PL149218B1 - Method of filling mined-out longwall workings and filling stopping therefor - Google Patents

Method of filling mined-out longwall workings and filling stopping therefor

Info

Publication number
PL149218B1
PL149218B1 PL1986258791A PL25879186A PL149218B1 PL 149218 B1 PL149218 B1 PL 149218B1 PL 1986258791 A PL1986258791 A PL 1986258791A PL 25879186 A PL25879186 A PL 25879186A PL 149218 B1 PL149218 B1 PL 149218B1
Authority
PL
Poland
Prior art keywords
dam
filling
casing
longwall
containers
Prior art date
Application number
PL1986258791A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL1986258791A priority Critical patent/PL149218B1/en
Priority to DE19873710839 priority patent/DE3710839A1/en
Priority to SU874202246A priority patent/SU1678216A3/en
Priority to CN87103428A priority patent/CN87103428A/en
Priority to GB8707846A priority patent/GB2188661B/en
Publication of PL149218B1 publication Critical patent/PL149218B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/02Supporting means, e.g. shuttering, for filling-up materials
    • E21F15/04Stowing mats; Goaf wire netting; Partition walls
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/04Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
    • E21D23/0481Supports specially adapted for use in combination with the placing of filling-up materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)
  • Packages (AREA)

Description

POLSKA RZECZPOSPOLITA LUDOWA POLAND REPUBLIC FOLK OPIS PATENTOWY PATENT DESCRIPTION 149 218 149 218 —p —P m m Patent dodatkowy do patentu nr--- Zgłoszom: 86 04 03 (P. 258791) Additional patent to patent no --- Notifications: 86 04 03 (P. 258791) 1czytelnia| 1 u· ?du Patentowego 11cz yt e ln ia | 1 of the Patent Office 1 Pierwszeństwo - Priority - URZĄD PATENTOWY OFFICE PATENT Zgłoszenie ogłoszono: 88 01 21 Application announced: 88 01 21 Int. Cl.4 E21F 15/00 E21F 11/04 E21D 23/00Int. Cl. 4 E21F 15/00 E21F 11/04 E21D 23/00 PRL PRL Opis patentowy opublikowano: 90 04 30 Patent description published: 90 04 30

Twórcy wynalazku: Jan Strojny, Woźniak, Aitoni Kandzia,Creators of the invention: Jan Strojny, Woźniak, Aitoni Kandzia,

Norbert Kostorz, Zbigniew Jaglarz, Robert RoszczykNorbert Kostorz, Zbigniew Jaglarz, Robert Roszczyk

Uprawiiony z patentu: Przedsiębiorstwo Eksploatacji Węgla Zachód Kopalnia Węgla Kamiennego Nowy Wirek,Covered under the patent: Przedsiębiorstwo Eksploatacji Węgla West Coal Mine Nowy Wirek,

Ruda śląska' (Polska)Ruda śląska '(Poland)

SPOSÓB PODSADZANIA WYROBISK ŚCIANOWYCH ORAZ TAMA DO PODSADZANIA WYYOBISK ŚCIANOWYCHMETHOD OF BLOWING WALL PLOTS AND A DAM FOR BLOWING WALL PLACES

Przedmiotem wynalazku jest sposób podsadzania wyrobisk ścianowych wyposażonych w obudowę zmechanizowaną typu osłonowego lub innego oraz tama podsadzkowa do stosowania tego sposobu. Podczas wybierania grubych pokładów węgla podzimmiym sysemmem ścianwwym oraz pokładów węgla zalegających pod chronionymi obiektami zlokalintwanymi na powierzchni powszechnie w kopalniach głębińnowych stosowana jest podsadzka hydrauliczna do wypeeniania wybranych przestrzeni. W zależności od rodzaju stosowanej w w^yrobiskach ścianowych obudowy sposób wyppłniania wybranych przestrzeni może być różny. Nie mnej jednak wspólną cechą tych sposobów jest: odgradzanie podsadzanej przestrzeni od przestrzeni roboczej ściany przegrodą zwaną tamą podsadzkową oraz wypeeniaaie tak ^grodzonej przestrzeni podsadzką hydrauliczną, to jest mieszaniną wody z piaskiem.The subject of the invention is a method of backfilling longwall workings equipped with a mechanized support of the shield type or other type, and a backfilling dam for using this method. When extracting thick coal seams under the cold longwall system and coal seams lying under protected objects on the surface, hydraulic filling is commonly used in deep mines to fill selected spaces. Depending on the type of the casing used in longwall workings, the method of filling the selected spaces may vary. However, the common feature of these methods is: separating the backfilled space from the working space of the wall with a partition called a backfilling dam and filling the fenced space with a hydraulic backfill, i.e. a mixture of water and sand.

