KR20230090300A - A twin wall structure using a PC panel and method for manufacturing of it - Google Patents

A twin wall structure using a PC panel and method for manufacturing of it Download PDF

Info

Publication number
KR20230090300A
KR20230090300A KR1020230072897A KR20230072897A KR20230090300A KR 20230090300 A KR20230090300 A KR 20230090300A KR 1020230072897 A KR1020230072897 A KR 1020230072897A KR 20230072897 A KR20230072897 A KR 20230072897A KR 20230090300 A KR20230090300 A KR 20230090300A
Authority
KR
South Korea
Prior art keywords
panel
bracket
panels
foundation
bar
Prior art date
Application number
KR1020230072897A
Other languages
Korean (ko)
Inventor
김성우
Original Assignee
주식회사 태영피씨엠
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 태영피씨엠 filed Critical 주식회사 태영피씨엠
Priority to KR1020230072897A priority Critical patent/KR20230090300A/en
Publication of KR20230090300A publication Critical patent/KR20230090300A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C2003/026Braces
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C2003/0486Truss like structures composed of separate truss elements

Abstract

PC제작 공장에서 브라켓트가 노출된 제1,2PC패널을 각각 제작하고 공사현장에서 간편하게 기초 트윈 월 구조물을 제작할 수 있도록 하며, 하단부에 제1,2연결철근이 노출된 제1,2PC패널을 일체형으로 제작하여서 기초 콘크리트 바닥과의 연결을 통하여 구조적 안정성을 확보하고 철근량을 줄일 수 있으며 공사기간을 단축할 수 있도록 한 PC패널을 이용한 기초 트윈 월 구조체 및 이의 제작방법에 관한 것이다.In the PC manufacturing plant, the 1st and 2nd PC panels with exposed brackets are manufactured respectively, and the basic twin wall structure can be easily manufactured at the construction site. It relates to a foundation twin wall structure using a PC panel and a manufacturing method thereof to ensure structural stability, reduce the amount of reinforcing bars, and shorten the construction period through connection with the foundation concrete floor.

Description

PC패널을 이용한 기초 트윈 월 구조체 및 이의 제작방법{A twin wall structure using a PC panel and method for manufacturing of it}Basic twin wall structure using a PC panel and manufacturing method thereof {A twin wall structure using a PC panel and method for manufacturing of it}

본 발명은 PC패널을 이용한 기초 트윈 월 구조체 및 이의 제작방법에 관한 것으로써, 더 상세하게는 PC제작 공장에서 브라켓트가 노출된 제1,2PC패널을 각각 제작하고 공사현장에서 간편하게 기초 트윈 월 구조물을 제작할 수 있도록 하며, 하단부에 제1,2연결철근이 노출된 제1,2PC패널을 일체형으로 제작하여서 기초 콘크리트 바닥과의 연결을 통하여 구조적 안정성을 확보하고 철근량을 줄일 수 있으며 공사기간을 단축할 수 있도록 한 PC패널을 이용한 기초 트윈 월 구조체 및 이의 제작방법에 관한 것이다.The present invention relates to a basic twin wall structure using a PC panel and a method of manufacturing the same, and more particularly, to manufacture the first and second PC panels with exposed brackets in a PC manufacturing plant, and to conveniently construct a basic twin wall structure at a construction site. The 1st and 2nd PC panels with the 1st and 2nd connecting reinforcing bars exposed at the bottom are integrally manufactured to ensure structural stability, reduce the amount of reinforcing bars, and shorten the construction period through connection with the foundation concrete floor. It relates to a basic twin wall structure using a PC panel and a manufacturing method thereof.

예컨대, 우수 저류조, 지하주차장과 같은 지하 구조물은 도 1에 도시된 바와 같이, 터파기공사 후 기초바닥을 형성하고, 기초바닥에 거푸집을 설치하여 RC(reinforced concrete)공법에 의한 현장 콘크리트로 외벽을 시공하고, 외벽 상단부에 피씨 슬래브 또는 현장콘크리트 슬래브를 탑재하여 시공하게 된다.For example, for underground structures such as rainwater storage tanks and underground parking lots, as shown in FIG. 1, a foundation floor is formed after excavation work, and a formwork is installed on the foundation floor to construct an outer wall with on-site concrete by the RC (reinforced concrete) method. It is constructed by mounting a PC slab or an on-site concrete slab on the upper part of the outer wall.

그러나, 상기 RC공법에 의한 외벽 시공은 벽체를 세우기 위하여 거푸집에 콘크리트를 타설하여 콘크리트 벽체가 경화되어야 다음의 공정을 진행할 수 있으므로 거푸집의 설치하고 제거해야 하는 번거로움이 있었으며, 이에 따른 공사기간이 길어지게 되는 문제점이 있어 왔다.However, the exterior wall construction by the RC method had the inconvenience of installing and removing the formwork because concrete was poured into the formwork to build the wall and the concrete wall had to harden before proceeding with the next process, which required a long construction period. I've been having issues with it.

