Description
1one
Изобретение относитс к горному делу и касаетс проходки восстающих горных выработок под защитой гидроизол ционных экранов.FIELD OF THE INVENTION The invention relates to mining and relates to the penetration of rising mining workings under the protection of waterproofing screens.
Цель изобретени - снижение трудоемкости выемки породы.The purpose of the invention is to reduce the labor intensity of rock excavation.
На фиг. 1 показан вертикальный контурный экран; на фиг. 2 - бурение и закрепление внутриконтуриой скважины; на фиг. 3 образование круговых засечек; на фиг. 4 - дополнительные горизонтальные экраны; на фиг. 5 - разработка породы; на фиг. 6 - крепление выработки; на фиг. 7 - сечение -А на фиг. 2; на фиг. 8 сечение Б-Б на фиг. 3; на фиг. 9 - сечение В-В на фиг. 4; на фиг. 10 -- сечение Г-Г на фиг. 6.FIG. 1 shows a vertical contour screen; in fig. 2 - drilling and securing the well inside the contour; in fig. 3 formation of circular serifs; in fig. 4 - additional horizontal screens; in fig. 5 - development of the breed; in fig. 6 - fixing production; in fig. 7 is a section on -A in FIG. 2; in fig. 8 section bb in fig. 3; in fig. 9 is a sectional view BB in FIG. four; in fig. 10 - section GG in FIG. 6
Сгюсоб реализуют следуюпи1м образом.They are implemented in the following way.
Контур 1 выработки между верхним 2 и нижним 3 этажами ограждают вертикаль12A contour of 1 generation between the upper 2 and lower 3 floors is protected by a vertical12
12524921252492
ным гидроизол ционным экраном 4 посредством бурени оконтуривающих скважин, образовани щелей между ними и их заполнени твердеюпшм материалом.with a naked waterproofing screen 4 by drilling contour wells, forming gaps between them and filling them with hardened material.
По центру выработки бур т скважину 5, упрочн ют ее стенки 6 твердеющим раствором и фрезой на п танге 7 образуют круговые засечки 8, размеида их одна -от другой на рассто нии длины заходки выемки породы . Затем, например, через трубу 9 с использованием пакеров 10 нагнетают твердеющий раствор давлением гидроразрыва до образовани ооювного и дополнительных горизонтальных экранов 11 при пере.мещении трубы 9.In the center of production of the drill hole 5, its walls 6 are strengthened with a hardening mortar and a milling cutter on tube 7 and form circular serifs 8, and one of them is different from each other over the length of the rock excavation stop. Then, for example, through the pipe 9 using packers 10, the hardening solution is injected with a hydraulic fracture pressure to form a core and additional horizontal screens 11 when the pipe 9 is displaced.
Выемку породы производ т заходками с разрушением экранов 11 и с выпуском породы 12 в нижний горизонт, при этом устанавливают крепь 13.The excavation of the rock is carried out by fittings with the destruction of screens 11 and with the release of rock 12 into the lower horizon, while fixing the lining 13.
177177
Фиг /Fig /
Фиг JFig j
ФигМFigm
Фчг 5Fchg 5
А-АAa
Фиг 6Fig 6
( oci aBiiri .ii, .. b R iU HKH;;a(oci aBiiri .ii, .. b R iU HKH ;; a
Редуктор.Л (абоli X(v.i И. FicpccK()lipeKTi,| А. Г сксReductor.L (abli X (v.i I. FicpccK () lipeKTi, | A. G scks
iiiKa: -1602/35Тираж 470Подпщ-ноеiiiKa: -1602 / 35 Circulation 470 Subscript
ВНИИПИ 1 осударсгвенного комитета (..ССРVNIIPI 1 of the State Committee (..SSR
по делам изо6р(.тений и открытийfor cases of painting (.t
113035. Москва. Ж 35. Раушска наб , д 4/.S113035. Moscow. G 35. Raushska nab, d 4 / .S
Филиал ППП «Патент, г Ужюрсд, ул. Проектна . 4Branch PPP "Patent, g Uzhursd, st. Design. four
Фт 8Ft 8
Ф Л. ЧF. L. H
Фи ЮPhi Yu
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833668208A SU1252492A1 (en) | 1983-11-29 | 1983-11-29 | Method of driving an ascending mine working |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833668208A SU1252492A1 (en) | 1983-11-29 | 1983-11-29 | Method of driving an ascending mine working |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1252492A1 true SU1252492A1 (en) | 1986-08-23 |
Family
ID=21091238
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU833668208A SU1252492A1 (en) | 1983-11-29 | 1983-11-29 | Method of driving an ascending mine working |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1252492A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106089027A (en) * | 2016-06-06 | 2016-11-09 | 北京中煤矿山工程有限公司 | A kind of construction method utilizing anti-well rig maintenance drop shaft |
-
1983
- 1983-11-29 SU SU833668208A patent/SU1252492A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 863867, кл. Е 21 D 1/00, 1979. Авторское свидетельство СССР № 739185, кл. Е 02 D 29/00, 1976. * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106089027A (en) * | 2016-06-06 | 2016-11-09 | 北京中煤矿山工程有限公司 | A kind of construction method utilizing anti-well rig maintenance drop shaft |
CN106089027B (en) * | 2016-06-06 | 2018-05-08 | 北京中煤矿山工程有限公司 | A kind of construction method using anti-well rig maintenance drop shaft |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2537711C1 (en) | Erection of tunnels in structurally unstable soils with karst phenomena and/or boil processes | |
DE2011823A1 (en) | Method of creating watertight barriers | |
SU1252492A1 (en) | Method of driving an ascending mine working | |
SU1335702A1 (en) | Method of mining ore in chamber-and-pillar system | |
SU812922A1 (en) | Method of consolidating slopes | |
SU1239336A1 (en) | Method of mining thick mineral deposits | |
SU825962A1 (en) | Method of controlling hard-to-cave roofs | |
RU2001200C1 (en) | Method for reinforcement of rock slopes | |
SU1129354A1 (en) | Method of underground working of mineral deposits | |
SU1420175A1 (en) | Method of erecting prestrained anchor-like support | |
SU1129384A2 (en) | Method of forming a partition in mine working | |
SU1671866A1 (en) | Shaft tunneling method with pre-shaft drifting | |
SU898080A1 (en) | Mine shaft sinking method | |
RU1789737C (en) | Method for formation of vertical working | |
SU1288249A1 (en) | Method of constructing counter-seepage curtains in soil | |
SU1138508A1 (en) | Method of erecting a framework roof support in front of working-face | |
SU1479655A1 (en) | Method of water insulation of vertical shafts | |
SU1672106A1 (en) | Method of protection of mine workings | |
RU2148123C1 (en) | Method for construction of "wall in earth" | |
SU1244239A1 (en) | Method of consolidating a rock body | |
SU1043325A1 (en) | Method of erecting filling-up mine partition | |
SU1550141A1 (en) | Method of mining steep coal seams | |
SU740939A1 (en) | Method of working mineral deposits by subterranean leaching in blocks | |
RU1798510C (en) | Rock consolidation method | |
SU1481420A1 (en) | Method of preventing rock swelling in mine workings |