SI9200305A
SI9200305A SI19929200305A SI9200305A SI9200305A SI 9200305 A SI9200305 A SI 9200305A SI 19929200305 A SI19929200305 A SI 19929200305A SI 9200305 A SI9200305 A SI 9200305A SI 9200305 A SI9200305 A SI 9200305A
Authority
SI
Slovenia
Prior art keywords
arrangement
pipes
holding frame
upright
designed
Prior art date
Application number
SI19929200305A
Other languages
Slovenian (sl)
Other versions
SI9200305B (en
Inventor
Juergen Blaess
Hans Schulze
Original Assignee
Friedrichsfeld Ag Keramik-
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Friedrichsfeld Ag Keramik- filed Critical Friedrichsfeld Ag Keramik-
Publication of SI9200305A publication Critical patent/SI9200305A/en
Publication of SI9200305B publication Critical patent/SI9200305B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/01Domestic plumbing installations for fresh water or waste water; Sinks for combinations of baths, showers, sinks, wash-basins, closets, urinals, or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/08Vertical ducts; Channels, e.g. for drainage for receiving utility lines, e.g. cables, pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Supports For Pipes And Cables (AREA)
  • Domestic Plumbing Installations (AREA)
  • Joints Allowing Movement (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)
  • Duct Arrangements (AREA)
  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
  • Professional, Industrial, Or Sporting Protective Garments (AREA)
  • Road Signs Or Road Markings (AREA)
  • Water Treatment By Sorption (AREA)
  • Bidet-Like Cleaning Device And Other Flush Toilet Accessories (AREA)
  • Percussion Or Vibration Massage (AREA)
  • Orthopedics, Nursing, And Contraception (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Chemical And Physical Treatments For Wood And The Like (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Coupling Device And Connection With Printed Circuit (AREA)
  • Connection Of Plates (AREA)
  • Dram (AREA)

Abstract

An arrangement with utility-duct elements contains, in a retaining frame (2), lines (4 to 6) and/or pipes (25, 26), in particular for water, said lines (4 to 6) and/or pipes (25, 26) being designed as essentially vertical runs and extending at least essentially over the entire height of the arrangement. This arrangement is to be further developed to the effect that rapid assembly is permitted as is, in an operationally reliable manner, compensation of temperature changes or tolerances. It is proposed that, by means of slots (80) arranged in the horizontal direction in the retaining frame (2), it be possible to align the lines (4 to 6) and/or the pipes (25, 26) in a horizontal direction with respect to the retaining frame (2). The lines (4 to 6) have, preferably in the upper region of the arrangement, in each case one bend (8 to 10) which is designed as an expansion bend and/or as a tolerance compensation means. <IMAGE>

Description

Friedrichsfeld AG Keramik- und KunststoffwerkeFriedrichsfeld AG Keramik- und Kunststoffwerke

Ureditev z instalacijskimi elementiArrangement with installation elements

Izum se nanaša na ureditev z instacijskimi elementi po značilnostih, navedenih v uvodnem delu prvega patentnega zahtevka.The invention relates to an arrangement with instinctive elements according to the characteristics mentioned in the introductory part of the first patent claim.

V zgradbah, ki so narejene predvsem z dokončanimi sestavnimi deli in se raztezajo v danem primeru čez več nadstropij, gre mnogokrat za instalacijske jaške ali komore, ki so ločene od preostalih stanovanjskih prostorov in v katerih so razporejeni preskrbovalni vodi za svežo vodo, odtočno vodo, v danem slučaju deževnico, kot tudi za električne vode. Taki instalacijski jaški ali komore so razporejene praviloma v neposredni bližini kuhinje in/ali kopalnice, da se na kar najkrajši poti omogoči povezava z armaturami in kadmi, umivalniki itd. Nadalje so za nadometno instalacijo znane ureditve, ki se označujejo kot instalacijski registri ali cevni registri in so opisani naprimer v tovarniškem tiskanem viru LORO-SANFIT, Installarionsregister-System 90, LOROWERK K.H. VAHLBRAUK GmbH, Kriegenveg 1, D-3353 Bad Gandersheim. Ta ureditev vsebuje na hrbtni strani držalen okvir, ki ga je treba pritrditi na steno prostora kopalnice in vsebuje cevovode za svežo in uporabljeno vodo. Cevi ali cevovodi so zasnovani kot pokončno skoznji prameni, in za povezavo z nadaljnjim instalacijskim registrom v naslednjem nadstropju so predvideni vezni elementi z dolžinsko poudarjenimi obojkami za izravnavo gradbeno običajnih višinskih in stranskih odstopkov. Držalni okvir nadalje služi za držanje armaturnih priključkov, umivalnika ali WC. Ta ureditev, vsebujoča navedene instalacijske elemente, se po vgraditvi prekrije z namenskim elementom, pri čemer se razni cevovodi povežejo z vsakokratno potrebnimi sanitarnimi predmeti opreme. Vgrajevanje tovrstnih ureditev ali cevnih registrov za saniranje predvsem stanovanj v industrijski gradnji stanovanj razen tega terja posebne predpriprave, da se integracija v razpoložljive instalacijske jaške in priključki v skladu s pogoji, kijih narekuje zgradba, lahko izvedejo z nizkimi montažnimi stroški. Izdelava potrebnih povezav, odcepov in podobnega zahteva zares visoke montažne stroške. Predvsem čas montaže za pritrditev raznih cevovodov kot tudi za pripravo odcepov in priključkov je zelo obsežen, pri čemer se opaža precejšnje motenje stanovalcev, in sicer ne le vsakokratne etaže, marveč tudi kar vse večnadstropne stanovanjske zgradbe.Buildings, which are made primarily of finished components and extend, as appropriate, over multiple floors, are often installation shafts or chambers that are separate from the rest of the living quarters and which house fresh water, drainage, rainwater, as well as electricity, if necessary. Such installation shafts or chambers shall, as a rule, be arranged in close proximity to the kitchen and / or bathroom to allow connection with fittings and bathtubs, sinks, etc. as quickly as possible. Furthermore, arrangements are known for surface installation, which are referred to as installation registers or pipe registers and are described, for example, in the factory printed source LORO-SANFIT, Installarionsregister-System 90, LOROWERK K.H. VAHLBRAUK GmbH, Kriegenveg 1, D-3353 Bad Gandersheim. This arrangement contains a retaining frame on the back that must be attached to the wall of the bathroom space and contains piping for fresh and used water. Pipes or pipelines are designed as upright beams, and connection elements with the next installation register on the next floor are provided with connecting elements with long-pointed sockets to compensate for the usual height and side deviations. The holder frame is further used to hold the fittings, sink or toilet. This arrangement, containing the installation elements listed above, is covered with a dedicated element after installation, connecting the various pipelines to the necessary sanitary items of equipment. The installation of such arrangements or pipe registers for the remediation, in particular, of dwellings in industrial dwelling construction requires, in addition, special prerequisites for the integration of the available installation shafts and fittings in accordance with the conditions dictated by the building to be carried out at low installation costs. Making the necessary connections, twists and the like requires really high installation costs. In particular, the assembly time for the attachment of various pipelines as well as for the preparation of branchings and connections is very extensive, with considerable disturbance of the occupants, not only on each floor but also on all multi-storey residential buildings.

Izhajajoč iz tega je izum osnovan na nalogi, v tolikšni meri izpopolniti ureditev z instalacijskimi elementi omenjene vrste, da se bo le-te dalo hitro in zanesljivo vgraditi in priključiti. Ureditev naj bo zastavljena za dolgo obratovalno dobo in funkcijsko zanesljivo naj sprejema dolžinske spremembe cevovodov, zlasti takih na osnovi temperaturnih sprememb. Nadalje naj ureditev ima kompaktne razsežnosti (ureditev naj bo zgoščena), posluževanje naj bi bilo enostavno, pri čemer naj bo zanesljivo omogočena izravnava odstopkov z razpoložljivimi priključki ali priključki, ki jih je šele treba pripraviti, za armature, kadi, korita ali podobno.Based on this, the invention is based on the task of refining the arrangement with the installation elements of the aforementioned type in such a way that they can be quickly and reliably installed and connected. The arrangement should be designed for long service life and functionally accept longitudinal changes of pipelines, especially those based on temperature changes. Furthermore, the arrangement should have compact dimensions (the arrangement should be compacted), the operation should be simple, reliably compensating for the variations with the available connections or attachments to be prepared for fittings, tubs, sinks or the like.

