SU994781A1 - Filling bridge - Google Patents

Filling bridge Download PDF

Info

Publication number
SU994781A1
SU994781A1 SU813290515A SU3290515A SU994781A1 SU 994781 A1 SU994781 A1 SU 994781A1 SU 813290515 A SU813290515 A SU 813290515A SU 3290515 A SU3290515 A SU 3290515A SU 994781 A1 SU994781 A1 SU 994781A1
Authority
SU
USSR - Soviet Union
Prior art keywords
lintel
frame
sealing
jumper
workings
Prior art date
Application number
SU813290515A
Other languages
Russian (ru)
Inventor
Иван Алексеевич Бабич
Владимир Владимирович Галлер
Анатолий Никитович Холин
Original Assignee
Babich Ivan A
Galler Vladimir V
Kholin Anatolij N
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Babich Ivan A, Galler Vladimir V, Kholin Anatolij N filed Critical Babich Ivan A
Priority to SU813290515A priority Critical patent/SU994781A1/en
Application granted granted Critical
Publication of SU994781A1 publication Critical patent/SU994781A1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

Изобретение относитс  к горному делу и может быть использовано при подземной добыче полезных ископаемых системами разработки с закладкой выработанного пространства. Известка шахтна  перемычка, включающа  оградительный щит, арочный каркас, состо щий из отдельных соединенных между собой секций, средства дл  закреплени  его в горной выработке и средства герметизации tl. Недостатком этой перемычки  вл етс  сложность ее конструкции, что значительно сказываетс  на трудозатратах по монтажу и демонтажу перемычки при ведении закладочных работ. Известна закладочна  перемычка, включающа  каркас из сборно-разборных труб, средства дл  раскреплени  . каркаса, съемные щиты, состо щие из съемных сварных полос, и средства герметизации С2. Недостатком этой перемычки  вл ет с  сложность устройства дощатой опалубки между арочным каркасом и конту ром выработки в случа х, когда геоме рические размеры выработки сильно от личаютс  от проектных и трудоемкость по монтажу и демонтажу перемычки. Цель изобретени  - снижение трудоемкости по монтажу и демонтажу перемычки и использование его дл  выработок любой конфигурации. Цепь достигаетс  тем, что в закладочной перемычке, включающей каркас из сборно-разборных труб, средства дл  раскреплени  каркаса, съемные щиты и средства герметизации, каркас перемычки собран в виде кубических или параллелепипедных  чеек, а средства герметизации образованы расположенными в пространстве между каркасом перемычки и контуром выработки мегаками с прочным наполнителем. На фиг. 1 изображена предлагаема  перемычка, общий вид) на фиг. 2 разрез А-А на фиг. 1,- на фиг.З разрез Б-Б на фиг. 1; на фиг. 4 узел I соединени  труб и крестовин в пространстве каркас с креплением съемных щитов и каркасу на фиг. 2; . на фиг. 5 - разрез В-В на фиг. 4. Закладочна  перемычка состоит из съемных щитов 1, пространственного каркаса, собираемого из труб 2, надеваемых на концы крестовин 3, раскрепл ющего устройства, например де рев нных распорных клиньев 4 и герметиэирующих средств в виде мешков 5 с наполнителем, Съемный щит 1 состоит из листа 6, обрамл юшего уголка 7 и навесных, скоб 8. К трубам 2 приварены трубки 9 дл  навесных скоб 8 щита 1 и защел ка 10 дл  фиксации на конце крестовин 3. Каждый конец крестовины 3 имеет паз 11 дл  защелки 10. Перемычка монтируетс  следующим образом. В месте установки перемычки из труб 2 и крестовин 3 собирают  чейки первого  руса пространственного каркаса, причем закрепление каждой трубы 2 на конце крестовин 3 осущест вл етс  поворотом трубы 2 вокруг сво ей оси на ISO с одновременным заведением защелки 10 трубы 2 в паз 11 конца крестовины 3. Собранный первый  рус пространственного каркаса представл ет собою параллелепипед длиной равной сумме длин, составл ющих его  чеек с шириной и высотой, равными ширине и высоте одной  чейки. К первому  русу каркаса со стороны заклад ки и к его торцам креп т съемные