1 〇〇°C以下,使冷卻後之該排氣所含的鹵化氫 氣體溶解於凝結水中,以該排氣所含的鹵化氫氣體作爲酸 回收後,將回收後的酸轉換爲鹵素。a discharge port; a discharge port for slag and/or molten metal disposed at a lower portion of the furnace body: a waste charging port disposed between the discharge D of the slag and/or the molten metal and the gas discharge port; The upper portion of the body is disposed along the furnace shaft to discharge the combustion-supporting gas downward into the furnace center block for the furnace, and the upper air outlet of the furnace wall between the waste charging inlet and the gas discharge port is disposed at one or more stages; and the waste At least one of burning, gasifying or melting the waste in a waste treatment furnace comprising a tuyere having one or more stages of a furnace wall between the inlet and the discharge port of the molten metal and/or the molten metal; At the time of the treatment, the exhaust gas outside the furnace body is taken out through a line connecting the gas discharge ports, and the hydrogenated gas contained in the exhaust gas after the dust removal is recovered as an acid by the acid recovery device, and the recovered acid is recovered. Converting to halogen, or discharging the exhaust gas outside the furnace body to a temperature below 1 〇〇 ° C via a line connecting the gas discharge ports, so that the hydrogen halide gas contained in the exhaust gas after cooling is dissolved in the condensation In the exhaust gas to the hydrogen halide contained as acid recovery, the recovery of the acid is converted to the halo. 1 6.如申請專利範圍第1 5項記載的廢棄物之處理方 法,其中,上述廢棄物內混合含鹵素濃度爲10質量%以 上的含氯系廢材裝入上述廢棄物處理爐中。 17. —種廢棄物之處理裝置,具備:爐體;配置在該 爐體上部的氣體排出口;配置在該爐體下部的熔渣及/或 熔融金屬的排出口;配置在該熔渣及/或熔融金屬的排出 口與上述氣體排出口之間的廢棄物裝入口;在上述爐體上 部沿著爐軸配置使助燃性氣體向下方噴入爐內用的爐中心 塊;上述廢棄物裝入口與上述氣體排出口之間的爐壁配置 (8) — · (8) — ·1. The method of treating waste according to the above aspect of the invention, wherein the waste containing chlorine-containing waste material having a halogen concentration of 10% by mass or more is charged into the waste treatment furnace. 17. A waste treatment apparatus comprising: a furnace body; a gas discharge port disposed at an upper portion of the furnace body; a discharge port for slag and/or molten metal disposed at a lower portion of the furnace body; and the slag and / or a waste charging port between the discharge port of the molten metal and the gas discharge port; and a furnace center block for discharging the combustion-supporting gas downward into the furnace along the furnace shaft in the upper portion of the furnace body; Furnace wall arrangement between the inlet and the above gas discharge port (8) — · (8) — 1289644 1段以上的上部風口;上述廢棄物裝入口與上述熔渣及/或 熔融金屬的排出口之間的爐壁配置1段以上的風口;及暫 時儲留配置在上述爐體底部所產生的熔渣及熔融金屬等的 熔漿用的熔漿室,可進行該廢棄物之燃燒、氣化或熔融的 至少其中之一處理,其特徵爲: 更具備上述熔漿室內部的氣體壓力形成該熔漿室設計 壓力的〇 · 5倍以上時,使儲留在該熔漿室內部的氣體經由 上述氣體排出口排出用的排氣裝置。 · 18· —種廢棄物之處理裝置,具備:爐體;配置在該 爐體上部的氣體排出口;配置在該爐體下部的熔渣及/或 熔融金屬的排出口;配置在該熔渣及/或熔融金屬的排出 口與上述氣體排出口之間的廢棄物裝入口;在上述爐體上 部沿著爐軸配置使助燃性氣體向下方噴入爐內用的爐中心 塊;上述廢棄物裝入口與上述氣體排出口之間的爐壁配置 1段以上的上部風口;及上述廢棄物裝入口與上述熔渣及/ 或熔融金屬的排出口之間的爐壁配置1段以上的風口,可 · 進行該廢棄物之燃燒、氣化或熔融的至少其中之一處理, 其特徵爲: 更具備連接上述爐體,將上述至少其中之一的處理所 產生的排氣導出該爐體.外部的管路,及將水、生產用氣體 、惰氣或蒸氣的至少其中之一所構成的冷媒噴入該管路入 口附近的爐內用的供給部。 19. 