Rešitev te naloge sledi po značilnostih, navedenih v značilnostnem delu 1. patentnega zahtevka.The solution to this task follows the characteristics set forth in the characteristic part of claim 1.

Predlagana ureditev z instalacijskimi elementi predstavlja tovarniško vnaprej izdelano gradbeno enoto, ki se jo da z majhnimi montažnimi posegi na kraju samem priključiti na razpoložljive armature, instalacijske dele, kadi, korita ali podobno in/ali je za take priključke pripravljena. Ureditev ima na smotrn način po višini nadstropja potekajoče, pod tlakom nahajajoče se vode, in sicer za toplo ali mrzlo svežo vodo, cirkulacijo kot tudi cevi za uporabljeno vodo in/ali deževnico, pri čemer so prav tako predvidene zanke kot razteznostne zanke kot tudi nastavljivi podaljški, vezni elementi in izravnalni deli. Prameni vodov ali cevi, potekajoči v bistvu navpično, so tako razporejeni, da sta njihova vsakokratna zgornji in spodnji konec v bistvu poravnana in potemtakem brez problemov omogočata priključitev na ustrezno ureditev v zgoraj oz. spodaj ležečem nadstropju. Po izumu so zanke v vodih pod tlakom predvidene zlasti za svežo vodo, medtem ko so cevi brez tlačne obremenitve, ki so predvidene predvsem za uporabljeno vodo ali deževnico, opremljene z dolžinsko poudarjenimi obojkami. Zlasti se da s pomočjo razteznostnih zank brez težav izravnati osne zamike med denimo prvo ureditvijo po izumu in nadaljnjo ureditvijo, ki jo je treba vgraditi v nad to nahajajoče se nadstropje.The proposed arrangement with installation elements is a pre-fabricated construction unit that can be connected to available fittings, installation parts, tubs, sinks or the like with small on-site assembly operations and / or is ready for such connections. The arrangement has expediently flowing, pressurized water in the height of the floor, for hot or cold fresh water, circulation as well as pipes for used water and / or rainwater, with loops as well as expansion loops as well as adjustable ones. extensions, fasteners and leveling parts. The strands of the pipes or pipes running substantially vertically are arranged so that their upper and lower ends are substantially aligned and thus allow them to be connected without difficulty to the above arrangement. downstairs. According to the invention, the loops in pressurized water lines are provided especially for fresh water, while the pipes without pressure load, which are provided primarily for the water or rainwater used, are provided with long stressed sleeves. In particular, axial displacements between, for example, the first arrangement according to the invention and the subsequent arrangement to be installed on the floor above can be easily compensated by means of expansion loops.

Na osnovi razteznostnih zank oz. upogibnih krakov v vsaki od druga nad drugo predvidenih ureditvah je dolžinska sprememba cevovoda, ki jo je treba kompenzirati v posamezni ureditvi, sorazmerno majhna, pri čemer se da na nadstropje izhajati z etažno višino 2,5 m. Dolžine upogibnih krakov se dajo definirano vnaprej, tako da obstaja visoka varnost in z veliko zanesljivostjo se odpravijo tozadevne montažne napake. V okviru izuma se zanke tovarniško delno pripravijo vnaprej z vsakokrat po enim upogibnim krakom in po pritrditvi držalnega okvira na steni prostora, ki je (gre za pritrditev) smotrno pokončna, se izpopolnijo, pri čemer se priključek s hkratno izravnavo odstopkov spelje k ustrezni ureditvi, ki se nahaja v naslednji etaži. Tako je tovarniško na voljo predvsem v bistvu vodoraven upogibni krak kot tudi pokončno usmerjen cevni del, ki je glede na pramen cevovoda v vodoravni smeri odmaknjen. Tako pride pri izpopolnitvi zanke na kraju samem brez problemov v pokončni in ležeči smeri do izravnave odstopkov in do priključitve na naslednjo ureditev sosednjega nadstropja. Posamezni priključki cevovodov so na smotrn način proti okviru nastavljivi in usmerljivi, tako da se da brez problemov izdelati zvezo z razpoložljivimi armaturami in podobnim. Okvir celotne ureditve se na smotrn način zgradi iz kovinskih palic, ki so iz stabilnostnih razlogov smotrno zasnovane kot kotniške ali profilne palice. Te palice imajo vsaj v območju različnih priključkov in/ali vodov ali cevi podolgovate luknje, skozi katere uprijemajo vijačni sorniki objemk ali siceršnjih držalnih elementov, da se tako omogoči po eni strani enostavna izravnava in po drugi zanesljiva pritrditev le-teh. Pri zgoščeni gradnji je masa ureditve največ 60 kg in jo zato lahko nosita dve osebi, tako da je transport kot tak možen brez problemov skozi ozko stopnišče.On the basis of expansion loops or. of the bending arms of each arrangement provided for above each other, the length change of the pipeline, which must be compensated for in each arrangement, is relatively small, with a floor height of 2.5 m. The lengths of the bending arms are predefined so that there is high security and the mounting errors are eliminated with great reliability. In the context of the invention, the loops are partially pre-fabricated at the factory with one bending leg each time and after attaching the retaining frame to the wall of the room, which is reasonably upright, they are perfected, and the connection with the simultaneous offsetting of the deflections is brought to the proper arrangement, located on the next floor. Thus, in the factory, a substantially horizontal bending arm is available, as well as an upright tubular section which is offset in relation to the pipeline beam in a horizontal direction. Thus, when completing the loop on the spot, without problems in the upright and lying direction, the alignment of the deviations and the connection to the next arrangement of the adjacent floor. The individual connections of the pipelines are adjustable and directional in an efficient manner against the frame, so that the connection with the available fittings and the like can be easily made. The framework of the whole arrangement is constructed in a sensible manner from metal rods which, for stability reasons, are expediently designed as angular or profile bars. These rods have elongated holes at least in the region of the various fittings and / or conduits or pipes through which the screw bolts of the clamps or other holding elements are held in order to allow, on the one hand, easy alignment and, on the other, a secure attachment. For compact construction, the weight of the arrangement is no more than 60 kg and can therefore be carried by two people, so that transport as such is possible without problems through a narrow staircase.

Posebne nadaljnje značilnosti in podrobnosti izuma so navedene v podzahtevkih.Specific further features and details of the invention are set forth in the sub-claims.

Izum v nadaljnjem pobliže opisujemo na osnovi v skicah predstavljenih izvedbenih primerov. Pri tem kaže sl. 1 prostorsko predstavitev ureditve z držalnim okvirom, sl. 2 povečano - pritrditev držalnega okvira na steni poslopja s tovarniško predvidenima konzolama, sl. 3 posebno držalno palico s stensko ploščo, sl. 4 držalno palico po sl. 3.The invention will now be further described on the basis of the embodiments presented in the drawings. In this respect, FIG. 1 is a spatial representation of an arrangement with a holding frame; FIG. 2 is an enlarged view of the mounting of the retaining frame on the wall of the building with the factory-fitted brackets, FIG. 3 shows a special holding rod with a wall plate, FIG. 4 shows a holding rod according to FIG. 3.

