SU1624154A1 - Method of preparing panel base - Google Patents
Method of preparing panel base Download PDFInfo
- Publication number
- SU1624154A1 SU1624154A1 SU874334176A SU4334176A SU1624154A1 SU 1624154 A1 SU1624154 A1 SU 1624154A1 SU 874334176 A SU874334176 A SU 874334176A SU 4334176 A SU4334176 A SU 4334176A SU 1624154 A1 SU1624154 A1 SU 1624154A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- workings
- trench
- massif
- delivery
- base
- Prior art date
Links
Landscapes
- Earth Drilling (AREA)
Abstract
Изобретение относитс к подготовке блоков в услови х повышенного горного давлени Цель изобретени - снижение затрат на подготовку и эксплуатацию основани блока Основание блока подготавливают проходкой откаточных, траншейных и доста- вочных выработок, сбойкой траншейных и доставочных выработок и формированием рудоприемных выработок. Массив межд доприемными выработками разгружают образованием защитных щелей в их контурах Разгруженный массив, а также массив над траншейными выработками укрепл ют в жущими веществами. Рудоприемные выработки формируют отбойкой зар дов на защитные щели после сбойки траншейных и доставочных выработок. Доставочные выработки проход т после укреплени разгр женнот массива и массива над траншейными выра ботками 2 илThe invention relates to the preparation of blocks under conditions of increased mining pressure. The purpose of the invention is to reduce the costs of preparing and operating the base of the block. The base of the block is prepared by sinking, trenching and sufficient workings, sluggish trench and delivery workings and the formation of ore receiving openings. The massif between the receptacle openings is unloaded by the formation of protective gaps in their contours. The unloaded massif, as well as the massif over the trench workings, is reinforced in burning substances. Ore mine workings are formed by blasting charges on the protective gaps after mounting trench and delivery workings. The delivery openings take place after the consolidation of the massifs of the massif and the massif above the trench excavations 2 or more.
Description
Изобретение относитс к горно-рудной промышленности и может быть использовано при подготовке оснований блоков, наход щихс в услови х повышенного горного давлени на месторождени х, отрабатываемых системами этажного и подэтаж- ного принудительного обрушени , а также этажно-камерными.The invention relates to the mining industry and can be used in the preparation of the bases of blocks that are under conditions of elevated mining pressure in fields developed by the systems of storey and under-floor forced collapse, as well as storey-chamber ones.
Цель изобретени - снижение затрат на подготовку и эксплуатацию основани блока.The purpose of the invention is to reduce the cost of preparing and operating the base of the unit.
На фиг. 1 представлен очистной блок, разрез по основанию; на фиг 2 - разрез А-А на фиг. 1.FIG. 1 shows a cleaning unit, a cut in the base; FIG. 2 is a section A-A in FIG. one.
Способ осуществл ют следующим образом .The method is carried out as follows.
Рудное тело 1, подготовленное полевыми откаточными выработками 2, в границах очистного блока 3 вскрывают траншейными выработками 4 и 5 Вскрытие ведут встречными забо ми с отгрузкой горной массы от проходки через скреперные полки 6 в состав 7. Параллельно с проходкой траншейных выработок 5 и 4 из них проход т зашитные щели 8, располага их в будущих рчдоприемных выработок на сопр жении с доставочными выработками 9, и pa в грчжают массив между ру.юприемными выработками Затем иэ траншейных выработок , и 4 производ т разбуривание всего объема основани блока скважинами 10, например, с помощью чстановки КБУ 70 Производ т инъектирование в жущих веществ через скважины 10 и закрепл ют разгруженный массив основани блока за контуры рудоприем- ной выработки и массив над траншейны ми выработками После проход т доставоч- ные выработки Проходк откаточной выра ботки 2 осуществл ют встречными забо ми после набора в жущими веществами паспортной прочности Одновременно с проходкой откаточной выработки 2 проход т и оборудуют доставочные выработки 9, которые сбивают с траншейными выработками С целью придани выработкам основани блока большей устойчивости отка точную выработку проход т с применением контурного взрывани , а доставочные с применением скважинных расширителем, ли бо фрез.The ore body 1, prepared by field haulage workings 2, within the clearing block 3, is opened with trench workings 4 and 5. The opening is carried out with counter holes with the shipment of rock mass from penetration through scraper shelves 6 to part 7. In parallel with the driving of trench workings 5 and 4 of them protective gaps 8 are positioned, they are located in future rhd-receiving openings in conjunction with delivery openings 9, and pa into an array between the reception openings Then the trench openings are drilled, and 4 are drilled block boreholes 10, for example, using a CBU 70 borehole. Injecting into the earthing material through boreholes 10 and fix the unloaded block base massif to the contours of the ore receiving mines and the massif above the trench workings. treatments 2 are carried out by opposing springs after they have been injected with passport-specific substances, simultaneously with the driving of the haulage working 2, they pass through and equip delivery workings 9, which knock down the trench workings E In order to impart the workings of a base unit more accurate production stability otka pass using contour blasting and haul using downhole expander whether bo cutters.
