SU1180506A1 - Method of excavating the roof-underlying layer in layer-wise mining of ore - Google Patents
Method of excavating the roof-underlying layer in layer-wise mining of ore Download PDFInfo
- Publication number
- SU1180506A1 SU1180506A1 SU843716783A SU3716783A SU1180506A1 SU 1180506 A1 SU1180506 A1 SU 1180506A1 SU 843716783 A SU843716783 A SU 843716783A SU 3716783 A SU3716783 A SU 3716783A SU 1180506 A1 SU1180506 A1 SU 1180506A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- ore
- layer
- mining
- width
- lay
- Prior art date
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
СПОСОБ ОТРАБОТКИ ПОДКРОВЕЛЬНОГО СЛОЯ ПРИ СЛОЕВОЙ ВЫЕМКЕ РУДЫ, включающий выемку руды очистными выработками, формирование целиков вдоль бортов выработок, закладку этих выработок твердеющими смес ми, последующую выемку целиков и закладку выработанного пространства твердеющими сло ми, отличающийс тем, что, с целью снижени 7Э 6 8-Ц И / /°7 затрат на отработку подкровельного сло при разработке основны.х запасов месторождений с неустойчивыми породами кровли слоевыми заходка-ми путем уменьщени объема подготовительных работ и снижени стоимости закладки, отработку подкровельного сло очистными выработками осуществл ют после выемки основных запасов руды из отработанной слоевой заходки, причем ширину очистных выработок принимают кратной щирине слоевой заходки, при этом очистную выработку вначале проход т в направлении налегающих пород, затем на рассто нии от контакта налегающих порол с рудой , кратным -ширине слоевой заходки, эту выработку проход т параллельно контакту породы с рудой в направлении, противопоS ложном подвиганию очистных работ, а смежные с этой выработкой целики от (Л рабатывают после затвердевани закладки в направлении очистных работ и закладывают образовавшеес выработанное пространство твердеющими смес ми пониженной прочности. 9 , .5 ас о ел о о , 2 3THE METHOD FOR DEVELOPING THE UNDERGROUND LAYER WHEN LAYER ORE EXTRACT -C And / / & 7 the cost of mining the roofing layer in the development of the main reserves of deposits with unstable roofs of the roof layered by reducing the amount of preparatory work and reduce the cost of laying, mining of the roofing layer with clearing workings is carried out after the main ore reserves have been removed from the spent strata, and the width of the clearing workings is taken as a multiple of the width of the strata, while the clearing output first passes in the direction of overlying rocks, then at a distance from foamed with ore, a multiple of the width of the layer approach, this production takes place parallel to the contact of the rock with the ore in the direction opposite to the false movement of the refining works, and the adjacent This generation of pillars (A ops after solidification Bookmarks towards sewage works and the resulting lay goaf hardening mixtures of reduced strength. 9, .5 ace about eating about 2 3
Description
Изобретение относитс к горному делу и может быть использовано при подземной разработке мощных наклонных и пологопадающих месторождений полезных ископаемых с неустойчивыми налегающими породами , а также при селективной выемке разносортных руд. Цель изобретени - снижение затрат на отработку подкровельного сло при разработке основных запасов месторождений с неустойчивыми породами кровли слоевыми заходками путем уменьшени объема подготовительных работ и снижени стоимости закладки. На фиг. 1 показан план разработки рудного тела; на фиг. 2- разрез А-А на фиг. 1. Рудную залежь 1 отрабатывают в восход щем пор дке сло ми 2 с оставлением подкровельного сло у рудной корки 3 и последующей ее выемкой Г-образными очистными выработками 4,проводимыми в направлении к налегающим породам 5. Затем при проведении вентил ционной выработки 6 Г-образна выработка 4 сбиваетс с вентил ционным восстающим 7. После запалнени Г-образной выработки 4 твердеющей смесью 8 отрабатывают остальную часть запасов рудной корки путем проходки выработки 9. Способ осуществл ют следующим образом . Мощную пологопадающую рудную залежь 1 с неустойчивыми породами кровли дел т на ленты, которые отрабатывают сло ми 2 той же ширины сплощны.м восход щим пор дком, в двух смежных лентах выемку слоев ведут слоевыми заходками до проектного положени рудной корки. При отработке, например, каждой третьей ленты в рудной корке в направлении к контакту рудного тела с налегающими породами проход т из сло по одной из границ ленты Г-образную очистную выработку щириной кратной ширине заходки, например, равной 1/2 ширины заходки. Причем прот женную часть очистной выработки проход т параллельно контакту в направлении, обратном движению фронта очистных работ и отсто щей от него на рассто нии, кратном ширине слоевой заходки (например, равном 1/2 щирины заходки). Затем эта выработка сбиваетс с помощью вентил ционной выработки 6 с вентил ционным восстающим 7. После заполнени Г-образной выработки 4 твердеющей смесью 8 и ее затвердевани из вентил ционной выработки 6 осуществл ют выемку оставшихс запасов 9 в обратном направлении, а выработанное