RU2539454C1 - Construction method of process branch of vertical well shaft and device for its implementation - Google Patents

Construction method of process branch of vertical well shaft and device for its implementation Download PDF

Info

Publication number
RU2539454C1
RU2539454C1 RU2013151152/03A RU2013151152A RU2539454C1 RU 2539454 C1 RU2539454 C1 RU 2539454C1 RU 2013151152/03 A RU2013151152/03 A RU 2013151152/03A RU 2013151152 A RU2013151152 A RU 2013151152A RU 2539454 C1 RU2539454 C1 RU 2539454C1
Authority
RU
Russia
Prior art keywords
tubing
installation
assembly
shaft
barrel
Prior art date
Application number
RU2013151152/03A
Other languages
Russian (ru)
Inventor
Александр Александрович Кисель
Original Assignee
Александр Александрович Кисель
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Александр Александрович Кисель filed Critical Александр Александрович Кисель
Priority to RU2013151152/03A priority Critical patent/RU2539454C1/en
Application granted granted Critical
Publication of RU2539454C1 publication Critical patent/RU2539454C1/en

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

FIELD: mining.
SUBSTANCE: method involves installation of a sinking tower, driving of a shaft at least with one mine mini excavator with a replaceable hydraulic hammer. Tubing lining of the shaft is performed using a unit moving in the shaft. Installation of tubing is performed using a tubing hydraulic claw with a counter-weight, which is arranged on an overhead crane moved with manually driven crabs.
EFFECT: acceleration of driving of a process branch from construction of a mouth to construction of a support of the process branch.
5 cl, 3 dwg

Description

Предлагаемое изобретение относится к области горного дела.The present invention relates to the field of mining.

Известен комплекс КПШ-2, включающий подвесную опалубку, проходческие лебедки, кран-экскавтор, бадьи для подъема отработанной породы. Известный комплекс КПШ-2 позволяет проходить устье и технологический отход на глубину до 50 м. Известный комплекс КПШ-2 не обеспечивает требуемую технологичность и скорость проходки ствола. В свою очередь, предлагаемое изобретение позволит устранить недостатки известного комплекса, ускорив проходку технологического отхода от сооружения устья до сооружения крепи технологического отхода.The KPSH-2 complex is known, including suspended formwork, sinking winches, an excavator crane, tubs for lifting waste rock. The well-known KPSh-2 complex allows you to go through the mouth and technological waste to a depth of 50 m. The well-known KPSh-2 complex does not provide the required manufacturability and speed of penetration of the barrel. In turn, the present invention will eliminate the disadvantages of the known complex, accelerating the sinking of technological waste from the construction of the mouth to the construction of the lining of the technological waste.

Указанный выше технический результат достигается при использовании предложенных способа и устройства для сооружения технологического отхода вертикального шахтного ствола.The above technical result is achieved by using the proposed method and device for the construction of technological waste vertical shaft shaft.

Способ сооружения технологического отхода вертикального шахтного ствола предусматривает монтаж проходческого копра, проходку ствола по меньшей мере одним шахтным миниэкскаватором со сменным гидромолотом и тюбинговую обделку ствола с использованием агрегата, перемещающегося в стволе. Грунт извлекают бадьями с преимущественным объемом 3 м3 на направляющих канатах с контргрузом на платформе агрегата для сборки и монтажа тюбинговой обделки. Монтаж тюбингов выполняют с использованием по меньшей мере одного тюбингового гидрозахвата с противовесом, располагаемого на кран-балке, перемещаемой кошками с ручным приводом. Агрегат для сборки и монтажа тюбинговой обделки ствола перемещается с использованием канатов, приводимых в движение машинами, расположенными на поверхности, и гидродомкратов.A method of constructing a vertical shaft mine process waste involves installing a tunneling driver, driving a shaft with at least one shaft miniexcavator with a replaceable hydraulic hammer, and tubing barrel lining using an assembly moving in the shaft. The soil is removed by tubs with a predominant volume of 3 m 3 on guide ropes with a counterweight on the platform of the unit for assembly and installation of tubing lining. Installation of tubing is performed using at least one tubing hydraulic grip with a counterweight located on a crane beam, moved by cats with a manual drive. The assembly for assembling and mounting the tubing lining of the barrel is moved using ropes driven by machines located on the surface and hydraulic jacks.