Sl. 1 kaže ureditev z držalnim okvirom 2, ki ima vod 4 za mrzlo vodo, vod 5 za toplo vodo kot tudi vod 6 za kroženje. Ti vodi so na običajen način prirejeni za razpoložljiv vodni tlak, zgrajeni so iz tlačnih cevi, cevnih lokov, T-kosov ali podobnega in potekajo v pokončni smeri po višini nadstropja naprimer 2,5 m. V zgornjem delu ureditve omenjeni vodi vsebujejo vsakokrat razteznostno zanko 8, 9,10 z upogibnimi kraki, da se kompenzirajo dolžinske spremembe. Ker ima vsakokratna ureditev, ki se označuje tudi kot register, skupno višino, ki ustreza naječ višini nadstropja, velikostnega reda okoli 2,5 m, so dolžinske spremembe sorazmerno majhne. Ker je vsa ureditev zasnovana kot tovarniško vnaprej izdelana gradbena enota, so vsakokratne razteznostne zanke dimenzionirane ustrezno potrebam, pri čemer se izognemo napačnim izračunom dolžine krakov, kakršnih se je v praksi bati pri montaži na kraju samem, in zagotovi se visoka kakovost in varnost ureditve. Nadalje se s tovarniško izdelavo in proizvodnjo spojev s cevnimi loki, T-kosi ali podobnim zagotovi funkcijska zanesljivost.FIG. 1 shows an arrangement with a holding frame 2 having a conduit 4 for cold water, a conduit 5 for hot water as well as conduit 6 for circulation. These conduits are custom-designed for available water pressure, constructed from pressure pipes, tubular arches, T-pieces or the like, and extend in an upright direction over a floor height of about 2.5 m. In the upper part of the arrangement, said lines each comprise an expansion loop 8, 9,10 with bending arms to compensate for the length changes. As each arrangement, also referred to as the register, has a total height corresponding to a floor height of about 2.5 m in size, the length changes are relatively small. As the whole arrangement is designed as a pre-fabricated building unit, each of the expansion loops is dimensioned to fit the needs, avoiding miscalculations of the lengths of the legs that are practically feared during on-site assembly and ensuring high quality and safety of the arrangement. Furthermore, the factory design and manufacture of joints with tubular arches, T-pieces or the like ensures functional reliability.

Predpostavimo, da se v večnadstropnem stanovanjskem poslopju v vsaki etaži v tam razpoložljivem instalacijskem jašku ali podobnem vgradi ureditev po izumu, tako da se pojavi druga nad drugo številu nadstropij enako število takih ureditev. Montaža poteka po nadstropjih od spodaj gor, pri čemer se v tleh oz. stropovih predvidijo prekinitve ustrezno spodnjemu koncu 14, 15, 16 oz. zgornjemu koncu 17, 18, 19. V vsakokratni ureditvi se na posebno smotrn način ujemajo spodnji in zgornji konci vsakokratnega voda. Morebitne osne zamike med drug k drugemu obrnjenimi konci pokončno drug nad drugim v vsakokratnem nadstropju razporejenih registrov se da na osnovi razteznostnih zank 8, 9, 10 brez problemov izravnati. V ta namen se v območju razteznostne zanke nahajajoči se cevni kosi na potreben način odrežejo na primerno dolžino in medsebojno izravnajo z zasukom, pri čemer se da povezava brez nadaljnjega vzpostaviti skozi strop s pomočjo obojk, ki tu niso pobliže predstavljene. Da bi v območju razteznostne zanke nahajajoče se cevne dele na navedeni način privedli na potrebno dolžino in jih lahko izravnali z naslednjo ureditvijo, se razteznostne zanke tovarniško samo delno pripravijo, tako da so pripravljeni naprimer vodoravni upogibni kraki 11 - 13, ki se preko cevnega loka vežejo na pokončne cevovodne pramene, kot tudi preko cevnih lokov pokončno gor priključeni cevovodni deli, preostali deli zanke kot tudi gor priključujoči se pokončni cevni deli pa se dajo na razpolago z zgornjimi konci 17 - 19, s tem da se za potrebe priključitve in izravnave odstopkov na potreben način na kraju samem odrežejo na pravo dolžino in izravnajo.Assume that in the multi-storey residential building on each floor in the available installation shaft or similar installation according to the invention, so that one above the other number of floors appears the same number of such arrangements. Installation is carried out on the floors from the bottom up, with the floor or the floor. the ceilings provide for interruptions corresponding to the lower end of 14, 15, 16 and. upper ends 17, 18, 19. In each arrangement, the lower and upper ends of each line are matched in a particularly sensible manner. Possible axial displacements between the ends facing upright on top of each other on the respective floors of the registers can be easily offset on the basis of the expansion loops 8, 9, 10. For this purpose, in the area of the expansion loop, the tubular pieces located in the required manner are cut to a suitable length and straightened with a twist, whereby the connection can be further made through the ceiling by means of clamps, which are not shown here. In order to bring the pipe sections in the said area to the required length in the said area and can be offset by the following arrangement, the expansion loops are only partially fabricated in the factory so that horizontal bending arms 11-13 are prepared, for example, extending over the pipe arc bind to upright piping strands, as well as upright connected piping parts through the pipe arches, and the rest of the loop as well as upstream upright tubing parts are made available at the upper ends 17-19, making sure that connections and offset balances are available they are cut to the right length and offset in the necessary manner.

Pri izdelavi omenjenih prehodov v stropu se, kar je prednostno, zgoraj na držalnem okviru 2 razporedi lovilna ponev 20. Pri delu padajo padajoči kamni ali betonski deli v omenjeno lovilno ponev 20, tako da se izognemo poškodbam spodaj nahajajoče se ureditve in predvsem njenih raznih vodov in cevi itd. Tudi tvorba prahu in umazanije se v celoti zmanjša na minimum, kar je posebno prednostno v pogledu naseljenih stanovanj. Ta lovilna ponev vsebuje na svoji spodnji strani pritrdilne dele 22 v obliki nog ali podobnega, ki sovpadajo s prirejenimi deli 24 držalnega okvira 2. Pritrdilni deli 22 in deli 24 so na tak način medsebojno določeni, da je lovilna ponev zanesljivo držana in na vode se ne prenašajo nikakršne sile.Preferably, when constructing said passageways in the ceiling, a catch pan 20 is arranged above the retaining frame 2. In operation, falling stones or concrete parts fall into said catch pan 20 so as to avoid damage to the arrangement below and, in particular, its various lines. and pipes etc. The formation of dust and dirt is also completely reduced to a minimum, which is particularly advantageous in terms of inhabited dwellings. This tray contains, on its underside, foot-like or similar fastening portions 22 which coincide with the adapted portions 24 of the retaining frame 2. The retaining portions 22 and the portions 24 are arranged in such a way that the tray is securely held and in the water. they do not tolerate any force.

