KR20170051018A - A twin wall structure using a PC panel and method for manufacturing of it - Google Patents

A twin wall structure using a PC panel and method for manufacturing of it Download PDF

Info

Publication number
KR20170051018A
KR20170051018A KR1020150153298A KR20150153298A KR20170051018A KR 20170051018 A KR20170051018 A KR 20170051018A KR 1020150153298 A KR1020150153298 A KR 1020150153298A KR 20150153298 A KR20150153298 A KR 20150153298A KR 20170051018 A KR20170051018 A KR 20170051018A
Authority
KR
South Korea
Prior art keywords
panel
bracket
panels
truss
reinforcing bar
Prior art date
Application number
KR1020150153298A
Other languages
Korean (ko)
Inventor
김성우
Original Assignee
주식회사 태영피씨엠
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 태영피씨엠 filed Critical 주식회사 태영피씨엠
Priority to KR1020150153298A priority Critical patent/KR20170051018A/en
Publication of KR20170051018A publication Critical patent/KR20170051018A/en
Priority to KR1020230072897A priority patent/KR20230090300A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • E03F5/101Dedicated additional structures, interposed or parallel to the sewer system
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C2003/026Braces
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C2003/0486Truss like structures composed of separate truss elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Hydrology & Water Resources (AREA)
  • Revetment (AREA)
  • Foundations (AREA)

Abstract

The present invention relates to a basic twin-wall structure using a PC panel and a manufacturing method thereof configured to easily manufacture first and second PC panels, to each of which a bracket is exposed, in a PC manufacturing plant and a basic twin-wall structure at a construction site, integrally manufacture first and second PC panels, to which the first and second connecting bars are exposed at the lower end thereof, secure the structural stability through the connection with the bottom of a concrete, reduce the amount of rebars, and to shorten the construction period.

Description

PC패널을 이용한 기초 트윈 월 구조체 및 이의 제작방법{A twin wall structure using a PC panel and method for manufacturing of it}BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a twin wall structure using a PC panel and a manufacturing method thereof,

본 발명은 PC패널을 이용한 기초 트윈 월 구조체 및 이의 제작방법에 관한 것으로써, 더 상세하게는 PC제작 공장에서 브라켓트가 노출된 제1,2PC패널을 각각 제작하고 공사현장에서 간편하게 기초 트윈 월 구조물을 제작할 수 있도록 하며, 하단부에 제1,2연결철근이 노출된 제1,2PC패널을 일체형으로 제작하여서 기초 콘크리트 바닥과의 연결을 통하여 구조적 안정성을 확보하고 철근량을 줄일 수 있으며 공사기간을 단축할 수 있도록 한 PC패널을 이용한 기초 트윈 월 구조체 및 이의 제작방법에 관한 것이다.The present invention relates to a basic twin wall structure using a PC panel and a method of manufacturing the same. More particularly, the present invention relates to a method of manufacturing a basic twin wall structure And the first and second PCBs with the first and second connecting bars exposed at the lower part are integrally manufactured so that the structural stability can be secured through connection with the bottom of the foundation concrete and the amount of reinforcing steel can be reduced and the construction period can be shortened To a basic twin wall structure using a PC panel and a manufacturing method thereof.

예컨대, 우수 저류조, 지하주차장과 같은 지하 구조물은 도 1에 도시된 바와 같이, 터파기공사 후 기초바닥을 형성하고, 기초바닥에 거푸집을 설치하여 RC(reinforced concrete)공법에 의한 현장 콘크리트로 외벽을 시공하고, 외벽 상단부에 피씨 슬래브 또는 현장콘크리트 슬래브를 탑재하여 시공하게 된다.For example, as shown in FIG. 1, an underground structure such as a storeroom tank, an underground parking lot, and the like is formed by forming a foundation floor after a treadmill, installing a mold on a foundation floor, And a concrete slab or a PC slab is mounted on the upper end of the outer wall.

