SU991059A1 - Method of constructing roofs of vertical mine working - Google Patents

Method of constructing roofs of vertical mine working Download PDF

Info

Publication number
SU991059A1
SU991059A1 SU813329187A SU3329187A SU991059A1 SU 991059 A1 SU991059 A1 SU 991059A1 SU 813329187 A SU813329187 A SU 813329187A SU 3329187 A SU3329187 A SU 3329187A SU 991059 A1 SU991059 A1 SU 991059A1
Authority
SU
USSR - Soviet Union
Prior art keywords
concrete
water
openings
mine working
vertical mine
Prior art date
Application number
SU813329187A
Other languages
Russian (ru)
Inventor
Вячеслав Федорович Пьянов
Николай Максимович Шмагин
Юрий Элизарович Бронштейн
Валерий Михайлович Рухов
Original Assignee
Ордена Трудового Красного Знамени Научно-Исследовательский Институт Оснований И Подземных Сооружений Им.Н.М.Герсеванова
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ордена Трудового Красного Знамени Научно-Исследовательский Институт Оснований И Подземных Сооружений Им.Н.М.Герсеванова filed Critical Ордена Трудового Красного Знамени Научно-Исследовательский Институт Оснований И Подземных Сооружений Им.Н.М.Герсеванова
Priority to SU813329187A priority Critical patent/SU991059A1/en
Application granted granted Critical
Publication of SU991059A1 publication Critical patent/SU991059A1/en

Links

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)

Description

Изобретение относитс  к горному |делу и может быть использовано дл  строительства подземных сооружений. Известен.способ устройства перекрытий , например, в кессонах, включающий бетонирование их после прохо ки выработки illj. Недостатком данного способа  вл етс  необходимость большого расхода лесоматериалов на опалубку и стойки . Наиболее близким к изобретению технической сущности и достигаемому результату  вл етс  способ ус ройства перекрытий, включающий уста новку арматурного каркаса и подачу него бетона. Способ предусматривает бетонирование перекрытий непосред ственно на поверхности грунта и исключает применение опалубки 2. Недостатком известного способа  вл етс  выполнение перекрытий сверху вниз с разработкой грунта черезПроемы в них, что значительно увеличивает трудоемкость работ. Цель изобретени  - снижение трудоемкости работ. Поставленна  цель достигаетс  тем, что согласно способу устройства перекрытий вертикальной горной выработки , включающему установку арматурного каркаса и подачу в него бетона , после установки арматурного каркаса в нем выполн ют проемы, затем выработку заполн ют водой до уровн  каркаса, а перед подачей бетона его перемешивают с технической пеной до достижени  бетоном плотности , меньшей плотности воды, а после затвердевани  бетона производ т откачку воды через проемы. На фиг. 1 изображено устройьтво перекрыти  вертикальной выработки, затопление выработки водой; на фиг.2укладка бетона; Предлагаемый способ реализуют следующим образом. 39 Выработку с вертикальными стенами 1 заполн ют водой 2 дс уровн  выполн емого перекрыти . Устанавливают арматурный каркас 3. до или после затоплени , например, с применением верхолазных работ. После установки арматурного каркаса в нем выполн ют проемы . После этого в .зону перекрыти  подают бетон 5 по бетоноводу 6. При этом перед подачей бетон 5 вспенивают посредством его перемешивани  в растворосмесите ле (не показано) с технической пеной до достижени  им плотности мень шей 1 г/см . Укладываемый бетон 5 образует слой, плавающий в воде. После затвердевани  бетона производ т откачку воды через проемы При устройстве а выработке неско ких перекрытий их выполн ют снизу вверх. Исполь зование изобретени  позволит значительно снизить трудоемкость работ по устройству перекрытий в вер тикальных горных выработках. формула изобретени  Способ устройства перекрытий вертикальной горной выработки, включащий установку арматурного каркаса и подачу в него бетона, отличающийс  тем, что, с целью снижени  трудоемкости работ, после установки арматурного каркаса в нем выполн ют проемы, затем выработку заполн ют водой до уровн  каркаса, а перед подачей бетона его перемешивают с технической пеной до достижени  бетоном плотности, меньшей плотности воды, после затвердевани  бетона производ т откачку воды через проемы . Источники информации, прин тые во внимание при экспертизе It Байцур А.И. Опускные колодцы. Киев, Буд1вельник , 1972, с. 128. 2. Круглицкий Н.М. и др. Траншейные стенки в грунтах. Киев, Наукова думка, 1973, с. , рис. 128 (прототип).The invention relates to mining and can be used for the construction of underground structures. The known method of overlapping, for example, in caissons, including concreting them after passing through the production illj. The disadvantage of this method is the need for a large consumption of timber for formwork and racks. The closest to the invention of the technical essence and the achieved result is the method of the device of floors, including the installation of the reinforcement cage and the supply of concrete to it. The method involves concreting floors directly on the soil surface and eliminates the use of formwork 2. A disadvantage of the known method is to perform overlaps from top to bottom with the development of soil through the holes in them, which significantly increases the complexity of the work. The purpose of the invention is to reduce the complexity of the work. This goal is achieved by the fact that according to the method of overlapping vertical mine workings, including installing the reinforcement cage and feeding concrete into it, after installing the reinforcement cage, openings are made in it, then the production is filled with water to the level of the framework technical foam to achieve concrete density, lower water density, and after the concrete has hardened, water is pumped out through the openings. FIG. 1 shows a device to block the vertical generation, the flooding of the production of water; on Fig.2 laying concrete; The proposed method is implemented as follows. 39 Production with vertical walls 1 is filled with water 2 ds of the level of overlap being performed. Install the reinforcement cage 3. before or after flooding, for example, using climbing work. After installing the reinforcement cage, openings are made in it. After that, concrete 5 is supplied to the overlap zone through the concrete line 6. Before it is fed, concrete 5 is foamed by mixing it in a mortar mixer (not shown) with technical foam until it reaches a density of less than 1 g / cm. The laid concrete 5 forms a layer floating in the water. After the concrete hardens, water is pumped out through the openings. At the device and the production of several floors, they are made from the bottom up. The use of the invention will significantly reduce the laboriousness of work on the construction of floors in vertical mining workings. Claims The device for overlapping vertical mine workings, including installation of a reinforcement cage and supply of concrete into it, characterized in that, in order to reduce the labor intensity, after installation of the reinforcement cage, openings are made in it, and then the development is filled with water to the framework level, Before the concrete is supplied, it is mixed with technical foam until the concrete reaches a density less than the density of water. After the concrete has hardened, water is pumped out through the openings. Sources of information taken into account in the examination It Baytsur A.I. Drop wells. Kiev, Budlivnik, 1972, p. 128. 2. Kruglitsky N.M. and others. Trench walls in soils. Kiev, Naukova Dumka, 1973, p. fig 128 (prototype).

