SU563497A1 - Methods of working-out thick gently sloping coal veine - Google Patents

Methods of working-out thick gently sloping coal veine

Info

Publication number
SU563497A1
SU563497A1 SU7402042695A SU2042695A SU563497A1 SU 563497 A1 SU563497 A1 SU 563497A1 SU 7402042695 A SU7402042695 A SU 7402042695A SU 2042695 A SU2042695 A SU 2042695A SU 563497 A1 SU563497 A1 SU 563497A1
Authority
SU
USSR - Soviet Union
Prior art keywords
excavation
floor
upper layer
adjacent
layer
Prior art date
Application number
SU7402042695A
Other languages
Russian (ru)
Inventor
Абылкас Сагинович Сагинов
Сергей Сын-Гувич Квон
Владимир Викторович Ефимов
Тлеутай Ермекович Шогельбаев
Жолумбет Мухамеджанович Мухамеджанов
Андрей Давидович Фишер
Original Assignee
Карагндинский Политехнический Институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Карагндинский Политехнический Институт filed Critical Карагндинский Политехнический Институт
Priority to SU7402042695A priority Critical patent/SU563497A1/en
Application granted granted Critical
Publication of SU563497A1 publication Critical patent/SU563497A1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

ilil

Изобретение относитс  к горной промышленности и может быть использовано при разработке мощных пологих угольных пластов .The invention relates to the mining industry and can be used in the development of powerful flat coal seams.

Известен способ разработки моидных пологих угольных пластов двум  наклонными сло ми в нисход щем пор дке, включающий проведение подготовительных выработок в верхнем и нижнем сло х с оставлением целиков угл  между выемочными пол ми 1.There is a known method for developing flat shallow coal seams in two downward sloping layers in order to carry out preparatory workings in the upper and lower layers, leaving the coal ends between the excavation fields 1.

Однако этому способу присущи значительные потери угл , большой объем подготовительных выработок и пожароопасность (1).However, this method is characterized by significant loss of coal, a large amount of development workings and fire hazard (1).

Известен также способ разработки мощных пологих пластов двум  наклонными сло ми с опережающей отработкой нижнего сло  верхним , включающий проведение подготовительных выработок только в нижнем слое по одной на каждое выемочное поле 2.There is also known a method of developing thick flat seams with two inclined layers with advanced development of the lower layer by the upper one, which includes carrying out preparatory workings only in the lower layer, one for each excavation field 2.

Однако данный способ характеризуетс  относительно низкой концентрацией горных работ .However, this method is characterized by a relatively low concentration of mining.

Цель изобретени  - увеличение концентрации горных работ.The purpose of the invention is to increase the concentration of mining.

Дл  этого отработку пластов ведут одновременно в двух смежных выемочных пол х с опережением очистного забо  нижнего сло  одного выемочного пол  очистным забоем верхнего сло  смежного выемочного пол , причем подготовительную выработку, служащую дл  отработки этих выемочных полей, одновременно используют как конвейерную дл  очистного забо  нижнего сло  одного выег 10чного пол  и как вентил ционную дл  очистного забо  верхнего сло  смежного выемочного пол , а между отработанным верхним слоем одного выемочного пол  и отрабатываемым верхним слоем смежного выемочного пол  оставл ют барьерный целик, расположенный над вышеупом нутой выработкой.For this, the mining operations are conducted simultaneously in two adjacent excavation fields with the advance of the clearing bottom layer of one excavation floor by the clearing bottom of the upper layer of the adjacent excavating floor, and the preparatory development used to develop these excavation fields is simultaneously used as a conveyor belt for the clearing bottom bottom layer of one the floor of the 10th floor and as a vent for the clearing downhole of the upper layer of the adjacent excavation floor, and between the spent upper layer of one excavation floor and the The top layer of the adjacent excavation floor is left of the barrier pillar located above the above-mentioned excavation.

На чертеже представлена схема ведени  очистных работ.The drawing shows the scheme of cleaning works.

Угольный пласт отрабатывают двум  наклонными сло ми в нисход щем пор дке с проведением подготовительных выработок только в нижнем слое но одной на каждое выемочное поле. Отработку пласта ведут одновременно в двух смежных выемочных пол х с оперел ением очистного забо  нижнего сло  1 одного выемочного пол  очистным забоем верхнего сло  2 смежного выемочного пол . Подготовительную выработку 3, слулсащую дл  отработки этих выемочных полей, одновременно используют как конвейерную дл  очистного забо  нижнего сло  одного выемочного нол  и как вентил ционную дл  очистного забо  верхнего сло  смежного выемочного пол  посредством установки передвижной перемычки между очистными забо ми нижнего и верхнего слоев смежных выемочных полей.The coal seam is worked by two inclined layers in a descending order with preparatory workings only in the lower layer but one for each excavation field. The reservoir development is carried out simultaneously in two adjacent excavation fields, with the refining bottom of the lower layer 1 of one excavating floor diving with the cleaning bottom of the upper layer 2 of the adjacent excavating floor. Preparatory workout 3, which is used for working out these excavation fields, is simultaneously used as a conveyor belt for the cleansing slab of the lower layer of one excavation nol and as a vent for the clearing slab of the upper layer of the adjacent excavation field by installing a movable jumper between the cleansing holes of the lower and upper layers of the adjacent excavation fields .