또한, 현장 콘크리트에 의해 시공되는 종래의 외벽 외주면에는 지하층이라는 특성 때문에 심할 경우 물이 실내측 외벽에 흐르는 문제가 발생되어 충분히 건조되지 못한 외벽의 경우에는 균열이 발생되어 누수 발생으로 연결되는 문제가 발생되고 있다.In addition, due to the characteristics of the basement layer on the outer circumferential surface of the conventional outer wall constructed with on-site concrete, water flows to the outer wall on the indoor side in severe cases. It is becoming.

한국특허공개번호 제10-2006-0024850호Korean Patent Publication No. 10-2006-0024850

본 발명은 상기와 같은 문제점을 해결하기 위하여 창출된 것으로써, 하단부에 제1,2연결철근이 노출된 제1,2PC패널을 일체형으로 제작하여서 기초 콘크리트 바닥과의 연결을 통하여 구조적 안정성을 확보하고 철근량을 줄일 수 있으며 공사기간을 단축할 수 있도록 한 PC패널을 이용한 기초 트윈 월 구조체 및 이의 제작방법을 제공하는 데 그 목적이 있다.The present invention was created to solve the above problems, and the 1st and 2nd PC panels with the 1st and 2nd connecting reinforcing bars exposed at the bottom are integrally manufactured to secure structural stability through connection with the foundation concrete floor The purpose is to provide a basic twin wall structure using a PC panel that can reduce the amount of reinforcing bars and shorten the construction period and its manufacturing method.

본 발명의 다른 목적은 기초 콘크리트 바닥과 기초 트윈월이 일체화되어 구조적으로 안정된 PC패널을 이용한 트윈월 구조체 및 이의 제작방법을 제공하는 데 있다.Another object of the present invention is to provide a twin wall structure using a structurally stable PC panel in which a foundation concrete floor and a foundation twin wall are integrated and a manufacturing method thereof.

상기 목적을 달성하는 본 발명 PC패널을 이용한 기초 트윈월 구조체는,The basic twin wall structure using the PC panel of the present invention to achieve the above object,

제1보강근이 매립되며, 제1보강근에 일단이 고정되고 타단이 외부로 돌출된 복수의 제1브라켓트를 가지는 제1PC패널과;a first PC panel having a plurality of first brackets in which first reinforcing bars are embedded, one end fixed to the first reinforcing bars and the other end protruding outward;

제2보강근이 매립되며, 제2보강근에 일단이 고정되고 타단이 외부로 돌출된 복수의 제2브라켓트를 가지는 제2PC패널과;a second PC panel having a plurality of second brackets in which the second reinforcing bars are embedded, one end fixed to the second reinforcing bars and the other end protruding outward;

수평상으로 배치되어 상기 제1PC패널과 제2PC패널이 일정간격 유지되도록 상호 마주하는 상기 제1브라켓트와 제2브라켓트를 연결하는 연결바를 구비하여 된 것을 특징으로 한다.It is characterized in that it is provided with a connecting bar connecting the first bracket and the second bracket that are arranged horizontally and face each other so that the first PC panel and the second PC panel are maintained at a predetermined distance.

또한, 본 발명 구조체는 경사상으로 배치되어 상기 제1PC패널과 제2PC패널이 일정간격 유지되도록 상기 제1브라켓트와 제2브라켓트를 연결하는 경사바를 더 구비하여 된 것을 특징으로 한다.In addition, the structure of the present invention is characterized in that it further includes an inclined bar connecting the first bracket and the second bracket so that the first PC panel and the second PC panel are arranged in an inclined shape to maintain a predetermined distance.

또한, 본 발명 구조체는 상기 제1PC패널의 하단부에 제1연결철근이 돌출되도록 배근되고, 상기 제2PC패널의 하단부에 제2연결철근이 돌출되도록 배근되며,In addition, the structure of the present invention is reinforced so that the first connection reinforcement protrudes from the lower end of the first PC panel, and the second connection reinforcement is reinforced so that the second connection reinforcement protrudes from the lower end of the second PC panel,

상기 제1,2PC패널의 하단부에 상기 제1,2연결철근이 수용되는 내부 공간이 형성된 트러스 받침대가 고정된 것을 특징으로 한다.It is characterized in that a truss base having an inner space for accommodating the first and second connecting reinforcing bars is fixed to the lower end of the first and second PC panels.

