PL199198B1 - Method of mining in low beds - Google Patents

Method of mining in low beds

Info

Publication number
PL199198B1
PL199198B1 PL355774A PL35577402A PL199198B1 PL 199198 B1 PL199198 B1 PL 199198B1 PL 355774 A PL355774 A PL 355774A PL 35577402 A PL35577402 A PL 35577402A PL 199198 B1 PL199198 B1 PL 199198B1
Authority
PL
Poland
Prior art keywords
ore
transport
mining
exploitation
winch
Prior art date
Application number
PL355774A
Other languages
Polish (pl)
Other versions
PL355774A1 (en
Inventor
Wiktor Bladek
Zbigniew Bryja
Zbigniew Nolka
Ireneusz Sniegowski
Stanislaw Szewczyk
Zdzislaw Kozicki
Original Assignee
Wiktor Bladek
Zbigniew Bryja
Zdzislaw Kozicki
Zbigniew Nolka
Ireneusz Sniegowski
Stanislaw Szewczyk
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wiktor Bladek, Zbigniew Bryja, Zdzislaw Kozicki, Zbigniew Nolka, Ireneusz Sniegowski, Stanislaw Szewczyk filed Critical Wiktor Bladek
Priority to PL355774A priority Critical patent/PL199198B1/en
Publication of PL355774A1 publication Critical patent/PL355774A1/en
Publication of PL199198B1 publication Critical patent/PL199198B1/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

Sposób pozwala na prowadzenie eksploatacji złóż o niskich pokładach, zwłaszcza do wybierania złóż rud miedzi. Polega on na tym, że w polu eksploatacyjnym materiałami wybuchowymi drąży się metodą selektywną chodniki transportowe, furtą eksploatacyjną większą od furty złożonej, a z powstałych między chodnikami transportowymi pasów eksploatacyjnych urabia się tylko rudę. Proces urabiania prowadzi się jednocześnie w dwóch przyległych do siebie pasach eksploatacji z trzech przylegających do nich chodników transportowych dwóch zewnętrznych oraz środkowego, z których urobioną rudę zgarnia się do środkowego chodnika, zgarniakiem liniowym rozpiętym między kołowrotem, a rolką zwrotną usytuowanymi w zewnętrznych chodnikach transportowych.This method allows for the mining of low-seam deposits, particularly for copper ore deposits. It involves selectively excavating transport galleries in the mining field using explosives, using a larger extraction gate than the combined gate, and extracting only ore from the strips created between the transport galleries. The mining process is carried out simultaneously in two adjacent extraction lanes, consisting of three adjacent transport galleries: the two outer ones and the central one. The mined ore is then scraped into the central gallery by a linear scraper connected between the winch and the return roller located in the outer transport galleries.

Description

Przedmiotem wynalazku jest sposób prowadzenia eksploatacji złóż o niskich pokładach znajdujący zastosowanie zwłaszcza do wybierania złóż rud miedzi.The subject of the invention is a method of exploiting low-seam deposits, which is used in particular for mining copper ore deposits.

Znany jest sposób eksploatacji złóż o niskich pokładach polegający na tym, że drążone w polu eksploatowanym chodniki transportowe oraz powstałe między nimi pasy eksploatacyjne prowadzi się furtą eksploatacyjną większą od furty złożowej. Proces urabiania jednego zabioru prowadzi się dwufazowo selektywnie, materiałami wybuchowymi. Polega to na tym, że w jednej fazie urabia się i odstawia z przodka rudę w drugiej zaś kamień. Urobioną rudę transportuje się znanym sposobem przy pomocy maszyn ładująco-odstawczych, do szybów wydobywczych, zaś kamień pozostawia się na dole kopalni, korzystnie, kieruje się go do podsadzania wybranej przestrzeni na frontach eksploatacji złoża lub do dosadzania pustek w zrobach. W miarę postępu robót strop w chodnikach transportowych oraz w poszczególnych pasach kotwi się. Dla zapewnienia założonej stabilności stropu w pasach, na całej wysokości wyrobiska, pozostawia się filary szczątkowe. Wadą tego sposobu jest to, że w zrobach pozostaje około 15% złoża jako podparcie stropu, ponadto, dla zapewnienia założonego tempa eksploatacji złoża, stosuje się duże ilości samojezdnych maszyn górniczych, co powoduje nadmierne zanieczyszczenie powietrza oraz znaczne natężenie hałasu.There is a known method of exploitation of deposits with low seams, consisting in the fact that the transport galleries bored in the exploited field and the service belts formed between them are led through an exploitation door that is larger than the deposit door. The mining process of one grab is carried out in two-phase selective manner, using explosives. It consists in the fact that in one phase, ore is cut and put away from the face, and in the other, stone. The extracted ore is transported in a known manner by means of loading and hauling machines to the mining shafts, and the stone is left at the bottom of the mine, preferably it is directed to backfilling a selected space on the mining fronts or to adding voids in the goaf. As the works progress, the floor in the transport sidewalks and in individual lanes is anchored. In order to ensure the assumed stability of the ceiling in strips, residual pillars are left along the entire height of the excavation. The disadvantage of this method is that about 15% of the deposit remains in the goaf as a support for the roof, moreover, to ensure the assumed pace of exploitation of the deposit, large amounts of self-propelled mining machines are used, which causes excessive air pollution and a significant noise level.

