RU2011152903A - METHOD OF CONSTRUCTION OF UNDERGROUND STRUCTURE - Google Patents

METHOD OF CONSTRUCTION OF UNDERGROUND STRUCTURE Download PDF

Info

Publication number
RU2011152903A
RU2011152903A RU2011152903/03A RU2011152903A RU2011152903A RU 2011152903 A RU2011152903 A RU 2011152903A RU 2011152903/03 A RU2011152903/03 A RU 2011152903/03A RU 2011152903 A RU2011152903 A RU 2011152903A RU 2011152903 A RU2011152903 A RU 2011152903A
Authority
RU
Russia
Prior art keywords
walls
inventory
soil
structures
support
Prior art date
Application number
RU2011152903/03A
Other languages
Russian (ru)
Other versions
RU2489550C1 (en
Inventor
Сергей Олегович Зеге
Евгений Владимирович Щекудов
Original Assignee
Сергей Олегович Зеге
Евгений Владимирович Щекудов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Сергей Олегович Зеге, Евгений Владимирович Щекудов filed Critical Сергей Олегович Зеге
Priority to RU2011152903/03A priority Critical patent/RU2489550C1/en
Publication of RU2011152903A publication Critical patent/RU2011152903A/en
Application granted granted Critical
Publication of RU2489550C1 publication Critical patent/RU2489550C1/en

Links

Abstract

Способ возведения подземного сооружения, включающий выполнение по контуру котлована стен в грунте, поэтапную разработку грунта, устройство перекрытия с опорой на стены и демонтируемые инвентарные конструкции, бетонирование фундаментной плиты, с последующим возведением капитальных вертикальных несущих конструкций, креплением на них перекрытий и демонтажем инвентарных конструкций, отличающийся тем, что между выполненными по контуру котлована стенами в грунте сначала производят частичную выборку грунта, устанавливают с опорой на грунт и стены инвентарную конструкцию, устраивают перекрытие с опорой на инвентарную конструкцию и стены, после чего выбирают грунт под инвентарной конструкцией, монтируют дополнительные подкосы в распор между стенами и узлами инвентарной конструкции, после этого выбирают оставшуюся часть грунта котлована, бетонируют фундаментную плиту, затем монтируют несущие вертикальные стены и/или колонны, опирают на них перекрытие и демонтируют инвентарные конструкции и подкосы.A method of erecting an underground structure, including performing along the contour of the foundation pit of walls in the soil, stage-by-stage excavation of the floor, a floor slab based on the walls and dismountable inventory structures, concreting of the foundation slab, followed by the construction of capital vertical load-bearing structures, fixing the ceilings on them and dismantling the inventory structures, characterized in that between the walls made along the contour of the pit in the soil, at first a partial sampling of the soil is made, installed with support on the ground t and walls of the inventory structure, arrange the ceiling with support on the inventory structure and walls, after which the soil under the inventory structure is selected, additional struts are mounted between the walls and nodes of the inventory structure, then the remaining part of the excavation ground is selected, the foundation slab is concrete, then mounted bearing vertical walls and / or columns, support the ceiling on them and dismantle inventory structures and struts.

Claims (1)

Способ возведения подземного сооружения, включающий выполнение по контуру котлована стен в грунте, поэтапную разработку грунта, устройство перекрытия с опорой на стены и демонтируемые инвентарные конструкции, бетонирование фундаментной плиты, с последующим возведением капитальных вертикальных несущих конструкций, креплением на них перекрытий и демонтажем инвентарных конструкций, отличающийся тем, что между выполненными по контуру котлована стенами в грунте сначала производят частичную выборку грунта, устанавливают с опорой на грунт и стены инвентарную конструкцию, устраивают перекрытие с опорой на инвентарную конструкцию и стены, после чего выбирают грунт под инвентарной конструкцией, монтируют дополнительные подкосы в распор между стенами и узлами инвентарной конструкции, после этого выбирают оставшуюся часть грунта котлована, бетонируют фундаментную плиту, затем монтируют несущие вертикальные стены и/или колонны, опирают на них перекрытие и демонтируют инвентарные конструкции и подкосы. A method of erecting an underground structure, including performing along the contour of the foundation pit of walls in the soil, stage-by-stage excavation of the floor, a floor slab based on the walls and dismountable inventory structures, concreting of the foundation slab, followed by the construction of capital vertical load-bearing structures, fixing the ceilings on them and dismantling the inventory structures, characterized in that between the walls made along the contour of the pit in the soil, at first a partial sampling of the soil is made, installed with support on the ground t and walls of the inventory structure, arrange the ceiling with support on the inventory structure and walls, after which the soil under the inventory structure is selected, additional struts are mounted between the walls and nodes of the inventory structure, then the remaining part of the excavation ground is selected, the foundation slab is concrete, then mounted bearing vertical walls and / or columns, support the ceiling on them and dismantle inventory structures and struts.
RU2011152903/03A 2011-12-26 2011-12-26 Method for underground structure erection RU2489550C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2011152903/03A RU2489550C1 (en) 2011-12-26 2011-12-26 Method for underground structure erection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2011152903/03A RU2489550C1 (en) 2011-12-26 2011-12-26 Method for underground structure erection