한편, 상기 목적을 달성하는 본 발명 PC패널을 이용한 기초 트윈월 구조체의 시공방법은,On the other hand, the construction method of the basic twin wall structure using the PC panel of the present invention to achieve the above object,

a) 제1보강근이 매립되며, 제1보강근에 일단이 고정되고 타단이 외부로 돌출된 복수의 제1브라켓트를 가지는 제1PC패널을 공장 제작하는 단계와;a) factory-manufacturing a first PC panel having a plurality of first brackets in which first reinforcing bars are embedded, one end fixed to the first reinforcing bars and the other end protruding outward;

b) 제2보강근이 매립되며, 제2보강근에 일단이 고정되고 타단이 외부로 돌출된 복수의 제2브라켓트를 가지는 제2PC패널을 공장 제작하는 단계와;b) factory-manufacturing a second PC panel having a plurality of second brackets in which the second reinforcing bars are embedded, one end fixed to the second reinforcing bars and the other end protruding outward;

c) 상기 제1PC패널과 제2PC패널을 공사 현장으로 운반하여서, 상기 제1PC패널과 제2PC패널이 일정간격 유지되도록 연결바를 수평상으로 배치하여 상호 마주하는 상기 제1브라켓트와 제2브라켓트를 연결하는 단계와;c) The first and second PC panels are transported to the construction site, and a connecting bar is placed horizontally to connect the first bracket and the second bracket facing each other so that the first PC panel and the second PC panel are maintained at a certain distance. step of doing;

d) 상기 c)단계 이후에 상기 제1PC패널과 제2PC패널 사이에 경사바를 경사상으로 배치하여 제1브라켓트와 제2브라켓트를 연결하는 단계;를 포하하여 된 것을 특징으로 한다.d) connecting the first bracket and the second bracket by arranging an inclined bar between the first PC panel and the second PC panel in an inclined manner after the step c).

또한, 본 발명 시공방법은 상기 a)단계에서 제1PC패널의 하단부에 제1연결철근이 돌출되도록 배근하고, 상기 b)단계에서 제2PC패널의 하단부에 제2연결철근이 돌출되도록 배근하는 단계를 더 포함하고,In addition, the construction method of the present invention includes the steps of arranging reinforcement so that the first connection reinforcement protrudes from the lower end of the first PC panel in step a), and arranging reinforcement so that the second connection reinforcement protrudes from the lower end of the second PC panel in step b). include more,

상기 d)단계 이후에 상기 제1,2연결철근이 수용되는 내부 공간이 형성된 트러스 받침대를 상기 제1,2PC패널의 하단부에 고정시키는 e)단계를 더 포함하여 된 것을 특징으로 한다.After the step d), a step e) of fixing a truss stand having an internal space in which the first and second connecting reinforcing bars are accommodated to the lower end of the first and second PC panels is further included.

또한, 본 발명 시공방법은 상기 e)단계 이후에 바닥에 버림콘크리트를 타설하여 양생하는 단계와;In addition, the construction method of the present invention includes the steps of curing by pouring abandoned concrete on the floor after step e);

상기 제1,2PC패널 및 트러스 받침대를 기립시켜서 상기 트러스 받침대를 상기 버림콘크리트에 수평레벨을 맞추면서 고정와이어를 이용하여 안정하도록 고정시키는 단계와;elevating the first and second PC panels and the truss support and stably fixing the truss support using a fixing wire while leveling the truss support to the abandoned concrete;

상기 트러스 받침대 내부에 기초철근의 일부가 수용되도록 상기 버림콘크리트 상에 상기 기초철근을 배치하는 단계와;arranging the foundation reinforcement on the discarded concrete so that a part of the foundation reinforcement is accommodated inside the truss stand;

상기 트러스 받침대 및 기초철근이 매몰되도록 콘크리트를 현장 타설하여 기초 콘크리트 바닥을 형성하는 단계와;Forming a foundation concrete floor by casting concrete on-site so that the truss support and foundation reinforcing bars are buried;

상기 제1,2PC패널 사이의 공간이 충전되도록 상기 제1,2PC패널 사이에 콘크리트를 타설하는 단계;를 포함하여 된 것을 특징으로 한다.and pouring concrete between the first and second PC panels to fill the space between the first and second PC panels.

첫째, 제1,2PC패널이 일체형으로 제작, 설치되므로 공기단축 및 가설재 양을 최소화 할 수 있으며, 트러스 받침대(500)를 통하여 기초 콘크리트 바닥(600)과 일체화되어 구조적으로 안정된 기초 트윈월 구조체를 제공하고 철근량을 줄일 수 있도록 한다.First, since the 1st and 2nd PC panels are integrally manufactured and installed, it is possible to shorten the construction period and minimize the amount of temporary materials, and to provide a structurally stable foundation twin wall structure by being integrated with the foundation concrete floor 600 through the truss support 500. and reduce the amount of reinforcement.

둘째, 제1,2연결철근(413)(423)을 트러스 받침대(500)에 수용하여서 기초 콘크리트 바닥(600)을 형성하므로, 기초 트윈월(400)의 내력근인 제1,2연결철근(413)(423)을 기초 콘크리트 바닥(600)의 내력근으로서 활용을 수월하게 한다.Second, since the first and second connecting reinforcing bars 413 and 423 are accommodated in the truss support 500 to form the foundation concrete floor 600, the first and second connecting reinforcing bars 413 that are the load-bearing bars of the foundation twin wall 400 ) (423) as a load-bearing muscle of the foundation concrete floor (600) to facilitate utilization.

