SU1177515A1 - Method of filling voids in mine workings - Google Patents
Method of filling voids in mine workings Download PDFInfo
- Publication number
- SU1177515A1 SU1177515A1 SU843726756A SU3726756A SU1177515A1 SU 1177515 A1 SU1177515 A1 SU 1177515A1 SU 843726756 A SU843726756 A SU 843726756A SU 3726756 A SU3726756 A SU 3726756A SU 1177515 A1 SU1177515 A1 SU 1177515A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- solution
- filling
- mineral wool
- vault
- safety
- Prior art date
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
СПОСОБ ЗАПОЛНЕНИЯ ПУСТОТ В ГОРНЫХ ВЫРАБОТКАХ, включаюищй установку герметичной крепиопалубки по периметру нижней части вывала пород к и заполнение объема пустоты быстротвердеющим раствором с фиксированием окончани заполнени пустоты, отличающийс тем, что, с целью повышени безопасности ведени работ, перед подачей раствора на ограждение крепи опалубки укладывают подстилающий слой минеральной ваты и пропитывают его быстротвердеющим раствором, а после схватывани раствора укладывают еще один слой минеральной ваты в форме полусферы, повтор ющей очертание вывала. S (Л Ч Ч СП отMETHOD FOR FILLING EMPLOYMENTS, including the installation of sealed support around the lower part of the rock outfall to and filling the void volume with quick-hardening solution with a fixed ending of the void filling, characterized in that, in order to increase the safety of the work, before the solution is applied to the fencing of the vault, it is secured in the form of the vault, and in order to improve the safety of the work, before the solution is applied to the fence, the support should be secured with the vault support, provided that, in order to improve the safety of the work, before the solution is applied, the fence of the vault should be secured, and the support should be protected by an installation of the void. the underlying layer of mineral wool and impregnate it with a quick-hardening solution, and after setting the solution another layer of mineral wool is laid in the form of a floor snuffing repellents. S (LWH SP from
Description
Изобретение относитс к горной про мышленности и может быть использовано при заполнении закрепного пространства и пу-стот в горных выработках твердею1цими в жущими материалами, Цель изобретени - повышение безопасности ведени работ. На фиг.1 приведена принципиальна схема, по сн юща способ заполнени вывалов в горных выработках в жущим материалом; на фиг.2 -.разрез А-А- на фиг. I, Выработку 1, имеющую вывал горной породы (фиг.1 и 2), перекрепл ют. При установке зат жки в районе купола оставл ют не менее двух окон - лазов через которые подают маты из минеральной ваты и- насыпную минвату. Маты 2 из минваты укладывают на железобетонную зат жку по всей площади вынала и пропитывают их быстротвердею1ДИМ негор чим раствором, например, из гипса, после чего в течение 2 ч дают выдержку дл схватывани гипса. При этом образуетс непроницаемый негорычий подстилающий слой из гипса и минваты. Затем на этот слой укл дывают минвату так, чтобы в каждом поперечном сечении выработки по всей длине вывала образовалс арочный . симметричный свод из минваты 3, стрела подъема которого не менее 0,1 1 152 максимальной ширины выработки, и располагалс симметрично над верхними элементами крепи горрой выработки. Через вершину свода устанавливают трубу 4, которую подсоедин ют к смесительно-нагнетательной установке 5, например .,Темп-2, предназначенной дл подачи гипсового раствора в вывал горной выработки посредством рукава 6, причем раствор, который подают на вершину свода из минваты, расплываетс по обе стороны от нее к боковым стенкам горной выработки. Уровень наполнени вью ала ж:адким раствором определ етс сквозной контрольной трубой 7, один торец которой возвышаетс над максимальным уровнем свода из минваты на величину h, равную менее, чем 0,05 от максимальной ширины выработки , а другой торец проходит через крепь и расположен у верха выработки. Наполнение вывала раствором гипса 8 заканчиваетс тогда , когда из контрольной трубы 7 польетс раствор. После этого прекращают подачу раствора, отсоедин ют рукав от тру.бы 4. Торцы труб 4 и 7 герме- тично закрывают. После набора прочности раствором получаетс несгораемый свод, который предохран ет крепь от нагрузок и от возмоз1сности повторных вывалов.The invention relates to the mining industry and can be used in filling fixed space and emptiness in mine workings with hardening materials, the purpose of the invention is to increase the safety of operations. Fig. 1 is a schematic diagram illustrating a method for filling in dumps in mine workings with tarpaulin; in FIG. 2, a section A-A- in FIG. I, Production 1, having a rock outfall (Figures 1 and 2), is reattached. When installing the fixtures in the area of the dome, at least two windows are left — the windows through which the mats of mineral wool and the mineral wool are fed. Mats 2 of mineral wool are laid on a reinforced concrete pulling over the entire area and removed with a quick-hardening DME with a non-heated solution, for example, from gypsum, after which they are allowed to set for 2 hours to set gypsum. This forms an impermeable, non-burning, underlayment of gypsum and mineral