SU1150367A1 - Method of mining thick gently-sloping coal seams - Google Patents
Method of mining thick gently-sloping coal seams Download PDFInfo
- Publication number
- SU1150367A1 SU1150367A1 SU813302407A SU3302407A SU1150367A1 SU 1150367 A1 SU1150367 A1 SU 1150367A1 SU 813302407 A SU813302407 A SU 813302407A SU 3302407 A SU3302407 A SU 3302407A SU 1150367 A1 SU1150367 A1 SU 1150367A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- layer
- coal
- excavation
- under
- overlap
- Prior art date
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
СПОСОБ РАЗРАБОТКИ МСвДНЫХ ПОЛОГИХ УГОЛЬНЫХ ПЛАСТОВ, включающий погоризонтную подготовку коротких столбов нарезными выработками, выемку монтажного сло длинным очистным забоем с настилкой межслоевого гибкого перекрыти и выемку угл под гибким перекрытием механизированными комплексами с выпуском угл межслоевой TOjfflMi, отличающийс тем, что, с целью обеспечени полноты извлечени запасов угл , выемку монтажного сло и выемку угл под гибким перекрытием осуществл ют горизонтально расположенной вкрест простирани пласта и наклонной спаренными лавами, причем при выемке монтажного сло наклонную лаву располагают у кровли пласта, при выемке угл под гибким перекрытием наклонную лаву располагают у почвы пласта,а выпуск угл межслоевой толщи осуществл ют путем ослаблени последней из протсежуточных штреков, которые провод т впереди очистных забоев и параллельно им. О1 о со Од WAY OF DEVELOPMENT OF SMALL-SUSTAINED COAL STRAYS, including the restoration of the short section of the window with rifled workings, excavation of the installation layer with a long clearing face with laying of the interlayer flexible overlap and coal extraction under the overlap of the mechanized complex with the release of the interlayer layer layer and the extraction of the coal under the overlap layer by the mechanized systems with the layer of the layer body layer and the layer of the layer under the layer of the layer, the layer is applied. coal reserves, excavation of the installation layer and coal excavation under flexible overlap are carried out horizontally across the strike of the formation and on paired lavas, with sloping lava placed at the roof of the reservoir during excavation, when excavating coal under flexible overlap, inclined lava is located near the reservoir soil, and the release of coal from the interlayer thickness is effected by weakening the last of the intermediate drifts that lead ahead of the mining faces and parallel to them. O1 o sood od
Description
f Иэобретение относитс к горной промышленности и предназначено дл разработки мощных пологих угольных пластов. Известен способ разработки мощны пологих угольных пластов ClJ. Известен способ разработки мощны пологих угольных пластов, включающи погоризонтную подготовку коротких столбов нарезн№1И выработками, выемку монтажного сдо длинньм забоем с настилкой межслоевого гибкого перекрыти и выемку угл под гибким перекрытием механизированньми комплексами с выпуском угл межслоевой толщи . Однако известные способы характе ризуютс недостаточной полнотой извлечени угл , Цель изобретени - обеспечение полноты извлечени запасов угл . Поставленна цель достигаетс тем, что согласно способу разработк мощных пологих угольных пластов, включающему погоризоитную подготовк коротких столбов нарезньми выработками , выемку монтажного сло длинны очистньм забоем с настилкой межслое вого гибкого перекрыти и выемку угл под-гибким перекрытием механизированнь ш комплексами с выпуском угл межслоевой голщи, выемку монта ного сло и выемку угл под гибким пер крытием осуществл ют горизонтально расположенной вкрест простирани пласта и наклонной спаренкчыи лавам причем при выемке монтажного сло наклонную лаву располагают у кровли 67 пласта, при выемке угл под гибким перекрытием наклонную лаву располагают у почвы пласта, а выпуск угл межслоевой толщи осуществл ют путем ослаблени последней из промежуточных штреков. Которые провод т впереди, очистных забоев и параллельно им. Способ осуг;ествл етс следующим образом. Мощньй пологий пласт нарезают выработками по системе коротких столбов . При этом штреки провод т у кровли, в средней части и у почвы пласта по его простиранию, образу горизонт. Штреки сбивают между собой через 25-30 м ортами. Дл отработки оставшихс запасов угл первоначально подготавливают монтажный слой, который состоит из спаренных горизонтальной и наклонной лав, причем наклоннзто лаву располагают у кровли пласта. Затем производ т настилку гибкого перекрыти . Выемку угл под гибким перекрытием также производ т спаренными лавами, одну из которых, а именно наклонную, располагают у почвы пласта. Вьтуск угл межслойной толщи осуществл ют путем ослаблени последней из промежуточных штреков, которые провод т впереди очистных забоев и параллельно им. Ослабление межслоевой толщи осуществл ют одним из известных способов . Изобретение позвол ет значительно .