PL147062B1 - Method of protecting roof while withdrawing self-advancing roof supports from mined out longwall heading - Google Patents

Method of protecting roof while withdrawing self-advancing roof supports from mined out longwall heading Download PDF

Info

Publication number
PL147062B1
PL147062B1 PL25294785A PL25294785A PL147062B1 PL 147062 B1 PL147062 B1 PL 147062B1 PL 25294785 A PL25294785 A PL 25294785A PL 25294785 A PL25294785 A PL 25294785A PL 147062 B1 PL147062 B1 PL 147062B1
Authority
PL
Poland
Prior art keywords
roof
ceiling
ropes
casing
protecting
Prior art date
Application number
PL25294785A
Other languages
Polish (pl)
Other versions
PL252947A1 (en
Inventor
Henryk Szymiczek
Adolf Widera
Pawel Cieslik
Franciszek Gaszka
Original Assignee
Rybnicko Jastrzebskie Gwarectw
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rybnicko Jastrzebskie Gwarectw filed Critical Rybnicko Jastrzebskie Gwarectw
Priority to PL25294785A priority Critical patent/PL147062B1/en
Publication of PL252947A1 publication Critical patent/PL252947A1/en
Publication of PL147062B1 publication Critical patent/PL147062B1/en

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Description

Przedmiotem wynalazku jest sposób zabezpieczania stropu przy likwidacji scian z obudowa zmechanizowana, w czasie wyciagania sekcji obudowy do pola transportowego sciany• Stosowane dotychczas sposoby zabezpieczania stropu polegaly na izolowaniu zruszo- nego stropu od przestrzeni, z której wyciagane sa sekcje obudowy. Izolowanie stropu wyko¬ nywano nad stropnicami sekcji obudowy, poprzez mocowanie do lin stalowych siatki podsadz¬ kowej lub ogrodzeniowej. W tym celu na koncowym odcinku wybiegu sciany równoczesnie z prowadzona eksploatacja nad daszki sekcji obudowy zakladalo sie siatke i dociskalo strop¬ nicami do stropu. Nastepnie do Jej zwisajacego boku dopinalo sie drugi rzad siatki na zakladke, równa jej polowie szerokosci i laczylo miekkim drutem. Dalej po przesunieciu obudowy o caly zabiór zawieszalo sie na zakladke trzeci rzad siatki, dbajac o to by jej boczne krawedzie spotykaly sie z krawedziami boków siatki z pierwszego rzedu.Od dolu zawieszana siatke podtrzymywalo sie lina stalowa o srednicy okolo 20 mm.Konce liny mocowalo sie do obudowy chodników przyscianowych przy pomocy kilku zacisków.W ten sposób kazdemu zabiorowi odpowiadalo zawieszenie w opisany sposób kolejnej siatki podtrzymywanej lina ulozona wzdluz sciany w niewielkiej odleglosci od liny poprzedniej.Potem postepujac w taki sam sposób przy dwunastu zabiorach utworzylo sie oslone przyleg¬ la prawie na calej dlugosci do powierzchni obudowy wzdluz calej sciany oraz czesciowo takze za nia na szerokosci jednego metra przytwierdzona skalami zrobowymi do spagu, izo¬ lujaca w stopniu wystarczajacym wzruszony strop. Sposób ten jest jednak nie tylko ucia¬ zliwy i bardzo drogi ze wzgledu na wysoki koszt samej siatki i duza pracochlonnosc przy1 2 147062 | / Jej rozpinaniu i transporcie, ale i malo skuteczny, poniewaz przy przesuwaniu sekcji obu¬ dowy czesto zgarnia sie rozpiete liny w rózne strony i otwiera duza powierzchnie nieoli- nowanego stropu. Dodatkowa uciazliwoscia znanego sposobu Jest koniecznosc' okresowego przebywania przy rozpinaniu sztywnej siatki metalowej bezposrednio pod ociosem w przenos¬ niku zgrzeblowym.W odróznieniu od w/w sposobu, w sposobie wedlug wynalazku liny 41a utrzymania rów¬ nych odstepów miedzy soba laczy sie dystansowymi uchwytami zakladanymi na zakladke w po¬ przecznych rzedach w odleglosciach nie przekraczajacych szerokosci kilku sekcji obudowy, a dla ich usztywnienia dodatkowo uklada sie na nie w nieduzych odleglosciach równolegle do uchwytów rzedy drewnianych okladzin, tworzac konstrukcje sztucznego stropu o równej wytrzymalosci, na który naklada sie tkanine ze sztucznego tworzywa o nieduzej wytrzymalos¬ ci korzystnie wystarczajacej dla zabezpieczenia przed opadami mniejszych kamieni.Zaleta sposobu wedlug wynalazku jest zapewnienie stalego zabezpieczenia stropu przy likwidacji scian i wykorzystanie do tego celu miedzy innymi niedrogiej tkaniny z two¬ rzywa sztucznego.Sposób zabezpieczania stropu przy likwidacji scian z obudowa zmechanizowana jest dokladniej wyjasnione na rysunku, na którym fig, 1 przedstawia pionowy przekrój w poprzek sciany, po zabezpieczeniu stropu nad obudowa, a fig. 2 - poziomy przekrój tej samej scia¬ ny nad sztucznym stropem izolujacym zroszone warstwy stropowe.Na koncowym odcinku wybiegu sciany wzdluz jej calej dlugosci, przed stropnicami zmechanizowanej obudowy 1 rozciaga sie stalowa line 2 o srednicy okolo 20 mm. Jej konce