CN110130321A - The processing method of rock in a kind of manual digging pile construction - Google Patents

The processing method of rock in a kind of manual digging pile construction Download PDF

Info

Publication number
CN110130321A
CN110130321A CN201910396297.0A CN201910396297A CN110130321A CN 110130321 A CN110130321 A CN 110130321A CN 201910396297 A CN201910396297 A CN 201910396297A CN 110130321 A CN110130321 A CN 110130321A
Authority
CN
China
Prior art keywords
processing method
core
rock
construction
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910396297.0A
Other languages
Chinese (zh)
Inventor
王子彬
韦钦振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Hongye Construction Engineering Co Ltd
Original Assignee
Hubei Hongye Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Hongye Construction Engineering Co Ltd filed Critical Hubei Hongye Construction Engineering Co Ltd
Priority to CN201910396297.0A priority Critical patent/CN110130321A/en
Publication of CN110130321A publication Critical patent/CN110130321A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of processing methods of rock in manual digging pile construction, it is related to construction technology of manual digging pile field, it is the following steps are included: step S1. marks several setting circles with its inscribe, and adjacent two setting circles intersection along pile body marginal position in rock upper surface;Using drilling machine, successively drilling forms periphery hole to step S2. on each setting circle, circumferentially separates so that pile body excavates position with position is retained;Step S3. takes out drill core;The bottom of stake core is partially separated with not excavating by step S4. using wedge;Step S5. integrally takes out stake core;Step S6. repeats step S1~S5 segmentation and pushes ahead, until completing construction.

Description

The processing method of rock in a kind of manual digging pile construction
Technical field
The present invention relates to construction technology of manual digging pile fields, are specifically rocks in a kind of manual digging pile construction Processing method.
Background technique
Manual digging pile construction convenience, does not need heavy mechanical equipment at fast speed, and caisson is than timber, concrete Driven pile shock resistance is strong, and punching, impact cone punching, percussive drill punching, convolution drill hole of drilling machine, well foundation are bored in cost specific impulse It saves.To be used widely in highway, civil buildings.
But traditional method caisson underground work condition is poor, bad environments, large labor intensity, and safety and quality seem outstanding To be important, the inefficiency when encountering solid rock, cost increase is difficult to meet the requirement of duration.
Patent document " water mill of artificial digging pile bores construction method " (number of patent application: 201610804255.2) discloses The water mill of artificial digging pile bores construction method, firstly, not needing in construction using explosion, it is only necessary to which water mill, which bores, faces sky to be formed Face, so that a series of problems for avoiding explosion from causing, brings economic benefit.Secondly, can effectively avoid the hole wall damage of explosion initiation It is bad, the danger of collapse hole is prevented, the safety of construction is improved.Again, work progress protects preferably hole wall, convenient for control Stake holes size avoids traditional handicraft aperture ultra-wide problems of too, convenient for effectively control concreting side amount.
But the arrangement and method for construction is in tangent state, this coring between each coring point during water mill drills The layout type of point has the following deficiencies: that a core is unable to overall separation, takes the method for stage breaking to separate rock, efficiency It is low, at high cost.
Summary of the invention
In view of the deficiencies in the prior art, the purpose of the present invention is to provide rocks in a kind of manual digging pile construction Processing method, it is ensured that operability, safety, accuracy and feature of environmental protection of construction etc., while improving the efficiency of construction, Reduce the cost of construction.
To achieve the above objectives, the technical solution adopted by the present invention is that: the processing of rock in a kind of manual digging pile construction Method, comprising the following steps: step S1. marks several positioning with its inscribe along pile body marginal position in rock upper surface Circle, and adjacent two setting circles intersection;Using drilling machine, successively drilling forms periphery hole to step S2. on each setting circle, so that stake Body excavates position and circumferentially separates with position is retained;Step S3. takes out drill core;Step S4. uses wedge by the bottom of stake core It is partially separated with not excavating;Step S5. integrally takes out stake core;Step S6. repeats step S1~S5 segmentation and pushes ahead, until complete At construction.
Based on the above technical solution, in step S1, the intersection between two setting circles of intersection having a size of 35mm extremely 50mm。
Based on the above technical solution, in step S2, pile body excavates position and circumferentially separates with position is retained, and Form the free face of certain distance.
Based on the above technical solution, the sky size of facing of the free face is greater than 40mm.
Based on the above technical solution, in step S2, the drilling depth of periphery hole is 500mm to 800mm.
Based on the above technical solution, in step S2, the drilling machine is water mill drilling machine.
Based on the above technical solution, in step S3, the size of drill core is 120mm to 150mm.
Based on the above technical solution, in step S3, first drill core is separated with wedge, is then divided drill core with clamp From and take out.
Based on the above technical solution, in step S5, stake core is integrally hung out using hoist engine, and cleaning eye stake table Face.
The beneficial effects of the present invention are:
The present invention has fully considered operability, safety, accuracy and the feature of environmental protection etc. of construction, is not necessarily to explosion It fast and safely can accurately construct to rock section especially solid rock, the processing for rock in manual digging pile construction provides A kind of new method.
In addition, stake core overall separation integrally can be taken since periphery hole each in the present invention is using the layout type of intersection Out, improve efficiency and reduce cost.
Detailed description of the invention
Fig. 1 is the step flow chart of the processing method of rock in manual digging pile construction in the embodiment of the present invention;
Fig. 2 is the arrangement schematic diagram of setting circle in the embodiment of the present invention;
Fig. 3 is to drill through the schematic diagram after periphery hole in the embodiment of the present invention.
Specific embodiment
Make this hair by being further described to a specific embodiment of the invention below with reference to the attached drawing of specification Bright technical solution and its benefits are clearer.It describes embodiment below with reference to attached drawing to be exemplary, purport It is explaining the present invention, and is being not considered as limiting the invention.
Shown in Figure 1, the embodiment of the invention provides a kind of processing methods of rock in manual digging pile construction, including Following steps:
Step S1. is shown in Figure 2, marks several positioning with its inscribe along pile body marginal position in rock upper surface Circle, and adjacent two setting circles intersection;Specifically, the intersection between two setting circles of intersection is having a size of 35mm to 50mm.
Step S2. is shown in Figure 3, and using drilling machine, successively drilling forms periphery hole on each setting circle, so that pile body is opened It digs position and is circumferentially separated with position is retained;Specifically, drilling machine be water mill drilling machine, periphery hole drilling depth be 500mm extremely 800mm separates excavation position circumferentially with position is retained, and forms the free face of certain distance.By experiment, face sky ruler It is very little to should be greater than 40mm, it is ensured that stake core can be with overall separation, and ensures the cross dimensions of structure (specifically, small when facing sky size When 10mm, stake core is unable to overall separation;When facing sky size less than 20mm, most of stake core is unable to overall separation;When facing sky When size should be less than 30mm, small part stake core is unable to overall separation;When facing sky size and should be greater than 40mm, the stake core of different hardness It can overall separation).
Step S3. takes out drill core;Specifically, the size of drill core is 120mm to 150mm.First drill core is separated with wedge, so Drill core is separated and taken out with clamp specially afterwards, is created conditions for the separation of stake core.
The bottom of stake core is partially separated with not excavating by step S4. using wedge;
Step S5. integrally takes out stake core;Specifically, stake core is integrally hung out using hoist engine, and cleaning eye stake surface.
Step S6. repeats step S1~S5 segmentation and pushes ahead, until completing construction.
In the description of specification, reference term " one embodiment ", " preferably ", " example ", " specific example " or " one The description of a little examples " etc. means particular features, structures, materials, or characteristics described in conjunction with this embodiment or example, is contained in In at least one embodiment of the present invention or example, the schematic representation of above-mentioned term is not necessarily referred in the present specification It is identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can at any one or It is combined in a suitable manner in multiple embodiments or example.
The present invention is not limited to the above-described embodiments, for those skilled in the art, is not departing from Under the premise of the principle of the invention, several improvements and modifications can also be made, these improvements and modifications are also considered as protection of the invention Within the scope of.The content being not described in detail in this specification belongs to the prior art well known to professional and technical personnel in the field.

Claims (9)

1. the processing method of rock in a kind of manual digging pile construction, which comprises the following steps:
Step S1. marks several setting circles with its inscribe along pile body marginal position in rock upper surface, and adjacent two are fixed Circle of position intersection;
Using drilling machine, successively drilling forms periphery hole to step S2. on each setting circle, so that pile body excavates position and retains position Circumferentially separate;
Step S3. takes out drill core;
The bottom of stake core is partially separated with not excavating by step S4. using wedge;
Step S5. integrally takes out stake core;
Step S6. repeats step S1~S5 segmentation and pushes ahead, until completing construction.
2. processing method as described in claim 1, it is characterised in that: the intersection in step S1, between two setting circles of intersection Having a size of 35mm to 50mm.
3. processing method as described in claim 1, it is characterised in that: in step S2, pile body, which excavates position and retains position, to exist It is separated on circumference, and forms the free face of certain distance.
4. processing method as claimed in claim 3, it is characterised in that: the free face faces sky size greater than 40mm.
5. processing method as described in claim 1, it is characterised in that: in step S2, the drilling depth of periphery hole be 500mm extremely 800mm。
6. processing method as described in claim 1, it is characterised in that: in step S2, the drilling machine is water mill drilling machine.
7. processing method as described in claim 1, it is characterised in that: in step S3, the size of drill core is 120mm to 150mm.
8. processing method as described in claim 1, it is characterised in that: in step S3, first separate drill core with wedge, then use Drill core is separated and is taken out by clamp.
9. processing method as described in claim 1, it is characterised in that: in step S5, stake core is integrally hung out using hoist engine, And cleaning eye stake surface.
CN201910396297.0A 2019-05-14 2019-05-14 The processing method of rock in a kind of manual digging pile construction Pending CN110130321A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910396297.0A CN110130321A (en) 2019-05-14 2019-05-14 The processing method of rock in a kind of manual digging pile construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910396297.0A CN110130321A (en) 2019-05-14 2019-05-14 The processing method of rock in a kind of manual digging pile construction

Publications (1)

Publication Number Publication Date
CN110130321A true CN110130321A (en) 2019-08-16

Family

ID=67573725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910396297.0A Pending CN110130321A (en) 2019-05-14 2019-05-14 The processing method of rock in a kind of manual digging pile construction

Country Status (1)

Country Link
CN (1) CN110130321A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113154975A (en) * 2021-05-25 2021-07-23 四川省交通勘察设计研究院有限公司 Anti-slide pile pre-drilling blasting excavation method
CN113358407A (en) * 2021-07-08 2021-09-07 中国电建集团贵阳勘测设计研究院有限公司 Sampling method for multi-face empty rock structural face

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06185049A (en) * 1992-12-17 1994-07-05 Kajima Corp Construction of straight pipe type large bore cast-in-place piling
CN102071683A (en) * 2011-02-15 2011-05-25 中交第四公路工程局有限公司 Water drill dug pile construction method
CN105649012A (en) * 2015-12-30 2016-06-08 中铁局集团有限公司 Construction method for bored pile of subway station enclosure structure of upper-soft lower-hard ground
CN105804060A (en) * 2016-04-06 2016-07-27 中铁二十三局集团有限公司 Construction method for digging pile foundation hole manually
CN105821896A (en) * 2016-04-01 2016-08-03 中铁二十三局集团有限公司 Artificial pile foundation construction hole forming method
CN109025807A (en) * 2018-08-20 2018-12-18 中水电第十工程局(郑州)有限公司 A kind of construction method that rotary drilling rig is crept on complicated geology stratum

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06185049A (en) * 1992-12-17 1994-07-05 Kajima Corp Construction of straight pipe type large bore cast-in-place piling
CN102071683A (en) * 2011-02-15 2011-05-25 中交第四公路工程局有限公司 Water drill dug pile construction method
CN105649012A (en) * 2015-12-30 2016-06-08 中铁局集团有限公司 Construction method for bored pile of subway station enclosure structure of upper-soft lower-hard ground
CN105821896A (en) * 2016-04-01 2016-08-03 中铁二十三局集团有限公司 Artificial pile foundation construction hole forming method
CN105804060A (en) * 2016-04-06 2016-07-27 中铁二十三局集团有限公司 Construction method for digging pile foundation hole manually
CN109025807A (en) * 2018-08-20 2018-12-18 中水电第十工程局(郑州)有限公司 A kind of construction method that rotary drilling rig is crept on complicated geology stratum

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113154975A (en) * 2021-05-25 2021-07-23 四川省交通勘察设计研究院有限公司 Anti-slide pile pre-drilling blasting excavation method
CN113358407A (en) * 2021-07-08 2021-09-07 中国电建集团贵阳勘测设计研究院有限公司 Sampling method for multi-face empty rock structural face

Similar Documents

Publication Publication Date Title
CN104912076B (en) A static pile press complete machine is planted in a kind of reaming
CN104295239A (en) Method for using rotary drilling rig to drill into hard rock stratum
CN105649012A (en) Construction method for bored pile of subway station enclosure structure of upper-soft lower-hard ground
CN102182399B (en) Construction method and equipment for reverse circulation drill to drill hole, hammer to form hole, expand hole and remove slag
CN207436901U (en) A kind of rotary drilling rig
CN103277037B (en) Pipe pile leading-hole construction method under boulder cluster geological condition
CN103046931A (en) Method for forming holes of vertical shaft/pilot shaft through impact type drilling machine in impacting mode
CN104805831A (en) Pore-forming method of hard rock foundation pile with large diameter
CN109322301B (en) Quincuncial pore-forming construction method for rotary excavating bored concrete pile of large-diameter ultra-deep and ultra-thick rock stratum
CN203584301U (en) Hole guide equipment
CN101851922A (en) Method for eliminating underground anchor rope/rod by using all casing drill
CN110130321A (en) The processing method of rock in a kind of manual digging pile construction
CN110984132B (en) Construction method for grooving underground diaphragm wall under complex geological condition
CN102409978B (en) Rotary drilling hole forming method by using multi-stage alloy pilot roller bit in complex stratum cast-in-place pile construction
CN103485344A (en) Method for extracting construction engineering pile foundation
CN104947664A (en) Thick stone sea-filling layer prestressing force high-strength concrete square pile construction method
CN109610439A (en) The construction method of underground obstacle ultra-deep underground continuous wall grooving
CN207260148U (en) Service sleeve pile crown integrally abolishes device
CN103410447A (en) Square drill bit of rotary drilling rig
CN210918893U (en) Drill bit for rapidly repairing wall of pile hole
CN102425388A (en) Slag salvaging cylindrical drill for drilled pile
CN102628268A (en) Cyclone pile
CN202187735U (en) Bored pile tubular drill for fishing residue
CN205638313U (en) Cover bores to salvage handles bury drills device
CN104805830A (en) Uplift pile construction method without rock blasting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190816