그러나, 상기 RC공법에 의한 외벽 시공은 벽체를 세우기 위하여 거푸집에 콘크리트를 타설하여 콘크리트 벽체가 경화되어야 다음의 공정을 진행할 수 있으므로 거푸집의 설치하고 제거해야 하는 번거로움이 있었으며, 이에 따른 공사기간이 길어지게 되는 문제점이 있어 왔다.However, in the case of the outer wall construction by the RC method, since the concrete wall is cured by placing the concrete in the formwork in order to build up the wall, the following process can be carried out, so that it is troublesome to install and remove the formwork, There has been a problem.

또한, 현장 콘크리트에 의해 시공되는 종래의 외벽 외주면에는 지하층이라는 특성 때문에 심할 경우 물이 실내측 외벽에 흐르는 문제가 발생되어 충분히 건조되지 못한 외벽의 경우에는 균열이 발생되어 누수 발생으로 연결되는 문제가 발생되고 있다.Also, in the case of the outer wall of the conventional outer wall constructed by the on-site concrete, there is a problem that the water flows on the inner wall of the room due to the characteristic of the underground layer, .

한국특허공개번호 제10-2006-0024850호Korean Patent Publication No. 10-2006-0024850

본 발명은 상기와 같은 문제점을 해결하기 위하여 창출된 것으로써, 하단부에 제1,2연결철근이 노출된 제1,2PC패널을 일체형으로 제작하여서 기초 콘크리트 바닥과의 연결을 통하여 구조적 안정성을 확보하고 철근량을 줄일 수 있으며 공사기간을 단축할 수 있도록 한 PC패널을 이용한 기초 트윈 월 구조체 및 이의 제작방법을 제공하는 데 그 목적이 있다.SUMMARY OF THE INVENTION The present invention has been made in order to solve the above-mentioned problems, and it is an object of the present invention to provide an integrated structure of a first and a second PCB having first and second connection reinforcing bars exposed at a lower end thereof, The present invention aims at providing a basic twinwall structure using a PC panel and a method of manufacturing the same, which can reduce the amount of reinforcing bar and shorten a construction period.

본 발명의 다른 목적은 기초콘크리트바닥과 기초 트윈월이 일체화되어 구조적으로 안정된 PC패널을 이용한 트윈월 구조체 및 이의 제작방법을 제공하는 데 있다.Another object of the present invention is to provide a twin wall structure using a PC panel that is structurally stable by integrating a base concrete floor and a base twin wall, and a manufacturing method thereof.

상기 목적을 달성하는 본 발명 PC패널을 이용한 기초 트윈월 구조체는,To accomplish the above object, the present invention provides a basic twinwall structure using a PC panel,

제1보강근이 매립되며, 제1보강근에 일단이 고정되고 타단이 외부로 돌출된 복수의 제1브라켓트를 가지는 제1PC패널과;A first PC panel having a first reinforcing bar embedded therein, a first PC panel having a plurality of first brackets, one end of which is fixed to the first reinforcing bar, and the other end of which is protruded to the outside;

제2보강근이 매립되며, 제2보강근에 일단이 고정되고 타단이 외부로 돌출된 복수의 제2브라켓트를 가지는제2PC패널과;A second PC panel having a second reinforcing bar embedded therein and having a plurality of second brackets, one end of which is fixed to the second reinforcing bar and the other end of which is projected to the outside;

수평상으로 배치되어 상기 제1PC패널과 제2PC패널이 일정간격 유지되도록 상호 마주하는 상기 제1브라켓트와 제2브라켓트를 연결하는 연결바를 구비하여 된 것을 특징으로 한다.And a connection bar for connecting the first and second brackets to each other so that the first and second PC panels face each other so that the first PC panel and the second PC panel are spaced apart from each other by a predetermined distance.

