drop shaft
former
well
pass
rig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610393560.7A
Other languages
Chinese (zh)
Other versions
CN106089027B (en
Inventor
刘志强
程守业
李恩涛
杨春满
荆国业
王群
谭昊
姜浩亮
孙建荣
周兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing China Coal Mine Engineering Co ltd
Original Assignee
Beijing China Coal Mine Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing China Coal Mine Engineering Co ltd filed Critical Beijing China Coal Mine Engineering Co ltd
Priority to CN201610393560.7A priority Critical patent/CN106089027B/en
Publication of CN106089027A publication Critical patent/CN106089027A/en
Application granted granted Critical
Publication of CN106089027B publication Critical patent/CN106089027B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/28Enlarging drilled holes, e.g. by counterboring
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/04Lining shafts; Linings therefor with brick, concrete, stone, or similar building materials
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Abstract

The present invention discloses a kind of construction method utilizing anti-well rig maintenance drop shaft, comprises the steps: that (1) former pass space structure detects;(2) according to the result of detection of gained in step (1) to former pass filling;(3) utilize anti-well rig that the former pass after step (2) filling is carried out raising boring and form new pass;(4) the new drop shaft borehole wall drilled in step (3) is carried out supporting.Master operation of the present invention is no longer necessary to well operations under personnel, when carrying out borehole wall supporting, is controlled by country rock, and the most anti-well rig creeps into concrete and do not destroys its performance, and has ensured the personal safety of staff.