По мере отработки между отработанным верхним слоем одного выемочного пол  и отрабатываемым верхним- слоем смежного выемочного пол  оставл ют барьерный целик 4, который предохран ет очистной забой верхнего сло  смежного выемочного пол  от прорыва обрушенной породы.As the mining between the used top layer of the excavation floor and the top layer of the adjacent excavation floor is worked out, the barrier pillar 4 is left, which prevents the cleaning face of the upper layer of the adjacent excavation floor from breaking through the broken rock.

Claims (1)

Формула изобретени Invention Formula Способ разработки мощных пологих угольных пластов двум  наклонными сло ми с опережающей отработкой нижнего сло  верхним , включающий проведение подготовительных выработок только в нижнем слое по одной на каждое выемочное поле, отлнчающи и с   тем, что, с целью увеличени  концентрации горных работ, отработку пластов ведут одновременно в двух смежных выемочных пол х с опережением очистного забо  нижнего сло  одного выемочного пол  очистным забоем верхнегосло  смежного выемочного пол , причем подготовительную выработку, служащую дл  отработки этих выемочных полей , одновременно используют как конвейерную дл  очистного забо  нижнего сло  одного выемочного пол  и как вентил ционную дл  очистного забо  верхнего сло  смежного выемочного пол , а между отработ иным верхним слоем одного выемочного пол  и отрабатываемым верхним слоем смежного выемочного пол  оставл ют барьерный целик, расположенный над вышеупом нутой выработкой .The method of developing thick flat coal seams with two inclined layers with the upper layer advancing the upper layer, which includes carrying out preparatory workings only in the lower layer one for each excavation field, which also means that, in order to increase the concentration of mining, the seams are mined in two adjacent excavation fields with the advancement of the cleaning bottom of the lower layer of one excavation floor, the upper face of the adjacent excavation floor, the preparatory development serving for These mining fields are simultaneously used as a conveyor for the cleaning bottom of one excavation floor and as a ventilation for the cleaning hole of the upper layer of the adjacent excavation field, and between the developed upper layer of one excavation floor and the upper layer of the adjacent excavation floor located above the above workings.
SU7402042695A 1974-07-10 1974-07-10 Methods of working-out thick gently sloping coal veine SU563497A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU7402042695A SU563497A1 (en) 1974-07-10 1974-07-10 Methods of working-out thick gently sloping coal veine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU7402042695A SU563497A1 (en) 1974-07-10 1974-07-10 Methods of working-out thick gently sloping coal veine

Publications (1)

Publication Number Publication Date
SU563497A1 true SU563497A1 (en) 1977-06-30

Family

ID=20590571

Family Applications (1)

Application Number Title Priority Date Filing Date
SU7402042695A SU563497A1 (en) 1974-07-10 1974-07-10 Methods of working-out thick gently sloping coal veine

Country Status (1)

Country Link
SU (1) SU563497A1 (en)

Similar Documents

Publication Publication Date Title
SU563497A1 (en) Methods of working-out thick gently sloping coal veine
SU898070A1 (en) Method of working sloping mineral beds
SU643644A1 (en) Method of mining thick steep coal seams
SU754067A1 (en) Method of mining thick ore bodies
SU934009A1 (en) Method of working thick gently-sloping ore deposits
SU898075A2 (en) Method of working ore deposits
SU134242A1 (en) Chamber of mineral development system
SU992741A1 (en) Method of working sloping ore bodies separated by non-ore interbed
SU825964A1 (en) Method of working thick steeply-inclined ore bodies
SU690183A1 (en) Method of mining coal seams
SU857488A1 (en) Method of mining potassium outburst-hazardous seams
SU825961A1 (en) Method of working thick coal seams
SU706536A1 (en) Method of mining great ore deposits
SU887809A1 (en) Method of mining sloping and gently sloping coal beds
SU827790A1 (en) Method of working thick gently sloping mineral deposits
SU589406A1 (en) Method of working thick slightly inclined and inclined seams of ore deposits
SU662715A1 (en) Method of excavating thick slightly inclined seams of minerals with hard rock
SU669053A1 (en) Method of mining an excavation level
SU702170A1 (en) Method of mining thick steep coal seams
SU566933A1 (en) Method of exploitation of thick gently sloping gas-bearing-strata
SU768983A1 (en) Method of working steep coal seams
SU875044A1 (en) Method of working thick mineral deposits
SU1180506A1 (en) Method of excavating the roof-underlying layer in layer-wise mining of ore
SU655828A1 (en) Method of excavating thick slightly inclined coal seams
SU934006A1 (en) Method of working gently-sloping mineral beds