SU1043325A1 - Method of erecting filling-up mine partition - Google Patents

Method of erecting filling-up mine partition Download PDF

Info

Publication number
SU1043325A1
SU1043325A1 SU823427887A SU3427887A SU1043325A1 SU 1043325 A1 SU1043325 A1 SU 1043325A1 SU 823427887 A SU823427887 A SU 823427887A SU 3427887 A SU3427887 A SU 3427887A SU 1043325 A1 SU1043325 A1 SU 1043325A1
Authority
SU
USSR - Soviet Union
Prior art keywords
floor
additional
shield
mine
horizontal
Prior art date
Application number
SU823427887A
Other languages
Russian (ru)
Inventor
Евгений Моисеевич Шпарберг
Василий Николаевич Стафиевский
Владимир Васильевич Крупин
Владимир Михайлович Петров
Original Assignee
Сибирский Государственный Институт По Проектированию Шахт,Разрезов И Обогатительных Фабрик
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Сибирский Государственный Институт По Проектированию Шахт,Разрезов И Обогатительных Фабрик filed Critical Сибирский Государственный Институт По Проектированию Шахт,Разрезов И Обогатительных Фабрик
Priority to SU823427887A priority Critical patent/SU1043325A1/en
Application granted granted Critical
Publication of SU1043325A1 publication Critical patent/SU1043325A1/en

Links

Abstract

СПОСОБ ВОЗВЕДЕНЯ ШАХТНОЙ ЗАКЛАДОЧНОЙ ПЕРЕМЫЧКИ, включающий проходку из основной шахтной вы-работки дополнительной с плоскостью, перпендикул рной оси основной выработки, укладку уплотнител  и крепление шита, отличающийс  тем, что, с целью повышени  несушей способности перемычки при этажной системе разработки месторождений, дополнительные выработки проход т на всю высоту этажа, затем закладывают их твердеющей закладочной смесью, отрабатывают этаж горизонтальными сло ми в нисход щем пор дке, при этом перед отработкой каждого сло  проход т в закладочном массиве дополнительной выработки рабочий проем , оставл   в нем по периферии отрабатываемого горизонтального сло  опорную раму дл  щита. ; GO GO Ю aiA METHOD CONSTRUCTING THE MINE MORTGAGE LINKAGE, which includes penetration from the main shaft development with an additional plane, perpendicular to the main development axis, packing of the compactor and mounting of the shield, characterized in that t for the entire height of the floor, then lay them with a hardening filling mixture, work the floor in horizontal layers in a descending order, while before working each The passes in the backfill massif of the additional generation of the working opening, leaving a supporting frame for the shield in the periphery of the horizontal layer being worked out. ; GO GO Yu ai