Description

A kind of construction method utilizing anti-well rig maintenance drop shaft
Technical field
The present invention relates to drilling applications, particularly to a kind of construction method utilizing anti-well rig maintenance drop shaft.
Background technology
In well industrial and mineral thing exploitation roadway engineering system, needing substantial amounts of drop shaft engineering, these Project Realization differences are exploited The functions such as horizontal Ore is concentrated, regulation transport, the general 50-300m of the drop shaft degree of depth, filled by tippler or belt equipment at Ore During entering drop shaft, Ore free-falling, the drop shaft borehole wall and country rock are damaged by huge impulsive force, produce cavity with big Area caves in, and affects the use of drop shaft, affects the safety of mine, it is necessary to repair time serious.
The restorative procedure of drop shaft is carried out the most from top to bottom, needs operator to carry out piecemeal anchoring, the supporting such as whitewashing is made Industry, in the area that caves in, the biggest place, human users's difficulty, need to set up scaffold, safety problem can not get solving at all Certainly, accident often occurs.
Summary of the invention
In view of this, the invention reside in a kind of construction method utilizing anti-well rig maintenance drop shaft of offer, master operation is not Needing well operations under personnel again, when carrying out borehole wall supporting, be controlled by country rock, the most anti-well rig creeps into concrete and does not breaks Its performance bad, and ensured the personal safety of staff.
For solving the problems referred to above, the present invention adopts the following technical scheme that a kind of construction utilizing anti-well rig maintenance drop shaft Method, comprises the steps:
(1) former pass space structure detection;
(2) according to the result of detection of gained in step (1) to former pass filling;
(3) utilize anti-well rig that the former pass after step (2) filling is carried out raising boring and form new drop shaft well Cylinder;
(4) the new drop shaft borehole wall drilled in step (3) is carried out supporting.
The above-mentioned construction method utilizing anti-well rig maintenance drop shaft, step (1) comprises the steps:
A () installs lift on the top of former drop shaft, utilize ultrasonic meter along former pass from top to bottom to former Pass carries out profile scanning one by one;
B the data obtained in step (a) are analyzed by (), calculate former drop shaft spatial volume, and draw out former drop shaft The space structure shape of pit shaft.
The above-mentioned construction method utilizing anti-well rig maintenance drop shaft, step (2) comprises the steps:
(a1) anti-well rig is installed, and anti-well borer drill rod is protected;
(b1) the former pass of filling.
The above-mentioned construction method utilizing anti-well rig maintenance drop shaft, step (a1) concretely comprises the following steps: in the upper end of former drop shaft Well head installs rig girder steel, then installs anti-well rig on rig girder steel, and transfers anti-well borer drill rod to former drop shaft Lower end well head, then wraps up anti-well borer drill rod with sleeve pipe, and filling between anti-well borer drill rod outer wall and internal surface of sleeve pipe Grit material.
The above-mentioned construction method utilizing anti-well rig maintenance drop shaft, sleeve pipe is plastic tube.
The above-mentioned construction method utilizing anti-well rig maintenance drop shaft, step (b1) comprises the steps:
(i) with the lower end port of annular space between plug members closure sleeve outer wall and the former drop shaft borehole wall, then to Fill out in former pass and put fine sand;
(ii) brattice way handling slip ash tremie pipe, then according to the former drop shaft space body calculated in step (b) Long-pending precast concrete, carries out concrete filling to former pass the most piecemeal, until concrete filling body upper surface distance is bored Machine girder steel bottom, more than or equal to 0.3m and less than or equal to 0.5m, then refills anti-well rig basis concrete, and makes Anti-well rig basis concrete filling body and rig girder steel compact siro spinning technology.Anti-well rig basis concrete filling body constitutes anti- The concrete foundation on well rig basis and rig girder steel form anti-well rig basis, and wherein, rig girder steel is seated in coagulation soil matrix On plinth.Concrete foundation is higher than filling concrete strength.
The above-mentioned construction method utilizing anti-well rig maintenance drop shaft, when the former pass near former drop shaft lower end well head does not has When having destroyed, fine sand is filled to be damaged apart from former drop shaft the position of well section lower end well head 1m, fine sand fill length more than or etc. In 5m;What former pass carried out the concrete used by concrete filling is numbered C10-20
The above-mentioned construction method utilizing anti-well rig maintenance drop shaft, step (3) concretely comprises the following steps: be filled in step (ii) Concrete setting in former pass and intensity reach design when requiring, remove plug members, fill in releasing former pass The fine sand filled out, then reaming bit is installed in the lower end at anti-well borer drill rod, reaming from bottom to top, until former drop shaft upper end well Mouthful, new pass has crept into.Owing to the concrete conditions such as the well depth of each drop shaft, hole diameter are different, therefore it are filled in difference and slip The set strength of well shaft inner concrete to determine according to each pass concrete condition, generally selects low-grade coagulation Soil carrys out filling pass.
