SU857488A1 - Method of mining potassium outburst-hazardous seams - Google Patents

Method of mining potassium outburst-hazardous seams Download PDF

Info

Publication number
SU857488A1
SU857488A1 SU792763159A SU2763159A SU857488A1 SU 857488 A1 SU857488 A1 SU 857488A1 SU 792763159 A SU792763159 A SU 792763159A SU 2763159 A SU2763159 A SU 2763159A SU 857488 A1 SU857488 A1 SU 857488A1
Authority
SU
USSR - Soviet Union
Prior art keywords
layer
layers
rocks
potash
mining
Prior art date
Application number
SU792763159A
Other languages
Russian (ru)
Inventor
Николай Максимович Проскуряков
Владимир Григорьевич Садовников
Алексей Сергеевич Малахов
Леонид Васильевич Ишукин
Original Assignee
Ордена Трудового Красного Знамени Производственное Объединение "Белорускалий" Им. 50-Летия Ссср
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ордена Трудового Красного Знамени Производственное Объединение "Белорускалий" Им. 50-Летия Ссср filed Critical Ордена Трудового Красного Знамени Производственное Объединение "Белорускалий" Им. 50-Летия Ссср
Priority to SU792763159A priority Critical patent/SU857488A1/en
Application granted granted Critical
Publication of SU857488A1 publication Critical patent/SU857488A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/20Methods of underground mining; Layouts therefor for rock salt or potash salt

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Description

(54) СПОСОБ РАЗРАБОТКИ КАЛИЙНЫХ ВЫБРОСООПАСНЫХ(54) METHOD FOR DEVELOPING POTASSIUM EMISSIBLE

ПЛАСТОВPLASTES

II

Изобретение относитс  к горной промышленности и может быть использовано при подземной разработке сложных выбросоопасных калийных пластов сложного строени .The invention relates to the mining industry and can be used in the underground development of complex outburst potash strata of complex structure.

Известен способ сплошной разработки мощных пологопадающих пластов, включаюолий слоевую выемку пласта снизу вверх с закладкой выработанного пространства и подбутовкой кровли вручную 1.There is a method of continuous development of powerful gently dipping seams, including a layer-dredging of the seam from the bottom upwards with a bookmark of the worked-out space and the forging of the roof manually 1.

Недостатком данного способа  вл етс  низка  безопасность условий труда на выемке при разработке выбросоопасных пластов из-за больших напр жений, передаваемых на выбросоопасный пласт основной кровлей при усадке закладки в процессе отработки пласта.The disadvantage of this method is the low safety of working conditions at the excavation when developing outburst formations due to high stresses transferred to the outburst formation by the main roof during shrinkage of the bedding in the course of reservoir mining.

Известен способ разработки калийных выбросоопасных пластов, включаюш,ий одновременную отработку пласта полезного ископаемого в пределах шахтного пол  двум  сло ми с отработкой каждого сло  длинным очистным забоем с опережаюш,ей выемкой верхнего сло  и оставлением пропластка в выработанном пространстве между указанными сло ми 2.There is a known method of developing potash outburst formations, which include simultaneous mining of a mineral in a mine floor in two layers, with each layer worked by a long clearing face with an advance, leaving the upper layer and leaving a layer in the developed space between these layers 2.

Недостатком данного способа  вл етс  низка  безопасность ведени  очистных работ при наличии водоупорного сло  в газоносных породах основной кровли из-за резкой деформации покрывающих пород при отработке мошного пласта, привод шей к распространению трещиноватости до водоупорного горизонта и созданию угрозы прорыва воды в рудник.The disadvantage of this method is the low safety of cleaning operations in the presence of a waterproof layer in the gas-bearing rocks of the main roof due to the severe deformation of covering rocks during mining, the drive of the fracture to the water-impermeable horizon and the threat of water breakthrough in the mine.

Цель изобретени  - повышение безопасности ведени  очистных работ при наличии водоупорного сло  в газоносных породах ос10 новной кровли.The purpose of the invention is to improve the safety of cleaning works in the presence of a waterproof layer in the gas-bearing rocks of the main roof.

Поставленна  цель достигаетс  тем, что отработку нижнего сло  производ т камерами , располагаемыми параллельно линии очистного забо  верхнего сло , при этом The goal is achieved by the fact that the lower layer is tested by chambers located parallel to the refining line of the upper layer, while

15 опережение верхнего сло  по отношению к нижнему принимают равным рассто нию, врем  отработки которого обеспечивает дегазацию пород основной кровли.15, the advancing of the upper layer with respect to the lower one is taken to be equal to the distance, the time of working out of which ensures the degassing of the rocks of the main roof.