Sposób według wynalazku polega na tym, że w polu eksploatacyjnym, materiałami wybuchowymi drąży się chodniki transportowe, furtą eksploatacyjną większą od furty złożowej, korzystnie, metodą selektywną. Gabaryty prowadzonych chodników transportowych uzależnione są od wielkości maszyn używanych w poszczególnych operacjach procesu drążenia tych chodników. Z powstałych między chodnikami transportowymi pasów eksploatacyjnych urabia się tylko rudę. Proces urabiania prowadzi się jednocześnie z dwóch przyległych do siebie pasów eksploatacyjnych, odpowiednio z trzech przylegają cych do nich chodników transportowych: dwóch zewnę trznych oraz ś rodkowego przylegającego do obu pasów. W procesie urabiania wykonuje się kolejno po sobie trzy operacje: w pierwszej wierci się , znanym sposobem, otwory strzałowe, w drugiej ładuje się wywiercone otwory materiałem wybuchowym i odstrzeliwuje rudę, w trzeciej zaś urobioną rudę zgarniana się do środkowego chodnika zgarniakami linowymi, skąd transportuje się ją, znanym sposobem do szybów wydobywczych. Korzystnie, operację zgarniania prowadzi się, za pomocą dwóch zgarniaków linowych, rozpiętych między kołowrotem a rolką zwrotną usytuowanymi w zewnętrznych chodnikach transportowych, a ponadto, korzystnie - kołowrót jednego zgarniaka i rolka zwrotna drugiego zgarniaka osadzone są na samojezdnych maszynach górniczych. Takie rozwiązanie pozwala na szybie i pewne rozpinanie zgarniaków w założonym miejscu. Wybraną przestrzeń likwiduje się znanym sposobem.The method according to the invention consists in the fact that in the mining field, explosives are used to hollow the transport galleries through the exploitation door larger than the reservoir door, preferably by selective method. The dimensions of the transport walkways depend on the size of the machines used in the individual operations of the roadway drilling process. Only ore is mined from the operating belts between the transport pavements. The cutting process is carried out simultaneously from two adjacent operating belts, respectively from three adjacent transport galleries: two external and central one adjacent to both belts. In the mining process, three operations are performed one after another: in the first one, blast holes are drilled in a known way, in the second, the drilled holes are loaded with explosives and the ore is shot off, and in the third, the excavated ore is scraped to the central sidewalk with rope scrapers, from where it is transported. it, the well-known method for mining shafts. Preferably, the scraping operation is carried out by means of two cable scrapers spanned between the winch and the deflection roller located in the external transport paths, and more preferably, the winch of one scraper and the deflection roller of the other scraper are mounted on self-propelled mining machines. This solution allows for quick and safe unfastening of the scrapers in the assumed place. The selected space is liquidated in a known manner.