The above-mentioned construction method utilizing anti-well rig maintenance drop shaft, step (4) comprises the steps:
(I) remove the anti-well rig in step (3), lift and hanging scaffold are installed on new pass top, check new The safe condition of pass, processes and supporting unstable formation, local and concrete;
(II) new drop shaft inwall is poured.
The above-mentioned construction method utilizing anti-well rig maintenance drop shaft, step (II) concretely comprises the following steps: use hydraulic pressure synovial membrane Mode the most progressively pours new drop shaft inwall.
The invention has the beneficial effects as follows:
1. the present invention is a kind of to utilize concrete backfill, anti-well drill drilling to form after drop shaft set again to build the Synthetic of the borehole wall Reason method, well operations under wherein master operation is no longer necessary to personnel, and when carrying out borehole wall supporting, country rock has been controlled, And anti-well rig creeps into concrete does not destroy its performance, the most secure personal safety of staff.
2. the present invention construction period is shorter, and the most drilled drop shaft wellbore stability, easy supporting.
Accompanying drawing explanation
Fig. 1 is that the present invention utilizes showing of the construction method Central Plains pass space structure detection of anti-well rig maintenance drop shaft It is intended to;
Fig. 2 is the schematic diagram that the present invention utilizes that in the construction method of anti-well rig maintenance drop shaft, anti-well rig is installed;
Fig. 3 is that the present invention utilizes showing of the former pass fill concrete in the construction method of anti-well rig maintenance drop shaft It is intended to;
Fig. 4 is the schematic diagram that the present invention utilizes that in the construction method of anti-well rig maintenance drop shaft, anti-well rig reaming is crept into;
Fig. 5 is that the present invention utilizes the schematic diagram of new drop shaft borehole wall supporting in the construction method of anti-well rig maintenance drop shaft.
In figure: the former pass of 1-;2-ultrasonic meter;3-lift;4-anti-well rig;5-rig girder steel;6-is anti- Well borer drill rod;7-sleeve pipe;8-reaming bit;The new pass of 9-;10-hanging scaffold;11-concrete filling body.
Detailed description of the invention
For understanding the scheme in the explanation present invention, preferred embodiment is given below and is described with reference to the accompanying drawings.
As shown in Figures 1 to 3, the present invention utilizes the construction method of anti-well rig maintenance drop shaft, is that one utilizes concrete pair Former pass 1 backfills, and then recycles the drilling well of anti-well rig 4 and forms new pass 9 and new drop shaft is carried out set build The drop shaft comprehensive processing method of the borehole wall, it specifically comprises the following steps that
(1) due to after former drop shaft fall damage its configuration large change can occur, thus before it is administered The space structure shape of former drop shaft need to be understood, i.e. former pass 1 space structure is detected, concretely comprise the following steps:
A () installs lift 3 on the top of former drop shaft, utilize lift 3 to hang ultrasonic meter 2 and be allowed to slip along former Well shaft 1 carries out profile scanning one by one to former pass 1 from top to bottom, to obtain the space structure about former pass 1 The data of shape, as shown in Figure 1;
B the data obtained in step (a) are analyzed by (), calculate former drop shaft spatial volume, and draw out former drop shaft The space structure shape of pit shaft 1.
(2) occurred that large area is caved in and produces cavity due to the former drop shaft borehole wall, in order to carry out whole to the former drop shaft borehole wall Body is repaired, and uses concrete to backfill former pass 1 in the present invention, to obtaining the relatively stable drop shaft borehole wall, Therefore according in step (1), the result of detection of gained is to the filling of former pass 1, and it concretely comprises the following steps;
(a1) utilize anti-well rig 4 to creep in view of the present invention, for easy construction, former pass 1 is being backfilled Before, first anti-well rig 4 is installed and put in place, as in figure 2 it is shown, i.e. the upper end well head at former drop shaft installs rig girder steel 5, then exist Anti-well rig 4 is installed on rig girder steel 5, and anti-well borer drill rod 6 is transferred the lower end well head to former drop shaft, but due to concrete In additive anti-well borer drill rod 6 may be produced corrosion, and anti-well borer drill rod 6 after concrete setting, can be affected Rotate, therefore with sleeve pipe 7, anti-well borer drill rod 6 is wrapped up, and filling is thick between anti-well borer drill rod 6 outer wall and sleeve pipe 7 inwall Sand material, its middle sleeve 7 is plastic tube, selects PVC plastic pipe to use as sleeve pipe 7 in the present embodiment, uses set in this step Anti-well borer drill rod 6 is protected by pipe 7, and one of its purpose is to prevent the additive in concrete to anti-well borer drill rod 6 Corrode and be easy to the rotation of raising boring process anti-well borer drill rod 6 in subsequent step, another object is that and carry for raising boring For guide hole, consequently facilitating being smoothed out of whole construction;