На фиг. 1 представлен отрабатываемый пласт в плане; на фиг. 2 - разрез А-А FIG. 1 shows the reservoir being worked out in the plan; in fig. 2 - section aa

20 на фиг. 1.20 in FIG. one.

Предлагаемый способ разработки осуществл етс  с.чедующим образом.The proposed development method is carried out in a straightforward manner.

Производитс  обособленна  подготовка верхнего I и нижнего 2 слоев к выемке. Отработку верхнего сло  1 производ т длинным очистным забоем 3 на полную мощность управлением кровлей 4 полным обрушением. Обрушение пород кровли создает возможность течени  газов (дегазации пород) в сторону отработки по нарушенным породам 5 и далее в выработки, что обеспечивает полную дегазацию нижнего сло  и нормальное его проветривание при отработке. Нижний слой 2 отрабатывают одновременно с верхним слоем камерами 6, параллельными линии очистного забо  3 верхнего сло  с оставлением целиков 7 между ними, которые также параллельны указанному забою 3. Расположение целиков 7 параллельно линии очистного забо  позвол ет равномерно нагружать целики 7 обрушенными породами по мере подвигани  фронта очистных работ и по мере стабилизации давлени  на них обрушенных пород, что повышает их устойчивость и исключает резкое их обрушение, которое может привести к нарушению водоупорного горизонта и прорыву воды в шахту. Кроме того, отработка нижнего сло  камерами обеспечивает (в услови х разгрузки ) постепенное и равномерное разрушение междукамерных целиков, плавное опускание покрываюших пород без разрушени  их сплошности, что предотвращает нарушение пород водоупора и исключает угрозу затоплени  рудника, а также позвол ет отраба тывать верхний слой со сплошной вьге.мкой полезного ископаемого длинным очистным забоем и управление кровлей полным обрушение .м, допустимым по нормам безопасности от прорыва воды в шахту.Separate preparation of the upper I and lower 2 layers for excavation is carried out. The development of the upper layer 1 is made by a long clearing face 3 at full capacity by controlling the roof 4 with a full collapse. Collapse of roof rocks creates the possibility of gas flow (degassing of rocks) towards mining along broken rocks 5 and further into the mine workings, which ensures complete degassing of the lower layer and its normal ventilation during mining. The lower layer 2 is processed simultaneously with the upper layer by chambers 6 parallel to the clearing bottom line 3 of the upper layer, leaving the pillars 7 between them, which are also parallel to the specified face 3. The arrangement of the pillars 7 parallel to the clearing bottom line allows the pillars 7 to be evenly loaded as collapsed rocks of the front of the cleaning works and as the pressure on the crushed rocks stabilizes on them, which increases their stability and eliminates their sharp collapse, which can lead to the disturbance of the impermeable horizon and breaking water into the mine. In addition, working out the lower layer with chambers provides (under unloading conditions) gradual and uniform destruction of the inner-chamber pillars, smooth lowering of the overburden without destroying their continuity, which prevents disruption of the aquifer and eliminates the risk of flooding the mine continuous vyge.mkomu mineral fossil long cleaning face and roof management complete collapse. m, permissible according to safety standards from water breakthrough into the mine.

Верхний слой I отрабатывают с опережением к нижнему слою 2, а опережение а между указанны.ми сло ми принимают равным рассто нию, врем  отработки которогоThe upper layer I is worked in advance to the lower layer 2, and the advance and between the indicated layers is taken to be equal to the distance, the working time of which

обеспечивает дегазацию пород основной кровли.provides the degassing of the rocks of the main roof.

Отработка нижнего сло  камерами, располагаемыми параллельно линии очистного забо , опережение верхнего сло  по отношению к нижнему, равное рассто нию, врем  отработки которого обеспечивает дегазацию пород основной кровли, позвол ет достичь полную дегааацию пород без введени  специальных мер и исключить нарушение пород водоупора и устранить опасность прорыва воды в шахту.Testing the lower layer with chambers located parallel to the clearing line, advancing the upper layer with respect to the lower layer, equal to the distance, the working time of which ensures the degassing of the rocks of the main roof allows achieving complete degassing of the rocks without introducing special measures and eliminating disturbance breaking water into the mine.