Z opisu patentu PRL nr 75 572 znany jest sposób wybierania grubych pokładów węgla warstwami z góry ku dołowi z zasiewaniem sztucznego stropu dla warstw niżej położonych.From the PRL patent description No. 75,572 a method of selecting thick coal seams in layers from top to bottom with sowing an artificial roof for the lower layers is known.

W tym celu jednocześnie z urabianiem calizny węglowej na spodku wyrobiska ścianowego układa się belki tak, aby tworzyły one z frontem ściany kąt od 30 do 60°, po czym na tych belkach umieszcza się siatkę pasami równoległymi do frontu ściany i rabuje się obudowę lub wybraną przestrzeń podsadza podsadzką hydrauliczną sukcesywnie wraz z postępem frontu ściany. Natommast z opisu patentu PRL nr 64 632 znany jest sposób wybieΓania dwóch warstw pokładu grubego jednocześnie. Sposób ten polega na tym, że czołowe tamy podsadzkowe obu wyrobisk ścianowych łączy się ze sobą elastyczną przeponą, zbrojoną podłużnymi elementami·. Przeponę tę jednym końcem łączy się do dolnej części tamy czołowej i do zestwwów obudowy zmechanizowanej górnej ściany, a drugim końcem z górną częścią tamy czołowej dolnej ściany. W czasie przesuwania obudowy dolnej ściany tworzy się fałd przepony, a przy przesuwaniu obudowy górnej ściany przepona ta przemieszcza się po stropnicach obudowy ściany dolnej.For this purpose, beams are placed on the bottom of the longwall excavation simultaneously with the mining of solid coal, so that they form an angle of 30 to 60 ° with the front of the wall, then a mesh is placed on these beams with stripes parallel to the front of the wall and the casing or a selected space is robbed. he fills with a hydraulic filling successively as the front of the wall progresses. Natommast, from the PRL patent description No. 64 632, a method of selecting two layers of a thick seam at the same time is known. This method consists in the fact that the front loading dams of both longwall workings are connected with each other with a flexible diaphragm, reinforced with longitudinal elements. This diaphragm is connected with one end to the lower part of the head dam and to the motorized support of the upper wall, and the other end to the upper part of the front dam of the lower wall. When the housing of the lower wall is moved, the diaphragm fold is formed, and when the housing of the upper wall is moved, the diaphragm moves along the canopies of the lower wall housing.

149 218149 218

149 218149 218

Z opisu patentu PRL nr 60 804 znana jest czołowa tama podsadzkowa przemieszczana wraz z postępem ściany. Tama ta składa się z oddzielnych elementów połączonych cięgnami z przenośnikiem zgrzeboowjm. Poza tym tama ta ma płozy, na których są zamocowane przegubowo zastrzały i spodniki połączone ze sobą belką zaopatrzoną w hydrauliczny podnośnik. Drugi koniec tego podnośnika_ jest połączony z górną belką łączącą wysuwniki osadzone przesuwnie w spodnikach. Ponadto tama ta ma dwie przepony, z których górna jednym końcem jest zamocowana w głowicy umieszczonej na wys^w^kach, a drugim na poprzeczce w ten sposób, że część tej przepony zwisa poniżej dolnego jej punktu zamocowwłιia. Natommast przepona dolna, oparta na pasach, jednym końcem zamocowana jest na poprzeczce, a drugim do klinowych płóz. Tama ta ma zbyt skomplikowaną konstrukcję i dlatego nie znalazła szerszego zastosowania w przemyśle wydobywczym.From the patent description of the Polish People's Republic No. 60 804 there is known a front filling dam that is moved along with the wall advances. The dam consists of separate elements connected by means of a belt conveyor. In addition, the dam has skids on which the struts and floor slabs are articulated and connected to each other by a beam equipped with a hydraulic jack. The other end of the jack is connected to the upper beam connecting the sliders slidably mounted in the pods. Moreover, the dam has two diaphragms, the upper one of which is fixed to the head located at the heights and the other to the crossbar in such a way that part of the diaphragm hangs below its lower attachment point. Natommast, the lower diaphragm, based on the straps, is fixed with one end to the crossbar and the other to the wedge skids. The structure of this dam is too complicated and therefore it has not been widely used in the mining industry.