(b1) after installing anti-well rig 4 and anti-well borer drill rod 6 is properly protected, former pass 1 can be entered Row filling, as it is shown on figure 3, its concrete steps include:
I () is for avoid the concrete being filled in former pass 1 to leak to affect elsewhere subsequent construction, it will usually Plug members is used to be blocked by the lower end port of the annular space between sleeve pipe 7 outer wall and the former drop shaft borehole wall, and in order to anti- Only concrete and plug members bond together and are not easy to the dismounting of plug members, are carrying out former pass 1 with concrete Before backfill, it will usually fill out in former pass 1 and put fine sand, the filling out of its medium-fine sand puts height can be according near former drop shaft lower end The destruction situation of the former pass 1 of well head determines, when the former pass 1 near former drop shaft lower end well head is the most destroyed Time, fine sand is filled to be damaged apart from former drop shaft the position of well section lower end well head 1m, and fine sand fills length more than or equal to 5m;
(ii) brattice way utilize winch handling slip ash tremie pipe, wherein the internal diameter of tremie pipe be more than or equal to 150mm, Then according to the former drop shaft spatial volume precast concrete calculated in step (b), the most former pass 1 is carried out Concrete filling, until the position of concrete filling body 11 upper surface distance borehole drilling rig girder steel 5 bottom 0.5m, then refills anti-well Rig basis concrete, and make anti-well rig basis concrete filling body and rig girder steel 5 compact siro spinning technology, reach to undertake expansion The ability of hole load.The concrete foundation that anti-well rig basis concrete filling body is constituted and rig girder steel 5 form anti-well and bore Machine basis, wherein, rig girder steel 5 is seated in concrete foundation.Concrete foundation is higher than filling concrete strength.This example In, former pass 1 is carried out concrete used by concrete filling and is numbered C10-20
(3) utilize anti-well rig 4 that the former pass 1 after step (2) filling is carried out raising boring and form new drop shaft Pit shaft 9: support to make the concrete of backfill that the former drop shaft borehole wall to be formed, utilize anti-well rig 4 creep into new pass 9 it The steps such as front need (ii) are filled to the concrete setting in former pass 1 and intensity reaches to design requirement, remove the most again Plug members, releases the fine sand of filling in former pass 1, and then reaming bit is installed in the lower end at anti-well rig 4 drilling rod 6 8, reaming from bottom to top, until former drop shaft upper end well head, new pass 9 has crept into, as shown in Figure 4.Due to each drop shaft Well depth, the concrete condition such as hole diameter different, the set strength being therefore filled in different pass inner concrete will be according to each Pass concrete condition determines, generally selects low-grade concrete to carry out filling pass.
(4) the new drop shaft borehole wall drilled in step (3) is carried out supporting, as it is shown in figure 5, it specifically comprises the following steps that
(I) remove the anti-well rig 4 in step (3), lift 3 and hanging scaffold 10 are installed on new pass 9 top, execute Workman person utilizes lift 3 and hanging scaffold to check the safe condition of new pass 9 in entering new pass 9 for 10 times, to local Unstable formation and concrete carry out processing and supporting;
(II) use the mode of hydraulic pressure synovial membrane the most progressively to pour new drop shaft inwall, form new ore pass choking-up.
After forming new ore pass choking-up, the most dismountable relevant construction equipment, recovers the required charging of drop shaft and ore drawing Equipment, comes into operation drop shaft.
Utilizing the present invention borehole wall occur, large area is caved in and occurs that the former drop shaft in cavity carries out in maintenance process, to former Pit shaft is entered without personnel when pass 1 carries out space structure shape detection, and when needing workmen to enter pass Time, the concrete of backfill has defined reinforcing and has filled the former drop shaft borehole wall, does not haves large-area caving in, thus ensure that The personal safety of workmen's quilt, and solve in existing drop shaft restorative procedure in the area that caves in, the biggest place The problem of workmen's operating difficulties.
Above-described embodiment is only for clearly demonstrating the invention example, and not has the invention The restriction of body embodiment.For those of ordinary skill in the field, can also make on the basis of the above description The change of other multi-form or variation.Here without also cannot all of embodiment be given exhaustive.All the present invention's Any obvious change extended out or change the guarantor still in the invention claim within spirit and principle Protect among scope.