一種廢棄物之處理裝置,具備爐體,可進行該廢 棄物之燃燒、氣化或熔融的至少其中之一處理’其特徵爲 -8- 1289644 (9)1289644 an upper tuyere of one or more stages; a tuyere of one or more stages disposed between the waste inlet and the discharge port of the molten slag and/or the molten metal; and a temporary storage arrangement at the bottom of the furnace body a melting chamber for molten slag or molten metal, which is capable of performing at least one of combustion, vaporization, or melting of the waste, characterized in that: the gas pressure inside the inside of the molten chamber is formed to form When the pressure of the melt chamber design is 5 times or more, the gas stored in the inside of the inside of the refining chamber is exhausted through the gas discharge port. - a waste treatment apparatus comprising: a furnace body; a gas discharge port disposed in an upper portion of the furnace body; a discharge port of molten slag and/or molten metal disposed in a lower portion of the furnace body; and being disposed in the slag And/or a waste charging port between the discharge port of the molten metal and the gas discharge port; and a furnace center block for discharging the combustion-supporting gas downward into the furnace along the furnace shaft in the upper portion of the furnace body; An upper tuyeres of one or more stages are disposed on the furnace wall between the inlet and the gas discharge port; and a tuyere of one or more stages is disposed between the waste inlet and the discharge port of the slag and/or the molten metal, And performing at least one of burning, gasifying or melting of the waste, characterized in that: further comprising connecting the furnace body, and exhausting the exhaust gas generated by the treatment of at least one of the foregoing to the furnace body. The piping and the refrigerant composed of at least one of water, production gas, inert gas, and steam are injected into the furnace supply unit near the inlet of the pipeline. A waste treatment apparatus comprising a furnace body capable of performing at least one of combustion, gasification or melting of the waste material, characterized by -8-1289644 (9) 更具備連接上述爐體,將上述至少其中之一的處理所 產生的排氣導出該爐體外部的管路,及將水、生產用氣體 、惰氣或蒸氣的至少其中之一所構成的冷媒供給部設置在 該管路入口附近的爐內。 20. —種廢棄物之處理裝置,具備:爐體;配置在該 爐體上部的氣體排出口;配置在該爐體下部的熔渣及/或 熔融金屬的排出口;配置在該熔渣及/或熔融金屬的排出 口與上述氣體排出口之間的廢棄物裝入口;在上述爐體上 部沿著爐軸配置使助燃性氣體向下方噴入爐內用的爐中心 塊;上述廢棄物裝入口與上述氣體排出口之間的爐壁配置 1段以上的上部風口;及上述廢棄物裝入口與上述熔渣及/ 或熔融金屬的排出口之間的爐壁配置1段以上的風口,可 進行該廢棄物之燃燒、氣化或熔融的至少其中之一處理, 其特徵爲: 更具備測定上述管路的入口部及出口部之間的差壓用 的差壓測定裝置;可往返自由移動地配置在將上述至少其 中之一處理所產生的氣體連接上述爐體而導出該爐體外部 的管路的至少1個直線形部分的內部,根據上述差壓測定 裝置的測定結果刮除該管路內面的附著物用的圓錐形外型 的至少其中之一的刮除構件。 21. —種廢棄物之處理裝置,具備:爐體;配置在該 爐體上部的氣體排出口;配置在該爐體下部的熔渣及/或 熔融金屬的排出口;配置在該熔渣及/或熔融金屬的排出 -9-Further, the refrigerant is connected to the furnace body, and the exhaust gas generated by the treatment of at least one of the gases is led to the outside of the furnace body, and the refrigerant is composed of at least one of water, production gas, inert gas or steam. The supply portion is disposed in the furnace near the inlet of the line. 20. A waste treatment apparatus comprising: a furnace body; a gas discharge port disposed at an upper portion of the furnace body; a discharge port for slag and/or molten metal disposed at a lower portion of the furnace body; and the slag and / or a waste charging port between the discharge port of the molten metal and the gas discharge port; and a furnace center block for discharging the combustion-supporting gas downward into the furnace along the furnace shaft in the upper portion of the furnace body; An upper tuyeres of one or more stages are disposed on the furnace wall between the inlet and the gas discharge port; and a tuyere of one or more stages is disposed between the waste inlet and the discharge port of the slag and/or the molten metal. At least one of processing for burning, vaporizing, or melting the waste, further comprising: a differential pressure measuring device for measuring a differential pressure between the inlet portion and the