NO327365B1 - Fremgangsmate for a oppdage, diagnostisere og utbedre problemer i bronner - Google Patents
Fremgangsmate for a oppdage, diagnostisere og utbedre problemer i bronner Download PDFInfo
- Publication number
- NO327365B1 NO327365B1 NO20043607A NO20043607A NO327365B1 NO 327365 B1 NO327365 B1 NO 327365B1 NO 20043607 A NO20043607 A NO 20043607A NO 20043607 A NO20043607 A NO 20043607A NO 327365 B1 NO327365 B1 NO 327365B1
- Authority
- NO
- Norway
- Prior art keywords
- well
- interval
- well interval
- fluid
- pressure
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 38
- 239000012530 fluid Substances 0.000 claims description 96
- 238000005553 drilling Methods 0.000 claims description 57
- 230000015572 biosynthetic process Effects 0.000 claims description 52
- 238000007789 sealing Methods 0.000 claims description 52
- 239000000203 mixture Substances 0.000 claims description 30
- 150000001875 compounds Chemical class 0.000 claims description 18
- 238000011282 treatment Methods 0.000 claims description 11
- 230000002706 hydrostatic effect Effects 0.000 claims description 7
- 238000005086 pumping Methods 0.000 claims description 7
- 239000004927 clay Substances 0.000 claims description 6
- CDBYLPFSWZWCQE-UHFFFAOYSA-L Sodium Carbonate Chemical compound [Na+].[Na+].[O-]C([O-])=O CDBYLPFSWZWCQE-UHFFFAOYSA-L 0.000 claims description 4
- 229920000642 polymer Polymers 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 230000007423 decrease Effects 0.000 claims description 2
- 229920000126 latex Polymers 0.000 claims description 2
- 229910000029 sodium carbonate Inorganic materials 0.000 claims description 2
- 238000012546 transfer Methods 0.000 claims description 2
- 230000003014 reinforcing effect Effects 0.000 claims 1
- 238000005755 formation reaction Methods 0.000 description 43
- 238000012360 testing method Methods 0.000 description 12
- 230000000246 remedial effect Effects 0.000 description 5
- 238000004458 analytical method Methods 0.000 description 3
- 238000005520 cutting process Methods 0.000 description 3
- 239000011396 hydraulic cement Substances 0.000 description 3
- 239000004568 cement Substances 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 230000035699 permeability Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000005067 remediation Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- -1 velocities Chemical class 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/003—Means for stopping loss of drilling fluid
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
- E21B33/138—Plastering the borehole wall; Injecting into the formation
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Examining Or Testing Airtightness (AREA)
- Sealing Material Composition (AREA)
- Earth Drilling (AREA)
- Eye Examination Apparatus (AREA)
- Ultra Sonic Daignosis Equipment (AREA)
- Details Of Flowmeters (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Geophysics And Detection Of Objects (AREA)
- Processing Of Solid Wastes (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/082,459 US6926081B2 (en) | 2002-02-25 | 2002-02-25 | Methods of discovering and correcting subterranean formation integrity problems during drilling |
PCT/GB2003/000775 WO2003071090A1 (en) | 2002-02-25 | 2003-02-21 | Methods of discovering and correcting subterranean formation integrity problems during drilling |
Publications (2)
Publication Number | Publication Date |
---|---|
NO20043607L NO20043607L (no) | 2004-08-30 |
NO327365B1 true NO327365B1 (no) | 2009-06-15 |
Family
ID=27753099
