PL9699B1 - A method of making a caisson or well and lowering them into the water and to the bottom. - Google Patents

A method of making a caisson or well and lowering them into the water and to the bottom. Download PDF

Info

Publication number
PL9699B1
PL9699B1 PL9699A PL969928A PL9699B1 PL 9699 B1 PL9699 B1 PL 9699B1 PL 9699 A PL9699 A PL 9699A PL 969928 A PL969928 A PL 969928A PL 9699 B1 PL9699 B1 PL 9699B1
Authority
PL
Poland
Prior art keywords
caisson
well
piles
making
lowering
Prior art date
Application number
PL9699A
Other languages
Polish (pl)
Filing date
Publication date
Application filed filed Critical
Publication of PL9699B1 publication Critical patent/PL9699B1/en

Links

Description

Wynalazek dotyczy sposobu wykona¬ nia kesonu albo studni i opuszczania ich do wody i na dno rzeki, jeziora lub morza i polega na tern, ze strop kesonu (albo scianki poprzeczne studni) podpiera sie na palach, a jego ostrze umieszcza sie na po¬ moscie przymocowanym do tych pali, po- czem wykonywa sie dolna czesc kesonu, o- puszczenie zas kesonu odbywa sie w ten sposób, ze przez stopniowe ucinanie glo¬ wic pali ciezar kesonu (albo studni) prze¬ nosi sie kolejno na pale i na podstawione dzwigniki srubowe, zapomoca których ke¬ son opuszcza sie za kazdym razem na ty¬ le, na ile pozwala skok dzwignika srubo¬ wego.Dotychczas stosowany sposób opu¬ szczania kesonu (albo studni) wymaga wielkich i kosztownych rusztowan, na któ¬ rych zawiesza sie keson (albo studnia) za¬ pomoca kosztownych wieszarów i lancu¬ chów. Sposób ten wymaga znacznych na¬ kladów pienieznych, a oprócz tego prze¬ dluza okres robót.Fig. 1 przedstawia keson w przekroju przez os podluzna, opierajacy sie czescio¬ wo na palach, czesciowo na dzwignikach, fig. 2 — widok kesonu zgóry, fig, 3 — wi¬ dok kesonu w przekroju a—6.Keson (albo studnia) wykonywa i opu¬ szcza sie wedlug wynalazku w nastepuja¬ cy sposób.Najpierw wbija sie pale drewniane pa¬ rami P i p (fig. 1, 2 i 3), Na glowicach pali uklada sie w kierunku podluznej osi keso¬ nu belki B, a na nich ustawia sie dzwigary poprzeczne kesonu (albo studni), ponizej zas zawiesza sie na palach Pip pomost 5,na którym ustawia sie ostrze kesonu (albo studni) 6. Przez polaczenie ostrza 6 z dzwigarami kesonu otrzyma sie szkielet kesonu (albo studni), który wypelnia sie nastepnie betonem albo murem 7.Po wykonaniu dolnej czesci kesonu (al¬ bo studni) usuwa sie pomost 5 z pod o- strza; keson jest podparty wtedy tylko na glowicach pali. P i p, podpierajacych jego strop.Nastepnie ucina sie glowice kazdej pa¬ ry pali p na tyle, aby na nich mozna bylo postawic dzwigniki srubowe 8 z wysunie- temi wrzecionami i podeprzec strop ke¬ sonu.Po podparciu kesonu na dzwignikach 8 ucina sie glowice pali P na tyle, aby rózni¬ ca poziomów glowic 2, 3 pali p i P byla cokolwiek mniejsza, niz skok dzwignika 8, a wówczas wkreca sie wrzeciono dzwigni¬ ka 8 az do jego odciazenia, przyczem ke¬ son oprze sie na glowicach 3 pali P.Po podparciu kesonu na palach P i u- sunieciu dzwigników 8, ucina sie glowice pali p do punktu 4 na wysokosc równa 1—3; na nowych glowicach ustawia sie dzwigniki 8 i podpiera sie niemi strop ke¬ sonu, jak w pierwszym okresie. Dalej po¬ stepuje sie w sposób wyzej opisany. Te czynnosci powtarza sie dotad, dopóki ke¬ son nie opusci sie do poziomu dna.Gdy keson zanurzy sie w wodzie, nale¬ zy na nim postawic sluze i pracowac w sprezonem powietrzu, dzieki czemu zmniej¬ sza sie jednoczesnie obciazenie pali i dzwigników. Praca ta odbywa sie w tych samych warunkach, jak wykop gruntu, a wiec w warunkach normalnych dla robót kesonowych.Wyzej opisany sposób czyni zbytecz- nem wykonanie wielkich i kosztownych rusztowan i zastosowanie specjalnych ko¬ sztownych wieszarów, a tern samem zmniejsza koszt wykonania tych robót i przyspiesza to wykonanie.* PL PLThe invention relates to a method of making a caisson or well and lowering them into the water and to the bottom of a river, lake or sea, and consists in the fact that the caisson roof (or the transverse walls of the well) is supported on piles and its blade is placed on the bridge attached to these piles, then the lower part of the caisson is made, and the lowering of the caisson is done in such a way that by gradual cutting of the heads of the piles the weight of the caisson (or well) is transferred successively to the piles and the jacks provided The method of lowering the caisson (or well) used so far requires large and costly scaffolding on which the caisson is suspended (or well) by means of expensive hangers and chains. This method requires considerable cash outlays and, in addition, extends the period of work. 1 shows the caisson in section through the longitudinal axis, resting partially on piles, partially on jacks, FIG. 2 - top view of the caisson, FIG. 3 - view of the caisson in section a-6. The caisson (or well) is made and according to the invention, it is lowered as follows: first, the wooden piles are driven into the P and p pairs (Figs. 1, 2 and 3), the pile heads are placed in the direction of the longitudinal axis of the beam B, and on them the transverse girders of the caisson (or well) are set, and below the platform 5 is suspended on the Pipes, on which the blade of the caisson (or well) is placed 6. By joining the blade 6 with the caisson girders, the caisson (or well) skeleton is obtained, which then concrete or masonry 7. After the bottom part of the caisson (or the well) has been made, the platform 5 is removed from the slab; the caisson is then only supported on the pile heads. P and p, supporting its ceiling. Then the heads of each pair of piling are cut off to the extent that it is possible to put screw jacks 8 on them with extended spindles and support the ceiling of the keson. After supporting the caisson on the jacks 8, the heads are cut off piles P enough so that the difference in the levels of heads 2, 3 piles pi P is somewhat smaller than the stroke of the jack 8, and then the spindle of the lever 8 is screwed in until it is unloaded, and the head rests on the heads of 3 piles P. After supporting the caisson on piles P and lifting the jacks 8, the heads of piles p are cut to point 4 to a height of 1–3; on the new heads, the jacks 8 are set and the ceiling of the pit is propped against it, as in the first period. The next step is as described above. These activities are repeated until the keel has descended to the bottom level. When the caisson is immersed in the water, put a jack on it and work with compressed air, thanks to which the load on the piles and jacks is reduced at the same time. This work is carried out in the same conditions as the excavation of the ground, i.e. under normal conditions for caisson works. The above-described method makes it superfluous to build large and expensive scaffolding and to use special beam hangers, and the same reduces the cost of carrying out these works. and it speeds up the execution. * PL PL