Sposób według wynalazku umożliwia jednoczesne prowadzenie robót w polu eksploatacyjnym składającym się z trzech par pasów eksploatacyjnych przy czym w jednej parze pasów eksploatacyjnych wierci się znanym sposobem otwory strzałowe, w drugiej ładuje się wywiercone otwory materiałem wybuchowym i odstrzeliwuje urobek, a w trzeciej parze pasów eksploatacyjnych urobioną rudę zgarnia się do środkowego chodnika transportowego, skąd kieruje się ją do szybów wydobywczych. Zaletą, sposobu według wynalazku, jest to, że wybiera się tylko złoże, możliwe jest wyeliminowanie kotwienia stropu na całej długości pasów eksploatacyjnych, wybiera się około 99% całego złoża - nie ma konieczności pozostawienia około 15% złoża jako podparcie stropu w czasie eksploatacji, uzyskuje się lepsze, w porównaniu do znanego sposobu podparcie stropu po kontrolowanym zawale, zmniejszenie ilości maszyn ciężkich pracujących w oddziale co korzystnie wpływa na czystość powietrza i poziom hałasu. Istnieje również możliwość jednoczesnego otwarcia kilku pól eksploatacyjnych, co zapewnia lepszą organizację pracy.The method according to the invention makes it possible to simultaneously carry out works in an exploitation field consisting of three pairs of service belts, where in one pair of operating belts blast holes are drilled in the known method, in the other, the drilled holes are loaded with explosives and the excavated material is shot off, and in the third pair of operating belts - the mined ore it is scraped up to the central transport sidewalk, from where it is directed to the mining shafts. The advantage of the method according to the invention is that only the bed is selected, it is possible to eliminate the anchoring of the roof along the entire length of the service strips, about 99% of the entire bed is selected - there is no need to leave about 15% of the bed as a support for the ceiling during operation, it is obtained better, compared to the known method, support of the roof after a controlled collapse, reduction of the number of heavy machines working in the department, which has a positive effect on air cleanliness and noise level. It is also possible to open several production fields at the same time, which ensures better organization of work.

Przedmiot wynalazku wyjaśniony jest na rysunku, na którym fig. 1 przedstawia fragment pola eksploatacyjnego w którym jednocześnie prowadzi się proces w trzech parach pasów eksploatacyjnych, fig. 2 przedstawia jedną parę pasów eksploatacyjnych w fazie zgarniana urobionej rudy do środkowego chodnika transportowego, fig. 3 przedstawia przekrój A-A fig. 2, fig. 4 przedstawia przekrój B-B fig. 2.The subject of the invention is explained in the drawing, in which Fig. 1 shows a fragment of the mining field in which the process is carried out simultaneously in three pairs of operating belts, Fig. 2 shows one pair of operating belts in the phase of scraped off the ore to the central transport corridor, Fig. 3 shows section AA of fig. 2, fig. 4 is section BB of fig. 2.

Na rysunku pokazane jest pole eksploatacyjne 1, które tworzą chodniki transportowe 2-8 oraz położone między nimi odpowiednio: para pasów eksploatacyjnych 9 w której prowadzi się ładowanie materiału wybuchowego i strzelanie, para pasów eksploatacyjnych 10, w której prowadzi się wiercenie otworów strzałowych i para pasów eksploatacyjnych 11, w której prowadzi się zgarnianie urobku. W chodnikach transportowych 5 i 6 pokazane są samojezdne wozy wiertnicze w fazie wiercenia otworów strzałowych, w chodnikach transportowych 2 i 4 pokazane są samojezdne wozy transportowe na których osadzone są kołowroty 12 i rolki zwrotne 13, a między nimi rozpięte są liny 14 do którychThe figure shows the exploitation field 1, which forms the transport roads 2-8 and, respectively, located between them: a pair of service belts 9 for loading explosives and firing, a pair of service belts 10 for drilling blast holes and a pair of belts. exploitation 11, in which the spoil is scraped. The roadways 5 and 6 show self-propelled drill trucks in the blast hole drilling phase, while the roadways 2 and 4 show self-propelled transport trucks on which winches 12 and return rollers 13 are mounted, and ropes 14 are stretched between them to which

PL 199 198 B1 przymocowane są zgarniaki 15. W chodniku transportowym 3 pokazana jest ładowarka kopalniana w fazie odstawy rudy. Na fig. 3 pokazany jest fragment pasów 11 w koń cowej fazie zgarniania urobku, stropy chodników 2, 3, 4 zakotwione są kotwiami 16, natomiast strop 17 w obszarze między chodnikami transportowymi nie wymaga zabezpieczenia.Attached are the scrapers 15. In the transport sidewalk 3, the mine loader is shown in the ore delivery phase. Fig. 3 shows a fragment of the strips 11 in the final phase of scraping the spoil, the ceilings of the sidewalks 2, 3, 4 are anchored with anchors 16, while the ceiling 17 in the area between the transport sidewalks does not require protection.

