RO119208B1 - Process for opening fields from hill base by open workings - Google Patents

Process for opening fields from hill base by open workings Download PDF

Info

Publication number
RO119208B1
RO119208B1 ROA200201455A RO200201455A RO119208B1 RO 119208 B1 RO119208 B1 RO 119208B1 RO A200201455 A ROA200201455 A RO A200201455A RO 200201455 A RO200201455 A RO 200201455A RO 119208 B1 RO119208 B1 RO 119208B1
Authority
RO
Romania
Prior art keywords
hill
excavator
base
open
opening
Prior art date
Application number
ROA200201455A
Other languages
Romanian (ro)
Inventor
Constantin Predoiu
Dumitru UNGUREANU
Tiberiu Trotea
Petre Ceauşescu
Original Assignee
Compania Naţională A Lignitului Oltenia
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=32389912&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=RO119208(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Compania Naţională A Lignitului Oltenia filed Critical Compania Naţională A Lignitului Oltenia
Priority to ROA200201455A priority Critical patent/RO119208B1/en
Publication of RO119208B1 publication Critical patent/RO119208B1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to a process for opening a field at the hill base by open working, used for open pit-mining a lignite field. According to the invention, the process for opening the fields at the hill base by open working, consists in that, by reaching a hill versant, at the pit base, there is carried out a route (c), made as a high-capacity excavator (1) advances, this route (c) being arranged in the lateral side of the pit, on level curves and inclined planes. Upon reaching some previously established levels of mining stages, the same excavator (1) carries out some circulating platforms (11) until there is performed a final platform (12), which is at the highest stage of the hill, afterwards there is excavated the last block of the hill (13) and, successively, each lower stage of sterile (9, 8, 7 and 6) by the successive descending of the excavator (1) on the circulating platforms (11) carried out upon climbing, until the volumes thereof are exhausted, afterwards there being performed the outcroppig of the lignite layers (a and b) by the open mining processes, known per se.

Description

Invenția se referă la un procedeu pentru deschiderea prin lucrări miniere la zi a zăcămintelor aflate la baza colinelor, utilizat pentru exploatarea zăcămintelor de lignit în carieră.The invention relates to a process for opening through daily mining works of the deposits at the base of the hills, used for the exploitation of the lignite deposits in the quarry.

Este cunoscut un procedeu de exploatare a căbunelui în carieră, ce constă în exploatarea concomitentă a stratelor prin cuprinderea acestora în două până la trei trepte de exploatare, în cadrul cărora este desfășurat un front de lucru de cca 40-50cm, ce avansează pe direcție, cărbunele extras cu excavatoare fiind deversat continuu pe o bandă de transport înclinată și comună pentru toate treptele din care se extrage cărbunele.It is known a process for the exploitation of coal in the quarry, which consists in the simultaneous exploitation of the layers by including them in two to three operating stages, during which a working front of about 40-50 cm is developed, which advances in the direction, the coal extracted with excavators being continuously spilled on an inclined and common conveyor belt for all the stages from which the coal is extracted.

Toate treptele frontului de lucru avansează concomitent pe direcție și în același sens, iar intercalațiile sterile sunt excavate în urma frontului de cărbune, materialul respectiv fiind depozitat direct în spațiul exploatat.All the steps of the working front are advancing simultaneously in the same direction and in the same direction, and the sterile intercalations are excavated following the coal front, the respective material being deposited directly in the exploited space.

Procedeul pentru deschiderea prin lucrări miniere la zi a zăcămintelor aflate la baza colinelor asigură atacarea versanților colinelor prin pregătirea cu aceleași excavator de mare capacitate, a traseului de vehiculare până în vârful colinei, precum și pregătirea platformelor de vehiculare pentru excavarea propriu-zisă și deschiderea prin exteriorul colinei a straturilor de lignit este caracterizat prin aceea că, la atingerea versantului unei coline, de la baza carierei se execută un traseu realizat pe măsura înaintării sale cu un excavator de mare capacitate, traseu amenajat în lateralul carierei, pe curbe de nivel și plane înclinate și la atingerea unor cote ale unor trepte de exploatare, anterior stabilite, același excavator execută niște platforme de vehiculare până la execuția unei platforme finale, aflată la cea mai înaltă treaptă a colinei, după care se excavează ultimul bloc al colinei și, succesiv, fiecare treaptă de steril inferioară, prin coborârea succesivă a excavatorului de mare capacitate pe platformele de vehiculare executate la urcare, până la epuizarea volumelor acestora, după care se realizează descoperirea straturilor de lignit, prin procedee de exploatare la zi, în sine cunoscute.The process for opening by mining works the deposits at the base of the hills ensures the attack of the slopes of the hills by preparing with the same high capacity excavator, the vehicle route to the top of the hill, as well as preparing the vehicle platforms for the excavation itself and the opening by the outside of the hill of the lignite layers is characterized by the fact that, on reaching the slope of a hill, from the base of the quarry, a route is executed according to its progression with a large capacity excavator, route arranged along the side of the quarry, on level and flat curves also inclined to reach quotas of some operating stages, previously established, the same excavator executes some platforms of vehicles until the execution of a final platform, located at the highest level of the hill, after which the last block of the hill is excavated and, successively, each lower tailings step, pr in the successive descent of the excavator of high capacity on the platforms of vehicles executed during the ascent, until the exhaustion of their volumes, after which the discovery of the lignite layers is realized, by means of up-to-date exploitation processes, in themselves known.

