Procedure for casting pilesInfo
- Publication number
- SE9301035L SE9301035L SE9301035A SE9301035A SE9301035L SE 9301035 L SE9301035 L SE 9301035L SE 9301035 A SE9301035 A SE 9301035A SE 9301035 A SE9301035 A SE 9301035A SE 9301035 L SE9301035 L SE 9301035L
- Authority
- SE
- Sweden
- Prior art keywords
- pile
- procedure
- inflation
- hardened
- foot
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/62—Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/44—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
By making a foot on a cast-in-situ pile, for example an auger pile, the load carrying capacity is increased. An inflatable body (18) made of sheet steel folded in a zigzag pattern is placed in the concrete at the bottom of the pile and it is inflated when the concrete has hardened but not hardened so much that it prevents the inflation. The inflation will consolidate the soil around the foot.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE9301035A SE501607C2 (en) | 1993-03-28 | 1993-03-28 | Procedure for casting piles |
AU64399/94A AU6439994A (en) | 1993-03-28 | 1994-03-28 | A method of making cast-in-situ piles |
PCT/SE1994/000282 WO1994023135A1 (en) | 1993-03-28 | 1994-03-28 | A method of making cast-in-situ piles |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE9301035A SE501607C2 (en) | 1993-03-28 | 1993-03-28 | Procedure for casting piles |
Publications (3)
Publication Number | Publication Date |
---|---|
SE9301035D0 SE9301035D0 (en) | 1993-03-28 |
SE9301035L true SE9301035L (en) | 1994-09-29 |
SE501607C2 SE501607C2 (en) | 1995-03-27 |
Family
ID=20389395
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SE9301035A SE501607C2 (en) | 1993-03-28 | 1993-03-28 | Procedure for casting piles |
Country Status (3)
Country | Link |
---|---|
AU (1) | AU6439994A (en) |
SE (1) | SE501607C2 (en) |
WO (1) | WO1994023135A1 (en) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SE504048C2 (en) * | 1995-04-11 | 1996-10-28 | Torbjoern Norman | Method and apparatus for carrying out ground anchoring |
US6354768B1 (en) * | 2000-01-24 | 2002-03-12 | Geotechnical Reinforcement Company, Inc. | Soil reinforcement method and apparatus |
AU2001269847A1 (en) | 2000-06-15 | 2001-12-24 | Geotechnical Reinforcement Company, Inc. | Lateral displacement pier and method of installing the same |
US7226246B2 (en) | 2000-06-15 | 2007-06-05 | Geotechnical Reinforcement, Inc. | Apparatus and method for building support piers from one or successive lifts formed in a soil matrix |
US9169611B2 (en) | 2000-06-15 | 2015-10-27 | Geopier Foundation Company, Inc. | Method and apparatus for building support piers from one or more successive lifts formed in a soil matrix |
SE0202501L (en) * | 2002-08-23 | 2004-02-24 | Soilex Ab | Ways to make a pole and / or a tie rod |
CA2509997A1 (en) | 2002-12-06 | 2004-06-24 | Nathaniel S. Fox | Method for construction of piers in soil and a pier construction |
US20070212171A1 (en) * | 2004-08-30 | 2007-09-13 | Rasmussen Henning B | Methods for providing piled foundations for constructions, piled foundations and a balloon for porviding an enlarged footing |
US20120042605A1 (en) * | 2010-08-17 | 2012-02-23 | Turner Michael L | Removable Support Cage For Top Of Drilled Pier |
CN102747738A (en) * | 2012-07-25 | 2012-10-24 | 中国水电顾问集团西北勘测设计研究院 | Method for adopting high-pressure grouting steel pipe pile to perform covering layer side slope treatment |
RU2611099C1 (en) * | 2015-12-15 | 2017-02-21 | Михаил Анатольевич Чирва | Method for fixing walls of drilled shaft enlargement in unstable soils |
CN105714773B (en) * | 2016-03-01 | 2017-11-28 | 江苏东合南岩土科技股份有限公司 | A kind of method for processing foundation |
RU2645015C2 (en) * | 2016-07-13 | 2018-02-15 | Государственное автономное образовательное учреждение Астраханской области высшего образования Астраханский Государственный Архитектурно-Строительный Университет | Method of creating the general broadening for the pile group |
CN114482021B (en) * | 2021-09-26 | 2023-12-29 | 南水北调东线江苏水源有限责任公司 | Method for solidifying preset reverse friction combined pile foundation soil and formed cast-in-place pile |
CN114319383B (en) * | 2022-01-12 | 2023-04-14 | 宁波大学 | Umbrella-shaped anchor rod utilizing swelling characteristic of bentonite and construction method |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3375670A (en) * | 1965-11-26 | 1968-04-02 | Serota Stanley | Method of piling |
SE436781B (en) * | 1981-11-16 | 1985-01-21 | Atlas Copco Ab | SVELLKROPP |
GB2157750B (en) * | 1984-04-19 | 1988-01-27 | Juei Jse Lin | Improvements relating to cast-in-situ concrete pile construction |
-
1993
- 1993-03-28 SE SE9301035A patent/SE501607C2/en unknown
-
1994
- 1994-03-28 WO PCT/SE1994/000282 patent/WO1994023135A1/en active Application Filing
- 1994-03-28 AU AU64399/94A patent/AU6439994A/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
SE9301035D0 (en) | 1993-03-28 |
SE501607C2 (en) | 1995-03-27 |
WO1994023135A1 (en) | 1994-10-13 |
AU6439994A (en) | 1994-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SE9301035L (en) | Procedure for casting piles | |
GR3021148T3 (en) | Anchorage device for use in sand or sandy soils. | |
DE58903074D1 (en) | DEVICE FOR UNLOCKING THE REINFORCING IRON OF CONCRETE Piles. | |
JPS569507A (en) | Gravity type structure | |
DE69203578T2 (en) | Method of attaching an anchor for anchoring ground walls, structures, sheet piles, caimons and so on. | |
EP0810326A4 (en) | A soft settling structure and method for setting the same | |
FR2692298B1 (en) | PREFABRICATED REINFORCED CONCRETE MASK FOR ROLL COMPACTION CONCRETE AND RIPPED CONCRETE AND FOR LAKE TALUS ON KARSTIC TERRAIN. | |
CA1182653A (en) | Underwater structure and method for its construction | |
JPS55122914A (en) | Method for early improvement of soft ground | |
JPH07324316A (en) | Embankment reinforcing structure | |
ATE272756T1 (en) | SELF-FLOATING EARTH-MOVING MACHINE | |
JP2508832Y2 (en) | Honeycomb structure for civil engineering | |
JPH02178469A (en) | Air bag type formwork timbering construction method | |
TH4633EX (en) | stake | |
JPH02248525A (en) | Sandal for caisson | |
JPS6299513A (en) | Wall structure having earth pressure-reducing structure | |
JPS56119013A (en) | Hollow fill-type dam | |
JPS5721625A (en) | Construction of revetment using specific anchor underground | |
JPH0211472Y2 (en) | ||
JPS56115426A (en) | Construction of vibration-proof foundation of building | |
RU96120758A (en) | PILED FOUNDATION | |
JPS5771925A (en) | Construction of continuous underground wall and reference pile used therefor | |
RU2136814C1 (en) | Mooring structure | |
SU1559051A1 (en) | Building foundation | |
JPH0455066Y2 (en) |