Claims (1)

1. Zastrzezenia patentowe. 1. Sposób wykonania kesonu (albo studni), znamienny tern, ze strop kesonu (albo scianki poprzeczne studni) opiera sie na glowicach pali (P, p), a jego ostrze (6) umieszcza sie na pomoscie (5), przymoco¬ wanym do tych pali (P, p), przyczem po wykonaniu dolnej czesci kesonu usuwa sie pomost (5) z pod jego ostrza (6). 2. , Sposób opuszczania do wody i na dno kesonu (albo studni), wykonanego w sposób wedlug zastrz. 1, znamienny tern, ze przez stopniowe ucinanie glowic pali fP, p), ciezar kesonu przenosi sie kolejno na pale (P) i na dzwigniki (8), zapomoca których keson (albo studnia) opuszcza sie. Walerjan Marzec.Do opisu patentowego Nr 9699. Druk L. Boguslawskiego, Warszawa. PL PL1. Patent claims. 1. The method of making the caisson (or well), characterized by the fact that the caisson ceiling (or the chamber transverse walls) rests on the pile heads (P, p), and its blade (6) is placed on the platform (5) fixed to these piles (P, p), after making the bottom part of the caisson, remove the platform (5) from under its blades (6). 2. A method of lowering into the water and to the bottom of the caisson (or well), made in accordance with claim 1, characterized by the fact that by the gradual cutting of the heads of the piles fP, p), the weight of the caisson is transferred successively to the piles (P) and the jacks (8), by which the caisson (or well) is lowered. Walerjan Marzec. To the patent description No. 9699. Printed by L. Boguslawski, Warsaw. PL PL
PL9699A 1928-03-08 A method of making a caisson or well and lowering them into the water and to the bottom. PL9699B1 (en)

Publications (1)

Publication Number Publication Date
PL9699B1 true PL9699B1 (en) 1928-12-31

Family

ID=

Similar Documents

Publication Publication Date Title
US2422168A (en) Marine tower and method of placing same
CN110965804B (en) A method for removing the foundation of an offshore wind power jacket
US20110305523A1 (en) Support structure for use in the offshore wind farm industry
US3466878A (en) Rig for work at sea,in lakes,lagoons
US3027633A (en) Method and apparatus for bridge construction
US2586966A (en) Deep water oil well drilling system
NO170735B (en) PROCEDURE FOR THE CONSTRUCTION OF GRAVITATION PLATFORMS AND INSTALLATION OF SUCH ON THE SEA BATTLE BY CRANE
PL9699B1 (en) A method of making a caisson or well and lowering them into the water and to the bottom.
US720998A (en) Marine structure.
US3890794A (en) Method of replacing piling
US2900794A (en) Offshore equipment supports and methods for making same
KR101117927B1 (en) Offshore Structure Construction Method
CN115679831B (en) A trestle construction method using ship-assisted construction
CN111455882A (en) How to dismantle a double-curved arch bridge
NO144361B (en) PROCEDURE AND PLANT FOR EXECUTION OF SLIDE CASTING OF CONCRETE UNDER WATER
US2009461A (en) Method of making marine structures
US2591225A (en) Offshore platform
US2373484A (en) Method of building caisson gates and similar structures
CN209260721U (en) A kind of device for removing foundation pit inner concrete bearing diagonal
US3107495A (en) Method of erecting an offshore structure
US2930200A (en) Portable apparatus for supporting off shore drilling equipment
JPH05132939A (en) Installation method of underwater strut
US3148429A (en) Form for casting concrete wall slab
GB494746A (en) Working process and appertaining apparatus for the erection of houses of reinforced concrete
US1814688A (en) Scaffold