도 1은 종래 벽 구조물 시공방법을 설명하는 개략 단면도,
도 2는 본 발명 실시예의 기초 트윈 월을 나타낸 단면도,
도 3a 내지 도 3d는 본 발명 실시예의 기초 트윈 월의 제작방법을 설명하는 순서도,
도 4는 본 발명 실시예에 채용되는 제1,2PC패널을 나타낸 단면도이다.
1 is a schematic cross-sectional view illustrating a conventional wall structure construction method;
2 is a cross-sectional view showing a basic twin wall of an embodiment of the present invention;
Figures 3a to 3d is a flow chart explaining the manufacturing method of the basic twin wall of the embodiment of the present invention,
4 is a cross-sectional view showing first and second PC panels employed in an embodiment of the present invention.

본 발명 실시예의 PC패널을 이용한 기초 트윈 월 구조체 및 이의 제작방법은 하단부에 제1,2연결철근이 노출된 제1,2PC패널을 일체형으로 제작하여서 기초 콘크리트 바닥과의 연결을 통하여 구조적 안정성을 확보하고 철근량을 줄일 수 있으며 공사기간을 단축할 수 있도록 한다.Foundation twin wall structure using a PC panel and method of manufacturing the same according to an embodiment of the present invention secures structural stability through connection with the foundation concrete floor by integrally manufacturing the first and second PC panels in which the first and second connecting reinforcing bars are exposed at the lower end. It can reduce the amount of reinforcing bars and shorten the construction period.

특히, 제1,2PC패널에 제1,2브라켓트가 외부로 노출되도록 공장제작함으로써, 현장으로의 운반을 편리하게 하고 또한 연결바를 통한 제1,2PC패널의 연결작업을 간편하게 한다.In particular, by manufacturing the first and second brackets at the factory so that the first and second PC panels are exposed to the outside, transportation to the site is convenient and the connection work of the first and second PC panels through the connecting bar is also simplified.

도 2 및 도 3a를 참조하면, 본 발명 실시예의 기초 트윈월(400)은 제1보강근(411)이 매립되며, 제1보강근(411)에 일단이 고정되고 타단이 외부로 돌출된 복수의 제1브라켓트(412)를 가지는 제1PC패널(410)과; 제2보강근(421)이 매립되며, 제2보강근(421)에 일단이 고정되고 타단이 외부로 돌출된 복수의 제2브라켓트(422)를 가지는 제2PC패널(420)과; 수평상으로 배치되어 상기 제1PC패널(410)과 제2PC패널(420)이 일정간격 유지되도록 상호 마주하는 상기 제1브라켓트(412)와 제2브라켓트(422)를 연결하는 연결바(430)를 구비한다.2 and 3a, the basic twin wall 400 of the embodiment of the present invention has a first reinforcing bar 411 embedded, one end fixed to the first reinforcing bar 411 and the other end protruding to the outside of a plurality of first reinforcing bars 411. a first PC panel 410 having one bracket 412; a second PC panel 420 having a plurality of second brackets 422 in which the second reinforcing bars 421 are embedded, one end fixed to the second reinforcing bars 421 and the other end protruding outward; The connection bar 430 connecting the first bracket 412 and the second bracket 422 facing each other so that the first PC panel 410 and the second PC panel 420 are maintained at a certain distance from each other is arranged horizontally. provide

또한, 경사상으로 배치되어 상기 제1PC패널(410)과 제2PC패널(420)이 일정간격 유지되도록 상기 제1브라켓트(412)와 제2브라켓트(422)를 연결하는 경사바(440)를 구비한다.In addition, an inclined bar 440 is provided to connect the first bracket 412 and the second bracket 422 so that the first PC panel 410 and the second PC panel 420 are maintained at a predetermined interval by being arranged in an inclined shape. do.

또한, 본 발명 실시예의 기초 트윈월(400)은 상기 제1PC패널(410)의 하단부에는 제1연결철근(413)이 돌출되도록 배근되고, 상기 제2PC패널(420)의 하단부에는 제2연결철근(423)이 돌출되도록 배근되며, 상기 제1,2PC패널(410)(420)의 하단부에는 상기 제1,2연결철근(413)(423)이 수용되는 내부 공간이 형성된 트러스 받침대(500)가 고정된다.In addition, the basic twin wall 400 of the embodiment of the present invention is reinforced so that the first connection reinforcement 413 protrudes from the lower end of the first PC panel 410, and the second connection reinforcement is provided from the lower end of the second PC panel 420. 423 is arranged so as to protrude, and at the lower end of the first and second PC panels 410 and 420, a truss support 500 having an internal space in which the first and second connecting reinforcing bars 413 and 423 are accommodated is formed. It is fixed.

상기 연결바(430) 및 경사바(440)는 공사현장에서 제1,2브라켓트(412)(422)에 용접고정되거나 볼트 조립된다.The connecting bar 430 and the inclined bar 440 are welded and fixed to the first and second brackets 412 and 422 at a construction site or assembled with bolts.