wool. Then, mineral wool is laid on this layer so that in each cross-section of the excavation an arch is formed along the entire length of the blade. a symmetrical roof of mineral wool 3, the boom of which is not less than 0.1-1152 of the maximum width of the excavation, and was located symmetrically above the upper elements of the support of the excavation mine. A pipe 4 is installed through the top of the roof, which is connected to the mixing and injection unit 5, for example. Temp-2, which is intended to supply the gypsum solution to the mine workout through sleeve 6, and the solution that is fed to the top of the roof of the mineral wool is spread over both sides of it to the side walls of the mine workings. Filling level with a twist: the adducting solution is determined by the through control tube 7, one end of which rises above the maximum level of the roof of the mineral wool pool by an amount h less than 0.05 of the maximum working width and the other end passes through the support and is located top of production. Filling out the gypsum 8 solution ends when the solution is poured from the control tube 7. After that, the supply of the solution is stopped, the sleeve is disconnected from the tube 4. The ends of the pipes 4 and 7 are hermetically sealed. After the curing of the mortar, a fireproof roof is obtained, which protects the lining from loads and from the possibility of repeated dumps.
Фиг.FIG.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843726756A SU1177515A1 (en) | 1984-04-19 | 1984-04-19 | Method of filling voids in mine workings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843726756A SU1177515A1 (en) | 1984-04-19 | 1984-04-19 | Method of filling voids in mine workings |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1177515A1 true SU1177515A1 (en) | 1985-09-07 |
Family
ID=21113646
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU843726756A SU1177515A1 (en) | 1984-04-19 | 1984-04-19 | Method of filling voids in mine workings |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1177515A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2451181C1 (en) * | 2010-11-22 | 2012-05-20 | Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" | Method of threw out area supporting |
-
1984
- 1984-04-19 SU SU843726756A patent/SU1177515A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 875107, кл. Е 21 F 15/00, 1980. * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2451181C1 (en) * | 2010-11-22 | 2012-05-20 | Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" | Method of threw out area supporting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108316941B (en) | Broken surrounding rock and soft rock roadway U-shaped steel canopy supporting method | |
EA035418B1 (en) | Tunnel construction method using a pre-support member and a post-support member | |
US8635833B2 (en) | Top-down method for constructing below-grade structures | |
KR100799979B1 (en) | Lining reinforcing method for both edge parts of corrugated multi plated tunnel | |
CN110242334B (en) | Assembled FRP high-water-content material mining combined strut and construction method | |
CA1171675A (en) | Elongated underground construction having a uniform section and method of building this construction | |
CN109024632A (en) | A kind of the precast lattice beam structure and assembly monolithic construction method of slope reinforcement | |
CN216515662U (en) | Be applied to foundation ditch support's assembled slope protection structure | |
CN105672479B (en) | One kind assembles detachable building structure and construction technique entirely | |
CN113668576A (en) | Assembled type flaky stone slope surface protection structure and construction method | |
SU1177515A1 (en) | Method of filling voids in mine workings | |
US4648743A (en) | Method of producing a subterranean structure | |
CN107939419A (en) | A kind of tunnel U-shaped steel covers canopy supporting construction | |
CN110821530A (en) | Non-expanding excavation type tunnel water burst and support treatment method | |
CN115030556B (en) | Repairing and reinforcing method for exposed wall old building of brick | |
KR101531766B1 (en) | Method of Pre-supported tunnel costructed in a soft ground | |
DE102005049414A1 (en) | Method for manufacturing wall bodies with construction plates involves providing smooth visible surfaces on outside and transporting structural body to site, anchoring it on concrete foundation and filling interspace with concrete | |
RU2087720C1 (en) | Method of support of mine workings and device for its embodiment | |
EP0845063A1 (en) | Reinforcing masonry structures | |
CN213268014U (en) | Corrugated cover plate mounting structure for advanced construction of roof post-cast strip | |
KR970070352A (en) | New construction method of underground structures under non-installation | |
CN105937401A (en) | Support method for U-type ventilation primary tunneling setting-up double roadways | |
SU956802A1 (en) | Forms for supporting working zones | |
CN109488369A (en) | A kind of filling-up hydraulically barricade device and application method | |
CN217501649U (en) | Improved underground orepass tunneling operation platform |