Claims (2)

1.Способ разработки калийных г ыбросоопасных пластов, включаюший одновременную отработку пласта полезного ископаемого в пределах шахтного пол  дву.м  сло ми с опережающей выемкой верхнего сло  длинным очистным забоем и оставлением пропластка в выработанном пространстве между указанными сло ми, отличающийс  тем, что, с целью повышени  безопаснгости ведени  очистных работ при наличии водоупорного сло  в газоносных породах основной кровли, отработку нижнего сло  производ т камерами, располагаемыми параллельно линии очистного забо  верхнего сло .1. A method for developing potash reservoirs of hazardous layers, including the simultaneous mining of a mineral in a mine floor with two layers with advanced excavation of the upper layer by a long clearing face and leaving a layer in the developed space between these layers, characterized in that increasing the safety of cleaning operations in the presence of a waterproof layer in the gas-bearing rocks of the main roof, the lower layer is being worked out by cameras located parallel to the clearing face line Top layer 2.Способ по п. I, отличац)щийс  тем, что опережение верхнего сло  по отнощению к нижнему принимают равным рассто нию, врем  отработки которого обеспечивает дегазацию пород основной кровли.2. A method according to claim I, characterized in that the advancing of the upper layer with respect to the lower one is equal to the distance, the working time of which ensures the degassing of the rocks of the main roof. Источники информации, прин тые во внимание при экспертизеSources of information taken into account in the examination 1.Андреичев А. Н. Разработка калийных и каменно-сол ных месторождений, часть f, Госхимиздат, 1953, с. 67-68.1. Andreyevich A.N. Development of potash and rock-salt deposits, part f, Goskhimizdat, 1953, p. 67-68. 2.Зильбершмидт В. Г. и др. Технологи  подземной разработки калийных руд. 1977, М., «Недра, с. 47-49. Сильвинит Каменна  соль X . -Ь + 4- -i- -I- 2. Zilbershmidt V. G. and others. Technologists of underground mining of potash ores. 1977, M., “Minerals, p. 47-49. Silvinit Kamenna Salt X. - L + 4 - - - - I - К/Ч/уK / H / y чААХХХХХХCHAXXXXXX 4- 4- ..+ 4- .. + огog VVVV
SU792763159A 1979-05-08 1979-05-08 Method of mining potassium outburst-hazardous seams SU857488A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU792763159A SU857488A1 (en) 1979-05-08 1979-05-08 Method of mining potassium outburst-hazardous seams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU792763159A SU857488A1 (en) 1979-05-08 1979-05-08 Method of mining potassium outburst-hazardous seams

Publications (1)

Publication Number Publication Date
SU857488A1 true SU857488A1 (en) 1981-08-23

Family

ID=20826451

Family Applications (1)

Application Number Title Priority Date Filing Date
SU792763159A SU857488A1 (en) 1979-05-08 1979-05-08 Method of mining potassium outburst-hazardous seams

Country Status (1)

Country Link
SU (1) SU857488A1 (en)

Similar Documents

Publication Publication Date Title
US3999804A (en) Longwall mining with chain pillar recovery
US4799738A (en) Mining method for working large-scale mineral deposits by the caving system
SU857488A1 (en) Method of mining potassium outburst-hazardous seams
RU2282720C1 (en) Underground mining method in areas having limited dimensions
SU909178A1 (en) Method of working beds of complex structure with intervening muck
SU125787A1 (en) Method for developing thin and low-powered steeply dipping seams
SU887809A1 (en) Method of mining sloping and gently sloping coal beds
RU2349753C2 (en) Method of development of elginskiy coal basin
SU1254161A1 (en) Method of mining seam deposits
SU825962A1 (en) Method of controlling hard-to-cave roofs
SU898070A1 (en) Method of working sloping mineral beds
SU1071003A1 (en) Method of underground leaching of useful minerals from ore bodies
RU2301333C2 (en) Method for extracting low and average thickness beds across the run with rock left in mine
SU727851A1 (en) Method of mining thick gently sloping coal seams
RU2248447C1 (en) Method for extraction of slanted extraction fields on gently sloping coal beds
SU589408A1 (en) Method of mining pillars
SU855209A1 (en) Method of caving overlapping rocks
RU2053363C1 (en) Method for preparation and mining of gently sloping and sloping fire-hazardous coal seams
SU1219807A1 (en) Method of mining mineral deposits
SU563497A1 (en) Methods of working-out thick gently sloping coal veine
SU827790A1 (en) Method of working thick gently sloping mineral deposits
SU992741A1 (en) Method of working sloping ore bodies separated by non-ore interbed
SU939752A1 (en) Method of working thick gently-sloping beds
SU1218108A1 (en) Method of open mining of three adjoining horizontal and gently-sloping mineral seams
RU2039262C1 (en) Method for mining thick gently dipping coal seams