SU926315A1 - Method for installation of reinforced concrete suspended roof support - Google Patents

Method for installation of reinforced concrete suspended roof support Download PDF

Info

Publication number
SU926315A1
SU926315A1 SU802912292A SU2912292A SU926315A1 SU 926315 A1 SU926315 A1 SU 926315A1 SU 802912292 A SU802912292 A SU 802912292A SU 2912292 A SU2912292 A SU 2912292A SU 926315 A1 SU926315 A1 SU 926315A1
Authority
SU
USSR - Soviet Union
Prior art keywords
concrete
drilling
auger
drill
filled
Prior art date
Application number
SU802912292A
Other languages
Russian (ru)
Inventor
Владимир Михайлович Симонов
Юрий Порфирьевич Устинов
Original Assignee
Симферопольский Филиал Объдинения "Укрнистромпроект" Министерства Промышленности Строительных Материалов Усср
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Симферопольский Филиал Объдинения "Укрнистромпроект" Министерства Промышленности Строительных Материалов Усср filed Critical Симферопольский Филиал Объдинения "Укрнистромпроект" Министерства Промышленности Строительных Материалов Усср
Priority to SU802912292A priority Critical patent/SU926315A1/en
Application granted granted Critical
Publication of SU926315A1 publication Critical patent/SU926315A1/en

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

II

.Изобретение относитс  к способам установки железобетонной анкерной крепи в горных выработках.The invention relates to methods for installing reinforced concrete anchor in mine workings.

Известен способ установки железобетонной анкерной крепи, включающий бурение шпуров, заполнение их бетоном при помощи пневмонагнетател  или растворонасоса и установку в них анкеров 13.There is a method of installing reinforced anchor lining, including drilling holes, filling them with concrete using a pneumatic pressure charger or mortar pump and installing anchors in them 13.

Недостаток такого способа состоит в том, что при бурении образуетс  пыль, загр зн юща  воздух, а также в использовании дл  бетона в качестве заполнител  строительных материалов .The disadvantage of this method is that during the drilling process dust is generated that pollutes the air, and also is used for concrete as a filler for building materials.

Известен также другой способ установки железобетонной анкерной крепи, включающий бурение шпуров, заполнение их бетонной смесью из инертного заполнител , в жущего и воды, которую приготавливают после окончани  бурени  каждого шпура, и введение в наполненные бетоном шпуры анкеров12}.Another method of installing reinforced concrete anchors is also known, including drilling holes, filling them with an inert aggregate concrete mixture and water, which is prepared after each drill hole is finished drilling, and introducing anchors into the concrete-filled holes of boreholes 12}.

Недостаток такого способа состоит в расчете строительных материалов дл  инертного заполнител , удорожающего крепь, а также в запыленности воздуха при бурении шпуров под анкеры .The disadvantage of this method is in the calculation of building materials for an inert aggregate, which is more expensive to fix, and also in the dustiness of the air when drilling holes for anchors.

Цель изобретени  - снижение затрат на крепление и улучшение условий труда.The purpose of the invention is to reduce the cost of fixing and improving working conditions.

Цель достигаетс  тем, что буровую .мелочь при бурении шпуров направл ют посредством шнека в камеру-смеситель дл  использовани  в процессе приготовлени  бетонной смеси в качестве инертного заполнител .The goal is achieved in that the drill bit is drilled into the mixing chamber by means of an auger into the mixing chamber for use in the preparation of the concrete mix as an inert aggregate.

На чертеже изображена схема установки железобетонной анкерной крепи..The drawing shows a diagram of the installation of reinforced concrete anchors ..

Железобетонную анкерную крепь устанавливают следующим образом.Reinforced anchor lining set as follows.

Дл  закреплени  кровли бур т шпур To secure the roof of the drill hole

Claims (2)