Istota sposobu podsadzania wyrobisk ścianowych 'według wynalazku polega na tym, że po każdym kolennym zabiorze wraz z przesuwaniem każdego zestawu obudowy zmechanizowanej na spągu likwidowanej przestrzeni układa się pas tkaniny filtrującej usytuowany prostopadle do linii frontu ściany. Pas tej tkaniny stanowi przy tym jedną całość z przegrodą filtrującą czołowej tamy podsadzkowej. Następnie, po przesunięciu wszystkich zestwwów obudowy na nowe miejsce pracy, łączy się ze sobą wszystkie pasy tej tkaniny na całej długości i wysokości wyrobiska ścianowego tak, aby stanowiły one jednolitą przegrodę zabezpieczającą przestrzeń roboczą ściany przed przenikaniem do niej podsadzki hydraulicznej. Taki sposób podsadzania wyrobisk ścianowych upraszcza bardzo znacznie technologię podsadzania, a przy tym daje duże oszczędności zarówno w materitłach jak i w robociźnie.The essence of the method of backfilling longwall workings according to the invention consists in the fact that after each consecutive harvest, along with the movement of each set of powered supports, a strip of filtering fabric is placed on the floor of the liquidated space, perpendicular to the line of the wall front. The strip of this fabric is integral with the filtering partition of the leading backfilling dam. Then, after all the casing assemblies have been moved to the new workplace, all the strips of this fabric are connected together along the entire length and height of the longwall working so that they constitute a uniform partition protecting the working space of the wall against the penetration of the hydraulic prop. This method of backfilling the longwall workings greatly simplifies the technology of backfilling, and at the same time gives great savings in both materials and labor.

Przedmiotem wymalazku jest również tama cz owa do podsadzania wyrobisk ścianowych. Istota tej tamy polega na zastosowaniu ażurowej konstrukcji nośnej w postaci siatki kwadratów o oczkach od 0,5 do 1,0 m, wfkonanej korzystnie z łańcuchów lub z kształOownikóo stalowych o odpowwedniej wytrzymałości na zginanie. KonitrukcUa nośna tamy zamocowana jest jednym końcem do stropnic obudowy, a drugim do spągnic. Poza tym w skład tej tamy wchodzą również pojemniki tkaniny filtrującej zamocowane nieruchomo na ramionach stropnic tylnych oraz rolki kierujące zamocowane na tych stropnicach. Od strony likwidowanej przestrzeni każdy pojemnik tkaniny filtrującej jest zabezpieczony osłoną, która jednocześnie stanowi prowadnicę dla tkaniny filtrującej schodzącej z rolki kierującej. Taka konstrukcja tamy pozwala zmechanizować całkowicie najbardziej pracochłonną czynność jaką jest budowa tamy czołowej. Dzięki zastosowaniu pojemników tkaniny filtrującej rozwijanej samoczynnie wraz z postępem ściany wybitnie zmnnejszono czas potrzebny na przygotowanie ściany do podsadzania. Natomiast przez zastosowanie pasów podłużnych tkaniny filtrującej układanej na spągu wyeliminowano całkowicie przenikanie podsadzki do przestrzeni roboczej ściany.The subject of the invention is also a dam for backfilling longwall workings. The essence of this dam consists in the use of an openwork load-bearing structure in the form of a grid of squares with a mesh of 0.5 to 1.0 m, preferably made of chains or steel shapes with appropriate bending strength. The load-bearing structure of the dam is fixed with one end to the roof canopy, and the other to the floor rails. In addition, this dam also includes filter fabric containers fixed on the arms of the rear canopy and guide rollers mounted on these canopies. From the side of the liquidated space, each container of the filtering fabric is protected with a cover, which is also a guide for the filtering fabric coming off the guide roller. Such a dam structure allows to mechanize the most laborious activity, which is the construction of the front dam. Thanks to the use of filter cloth containers that are rolled out automatically as the wall advances, the time needed to prepare the wall for back-up has been significantly reduced. On the other hand, by using longitudinal belts of the filtering fabric placed on the floor, the penetration of the filling into the working space of the wall was completely eliminated.