또한, 본 발명 구조체는 경사상으로 배치되어 상기 제1PC패널과 제2PC패널이 일정간격 유지되도록 상기 제1브라켓트와 제2브라켓트를 연결하는 경사바를 더 구비하여 된 것을 특징으로 한다.In addition, the structure of the present invention is further provided with a tilting bar which is disposed in a tilted manner and connects the first bracket and the second bracket so that the first PC panel and the second PC panel are spaced apart from each other.

또한, 본 발명 구조체는 상기 제1PC패널의 하단부에 제1연결철근이 돌출되도록 배근되고, 상기 제2PC패널의 하단부에 제2연결철근이 돌출되도록 배근되며,Also, the structure of the present invention is arranged such that a first connecting reinforcing bar is projected to a lower end portion of the first PC panel, a second connecting reinforcing bar is projected to a lower end portion of the second PC panel,

상기 제1,2PC패널의 하단부에 상기 제1,2연결철근이 수용되는 내부 공간이 형성된 트러스 받침대가 고정된 것을 특징으로 한다.And a truss base having an inner space formed therein for receiving the first and second connecting bars is fixed to a lower end of the first and second PCBs.

한편, 상기 목적을 달성하는 본 발명 PC패널을 이용한 기초 트윈월 구조체의 시공방법은,According to another aspect of the present invention, there is provided a method of constructing a basic twinwall structure using a PC panel,

a) 제1보강근이 매립되며, 제1보강근에 일단이 고정되고 타단이 외부로 돌출된 복수의 제1브라켓트를 가지는 제1PC패널을 공장 제작하는 단계와;a) fabricating a first PC panel having a first reinforcing bar embedded therein, a first PC panel having a plurality of first brackets whose one ends are fixed to the first reinforcing bars and whose other ends are projected to the outside;

b) 제2보강근이 매립되며, 제2보강근에 일단이 고정되고 타단이 외부로 돌출된 복수의 제2브라켓트를 가지는 제2PC패널을 공장 제작하는 단계와;b) planting a second PC panel having a second reinforcing bar embedded therein, the second PC panel having a plurality of second brackets one end of which is fixed to the second reinforcement and the other end of which is projected to the outside;

c) 상기 제1PC패널과 제2PC패널을 공사 현장으로 운반하여서, 상기 제1PC패널과 제2PC패널이 일정간격 유지되도록 연결바를 수평상으로 배치하여 상호 마주하는 상기 제1브라켓트와 제2브라켓트를 연결하는 단계와;c) The first PC panel and the second PC panel are transported to a construction site so that the first PC panel and the second PC panel are vertically arranged so that the first PC panel and the second PC panel are spaced apart from each other and the first and second brackets ;

d) 상기 c)단계 이후에 상기 제1PC패널과 제2PC패널 사이에 경사바를 경사상으로 배치하여 제1브라켓트와 제2브라켓트를 연결하는 단계;를 포하하여 된 것을 특징으로 한다.and d) connecting the first bracket and the second bracket by arranging the tilting bar between the first PC panel and the second PC panel after the step c).

또한, 본 발명 시공방법은 상기 a)단계에서 제1PC패널의 하단부에 제1연결철근이 돌출되도록 배근하고, 상기 b)단계에서 제2PC패널의 하단부에 제2연결철근이 돌출되도록 배근하는 단계를 더 포함하고,In addition, in the method of the present invention, the step of arranging the first connection reinforcing bars so as to protrude from the lower end of the first PC panel in step (a) and the step of arranging the second connecting reinforcing bars to protrude to the lower end of the second PC panel in step (b) Further included,

상기 d)단계 이후에 상기 제1,2연결철근이 수용되는 내부 공간이 형성된 트러스 받침대를 상기 제1,2PC패널의 하단부에 고정시키는 e)단계를 더 포함하여 된 것을 특징으로 한다.And fixing the truss pedestal having the internal space for accommodating the first and second connecting bars to the lower end of the first and second PC panels after step d).