20 1 при помснци буровой шнековой штанги 2, при этом буровую мелочь посредством шнековой штанги 2 через цилиндр 3 направл ют в камеру-смеситель , .9 После бурени  в камеру добавл ют в жущее вещество и воду и перемешивают при помощи шнековой штанги 2. Затем шнековой штанге 2 придает обратное врацение, передвига  раствор через цилиндр 3 в шпур 1, при этом по мере заполнени  шпура бетонной смесью шнековую штангу опускают, цилиндры 3 раздвигают. В заполненный бетоном шпур ввод т анкер обычным способом. Далее цикл работ повтор етс . Применение предлагаемого способа позвол ет улучшить услови  труда путем пылеулавливани  при бурении шпуров и уменьшить затраты на к|эепление за счет использовани  в качестве буровой мелочи в качестве заполнител  дл  бетонной смеси. Формула изобретени  Способ установки железобе- нной анкерной крепи, включающий бурение шпуров, заполнение их бетонной смесью из инертного заполнител , в жущего и воды, которую приготавливают после окончани  бурени  ка)хдого шпура, и введение в наполненные бетоном шпуры анкеров, отличающийс  тем, что, с целью снижени  затрат на крепление и улучшение условий труда , буровую мелочь при бурении шпуров направл ют посредством шнека в камеру-смеситель дл  использовани  в процессе приготовлени  бетонной смеси в качестве инертного заполнител . Источники информации, прин тые во внимание при экспертизе 1. Инструкци  по установке железобетонных штанг. Кишинев, 1971, с. 23-25. 20 1 when drilling auger rod 2, while the drill fines, via auger rod 2, are directed through the cylinder 3 into the mixing chamber. 9 After drilling, the chamber and water are added to the chamber and mixed with auger rod 2. Then the auger Rod 2 is reversed by moving the solution through cylinder 3 into hole 1, while lowering the screw rod as the concrete mixture is filled, the cylinders 3 are moved apart. An anchor is inserted into the hole filled with concrete in the usual way. Further, the work cycle is repeated. The application of the proposed method makes it possible to improve the working conditions by collecting dust when drilling holes and to reduce the costs of heating by using as a drill breeze as aggregate for the concrete mix. The Invention Method A method for installing reinforced anchor lining, including drilling holes, filling them with a concrete mix from an inert aggregate, water and water, which is prepared after the end of the drill hole, and introducing anchors into concrete-filled holes, characterized in that In order to reduce the cost of fixing and improving working conditions, the drilling fines, when drilling holes, are guided into the mixing chamber by means of an auger for use in the process of preparing the concrete mix as an inert aggregate. Sources of information taken into account in the examination 1. Instructions for installing reinforced concrete rods. Chisinau, 1971, p. 23-25. 2. Авторское свидетельство СССР по за вке № 2 41758/03, кл. Е 21 D 21/00, 1976 (прототип).2. USSR author's certificate in application number 2 41758/03, cl. E 21 D 21/00, 1976 (prototype).
SU802912292A 1980-04-18 1980-04-18 Method for installation of reinforced concrete suspended roof support SU926315A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802912292A SU926315A1 (en) 1980-04-18 1980-04-18 Method for installation of reinforced concrete suspended roof support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802912292A SU926315A1 (en) 1980-04-18 1980-04-18 Method for installation of reinforced concrete suspended roof support

Publications (1)

Publication Number Publication Date
SU926315A1 true SU926315A1 (en) 1982-05-07

Family

ID=20890658

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802912292A SU926315A1 (en) 1980-04-18 1980-04-18 Method for installation of reinforced concrete suspended roof support

Country Status (1)

Country Link
SU (1) SU926315A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021008387A1 (en) * 2019-07-17 2021-01-21 廊坊景隆重工机械有限公司 Anchor rod and anchor cable stirrer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021008387A1 (en) * 2019-07-17 2021-01-21 廊坊景隆重工机械有限公司 Anchor rod and anchor cable stirrer

Similar Documents

Publication Publication Date Title
CZ9602005A3 (en) Fencing foundation pit, method of making the same as well as a building mixture used therefor
SU926315A1 (en) Method for installation of reinforced concrete suspended roof support
CN110005456A (en) A kind of large-deformation tunnel in soft rock benching tunnelling method anchor pole rapid constructing method
CN110145348A (en) Long system anchor bolt construction method under a kind of Europe superscript New Austrian Tunneling Method standard
RU2618539C1 (en) Method of repair and insulation operations in a well
CN109608143A (en) A kind of quick-setting early strength cement-silicate double solution grouting material and its application method
RU2760451C1 (en) Method for strengthening facked rocks during construction of connections of horizontal mining works
CN108868843A (en) A kind of anchor rod support method in tunnel
SU1677443A1 (en) Method for consolidation of mine workings
SU985304A1 (en) Method of erecting a roof support in mine working
SU989083A1 (en) Method of driving large-section workings
RU2677722C1 (en) Tamping method of marginal rocks massif of mines bridges
SU960441A1 (en) Method of consolidating fissured rock
SU1643718A1 (en) Method for controlling hard-to-collapse roof
SU1002594A1 (en) Method of advanced supporting of mine working with anchors
SU723152A1 (en) Method of driving large-section tunnel
SU1314012A1 (en) Method of consolidating hole-bottom zone of formation
SU1474264A1 (en) Method of constructing mine working support
SU877049A1 (en) Method and device for setting ferroconcrete anchors
SU737573A1 (en) Method of setting a wedging anchor bolt
SU1758232A1 (en) Method of consolidating rocks in vertical shaft sinking
SU397867A1 (en) METHOD FOR ELIMINATING USED EXPLOSIVE DRILLS IN SEISMIC EXPLOSION
SU1413246A1 (en) Method of constructing tunnel lining
SU777227A1 (en) Method of constructing mine roof support
RU2183273C2 (en) Method of rocks grouting with nonuniform jointing