Claims (1)

Формула изобретенияClaim Способ устройства перекрытий вертикальной горной выработки, включа5 щий установку арматурного каркаса и подачу в него бетона, отличающийся тем, что, с целью снижения трудоемкости работ, после установки арматурного каркаса в нем вы to полняют проемы, затем выработку заполняют водой до уровня каркаса, а перед подачей бетона его перемешивают с технической пеной до достижения бетоном плотности, меньшей плотно15 сти воды, после затвердевания бетона производят откачку воды через про емы.A method of arranging vertical mining slabs, including installing a reinforcing cage and supplying concrete to it, characterized in that, in order to reduce the complexity of the work, after installing the reinforcing cage, openings are made in it, then the excavation is filled with water to the level of the cage, and before by supplying concrete, it is mixed with technical foam until concrete reaches a density lower than water density; after the concrete has hardened, water is pumped out through openings.
SU813329187A 1981-08-05 1981-08-05 Method of constructing roofs of vertical mine working SU991059A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813329187A SU991059A1 (en) 1981-08-05 1981-08-05 Method of constructing roofs of vertical mine working

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813329187A SU991059A1 (en) 1981-08-05 1981-08-05 Method of constructing roofs of vertical mine working

Publications (1)

Publication Number Publication Date
SU991059A1 true SU991059A1 (en) 1983-01-23

Family

ID=20973523

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813329187A SU991059A1 (en) 1981-08-05 1981-08-05 Method of constructing roofs of vertical mine working

Country Status (1)

Country Link
SU (1) SU991059A1 (en)

Similar Documents

Publication Publication Date Title
RU2537711C1 (en) Erection of tunnels in structurally unstable soils with karst phenomena and/or boil processes
US4496268A (en) Method and apparatus for constructing reinforced concrete walls in the earth
CN109778903A (en) A kind of detachable assembling type reinforced concrete retaining wall structure and construction method
SU991059A1 (en) Method of constructing roofs of vertical mine working
US4648743A (en) Method of producing a subterranean structure
CN208982058U (en) Vertical shaft surrounding rock supporting structure
CN109630179A (en) The permanent fore shaft of return air shafts and wind cave piling wall combined construction method
KR101234270B1 (en) Method for non excavated excavating construction using steel pipe and steel pipe with hole
KR20140007309A (en) Method of pre-supported tunnel costructed in a soft ground
SU1472673A1 (en) Method of mining a thick steep mineral bed with goaf-filling
JP4020858B2 (en) Manufacturing method for underground structures
KR20220139630A (en) Cast in placed pile wall construction method
JP2003301454A (en) Earth retaining wall and construction method for underground structure
RU1778310C (en) Method for construction of mine workings
SU989083A1 (en) Method of driving large-section workings
SU771347A1 (en) Method of filling-up excavated area at shield system of mining
RU2444624C1 (en) Method of full development of gently sloping coal beds with power-driven systems without any preparatory mine workings
JPH0673722A (en) For open-cutting weak ground by deep soil stabilization by chemical method
CN217517611U (en) Municipal administration foundation ditch draws presses component and miniature steel-pipe pile combination supporting device
RU1802579C (en) Method for construction of chamber-type large-span underground working
CN209523201U (en) The structure of form concrete between a kind of subway station fender post
RU2004811C1 (en) Method for tunnel lining with monolithic concrete
RU2030586C1 (en) Method for erection of ceiling of underground structure
RU2263787C1 (en) Method for deep tunnel opening and repairing
SU1036847A1 (en) Method for erecting underground part to installation