dwukrotnie owija sie wokól podciagów zabudowanych w chodnikach przyscianowych i zabezpie¬ cza trzema zaciskami. Nastepnie rozwija sie podsadzkowa tkanine 3 z tworzywa sztucznego, najlepiej z polipropylenu, o szerokosci 1,35 m i zaklada nad line 2 zawieszona wzdluz sciany, w ten sposób by 0,5 m szarokosci pasa tkaniny 3 przesunelo sie nad lina 2, Dalej przesunietym odcinkiem tkaniny 3 opasowuje sie line 2 i mocuje przy pomocy miekkiego drutu do pozostalej czesci pasa. Dodatkowo tkanine 3 laczy sie wspomnianym juz drutem w nie¬ wielkich odleglosciach do liny 2. Po wykonaniu tych czynnosci przesuwa sie sekcje obudo¬ wy 1 o skok ich przesuwnika stanowiacy dlugosc jednego zabioru, tj. okolo 0,65 m, zwraca¬ jac uwage na to, aby stropnice obudowy 1 przylegaly do tkaniny 3 wraz z lina 2. Potem do pierwszego pasa tkaniny 3 dolacza sie na zakladke równa polowie szerokosci pasa tkanine 3» Drugi pas tkaniny 3 laczy sie z poprzednim miekkim drutem co 0,5 m. Po urobieniu drugiego zabioru rozwija sie i mocuje do podciagów w chodnikach przyscianowych druga line 2 równo¬ legle do pierwszej liny 2 w odleglosci 0,6 m.Nastepnie pomiedzy rozwieszone liny 2 zaklada sie co okolo 10 m specjalne dystan¬ sowe uchwyty 4, które utrzymywac beda równa odleglosc pomiedzy nimi oraz co okolo 2 m uklada sie dodatkowe drewniane okladziny 5 usztywniajace cala konstrukcje. Dalej analo¬ gicznie jak pas drugi uklada sie kolejne pasy tkaniny 3, w których zakladane na zakladke uchwyty 4 utrzymuja równoleglosc rozpietych lin 2 gwarantujaca zachowanie równej wytrzy¬ malosci utworzonego w ten sposób sztucznego stropu, który zakladane na zakladke okladzi¬ ny 5 korzystnie wzmacniaja, zapobiegajac przeciazeniu tkaniny 3 o nieduzej wytrzymalosci wystarczajacej dla zabezpieczenia przed opadami mniejszych kamieni. Ostatni pas tkaniny 3 wraz z podtrzymujaca go lina 2 wykonuje sie tak samo, jak pas pierwszy.Zastrzezenie patentowe Sposób zabezpieczania stropu przy likwidacji scian z obudowa zmechanizowana, w któ¬ rym przed koncem jej wybiegu zakladana jest nad stropnice sekcji obudowy, oslona mocowana do lin stalowych i uzupelniana w miare postepu sciany, znamienny tym, ze147 062 3 liny (2) dla utrzymania równych odstepów miedzy soba laczy sie dystansowymi uchwytami (4) zakladanymi na zakladke w poprzecznych rzedach w odleglosciach nieprzekraczajacych sze¬ rokosci kilku sekcji obudowy (1), a dla ich usztywnienia dodatkowo uklada sie na nie w nieduzych odleglosciach równolegle do uchwytów (4) rzedy drewnianych okladzin (5) tworzac konstrukcje sztucznego stropu o równej wytrzymalosci, na który naklada sie tkanine (3) ze sztucznego tworzywa o nieduzej wytrzymalosci korzystnie wystarczajacej dla zabezpieczenia przed opadami mniejszych kamieni.((=*//^//^/^/^Ay//^///= Y**uMiYtt£*& Xi i T\9A147 062 TS9.2 Pracownia Poligraficzna UP PRL. Naklad 100 egz.Cena 400 zl PLThe subject of the invention is a method of securing the ceiling during the liquidation of walls with a powered support, while pulling the support sections to the transport bay of the wall. The previously used methods of securing the ceiling consisted in isolating the roof from the space from which the support sections are taken out. The roof insulation was performed above the canopies of the casing section by attaching a backing or fence mesh to steel ropes. For this purpose, at the end section of the wall, simultaneously with the exploitation, a net was placed over the canopies of the housing section and the ceilings pressed against the ceiling. Then a second row of a pleated net, equal to its half width, was attached to its overhanging side and connected with a soft wire. Further, after moving the casing by the entire web, the third row of the net was hung on the tab, taking care that its side edges met the edges of the sides of the net from the first row. From the bottom, the suspended net was supported by a steel rope with a diameter of about 20 mm. The end of the rope was fastened to to the casing of the wall sidewalks with the use of several clamps. In this way, each ridge corresponded to the suspension of the next supported net in the described manner, a rope placed along the wall at a small distance from the previous rope. Then, proceeding in the same way, for twelve risers, a shield was formed adjacent to almost the entire length to the surface of the casing along the entire wall and partially also attached to the width of one meter with goaf scales to the spag, sufficiently insulating the disturbed ceiling. This method, however, is not only cumbersome and very expensive due to the high