Claims (10)

1. the construction method utilizing anti-well rig maintenance drop shaft, it is characterised in that comprise the steps:
(1) former pass (1) space structure detection;
(2) according to the result of detection of gained in step (1) to former pass (1) filling;
(3) utilize anti-well rig (4) that the former pass (1) after step (2) filling is carried out raising boring and form new drop shaft Pit shaft (9);
(4) the new drop shaft borehole wall (9) drilled in step (3) is carried out supporting.
The construction method utilizing anti-well rig maintenance drop shaft the most according to claim 1, it is characterised in that step (1) is wrapped Include following steps:
A () installs lift (3) on the top of former drop shaft, utilize ultrasonic meter (2) along former pass (1) from top to bottom Former pass (1) is carried out profile scanning one by one;
B the data obtained in step (a) are analyzed by (), calculate former drop shaft spatial volume, and draw out former pass (1) space structure shape.
The construction method utilizing anti-well rig maintenance drop shaft the most according to claim 2, it is characterised in that step (2) is wrapped Include following steps:
(a1) anti-well rig (4) is installed, and anti-well borer drill rod (6) is protected;
(b1) the former pass of filling (1).
The construction method utilizing anti-well rig maintenance drop shaft the most according to claim 3, it is characterised in that step (a1) has Body step is: the upper end well head at former drop shaft installs rig girder steel (5), then at rig girder steel (5) the anti-well rig of upper installation (4), and anti-well borer drill rod (6) is transferred the lower end well head to former drop shaft, then with sleeve pipe (7) by anti-well borer drill rod (6) Parcel, and filling grit material between anti-well borer drill rod (6) outer wall and sleeve pipe (7) inwall.
The construction method utilizing anti-well rig maintenance drop shaft the most according to claim 4, it is characterised in that sleeve pipe (7) is Plastic tube.
The construction method utilizing anti-well rig maintenance drop shaft the most according to claim 4, it is characterised in that step (b1) is wrapped Include following steps:
I () blocks the lower end port of annular space between sleeve pipe (7) outer wall and the former drop shaft borehole wall by plug members, then to former Fill out in pass (1) and put fine sand;
(ii) brattice way handling slip ash tremie pipe, then pre-according to the former drop shaft spatial volume calculated in step (b) Concrete processed, carries out concrete filling to former pass (1) the most piecemeal, until concrete filling body (11) upper surface distance Rig girder steel (5) bottom, more than or equal to 0.3m and less than or equal to 0.5m, then refills anti-well rig basis concrete, And make anti-well rig basis concrete filling body and rig girder steel (5) compact siro spinning technology.
The construction method utilizing anti-well rig maintenance drop shaft the most according to claim 6, it is characterised in that when slipping near former When the former pass (1) of downhole end well head is not destroyed, fine sand is filled to be damaged well section lower end well head 1m apart from former drop shaft Position, fine sand fills length more than or equal to 5m;Former pass (1) is carried out the mark of the concrete used by concrete filling Number it is C10-20
The construction method utilizing anti-well rig maintenance drop shaft the most according to claim 6, it is characterised in that step (3) has Body step is: be filled to the concrete setting in former pass (1) in step (ii) and intensity reaches design when requiring, remove Plug members, releases the fine sand of former pass (1) interior filling, and then reaming is installed in the lower end anti-well borer drill rod (6) Drill bit (8), reaming from bottom to top, until former drop shaft upper end well head, new pass (9) has crept into.
9. according to the arbitrary described construction method utilizing anti-well rig maintenance drop shaft of claim 1~8, it is characterised in that step Suddenly (4) comprise the steps:
(I) remove the anti-well rig (4) in step (3), lift (3) and hanging scaffold are installed on new pass (9) top (10), check the safe condition of new pass (9), unstable formation, local and concrete are processed and supporting;
(II) new drop shaft inwall is poured.
The construction method utilizing anti-well rig maintenance drop shaft the most according to claim 9, it is characterised in that step (II) Concretely comprise the following steps: use the mode of hydraulic pressure synovial membrane the most progressively to pour new drop shaft inwall.
CN201610393560.7A 2016-06-06 2016-06-06 A kind of construction method using anti-well rig maintenance drop shaft Active CN106089027B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610393560.7A CN106089027B (en) 2016-06-06 2016-06-06 A kind of construction method using anti-well rig maintenance drop shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610393560.7A CN106089027B (en) 2016-06-06 2016-06-06 A kind of construction method using anti-well rig maintenance drop shaft

Publications (2)

Publication Number Publication Date
CN106089027A true CN106089027A (en) 2016-11-09
CN106089027B CN106089027B (en) 2018-05-08

Family

ID=57448353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610393560.7A Active CN106089027B (en) 2016-06-06 2016-06-06 A kind of construction method using anti-well rig maintenance drop shaft

Country Status (1)

Country Link
CN (1) CN106089027B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761822A (en) * 2016-11-28 2017-05-31 北京中煤矿山工程有限公司 Drop shaft technique is repaired in a kind of metal mine backfill prose style free from parallelism slip casting
CN108626482A (en) * 2018-04-23 2018-10-09 西山煤电建筑工程集团有限公司矿建第分公司 The construction method of vertical gas pipe is installed using anti-well drilling machine
CN108756889A (en) * 2018-06-08 2018-11-06 北京中煤矿山工程有限公司 Anti- well drilling machine reaming construction broken formation gib technique
CN111852482A (en) * 2020-07-31 2020-10-30 湖南科技大学 Construction method of ore crusher foundation of slip-breaking system engineering below 40m
CN112523712A (en) * 2020-12-21 2021-03-19 吉林大学 Device and method for repairing damaged well wall