Claims (2)

1. Sposób prowadzenia eksploatacji złóż o niskich pokładach polegający na tym, że w polu eksploatacyjnym materiałami wybuchowymi drąży się chodniki transportowe, furtą eksploatacyjną większą od furty złożowej, korzystnie, metodą selektywną, znamienny tym, że z powstałych między chodnikami transportowymi pasów eksploatacyjnych urabia się tylko rudę, przy czym proces urabiania prowadzi się jednocześnie w dwóch przyległych do siebie pasach eksploatacyjnych z trzech przylegających do nich chodników transportowych, dwóch zewnętrznych oraz środkowego, z których kolejno wierci się znanym sposobem otwory strzałowe, następnie ładuje się wywiercone otwory materiałem wybuchowym i odstrzeliwuje rudę, po czym urobioną rudę zgarniana się, korzystnie, do środkowego chodnika, co najmniej jednym zgarniakiem linowym rozpiętym między kołowrotem, a rolką zwrotną usytuowanymi w zewnętrznych chodnikach transportowych.1. The method of exploitation of deposits with low seams consisting in the fact that in the exploitation field, explosives are used to drill into transport galleries, an exploitation door larger than the deposit door, preferably by a selective method, characterized by the fact that only exploitation belts formed between the transport paths are cut ore, the mining process is carried out simultaneously in two adjacent operating belts from three adjacent transport galleries, two external and central ones, from which blast holes are drilled in a known manner, then the drilled holes are loaded with explosives and the ore is shot, the mined ore is then scraped preferably to a central sidewalk with at least one rope scraper extending between the winch and a deflection roller located in the outer shipping walkways. 2. Sposób według zastrz. 1, znamienny tym, że zgarnianie rudy prowadzi się, dwoma zgarniakami linowymi, rozpiętymi między kołowrotem, a rolką zwrotną usytuowanymi w zewnętrznych chodnikach transportowych przy czym, korzystnie, kołowrót jednego zgarniaka i rolka zwrotna drugiego zgarniaka osadzone są na samojezdnych maszynach górniczych.2. The method according to p. The method of claim 1, wherein the scraping of the ore is carried out with two cable scrapers spanned between the winch and a deflection roller located in external transport pathways, preferably the one scraper winch and the second scraper deflection roller are mounted on self-propelled mining machines.
PL355774A 2002-08-29 2002-08-29 Method of mining in low beds PL199198B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL355774A PL199198B1 (en) 2002-08-29 2002-08-29 Method of mining in low beds

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL355774A PL199198B1 (en) 2002-08-29 2002-08-29 Method of mining in low beds

Publications (2)

Publication Number Publication Date
PL355774A1 PL355774A1 (en) 2004-03-08
PL199198B1 true PL199198B1 (en) 2008-08-29

Family

ID=32089961

Family Applications (1)

Application Number Title Priority Date Filing Date
PL355774A PL199198B1 (en) 2002-08-29 2002-08-29 Method of mining in low beds

Country Status (1)

Country Link
PL (1) PL199198B1 (en)

Also Published As

Publication number Publication date
PL355774A1 (en) 2004-03-08

Similar Documents

Publication Publication Date Title
CN103742176B (en) A kind of pick anchor one unit
RU2099524C1 (en) Combined method of mining of formation of steeply dipping coal seams
PL199198B1 (en) Method of mining in low beds
RU2425220C1 (en) Method for formation of steeply inclined transport access track
UA63927C2 (en) R.b. yuns method for combined deposit development
RU2208161C1 (en) Method of mining of steep coal seam
RU2103507C1 (en) Method and cutter-loader machine for development of seam deposits of minerals
RU2471990C1 (en) Method to mine sloping and inclined coal beds of average capacity
RU2295037C1 (en) Method for extracting thick inclined coal formation by column-chambers
PL200001B1 (en) Method for shortwall working of low thickness beds
SU1446307A1 (en) Method of creating artificial roof in mining coal seams in horizontal layers in descending order
UA32583U (en) Method for development of steep shallow ore deposits in contour zone of pits
SU1361328A1 (en) Method of excavating mineral beds
Młynarczyk et al. The evolution of mechanized excavating systems in LGOM mines conditions
RU2343284C2 (en) Method of bedded deposit development
RU2627803C1 (en) Method for chamber mining when preparing horizons
PL229748B1 (en) Method of exploitation of coal seams with allowing coal from over the excavation
PL152464B1 (en) The method of guidance of wall heading in conditions of great deformations of a rock mass
PL185456B1 (en) Method of getting coal in mines characterised by difficult geological conditions
RU2398965C1 (en) Method for preparation of bedded deposits to reverse order of mining when immediate roof rock is unstable
PL186861B1 (en) Method of mining residues from a bed of useful mineral, in particular hard coal one
PL199120B1 (en) Method of mining of compact beds
PL200556B1 (en) Method for open-end mining of low-depth covers
SU898067A1 (en) Method of working thick coal beds
PL199089B1 (en) Method of mining of low seam thickness deposits