cost of the mesh itself and the high laboriousness of the mesh. / Its unfastening and transport, but also not very effective, because when moving the casing sections, the stretched ropes are often scraped in different directions and a large surface of the non-lined ceiling is opened. An additional inconvenience of the known method is the necessity of periodically unfastening the rigid metal mesh directly under the chisel in the belt conveyor. In contrast to the above-mentioned method, in the method according to the invention, the rope 41a is connected with the distance between each other by means of distance holders placed on the belt conveyor. the overlap in the transverse rows at distances not exceeding the width of several sections of the casing, and for their stiffening, additionally, rows of wooden cladding are placed on them at short distances parallel to the handles, creating a structure of an artificial ceiling of equal strength, on which a plastic cloth is applied of low strength, preferably sufficient to protect against the fall of smaller stones. The advantage of the method according to the invention is to provide a permanent protection of the ceiling in the liquidation of walls and use for this purpose, inter alia, inexpensive plastic fabric. in the case of liquidation of walls with a powered support, it is explained in more detail in the drawing, in which Fig. 1 shows a vertical section across the wall, after securing the ceiling above the support, and Fig. 2 - a horizontal section of the same wall over an artificial ceiling insulating dewy floor layers. At the end of the wall, along its entire length, in front of the canopies of the mechanized support 1 there is a steel line 2 with a diameter of about 20 mm. Its ends are twice wrapped around the joists installed in the wall sidewalks and secured with three clamps. Then a filling fabric 3 made of plastic, preferably made of polypropylene, is unfolded, 1.35 m wide, over the line 2 suspended along the wall, so that 0.5 m of the gray fabric belt 3 passes over the rope 2, Next with the shifted section of the fabric 3 is wrapped around line 2 and fastened with a soft wire to the rest of the belt. In addition, the fabric 3 is connected with the above-mentioned wire at short distances to the rope 2. After performing these operations, the casing sections 1 are moved by the stroke of their shifter, which is the length of one thread, i.e. about 0.65 m, draws attention to so that the casing rails 1 adhere to the fabric 3 together with the rope 2. Then, overlap the first fabric strip 3 with an overlap equal to half the width of the fabric strip 3 »The second fabric strip 3 joins with the previous soft wire every 0.5 m. the second web is unrolled and fastened to the joists in the wall sidewalks, the second line 2 parallel to the first rope 2 at a distance of 0.6 m. Then, between the suspended ropes 2, special distance holders 4 are inserted every 10 m, which will be kept equal the distance between them and every 2 m there is additional wooden lining 5 stiffening the whole structure. Further, analogously to the second strip, successive strips of fabric 3 are arranged, in which the overlapped grips 4 maintain the parallelism of the stretched ropes 2, guaranteeing the preservation of equal strength of the artificial ceiling thus formed, which the overlapped liners 5 favorably strengthen, preventing the overloading of a fabric 3 which is weak enough to protect against the fall of smaller stones. The last fabric strip 3 together with the rope 2 supporting it is made in the same way as the first strip. Patent claim A method of securing the ceiling during the liquidation of walls with a mechanized support, in which, before the end of its run, it is placed over the canopies of the support section, the cover is fixed to the ropes steel and supplemented as the wall progresses, characterized by the fact that the ropes (2) are connected with distance holders (4) overlapped in transverse rows at distances not exceeding the width of several sections of the casing (1), to maintain equal spacing between them, and for their stiffening, additionally, at short distances, parallel to the handles (4), rows of wooden cladding (5) are arranged to form an artificial ceiling structure of equal strength, on which a fabric (3) made of plastic with low strength, preferably sufficient for securing against the fall of smaller stones. ((= * // ^ // ^ / ^ / ^ Ay // ^ /// = Y ** uMiYtt £ * & Xi i T \ 9A147 062 TS9.2 Printing workshop of the UP PRL. Mintage 100 copies Price PLN 400 PL