Ureditev nadalje obsega cevi 25, 26 za uporabljeno vodo oz. deževnico. Kot je razvidno, imata cev 25 za uporabljeno vodo in cev 26 za deževnico v zgornjem končnem območju po eno ekstremno dolgo dolžinsko poudarjeno obojko 28, ki omogoča premostiti razdaljo reda velikosti 30 cm. V dolžinsko poudarjeni obojki 28 sta od zgoraj vložena ustrezno dolga pomična kosa 30 s prirejenima obojkama 31. Kot se vidi, tudi pri ceveh 25, 26 njuna spodnja konca 32, 33 sovpadata z na vsakokratnem zgornjem koncu 34, 35 po izumu v kombinaciji predvidenima obojkama 31. Pri montaži potisni kos 30 povlečemo gor in ga z njegovo obojko 31 potisnemo čez spodnji konec cevi za uporabljeno vodo oz. cevi za deževnico v nadstropju nad tem montirane ureditve ter ga z njim na smotrn način zlepimo in varujemo. Nadalje je pri tu pokazani izvedbeni obliki cevi 26 za deževnico predvsem z vidika nezaželenega hrupa, ki ga povzroči tek vode, predvidena zanka 36. Ta zanka hkrati omogoča na enostaven način prilagoditev in poravnavo pri osnem zamiku. Naj pripomnimo, da cev 26 za deževnico lahko odpade, ko se ureditev vgrajuje v poslopje, kjer je odtok deževnice speljan naprimer zunaj poslopja. Cevi 25, 26 sta tako, da se ju da poravnati, s pomočjo objemk povezani s po izumu predvidenimi podolgovatimi luknjami držalnega okvira.The arrangement further comprises pipes 25, 26 for the water used or. rainwater. As can be seen, hose 25 for the water used and rainwater hose 26 in the upper end region each have an extremely long longitudinal socket 28, which allows to bridge a distance of the order of 30 cm. In the long-emphasized sleeves 28, correspondingly long movable pieces 30 with adapted sleeves 31 are inserted from above. As can be seen, even at the pipes 25, 26, their lower ends 32, 33 coincide with the respective upper ends 34, 35 of the invention in combination with the provided sleeves. 31. During assembly, push piece 30 is pulled up and pushed with its sleeve 31 over the lower end of the pipe for the water used. Rainwater pipes on the floor above the assembled installation and securely seal and secure it. Furthermore, in the embodiment of the rainwater pipe 26 shown here, in particular in view of the undesirable noise caused by the flow of water, a loop 36 is provided. This loop simultaneously allows for easy adjustment and alignment at axial offset. Note that rainwater hose 26 may fall off when the installation is installed in a building where rainwater runoff is directed approximately outside the building. The tubes 25, 26 are aligned so that they can be connected by means of clamps to the elongated holes of the holding frame according to the invention.

Cev 25 za uporabljeno vodo ima v spodnjem delu ureditve štirikraten odcep 38. Ta posebni odcep s štirimi izhodi ali priključki je tovarniško izdelan iz več posamičnih odcepov z ustreznimi obojkami, pri čemer so posamični deli tovarniško medsebojno neločljivo povezani. Pri tem je predviden izhod 40 k WC z imenskim premerom DN 100. Drugi izhodi 41 do 43 služijo za priključitev vlečnih vodov 46 do 48, ki vodijo h kopalni kadi, umivalniku v kopalnici kot tudi k pomivalnemu koritu v sosedni kuhinji. Omenjeni vlečni vodi, ki so na predstavljeni način speljani v cev 25 za uporabljeno vodo, vsebujejo kombinacijo iz vsaj dveh, prednostno petih, lokov z dolgimi obojkami in pomičnih kosov, da se na najožjem prostoru omogoči prilagoditev na kraju samem v vseh smereh. Tako se da brez nadaljnjega izravnati odstopek odprtine v steni h kopalnici oz. kuhinji reda velikosti 8 cm. Vsak od vlečnih vodov se da na potreben način ločeno prestavljati in nastavljati. Vsega skupaj je torej predvidenih petero lokov z dolgimi obojkami, ki sodelujejo po svojih razmikih in so medsebojno natančno nastavljeni, da tako brez problemov omogočajo izravnavo v različnih prostorskih smereh.The used water pipe 25 has a four-way branch 38 in the lower part of the arrangement. This special four-outlet or connection branch is factory-made from several individual branches with corresponding clamps, with the individual parts being individually interconnected at the factory. Exit 40 to the toilet with a nominal diameter of DN 100 is foreseen. Other exits 41 to 43 are used to connect the tow lines 46 to 48, which lead to the bath tub, the sink in the bathroom, as well as to the sink in the adjacent kitchen. These draw lines, which are presented in the manner shown in the water pipe 25, comprise a combination of at least two, preferably five, long-arm arches and movable pieces to allow on-site adjustments in all directions. In this way, the deviation of the opening in the wall towards the bathroom or the bathroom can be further offset. kitchen size 8 cm. Each of the traction lines can be moved and adjusted separately as necessary. All together, five arches with long sockets are planned, which cooperate at their distances and are precisely tuned to each other so that they can smooth out in different spatial directions without problems.

V vodih 4, 5 za mrzlo in toplo vodo, ki tvorita vzpenjalna pramena, so nadalje predvideni izhoda 54, 55 in njima sledeča poševnosedežna ventila 56, 57 kot tudi vodna števca 58, 59. Ta poševnosedežna ventila 56, 57 kot tudi vodna števca 58, 59 so tako razporejeni, da se jih da upravljati oz. videti iz sosednega prostora, predvsem kopalnice, skozi ustrezno revizijsko odprtino.In cold water and hot water lines 5, 5, which form the climbing strands, outlets 54, 55 and the following seatback valves 56, 57 as well as water counters 58, 59 are further provided. These seatback valves 56, 57 as well as water counters 58 , 59 are so arranged that they can be operated or operated. look from the adjacent space, especially the bathroom, through the appropriate inspection opening.

Kot se vidi, sta za omenjenima vodnima števcema 58, 59 dalje speljana voda, da se omogočijo potrebni priključki k armaturam kuhinje in kopalnice. Tu naj se omenijo zlasti vodne pipe ali mešalne armature ob kuhinjskem pomivalnem koritu, kopalni kadi kot tudi umivalniku v kopalnici. Nadalje so lahko predvideni ustrezni kotni ventili za omenjena umivalna korita kot tudi za visokoviseč ali nizkoviseč izplakovalni kotliček. Glede na vgraditvene pogoje se omenjeni priključki tovarniško v tolikšni meri vnaprej pripravijo in izdelajo, da je treba na kraju samem s sorazmerno malo dela izdelati samo še povezavo z armaturami, kotnimi ventili ali podobnim.As can be seen, the two water meters 58, 59 are further fed to allow the necessary connections to the kitchen and bathroom fittings. Particular mention should be made of water faucets or faucets next to the kitchen sink, bathtub as well as the sink in the bathroom. Further, suitable angle valves may be provided for said sinks as well as for a high or low hanging flushing kettle. Depending on the installation conditions, these connections are pre-fabricated to the factory and manufactured in such a way that only a connection with fittings, angle valves or the like has to be made with relatively little work.

Kot posebno smotrne za priključitev omenjenih armatur so se izkazale stenske plošče, pri čemer naj tu le kot primer omenimo stenski plošči 64,65 za mrzlo vodo in toplo vodo ob umivalniku kopalnice. Stenski plošči 64, 65 kot tudi ostale, tu v podrobnostih neobrazložene stenske plošče so glede na držalni okvir 2 nastavljivo razporejene. To bo v podrobnostih še obrazloženo spodaj.Wall panels have proven to be particularly useful for connection of the aforementioned fittings, with only 64.65 wall panels for cold water and hot water next to the bathroom sink. Wall panels 64, 65 as well as the rest of the wall panels, which are not explained in detail here, are adjustably arranged according to the holding frame 2. This will be further explained below.

Držalni okvir 2 vsebuje štiri pokončne profilne palice 71 do 74, ki praktično predstavljajo vogalne omejitve ureditve. Kot se vidi, je držalni okvir 2 v bistvu zasnovan kot pravokotniška omara, ki ima na vsaki svojih četvero stranic razne prečne palice 76 do 79. Prečne palice 77, 79, ki se nahajajo na ozkih straneh, so smotrno zasnovane kot kotniške palice in služijo tudi za pritrditev ob poslopje. Prečne palice 78, ki se po tej predstavitvi nahajajo na hrbtni strani ureditve, so smotrno ločljivo pritrjene in sicer predvsem s pomočjo vijakov. Kabelski prameni ali drugi vodi, ki se v danem primeru nahajajo v zgradbi ali v njenem jašku, potemtakem pri vgrajevanju ureditve ne motijo. Pokončni profilni palici 73, 74, ki se nahajata na hrbtni strani, lahko položimo v neposredno naleganje na steno zgradbe, tako da omenjeni kabelski prameni ali podobno pridejo v notranji prostor ureditve. Zatem se da nato tudi zadnje prečne palice 78 na potreben način spet vijačno povezati. Smotrno so omenjene zadnje prečne palice 78 tovarniško pokončno zložene in se jih po montaži in izravnavi ureditve prevede v potrebni ležeč položaj in z vijaki poveže.The frame 2 comprises four upright profile bars 71 to 74, which practically represent the corner constraints of the arrangement. As can be seen, the holding frame 2 is essentially designed as a rectangular cabinet, each having four transverse bars 76 to 79 on each of its four sides. The narrow bars 77, 79, which are located on the narrow sides, are expediently designed as corner bars and serve also for attachment to the building. The transverse bars 78, which, after this presentation, are located on the back of the arrangement, are cleverly secured, especially by means of screws. Cable ties or other ducts, which are located in the building or shaft, as appropriate, do not interfere with the installation. The upright profile bars 73, 74 located on the back can be placed directly against the wall of the building so that said cable strands or the like come into the interior space of the arrangement. Thereafter, the back transverse rods 78 can then be screwed together in the necessary manner. Reasonably mentioned rear cross bars 78 are folded upright at the factory and, after mounting and straightening the arrangement, are translated to the required recumbent position and screwed together.