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO20043607A NO327365B1 (no) | 2002-02-25 | 2004-08-30 | Fremgangsmate for a oppdage, diagnostisere og utbedre problemer i bronner |
Country Status (10)
Country | Link |
---|---|
US (5) | US6926081B2 (pt) |
EP (1) | EP1481147B1 (pt) |
AR (1) | AR038447A1 (pt) |
AU (1) | AU2003208440B2 (pt) |
BR (1) | BR0307940B1 (pt) |
CA (1) | CA2475359C (pt) |
DE (1) | DE60303592D1 (pt) |
MX (1) | MXPA04008154A (pt) |
NO (1) | NO327365B1 (pt) |
WO (1) | WO2003071090A1 (pt) |
Families Citing this family (61)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7185719B2 (en) * | 2002-02-20 | 2007-03-06 | Shell Oil Company | Dynamic annular pressure control apparatus and method |
US6926081B2 (en) * | 2002-02-25 | 2005-08-09 | Halliburton Energy Services, Inc. | Methods of discovering and correcting subterranean formation integrity problems during drilling |
US7866394B2 (en) | 2003-02-27 | 2011-01-11 | Halliburton Energy Services Inc. | Compositions and methods of cementing in subterranean formations using a swelling agent to inhibit the influx of water into a cement slurry |
GB2403488B (en) * | 2003-07-04 | 2005-10-05 | Flight Refueling Ltd | Downhole data communication |
MXPA06001754A (es) | 2003-08-19 | 2006-05-12 | Shell Int Research | Sistema y metodo de perforacion. |
US7607482B2 (en) | 2005-09-09 | 2009-10-27 | Halliburton Energy Services, Inc. | Settable compositions comprising cement kiln dust and swellable particles |
US7156172B2 (en) * | 2004-03-02 | 2007-01-02 | Halliburton Energy Services, Inc. | Method for accelerating oil well construction and production processes and heating device therefor |
US7607483B2 (en) | 2004-04-19 | 2009-10-27 | Halliburton Energy Services, Inc. | Sealant compositions comprising colloidally stabilized latex and methods of using the same |
MY140447A (en) * | 2004-09-22 | 2009-12-31 | Balance B V | Method of drilling a lossy formation |
US7690429B2 (en) * | 2004-10-21 | 2010-04-06 | Halliburton Energy Services, Inc. | Methods of using a swelling agent in a wellbore |
US7488705B2 (en) | 2004-12-08 | 2009-02-10 | Halliburton Energy Services, Inc. | Oilwell sealant compositions comprising alkali swellable latex |
US20070111900A1 (en) * | 2005-11-11 | 2007-05-17 | Reddy B R | Sealant compositions comprising solid latex |
US20070111901A1 (en) * | 2005-11-11 | 2007-05-17 | Reddy B R | Method of servicing a wellbore with a sealant composition comprising solid latex |
US7891424B2 (en) | 2005-03-25 | 2011-02-22 | Halliburton Energy Services Inc. | Methods of delivering material downhole |
US7870903B2 (en) | 2005-07-13 | 2011-01-18 | Halliburton Energy Services Inc. | Inverse emulsion polymers as lost circulation material |
US7617870B1 (en) | 2008-05-14 | 2009-11-17 | Halliburton Energy Services, Inc. | Extended cement compositions comprising oil-swellable particles and associated methods |
US7607484B2 (en) | 2005-09-09 | 2009-10-27 | Halliburton Energy Services, Inc. | Foamed cement compositions comprising oil-swellable particles and methods of use |
US7913757B2 (en) * | 2005-09-16 | 2011-03-29 | Halliburton Energy Services. Inc. | Methods of formulating a cement composition |
US7687440B2 (en) * | 2005-12-01 | 2010-03-30 | Halliburton Energy Services, Inc. | Wellbore sealant compositions containing cationic latexes |
US7694738B2 (en) * | 2005-12-01 | 2010-04-13 | Halliburton Energy Services, Inc. | Methods of using wellbore sealant compositions containing cationic latexes |
US8132623B2 (en) | 2006-01-23 | 2012-03-13 | Halliburton Energy Services Inc. | Methods of using lost circulation compositions |
US7776797B2 (en) | 2006-01-23 | 2010-08-17 | Halliburton Energy Services, Inc. | Lost circulation compositions |
US7520327B2 (en) * | 2006-07-20 | 2009-04-21 | Halliburton Energy Services, Inc. | Methods and materials for subterranean fluid forming barriers in materials surrounding wells |
WO2008021096A2 (en) * | 2006-08-07 | 2008-02-21 | Aquablok, Ltd. | Subsurface reactive sealant product |
US20080060811A1 (en) * | 2006-09-13 | 2008-03-13 | Halliburton Energy Services, Inc. | Method to control the physical interface between two or more fluids |
US8412500B2 (en) | 2007-01-29 | 2013-04-02 | Schlumberger Technology Corporation | Simulations for hydraulic fracturing treatments and methods of fracturing naturally fractured formation |
US9135475B2 (en) | 2007-01-29 | 2015-09-15 | Sclumberger Technology Corporation | System and method for performing downhole stimulation operations |
US20080280786A1 (en) * | 2007-05-07 | 2008-11-13 | Halliburton Energy Services, Inc. | Defoamer/antifoamer compositions and methods of using same |
US9206344B2 (en) | 2007-05-10 | 2015-12-08 | Halliburton Energy Services, Inc. | Sealant compositions and methods utilizing nano-particles |
US8685903B2 (en) | 2007-05-10 | 2014-04-01 | Halliburton Energy Services, Inc. | Lost circulation compositions and associated methods |
US8476203B2 (en) | 2007-05-10 | 2013-07-02 | Halliburton Energy Services, Inc. | Cement compositions comprising sub-micron alumina and associated methods |
US9199879B2 (en) | 2007-05-10 | 2015-12-01 | Halliburton Energy Serives, Inc. | Well treatment compositions and methods utilizing nano-particles |
US9512351B2 (en) | 2007-05-10 | 2016-12-06 | Halliburton Energy Services, Inc. | Well treatment fluids and methods utilizing nano-particles |
US8586512B2 (en) | 2007-05-10 | 2013-11-19 | Halliburton Energy Services, Inc. | Cement compositions and methods utilizing nano-clay |
EP2229500A1 (en) * | 2007-06-21 | 2010-09-22 | Swelltec Limited | Apparatus and method with hydrocarbon swellable and water swellable body |
GB0711979D0 (en) * | 2007-06-21 | 2007-08-01 | Swelltec Ltd | Method and apparatus |
CA2689912C (en) | 2007-07-26 | 2014-05-13 | Fred E. Dupriest | Method for controlling loss of drilling fluid |
US8240377B2 (en) * | 2007-11-09 | 2012-08-14 | Halliburton Energy Services Inc. | Methods of integrating analysis, auto-sealing, and swellable-packer elements for a reliable annular seal |
US20090143255A1 (en) * | 2007-11-30 | 2009-06-04 | Funkhouser Gary P | Methods and Compositions for Improving Well Bore Stability in Subterranean Formations |
US20090159334A1 (en) * | 2007-12-19 | 2009-06-25 | Bp Corporation North America, Inc. | Method for detecting formation pore pressure by detecting pumps-off gas downhole |
US8794350B2 (en) * | 2007-12-19 | 2014-08-05 | Bp Corporation North America Inc. | Method for detecting formation pore pressure by detecting pumps-off gas downhole |
DE102008003109A1 (de) * | 2008-01-01 | 2009-07-02 | Fev Motorentechnik Gmbh | VCR - Gelenkwellenabtrieb |
US7984770B2 (en) * | 2008-12-03 | 2011-07-26 | At-Balance Americas, Llc | Method for determining formation integrity and optimum drilling parameters during drilling |
US7762329B1 (en) * | 2009-01-27 | 2010-07-27 | Halliburton Energy Services, Inc. | Methods for servicing well bores with hardenable resin compositions |
US7934554B2 (en) * | 2009-02-03 | 2011-05-03 | Halliburton Energy Services, Inc. | Methods and compositions comprising a dual oil/water-swellable particle |
US20100212892A1 (en) * | 2009-02-26 | 2010-08-26 | Halliburton Energy Services, Inc. | Methods of formulating a cement composition |
US7923413B2 (en) * | 2009-05-19 | 2011-04-12 | Schlumberger Technology Corporation | Lost circulation material for oilfield use |
US8820405B2 (en) | 2010-04-27 | 2014-09-02 | Halliburton Energy Services, Inc. | Segregating flowable materials in a well |
BR112012026845B1 (pt) * | 2010-04-27 | 2019-09-17 | Halliburton Energy Services, Inc. | Método para controlar pressão em um furo de poço e sistema de poço |
US8392158B2 (en) * | 2010-07-20 | 2013-03-05 | Schlumberger Technology Corporation | Methods for completing thermal-recovery wells |
US8517094B2 (en) | 2010-09-03 | 2013-08-27 | Landmark Graphics Corporation | Detecting and correcting unintended fluid flow between subterranean zones |
US8656995B2 (en) * | 2010-09-03 | 2014-02-25 | Landmark Graphics Corporation | Detecting and correcting unintended fluid flow between subterranean zones |
AU2011350663B2 (en) | 2010-12-30 | 2015-09-03 | Schlumberger Technology B.V. | System and method for performing downhole stimulation operations |
US9109992B2 (en) * | 2011-06-10 | 2015-08-18 | Halliburton Energy Services, Inc. | Method for strengthening a wellbore of a well |
GB201319184D0 (en) | 2013-10-30 | 2013-12-11 | Maersk Olie & Gas | Fracture characterisation |
US20150233205A1 (en) * | 2014-02-17 | 2015-08-20 | Sharp-Rock Technologies, Inc. | Pumping Fluid To Seal A Subterranean Fracture |
CN110185410B (zh) * | 2019-05-27 | 2021-02-19 | 濮阳市元亨利通石油机械有限公司 | 高压验封装置及其使用方法 |
CN110210144B (zh) * | 2019-06-05 | 2019-12-27 | 西南石油大学 | 一种暂堵剂促进水平井压裂裂缝均匀扩展的优化设计方法 |
US11365341B2 (en) * | 2020-05-29 | 2022-06-21 | Halliburton Energy Services, Inc. | Methods and compositions for mitigating fluid loss from well ballooning |
CN114165205B (zh) * | 2021-12-06 | 2023-07-21 | 西安石油大学 | 一种考虑渗吸的压裂液井间串通量计算方法 |
US11661815B1 (en) | 2022-06-06 | 2023-05-30 | Halliburton Energy Services, Inc. | Resins for repair of well integrity issues |
Family Cites Families (84)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US478490A (en) * | 1892-07-05 | Combined land-roller | ||
US2934377A (en) * | 1956-07-27 | 1960-04-26 | Lyon George Albert | Wheel cover |
US3615794A (en) * | 1968-05-20 | 1971-10-26 | Dow Chemical Co | Sealing composition and method |
US3846310A (en) * | 1972-03-03 | 1974-11-05 | Exxon Production Research Co | Hydraulic fracturing method using gelled hydrocarbons |
US3960082A (en) * | 1974-01-29 | 1976-06-01 | Fedor Ignatievich Sloevsky | Down-the-hole device for breaking rock, concrete and reinforced concrete by pulsewize high liquid pressure |
US4173999A (en) * | 1977-09-26 | 1979-11-13 | Mobil Oil Corporation | Technique for controlling lost circulation employing improved soft plug |
US4152941A (en) | 1978-05-08 | 1979-05-08 | Terra Tek, Inc. | Process for measuring the fracture toughness of rock under simulated down-hole stress conditions |
US4434848A (en) * | 1980-07-10 | 1984-03-06 | Standard Oil Company | Maximizing fracture extension in massive hydraulic fracturing |
US4498995A (en) * | 1981-08-10 | 1985-02-12 | Judith Gockel | Lost circulation drilling fluid |
FR2618846A2 (fr) * | 1986-11-25 | 1989-02-03 | Schlumberger Cie Dowell | Procede de colmatage de formations souterraines notamment dans le secteur des forages petroliers ainsi que compositions et applications correspondantes |
US4714115A (en) * | 1986-12-08 | 1987-12-22 | Mobil Oil Corporation | Hydraulic fracturing of a shallow subsurface formation |
US4718490A (en) * | 1986-12-24 | 1988-01-12 | Mobil Oil Corporation | Creation of multiple sequential hydraulic fractures via hydraulic fracturing combined with controlled pulse fracturing |
US4836940A (en) * | 1987-09-14 | 1989-06-06 | American Colloid Company | Composition and method of controlling lost circulation from wellbores |
US4930575A (en) | 1989-03-31 | 1990-06-05 | Marathon Oil Company | Method of protecting a permeable formation |
US6069007A (en) * | 1989-06-21 | 2000-05-30 | City Of Hope | Ribozyme cleavage of HIV RNA |
JPH03155892A (ja) * | 1989-08-28 | 1991-07-03 | Matsushita Electric Works Ltd | ヘアカッター |
US5253709A (en) * | 1990-01-29 | 1993-10-19 | Conoco Inc. | Method and apparatus for sealing pipe perforations |
US5205164A (en) | 1990-08-31 | 1993-04-27 | Exxon Production Research Company | Methods for determining in situ shale strengths, elastic properties, pore pressures, formation stresses, and drilling fluid parameters |
US5222048A (en) * | 1990-11-08 | 1993-06-22 | Eastman Teleco Company | Method for determining borehole fluid influx |
US5180020A (en) * | 1991-10-31 | 1993-01-19 | Conoco Inc. | Method for inhibiting the initiation and propagation of formation fractures while drilling |
US5207282A (en) * | 1991-10-31 | 1993-05-04 | Conoco Inc. | Method for inhibiting the initiation and propagation of formation fractures while drilling and casing a well |
US5275041A (en) * | 1992-09-11 | 1994-01-04 | Halliburton Company | Equilibrium fracture test and analysis |
US5358051A (en) * | 1993-10-22 | 1994-10-25 | Halliburton Company | Method of water control with hydroxy unsaturated carbonyls |
US5335726A (en) * | 1993-10-22 | 1994-08-09 | Halliburton Company | Water control |
US5482116A (en) * | 1993-12-10 | 1996-01-09 | Mobil Oil Corporation | Wellbore guided hydraulic fracturing |
US5497658A (en) | 1994-03-25 | 1996-03-12 | Atlantic Richfield Company | Method for fracturing a formation to control sand production |
US5472049A (en) * | 1994-04-20 | 1995-12-05 | Union Oil Company Of California | Hydraulic fracturing of shallow wells |
US5489740A (en) * | 1994-04-28 | 1996-02-06 | Atlantic Richfield Company | Subterranean disposal of wastes |
US5555945A (en) * | 1994-08-15 | 1996-09-17 | Halliburton Company | Early evaluation by fall-off testing |
US5497831A (en) * | 1994-10-03 | 1996-03-12 | Atlantic Richfield Company | Hydraulic fracturing from deviated wells |
GB9426025D0 (en) * | 1994-12-22 | 1995-02-22 | Smith Philip L U | Oil and gas field chemicals |
GB9619418D0 (en) * | 1996-09-18 | 1996-10-30 | Urlwin Smith Phillip L | Oil and gas field chemicals |
US6156708A (en) * | 1997-02-13 | 2000-12-05 | Actisystems, Inc. | Aphron-containing oil base fluids and method of drilling a well therewith |
US5881826A (en) * | 1997-02-13 | 1999-03-16 | Actisystems, Inc. | Aphron-containing well drilling and servicing fluids |
US6123159A (en) * | 1997-02-13 | 2000-09-26 | Actisystems, Inc. | Aphron-containing well drilling and servicing fluids of enhanced stability |
US20040002591A1 (en) * | 1997-09-05 | 2004-01-01 | Human Genome Sciences, Inc. | 50 human secreted proteins |
US6060434A (en) * | 1997-03-14 | 2000-05-09 | Halliburton Energy Services, Inc. | Oil based compositions for sealing subterranean zones and methods |
US5913364A (en) * | 1997-03-14 | 1999-06-22 | Halliburton Energy Services, Inc. | Methods of sealing subterranean zones |
US6258757B1 (en) * | 1997-03-14 | 2001-07-10 | Halliburton Energy Services, Inc. | Water based compositions for sealing subterranean zones and methods |
US6148912A (en) * | 1997-03-25 | 2000-11-21 | Dresser Industries, Inc. | Subsurface measurement apparatus, system, and process for improved well drilling control and production |
US5968879A (en) * | 1997-05-12 | 1999-10-19 | Halliburton Energy Services, Inc. | Polymeric well completion and remedial compositions and methods |
US5934377A (en) * | 1997-06-03 | 1999-08-10 | Halliburton Energy Services, Inc. | Method for isolating hydrocarbon-containing formations intersected by a well drilled for the purpose of producing hydrocarbons therethrough |
US5868030A (en) * | 1997-07-01 | 1999-02-09 | Halliburton Energy Services, Inc. | Core sample test method and apparatus |
US5873413A (en) * | 1997-08-18 | 1999-02-23 | Halliburton Energy Services, Inc. | Methods of modifying subterranean strata properties |
WO1999010623A1 (en) * | 1997-08-26 | 1999-03-04 | Exxonmobil Upstream Research Company | Stimulation of lenticular natural gas formations |
US5964293A (en) * | 1997-09-25 | 1999-10-12 | Halliburton Energy Services, Inc. | Well completion methods using rubber latex compositions in subterranean formations containing salt zones |
US6225118B1 (en) * | 1997-10-01 | 2001-05-01 | Biocure Limited | Multicellular in vitro assay of angiogenesis |
US6059036A (en) * | 1997-11-26 | 2000-05-09 | Halliburton Energy Services, Inc. | Methods and compositions for sealing subterranean zones |
US6456902B1 (en) * | 1998-04-08 | 2002-09-24 | Foy Streetman | Web-based system and method for enhancing fluid and gas recovery as well as remote on demand control of fluid flow in a well |
US6012524A (en) * | 1998-04-14 | 2000-01-11 | Halliburton Energy Services, Inc. | Remedial well bore sealing methods and compositions |
US6059035A (en) * | 1998-07-20 | 2000-05-09 | Halliburton Energy Services, Inc. | Subterranean zone sealing methods and compositions |
US6148917A (en) * | 1998-07-24 | 2000-11-21 | Actisystems, Inc. | Method of releasing stuck pipe or tools and spotting fluids therefor |
GB2340147A (en) * | 1998-07-30 | 2000-02-16 | Sofitech Nv | Wellbore fluid |
US6251990B1 (en) * | 1998-08-24 | 2001-06-26 | Shin-Etsu Chemical Co., Ltd. | Silicone rubber compositions having high-voltage electrical insulation, sealing and repairing compounds for polymeric insulators |
US6356205B1 (en) * | 1998-11-30 | 2002-03-12 | General Electric | Monitoring, diagnostic, and reporting system and process |
US6196317B1 (en) * | 1998-12-15 | 2001-03-06 | Halliburton Energy Services, Inc. | Method and compositions for reducing the permeabilities of subterranean zones |
US6186230B1 (en) * | 1999-01-20 | 2001-02-13 | Exxonmobil Upstream Research Company | Completion method for one perforated interval per fracture stage during multi-stage fracturing |
US6271181B1 (en) * | 1999-02-04 | 2001-08-07 | Halliburton Energy Services, Inc. | Sealing subterranean zones |
US6328106B1 (en) * | 1999-02-04 | 2001-12-11 | Halliburton Energy Services, Inc. | Sealing subterranean zones |
US6837313B2 (en) * | 2002-01-08 | 2005-01-04 | Weatherford/Lamb, Inc. | Apparatus and method to reduce fluid pressure in a wellbore |
US6401818B1 (en) * | 1999-05-27 | 2002-06-11 | Schlumberger Technology Corporation | Wellbore perforation method and apparatus |
CA2383691A1 (en) * | 1999-08-12 | 2001-02-22 | Steven M. Ruben | Human tumor necrosis factor receptor tr16 |
US6237688B1 (en) * | 1999-11-01 | 2001-05-29 | Halliburton Energy Services, Inc. | Pre-drilled casing apparatus and associated methods for completing a subterranean well |
GC0000213A (en) * | 1999-11-29 | 2006-03-29 | Shell Int Research | Creating multiple fractures in an earth formation |
IT1310794B1 (it) | 1999-12-10 | 2002-02-22 | Vidoni Mario | Apparecchio di pulizia con spazzola regolabile |
EP1292757A1 (en) | 2000-06-20 | 2003-03-19 | Shell Internationale Researchmaatschappij B.V. | System for creating a conduit in a borehole formed in an earth formation |
GB2363810B (en) | 2000-06-21 | 2003-03-26 | Sofitech Nv | Processes for treating subterranean formations |
SG97893A1 (en) * | 2000-06-29 | 2003-08-20 | Singapore Tech Aerospace Ltd | A method of monitoring and displaying health performance of an aircraft engine |
US6374925B1 (en) * | 2000-09-22 | 2002-04-23 | Varco Shaffer, Inc. | Well drilling method and system |
US6460691B1 (en) * | 2000-10-23 | 2002-10-08 | Horst Gaensewig | Filling machine |
US20020112888A1 (en) * | 2000-12-18 | 2002-08-22 | Christian Leuchtenberg | Drilling system and method |
US6725934B2 (en) * | 2000-12-21 | 2004-04-27 | Baker Hughes Incorporated | Expandable packer isolation system |
US6356208B1 (en) * | 2001-05-04 | 2002-03-12 | Chunghwatelecom Co., Ltd. | Structure for a car sensing infrared communication device placed over a lane of a freeway |
US6561273B2 (en) * | 2001-06-19 | 2003-05-13 | Halliburton Energy Services, Inc. | Oil based compositions and method for temporarily sealing subterranean zones |
US6367549B1 (en) * | 2001-09-21 | 2002-04-09 | Halliburton Energy Services, Inc. | Methods and ultra-low density sealing compositions for sealing pipe in well bores |
JP3820968B2 (ja) * | 2001-11-20 | 2006-09-13 | ブラザー工業株式会社 | 留守番電話装置 |
US6926081B2 (en) | 2002-02-25 | 2005-08-09 | Halliburton Energy Services, Inc. | Methods of discovering and correcting subterranean formation integrity problems during drilling |
US6739414B2 (en) * | 2002-04-30 | 2004-05-25 | Masi Technologies, L.L.C. | Compositions and methods for sealing formations |
US6702044B2 (en) * | 2002-06-13 | 2004-03-09 | Halliburton Energy Services, Inc. | Methods of consolidating formations or forming chemical casing or both while drilling |
US7101848B2 (en) * | 2002-10-08 | 2006-09-05 | Boehringer Ingelheim Pharma Gmbh & Co. Kg | Bicyclic oligopeptides |
AU2003285500B8 (en) * | 2002-11-20 | 2011-02-03 | Cancer Research Technology Limited | Antibodies binding to human magic roundabout (MR), polypeptides and uses thereof for inhibition of angiogenesis |
US7037881B2 (en) * | 2003-02-03 | 2006-05-02 | Growcock Frederick B | Stabilized colloidal and colloidal-like systems |
US7125825B2 (en) * | 2003-04-25 | 2006-10-24 | Tomah Products, Inc. | Amidoamine salt-based viscosifying agents and methods of use |
US7199085B2 (en) * | 2003-05-06 | 2007-04-03 | Masi Technologies, Inc. | Colloidal and colloidal-like systems in aqueous, clay-based fluids |
-
2002
- 2002-02-25 US US10/082,459 patent/US6926081B2/en not_active Expired - Lifetime
-
2003
- 2003-01-24 US US10/350,429 patent/US7213645B2/en not_active Expired - Lifetime
- 2003-02-21 WO PCT/GB2003/000775 patent/WO2003071090A1/en not_active Application Discontinuation
- 2003-02-21 DE DE60303592T patent/DE60303592D1/de not_active Expired - Fee Related
- 2003-02-21 CA CA2475359A patent/CA2475359C/en not_active Expired - Fee Related
- 2003-02-21 EP EP03706728A patent/EP1481147B1/en not_active Expired - Lifetime
- 2003-02-21 MX MXPA04008154A patent/MXPA04008154A/es active IP Right Grant
- 2003-02-21 BR BRPI0307940-6A patent/BR0307940B1/pt not_active IP Right Cessation
- 2003-02-21 AR ARP030100568A patent/AR038447A1/es active IP Right Grant
- 2003-02-21 AU AU2003208440A patent/AU2003208440B2/en not_active Ceased
-
2004
- 2004-08-30 NO NO20043607A patent/NO327365B1/no not_active IP Right Cessation
-
2006
- 2006-05-04 US US11/429,632 patent/US7308936B2/en not_active Expired - Lifetime
- 2006-05-04 US US11/430,305 patent/US7311147B2/en not_active Expired - Lifetime
- 2006-05-04 US US11/429,111 patent/US7314082B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
US7213645B2 (en) | 2007-05-08 |
AU2003208440B2 (en) | 2007-02-08 |
MXPA04008154A (es) | 2004-11-26 |
EP1481147A1 (en) | 2004-12-01 |
BR0307940B1 (pt) | 2014-02-18 |
US20060266519A1 (en) | 2006-11-30 |
WO2003071090A1 (en) | 2003-08-28 |
US7308936B2 (en) | 2007-12-18 |
US20030162670A1 (en) | 2003-08-28 |
DE60303592D1 (de) | 2006-04-20 |
AU2003208440A1 (en) | 2003-09-09 |
US6926081B2 (en) | 2005-08-09 |
CA2475359C (en) | 2011-04-26 |
US20060272860A1 (en) | 2006-12-07 |
EP1481147B1 (en) | 2006-02-15 |
US20030181338A1 (en) | 2003-09-25 |
US20060266107A1 (en) | 2006-11-30 |
NO20043607L (no) | 2004-08-30 |
US7311147B2 (en) | 2007-12-25 |
BR0307940A (pt) | 2004-12-21 |
CA2475359A1 (en) | 2003-08-28 |
US7314082B2 (en) | 2008-01-01 |
AR038447A1 (es) | 2005-01-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO327365B1 (no) | Fremgangsmate for a oppdage, diagnostisere og utbedre problemer i bronner | |
US7753117B2 (en) | Tool and method for evaluating fluid dynamic properties of a cement annulus surrounding a casing | |
US20110220350A1 (en) | Identification of lost circulation zones | |
US7325607B2 (en) | Methods and systems for using high-yielding non-Newtonian fluids for severe lost circulation prevention | |
NO321471B1 (no) | Fremgangsmate og anordning for evaluering av bronnforhold under bronnfluidsirkulasjon | |
US7753118B2 (en) | Method and tool for evaluating fluid dynamic properties of a cement annulus surrounding a casing | |
US6378363B1 (en) | Method for obtaining leak-off test and formation integrity test profiles from limited downhole pressure measurements | |
Yihdego | Hydraulic in situ testing for mining and engineering design: packer test procedure, preparation, analysis and interpretation | |
CN107605463A (zh) | 一种用于钻井堵漏施工的井筒动液面监测方法 | |
BRPI1000329A2 (pt) | método para determinar a integridade de uma vedação anular em um furo de poço, e, aparelho para furo de poço | |
GB2583583A (en) | Method for checking the integrity of casing string intervals for installation of a cement bridge in wells to be abandoned | |
Skadsem et al. | Study of ultrasonic logs and seepage potential on sandwich sections retrieved from a north sea production well | |
US8919438B2 (en) | Detection and quantification of isolation defects in cement | |
CA2529539C (en) | Method to measure and locate a fluid communication pathway in a material behind a casing | |
Alberty et al. | The use of modeling to enhance the analysis of formation-pressure integrity tests | |
Enever et al. | Recent experience with extended leak-off tests for in-situ stress measurements in Australia | |
Watson | Surface casing vent flow repair-A process | |
CN114320265A (zh) | 基于井下工程参数测量的井漏早期检测方法 | |
Zapata Bermudez et al. | Identify, Remediate and Verify Cross Sectional Cement Barriers for Permanent Well P&A | |
Kamenar et al. | How to plan a safe and successful permeability test program in coal seams | |
Abilov | Improving Formation Pressure Integrity Tests with Field-Wise Test Data Analysis and Hydraulic Impedance Testing | |
US6273202B1 (en) | Swab test for determining relative formation productivity | |
Youssef et al. | Review of Remedial Cementing: Factors, Design Considerations, and Case Studies | |
Carlsen | Surface volume control through continuous surveillance of drilling data | |
Adams | The Hydraulic Fracturing Method of In-Situ Stress Testing From a Field Equipment Perspective |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM1K | Lapsed by not paying the annual fees |