Claims (2)

1. Zastrzezenie patentowe Sposób zabezpieczania stropu przy likwidacji scian z obudowa zmechanizowana, w któ¬ rym przed koncem jej wybiegu zakladana jest nad stropnice sekcji obudowy, oslona mocowana do lin stalowych i uzupelniana w miare postepu sciany, znamienny tym, ze147 062 3 liny (2) dla utrzymania równych odstepów miedzy soba laczy sie dystansowymi uchwytami (4) zakladanymi na zakladke w poprzecznych rzedach w odleglosciach nieprzekraczajacych sze¬ rokosci kilku sekcji obudowy (1), a dla ich usztywnienia dodatkowo uklada sie na nie w nieduzych odleglosciach równolegle do uchwytów (4) rzedy drewnianych okladzin (5) tworzac konstrukcje sztucznego stropu o równej wytrzymalosci, na który naklada sie tkanine (3) ze sztucznego tworzywa o nieduzej wytrzymalosci korzystnie wystarczajacej dla zabezpieczenia przed opadami mniejszych kamieni. ((=*//^//^/^/^Ay//^///= Y**uMiYtt£*& Xi i T\9A147 062 TS9.1. Patent claim A method of securing the ceiling during the liquidation of walls with a mechanized support, in which, before the end of its run, a cover is installed over the canopies of the support section, the cover is attached to steel ropes and supplemented as the wall progresses, characterized by the fact that the ropes (2 ) in order to maintain equal spacing between each other, it is connected with distance handles (4) overlapped in transverse rows at distances not exceeding the width of several sections of the casing (1), and for their stiffening additionally placed on them at short distances parallel to the handles (4 ) rows of wooden cladding (5) to form an artificial ceiling structure of equal strength, over which a plastic fabric (3) of low strength, preferably sufficient to protect against the fall of smaller stones, is applied. ((= * // ^ // ^ / ^ / ^ Ay // ^ /// = Y ** uMiYtt £ * & Xi i T \ 9A147 062 TS9. 2. Pracownia Poligraficzna UP PRL. Naklad 100 egz. Cena 400 zl PL2. Printing studio of the Polish People's Republic. Mintage 100 copies. Price PLN 400 PL
PL25294785A 1985-04-15 1985-04-15 Method of protecting roof while withdrawing self-advancing roof supports from mined out longwall heading PL147062B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL25294785A PL147062B1 (en) 1985-04-15 1985-04-15 Method of protecting roof while withdrawing self-advancing roof supports from mined out longwall heading