Устройство для сооружения технологического отхода вертикального шахтного ствола включает по меньшей мере один шахтный миниэкскаватор со сменным гидромолотом и агрегат для сборки и монтажа тюбинговой обделки ствола, перемещающийся с использованием канатов, приводимых в движение машинами, расположенными на поверхности, и гидродомкратов, оснащенный по меньшей мере одним тюбинговым захватом с противовесом. Шахтный миниэкскаватор со сменным гидромолотом базируется с возможностью перемещения на монтажной платформе агрегата для сборки и монтажа тюбинговой обделки ствола. Тюбинговый захват с противовесом расположен на кран-балке, перемещаемой кошками с ручным приводом. Устройство включает бадьи с преимущественным объемом 3 м3 для извлечения грунта на направляющих канатах с контргрузом на платформе агрегата для сборки и монтажа тюбинговой обделки.A device for constructing a vertical shaft mine process waste includes at least one shaft mini-excavator with a replaceable hydraulic hammer and an assembly for assembling and mounting a tubing barrel lining, moving using ropes driven by machines located on the surface, and hydraulic jacks equipped with at least one Tubing gripper with counterweight. The mine mini-excavator with a replaceable hydraulic hammer is based on the ability to move the unit to the assembly platform for assembly and installation of the tubing lining of the barrel. Tubing grip with a counterweight is located on the crane-beam, moved by cats with a manual drive. The device includes tubs with a predominant volume of 3 m 3 for extracting soil on guide ropes with a counterweight on the platform of the unit for assembly and installation of tubing lining.

Предложенное изобретение поясняется чертежами.The proposed invention is illustrated by drawings.

Фиг.1 - Устройство для сооружения технологического отхода вертикального шахтного ствола в рабочем состоянии.Figure 1 - Device for the construction of technological waste vertical shaft shaft in working condition.

Фиг.2 - Гидравлический захват для монтажа тюбингов.Figure 2 - Hydraulic grip for mounting tubing.

Фиг.3 - Строительство технологического отхода вертикального шахтного ствола (схематическое изображение).Figure 3 - Construction of technological waste vertical shaft shaft (schematic image).

Предложенное устройство для сооружения технологического отхода вертикального шахтного ствола представляет собой комплекс оборудования, который включает (фиг.1) агрегат для сборки и монтажа тюбинговой обделки ствола 1 и шахтный миниэкскаватор 2 со сменным гидромолотом. Шахтный миниэкскаватор 2 со сменным гидромолотом базируется с возможностью перемещения на монтажной платформе агрегата для сборки и монтажа тюбинговой обделки ствола 1. Помимо гидромолота предусмотрена возможность оснащения миниэкскаватора ковшом. Свободно перемещающийся миниэкскаватор 2 может быть использован как для сооружения устья ствола, так и дальнейших работ по проходке технологического отхода шахтного ствола, простота его перемещения обеспечит высокую точность ведения работ. Автономный шагающий агрегат для сборки и монтажа тюбинговой обделки ствола 1 перемещается в стволе технологического отхода с использованием канатов, приводимых в движение машинами, расположенными на поверхности (фиг.3), и четырех распорных гидродомкратов (гидроцилиндров) 3, 4. Данный агрегат включает двухъярусный полок, монтажную платформу, гидродомкраты (гидроцилиндры) 3, 4 для перемещения всего агрегата и монтажной платформы. Для монтажа тюбинговой крепи, выполняемого после проходки ствола отхода миниэкскаватором, используются тюбинговые гидравлические захваты (гидрозахваты) 6 с противовесом, расположенные на тельферах с ручным приводом двух кран-балок 5, перемещаемых двумя кошками с ручным приводом (фиг.2). Для извлечения грунта используют бадьи объемом 3 м3 на направляющих канатах с контргрузом на платформе агрегата для сборки и монтажа тюбинговой обделки.The proposed device for the construction of technological waste of a vertical shaft shaft is a complex of equipment that includes (Fig. 1) an assembly for assembly and installation of a tubing lining of the barrel 1 and a mine mini-excavator 2 with a replaceable hydraulic hammer. The mine mini-excavator 2 with a replaceable hydraulic hammer is based on the ability to move the unit to the assembly platform for assembly and installation of the tubing lining of the barrel 1. In addition to the hydraulic hammer, it is possible to equip the mini-excavator with a bucket. Freely moving mini-excavator 2 can be used both for the construction of the wellhead and for further work on sinking of the shaft’s technological waste, the ease of its movement will ensure high accuracy of work. An autonomous walking unit for assembling and mounting the tubing lining of the barrel 1 is moved in the barrel of technological waste using ropes driven by machines located on the surface (Fig. 3) and four expansion hydraulic jacks (hydraulic cylinders) 3, 4. This unit includes a two-tier shelf , mounting platform, hydraulic jacks (hydraulic cylinders) 3, 4 for moving the entire unit and mounting platform. To install the tubing lining, performed after digging the waste trunk with a mini-excavator, we use hydraulic tubing grippers (hydraulic grippers) 6 with a counterweight located on hoists with a manual drive of two crane beams 5, moved by two cats with a manual drive (figure 2). To extract the soil, tubs of 3 m 3 volume are used on guide ropes with a counterweight on the unit platform for assembly and installation of the tubing lining.