Przedmot wTyialazku jest uwidoczniony w przykaddowym wykoneniu na rysunku, na którym fig· 1 przedstawia czołową tamę podsadź kową w widoku z boku, a fig. 2 - fragment tej tamy w widoku z boku. Jak uwidoczniono na rysunku tama czołowa do podsadzania wyrobisk ścianowych według wyyialazku składa się z ażurowej konstrukcji nośnej 1 wykonanej w postaci siatki kwadratów o oczkach od 0,5 do 1,0 m korzystnie z zużytych łańcuchów przenośników zgrzebłowych lub z kształOownikóo staOowyuC o odpowwedniej wytrzymałości na zginanie. KonitΓukcUa ta jest zamocowana rozłącznie: u góry do stropnic 2, a u dołu do spągnic 5 obudowy zmeehanizowanej.The object of the tub is shown in the exemplary embodiment in the drawing, in which Fig. 1 shows the front loading dam in a side view, and Fig. 2 shows a fragment of this dam in a side view. As shown in the figure, the head dam for backfilling longwall workings according to the invention consists of an openwork supporting structure 1 made in the form of a grid of squares with a mesh of 0.5 to 1.0 m, preferably of worn scraper conveyor chains or of a steel profile with a suitable bending strength. . This end piece is detachably attached: at the top to the canopy 2, and at the bottom to the runner 5 of the modified casing.

W skład tamy wchodzą również pojemniki 4 tkaniny filtrującej 5 zamocowane nieruchomo na ramionach 6 stropnic tylnych 2 każdego zestawu obudowy zmechanizowanej. Szerokość każdego takiego pojemnika odpowiada 0,5 szerokości tkaniny filtrująceU 5· Poza tym nad każdym pojemnikiem 4 na stropnicy tylnej 2 jest zamocowana nieruchomo rolka kierująca 7 oraz osłona 8 zabezpieczająca pojemnik od strony likwidowanej przestrzeni. Osłony te stanowią jednocześnie prowadnicę dla tkaniny filtrującej 5 schodzącej z rolek kierujących 7.The dam also includes containers 4 of filtering cloth 5 fixed fixedly on the arms 6 of the rear canopy 2 of each set of powered support. The width of each such container corresponds to 0.5 of the width of the filter cloth 5. Moreover, above each container 4 on the rear canopy 2, a guide roller 7 and a cover 8 protecting the container from the side of the liquidated space are fixed. At the same time, these covers act as a guide for the filter cloth 5 coming off the guide rollers 7.

Podsadzanie wyrobisk ścianowych zgodnie z wynalazkiem odbywa się w następujący sposób. Po wdaniu kolejnego zabioru calizny węglowej poszczególne zestawy obudowy zmechanizowanej przemieszcza się na nowe miejsce pracy. Wraz z tymi zestawami przemieszcza się zamocowaną na stałe do nich konstrukcję nośną 1 tamy podsadzkowej. W czasie tego przemieszczaniaThe backfilling of the longwall workings according to the invention takes place as follows. After the next collection of coal has been taken, individual sets of mechanized support are moved to a new workplace. Together with these sets, the supporting structure 1 of the backfilling dam fixed to them is moved. During this shipment