Prin aplicarea invenției, se obțin următoarele avantaje:By applying the invention, the following advantages are obtained:

- realizarea unor viteze mari de avans și a unor producții mari în același timp cu obținerea unor costuri mici;- achieving high feed rates and high production while achieving low costs;

- reducerea numărului de operații tehnologice de ripare ale transporturilor de front;- reducing the number of technological repairs for front-line transport;

- reducerea complexității echipamentelor de excavare și transport în treptele superioare.- reducing the complexity of excavation and transport equipment in the upper levels.

Se dă, în continuare, un exemplu de realizare în legătură și cu figura care reprezintă o secțiune printr-un zăcământ situat la baza unei coline, cu reprezentarea fazelor procedeului pentru deschiderea zăcămintelor, conform invenției.The following is an example of an embodiment in connection with the figure representing a section through a deposit located at the base of a hill, with the representation of the phases of the process for opening the deposits, according to the invention.

Procedeul pentru deschiderea prin lucrări miniere la zi a zăcămintelor aflate la baza colinelor, conform invenției, constă în săparea la nivelul carierei cu un excavator 1, la nivelul unui strat a de lignit de la baza colinei o treaptă de steril care este împărțită în niște blocuri paralele 2, 3 și 4, care ating în înălțime partea inferioară a unui alt strat b, de lignit, aflat la partea superioară a primului strat a. Cu excavatorul 1, de mare capacitate, se execută un traseu c, în lateralul carierei, pe curbe de nivel și plane înclinate, pe care avansează excavatorul 1 spre niște trepte de steril 6,7, 8 și 9, superioare.The process for opening through daily mining works of the deposits at the base of the hills, according to the invention, consists of excavating at the level of the quarry with an excavator 1, at the level of a layer of lignite from the base of the hill a tailings step which is divided into blocks. parallels 2, 3 and 4, which reach in height the lower part of another layer b, of lignite, located at the top of the first layer a. With the excavator 1, of high capacity, a path c is executed, on the side of the quarry, on level curves and inclined planes, on which the excavator 1 advances towards some sterile steps 6,7, 8 and 9, higher.

Executarea traseului c se face în mai multe faze corespunzătoare caracteristicilor geo-mecanice ale solului și, la atingerea unor cote anterior stabilite, se realizează niște platforme de vehiculare 11, până la crearea unei platforme de vehiculare 12, finală, aflată la cea mai înaltă treaptă a colinei.The execution of the route c is carried out in several phases corresponding to the geo-mechanical characteristics of the soil and, at reaching previously established quotas, it is realized some vehicle platforms 11, until the creation of a final vehicle platform 12, located at the highest level. of the hill.

Pe această ultimă platformă de vehiculare 12, cu excavatorul 1 se excavează un ultim bloc 13, al colinei, asimilat ca volum cu volumul unui con, sterilul fiind depus pe transportorul de mare capacitate al excavatorului 1, după care excavatorul 1 coboară spre platforma de vehiculare 11 inferioară, creată la urcare. Treptele de steril 9,8,7 și 6 se excavează pânăOn this last vehicle platform 12, with the excavator 1 is excavated a last block 13, of the hill, assimilated as volume with the volume of a cone, the tailings being deposited on the high capacity conveyor of the excavator 1, after which the excavator 1 descends to the vehicle platform. 11 lower, created during the climb. The tailings steps 9,8,7 and 6 are dug up

RO 119208 Β1 la epuizarea volumelor lor, fiind asimilate fiecare cu un trunchi de con. Se excavează, în continuare, stratul de lignit b și a cu un alt excavator 5. Fiecare treaptă de steril 6, 7, 8, și 50 9 se excavează împărțind-o în blocuri paralele 2, 3 și 4 și excavând blocurile după metode cunoscute și pe măsură ce sunt eliberate de realizarea traseului c, de către excavatorul 1, vitezele celor două excavatoare 1 și 5 fiind corelate astfel, încât timpul de excavare să fie eficient.EN 119208 Β1 when their volumes are exhausted, each being assimilated with a cone trunk. The lignite layer b and a are then excavated with another excavator 5. Each step of tailings 6, 7, 8, and 50 9 is excavated by dividing it into parallel blocks 2, 3 and 4 and excavating the blocks according to known methods. and as they are released by the completion of route c, by excavator 1, the speeds of the two excavators 1 and 5 are correlated so that the excavation time is efficient.