이 실시예의 PC패널을 이용한 기초 트윈 월 구조체는 제1,2브라켓트(412)(422)가 노출된 각 제1,2PC패널(410)(420)을 공장제작함으로써, 공사 현장으로의 운반을 간편하게 하고 또한 공사현장에서 연결바(430)와 경사바(440)의 조립을 편리하게 한다.The basic twin wall structure using the PC panel of this embodiment is easily transported to the construction site by manufacturing each of the first and second PC panels 410 and 420 in which the first and second brackets 412 and 422 are exposed. And also, it is convenient to assemble the connecting bar 430 and the inclined bar 440 at the construction site.

또한, 하단부에 제1,2연결철근(413)(423)이 노출되도록 제1,2PC패널(410)(420)을 제작함으로써 현장에서 기초 콘크리트 바닥(600)과의 연결을 통하여 구조적 안정성을 확보하고 철근량을 줄일 수 있으며 공사기간을 단축할 수 있으며, 특히 공사현장에서 트러스 받침대(500)를 제1,2PC패널(410)(420)과 일체형으로 제작하고 트러스 받침대(500)에 상기 제1,2연결철근(413)(423)이 수용되도록 함으로써 기초 콘크리트 바닥(600)과의 구조적 안정성을 보다 더 확보할 수 있게 한다.In addition, by manufacturing the first and second PC panels 410 and 420 so that the first and second connecting reinforcing bars 413 and 423 are exposed at the lower end, structural stability is secured through connection with the foundation concrete floor 600 at the site. The amount of reinforcement can be reduced and the construction period can be shortened. By allowing the two connecting reinforcing bars 413 and 423 to be accommodated, it is possible to further secure structural stability with the foundation concrete floor 600.

상기와 같은 구성의 기초 트윈월을 제작하는 방법은, 도 4를 참조하면, 먼저 공장에서 제1,2PC패널(410)(420)을 제작한다.Referring to FIG. 4, in the method of manufacturing the basic twin wall having the above configuration, first, the first and second PC panels 410 and 420 are manufactured in a factory.

제1PC패널(410)에는 일정간격으로 복수의 제1브라켓트(412)의 일단이 용접고정된 제1보강근(411)을 매립하되, 제1브라켓트(412)의 타단이 외부로 돌출되도록 매립한다.In the first PC panel 410, first reinforcing bars 411 to which one ends of the plurality of first brackets 412 are fixed by welding are embedded at regular intervals, but the other ends of the first brackets 412 are embedded so that they protrude outward.

또한, 제1PC패널(410)과 대향되는 제2PC패널(420)에도 일정간격으로 복수의 제2브라켓트(422)의 일단이 용접고정된 제2보강근(421)을 매립하되, 제2브라켓트(422)의 타단이 외부로 돌출되도록 매립한다.In addition, the second reinforcing bars 421 to which one ends of the plurality of second brackets 422 are welded and fixed are buried at regular intervals in the second PC panel 420 opposite to the first PC panel 410, but the second bracket 422 ) is buried so that the other end protrudes to the outside.

상기 제1,2PC패널(410)(420)에 제1,2보강근(411)(421)을 매립할때, 각 제1,2PC패널(410)(420)의 하단부에 제1,2연결철근(413)(423)이 돌출되도록 배근한다.When the first and second reinforcing bars 411 and 421 are embedded in the first and second PC panels 410 and 420, the first and second connecting reinforcing bars are formed at the lower ends of the first and second PC panels 410 and 420, respectively. (413) Arrange the reinforcement so that the (423) protrudes.

이어서 상기와 같이 공장 제작된 제1,2PC패널(410)(420)을 공사 현장으로 운반하여서, 도 3a에 도시된 바와 같이 상기 제1PC패널(410)과 제2PC패널(420)이 일정간격 유지되도록 연결바(430)를 수평상으로 배치하여 상호 마주하는 상기 제1브라켓트(412)와 제2브라켓트(422)를 볼트 또는 용접으로 연결한다.Subsequently, the first and second PC panels 410 and 420 manufactured at the factory are transported to the construction site, and as shown in FIG. 3A, the first and second PC panels 410 and 2 PC panels 420 maintain a certain distance. The connecting bar 430 is arranged horizontally to connect the first bracket 412 and the second bracket 422 facing each other by bolts or welding.

또한, 상기 제1PC패널(410)과 제2PC패널(420) 사이에 경사바(440)를 경사상으로 배치하여 제1브라켓트(412)와 제2브라켓트(422)를 연결한다.In addition, an inclined bar 440 is inclinedly disposed between the first PC panel 410 and the second PC panel 420 to connect the first bracket 412 and the second bracket 422.

이어서 도 3b에 도시된 바와 같이, 상기 제1,2연결철근(413)(423)이 수용되는 내부 공간이 형성된 트러스 받침대(500)를 상기 제1,2PC패널(410)(420)의 하단부에 고정시킨다.Subsequently, as shown in FIG. 3B, a truss stand 500 having an internal space in which the first and second connecting reinforcing bars 413 and 423 are accommodated is formed at the lower end of the first and second PC panels 410 and 420. fix it

이어서 바닥에 버림콘크리트(60)를 타설하여 양생시키고, 상기 제1,2PC패널(410)(420) 및 트러스 받침대(500)를 기립시켜서 상기 트러스 받침대(500)를 상기 버림콘크리트(60)에 수평레벨을 맞추고 고정와이어(710)(720)를 이용하여 풍하중에 안정하도록 고정시킨다.Next, cast-off concrete 60 is poured on the floor and cured, and the 1st and 2nd PC panels 410, 420 and the truss stand 500 are erected so that the truss stand 500 is leveled to the set-off concrete 60. Adjust the level and use the fixing wires 710 and 720 to fix it so that it is stable against wind load.

이어서 도 3c에 도시된 바와 같이, 상기 트러스 받침대(500) 내부에 기초철근(610)의 일부가 수용되도록 상기 버림콘크리트(60) 상에 상기 기초철근(610)을 배치하고, 도 3d에 도시된 바와 같이 상기 트러스 받침대(500) 및 기초철근(610)이 매몰되도록 콘크리트를 현장 타설하여 기초 콘크리트 바닥(600)을 형성한다.Subsequently, as shown in FIG. 3C, the foundation reinforcement 610 is placed on the discarded concrete 60 so that a portion of the foundation reinforcement 610 is accommodated inside the truss support 500, and the foundation reinforcement 610 is placed on the As shown, the foundation concrete floor 600 is formed by pouring concrete so that the truss support 500 and the foundation reinforcing bars 610 are buried.

상기와 같이 시공된 기초 트윈월(400)에는 제1,2PC패널(410)(420) 사이의 공간이 충전되도록 상기 제1,2PC패널(410)(420) 사이의 공간을 통하여 콘크리트를 타설하여 트윈월을 완성시킨다.In the foundation twin wall 400 constructed as described above, concrete is poured through the space between the first and second PC panels 410 and 420 so that the space between the first and second PC panels 410 and 420 is filled. Complete the twin wall.

상기와 같은 제작방법은 상기 제1,2연결철근(413)(423)을 트러스 받침대(500)에 수용하여서 기초 콘크리트 바닥(600)을 형성하므로, 제1,2PC패널(410)(420)의 내력근인 제1,2연결철근(413)(423)을 기초 콘크리트 바닥(600)의 보강근으로서 활용을 수월하게 한다.In the manufacturing method as described above, since the first and second connecting reinforcing bars 413 and 423 are accommodated in the truss support 500 to form the foundation concrete floor 600, the first and second PC panels 410 and 420 are formed. It is easy to utilize the first and second connecting bars 413 and 423, which are load-bearing bars, as reinforcing bars of the foundation concrete floor 600.

미설명부호 700은 견인용 브라켓이다.Reference numeral 700 is a bracket for towing.

400...기초 트윈월 410,420...제1,2PC패널
500...트러스 받침대 600...기초 콘크리트 바닥
700...견인 브라켓
400... basic twin wall 410,420... 1st, 2nd PC panel
500 ... truss base 600 ... foundation concrete floor
700...Towing bracket

Claims (2)

제1보강근(411)이 매립되며, 제1보강근(411)에 일단이 고정되고 타단이 외부로 돌출된 복수의 제1브라켓트(412)를 가지는 제1PC패널(410)과;
제2보강근(421)이 매립되며, 제2보강근(421)에 일단이 고정되고 타단이 외부로 돌출된 복수의 제2브라켓트(422)를 가지는 제2PC패널(420)과;
수평상으로 배치되어 상기 제1PC패널(410)과 제2PC패널(420)이 일정간격 유지되도록 상호 마주하는 상기 제1브라켓트(412)와 제2브라켓트(422)를 연결하는 연결바(430)와;
경사상으로 배치되어 상기 제1PC패널(410)과 제2PC패널(420)이 일정간격 유지되도록 상기 제1브라켓트(412)와 제2브라켓트(422)를 연결하는 경사바(440)를 구비하며,
상기 제1PC패널(410)의 하단부에는 제1연결철근(413)이 돌출되도록 배근되고, 상기 제2PC패널(420)의 하단부에는 제2연결철근(423)이 돌출되도록 배근되며, 상기 제1,2PC패널(410)(420)의 하단부에는 상기 제1,2연결철근(413)(423)이 수용되는 내부 공간이 형성된 트러스 받침대(500)가 고정되며,
상기 제1PC패널(410)은 상기 제1브라켓트(412)가 외부로 노출되도록 공장제작되어 현장으로 운반되고, 상기 제2PC패널(420)은 상기 제2브라켓트(422)가 외부로 노출되도록 공장제작되어 현장으로 운반되며, 상기 연결바(430)와 상기 경사바(440)는 현장에서 상기 제1브라켓트(412)와 상기 제2브라켓트(422)에 양단이 용접고정되거나 볼트 조립되고,
상기 트러스 받침대(500) 내에는 기초콘크리트 바닥(600)의 타설을 위한 기초철근(610)의 일부가 수용되는 것을 특징으로 하는 PC패널을 이용한 기초 트윈 월 구조체.
a first PC panel 410 having a plurality of first brackets 412 in which the first reinforcing bars 411 are embedded, one end fixed to the first reinforcing bars 411 and the other end protruding outward;
a second PC panel 420 having a plurality of second brackets 422 in which the second reinforcing bars 421 are embedded, one end fixed to the second reinforcing bars 421 and the other end protruding outward;
A connecting bar 430 that connects the first bracket 412 and the second bracket 422 that are disposed horizontally and face each other so that the first PC panel 410 and the second PC panel 420 are maintained at a predetermined interval, and ;
An inclined bar 440 connected to the first bracket 412 and the second bracket 422 so that the first PC panel 410 and the second PC panel 420 are maintained at a predetermined interval is provided with an inclined bar 440,
The lower end of the first PC panel 410 is reinforced so that the first connection reinforcement 413 protrudes, and the lower end of the second PC panel 420 is reinforced so that the second connection reinforcement 423 protrudes. At the lower end of the 2PC panel 410, 420, a truss stand 500 having an internal space in which the first and second connecting bars 413 and 423 are accommodated is fixed.
The first PC panel 410 is factory-manufactured to expose the first bracket 412 to the outside and transported to the site, and the second PC panel 420 is factory-manufactured to expose the second bracket 422 to the outside. and transported to the site, both ends of the connecting bar 430 and the inclined bar 440 are welded and fixed to the first bracket 412 and the second bracket 422 at the site or assembled with bolts,
In the truss support 500, a foundation twin wall structure using a PC panel, characterized in that a portion of the foundation reinforcement 610 for the casting of the foundation concrete floor 600 is accommodated.
a) 제1보강근이 매립되며, 제1보강근에 일단이 고정되고 타단이 외부로 돌출된 복수의 제1브라켓트를 가지는 제1PC패널을 공장 제작하고 제1PC패널의 하단부에 제1연결철근이 돌출되도록 배근하는 단계와;
b) 제2보강근이 매립되며, 제2보강근에 일단이 고정되고 타단이 외부로 돌출된 복수의 제2브라켓트를 가지는 제2PC패널을 공장 제작하고 제2PC패널의 하단부에 제2연결철근이 돌출되도록 배근하는 단계와;
c) 상기 제1PC패널과 제2PC패널을 공사 현장으로 운반하여서, 상기 제1PC패널과 제2PC패널이 일정간격 유지되도록 연결바를 수평상으로 배치하여 상호 마주하는 상기 제1브라켓트와 제2브라켓트를 연결하는 단계와;
d) 상기 c)단계 이후에 상기 제1PC패널과 제2PC패널 사이에 경사바를 경사상으로 배치하여 제1브라켓트와 제2브라켓트를 연결하는 단계와;
e) 상기 제1,2연결철근이 수용되는 내부 공간이 형성된 트러스 받침대를 상기 제1,2PC패널의 하단부에 고정시키는 단계;를 포함하고,
상기 e)단계 이후에 바닥에 버림콘크리트를 타설하여 양생하는 단계와;
상기 제1,2PC패널 및 트러스 받침대를 기립시켜서 상기 트러스 받침대를 상기 버림콘크리트에 수평레벨을 맞추면서 고정와이어를 이용하여 안정하도록 고정시키는 단계와;
상기 트러스 받침대 내부에 기초철근의 일부가 수용되도록 상기 버림콘크리트 상에 상기 기초철근을 배치하는 단계와;
상기 트러스 받침대 및 기초철근이 매몰되도록 콘크리트를 현장 타설하여 기초 콘크리트 바닥을 형성하는 단계와;
상기 제1,2PC패널 사이의 공간이 충전되도록 상기 제1,2PC패널 사이에 콘크리트를 타설하는 단계;를 포함하는 것을 특징으로 하는 PC패널을 이용한 기초 트윈 월 구조체의 제작방법.
a) A first PC panel having a plurality of first brackets in which the first reinforcing bar is embedded, one end fixed to the first reinforcing bar and the other end protruding outward is manufactured in a factory, and the first connecting reinforcing bar protrudes from the lower end of the first PC panel. the step of arranging;
b) A second PC panel having a plurality of second brackets in which the second reinforcing bar is embedded, one end fixed to the second reinforcing bar and the other end protruding outward is manufactured in a factory, and the second connecting reinforcing bar protrudes from the lower end of the second PC panel. the step of arranging;
c) The first and second PC panels are transported to the construction site, and a connecting bar is placed horizontally to connect the first bracket and the second bracket facing each other so that the first PC panel and the second PC panel are maintained at a certain distance. step of doing;
d) connecting the first bracket and the second bracket by arranging an inclined bar between the first PC panel and the second PC panel after step c);
e) fixing a truss stand having an inner space in which the first and second connecting reinforcing bars are accommodated to the lower end of the first and second PC panels;
Curing by pouring abandoned concrete on the floor after step e);
elevating the first and second PC panels and the truss support and stably fixing the truss support using a fixing wire while leveling the truss support to the abandoned concrete;
arranging the foundation reinforcement on the discarded concrete so that a part of the foundation reinforcement is accommodated inside the truss stand;
Forming a foundation concrete floor by casting concrete on-site so that the truss support and foundation reinforcing bars are buried;
Casting concrete between the first and second PC panels to fill the space between the first and second PC panels; manufacturing method of a basic twin wall structure using PC panels, characterized in that it comprises a.
KR1020230072897A 2015-11-02 2023-06-07 A twin wall structure using a PC panel and method for manufacturing of it KR20230090300A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020230072897A KR20230090300A (en) 2015-11-02 2023-06-07 A twin wall structure using a PC panel and method for manufacturing of it