При осуществлении предложенного способа выполняют устройство оголовка ствола, монтаж проходческого копра с машинным узлом (фиг.3) и далее проходку ствола шахтным миниэкскаватором 2 со сменным гидромолотом (фиг.1). Работы, выполняемые шахтным экскаватором 2, производятся до достижения пород, не позволяющих вести работы данным оборудованием. Грунт извлекается бадьями объемом 3 м3 на направляющих канатах с контргрузом на платформе для сборки и монтажа тюбинговой обделки. Одновременно выполняют тюбинговую обделку ствола с использованием тюбинговых гидрозахватов 6 с противовесом, располагаемых на кран-балках 5, перемещаемых кошками с ручным приводом. Агрегат для сборки и монтажа тюбинговой обделки ствола перемещается с использованием канатов, приводимых в движение машинами, расположенными на поверхности, и гидродомкратов 3, 4.In the implementation of the proposed method, the device is used for the head of the barrel, the installation of a heading machine with a machine unit (Fig. 3), and then the sinking of the shaft with a mine excavator 2 with a replaceable hydraulic hammer (Fig. 1). The work performed by the mine excavator 2 is carried out until the rocks that do not allow work with this equipment are reached. The soil is removed by tubs with a volume of 3 m 3 on guide ropes with a counterweight on a platform for the assembly and installation of tubing lining. At the same time, a tubing lining of the trunk is performed using tubing hydraulic grips 6 with a counterweight located on the crane-beams 5, moved by cats with a manual drive. The assembly for assembling and mounting the tubing lining of the barrel is moved using ropes driven by machines located on the surface and hydraulic jacks 3, 4.

Таким образом, предложены способ и устройство для сооружения технологического отхода вертикального шахтного ствола, характеризующиеся быстротой и функциональностью при выполнении производственных операций.Thus, the proposed method and device for the construction of technological waste vertical shaft shaft, characterized by speed and functionality when performing production operations.

Claims (5)