또한, 본 발명 시공방법은 상기 e)단계 이후에 바닥에 버림콘크리트를 타설하여 양생하는 단계와;In addition, the method of the present invention may further include the step of curing the pouring concrete on the floor after the step e);

상기 제1,2PC패널 및 트러스 받침대를 기립시켜서 상기 트러스 받침대를 상기 버림콘크리트에 수평레벨을 맞추면서 고정와이어를 이용하여 안정하도록 고정시키는 단계와;Fixing the first and second PC panels and the truss bracket so that the truss bracket is stably fixed using the fixing wire while adjusting the truss bracket to the horizontal level;

상기 트러스 받침대 내부에 기초철근의 일부가 수용되도록 상기 버림콘크리트 상에 상기 기초철근을 배치하는 단계와;Disposing the foundation reinforcement on the abandoned concrete so that a portion of the foundation reinforcement is accommodated in the truss base;

상기 트러스 받침대 및 기초철근이 매몰되도록 콘크리트를 현장 타설하여 기초 콘크리트바닥을 형성하는 단계와;Forming a foundation concrete floor by casting the concrete so that the truss base and the foundation steel are buried;

상기 제1,2PC패널 사이의 공간이 충전되도록 상기 제1,2PC패널 사이에 콘크리트를 타설하는 단계;를 포함하여 된 것을 특징으로 한다.And placing the concrete between the first and second panels so that a space between the first and second panels is filled.

첫째, 제1,2PC패널이 일체형으로 제작, 설치되므로 공기단축 및 가설재 양을 최소화 할 수 있으며, 트러스 받침대(500)를 통하여 기초콘크리트바닥(600)과 일체화되어 구조적으로 안정된 기초 트윈월 구조체를 제공하고 철근량을 줄일 수 있도록 한다.First, since the first and second PC panels are integrally manufactured and installed, the amount of shortening of air and the amount of construction material can be minimized, and the structure can be integrated with the foundation concrete floor 600 through the truss pedestal 500 to provide a structurally stable foundation twinwall structure And reduce the amount of rebar.

둘째, 제1,2연결철근(413)(423)을 트러스 받침대(500)에 수용하여서 기초 콘크리트바닥(600)을 형성하므로, 기초 트윈월(400)의 내력근인 제1,2연결철근(413)(423)을 기초 콘크리트바닥(600)의 내력근으로서 활용을 수월하게 한다.Second, since the first and second connecting bars 413 and 423 are received in the truss bases 500 to form the base concrete floor 600, the first and second connecting bars 413 and 413, ) 423 as the strength of the foundation concrete floor 600.

도 1은 종래 벽 구조물 시공방법을 설명하는 개략 단면도,
도 2는 본 발명 실시예의 기초 트윈 월을 나타낸 단면도,
도 3a 내지 도 3d는 본 발명 실시예의 기초 트윈 월의 제작방법을 설명하는 순서도,
도 4는 본 발명 실시예에 채용되는 제1,2PC패널을 나타낸 단면도이다.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a schematic cross-sectional view illustrating a conventional wall structure construction method;
2 is a sectional view showing a basic twin wall of the embodiment of the present invention,
FIGS. 3A to 3D are flowcharts for explaining a method of manufacturing a basic twin wall according to the embodiment of the present invention,
4 is a cross-sectional view showing a first and a second PC panels employed in the embodiment of the present invention.

본 발명 실시예의 PC패널을 이용한 기초 트윈 월 구조체 및 이의 제작방법은 하단부에 제1,2연결철근이 노출된 제1,2PC패널을 일체형으로 제작하여서 기초 콘크리트 바닥과의 연결을 통하여 구조적 안정성을 확보하고 철근량을 줄일 수 있으며 공사기간을 단축할 수 있도록 한다.The basic twin wall structure using the PC panel of the present invention and the method of manufacturing the same according to the embodiment of the present invention have a structure in which the first and second PC panels exposed with the first and second connecting bars are integrally formed at the lower end thereof, To reduce the amount of rebar and to shorten the construction period.