повысить полноту извлечени запасов угл .f The invention relates to the mining industry and is intended for the development of thick flat coal seams. There is a method of developing powerful sloping coal seams ClJ. The known method of developing powerful flat coal seams, including horizontal preparation of short pillars, tapped # 1 and workings, excavation of the installation site with a long face with laying of interlayer flexible overlap and excavation of coal under flexible overlap of mechanized complexes with the release of coal interlayer thickness. However, the known methods are characterized by insufficient coal extraction, the purpose of the invention is to ensure the complete extraction of coal reserves. The goal is achieved by the fact that according to the method of development of thick flat coal seams, including the construction of short pillars of short pillars in tapped workings, the excavation of the assembly layer is long with clean bottom with laying of interlayer flexible overlap and excavation with under-flexible overlap by means of the wedge of the exhaust beam and the excavation of the sub-flexible overlap by means of the wedge of the block and the outlet under the flexible overlap by means of the body under the exhaust beam. the excavation of the installation layer and the coal excavation under flexible transverse is carried out horizontally located across the strike of the formation and inclined sparenkivy lavas In the case of the assembly layer, inclined lava is placed at the roof 67 of the formation, when excavating coal under flexible overlap, inclined lava is located near the soil of the formation, and the release of coal from the interlayer thickness is effected by weakening the last of the intermediate drifts. Which lead ahead, cleaning faces and parallel to them. The method is stemmed as follows. The mighty shallow layer is cut by workings along the system of short pillars. At the same time, drifts are conducted at the roof, in the middle part and at the soil of the formation along its strike, forming the horizon. Drifts knock each other through 25-30 m orts. To work out the remaining coal reserves, an assembly layer is initially prepared, which consists of paired horizontal and inclined lavas, with the sloping lava located at the top of the seam. Then, a flexible overlap is laid. Coal extraction under flexible overlap is also performed by paired lavas, one of which, namely the inclined one, is positioned near the soil of the formation. Vtusk coal interlayer thickness is carried out by weakening the last of the intermediate drifts, which are held ahead of the working faces and parallel to them. The weakening of the interlayer sequence is carried out by one of the known methods. The invention makes it possible to significantly increase the completeness of coal extraction.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU813302407A SU1150367A1 (en) | 1981-03-18 | 1981-03-18 | Method of mining thick gently-sloping coal seams |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU813302407A SU1150367A1 (en) | 1981-03-18 | 1981-03-18 | Method of mining thick gently-sloping coal seams |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1150367A1 true SU1150367A1 (en) | 1985-04-15 |
Family
ID=20963475
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU813302407A SU1150367A1 (en) | 1981-03-18 | 1981-03-18 | Method of mining thick gently-sloping coal seams |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1150367A1 (en) |
-
1981
- 1981-03-18 SU SU813302407A patent/SU1150367A1/en active
Non-Patent Citations (1)
Title |
---|
1. Гапанович Л.Н. и др. Совершенствование технологии и средств комплексной механизации выемки мощных пологих пластов с выпуском угл подкровельной толщи. М., ЦНИЭИуголь, 1977,. с. 51-55. 2. Там же, с. 13-14 (прототип). * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2632087C2 (en) | Method for developing coal with benching and backfilling in adjacent stope drifts of wangeviry type | |
RU2327037C1 (en) | Excavation method of thick flat-lying coal seam with fast roof | |
SU1150367A1 (en) | Method of mining thick gently-sloping coal seams | |
SU1751333A1 (en) | Method of combined mining of bed mineral deposits | |
SU1795100A1 (en) | Method for mining thick steeply dipping coal seams | |
SU899956A1 (en) | Method of mining sloping and steep fire-hazardous coal beds | |
SU143761A1 (en) | The system for the development of heavy coal seams with pillars in the fall | |
SU877013A1 (en) | Method of mining thick sloping coal beds | |
SU1067227A2 (en) | Method of hydraulic stowing of goaf at working-out steep coal seams along strike | |
SU898067A1 (en) | Method of working thick coal beds | |
SU806873A1 (en) | Support for carrying interlevel pillars | |
SU949179A1 (en) | Method for underground working of seam deposits | |
RU2134785C1 (en) | Method of mining thick steep coal seam | |
SU649845A1 (en) | Method of excavating slightly inclined seams of minerals | |
SU1035219A1 (en) | Method of working thick coal seams | |
SU732532A1 (en) | Method for mining gently sloping mineral seams | |
RU2093679C1 (en) | Method for opencast mining of contiguous horizontal and slightly inclined seams of minerals | |
SU1745938A1 (en) | Thick pitching coal seam exploitation method | |
SU1656124A1 (en) | Method for mining thick steeply deeping coal seam with stowing | |
RU2038476C1 (en) | Coal deposit exploitation method | |
RU1800028C (en) | Method for mining thick flat seam with use of self-cementing fill | |
SU589399A1 (en) | Method of working thick steep coal-bearing seams | |
RU2063510C1 (en) | Method for working thick steeply dipping coal seams | |
SU981609A1 (en) | Method of working near-shaft pillars in thick gently-sloping deposits | |