Razne prečne palice 76 do 79 imajo vsaj v bližini ob sebi speljanih cevi ali vodov vodoravno potekajoče podolgovate luknje 80. V teh podolgovatih luknjah so nastavljivo razporejene primerne cevne objemke, držalne palice ali podobno, na katerih so pritrjeni vodi ali cevi. Smotrno so prečne palice zasnovane kot vnaprej pripravljeni luknjani profili ali kotniški profili s podolgovatimi luknjami. Konci prečnih profilov so prednostno zvaljeni s pokončnimi profili 71 do 74 in v celoti ima držalni okvir 2 visoko stabilnost. Z zasnovo prečnih profilov kot vnaprej pripravljenimi profilnimi palicami s podolgovatimi luknjami lahko v enakem držalnem okviru uredimo vode in cevi tako, kot je predstavljeno na sl. 1, ali v zrcalni simetriji k tej. S tem se dobijo nadaljnje izdelovalne prednosti, saj se da, če je treba, obe izvedbeni varianti, torej levo in desno varianto, izdelati z vsakokrat enakim držalnim okvirom.Various transverse rods 76 to 79 have at least adjacent elongated holes 80 in the adjacent tubes or conduits. These elongated holes are adjustably arranged with suitable tubular clamps, holding rods or the like, on which the tubes or pipes are attached. Preferably, the transverse bars are designed as prefabricated holes or angular profiles with elongated holes. The ends of the transverse profiles are preferably rolled up with the upright profiles 71 to 74, and overall the holding frame 2 has high stability. By designing the transverse profiles as pre-prepared profile bars with elongated holes, the water and pipes can be arranged in the same holding frame as shown in FIG. 1, or in mirror symmetry to this. This gives further manufacturing advantages, since if necessary, both variants, ie the left and right variants, can be produced with the same holding frame in each case.

Na držalnem okviru 2 sta nadalje spodaj pritrjeni dve postavljalni plošči 81. Spodnja robova teh postavljalnih plošč 81 ležita smotrno za vnaprej dano majhno vrednost globlje kot spodnji konci cevi in vodov. Ti postavljalni plošči, ki sta prednostno zasnovani kot leseni plošči, služita potemtakem kot zaščita za omenjene konce cevi. Ti postavljalni plošči 81 omogočata pri transportu ali pri montaži varnejše podprtje ureditve, ki se jo da s pomočjo postavljalnih plošč 81 po potrebi postaviti na tla.Two mounting plates 81 are further attached to the retaining frame 2 below. The lower edges of these mounting plates 81 lie expediently for a given small value deeper than the lower ends of the pipes and lines. Preferably, these mounting plates, which are preferably designed as wooden panels, serve as a protection for said pipe ends. These mounting plates 81 allow the transport, or the mounting, to be supported more securely by the arrangement, which can be placed on the floor by means of the mounting plates 81 if necessary.

Nadalje je na prednji strani ureditve v vodoravni ravnini razporejenih v danem primeru četvero ali več vogalnih lesov. Ti vogalni lesovi 82 omogočajo nakladljivost ureditve. Za potrebe transporta in/ali skladiščenja se da brez problemov več takih ureditev naložiti drugo na drugo in s tem držati potrebni skladiščni prostor sorazmerno majhnega. Nadalje so ti vogalni lesovi 82 smotrno ravninsko poravnani s pritrdilnimi konzolami za snemljivo steno. Ta stena je predvsem kot kuhinjska stena zasnovana v obliki iverke ali podobnega. S tem je zagotovljeno, da ima kuhinjski priključek za mešalno baterijo, kotne ventile ali podobno potrebno globinsko lego. Slednjič omenjeni vogalni lesovi 82 služijo za pritrditev omenjene kuhinjske stene. Sneta kuhinjska stena se da namreč z vijaki pritrditi na vogalne lesove 82 ureditve in niso potrebna nikakršna dodatna pritrdilna sredstva za kuhinjsko steno.Further, there are four or more corner timbers arranged in the horizontal plane at the front of the arrangement in the horizontal plane. These corner woods 82 make the arrangement workable. For transport and / or storage purposes, several such arrangements can be stacked without difficulty, keeping the required storage space relatively small. Further, these corner woods 82 are substantially planarly aligned with the retaining wall mounting brackets. This wall is basically like a kitchen wall designed in the form of chipboard or something. This ensures that the kitchen connection has a mixer battery, angle valves or similar depth required. The aforementioned corner woods 82 serve to secure said kitchen wall. The removable kitchen wall can be bolted to the corner woods 82 of the arrangement and no additional fixtures are required for the kitchen wall.

Sl. 2 kaže delno in povečano od držalnega okvira pokončno profilno palico 72 in eno od prečnih palic 77, kije zasnovana kot kotniški profil. Nadalje je predstavljen v steni zgradbe sidran kotniški profil 84 kot tudi gumijasta vzmet 86 s spodnjim vijačnim sornikom 88 in zgornjim vijačnim sornikom 89. Na držalnem okviru pritrjena prečna palica ima v vodoravnem kraku 90 vzporedno z risalno ravnino potekajoč razporek 92. Kotniški profil 84 vsebuje pravokotno na risalno ravnino potekajočo podolgovato luknjo 85. Vijačni sornik 88 je vstavljen skozi podolgovato luknjo 85 in zgornji vijačni sornik 89 skozi razporek 92. Gumijasta vzmet torej loči oba z njo trdno povezana vijačna somika 88, 89, tako da je preprečen direkten prenos zvoka. Držalni okvir se da torej glede zgradbe prestaviti v obeh vodoravnih smereh in s pomočjo vijačnega droga 88 se lahko v zvezi s prirejenima maticama izvede nastavitev višine. Kot se vidi v zvezi s sl. 1, sta na obeh ozkih straneh držalnega okvira 2 druga nad drugo na pokončnem razmiku razporejeni vsakokrat dve prečni palici 77, 79. Po sl. 2 so vse od teh omenjenih štirih prečnih palic preko gumijastih vzmeti 86 ustrezno polovljene na s steno zgradbe povezanih kotniških profilih. Ti štirje gumijasti vzmetni elementi ustvarjajo dobro zaščito proti prenosu zvoka, saj so vsi priključki pritrjeni na držalnem okviru 2. S pomočjo vijačnih drogov je brez problemov možna natančna pokončna poravnava ureditve. Na osnovi razporkov 92 v ustreznih krakih prečnih palic 77, 79 se da ureditev pri montaži brez posebnih težav vložiti sprva samo ohlapno, da se zatem z ustrezno prestavitvijo vijačnega droga natančno naravna in pritrdi s pomočjo omenjenih matic.FIG. 2 shows, partly and enlarged from the holding frame, an upright profile bar 72 and one of the transverse bars 77, which is designed as an angular profile. Further, an angled angular profile 84 is shown in the wall of the building as well as a rubber spring 86 with a lower helical bolt 88 and an upper helical bolt 89. A transverse rod fixed in the horizontal arm 90 extends in a horizontal plane 90 parallel to the drawing plane. an elongated hole 85 extends to the drawing plane. The screw bolt 88 is inserted through the elongated hole 85 and the upper bolt bolt 89 through the slot 92. The rubber spring thus separates the two tightly connected helical bolts 88, 89 so that direct sound transmission is prevented. The mounting frame can therefore be moved in both horizontal directions with respect to the structure, and a height adjustment can be made with respect to the adjusted nuts 88 with respect to the adapted nuts. As can be seen from FIG. 1, two transverse bars 77, 79 are arranged on each narrow side of the holding frame 2 above each other at an upright spacing, respectively. 2, all of the aforementioned four transverse bars through the rubber springs 86 are properly arranged on the wall-connected corner profiles. These four rubber spring elements provide good protection against sound transmission as all the connectors are secured to the mounting frame 2. With the help of screw rods, precise upright alignment of the arrangement is easily possible. Based on the grooves 92 in the corresponding arms of the transverse rods 77, 79, the mounting arrangement can be initially loosened initially without any problems, so that it can be precisely adjusted and secured with the help of said nuts by proper repositioning of the screw rod.