1. Способ сооружения технологического отхода вертикального шахтного ствола, предусматривающий монтаж проходческого копра,
проходку ствола по меньшей мере одним шахтным миниэкскаватором со сменным гидромолотом и
тюбинговую обделку ствола с использованием агрегата, перемещающегося в стволе, причем
монтаж тюбингов выполняют с использованием по меньшей мере одного тюбингового гидрозахвата с противовесом, располагаемого на кран-балке, перемещаемой кошками с ручным приводом.
1. The method of construction of technological waste vertical shaft shaft, providing for the installation of a tunneling head,
driving a shaft with at least one mine mini-excavator with a replaceable hydraulic hammer and
tubing lining of the barrel using an aggregate moving in the barrel, moreover
installation of tubing is performed using at least one tubing hydraulic grip with a counterweight located on a crane beam, moved by cats with a manual drive.
2. Способ по п. 1, отличающийся тем, что грунт извлекают бадьями с преимущественным объемом 3 м3 на направляющих канатах с контргрузом на платформе агрегата для сборки и монтажа тюбинговой обделки.2. The method according to p. 1, characterized in that the soil is removed by tubs with a predominant volume of 3 m 3 on guide ropes with a counterweight on the platform of the unit for assembly and installation of tubing lining. 3. Способ по п. 1, отличающийся тем, что агрегат для сборки и монтажа тюбинговой обделки ствола перемещается с использованием канатов, приводимых в движение машинами, расположенными на поверхности, и гидродомкратов.3. The method according to p. 1, characterized in that the unit for assembly and installation of the tubing lining of the barrel is moved using ropes driven by machines located on the surface, and hydraulic jacks. 4. Устройство для сооружения технологического отхода вертикального шахтного ствола, включающее
по меньшей мере один шахтный миниэкскаватор со сменным гидромолотом и
агрегат для сборки и монтажа тюбинговой обделки ствола, перемещающийся с использованием канатов, приводимых в движение машинами, расположенными на поверхности, и гидродомкратов, оснащенный по меньшей мере одним тюбинговым захватом с противовесом, при этом
тюбинговый захват с противовесом расположен на кран-балке, перемещаемой кошками с ручным приводом, а
шахтный миниэкскаватор со сменным гидромолотом базируется с возможностью перемещения на монтажной платформе агрегата для сборки и монтажа тюбинговой обделки ствола.
4. A device for the construction of technological waste vertical shaft shaft, including
at least one mine mini-excavator with a replaceable hydraulic hammer and
an assembly for assembling and mounting a tubing lining of the barrel moving using ropes driven by machines located on the surface and hydraulic jacks equipped with at least one tubing grip with a counterweight
Tubing grip with counterweight is located on the crane-beam, moved by cats with a manual drive, and
a mine mini-excavator with a replaceable hydraulic hammer is based on the ability to move the unit to the assembly platform for assembly and installation of the tubing lining of the barrel.
5. Устройство по п. 4, отличающееся тем, что включает бадьи с преимущественным объемом 3 м3 для извлечения грунта на направляющих канатах с контргрузом на платформе агрегата для сборки и монтажа тюбинговой обделки. 5. The device according to p. 4, characterized in that it includes tubs with a predominant volume of 3 m 3 for extracting soil on guide ropes with a counterweight on the platform of the unit for assembly and installation of tubing lining.
RU2013151152/03A 2013-11-19 2013-11-19 Construction method of process branch of vertical well shaft and device for its implementation RU2539454C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2013151152/03A RU2539454C1 (en) 2013-11-19 2013-11-19 Construction method of process branch of vertical well shaft and device for its implementation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2013151152/03A RU2539454C1 (en) 2013-11-19 2013-11-19 Construction method of process branch of vertical well shaft and device for its implementation

Publications (1)

Publication Number Publication Date
RU2539454C1 true RU2539454C1 (en) 2015-01-20

Family

ID=53288531

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2013151152/03A RU2539454C1 (en) 2013-11-19 2013-11-19 Construction method of process branch of vertical well shaft and device for its implementation

Country Status (1)

Country Link
RU (1) RU2539454C1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2592580C1 (en) * 2015-01-30 2016-07-27 Общество с ограниченной ответственностью "Скуратовский опытно-экспериментальный завод" Method of well shaft construction, shaft sinking combine, rock destruction unit and reinforcing support erection device (versions)
RU2600807C1 (en) * 2015-09-29 2016-10-27 Общество с ограниченной ответственностью "Скуратовский опытно-экспериментальный завод" Shaft sinking combine

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1177489A1 (en) * 1982-06-28 1985-09-07 Научно-Исследовательский Институт Строительства Угольных И Горно-Рудных Предприятий Installation for sinking vertical mine shafts
SU1346801A1 (en) * 1986-01-16 1987-10-23 E.G.Гуменников, В.Л.Шестак, Д.П.Зуев, А.С.Сасса и В.Л.Виноградов Mine shaft muck-loading unit
SU1583615A1 (en) * 1987-12-25 1990-08-07 Всесоюзный проектно-технологический институт транспортного строительства Tunneling unit
RU2098629C1 (en) * 1995-03-14 1997-12-10 Анатолий Тимофеевич Запорожец Method for sinking of shallow mine shafts
RU2141030C1 (en) * 1997-04-24 1999-11-10 ЗАО "Горнопроходческий трест "Спецтоннельстрой" Device for construction of mine shafts
JP3158592U (en) * 2010-01-27 2010-04-08 旌詮工程有限公司 Telescopic ring plate type underground excavator
RU2493367C1 (en) * 2012-07-06 2013-09-20 Александр Александрович Кисель Method to construct vertical mine by blasting and drilling method with tubing lining and tunnelling complex for method realisation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1177489A1 (en) * 1982-06-28 1985-09-07 Научно-Исследовательский Институт Строительства Угольных И Горно-Рудных Предприятий Installation for sinking vertical mine shafts
SU1346801A1 (en) * 1986-01-16 1987-10-23 E.G.Гуменников, В.Л.Шестак, Д.П.Зуев, А.С.Сасса и В.Л.Виноградов Mine shaft muck-loading unit
SU1583615A1 (en) * 1987-12-25 1990-08-07 Всесоюзный проектно-технологический институт транспортного строительства Tunneling unit
RU2098629C1 (en) * 1995-03-14 1997-12-10 Анатолий Тимофеевич Запорожец Method for sinking of shallow mine shafts
RU2141030C1 (en) * 1997-04-24 1999-11-10 ЗАО "Горнопроходческий трест "Спецтоннельстрой" Device for construction of mine shafts
JP3158592U (en) * 2010-01-27 2010-04-08 旌詮工程有限公司 Telescopic ring plate type underground excavator
RU2493367C1 (en) * 2012-07-06 2013-09-20 Александр Александрович Кисель Method to construct vertical mine by blasting and drilling method with tubing lining and tunnelling complex for method realisation