пространство заполн ют малопрочной закладкой.The invention relates to mining and can be used in the underground mining of thickly inclined and gently dipping mineral deposits with unstable overburden rocks, as well as in the selective excavation of multi-grade ores. The purpose of the invention is to reduce the cost of mining the roofing layer in the development of the main reserves of deposits with unstable roof rocks by layering by reducing the amount of preparatory work and reducing the cost of laying. FIG. 1 shows the ore body development plan; in fig. 2 is a section A-A in FIG. 1. The ore deposit 1 is processed in an upward order by layers 2, leaving the underroof layer at the ore crust 3 and its subsequent excavation with an L-shaped clearing workings 4 conducted in the direction of overburden 5. Then shaped mine 4 is knocked down with a vent rising 7. After the L-shaped mine has been filled 4 with a hardening mixture 8, the rest of the ore crust’s reserves are mined by driving the mine 9. The method is carried out as follows. The powerful gently dipping ore deposit 1 with unstable roof rocks is divided into ribbons, which are worked out in layers 2 of the same width with ascending order, and in two adjacent tapes the layers are dredged to the design position of the ore crust. When mining, for example, every third ribbon in the ore crust in the direction to the contact of the ore body with overlying rocks passes from the layer along one of the edges of the tape, an L-shaped clearing develops with a width of a multiple of the entry width, for example, equal to 1/2 of the entry width. Moreover, the extended part of the clearing generation runs parallel to the contact in the direction opposite to the movement of the front of the cleaning operation and spaced from it at a distance multiple of the width of the layer approach (for example, equal to 1/2 of the approach width). This production is then knocked down with the help of the ventilation output 6 with the ventilation riser 7. After filling the L-shaped output 4 with hardening mixture 8 and its solidification from the ventilation output 6, the remaining stocks 9 are dredged in the opposite direction, and the developed space is filled with low strength bookmark.
77
ф1/г.2F1 / G.2
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843716783A SU1180506A1 (en) | 1984-02-03 | 1984-02-03 | Method of excavating the roof-underlying layer in layer-wise mining of ore |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843716783A SU1180506A1 (en) | 1984-02-03 | 1984-02-03 | Method of excavating the roof-underlying layer in layer-wise mining of ore |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1180506A1 true SU1180506A1 (en) | 1985-09-23 |
Family
ID=21109731
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU843716783A SU1180506A1 (en) | 1984-02-03 | 1984-02-03 | Method of excavating the roof-underlying layer in layer-wise mining of ore |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1180506A1 (en) |
-
1984
- 1984-02-03 SU SU843716783A patent/SU1180506A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 599075, кл. Е 21 С 41/06, 1976. Авторское свидетельство СССР № 2919093, кл. Е 21 С 41/06, 1980. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5782539A (en) | Wall-to-wall surface mining process | |
Hamrin et al. | Underground mining methods and applications | |
US3999804A (en) | Longwall mining with chain pillar recovery | |
US4799738A (en) | Mining method for working large-scale mineral deposits by the caving system | |
RU2209972C2 (en) | Method of mining of jointly occurring steep thin ore bodies in stable and medium-stable rocks | |
RU2325528C1 (en) | Method to control hard-caving roof | |
SU1180506A1 (en) | Method of excavating the roof-underlying layer in layer-wise mining of ore | |
SU1155757A1 (en) | Method of mining mineral deposits | |
SU827790A1 (en) | Method of working thick gently sloping mineral deposits | |
SU909178A1 (en) | Method of working beds of complex structure with intervening muck | |
SU1795100A1 (en) | Method for mining thick steeply dipping coal seams | |
SU1239336A1 (en) | Method of mining thick mineral deposits | |
SU992741A1 (en) | Method of working sloping ore bodies separated by non-ore interbed | |
RU2038476C1 (en) | Coal deposit exploitation method | |
SU848643A1 (en) | Method of mining ore bodies | |
SU825964A1 (en) | Method of working thick steeply-inclined ore bodies | |
SU898075A2 (en) | Method of working ore deposits | |
SU1458574A1 (en) | Method of mining ore bodies | |
US2896929A (en) | Method of driving rock excavations | |
SU907251A1 (en) | Method of working coal beds | |
SU949182A1 (en) | Method for working gently sloping mineral seams | |
SU1317128A1 (en) | Method of mining thick ore deposits | |
SU894196A1 (en) | Method of mining deposits of unstable ores | |
RU2083833C1 (en) | Method for development of steep coal seams with backing worked-out area | |
SU956793A1 (en) | Method of working thick ore deposits |