Sl. 3 kaže že omenjeno stensko ploščo 64, ki je s pomočjo držalne palice 96 preko vijakov 98 pritrjena na zadnji, vodoravni prečni palici 78. Držalna palica 96 ima dva pokončna razporka 100, skozi katera sta vijaka 98 vodena enako kot skozi pokončno podolgovato luknjo 80 prečne palice 78. Naj velja, da ima vodoravna prečna palica 78 enako kot preostale prečne palice držalnega okvira vsakokrat več takih vodoravnih podolgovatih lukenj 80, preko katerih se omogoči prečna prestavitev in nastavljanje veznih elementov s cevnimi vodi. V zvezi s posebno držalno palico se nadalje omogoči pokončna poravnava potrebnih priključkov, tu naprimer s pomočjo stenske plošče 94. Na stensko ploščo 64 je na običajen način priključen vod 66. Kot je razvidno v zvezi s sl. 1, je ta vod 66 naprimer z vodnim števcem 58 povezan preko vijačnega priključka 67. Po kraju montaže posamičnih stenskih plošč lahko zveza z nadaljnjimi cevmi znotraj ureditve po potrebi lahko sledi tudi preko cevnega ločnega kosa 102. Ta zveza se opravi predvsem šele po montaži držalnega okvira. Tako se da na smotrn način izvesti naravnavo in prilagoditev h gradbeniško pripravljenim odprtinam v steni za armature, priključne cevovode ali podobno. Nadalje naj se predpostavlja, da držalna palica 96 namesto v sl. 3 predstavljene ortogonalne usmeritve glede na prečno palico 78 lahko proti slednji zavzame drugo kotno postavitev in enako je s pomočjo obeh vijakov 98 zagotovljena varnejša pritrditev na držalnem okviru in armaturo, priključne kose ali podobno se da brez problemov priključiti na potrebni način na ustrezno naravnano držalno palico 96 oz. njeno stensko ploščo 64.FIG. 3 shows the aforementioned wall panel 64, which is secured by means of a holding rod 96 via screws 98 to the rear horizontal transversal rod 78. The supporting rod 96 has two upright spacers 100 through which the screws 98 are guided in the same way as through an upright elongate hole 80 of the transverse rods 78. The horizontal transverse rod 78 should be considered to have, in the same manner as the other transverse rods of the retaining frame, several such horizontal elongated holes 80 through which transverse and adjusting of the connecting elements with the tubing can be made. With respect to the special holding rod, the upright alignment of the necessary attachments is further facilitated, for example by means of wall panel 94. Conduit 66 is connected in the usual manner to wall panel 64. As can be seen with reference to FIG. 1, this conduit 66 is connected, for example, to the water counter 58 via a screw connection 67. After the mounting of the individual wall panels, the connection with further tubes within the arrangement may, if necessary, also be traced through the tubular detachable piece 102. This connection is made only after the mounting of the retaining bracket. frame. In this way it is expedient to adjust and adapt to the construction openings in the wall for fittings, connection pipelines or the like. Further, it should be assumed that the holding rod 96 instead of in FIG. 3 orthogonal orientations with respect to the transverse rod 78 may take a second angular position against the latter, and in the same way, by means of both screws 98, a secure attachment to the holding frame and armature, connecting pieces or the like can be connected without difficulty to the appropriately aligned holding rod. 96 oz. its wall panel 64.

Sl. 4 kaže posebno zasnovo držalne palice 96 z obema vzporednima razporkoma 100. Držalna palica 96 ima nadalje na skupnem delilnem krogu venca lukenj v celoti osem pritrdilnih lukenj 104. Te pritrdilne luknje 104 služijo naprimer za vijačno povezavo pred tem opisane stenske plošče. Vidi se, da je po potrebi možna pritrditev v vsakokrat za 45 kotnih stopinj medsebojno zamaknjenih položajih.FIG. 4 shows a special design of the holding rod 96 with both parallel spacings 100. The holding rod 96 further comprises eight fixing holes 104 on the joint dividing circle of the hole ring. These mounting holes 104 serve, for example, to screw the previously described wall panels. It can be seen that, if necessary, it is possible to attach the positions to each other by 45 degree degrees.

Neodvisno od vsakokratne zasnove so držalni elementi vsakokratnih vodov ali cevi s pomočjo vijakov ali vijačnih sornikov, ki segajo skozi prirejene podolgovate luknje najbolje vodoravnih palic držalnega okvira, s tem po izumu povezani preko za potrebe poravnave pri montaži ločljivih in spet pritrdljivih vijačnih zvez.Independently of the design, the holding elements of the respective lines or tubes are connected by means of screws or screw bolts extending through the adapted elongated holes of the best horizontal bars of the retaining frame, thereby being aligned for the purpose of alignment for mounting detachable and retaining screw connections.

Claims (12)