Description

Изобретение относитс  к горной промышленности и может быть использовано при подземной разработке месторождений полезных ископаемых с закладкой выработанного пространства. Известен способ возведени  шахтной перемычки , включающий возведение тела перемычки из бетона или железобетона и размещение ее в дополнительной выработке, пройденной по контуру основной 1. Недостатком такого способа  вл етс  возможность разрушени  тела перемычки под воздействием горного давлени , следствием чего  вл етс  разгерметизаци . Известен также способ воздведени  шахтной закладочной перемычки, включающий проходку из основной щахтной выработки дополнительной с плоскостью, перпендикул рной оси основной выработки, укладку уплотнител  по боковой поверхности телескопического щита и его крепление 2. Недостаток известного способа заключаетс  в том, что несуща  способность консольной части закладочного массива, прилегающего к щиту, недостаточно высока . Цель изобретени  - повышение несущей способности щахтной закладочной перемычки при этажной системе разработки месторождений. Указанна  цель достигаетс  тем, что согласно способу возведени  шахтной закладочной перемычки, включающему проходку из основной щахтной выработки дополнительной с плоскостью, перпендикул рной оси основной выработки, укладку уплотнител  и крепление щита, дополнительные выработки проход т на всю высоту этажа, затем закладывают их твердеющей закладочной смесью, отрабатывают этаж горизонтальными сло ми в нисход щем пор дке, при этом перед отработкой каждого сло  проход т в закладочном массиве дополнительной выработки рабочий проем, оставл   в нем по периферии отрабатываемого горизонтального сло  опорную раму дл  щита. На фиг. 1 изображена конструкци  щахтной перемычки; на фиг. 2 - разрез А-А на фиг. 1; на фиг. 3 - способ возведени  перемычки; на фиг. 4 - разрез Б-Б на фиг. 3. Шахтна  перемычка содержит опорную раму 1, выполненную по периферии горизонтального сло  из твердеющей закладочной смеси, щит 2, уплотнитель 3 между щитом и рамой и средства 4 креплени , выполненные в виде телескопических механизмов дл  взаимодействи  со стенками горизонтального сло  в гнездах 5. Телескопическими механизмами могут быть винтовые, клиновые или реечные домкраты и др. Способ осуществл етс  следующим образом . После вскрыти  выемочного участка промкверщлангами 6 и скатами 7 из заходок 8 на основном горизонте проход т дополнительную выработку 9 на всю высоту этажа, например, комплексом КМД72, а затем обратным ходом расшир ют пройденную выработку , например, на всю мощность пласта , образу  камеру 10. Затем в заходке 8 устанавливают перемычку под камерой и подают в камеру упрочненную закладку. После этого начинают отработку выемочного участка, например комбайном ГПК-2, горизонтальными сло ми в нисход щем пор дке . При отработке каждого горизонтального сло  комбайном в затвердевшем закладочном массиве камеры 10 вырубают рабочий проем, оставл   по периферии поперечного сечени  горизонтального сло  опорную раму 1 и защища  ее внешнюю плоскость дл  креплени  щита. Прочность затвердевшего закладочного массива за весь период отработки выемочного участка не превышает 30-40 кг/см, что значительно ниже прочности угл , поэтому проходка выработок по упрочненной закладке не вызывает осложнений, Проход комбайна через рабочий проем в опорной раме обеспечиваетс  засыпкой открытой горной массой уступов у нижнего порога рамы По окончании очистных работ в горизонтальном слое с внешней стороны опорных рам устанавливают щиты 2, предварительно укрепив по периметру щита уплотнитель 3. После этого к щиту креп т телескопические механизмы 4, упирают второй их конец в гнезда 5 на стенках выработки и раздвигают телескопические механизмы, при жима  щит с уплотнителем к опорной раме с усилием, превышающим гидравлическое давление на щит незатвердеющей упрочненной закладки. После возведени  перемычек в выработанное пространство горизонтального сло  подают упрочненную закладочную смесь и оставл ют за щитами до набора необходимой прочности. После этого щиты с телескопическими механизмами демонтируют дл  повторного использовани  и осуществл ют дозакладку горизонтального сло  на участках от опорных рам 1 до скатов 7. Предлагаемый способ возведени  шахт ой закладочной перемычки позвол ет повысить ее несущую способность и повысить безопасность работы под закладочным массивом при нисход щем пор дке отработки этажа горизонтальными сло ми. /}The invention relates to the mining industry and can be used in underground mining of mineral deposits with the laying of the goaf. There is a known method of erecting a shaft bridge, which includes erecting a bridge body made of concrete or reinforced concrete and placing it in additional development, passed along the main contour 1. The disadvantage of this method is the possibility of destroying the body of the jumper under the influence of rock pressure, which results in depressurization. There is also known a method of erection of a mine backfill liner, which includes penetration from the main mine workings with an additional plane, perpendicular axis of the main workings, laying the seal on the side surface of the telescopic shield and its mounting 2. The disadvantage of this method is that adjacent to the shield is not high enough. The purpose of the invention is to increase the carrying capacity of the saddle lintel in the storey field development system. This goal is achieved by the fact that, according to the method of erection of a mine backfill liner, including sinking from the main mine working with an additional plane, perpendicular to the main production axis, laying the compactor and mounting the shield, the additional mining works take place to the entire height of the floor, then lay them with hardening filling mixture , work the floor in horizontal layers in a descending order, while before working out each layer, a working aperture passes in the backfilling array of additional generation , leaving in it along the periphery of the horizontal layer being worked out a supporting frame for the shield. FIG. 1 shows the construction of a jumper; in fig. 2 shows section A-A in FIG. one; in fig. 3 - way to build a jumper; in fig. 4 shows a section BB in FIG. 3. The mine bridge contains a support frame 1, made around the periphery of a horizontal layer of a hardening filling mixture, a shield 2, a seal 3 between the shield and the frame and fastening means 4 made in the form of telescopic mechanisms for interacting with the walls of the horizontal layer in slots 5. Telescopic mechanisms there may be screw, wedge or rack jacks, etc. The method is carried out as follows. After the excavation section is opened, the industrial clamps 6 and slopes 7 of the stopovers 8 on the main horizon undergo additional production 9 over the entire height of the floor, for example, with a KMD72 complex, and then, with a reverse stroke, they expand the excavated production, for example, with the entire reservoir thickness. Then in gate 8, a jumper is installed under the camera and fed to the chamber with a reinforced tab. Thereafter, the mining of the excavation site, for example, a GPK-2 combine, is started in horizontal layers in a downward order. When working each horizontal layer by a combine in the hardened backfill array of chamber 10, a working opening is cut down, leaving a supporting frame 1 along the periphery of the horizontal section and protecting its outer plane to secure the shield. The strength of the hardened filling mass for the entire period of mining the excavation site does not exceed 30-40 kg / cm, which is significantly lower than the strength of coal, therefore excavation of workings along the hardened laying does not cause complications. The harvester’s passage through the working opening in the support frame is filled with an open rock mass of ledges the lower threshold of the frame At the end of the cleaning work in the horizontal layer on the outer side of the support frames install shields 2, having previously consolidated seal 3 around the shield perimeter. Lescopic mechanisms 4, abut the second end of them in slots 5 on the walls of the excavation and push the telescopic mechanisms apart, hold the shield with a compactor to the supporting frame with a force exceeding the hydraulic pressure on the shield of the non-hardening reinforced bookmark. After the jumpers are erected, the reinforced filling mixture is fed into the worked-out space of the horizontal layer and left behind the shields until the required strength is obtained. After that, the shields with telescopic mechanisms are dismantled for reuse and carry out the re-recording of the horizontal layer in sections from supporting frames 1 to ramps 7. The proposed method of erecting the shaft of the backfill liner improves its load carrying capacity and increases the safety of work under the backfill array during the descending In this case, working out the floor in horizontal layers. /}