Publications (2)

Publication Number Publication Date
RU2011152903A true RU2011152903A (en) 2013-07-10
RU2489550C1 RU2489550C1 (en) 2013-08-10

Family

ID=48787181

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2011152903/03A RU2489550C1 (en) 2011-12-26 2011-12-26 Method for underground structure erection

Country Status (1)

Country Link
RU (1) RU2489550C1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104963344B (en) * 2015-07-17 2017-05-31 江苏江都建设集团有限公司 The deep basal pit underground construction method that concrete supporting removal and structure construction are synchronously carried out
RU2676342C1 (en) * 2018-01-31 2018-12-28 Федеральное государственное казенное военное образовательное учреждение высшего образования "Академия Федеральной службы охраны Российской Федерации" (Академия ФСО России) Method for constructing a protected command and control centers

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2067521A5 (en) * 1969-11-06 1971-08-20 Perrollaz Pierre
RU2136818C1 (en) * 1999-01-20 1999-09-10 Общество с ограниченной ответственностью "Финансово-промышленная корпорация "Сатори" Method for building of multistory underground structure with simultaneous excavation of basin
RU2220258C1 (en) * 2003-04-04 2003-12-27 Зеге Сергей Олегович Process of erection of multilevel underground structure ( variants )
RU83080U1 (en) * 2008-12-04 2009-05-20 Сергей Олегович Зеге COTTAGE FASTENING SYSTEM IN CONSTRUCTION OF UNDERGROUND STRUCTURES
RU2414563C1 (en) * 2009-10-02 2011-03-20 Андрей Викторович Карпов Method to erect multistory subsurface structure

Also Published As

Publication number Publication date
RU2489550C1 (en) 2013-08-10

Similar Documents

Publication Publication Date Title
EA201792588A1 (en) CONSTRUCTION OF ASSEMBLED LUNG CONCRETE PLATE AND COLUMNS AND METHOD FOR ITS ASSEMBLY
RU2536539C2 (en) Construction method of deep-laid double-arched underground station
NZ749248A (en) Precast concrete formwork, floor system and a method of construction
JP2009074272A (en) Building reconstruction method
KR20150138785A (en) Vertical expansion remodeling method of existing building with seperate load path
RU2011152903A (en) METHOD OF CONSTRUCTION OF UNDERGROUND STRUCTURE
KR101445286B1 (en) PC-SF Method for Construction Duration Reduction of Typical Floor
JP5977412B2 (en) Basement of new building using existing building
WO2013032349A3 (en) Monolithic- precast housing construction system
JP5925231B2 (en) Building construction method and underground building of new building
JP5506057B2 (en) Building construction method
JP2006002428A (en) Reinforcing method of existing floor and base isolation method of existing building
RU83080U1 (en) COTTAGE FASTENING SYSTEM IN CONSTRUCTION OF UNDERGROUND STRUCTURES
RU108785U1 (en) DEVICE FOR UNLOADING STONE CONSTRUCTIONS OF BUILDING
JP2015229857A (en) Base isolation method for existing building
RU146200U1 (en) COTTAGE
RU190916U1 (en) UNDERGROUND EQUIPMENT
RU2563858C1 (en) Method of erection of monolithic walls in retained formwork
RU2435010C1 (en) Method to reinforce assembly of floor slabs resting against wall
RU2465422C1 (en) Device to unload stone structures of building and method of its assembly
RU2617813C2 (en) The method of erection of prefabricated multi-storey reinforced concrete frame of a building
JP2014201948A (en) Building design method
RU147740U1 (en) FIXED WALL FORMWORK
JP2005226393A (en) Partitioning base isolation method
PL424089A1 (en) Method for erecting buildings with the skeleton construction, on the basis of the prefabricated dual-differently-nodal construction column and the prefabricated dual-differently-nodal construction column

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20131227

NF4A Reinstatement of patent

Effective date: 20150220

MM4A The patent is invalid due to non-payment of fees

Effective date: 20191227