PATENTNI ZAHTEVKIPATENT APPLICATIONS 1. Ureditev z instalacijskimi elementi, vsebujoča v držalnem okviru (2) vode (4 do 6) in/ali cevi (25, 26), zlasti za vodo, pri čemer so vodi (4 do 6) in/ali cevi zasnovani kot v bistvu pokončno postavljeni prameni, ki potekajo smotrno vsaj v bistvu po vsej višini ureditve, označena s tem, da so vodi (4 do 6) in/ali cevi (25, 26) s pomočjo v držalnem okviru (2) v vodoravni smeri razporejenih podolgovatih lukenj (80) glede na držalni okvir tako pritrjeni, da se jih da naravnati v vodoravni smeri, in da imajo vodi (4 do 6), prednostno v zgornjem območju ureditve, po eno zanko (8 do 10), ki so zasnovane kot razteznostne zanke in/ali kot sredstva za izravnavo odstopkov.1. Arrangement with installation elements contained in the holding frame (2) of water (4 to 6) and / or pipes (25, 26), in particular for water, the ducts (4 to 6) and / or pipes being designed as in substantially upright strands extending substantially at least substantially throughout the height of the arrangement, characterized in that the conduits (4 to 6) and / or tubes (25, 26) are elongated horizontally in the holding frame (2) holes (80) with respect to the holding frame so fixed that they can be adjusted horizontally, and that the leads (4 to 6), preferably in the upper region of the arrangement, have one loop (8 to 10), which are designed as extensions loops and / or as means of offsetting. 2. Ureditev po zahtevku 1, značilna po tem, da so podolgovate luknje (80) razporejene v prečnih palicah (76 do 79) držalnega okvira (2), ki vsebuje na po sebi znan način s pomočjo vodoravnih prečnih palic (76 do 79) povezane, pokončne profilne palice (71 do 74), pri čemer so podolgovate luknje (80) razporejene vsaj v območju vodov (4 do 6) in/ali cevi (25, 26).Arrangement according to Claim 1, characterized in that the elongated holes (80) are arranged in transverse bars (76 to 79) of the holding frame (2), which contains in a known manner by means of horizontal transverse bars (76 to 79) connected upright profile bars (71 to 74), with elongated holes (80) arranged at least in the area of conduits (4 to 6) and / or pipes (25, 26). 3. Ureditev po zahtevku 1 ali 2, značilna po tem, da je držalni okvir (2) zasnovan v bistvu kot pravokotniška omara in/ali da so v notranjosti držalnega okvira (2) na držalnem okviru (2) razporejeni vodi (4 do 6) in/ali cevi (25, 26) kot tudi njihovi vezni in držalni elementi.Arrangement according to claim 1 or 2, characterized in that the holding frame (2) is essentially designed as a rectangular cabinet and / or that water (4 to 6) is arranged inside the holding frame (2) on the holding frame (2). ) and / or pipes (25, 26) as well as their connecting and holding elements. 4. Ureditev, zlasti po zahtevku 3, značilna po tem, da je držalni element zasnovan kot držalna palica (96) za stensko ploščo (64) in/ali da ima držalna palica (96) vsaj en, prednostno dva razporka (100), pri čemer so vijaki (98) vstavljeni skozi pokončni ali pokončna razporka (100) kot tudi skozi podolgovato luknjo (80) držalnega okvira (2).Arrangement, in particular according to claim 3, characterized in that the holding element is designed as a holding rod (96) for the wall panel (64) and / or that the holding rod (96) has at least one, preferably two spacers (100), the screws (98) being inserted through the upright or upright spacers (100) as well as through the elongated hole (80) of the retaining frame (2). 5. Ureditev po enem od zahtevkov 1 do 4, značilna po tem, da je držalni okvir (2), predvsem preko svojih na ozkih straneh razporejenih prečnih palic (77, 79), s pomočjo vijačnih somikov (88, 89), in sicer smotrno v zvezi z gumijastimi vzmetmi (66), pritrdljiv na steno zgradbe.Arrangement according to one of Claims 1 to 4, characterized in that the holding frame (2), in particular through its narrow laterally arranged transverse bars (77, 79), is provided by means of screw catches (88, 89), namely suitable for rubber springs (66) mounted on the wall of the building. 6. Ureditev po enem od zahtevkov 1 do 5, značilna po tem, da je držalnemu ok11 viru (2) v zgornjem končnem območju prirejena lovilna ponev (20).Arrangement according to one of Claims 1 to 5, characterized in that the catch pan (20) is arranged in the upper end region in the upper end region. 7. Ureditev po enem od zahtevkov 1 do 6, značilna po tem, da sta na spodnjem koncu držalnega okvira (2) razporejeni vsaj dve postavljalni plošči (81), katerih spodnja robova ležita v pokončni smeri za vnaprej dan odmik globlje od spodnjih koncev (14 do 16, 32, 33) vodov (4 do 6) in/ali cevi (25, 26).Arrangement according to one of Claims 1 to 6, characterized in that at least two mounting plates (81) are arranged at the lower end of the retaining frame (2), the lower edges of which lie in an upright direction for a advance deeper than the lower ends (7). 14 to 16, 32, 33) conduits (4 to 6) and / or pipes (25, 26). 8. Ureditev po enem od zahtevkov 1 do 7, značilna po tem, da ima predvsem za uporabljeno vodo predvidena cev (25) vnaprej pripravljen odcep (38), ki ima vsaj dva, smotrno štiri izhode (40 do 43) in/ali ki sestoji iz posamičnih, tovarniško neločljivo medsebojno povezanih posameznih delov.Arrangement according to one of Claims 1 to 7, characterized in that the pipe (25) provided in particular for the water used has a pre-arranged branch (38) having at least two, expediently four outlets (40 to 43) and / or consists of individual, factory-individually interconnected individual parts. 9. Ureditev po enem od zahtevkov 1 do 8, značilna po tem, da je na cev (25), zlasti s pomočjo vlečnega voda (46 do 48), priključen vsaj eden, prednostno pet z dolžinsko poudarjenimi obojkami opremljenih lokov, v katerih so nastavljivo razporejeni pomični kosi.Arrangement according to one of Claims 1 to 8, characterized in that at least one, preferably five, longitudinally mounted sockets are provided to the tube (25), in particular by means of a traction cable (46 to 48), in which adjustable spreaders. 10. Ureditev po enem od zahtevkov 1 do 9, značilna po tem, da sta na držalnem okviru (2), prednostno na pokončnih profilnih palicah (71 do 74), razporejena vsaj dva, smotrno vsaj štirje vogalni lesovi (82) v skupni ravnini, ki je v bistvu pokončna, in/ali da je na vogalnih lesovih (82) pritrjena plošča, ki je smotrno zasnovana kot sestaven del stene.Arrangement according to one of Claims 1 to 9, characterized in that at least two, preferably at least four corner woods (82) are arranged in a common plane on the holding frame (2), preferably on upright profile bars (71 to 74). , which is substantially upright, and / or that a panel, which is reasonably designed as an integral part of the wall, is attached to the corner woods (82). 11. Ureditev po enem od zahtevkov 1 do 10, značilna po tem, da je vod (66), katerega dolžina je vnaprej določljiva, preko kot cevni lok zasnovanega kosa (102) priključljiv, prednostno z vlepljenjem, privitjem ali valjenjem, na vod (4, 5), in/ali da je drugi konec voda (66) s pomočjo vijačne zveze (67) priključljiv na stensko ploščo (64) ali na nadaljnji instalacijski element.Arrangement according to one of Claims 1 to 10, characterized in that the line (66), the length of which is predetermined, can be connected via a tubular arch of the shaped piece (102), preferably by attachment, screwing or rolling, to the line ( 4, 5), and / or that the other end of the conduit (66) is connected to the wall panel (64) or to a further installation element by means of a screw connection (67). 12. Ureditev po enem od zahtevkov 1 do 11, značilna po tem, da cevi (25, 26), zlasti na svojih zgornjih končnih območjih, vsebujeta dolžinsko poudarjeni obojki (28) in/ali pomična kosa (30) s prirejenima obojkama (31).Arrangement according to one of Claims 1 to 11, characterized in that the pipes (25, 26), in particular in their upper end regions, comprise longitudinally stressed sleeves (28) and / or a movable piece (30) with adapted sleeves (31). ). Friedrichsfeld AGFriedrichsfeld AG Keramik- und Kunststoffwerke Zanjo: PATfNTNA PISARNAKeramik- und Kunststoffwerke To Her: PATFNT OFFICE 22335.PR0.SK-XI/9222335.PR0.SK-XI / 92 POVZETEKSUMMARY Ureditev z instalacijskimi elementi vsebuje v držalnem okviru (2) vode (4 do 6) in/ali cevi (25,26), zlasti za vodo, pri čemer so ti vodi (4 do 6) in/ali cevi (25, 26) zasnovani kot v bistvu pokončno postavljeni prameni in potekajo vsaj v bistvu po vsej višini ureditve. Ta ureditev naj bi bili v tem smislu izpopolnjena, da se omogoči hitro montažo kot tudi da je omogočena funkcijsko zanesljiva izravnava temperaturnih sprememb ali odstopkov. Predlaga se, da so vodi (4 do 6) in/ali cev: (25, 26) s pomočjo v držalnem okviru (2) v vodoravni smeri razporejenih podolgovatih lukenj (80) glede na držalni okvir (2) tako pritrjeni, da se jih da naravnati v vodoravni smeri. Vodi (4 do 6) imajo prednostno v zgornjem območju ureditve po eno zanko (8 do 10), ki so zasnovane kot razteznostne zanke in/ali kot sredstva za izravnavo odstopkov.The arrangement with the installation elements comprises in the holding frame (2) water (4 to 6) and / or pipes (25,26), in particular for water, where these lines (4 to 6) and / or pipes (25, 26) designed as essentially upright strands and running at least substantially throughout the entire height of the arrangement. In this sense, these arrangements should be refined to allow for rapid assembly as well as to enable functionally reliable balancing of temperature changes or deviations. It is suggested that the ducts (4 to 6) and / or the pipe: (25, 26) be secured to the support frame (2) in the horizontal direction of the elongated holes (80) relative to the holding frame (2) so that align them horizontally. The leads (4 to 6) preferably have one loop (8 to 10) in the upper arrangement area, which are designed as expansion loops and / or as means of offsetting.
SI9200305A 1991-11-29 1992-11-06 Arrangement of duct elements SI9200305B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE9114896U DE9114896U1 (en) 1991-11-29 1991-11-29 Arrangement with installation elements