Claims (1)

СПОСОБ ВОЗВЕДЕНЯ ШАХТНОЙ ЗАКЛАДОЧНОЙ ПЕРЕМЫЧКИ, вклю чающий проходку из основной шахтной вы-работки дополнительной с плоскостью, перпендикулярной оси основной выработки, укладку уплотнителя и крепление щита, отличающийся тем, что, с целью повышения несущей способности перемычки при этажной системе разработки месторождений, дополнительные выработки проходят на всю высоту этажа, затем закладывают их твердеющей закладочной смесью, отрабатывают этаж горизонтальными слоями в нисходящем порядке, при этом перед отработкой каждого слоя проходят в закладочном массиве дополнительной выработки рабочий проем, оставляя в нем по периферии отрабатываемого горизонтального слоя опорную раму для щита.METHOD FOR ESTABLISHING A SHAFT SHAFT JUMPER JOINT, including sinking from the main shaft excavation with an additional one with a plane perpendicular to the axis of the main mine, laying the seal and securing the shield, characterized in that, in order to increase the bearing capacity of the jumper with the floor system of field development, additional mine workings pass to the entire height of the floor, then lay them with a hardening filling mixture, work out the floor in horizontal layers in a descending order, while before working off each layer odyat in additional filling mass production of the working opening, leaving it at the periphery executed by a horizontal layer of a support frame for the panel. SU ,.,,1043325SU,. ,, 1043325
SU823427887A 1982-04-23 1982-04-23 Method of erecting filling-up mine partition SU1043325A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823427887A SU1043325A1 (en) 1982-04-23 1982-04-23 Method of erecting filling-up mine partition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823427887A SU1043325A1 (en) 1982-04-23 1982-04-23 Method of erecting filling-up mine partition

Publications (1)

Publication Number Publication Date
SU1043325A1 true SU1043325A1 (en) 1983-09-23

Family

ID=21008252

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823427887A SU1043325A1 (en) 1982-04-23 1982-04-23 Method of erecting filling-up mine partition

Country Status (1)

Country Link
SU (1) SU1043325A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Горное дело. - Энциклопедический словарь. Т. 6. М., 1959, с. 156. 2. Авторское свидетельство СССР № 726349, кл. Е 21 F 1/14, 1977 (прототип). *

Similar Documents

Publication Publication Date Title
RU2125652C1 (en) Method of extracting operations
US4174135A (en) Underground formed wall single-entry mining method
SU1043325A1 (en) Method of erecting filling-up mine partition
RU2134350C1 (en) Method for fortifying mine workings driven in rock matter liable to heaving
RU2060398C1 (en) Method for preparation of waterproofing stopping for operation under emergency conditions
RU2194858C2 (en) Method of combined mining of bedded mineral deposits
RU2152473C1 (en) Method for erection of vehicular traffic tunnel of urban ring highway of megapolis
SU1461942A1 (en) Method of mining thick ore deposits
CN214787406U (en) I-steel self-filling roadside support facility
SU1129354A1 (en) Method of underground working of mineral deposits
SU989083A1 (en) Method of driving large-section workings
RU2062325C1 (en) Method for exploitation of underground ore deposit and device for implementing the same
SU1705572A1 (en) Protective layer
SU985304A1 (en) Method of erecting a roof support in mine working
SU1252492A1 (en) Method of driving an ascending mine working
SU1795100A1 (en) Method for mining thick steeply dipping coal seams
SU1263855A1 (en) Method of mining mineral deposits
SU1745940A1 (en) Method of erecting supporting pillar
SU1602993A1 (en) Method of mining mineral deposits
SU1710750A1 (en) Method of mining thick coal seams with filling
RU2042814C1 (en) Method for passing hollows of gas-dynamic phenomena
SU1317128A1 (en) Method of mining thick ore deposits
SU1555485A1 (en) Method of underground mining of mineral deposits
SU625044A1 (en) Method of supporting mine workings
RU1789737C (en) Method for formation of vertical working