outlet portion of the conduit; Arranging the inside of at least one linear portion of the conduit outside the furnace body by connecting the gas generated by the at least one of the processes to the furnace body, and measuring the knot according to the differential pressure measuring device A scraping member that scrapes at least one of the conical shapes for the attachment of the inner surface of the pipe. 21. A waste treatment apparatus comprising: a furnace body; a gas discharge port disposed at an upper portion of the furnace body; a discharge port for slag and/or molten metal disposed at a lower portion of the furnace body; and the slag and / or the discharge of molten metal - 9 - 1289644 (10) 口與上述氣體排出口之間的廢棄物裝入口;在上述爐體上 部沿著爐軸配置使助燃性氣體向下方噴入爐內用的爐中心 塊;上述廢棄物裝入口與上述氣體排出口之間的爐壁配置 1段以上的上部風口;及上述廢棄物裝入口與上述熔渣及/ 或熔融金屬的排出口之間的爐壁配置1段以上的風口,可 進行該廢棄物之燃燒、氣化或熔融的至少其中之一處理, 其特徵爲:1289644 (10) A waste charging port between the port and the gas discharge port; a furnace center block for injecting a combustion-supporting gas downward into the furnace along the furnace shaft in the upper portion of the furnace body; One or more upper tuyères are disposed in the furnace wall between the gas discharge ports; and the tuyere between the waste charging inlet and the discharge port of the molten slag and/or the molten metal is disposed at one or more air outlets, and the air outlet can be disposed. At least one of the treatment of waste combustion, gasification or melting, characterized by: 更具備從設置在上述爐中心塊、上述上部風口或者上 述廢棄物裝入口與上述氣體排出口之間的爐壁的1個以上 噴嘴中的至少其中之一,朝著上述爐體下部的方向、從上 述側壁朝著爐軸方向或從上述側壁朝著爐軸方向偏離方向 的至少其中之一方向噴入蒸氣的蒸氣供給系統。Further, at least one of one or more nozzles provided in the furnace center block, the upper tuyere, or the furnace wall between the waste charging inlet and the gas discharge port is provided in a direction toward the lower portion of the furnace body, A vapor supply system that injects steam from at least one of the side walls toward the furnace axis direction or from the side wall toward the furnace axis direction. -10- 1289644 柒、指定代表圖: (一) 、本案指定代表圖為:第_j_圖 (二) 、本代表圖之元件代表符號簡單說明: 1:氣化熔爐,la:爐體,2:內襯耐火物,3:廢棄物, 4:廢棄物裝入口,5:氣體排出口,6:管路,7:推桿, 8:炭材,9:爐中心塊,9a:助燃性氣體, 10:上部風口,l〇a:助燃性氣體,η:下部風口, 1 la:助燃性氣體,1 lb:燃料,12:冷媒,13:噴嘴, 14:噴嘴,15··氣體,28:裝入裝置,29:雙重閘閥, 29a:上部閘閥,29b:下部閘閥,30:爐內監視窗, 32:炭材,3 3:噴嘴,34:蒸氣,35·.未利用碳, 36··炭材,78:連接部,79:位置測量裝置, 8〇:溫度測量裝置,81:溫度測量溫度 掏、J案若有化學式時,請揭示最能顯示發明特徵的化學-10- 1289644 柒, designated representative map: (1), the designated representative figure of this case is: _j_ diagram (2), the representative symbol of the representative figure is a simple description: 1: gasification furnace, la: furnace body, 2: lining refractory, 3: waste, 4: waste loading, 5: gas discharge, 6: piping, 7: putter, 8: charcoal, 9: furnace center block, 9a: combustion support Gas, 10: upper tuyere, l〇a: combustion-supporting gas, η: lower tuyere, 1 la: combustion-supporting gas, 1 lb: fuel, 12: refrigerant, 13: nozzle, 14: nozzle, 15 · gas, 28 : Loading device, 29: Double gate valve, 29a: Upper gate valve, 29b: Lower gate valve, 30: In-furnace monitoring window, 32: Charcoal material, 3 3: Nozzle, 34: Vapor, 35·. Unutilized carbon, 36· ·Charcoal material, 78: Connection part, 79: Position measuring device, 8〇: Temperature measuring device, 81: Temperature measuring temperature 掏, J If there is a chemical formula, please disclose the chemistry that best shows the characteristics of the invention. -4 --4 -
TW092124500A 2002-09-04 2003-09-04 Method and apparatus for treating waste TWI289644B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002259252 2002-09-04