Publications (2)

Publication Number Publication Date
SI9200305A true SI9200305A (en) 1993-06-30
SI9200305B SI9200305B (en) 1998-06-30

Family

ID=6873788

Family Applications (1)

Application Number Title Priority Date Filing Date
SI9200305A SI9200305B (en) 1991-11-29 1992-11-06 Arrangement of duct elements

Country Status (13)

Country Link
EP (1) EP0545141B1 (en)
AT (1) ATE148526T1 (en)
CZ (1) CZ281254B6 (en)
DE (2) DE9114896U1 (en)
DK (1) DK0545141T3 (en)
ES (1) ES2098424T3 (en)
GR (1) GR3022568T3 (en)
HR (1) HRP921343B1 (en)
HU (2) HU9203762D0 (en)
PL (1) PL170313B1 (en)
SI (1) SI9200305B (en)
SK (1) SK278703B6 (en)
YU (1) YU48624B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0596833A1 (en) * 1992-11-03 1994-05-11 Annelies Hussauf-Tüchi Installation fitting for sanitary appliances
DE29519884U1 (en) * 1995-12-15 1996-02-08 Hautec Systemelemente GmbH, 01558 Großenhain Manhole register for installation systems in the sanitary and heating area
DE19731592A1 (en) * 1997-07-17 1999-02-25 Cta Anlagenbau Gmbh Supply pipe blocks
DE102023136280A1 (en) 2022-12-23 2024-07-04 Christian Münker INSTALLATION SYSTEM FOR A HEATING SYSTEM, METHOD FOR PRODUCING AN INSTALLATION SYSTEM, HEATING SYSTEM WITH INSTALLATION SYSTEM

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2774134A (en) * 1953-10-22 1956-12-18 Smith John Lawrence Plumber's pipe jig
CH394064A (en) * 1962-05-14 1965-06-15 Miller Jun Fritz Sanitary installation system
DE1294296B (en) * 1964-12-18 1969-04-30 Sanitaertechnik Wolfsburg Rein Sanitary cubicle
CH471291A (en) * 1968-03-14 1969-04-15 Fischer Ag Georg Sanitary installation unit
DE1916292C3 (en) * 1969-03-29 1975-06-19 Siemens Ag, 1000 Berlin Und 8000 Muenchen Process for coating niobium with copper
DE1929437A1 (en) * 1969-06-10 1970-12-17 Wilhelm Ganhoer Installation block for sanitary, heating and kitchen facilities
FR2063375A5 (en) * 1969-10-13 1971-07-09 Sermondadaz Jean
FR2079775A5 (en) * 1970-02-12 1971-11-12 Legeard Jean
DE2152851A1 (en) * 1970-11-06 1972-05-18 Bosi, Paolo, Verona (Italien) Device for distributing and discharging the water in a water pipe system of a building
DE2249788A1 (en) * 1972-10-06 1974-04-11 Autokino Bau Gmbh Prefabricated toilet unit with wash basin - is upright U section with basin at front and preassembled pref. foam insulated piping behind
FR2253892A2 (en) * 1973-12-10 1975-07-04 Cale Indle Soc Nouv Prefabricated building section with pipe system - has frame comprising both fixed and sliding pipes of equal lengths
CH583872A5 (en) * 1974-10-03 1977-01-14 Schulte & Co Schlossfab
DE2937624C2 (en) * 1979-09-18 1984-05-17 Domozell-Sanitärzellen GmbH, 5000 Köln Installation device for bathrooms, washrooms, toilets and the like.
DE3014382C2 (en) * 1980-04-15 1985-11-21 Domozell-Sanitärzellen GmbH, 5000 Köln Device for installing cable runs
DE3240599A1 (en) * 1982-11-03 1984-05-03 Louis Wilhelmus van 4902 Oosterhout Mook Supporting device for pipelines
DE3309460A1 (en) * 1983-03-16 1984-09-27 Sanbloc GmbH Installations-Fertigbau, 8120 Weilheim Foamed installation module for sanitary apparatuses
DE3327883C2 (en) * 1983-08-02 1985-11-07 Sanbloc GmbH Installations-Fertigbau, 8120 Weilheim Installation block for sanitary appliances with a foamed building block held high by mounting supports
CA1257054A (en) * 1985-03-25 1989-07-11 Thomas M. Tymon Flocced mineral materials and water-resistant articles materials made therefrom
DE3800840C1 (en) * 1988-01-14 1989-03-30 Mero-Werke Dr.-Ing. Max Mengeringhausen Gmbh & Co, 8700 Wuerzburg, De

Also Published As

Publication number Publication date
ATE148526T1 (en) 1997-02-15
HUT62953A (en) 1993-06-28
GR3022568T3 (en) 1997-05-31
CZ281254B6 (en) 1996-07-17
HRP921343A2 (en) 1995-02-28
HU216179B (en) 1999-04-28
HU9203762D0 (en) 1993-03-29
PL170313B1 (en) 1996-11-29
ES2098424T3 (en) 1997-05-01
EP0545141B1 (en) 1997-01-29
SK350692A3 (en) 1995-03-08
CZ350692A3 (en) 1993-11-17
YU102592A (en) 1996-01-09
SK278703B6 (en) 1998-01-14
HRP921343B1 (en) 1998-06-30
PL296774A1 (en) 1993-08-09
DK0545141T3 (en) 1997-07-07
EP0545141A1 (en) 1993-06-09
DE59207991D1 (en) 1997-03-13
SI9200305B (en) 1998-06-30
YU48624B (en) 1999-03-04
DE9114896U1 (en) 1992-01-23

Similar Documents

Publication Publication Date Title
DK2617912T3 (en) Prefabricated module FOR A BUILDING
DK2617913T3 (en) Prefabricated PANEL TO A BUILDING
US20040040223A1 (en) Modular buildings
SI9200305A (en) Arrangement of duct elements
US3605354A (en) Construction unit
JP3249454B2 (en) Equipment plumbing for apartment houses
EP3399113A1 (en) Plumbing unit
FI64216C (en) STOMKONSTRUKTION FOER MONTERING AV VVS-ROER
JPH0261264A (en) Structure body
KR200495781Y1 (en) multi holder for fixing pipe
PL175981B1 (en) Drainage valve
JP3190201B2 (en) Underfloor piping structure of building unit
JP4229620B2 (en) Resin piping terminal support device and support method
JP3188807B2 (en) Building unit piping method and piping structure
AU593457B2 (en) Prefabricated plumbing units
JP2532849Y2 (en) Connection structure of piping unit and wall panel
JPH0542139Y2 (en)
JPH0619661Y2 (en) Sanitary ware installation structure
JP2002188205A (en) Method for forming frame structure
SE504800C2 (en) Installation system for bathrooms and other wet rooms with hole profiles and snap locks
CZ1197U1 (en) General-purpose supporting frame for installation of closet or bidet bowl
BRMU8900775U2 (en) handrail provision
ITMI980263U1 (en) UNIVERSAL SUPPORT FOR SANITARY ITEMS SUSPENDED IN PARTICULAR BIDET AND SIMILAR TOILET TANKS