149 218 rozwija się samoczynnie pas tkaniny filtrującej 5 umieszczony w pojemniku 4 zamocowanym na tym zestawie obudowy, przy czym tkanina podsadzkowa ułożona na spągu wyrobiska jest przy tym przytrzymywana przez podsadzkę hydrauliczną. Tkanina filtrująca jest nawinięta na pojemnik z zakładką po obydwu stronach po ok. 0,4 m. Po rozwinięciu z pojemnika uzyskuje się przy łączeniu tkaniny zakładkę o szerokości 0,1 < 0,3 m. Po przesunięciu wszystkich zestawów obudowy na nowe miejsce pracy poszczególne pasy tkaniny filtrującej 5 łączy się ze sobą w liniach pionowych tak, aby stanowiły onę jednolitą przegrodę zabezpieczającą przestrzeń roboczą ściany przed przenikaniem do niej podsadzki hydraulicznej. Podsadzanie wybranej przestrzeni można wykonywać po każdym kolejnym zabiorze lub po wykonaniu kilku zabiorów i przesunięciu obudowy zmechanizowanej na określoną odległość. Po podsadzeniu likwidowanej przestrzeni i urobieniu kolejnego zabioru cykl opisanych wyżej czynności rozpoczyna się od nowa.149 218, the filter fabric strip 5 placed in the container 4 attached to the casing assembly is self-unwinding, the backing fabric on the bottom of the excavation being held by the hydraulic support. The filter cloth is wound on the container with an overlap on both sides for approx. 0.4 m. After unrolling from the container, an overlap of 0.1 <0.3 m wide is obtained when joining the fabric. The strips of filtering fabric 5 are joined together in vertical lines so as to constitute a uniform partition protecting the working space of the wall against the penetration of the hydraulic proppant. Filling up the selected space can be performed after each consecutive harvest or after a few steps and moving the powered support for a specific distance. After replenishing the liquidated space and creating another collection, the cycle of activities described above begins anew.

Sposób według wynalazku nadaje się do wybierania grubych pokładów węgla zarówno na warstwy jak i na całą grubość, zwłaszcza wszędzie tam gdzie konieczne jest stosowanie podsadzki hydraulicznej przy jednoczesnym zagwarantowaniu dużej podporności obudowy zmechanizowane j ·The method according to the invention is suitable for selecting thick coal seams both in layers and in the entire thickness, especially wherever it is necessary to use a hydraulic proppant while ensuring high support capacity of the powered roof support.

Claims (3)