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL25294785A PL147062B1 (en) 1985-04-15 1985-04-15 Method of protecting roof while withdrawing self-advancing roof supports from mined out longwall heading

Publications (2)

Publication Number Publication Date
PL252947A1 PL252947A1 (en) 1986-10-21
PL147062B1 true PL147062B1 (en) 1989-04-29

Family

ID=20026213

Family Applications (1)

Application Number Title Priority Date Filing Date
PL25294785A PL147062B1 (en) 1985-04-15 1985-04-15 Method of protecting roof while withdrawing self-advancing roof supports from mined out longwall heading

Country Status (1)

Country Link
PL (1) PL147062B1 (en)

Also Published As

Publication number Publication date
PL252947A1 (en) 1986-10-21

Similar Documents

Publication Publication Date Title
PL147062B1 (en) Method of protecting roof while withdrawing self-advancing roof supports from mined out longwall heading
RU2190765C2 (en) Method of dismantling powered cleaning complexes
RU2006137694A (en) METHOD AND DEVICE FOR INSTALLING PANEL FASTENERS
SU757726A1 (en) Method of section-wise erecting of flexible roof
CS201019B2 (en) Altitude adjustable cover of the running way for the underground mining works particularly for the sloping and steep seams
RU2078931C1 (en) Method of support of mine workings and frame support for its embodiment
PL99187B1 (en) METHOD OF TRANSPORTING THE SELECTED SCREEN ASSEMBLY FROM POST-OPERATING MINING PITCHES AND SECURING THE CEILING SPACE
SU1125380A1 (en) Flexible protecting web
KR20120134441A (en) Construction method of waterproof in tunnel
SU1624177A1 (en) Flexible canopy
SU777230A1 (en) Method of securing stope working roof
PL150316B1 (en) Method of confining a pace to be filled with pneumatically feed filling material
PL43310B1 (en)
SU1298380A1 (en) Device for setting deep-well benchmarks into borehole
RU2170826C1 (en) Method of roof control and yielding support for method embodiment
SU1054548A1 (en) Apparatus for laying-on flexible ceiling
RU1795101C (en) Method of rilling thick steeply dipping coal seems
SU815310A1 (en) Flexible metal celling and method of constructing same
SU1765407A1 (en) Method of forming ceiling of mounting chamber during mining of thick steeply dipping seams by horizontal layers
PL121813B1 (en) Method of preparing workings for translocation of mechanized roof supports thereinrovannykh hhitovykh krepejj
SU1086173A1 (en) Power junction support
SU891970A1 (en) Sectional portable form
SU1137214A1 (en) Multilayer ceiling for working thick sloping and steep seams with filling-up
PL155871B1 (en) Method for strengthening the load bearing structure of a filling dam
RU2059818C1 (en) Method for rill stoping of thick seams