특히, 제1,2PC패널에 제1,2브라켓트가 외부로 노출되도록 공장제작함으로써, 현장으로의 운반을 편리하게 하고 또한 연결바를 통한 제1,2PC패널의 연결작업을 간편하게 한다.Particularly, since the first and second brackets are exposed to the outside on the first and second PC panels, the first and second PC panels can be easily transported to the site and the first and second PC panels can be easily connected.

도 2 및 도 3a를 참조하면, 본 발명 실시예의 기초 트윈 월(400)은 제1보강근(411)이 매립되며, 제1보강근(411)에 일단이 고정되고 타단이 외부로 돌출된 복수의 제1브라켓트(412)를 가지는 제1PC패널(410)과; 제2보강근(421)이 매립되며, 제2보강근(421)에 일단이 고정되고 타단이 외부로 돌출된 복수의 제2브라켓트(422)를 가지는제2PC패널(420)과; 수평상으로 배치되어 상기 제1PC패널(410)과 제2PC패널(420)이 일정간격 유지되도록 상호 마주하는 상기 제1브라켓트(412)와 제2브라켓트(422)를 연결하는 연결바(430)를 구비한다.Referring to FIGS. 2 and 3A, the basic twin wall 400 of the embodiment of the present invention includes a plurality of first reinforcement rods 411, one end of which is fixed to the first reinforcement rods 411, A first PC panel 410 having one bracket 412; A second PC panel 420 having a second reinforcing bar 421 embedded therein and having a plurality of second brackets 422 having one end fixed to the second reinforcing bars 421 and the other end protruding to the outside; A connection bar 430 connecting the first bracket 412 and the second bracket 422 facing each other so that the first PC panel 410 and the second PC panel 420 are spaced apart from each other, Respectively.

또한, 경사상으로 배치되어 상기 제1PC패널(410)과 제2PC패널(420)이 일정간격 유지되도록 상기 제1브라켓트(412)와 제2브라켓트(422)를 연결하는 경사바(440)를 구비한다.The first bracket 412 and the second bracket 422 are connected to each other so that the first PC panel 410 and the second PC panel 420 are spaced from each other by a predetermined distance. do.

또한, 본 발명 실시예의 기초 트윈월 구조체(400)는 상기 제1PC패널(410)의 하단부에는 제1연결철근(413)이 돌출되도록 배근되고, 상기 제2PC패널(420)의 하단부에는 제2연결철근(423)이 돌출되도록 배근되며, 상기 제1,2PC패널(410)(420)의 하단부에는 상기 제1,2연결철근(413)(423)이 수용되는 내부 공간이 형성된 트러스 받침대(500)가 고정된다.The first PC panel 410 has a first connection reinforcing bar 413 protruded from a lower end of the first PC panel 410 and a second connection A truss base 500 having an inner space in which the first and second connection bars 413 and 423 are received is formed at a lower end of the first and second PC panels 410 and 420, Is fixed.

상기 연결바(430) 및 경사바(440)는 공사현장에서 제1,2브라켓트(412)(422)에 용접고정되거나 볼트 조립된다.The connection bar 430 and the tilting bar 440 are welded or bolted to the first and second brackets 412 and 422 at the construction site.

이 실시예의 PC패널을 이용한 기초 트윈 월 구조체는 제1,2브라켓트(412)(422)가 노출된 각 제1,2PC(410)(420)를 공장제작함으로써, 공사 현장으로의 운반을 간편하게 하고 또한 공사현장에서 연결바(430)와 경사바(440)의 조립을 편리하게 한다.In the basic twin wall structure using the PC panel of this embodiment, the first and second PCs 410 and 420, to which the first and second brackets 412 and 422 are exposed, are manufactured in a factory, Also, it facilitates the assembly of the connecting bar 430 and the tilting bar 440 at a construction site.