щиты 1 посредством заведени  навесных скоб 8 в трубки 9. Потом первый  рус перемычки в нижних ее гран х, примыкающих к стенам выработки, раскрепл ют путем забивки дерев нных клиньев 4с каждой стороны перемычки. Зазоры между стенами выработки и торцами перемычки уплотн ют мешками 5 с легким и прочным наполнителем, например керамзитовым гравием. В такой же последовательности собирают последующие  русы перемычки.The invention relates to mining and can be used in underground mining of mining systems with the laying of a goaf. Lime shaft jumper, including a protective shield, an arched frame, consisting of separate interconnected sections, means for fixing it in the mine workings and means of sealing tl. The disadvantage of this jumper is the complexity of its design, which significantly affects the labor costs for installation and dismantling of the jumper during the backfilling work. A known backfill liner comprising a framework of collapsible tubes, means for fastening. frame, removable shields, consisting of removable welded strips, and means of sealing C2. The disadvantage of this jumper is the complexity of the device of the wooden formwork between the arched frame and the contour of production in cases where the geometric dimensions of the development differ greatly from the design and complexity of installation and dismantling of the lintel. The purpose of the invention is to reduce the complexity of the installation and dismantling of the lintel and its use for workings of any configuration. The chain is achieved by the fact that in a stowing bridge, including a frame of collapsible tubes, means for detaching the frame, removable shields and means of sealing, the frame of the jumper is assembled in the form of cubic or parallelepiped cells, and the means of sealing are formed located in the space between the frame of the jumper and the contour made with megakami with durable filler. FIG. 1 shows the proposed jumper, a general view) in FIG. 2, section A-A in FIG. 1, in FIG. 3, section BB in FIG. one; in fig. 4, the node I of the connection of pipes and crosses in the space of the frame with the fastening of removable shields and the frame in FIG. 2; . in fig. 5 shows a section B-B in FIG. 4. The stowing bridge consists of removable shields 1, a spatial frame assembled from pipes 2, mounted on the ends of crosses 3, a fixing device, for example, wooden spacing wedges 4 and sealing means 5 in the form of bags 5 with filler. Removable shield 1 consists of sheet 6, framed corner 7 and hinged brackets 8. Tubes 2 are welded to tubes 9 for hinged brackets 8 of the shield 1 and latch 10 for fixing at the end of the crosses 3. Each end of the cross 3 has a groove 11 for the latch 10. The jumper is mounted as follows in a way. At the place of installation, the jumpers from pipes 2 and crosses 3 collect the cells of the first Rus of the spatial frame, with the fixing of each pipe 2 at the end of the crosses 3 realizing is turning the pipe 2 around its axis to ISO with simultaneous insertion of the latch 10 of pipe 2 into the groove 11 of the end of the cross 3. The assembled first Russian of the spatial framework is a parallelepiped of length equal to the sum of the lengths of its cells with a width and height equal to the width and height of one cell. Removable shields 1 are fastened to the first floor of the frame from the side of the inlay and to its ends by inserting hinged brackets 8 into the tubes 9. Then the first Russian bridges in its lower faces adjacent to the walls of the mine are fastened by hammering wooden wedges 4c each side jumper. The gaps between the walls of the excavation and the ends of the lintel are sealed with bags 5 with lightweight and durable filler, for example, expanded clay gravel. In the same sequence, the subsequent Rus jumpers are assembled.

Claims (2)