Zastrzeżenia patentowePatent claims 1· Sposób podsadzania wyrobisk ścianowych wyposażonych w obudowę zmechanizowaną typu osłonowego lub innego oraz w czołową tamę podsadzkową przemieszczającą się wraz z tą obudową, znamienny tym, że po każdym kolejnym zabiorze wraz z przemieszczaniem każdego zestawu obudowy jednocześnie na spągu wybranej przestrzeni układa się pas tkaniny filtrującej stanowiącej jedną całość z przegrodą filtrującą czołowej tamy podsadzkowej i po przesunięciu wszystkich zestawów obudowy na nowe miejsce pracy łączy się ze sobą wszystkie pasy tej tkaniny na całej długości i szerokości wyrobiska ścianowego tak, aby stanowiły one jednolitą przegrodę zabezpieczającą przestrzeń roboczą ściany przed przenikaniem do niej podsadzki hydraulicznej.1 The method of supporting longwall workings equipped with a mechanized casing of a shielding or other type, and with a front loading dam moving along with this casing, characterized in that after each subsequent harvest, along with the movement of each set of the casing simultaneously, a strip of filtering fabric is placed on the floor of the selected space one piece with the filtering partition of the front filling dam and after moving all the casing sets to the new workplace, all the strips of this fabric are joined together along the entire length and width of the longwall working so that they constitute a uniform partition protecting the working space of the wall against penetration of the filling into it hydraulic. 2. Tama do podsadzania wyrobisk ścianowych wyposażonych w obudowę zmechanizowaną typu osłonowego lub innego, znamienna tym, że ma ażurową konstrukcję nośną (1) w postaci siatki kwadratów o oczkach od 0,5 do 1,0 m, wykonanej korzystnie z łańcuchów, zamocowaną jednym końcem do stropnic tylnych (2) obudowy, a drugim do spągnic (3) oraz ma pojemniki (4) tkaniny filtrującej (5) zamocowane nieruchomo na ramionach (6) każdej stropnicy tylnej (2) i rolki kierujące (7) zamocowane na tych stropnicach nad pojemnikami (4), które to pojemniki od strony likwidowanej przestrzeni są zabezpieczone osłonami (8) stanowiącymi jednocześnie prowadnice dla pasów tkaniny filtrującej (5) schodzących z rolek kierujących (7).2. The dam for supporting longwall workings equipped with a mechanized support of the shielding or other type, characterized in that it has an openwork supporting structure (1) in the form of a grid of squares with mesh from 0.5 to 1.0 m, preferably made of chains, fixed with one the end to the rear canopies (2) of the casing, and the other to the floor canopies (3), and has filter cloth containers (4) (5) fixed on the arms (6) of each rear canopy (2) and guide rollers (7) fixed on these canopies above the containers (4), which containers from the side of the liquidated space are protected with shields (8) which also act as guides for the filter cloth belts (5) coming off the guide rollers (7). 3. Tama według zastrz. 2, znamienna tym, że ażurowa konstrukcja nośna (1) w postaci siatki kwadratów o oczkach od 0,5 do 1,0 m jest wykonana z kształtowników3. The dam according to claim 2, characterized in that the openwork supporting structure (1) in the form of a grid of squares with a mesh of 0.5 to 1.0 m is made of sections 149 213149 213 Pracownia Poligraficzna UP RP. Nakład 100 egz. Cena 1500 złPrinting House of the Polish Patent Office. Circulation 100 copies. Price 1500 PLN
PL1986258791A 1986-04-03 1986-04-03 Method of filling mined-out longwall workings and filling stopping therefor PL149218B1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
PL1986258791A PL149218B1 (en) 1986-04-03 1986-04-03 Method of filling mined-out longwall workings and filling stopping therefor
DE19873710839 DE3710839A1 (en) 1986-04-03 1987-04-01 METHOD OF MOVING THE STRAIN SPACES AND DAM FOR THE TRANSFER OF SPREAD SPACES
SU874202246A SU1678216A3 (en) 1986-04-03 1987-04-01 Filling pillar for filling up workings supported with powered roof support
CN87103428A CN87103428A (en) 1986-04-03 1987-04-02 The partition wall of a kind of method of backfill longwall face and backfill longwall face
GB8707846A GB2188661B (en) 1986-04-03 1987-04-02 A method of backfilling longwall workings and a dam for backfilling longwall workings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL1986258791A PL149218B1 (en) 1986-04-03 1986-04-03 Method of filling mined-out longwall workings and filling stopping therefor

Publications (1)

Publication Number Publication Date
PL149218B1 true PL149218B1 (en) 1990-01-31

Family

ID=20030979

Family Applications (1)

Application Number Title Priority Date Filing Date
PL1986258791A PL149218B1 (en) 1986-04-03 1986-04-03 Method of filling mined-out longwall workings and filling stopping therefor

Country Status (5)