Publications (2)

Publication Number Publication Date
TW200419109A TW200419109A (en) 2004-10-01
TWI289644B true TWI289644B (en) 2007-11-11

Family

ID=31973063

Family Applications (2)

Application Number Title Priority Date Filing Date
TW092124500A TWI289644B (en) 2002-09-04 2003-09-04 Method and apparatus for treating waste
TW095107441A TWI276755B (en) 2002-09-04 2003-09-04 Method for treating waste

Family Applications After (1)

Application Number Title Priority Date Filing Date
TW095107441A TWI276755B (en) 2002-09-04 2003-09-04 Method for treating waste

Country Status (6)

Country Link
JP (1) JPWO2004023039A1 (en)
KR (2) KR100671769B1 (en)
CN (3) CN100498068C (en)
AU (1) AU2003264364A1 (en)
TW (2) TWI289644B (en)
WO (1) WO2004023039A1 (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1148295B1 (en) * 1999-01-27 2011-03-23 Sumitomo Metal Industries, Ltd. Gasification melting furnace for wastes and gasification melting method
JP5116248B2 (en) * 2006-03-29 2013-01-09 中国電力株式会社 System for monitoring blockage of flue pipe in melting furnace and method for determining blockage
JP5455807B2 (en) * 2010-06-21 2014-03-26 日本碍子株式会社 Operation method of radioactive waste melting furnace and flue blockage prevention device
CN102748761A (en) * 2011-04-22 2012-10-24 江苏腾明环保科技有限公司 Novel solid garbage incinerator
JP5622686B2 (en) * 2011-08-19 2014-11-12 大陽日酸株式会社 Combustion abatement equipment
WO2014132230A1 (en) * 2013-02-28 2014-09-04 How Kiap Gueh Molten metal gasifier
FR3010175B1 (en) * 2013-08-27 2015-09-11 Degremont INCINERATION FURNACE FOR PULSE PRODUCTS, IN PARTICULAR SLUDGE OF PURIFICATION STATIONS
CN105090969A (en) * 2015-06-02 2015-11-25 黄传贤 Blast furnace type refuse incinerator
CN107447065A (en) * 2017-10-11 2017-12-08 中冶节能环保有限责任公司 A kind of cold conditions slag efficient stable processing unit and method
CN108330282A (en) * 2018-03-08 2018-07-27 扬州晨光特种设备有限公司 Danger wastes melting-integrated the processing method of metallurgy
CN110345495A (en) * 2018-04-02 2019-10-18 江苏金牛环保工程设备有限公司 Spray gun is used in a kind of organic silicon waste liquid and waste residue slurry burning
CN116461994A (en) * 2023-03-29 2023-07-21 山东恒泰利华环境科技有限公司 Powder material pipeline conveying anti-blocking device and method containing phase-change gas