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1252492A1 (en) * 1983-11-29 1986-08-23 Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Институт По Осушению Месторождений Полезных Ископаемых,Специальным Горным Работам,Рудничной Геологии И Маркшейдерскому Делу Method of driving an ascending mine working
CN103527140A (en) * 2012-10-22 2014-01-22 洛阳富兴管业有限公司 Cement pipe dado filling and grouting technology
CN104912569A (en) * 2015-06-05 2015-09-16 中国安全生产科学研究院 Draw shaft treatment method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1252492A1 (en) * 1983-11-29 1986-08-23 Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Институт По Осушению Месторождений Полезных Ископаемых,Специальным Горным Работам,Рудничной Геологии И Маркшейдерскому Делу Method of driving an ascending mine working
CN103527140A (en) * 2012-10-22 2014-01-22 洛阳富兴管业有限公司 Cement pipe dado filling and grouting technology
CN104912569A (en) * 2015-06-05 2015-09-16 中国安全生产科学研究院 Draw shaft treatment method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘付高: "深部溜井垮塌三维探测及其修复方案研究", 《采矿技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761822A (en) * 2016-11-28 2017-05-31 北京中煤矿山工程有限公司 Drop shaft technique is repaired in a kind of metal mine backfill prose style free from parallelism slip casting
CN108626482A (en) * 2018-04-23 2018-10-09 西山煤电建筑工程集团有限公司矿建第分公司 The construction method of vertical gas pipe is installed using anti-well drilling machine
CN108756889A (en) * 2018-06-08 2018-11-06 北京中煤矿山工程有限公司 Anti- well drilling machine reaming construction broken formation gib technique
CN111852482A (en) * 2020-07-31 2020-10-30 湖南科技大学 Construction method of ore crusher foundation of slip-breaking system engineering below 40m
CN112523712A (en) * 2020-12-21 2021-03-19 吉林大学 Device and method for repairing damaged well wall
CN112523712B (en) * 2020-12-21 2023-11-14 吉林大学 Device and method for repairing damaged well wall

Also Published As

Publication number Publication date
CN106089027B (en) 2018-05-08

Similar Documents

Publication Publication Date Title
CN106089027B (en) A kind of construction method using anti-well rig maintenance drop shaft
CN113445498A (en) Construction process of karst hole pile foundation in complex geology
CN106988302B (en) A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method
CN103835661B (en) A kind of local excavation pre support mine shaft rising boring technique
CN109763483B (en) Up-going type sectional grouting process for thick fourth-system deep-buried mining cave-in broken stratum
CN104047542B (en) Embedding rock taper pile impacts drilling pipe hammer system and embedding rock taper pile impacts construction method
CN110629747A (en) Full-casing full-rotation construction process for pile foundation under complex geological conditions
CN108386193A (en) A kind of hard integrality top plate chemically expansible pressure break pressure relief method in end
CN104989272A (en) Upward inverse well drilling process
CN110158579A (en) A kind of bored pile construction method
CN107642041A (en) The hollow clump of piles anchorage of super-large diameter
CN106837382A (en) A kind of subway tunnel country rock pre grouting from the surface reinforcement process
JP7292772B2 (en) External expansion pipe construction method for drilling in the mining zone
CN105672309B (en) The recyclable overlength steel pile casting wall protecting method of karst area embedded rock pile pore-forming
CN107091094A (en) Short inclined shaft pilot shaft excavation method in one kind
CN104005768A (en) Construction strengthening method for soft geological layer in middle section of vertical shaft
CN212052725U (en) Karst cave area stake construction structures
CN112360551A (en) Shaft pipeline arrangement device and arrangement method
CN104264679B (en) A kind of electric power pylon basis heavy caliber Underwater pile construction method
CN208330410U (en) A kind of Tunnel Passing crushed zone canopy protection structure
CN205636725U (en) Deep basement rock ground is wall construction system even
CN216950245U (en) Construction structure of super-large-diameter rock-socketed rotary digging pile
CN115030165B (en) Under-penetration highway structure for ultra-shallow buried tunnel and construction method
CN218716850U (en) Pipe roof supporting structure
CN112502615B (en) Construction method of deep large-diameter gas extraction well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant