RU2012132640A - Способ и система управления для планирования нагрузки электростанции - Google Patents
Способ и система управления для планирования нагрузки электростанции Download PDFInfo
- Publication number
- RU2012132640A RU2012132640A RU2012132640/08A RU2012132640A RU2012132640A RU 2012132640 A RU2012132640 A RU 2012132640A RU 2012132640/08 A RU2012132640/08 A RU 2012132640/08A RU 2012132640 A RU2012132640 A RU 2012132640A RU 2012132640 A RU2012132640 A RU 2012132640A
- Authority
- RU
- Russia
- Prior art keywords
- generating units
- components
- maintenance
- load
- plan
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract 17
- 238000007726 management method Methods 0.000 title 1
- 238000012423 maintenance Methods 0.000 claims abstract 14
- 238000005457 optimization Methods 0.000 claims abstract 7
- 238000004519 manufacturing process Methods 0.000 claims abstract 2
- 230000001276 controlling effect Effects 0.000 claims 2
- 230000001105 regulatory effect Effects 0.000 claims 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Tourism & Hospitality (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Automation & Control Theory (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Feedback Control In General (AREA)
Abstract
1. Способ оптимизации планирования нагрузки для электростанции, имеющей один или более блоков генерирования, при этом способ, содержащий этапы, на которых:- анализируют рабочее состояние одного или более компонентов блоков генерирования, имеющих один или более индексов риска, ассоциированных с одним или более компонентами блоков генерирования;- обновляют, по меньшей мере, одну целевую функцию, которая отражает состояние одного или более компонентов блоков генерирования;- решают одну или более целевых функций, чтобы оптимизировать план одного или более блоков генерирования и рабочее состояние одного или более компонентов блоков генерирования; и- управляют одним или более блоками генерирования при оптимизированном плане и рабочем состоянии.2. Способ по п.1, в котором этап анализа включает в себя этап, на котором оценивают характеристики, оценивают эксплуатационные затраты и смещения в плане технического обслуживания в горизонте прогнозирования.3. Способ по п.1, в котором оптимизация планирования нагрузки включает в себя этап, на котором планируют выработку, планируют техническое обслуживание или нагрузку для одного или более блоков генерирования или комбинацию вышеозначенного.4. Способ по п.1, в котором оптимизация планирования нагрузки включает в себя этап, на котором оптимизируют индексы риска для одного или более компонентов одного или более блоков генерирования посредством надлежащего изменения регулируемых переменных.5. Способ по п.1, в котором оптимизация планирования нагрузки включает в себя этап, на котором задают отсрочку или опережение запуска технического обслуживания для технического обслужи�
Claims (10)
1. Способ оптимизации планирования нагрузки для электростанции, имеющей один или более блоков генерирования, при этом способ, содержащий этапы, на которых:
- анализируют рабочее состояние одного или более компонентов блоков генерирования, имеющих один или более индексов риска, ассоциированных с одним или более компонентами блоков генерирования;
- обновляют, по меньшей мере, одну целевую функцию, которая отражает состояние одного или более компонентов блоков генерирования;
- решают одну или более целевых функций, чтобы оптимизировать план одного или более блоков генерирования и рабочее состояние одного или более компонентов блоков генерирования; и
- управляют одним или более блоками генерирования при оптимизированном плане и рабочем состоянии.
2. Способ по п.1, в котором этап анализа включает в себя этап, на котором оценивают характеристики, оценивают эксплуатационные затраты и смещения в плане технического обслуживания в горизонте прогнозирования.
3. Способ по п.1, в котором оптимизация планирования нагрузки включает в себя этап, на котором планируют выработку, планируют техническое обслуживание или нагрузку для одного или более блоков генерирования или комбинацию вышеозначенного.
4. Способ по п.1, в котором оптимизация планирования нагрузки включает в себя этап, на котором оптимизируют индексы риска для одного или более компонентов одного или более блоков генерирования посредством надлежащего изменения регулируемых переменных.
5. Способ по п.1, в котором оптимизация планирования нагрузки включает в себя этап, на котором задают отсрочку или опережение запуска технического обслуживания для технического обслуживания одного или более компонентов одного или более блоков генерирования на основе состояния компонента или потребности нагрузки.
6. Способ по п.1, в котором целевая функция включает в себя, по меньшей мере, один член для управления технологическим процессом одного или более компонентов одного или более блоков генерирования или, по меньшей мере, один член, ассоциированный с техническим обслуживанием одного или более компонентов одного или более блоков генерирования, или комбинацию вышеозначенного.
7. Способ по п.1, в котором обновление включает в себя этап, на котором обновляют целевую функцию (a) затратами, ассоциированными с отсрочкой или опережением технического обслуживания одного или более компонентов одного или более блоков генерирования, или (b) затратами, ассоциированными с жизненным циклом одного или более компонентов одного или более блоков генерирования, или комбинацией (a) и (b).
8. Система управления для планирования нагрузки электростанции, имеющей один или более блоков генерирования, причем система управления содержит:
- оптимизатор, имеющий, по меньшей мере, одну целевую функцию для оптимизации планирования нагрузки, которая включает в себя планирование технического обслуживания, и для оптимального управления технологическими процессами одного или более блоков генерирования, причем упомянутый оптимизатор использует компонент модели станции и компонент модели повреждений для оптимизации планирования нагрузки.
9. Система по п.8, в которой оптимизатор содержит:
- анализатор планировщика для анализа рабочего состояния одного или более компонентов блоков генерирования, имеющих один или более индексов риска, ассоциированных с одним или более компонентами блоков генерирования.
10. Система по п.8, в которой оптимизатор выполнен с возможностью планирования технического обслуживания, осуществляемого посредством устройства запуска технического обслуживания на основе индексов риска, ассоциированных с одним или более компонентами одного или более блоков генерирования, либо прогноза потребности или улучшений в рабочем состоянии, обусловленных новыми регулируемыми переменными, либо плана заранее запланированного технического обслуживания, либо осуществляемого пользователем через пользовательский интерфейс, или комбинации вышеозначенного.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IN3244CH2009 | 2009-12-31 | ||
IN3244/CHE/2009 | 2009-12-31 | ||
PCT/IB2010/001106 WO2011080548A1 (en) | 2009-12-31 | 2010-05-13 | Method and control system for scheduling load of a power plant |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2012132640A true RU2012132640A (ru) | 2014-02-10 |
RU2523191C2 RU2523191C2 (ru) | 2014-07-20 |
Family
ID=42556691
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2012132640/08A RU2523191C2 (ru) | 2009-12-31 | 2010-05-13 | Способ и система управления для планирования нагрузки электростанции |
Country Status (10)
Country | Link |
---|---|
US (1) | US10013660B2 (ru) |
EP (1) | EP2519863A1 (ru) |
JP (1) | JP5996436B2 (ru) |
KR (1) | KR101733393B1 (ru) |
CN (2) | CN107862463B (ru) |
AU (1) | AU2010337991B2 (ru) |
CA (1) | CA2785752C (ru) |
RU (1) | RU2523191C2 (ru) |
WO (1) | WO2011080548A1 (ru) |
ZA (1) | ZA201204798B (ru) |
Families Citing this family (55)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9069725B2 (en) | 2011-08-19 | 2015-06-30 | Hartford Steam Boiler Inspection & Insurance Company | Dynamic outlier bias reduction system and method |
GB201200491D0 (en) | 2012-01-12 | 2012-02-22 | Romax Technology Ltd | Method for operating a wind turbine generator |
US9411326B2 (en) * | 2012-08-21 | 2016-08-09 | General Electric Company | Plant control optimization system including visual risk display |
US9255525B2 (en) * | 2012-11-30 | 2016-02-09 | General Electric Company | System and method for gas turbine operation |
US20140324495A1 (en) * | 2013-02-22 | 2014-10-30 | Vestas Wind Systems A/S | Wind turbine maintenance optimizer |
US20140244328A1 (en) * | 2013-02-22 | 2014-08-28 | Vestas Wind Systems A/S | Wind turbine maintenance optimizer |
US10418833B2 (en) | 2015-10-08 | 2019-09-17 | Con Edison Battery Storage, Llc | Electrical energy storage system with cascaded frequency response optimization |
US9430311B2 (en) * | 2013-07-23 | 2016-08-30 | Halliburton Energy Services, Inc. | Cause and effect mapping for failure mode effect analysis creation and risk management |
US9471080B2 (en) | 2013-10-21 | 2016-10-18 | Restore Nv | Portfolio managed, demand-side response system |
EP2889711B1 (en) | 2013-12-30 | 2020-07-01 | Rolls-Royce Corporation | System and method for optimizing component life in a power system |
US9404426B2 (en) * | 2013-12-31 | 2016-08-02 | General Electric Company | Methods and systems for enhancing control of power plant generating units |
CA3116974A1 (en) * | 2014-04-11 | 2015-10-15 | Hartford Steam Boiler Inspection And Insurance Company | Improving future reliability prediction based on system operational and performance data modelling |
US10101731B2 (en) | 2014-05-01 | 2018-10-16 | Johnson Controls Technology Company | Low level central plant optimization |
US9605559B2 (en) | 2015-02-02 | 2017-03-28 | General Electric Company | Wash timing based on turbine operating parameters |
CN105929687B (zh) * | 2015-02-27 | 2020-02-04 | 约翰逊控制技术公司 | 高层级中央设施优化 |
US10205322B1 (en) | 2015-03-09 | 2019-02-12 | Cummins Power Generation Ip, Inc. | Economically efficient operation of a power generator |
US10339461B2 (en) | 2015-09-30 | 2019-07-02 | The Boeing Company | System for maintenance of a manufactured product |
US10282687B2 (en) * | 2015-10-07 | 2019-05-07 | University Of Utah Research Foundation | Systems and methods for managing power generation resources |
US10509374B2 (en) | 2015-10-07 | 2019-12-17 | University Of Utah Research Foundation | Systems and methods for managing power generation and storage resources |
US10296030B2 (en) * | 2015-10-07 | 2019-05-21 | University Of Utah Research Foundation | Systems and methods for power system management |
US10186889B2 (en) | 2015-10-08 | 2019-01-22 | Taurus Des, Llc | Electrical energy storage system with variable state-of-charge frequency response optimization |
US10554170B2 (en) | 2015-10-08 | 2020-02-04 | Con Edison Battery Storage, Llc | Photovoltaic energy system with solar intensity prediction |
US10197632B2 (en) | 2015-10-08 | 2019-02-05 | Taurus Des, Llc | Electrical energy storage system with battery power setpoint optimization using predicted values of a frequency regulation signal |
US10418832B2 (en) | 2015-10-08 | 2019-09-17 | Con Edison Battery Storage, Llc | Electrical energy storage system with constant state-of charge frequency response optimization |
US10283968B2 (en) | 2015-10-08 | 2019-05-07 | Con Edison Battery Storage, Llc | Power control system with power setpoint adjustment based on POI power limits |
US11210617B2 (en) | 2015-10-08 | 2021-12-28 | Johnson Controls Technology Company | Building management system with electrical energy storage optimization based on benefits and costs of participating in PDBR and IBDR programs |
US10742055B2 (en) | 2015-10-08 | 2020-08-11 | Con Edison Battery Storage, Llc | Renewable energy system with simultaneous ramp rate control and frequency regulation |
US10700541B2 (en) | 2015-10-08 | 2020-06-30 | Con Edison Battery Storage, Llc | Power control system with battery power setpoint optimization using one-step-ahead prediction |
US10222427B2 (en) | 2015-10-08 | 2019-03-05 | Con Edison Battery Storage, Llc | Electrical energy storage system with battery power setpoint optimization based on battery degradation costs and expected frequency response revenue |
US10250039B2 (en) | 2015-10-08 | 2019-04-02 | Con Edison Battery Storage, Llc | Energy storage controller with battery life model |
US10190793B2 (en) | 2015-10-08 | 2019-01-29 | Johnson Controls Technology Company | Building management system with electrical energy storage optimization based on statistical estimates of IBDR event probabilities |
US10564610B2 (en) | 2015-10-08 | 2020-02-18 | Con Edison Battery Storage, Llc | Photovoltaic energy system with preemptive ramp rate control |
US10389136B2 (en) | 2015-10-08 | 2019-08-20 | Con Edison Battery Storage, Llc | Photovoltaic energy system with value function optimization |
US20170242081A1 (en) * | 2016-02-24 | 2017-08-24 | General Electric Company | System and method for optimization of recommended service intervals |
CN106096815A (zh) * | 2016-05-31 | 2016-11-09 | 中国电力科学研究院 | 一种配电网运行效率影响度分析方法 |
US10778012B2 (en) | 2016-07-29 | 2020-09-15 | Con Edison Battery Storage, Llc | Battery optimization control system with data fusion systems and methods |
US10594153B2 (en) | 2016-07-29 | 2020-03-17 | Con Edison Battery Storage, Llc | Frequency response optimization control system |
JP6812169B2 (ja) * | 2016-08-29 | 2021-01-13 | 川崎重工業株式会社 | エネルギー需要設備の運用に関する計画作成装置及び計画作成方法 |
JP6677608B2 (ja) * | 2016-09-05 | 2020-04-08 | 株式会社東芝 | 水力機械の壊食予測装置および予測方法 |
CN106779443B (zh) * | 2016-12-26 | 2020-11-03 | 国网山东省电力公司泰安供电公司 | 电力调度中的操作风险确定方法和装置 |
US20180253087A1 (en) * | 2017-03-06 | 2018-09-06 | General Electric Company | Scheduling maintenance to reduce degradation of a power generation system |
US10333987B2 (en) * | 2017-05-18 | 2019-06-25 | Bank Of America Corporation | Security enhancement tool for a target computer system operating within a complex web of interconnected systems |
KR102073537B1 (ko) * | 2017-09-06 | 2020-02-04 | 가부시키가이샤 티엘브이 | 리스크 평가 장치, 리스크 평가 시스템, 리스크 평가 방법 및 리스크 평가 프로그램 |
US10504195B2 (en) | 2017-11-13 | 2019-12-10 | Mitsubishi Electric Research Laboratories, Inc. | System and method for decentralized energy production |
US10838441B2 (en) | 2017-11-28 | 2020-11-17 | Johnson Controls Technology Company | Multistage HVAC system with modulating device demand control |
US10838440B2 (en) | 2017-11-28 | 2020-11-17 | Johnson Controls Technology Company | Multistage HVAC system with discrete device selection prioritization |
US10678227B2 (en) | 2018-03-15 | 2020-06-09 | Johnson Controls Technology Company | Central plant control system with plug and play EMPC |
US11159022B2 (en) | 2018-08-28 | 2021-10-26 | Johnson Controls Tyco IP Holdings LLP | Building energy optimization system with a dynamically trained load prediction model |
US11163271B2 (en) | 2018-08-28 | 2021-11-02 | Johnson Controls Technology Company | Cloud based building energy optimization system with a dynamically trained load prediction model |
US11636292B2 (en) | 2018-09-28 | 2023-04-25 | Hartford Steam Boiler Inspection And Insurance Company | Dynamic outlier bias reduction system and method |
WO2021055847A1 (en) | 2019-09-18 | 2021-03-25 | Hartford Steam Boiler Inspection And Insurance Company | Computer-based systems, computing components and computing objects configured to implement dynamic outlier bias reduction in machine learning models |
US11328177B2 (en) | 2019-09-18 | 2022-05-10 | Hartford Steam Boiler Inspection And Insurance Company | Computer-based systems, computing components and computing objects configured to implement dynamic outlier bias reduction in machine learning models |
US11615348B2 (en) | 2019-09-18 | 2023-03-28 | Hartford Steam Boiler Inspection And Insurance Company | Computer-based systems, computing components and computing objects configured to implement dynamic outlier bias reduction in machine learning models |
KR102209858B1 (ko) * | 2020-08-21 | 2021-01-29 | 주식회사 아라아이티이엔지 | 인공신경망 기반의 가열 및 냉각 설비 가동 스케쥴링 방법 |
FR3137835A1 (fr) | 2022-07-15 | 2024-01-19 | L'oreal | Composition pour la coloration des fibres kératineuses |
Family Cites Families (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU399606A1 (ru) * | 1972-04-29 | 1973-10-03 | Способ оптимизации режима работы тепловой | |
RU2035107C1 (ru) * | 1992-01-22 | 1995-05-10 | Игорь Анатольевич Козурман | Система электроснабжения |
US6278899B1 (en) * | 1996-05-06 | 2001-08-21 | Pavilion Technologies, Inc. | Method for on-line optimization of a plant |
US7406431B2 (en) * | 2000-03-17 | 2008-07-29 | Siemens Aktiengesellschaft | Plant maintenance technology architecture |
JP3442059B2 (ja) | 2000-05-11 | 2003-09-02 | 松下電器産業株式会社 | 電子放出性薄膜およびこれを用いたプラズマディスプレイパネルならびにこれらの製造方法 |
US6611773B2 (en) * | 2000-11-28 | 2003-08-26 | Power Measurement Ltd. | Apparatus and method for measuring and reporting the reliability of a power distribution system with improved accuracy |
US6671634B2 (en) * | 2000-12-27 | 2003-12-30 | Abb Research Ltd. | System and method for reliability assessment of a power system having integrated modules |
US6853930B2 (en) * | 2001-02-27 | 2005-02-08 | Hitachi, Ltd. | System for aiding the preparation of operation and maintenance plans for a power generation installation |
JP3801063B2 (ja) * | 2001-02-27 | 2006-07-26 | 株式会社日立製作所 | 発電設備の運転・保全計画支援システム |
JP4737735B2 (ja) * | 2001-05-01 | 2011-08-03 | 学校法人東海大学 | 多品目多工程ロットサイズスケジューリング方法 |
US7089190B2 (en) * | 2001-05-18 | 2006-08-08 | Power Resource Managers, Llp | System and method for managing utility power use |
US8417360B2 (en) * | 2001-08-10 | 2013-04-09 | Rockwell Automation Technologies, Inc. | System and method for dynamic multi-objective optimization of machine selection, integration and utilization |
US6999829B2 (en) * | 2001-12-26 | 2006-02-14 | Abb Inc. | Real time asset optimization |
JP2003284260A (ja) * | 2002-03-25 | 2003-10-03 | Hitachi Ltd | 発電設備改修及び更新支援方法、及びそのシステム |
FR2849238A1 (fr) * | 2002-12-20 | 2004-06-25 | Elyo | Systeme de prise en charge et d'exploitation des installations et services d'un site |
US7203622B2 (en) * | 2002-12-23 | 2007-04-10 | Abb Research Ltd. | Value-based transmission asset maintenance management of electric power networks |
US7272516B2 (en) * | 2002-12-23 | 2007-09-18 | Abb Research | Failure rate adjustment for electric power network reliability analysis |
EP1513085A1 (en) * | 2003-09-08 | 2005-03-09 | Abb Research Ltd. | Method of scheduling maintenance actions |
JP2007293889A (ja) * | 2004-01-05 | 2007-11-08 | Hitachi Ltd | 発電設備の運用管理システム及び保守管理サービス方法 |
US20060247798A1 (en) * | 2005-04-28 | 2006-11-02 | Subbu Rajesh V | Method and system for performing multi-objective predictive modeling, monitoring, and update for an asset |
US8055358B2 (en) * | 2005-12-05 | 2011-11-08 | Fisher-Rosemount Systems, Inc. | Multi-objective predictive process optimization with concurrent process simulation |
WO2007087537A2 (en) * | 2006-01-23 | 2007-08-02 | The Trustees Of Columbia University In The City Of New York | System and method for grading electricity distribution network feeders susceptible to impending failure |
FI118642B (fi) * | 2006-04-28 | 2008-01-31 | Kone Corp | Hissijärjestelmä |
CN1916949B (zh) * | 2006-09-06 | 2010-11-10 | 成都赛康信息技术有限责任公司 | 电力设备状态评估及维修策略支撑系统 |
RU2007139972A (ru) * | 2007-10-29 | 2009-05-10 | Закрытое акционерное общество "Техсистем груп" (RU) | Способ оптимизации режимов работы электростанций |
CN101232182A (zh) * | 2008-01-18 | 2008-07-30 | 清华大学 | 三维协调的电网能量管理系统及对电网的评估及控制方法 |
CN100555792C (zh) * | 2008-01-30 | 2009-10-28 | 湖南大学 | 基于多智能体的配电网节能降耗综合管理系统及其管理方法 |
CN101465616B (zh) * | 2008-12-30 | 2013-11-27 | 上海市电力公司 | 一种基于ucps的agc机组评价系统 |
US8433450B2 (en) * | 2009-09-11 | 2013-04-30 | Emerson Process Management Power & Water Solutions, Inc. | Optimized control of power plants having air cooled condensers |
AU2010327985B2 (en) * | 2009-12-10 | 2012-12-13 | Accenture Global Services Limited | Energy facility control system |
-
2010
- 2010-05-13 KR KR1020127020236A patent/KR101733393B1/ko active IP Right Grant
- 2010-05-13 JP JP2012546512A patent/JP5996436B2/ja active Active
- 2010-05-13 CN CN201711156918.5A patent/CN107862463B/zh active Active
- 2010-05-13 AU AU2010337991A patent/AU2010337991B2/en active Active
- 2010-05-13 RU RU2012132640/08A patent/RU2523191C2/ru active
- 2010-05-13 EP EP10722777.9A patent/EP2519863A1/en not_active Ceased
- 2010-05-13 CN CN201080065000XA patent/CN102893227A/zh active Pending
- 2010-05-13 CA CA2785752A patent/CA2785752C/en active Active
- 2010-05-13 WO PCT/IB2010/001106 patent/WO2011080548A1/en active Application Filing
-
2012
- 2012-06-27 ZA ZA2012/04798A patent/ZA201204798B/en unknown
- 2012-07-02 US US13/539,773 patent/US10013660B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
EP2519863A1 (en) | 2012-11-07 |
AU2010337991A1 (en) | 2012-07-19 |
KR101733393B1 (ko) | 2017-05-10 |
CN107862463A (zh) | 2018-03-30 |
WO2011080548A1 (en) | 2011-07-07 |
RU2523191C2 (ru) | 2014-07-20 |
AU2010337991B2 (en) | 2014-06-26 |
CA2785752A1 (en) | 2011-07-07 |
CN107862463B (zh) | 2021-09-28 |
JP2013516671A (ja) | 2013-05-13 |
KR20120117847A (ko) | 2012-10-24 |
JP5996436B2 (ja) | 2016-09-21 |
CA2785752C (en) | 2017-04-18 |
CN102893227A (zh) | 2013-01-23 |
US10013660B2 (en) | 2018-07-03 |
ZA201204798B (en) | 2013-08-28 |
US20130006439A1 (en) | 2013-01-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2012132640A (ru) | Способ и система управления для планирования нагрузки электростанции | |
WO2009114309A3 (en) | Apparatus for optimizing a chemical looping combustion plant using a model predictive controller | |
JP5860612B2 (ja) | 発電設備を改良するシステムおよび方法 | |
US10591875B2 (en) | Process optimization method and system for a power plant | |
CN101498458B (zh) | 一种锅炉在线燃烧优化的模型更新方法 | |
KR101771985B1 (ko) | 에너지 수급 운용 가이던스 장치 및 제철소 내의 에너지 수급 운용 방법 | |
CN113131523A (zh) | 一种分品种电力供应预测方法及系统 | |
CN112686571B (zh) | 基于动态自适应建模的综合智慧能源优化调度方法及系统 | |
MY191055A (en) | Process model predictive control system and method for promoting production of anaerobic digestion gas | |
CN104376372A (zh) | 基于源网荷互动模式的智能配电网调度业务优化方法 | |
EP3945385A1 (en) | Continuous flow engine monitoring method and system | |
CN112950001A (zh) | 基于云边端闭环架构的智慧能量管控系统及方法 | |
CN117270410A (zh) | 一种智能家居能耗控制方法、设备及计算机可读存储介质 | |
CN105740069B (zh) | 一种多级数据转化任务的自动调度方法 | |
CN104299055B (zh) | 一种抑制电厂内机组反向调节的发电计划优化方法 | |
JP2017028816A (ja) | 計画策定装置、計画策定方法、及びプログラム | |
CN115220708A (zh) | 一种航天器飞行程序的半自动编排方法 | |
CN107730046A (zh) | 一种电力短期负荷预测系统及方法 | |
CN104299054A (zh) | 一种引入水电机组振动区的发电计划优化方法 | |
CN104578175A (zh) | 一种用于电网备用调节的agc控制方法 | |
Wang et al. | Research on spare parts requirement quantity forecasting for communication equipment | |
Warsokusumo et al. | Real-time online monitoring for maintaining energy efficiency performance of power generation system | |
Carpenter | Data-Driven Management Strategy Can Reduce Environmental Effect of Production Plants | |
CN106292411B (zh) | 一种采茶机群控制优化系统 | |
ATE540559T1 (de) | Betriebsverfahren und schaltungsanordnung für lichtquellen |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PC43 | Official registration of the transfer of the exclusive right without contract for inventions |
Effective date: 20200528 |