/ в последнюю очередь уплотн ют метками 5 верхнюю часть перемычки. Иа этом монтаж переглычки закончен. Она может; быть использована дл  нагнетани  за нее закладочной смеси, после затвердени  Которой перемычка демонтируетс  и может быть повторно использована . Закладочна  перемычка предлагаемой конструкции многоразового использовани  дает Возможность примен ть ее дл  выработок любой конфигурации . Формула изобретени  Закладочна  перемычка, включающа , каркас из сборно-разборных труб, средства дл  раскреплени  каркаса, съемные щиты и средства герметизации, отличающа с  тем, что, с целью снижени  трудоемкости по монтажу и демонтажу перемычки и использовани  е.е дл  выработок любой конфигурации, каркас перемычки собран в виде кубических или параишелепипедных  чеек, а средство герметизации образовано расположенными в пространств .е между каркасом перемычки и контуром выработки мешками с прочным наполнителем. Источники информации, прин тые во внимание при экспертизе 1,Авторское свидетельство СССР rf 335412, кл. Е 21 F 1/14, 1971. The last part of the jumper is sealed with marks 5. And this installation of the shut-off is completed. She can; be used to inject the filling mixture for it, after hardening by which the web is dismantled and can be reused. The reusable stowage bar of the proposed construction makes it possible to use it for workings of any configuration. Claims of an inventive lintel, including a frame of collapsible tubes, means for unfastening the frame, removable shields and means of sealing, characterized in that, in order to reduce the laboriousness of assembling and dismounting the lintel and using it for workings of any configuration, the skeleton of the lintel is assembled in the form of cubic or pair-shaped cells, and the means of sealing is formed by spaced bags with durable filling material located in the spaces between the lintel skeleton and the production circuit. Sources of information taken into account in the examination 1, USSR Copyright Certificate rf 335412, cl. E 21 F 1/14, 1971. 2.Авторское свидетельство СССР № 721545, кл. Е 21 F 02, 1977 (прототип ) .2. USSR author's certificate number 721545, cl. E 21 F 02, 1977 (prototype). JJ фуг. 2fug. 2 l-l- г J JMr. J J уat f-вf-in
SU813290515A 1981-05-18 1981-05-18 Filling bridge SU994781A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813290515A SU994781A1 (en) 1981-05-18 1981-05-18 Filling bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813290515A SU994781A1 (en) 1981-05-18 1981-05-18 Filling bridge

Publications (1)

Publication Number Publication Date
SU994781A1 true SU994781A1 (en) 1983-02-07

Family

ID=20958924

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813290515A SU994781A1 (en) 1981-05-18 1981-05-18 Filling bridge

Country Status (1)

Country Link
SU (1) SU994781A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2484254C1 (en) * 2011-12-30 2013-06-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" Method for construction of stowing barricade in mine working
FR3010131A1 (en) * 2013-09-05 2015-03-06 Fondaconcept MODULAR ELEMENT FOR THE CASTING OF CONCRETE FILLING STRUCTURES

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2484254C1 (en) * 2011-12-30 2013-06-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" Method for construction of stowing barricade in mine working
FR3010131A1 (en) * 2013-09-05 2015-03-06 Fondaconcept MODULAR ELEMENT FOR THE CASTING OF CONCRETE FILLING STRUCTURES

Similar Documents

Publication Publication Date Title
CN109252875B (en) Existing tunnel lining reinforcing structure and reinforcing method
US4099386A (en) Arrangements used for shoring excavations in the ground
Broch et al. The inner lining system in Norwegian traffic tunnels
SU994781A1 (en) Filling bridge
ATE18789T1 (en) ELONGED WORK OF CONSTANT CROSS-SECTION AND METHOD OF CONSTRUCTING THIS WORK.
JP2004169474A (en) Connecting structure for tunnel cutting and enlarging section
CN106677821A (en) Assembly type tunnel lining back circumferential drainage structure and implementation method thereof
CN112228076B (en) Fast excavation construction method for hard rock large-span tunnel
CN209228391U (en) A kind of tunnel lining structure
SU1266988A1 (en) Method of working pillars
JPH0464697A (en) Construction of tunneling space
RU2039261C1 (en) Method for mining of contiguous gently dipping beds
SU721545A1 (en) Mine barrier
CN209761450U (en) Zero earthing buckled plate advances hole structure
SU1555597A1 (en) Tuknnel lining and method of making pipeline
SU1654465A1 (en) Method of creating openings between tunnels of underground railway station
SU831992A1 (en) Method of fencing a mine working from excavated space
KR900007883B1 (en) Excavating method of turnel
SU968429A1 (en) Method of erecting a drift-adjoining strip
SU891970A1 (en) Sectional portable form
GB1472853A (en) Retaining walls
RU2039148C1 (en) Method for erecting reinforced concrete head of a thin wall
RU2004811C1 (en) Method for tunnel lining with monolithic concrete
UA147521U (en) METHOD OF CONSTRUCTION OF TRANSITION UNDER THE ROAD AND OTHER OBSTACLES
SU1168718A1 (en) Method of constructing monolithic lining