Country Link
CN (1) CN87103428A (en)
DE (1) DE3710839A1 (en)
GB (1) GB2188661B (en)
PL (1) PL149218B1 (en)
SU (1) SU1678216A3 (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009103303A1 (en) * 2008-02-19 2009-08-27 Rag Aktiengesellschaft Method for controlling longwall mining operations
CN101265808B (en) * 2008-04-16 2010-04-07 刘兴才 Coal mine conjuncted asynchronous bracket filled block wall
CN102168567A (en) * 2010-02-25 2011-08-31 郑州四维机电设备制造有限公司 Filling supporting partition board bracket
CN101793159A (en) * 2010-03-19 2010-08-04 中国矿业大学 Dam-type filling hydraulic bracket in mined-out region
CN102155259B (en) * 2011-03-08 2014-05-07 北京科技大学 Filling retaining wall constructed by using tunneling waste stones, and construction method of retaining wall
CN103266914B (en) * 2013-06-07 2016-03-23 冀中能源集团有限责任公司 Solid filling coal mining automation control system
CN105065049A (en) * 2015-08-26 2015-11-18 冀中能源股份有限公司邢东矿 Hydraulic support for high-water cut and fill mining
CN105178998A (en) * 2015-09-18 2015-12-23 冀中能源股份有限公司邢东矿 Hydraulic support for waste rock filling
CN105715289B (en) * 2016-04-15 2018-05-08 陕西开拓建筑科技有限公司 Gob side entry retaining face end support
CN106014406B (en) * 2016-07-01 2017-05-10 黑龙江科技大学 Coal mining machine with filling function and coal mining method
CN109372564A (en) * 2018-12-10 2019-02-22 华电郑州机械设计研究院有限公司 A kind of filling coal mining support apparatus
CN112678020B (en) * 2021-01-16 2022-10-11 陕西煤业化工技术研究院有限责任公司 Mine inclined roadway driving safety protection system and arrangement method thereof
CN112627886A (en) * 2021-01-27 2021-04-09 福州大学 Self-adaptive reusable filling retaining wall and construction method thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE807649A (en) * 1972-11-25 1974-03-15 Lubba Artur METHOD AND DEVICES FOR LAYING A PADDING IN PARTICULAR IN SIZES MADE OF WIRES CONNECTED TO ONE TO THE OTHERS IN FLAT SHAPE
DE2442177A1 (en) * 1974-09-03 1976-03-11 Roesler Draht Kg PROCESS AND DEVICE TO PREVENT THE DEVELOPMENT OF DUST, IN PARTICULAR ROCK DUST, FROM THE HANGING AND BREAKAGE DURING THE EXTENSION OF SHIELDS OR TREADS, PRIORLY COAL MINING
GB2104941B (en) * 1981-08-29 1985-01-16 Dowty Mining Equipment Ltd Mineral mining apparatus

Also Published As

Publication number Publication date
GB2188661B (en) 1989-11-22
DE3710839A1 (en) 1987-10-08
GB2188661A (en) 1987-10-07
GB8707846D0 (en) 1987-05-07
SU1678216A3 (en) 1991-09-15
CN87103428A (en) 1987-10-14

Similar Documents

Publication Publication Date Title
PL149218B1 (en) Method of filling mined-out longwall workings and filling stopping therefor
CS209867B2 (en) Walking reinforcement for the heavy seams
CA2998001C (en) Rapid development mobile canopy for underground mining
US4415295A (en) Mineral mining installations
SU1656134A1 (en) Temporary face support
PL93301B1 (en)
SU1070318A1 (en) Power roof support unit
PL149367B1 (en) Self-advancing roof supports unit
SU1086173A1 (en) Power junction support
RU2059827C1 (en) Set for steeply deepen seams
SU1138510A1 (en) Roof support for mounting layer
SU1222846A1 (en) Mechanized set for mining thick steep coal seams
SU95396A1 (en) Shield for the development of thin and medium power steeply dipping coal seams with stripes in the fall
SU1670149A1 (en) Method for overcoming inrush in seam roof
SU757726A1 (en) Method of section-wise erecting of flexible roof
SU1062399A1 (en) Power roof support unit
SU1021788A1 (en) Power roof support unit
PL65116B1 (en)
PL84289B1 (en)
PL169348B1 (en) Self-advancing open-end/shortwall roof supports for protecting a shortwall working in a thick and steeply inclined hard coal bed
PL158723B1 (en) Method of and hydraulic roof support system for rearranging a packing dam
SU976092A1 (en) Fencing shield
PL160659B1 (en) Displaceable segment of a front filling dam
PL118374B2 (en) Suspended mine roof support
PL149535B1 (en) Segmented,repeating filling dam,particularly for high headings