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"Шахтный универсальный мини-экскаватор L520 проходки вертикального ствола на шахте "Распадская"", Ежеквартальный корпоративный журнал Огни "Распадской", N 4, 2007 *
ЗАПЛАВСКИЙ Г.А И ДР., Горные работы, проведение и крепление горных выработок, издание второе, переработанное в дополнительное, Москва, Недра, 1986 . *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2592580C1 (en) * 2015-01-30 2016-07-27 Общество с ограниченной ответственностью "Скуратовский опытно-экспериментальный завод" Method of well shaft construction, shaft sinking combine, rock destruction unit and reinforcing support erection device (versions)
RU2600807C1 (en) * 2015-09-29 2016-10-27 Общество с ограниченной ответственностью "Скуратовский опытно-экспериментальный завод" Shaft sinking combine
WO2017058058A1 (en) * 2015-09-29 2017-04-06 Общество с ограниченной ответственностью "Скуратовский опытно-экспериментальный завод" Shaft sinking machine
EA034047B1 (en) * 2015-09-29 2019-12-23 Общество с ограниченной ответственностью "Скуратовский опытно-экспериментальный завод" Shaft sinking machine

Similar Documents

Publication Publication Date Title
EA201800133A1 (en) METHOD OF CONSTRUCTION OF A URBAN TUNNEL OF A LOW-DEPTH SEA IN WATER-RICH WITH A CARTO GROUND WITH THE USE OF THE CONSOLE DRILLING MACHINE
CN106400803A (en) Integral cast-in-situ bored pile head breaking process
CN208236413U (en) A kind of shaft construction device
CN101892676A (en) Percussive drilling construction process for diaphragm wall passing through rock-filled layer in reclamation area
CN102155161A (en) Novel omnibearing drill boom of drill loader
CN108222944A (en) A kind of improved drop shaft sinking driving shaft construction method
RU2539454C1 (en) Construction method of process branch of vertical well shaft and device for its implementation
CN207453985U (en) A kind of high crag tunnel for the first time lining trolley one lining trolley device
CN106223978A (en) Overall downstriker metal form construction coal bunker construction technology
CN105862862B (en) A kind of large diameter pile buries hammer Refloatation method
RU2141030C1 (en) Device for construction of mine shafts
RU2493367C1 (en) Method to construct vertical mine by blasting and drilling method with tubing lining and tunnelling complex for method realisation
CN201650332U (en) Hydraulic supporting device for fully-mechanized coal winning working face
CN101736764B (en) Impact type excavating device
CN104989409B (en) A kind of full face tunneling method after vertical shaft light section pore-forming
CN107288640B (en) A kind of nothing is surely restricted self-supporting modularization vertical shaft driving and masonry construction device
CN207436063U (en) Friction pile churning driven fast pore-creating edger
CN110130321A (en) The processing method of rock in a kind of manual digging pile construction
CN210152652U (en) Multifunctional trolley suitable for drilling and blasting construction
CN108952568B (en) Drilling machine
CN201301461Y (en) Impact excavating device
KR101176515B1 (en) Blast hole Down-drilling Device for Backhoe
RU126367U1 (en) VERTICAL UNDERGROUND MINING EXPLORATION COMBINE
CN204252122U (en) A kind of self-propelled automatic lifting full circle swinging integrally constructs machine
CN202925545U (en) Guide sleeve special for steel reinforcement cage