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5310562A (en) * 1976-07-16 1978-01-31 Nippon Steel Corp Method of melting treatment for products of thermal decomposition of waste materials
JPS5310561A (en) * 1976-07-16 1978-01-31 Nippon Steel Corp Method of melting treatment for waste materials in use of shaft furnace
JPS5821729U (en) * 1981-07-27 1983-02-10 大阪瓦斯株式会社 industrial waste melting furnace
JP3343467B2 (en) * 1995-09-29 2002-11-11 日本鋼管株式会社 Waste melting furnace
JP3513783B2 (en) * 1995-10-11 2004-03-31 プロメトロンテクニクス株式会社 Waste treatment equipment
JP3585342B2 (en) * 1997-03-27 2004-11-04 日立造船株式会社 Exhaust duct dust removal device
JPH10281437A (en) * 1997-04-09 1998-10-23 Nippon Steel Corp Method and apparatus for treating chlorine-containing plastic
EP1148295B1 (en) * 1999-01-27 2011-03-23 Sumitomo Metal Industries, Ltd. Gasification melting furnace for wastes and gasification melting method
JP2001208332A (en) * 2000-01-31 2001-08-03 Nkk Corp Adhered substance removing apparatus for melting furnace exhaust duct
JP2002155287A (en) * 2000-11-21 2002-05-28 Nobuaki Debari Melting furnace for dry distillation and gasification of industrial waste and gas turbine power generator utilizing dry-distilled gas and continuous power generation method for the generator
DE10131464B4 (en) * 2001-06-29 2006-04-20 Bayer Industry Services Gmbh & Co. Ohg Process for the low-corrosive and low-emission co-incineration of highly halogenated waste in waste incineration plants

Also Published As

Publication number Publication date
KR100671765B1 (en) 2007-01-19
WO2004023039A1 (en) 2004-03-18
CN101029734A (en) 2007-09-05
KR100671769B1 (en) 2007-01-19
CN100498068C (en) 2009-06-10
CN1678869A (en) 2005-10-05
TW200630566A (en) 2006-09-01
KR20050057210A (en) 2005-06-16
KR20060021418A (en) 2006-03-07
AU2003264364A1 (en) 2004-03-29
CN1818471A (en) 2006-08-16
TW200419109A (en) 2004-10-01
JPWO2004023039A1 (en) 2005-12-22
TWI276755B (en) 2007-03-21
CN101029734B (en) 2010-05-26

Similar Documents

Publication Publication Date Title
KR101170086B1 (en) Method and apparatus for treating waste
TWI289644B (en) Method and apparatus for treating waste
JP5815503B2 (en) Method and apparatus for gasifying organic waste
JP4764095B2 (en) Purification method of gasification gas
JP4648794B2 (en) Gasification gas purification method and apparatus
SK288020B6 (en) Reactor and method for gasifying and/or melting materials
JP4434752B2 (en) Waste gasification and melting system
JP2002081624A (en) Waste gasification melting furnace and operation method of the melting furnace
CN101178181A (en) Plasma medical refuse burning methods
JP4007389B2 (en) Waste disposal method
JP4007388B2 (en) Waste disposal method
JP2006226671A (en) Treatment method and treatment device of waste
JP2007255844A (en) Fusing equipment and fusing method of gasification fusing system
JP2000273473A (en) Method for treating waste generated in coke oven
JP2009051867A (en) Method for treating medical treatment-based plastic waste or the like and apparatus for treating the same
KR101425922B1 (en) Waste water traetment equipment and waste water traetment method using thereof
JPH10281437A (en) Method and apparatus for treating chlorine-containing plastic
JP3989608B2 (en) Waste plastic treatment method
JP2008285730A (en) Apparatus and method for sorting and collecting steel material
JP2008106117A (en) Operation control method for gasification reforming facility
JPH04302909A (en) Method and apparatus for treating waste
JP3622625B2 (en) Waste treatment method and waste treatment facility
JP2005207697A (en) Exhaust gas treatment method and device for fusion furnace
JP2006112714A (en) Waste gasifying reforming furnace
JP2002267147A (en) Cooler for hot gas

Legal Events

Date Code Title Description
MM4A Annulment or lapse of patent due to non-payment of fees