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020150153298A KR20170051018A (en) 2015-11-02 2015-11-02 A twin wall structure using a PC panel and method for manufacturing of it
KR1020230072897A KR20230090300A (en) 2015-11-02 2023-06-07 A twin wall structure using a PC panel and method for manufacturing of it

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020150153298A Division KR20170051018A (en) 2015-11-02 2015-11-02 A twin wall structure using a PC panel and method for manufacturing of it

Publications (1)

Publication Number Publication Date
KR20230090300A true KR20230090300A (en) 2023-06-21

Family

ID=58741499

Family Applications (2)

Application Number Title Priority Date Filing Date
KR1020150153298A KR20170051018A (en) 2015-11-02 2015-11-02 A twin wall structure using a PC panel and method for manufacturing of it
KR1020230072897A KR20230090300A (en) 2015-11-02 2023-06-07 A twin wall structure using a PC panel and method for manufacturing of it

Family Applications Before (1)

Application Number Title Priority Date Filing Date
KR1020150153298A KR20170051018A (en) 2015-11-02 2015-11-02 A twin wall structure using a PC panel and method for manufacturing of it

Country Status (1)

Country Link
KR (2) KR20170051018A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109594688A (en) * 2019-01-16 2019-04-09 中建局集团建设发展有限公司 A kind of double skin wall constructions of steel truss and its construction method
CN112177041B (en) * 2020-08-24 2021-11-05 福建建中建设科技有限责任公司 Underground space prefabricated and assembled integral structure and construction method thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060024850A (en) 2004-09-15 2006-03-20 삼성물산 주식회사 Steel-concrete sandwitch type hybrid beam and high strength hybrid structure system using the same

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060024850A (en) 2004-09-15 2006-03-20 삼성물산 주식회사 Steel-concrete sandwitch type hybrid beam and high strength hybrid structure system using the same

Also Published As

Publication number Publication date
KR20170051018A (en) 2017-05-11

Similar Documents

Publication Publication Date Title
KR20230090300A (en) A twin wall structure using a PC panel and method for manufacturing of it
KR101001208B1 (en) A constructing method of structure using sandwich pc-wall
KR101314081B1 (en) Retaining wall and upeer structure connection method for rahmen structure
KR101574253B1 (en) A method for construction using a twin wall structure using a PC panel
KR101588593B1 (en) Temporary bridge construction method
KR101570484B1 (en) Half-PC Column using lightweight Encased Inner Form And Manufacturing Method Thereof, And Construction Method Using The Same
KR101663132B1 (en) Self-supporting type column structure
KR101478131B1 (en) Construction Method of Precast Pier
KR20170032826A (en) Precast concrete dual wall structure and construction method thereof
KR100787119B1 (en) Pier having Precast Concrete Pipe
KR101186053B1 (en) Method of Constructing Insitu Concrete Beam Using Preinstalled Precast Concrete Slab
KR200424776Y1 (en) Pier having Precast Concrete Pipe
KR101478611B1 (en) Method for pre-constructing staircase in building by using precast concrete column
KR101259156B1 (en) Method constructing precasting water-storage tank
KR101750404B1 (en) Structure using same time pouring process for wall and foundation concrete and construction method therefor
JP5865567B2 (en) Connecting slab and its construction method
KR101192362B1 (en) Half pc slab with additional strengthening of shearing resistance force
KR101036177B1 (en) Method for constructing building using PRC integrating method
KR101105883B1 (en) Basic mat constructing method of high rise concrete structure
KR20140110491A (en) Half precast concrete column manufacturing method using saddle-type ties and dual hoops and constructing method using the same
KR200387408Y1 (en) Knockdown basic-block
KR101616483B1 (en) Construction Method Of Underground Parking Lot Using Precast Concrete Beam With Changing Cross Section
KR101677431B1 (en) Large concrete retaining wall and method of construction
KR101576215B1 (en) Prefabricated precast concrete girder for building construction
KR101056395B1 (en) The water-storage tank of assembly type and method for constructing thereof

Legal Events

Date Code Title Description
A107 Divisional application of patent
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
AMND Amendment
X601 Decision of rejection after re-examination