Claims (1)

RevendicareClaim Procedeu pentru deschiderea prin lucrări miniere la zi a zăcămintelor aflate la baza colinelor, ce constă în exploatarea succesivă a treptelor de steril, în blocuri paralele, utilizând excavatoare de mare capacitate, caracterizat prin aceea că, la tingerea versantului unei 60 coline, de la baza carierei se execută un traseu (c) realizat pe măsura înaintării sale cu un excavator (1) de mare capacitate, traseul (c) fiind amenajat în lateralul carierei, pe curbe de nivel și plane înclinate și, la atingerea unor cote ale unor trepte de exploatare (6, 7, 8, 9), anterior stabilite, același excavator (1) execută niște platforme de vehiculare (11) până la execuția unei platforme finale (12), aflată la cea mai înaltă treaptă a colinei, după care se 65 excavează ultimul bloc al colinei (13) și, succesiv, fiecare treaptă de steril (9, 8, 7, și 6) inferioară, prin coborârea succesivă a excavatorului (1) de mare capacitate pe platformele de vehiculare (11) executate la urcare, până la epuizarea volumelor acestora, după care se realizează decopertarea straturilor de lignit (a și b) prin procedee de exploatare la zi, în sine cunoscute. 70Procedure for the opening by mining works of the deposits located at the base of the hills, which consists in the successive exploitation of the steps of tailings, in parallel blocks, using high capacity excavators, characterized in that, when dyeing the slope of a 60 hills, from the base a career (c) is performed on the course of its career with a excavator (1) of high capacity, the route (c) being arranged on the side of the quarry, on level curves and inclined planes and, on reaching levels of some steps. exploitation (6, 7, 8, 9), previously established, the same excavator (1) executes vehicle platforms (11) until the execution of a final platform (12), located at the highest level of the hill, after which 65 excavates the last block of the hill (13) and, successively, each lower litter (9, 8, 7, and 6), by successively lowering the excavator (1) of high capacity on the vehicle platforms (11). take you to the climb, until the exhaustion of their volumes, after which the lignite layers (a and b) are discovered by means of up-to-date exploitation processes, known in themselves. 70
ROA200201455A 2002-11-13 2002-11-13 Process for opening fields from hill base by open workings RO119208B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
ROA200201455A RO119208B1 (en) 2002-11-13 2002-11-13 Process for opening fields from hill base by open workings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ROA200201455A RO119208B1 (en) 2002-11-13 2002-11-13 Process for opening fields from hill base by open workings

Publications (1)

Publication Number Publication Date
RO119208B1 true RO119208B1 (en) 2004-05-28

Family

ID=32389912

Family Applications (1)

Application Number Title Priority Date Filing Date
ROA200201455A RO119208B1 (en) 2002-11-13 2002-11-13 Process for opening fields from hill base by open workings

Country Status (1)

Country Link
RO (1) RO119208B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988746A (en) * 2017-05-04 2017-07-28 云南华联锌铟股份有限公司 A kind of outdoor mining methods that become more meticulous of slight slope and thin ore body

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988746A (en) * 2017-05-04 2017-07-28 云南华联锌铟股份有限公司 A kind of outdoor mining methods that become more meticulous of slight slope and thin ore body

Similar Documents

Publication Publication Date Title
EA200601055A1 (en) METHOD OF EXPLOSION OF MULTIPLE LAYERS OR MOUNTAIN LEVELS
CN1693662A (en) Improved sublevel caving method without bottom column
CN109236295A (en) A kind of three step stoping methods suitable for Deep Thick large ore deposit
RO119208B1 (en) Process for opening fields from hill base by open workings
Burliga Heterogeneity of folding in Zechstein (Upper Permian) salt formations in the Kłodawa Salt Structure, central Poland
CN102943673A (en) Cutting method combining deep hole cutting and small well cutting
RU2652234C1 (en) Method of open development of inclined deposits with the use of spoil banks
RU2685587C1 (en) Method for open development of steeply-dipping deposits with application of combined temporary non-working sides
Wrobel et al. Petroleum processes in the Palaeozoic and Mesozoic strata between Tarnów and Rzeszów (SE Poland): 2-D modelling approach
RU2246620C2 (en) Method for open extraction of steep-falling deposits with internal dump-forming
SU1083662A1 (en) Method of mining steep-slope ore-bodies
RU2204721C1 (en) Method of opencast mining of mineral beds
RU2309252C1 (en) Method for large chamber cutting in horizontal layers
RU2806860C1 (en) Method of mining ore bodies
SU885556A1 (en) Method of stripping the working levels of a mine pit
RU2757883C1 (en) Method for underground mining of steeply dipping thick ore bodies
RU2167297C2 (en) Method of opencast mining of steeply dipping stretched deposits
RU2425221C1 (en) Unpacking method of temporarily nonworking flank of open-pit mine
RU2242611C1 (en) Method for extraction of kimberlite pipe under elastic shields
RU2279544C1 (en) Steep mineral deposit development method
SU717335A1 (en) Method of stripping mineral fields at open-cast mining
RU2278261C1 (en) Method of combined open-cut and underground steeply pitching deposit development
RU2081319C1 (en) Method for mining inclined ore bodies
Salamon Relationship between morphology and glaciomarginal deposition in the fore land area of the Opava Mountains (S Poland)
SU1102953A1 (en) Method of preparing mine field of steep coal beds