SU1624154A1 - Method of preparing panel base - Google Patents

Method of preparing panel base Download PDF

Info

Publication number
SU1624154A1
SU1624154A1 SU874334176A SU4334176A SU1624154A1 SU 1624154 A1 SU1624154 A1 SU 1624154A1 SU 874334176 A SU874334176 A SU 874334176A SU 4334176 A SU4334176 A SU 4334176A SU 1624154 A1 SU1624154 A1 SU 1624154A1
Authority
SU
USSR - Soviet Union
Prior art keywords
workings
trench
massif
delivery
base
Prior art date
Application number
SU874334176A
Other languages
Russian (ru)
Inventor
Семен Арсеньевич Бобин
Вячеслав Владимирович Набатов
Виктор Иванович Лушников
Павел Тихонович Гайдин
Валерий Митрофанович Кирпиченко
Николай Дмитриевич Королев
Владимир Викторович Балякин
Владимир Семенович Лялько
Original Assignee
Московский Горный Институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Московский Горный Институт filed Critical Московский Горный Институт
Priority to SU874334176A priority Critical patent/SU1624154A1/en
Application granted granted Critical
Publication of SU1624154A1 publication Critical patent/SU1624154A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

Изобретение относитс  к подготовке блоков в услови х повышенного горного давлени  Цель изобретени  - снижение затрат на подготовку и эксплуатацию основани  блока Основание блока подготавливают проходкой откаточных, траншейных и доста- вочных выработок, сбойкой траншейных и доставочных выработок и формированием рудоприемных выработок. Массив межд доприемными выработками разгружают образованием защитных щелей в их контурах Разгруженный массив, а также массив над траншейными выработками укрепл ют в жущими веществами. Рудоприемные выработки формируют отбойкой зар дов на защитные щели после сбойки траншейных и доставочных выработок. Доставочные выработки проход т после укреплени  разгр женнот массива и массива над траншейными выра ботками 2 илThe invention relates to the preparation of blocks under conditions of increased mining pressure. The purpose of the invention is to reduce the costs of preparing and operating the base of the block. The base of the block is prepared by sinking, trenching and sufficient workings, sluggish trench and delivery workings and the formation of ore receiving openings. The massif between the receptacle openings is unloaded by the formation of protective gaps in their contours. The unloaded massif, as well as the massif over the trench workings, is reinforced in burning substances. Ore mine workings are formed by blasting charges on the protective gaps after mounting trench and delivery workings. The delivery openings take place after the consolidation of the massifs of the massif and the massif above the trench excavations 2 or more.

Description

Изобретение относитс  к горно-рудной промышленности и может быть использовано при подготовке оснований блоков, наход щихс  в услови х повышенного горного давлени  на месторождени х, отрабатываемых системами этажного и подэтаж- ного принудительного обрушени , а также этажно-камерными.The invention relates to the mining industry and can be used in the preparation of the bases of blocks that are under conditions of elevated mining pressure in fields developed by the systems of storey and under-floor forced collapse, as well as storey-chamber ones.

Цель изобретени  - снижение затрат на подготовку и эксплуатацию основани  блока.The purpose of the invention is to reduce the cost of preparing and operating the base of the unit.

На фиг. 1 представлен очистной блок, разрез по основанию; на фиг 2 - разрез А-А на фиг. 1.FIG. 1 shows a cleaning unit, a cut in the base; FIG. 2 is a section A-A in FIG. one.

Способ осуществл ют следующим образом .The method is carried out as follows.

Рудное тело 1, подготовленное полевыми откаточными выработками 2, в границах очистного блока 3 вскрывают траншейными выработками 4 и 5 Вскрытие ведут встречными забо ми с отгрузкой горной массы от проходки через скреперные полки 6 в состав 7. Параллельно с проходкой траншейных выработок 5 и 4 из них проход т зашитные щели 8, располага  их в будущих рчдоприемных выработок на сопр жении с доставочными выработками 9, и pa в грчжают массив между ру.юприемными выработками Затем иэ траншейных выработок , и 4 производ т разбуривание всего объема основани  блока скважинами 10, например, с помощью чстановки КБУ 70 Производ т инъектирование в жущих веществ через скважины 10 и закрепл ют разгруженный массив основани  блока за контуры рудоприем- ной выработки и массив над траншейны ми выработками После проход т доставоч- ные выработки Проходк откаточной выра ботки 2 осуществл ют встречными забо ми после набора в жущими веществами паспортной прочности Одновременно с проходкой откаточной выработки 2 проход т и оборудуют доставочные выработки 9, которые сбивают с траншейными выработками С целью придани  выработкам основани  блока большей устойчивости отка точную выработку проход т с применением контурного взрывани , а доставочные с применением скважинных расширителем, ли бо фрез.The ore body 1, prepared by field haulage workings 2, within the clearing block 3, is opened with trench workings 4 and 5. The opening is carried out with counter holes with the shipment of rock mass from penetration through scraper shelves 6 to part 7. In parallel with the driving of trench workings 5 and 4 of them protective gaps 8 are positioned, they are located in future rhd-receiving openings in conjunction with delivery openings 9, and pa into an array between the reception openings Then the trench openings are drilled, and 4 are drilled block boreholes 10, for example, using a CBU 70 borehole. Injecting into the earthing material through boreholes 10 and fix the unloaded block base massif to the contours of the ore receiving mines and the massif above the trench workings. treatments 2 are carried out by opposing springs after they have been injected with passport-specific substances, simultaneously with the driving of the haulage working 2, they pass through and equip delivery workings 9, which knock down the trench workings E In order to impart the workings of a base unit more accurate production stability otka pass using contour blasting and haul using downhole expander whether bo cutters.