О5O5
юYu
СПSP
-U-U
После оформлени комплекса выработок основани блока и сбойки траншейных и до ставочных выработок производ т отбойку руды в контурах рудоприемной выработки 11 путем зар жени и взрывани скважин 10 в пределах контура рудоприемной выработки И на защитные щели 8.After the complex of the block base workings has been formed and the trench and pre-mine workings are assembled, the ore is crushed in the ore receiving contours 11 by charging and blasting wells 10 within the ore receiving contour I and into the protective slots 8.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU874334176A SU1624154A1 (en) | 1987-11-24 | 1987-11-24 | Method of preparing panel base |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU874334176A SU1624154A1 (en) | 1987-11-24 | 1987-11-24 | Method of preparing panel base |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1624154A1 true SU1624154A1 (en) | 1991-01-30 |
Family
ID=21338604
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU874334176A SU1624154A1 (en) | 1987-11-24 | 1987-11-24 | Method of preparing panel base |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1624154A1 (en) |
-
1987
- 1987-11-24 SU SU874334176A patent/SU1624154A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 581282, кл. Е 21 С 41/06, 1974. Авторское свидетельство СССР № 534567, кл. Е 21 С 41/06, 1972 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA1123726A (en) | Explosive fracturing of deep rock | |
CN111058847B (en) | Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body | |
US4135450A (en) | Method of underground mining | |
SU1624154A1 (en) | Method of preparing panel base | |
SU1116177A1 (en) | Method of driving a mine working in rock body with gas-dynamic hazard | |
SU1263868A1 (en) | Method of controlling the strained state of rock about mine working | |
SU1411473A1 (en) | Method of caving overburden | |
SU1765402A1 (en) | Ore block completion method | |
SU1666709A1 (en) | Method for preparation of bottom of stoping block | |
SU817253A1 (en) | Method of driving a mine working | |
SU740939A1 (en) | Method of working mineral deposits by subterranean leaching in blocks | |
SU1395833A1 (en) | Method of preventing the building of mine working soil | |
RU2047769C1 (en) | Method for working steeply dipping ore bodies | |
SU1599542A1 (en) | Method of working blocks | |
SU602684A1 (en) | Method of mining mineral deposits | |
SU1608345A1 (en) | Method of mining mineral deposits | |
SU1446310A1 (en) | Mine working protection method | |
RU1770571C (en) | Method for making raise mine working | |
SU1164416A1 (en) | Method of preparing rock to breaking for entry-driving | |
RU2046942C1 (en) | Mountain rocks cutting method | |
RU2074321C1 (en) | Method for preventing rock ground in workings from heaving | |
SU1617143A1 (en) | Method of mining sloping thin ore deposits | |
SU1120749A1 (en) | Method of underground leaching of minerals | |
SU1747698A1 (en) | Method of preparing coal seam for cutting | |
RU2012804C1 (en) | Method for protection of workings from rock pressure |