О5O5

юYu

СПSP

-U-U

После оформлени  комплекса выработок основани  блока и сбойки траншейных и до ставочных выработок производ т отбойку руды в контурах рудоприемной выработки 11 путем зар жени  и взрывани  скважин 10 в пределах контура рудоприемной выработки И на защитные щели 8.After the complex of the block base workings has been formed and the trench and pre-mine workings are assembled, the ore is crushed in the ore receiving contours 11 by charging and blasting wells 10 within the ore receiving contour I and into the protective slots 8.

Claims (1)

Формула изобретени Invention Formula Способ подготовки основани  блока, включающий проходку откаточных, траншейных и доставочных выработок, образование из траншейных выработок защитных щелей, сбойку траншейных и доставочных выработок и формирование рудоприемных выработок отбойкой скважинных зар дов, отличающийс  тем, что, с целью снижени  затрат на подготовку и эксплуатацию основани The method of preparing the base of the unit, which includes sinking, trenching and delivery workings, forming protective gaps from trench workings, assembling trench and delivery workings, and forming bore holes in the mine reception, characterized in that in order to reduce the cost of preparation and operation of the base блока, массив разгружают между рудоприем- ными выработками образованием защитных щелей в их контурах, затем укрепл ют разгруженный массив и массив над траншейными выработками, после этого проход т доставочные выработки, причем рудоприемные выработки формируют отбойкой зар дов на образованные защитные щели после сбойки траншейных и доставочных выработок .block, the massif is unloaded between the ore receiving mines by forming protective gaps in their contours, then reinforcing the unloaded mass and massif over the trench mines, after that the mine workings pass, and the ore receiving mines are formed by blasting charges on the formed protective gaps after shedding the trench and haul workings. 4four 11eleven 10ten 11eleven Фиг.11
SU874334176A 1987-11-24 1987-11-24 Method of preparing panel base SU1624154A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874334176A SU1624154A1 (en) 1987-11-24 1987-11-24 Method of preparing panel base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874334176A SU1624154A1 (en) 1987-11-24 1987-11-24 Method of preparing panel base

Publications (1)

Publication Number Publication Date
SU1624154A1 true SU1624154A1 (en) 1991-01-30

Family

ID=21338604

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874334176A SU1624154A1 (en) 1987-11-24 1987-11-24 Method of preparing panel base

Country Status (1)

Country Link
SU (1) SU1624154A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 581282, кл. Е 21 С 41/06, 1974. Авторское свидетельство СССР № 534567, кл. Е 21 С 41/06, 1972 *

Similar Documents

Publication Publication Date Title
CA1123726A (en) Explosive fracturing of deep rock
CN111058847B (en) Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body
US4135450A (en) Method of underground mining
SU1624154A1 (en) Method of preparing panel base
SU1116177A1 (en) Method of driving a mine working in rock body with gas-dynamic hazard
SU1263868A1 (en) Method of controlling the strained state of rock about mine working
SU1411473A1 (en) Method of caving overburden
SU1765402A1 (en) Ore block completion method
SU1666709A1 (en) Method for preparation of bottom of stoping block
SU817253A1 (en) Method of driving a mine working
SU740939A1 (en) Method of working mineral deposits by subterranean leaching in blocks
SU1395833A1 (en) Method of preventing the building of mine working soil
RU2047769C1 (en) Method for working steeply dipping ore bodies
SU1599542A1 (en) Method of working blocks
SU602684A1 (en) Method of mining mineral deposits
SU1608345A1 (en) Method of mining mineral deposits
SU1446310A1 (en) Mine working protection method
RU1770571C (en) Method for making raise mine working
SU1164416A1 (en) Method of preparing rock to breaking for entry-driving
RU2046942C1 (en) Mountain rocks cutting method
RU2074321C1 (en) Method for preventing rock ground in workings from heaving
SU1617143A1 (en) Method of mining sloping thin ore deposits
SU1120749A1 (en) Method of underground leaching of minerals
SU1747698A1 (en) Method of preparing coal seam for cutting
RU2012804C1 (en) Method for protection of workings from rock pressure