또한, 하단부에 제1,2연결철근(412)(422)이 노출되도록 제1,2PC패널(410)(420)을 제작함으로써 현장에서 기초 콘크리트 바닥(600)과의 연결을 통하여 구조적 안정성을 확보하고 철근량을 줄일 수 있으며 공사기간을 단축할 수 있으며, 특히 공사현장에서 트러스 받침대(500)를 제1,2PC패널(410)(420)과 일체형으로 제작하고 트러스 받침대(500)에 상기 제1,2연결철근(412)(422)이 수용되도록 함으로써 기초 콘크리트 바닥(600)과의 구조적 안정성을 보다 더 확보할 수 있게 한다.The first and second PC panels 410 and 420 are fabricated to expose the first and second connection reinforcing bars 412 and 422 at the lower end thereof to secure structural stability through connection with the foundation concrete floor 600 in the field. The truss base 500 is integrally formed with the first and second PC panels 410 and 420 at the construction site and the truss base 500 is integrally formed with the first and second PCBs 410 and 420, 2 connection reinforcing bars 412 and 422 are accommodated, thereby further securing the structural stability with the foundation concrete floor 600. [

상기와 같은 구성의 기초 트윈월을 제작하는 방법은, 도 4를 참조하면, 먼저 공장에서 제1,2PC패널(410)(420)을 제작한다.Referring to FIG. 4, a method for fabricating a basic twinwall having the above-described configuration includes fabricating first and second PC panels 410 and 420 in a factory.

제1PC패널(410)에는 일정간격으로 복수의 제1브라켓트(412)의 일단이 용접고정된 제1보강근(411)을 매립하되, 제1브라켓트(412)의 타단이 외부로 돌출되도록 매립한다.The first reinforcing bars 411 are welded to the first PC panel 410 so that the other ends of the first brackets 412 protrude to the outside.

또한, 제1PC패널(410)과 대향되는 제2PC패널(420)에도 일정간격으로 복수의 제2브라켓트(422)의 일단이 용접고정된 제2보강근(421)을 매립하되, 제2브라켓트(422)의 타단이 외부로 돌출되도록 매립한다.A second reinforcing bar 421 having one end of a plurality of second brackets 422 welded and fixed to the second PC panel 420 is also embedded in the second PC panel 420 facing the first PC panel 410. The second brackets 422 ) Is projected to the outside.

상기 제1,2PC패널(410)(420)에 제1,2보강근(411)(421)을 매립할때, 각 제1,2PC패널(410)(420)의 하단부에 제1,2연결철근(413)(423)이 돌출되도록 배근한다.When the first and second reinforcing rods 411 and 421 are embedded in the first and second PC panels 410 and 420 at the lower ends of the first and second PC panels 410 and 420, (413) and (423) project.

이어서 상기와 같이 공장 제작된 제1,2PC패널(410)(420)을 공사 현장으로 운반하여서, 도 3a에 도시된 바와 같이 상기 제1PC패널(410)과 제2PC패널(420)이 일정간격 유지되도록 연결바(430)를 수평상으로 배치하여 상호 마주하는 상기 제1브라켓트(412)와 제2브라켓트(422)를 볼트 또는 용접으로 연결한다.Then, the first and second PC panels 410 and 420 manufactured as described above are transported to a construction site so that the first PC panel 410 and the second PC panel 420 are spaced apart from each other So that the first bracket 412 and the second bracket 422 facing each other are bolted or welded to each other.

또한, 상기 제1PC패널(410)과 제2PC패널(420) 사이에 경사바(440)를 경사상으로 배치하여 제1브라켓트(412)와 제2브라켓트(422)를 연결한다.The inclined bar 440 is disposed between the first PC panel 410 and the second PC panel 420 in a tilted manner to connect the first bracket 412 and the second bracket 422 to each other.

이어서 도 3b에 도시된 바와 같이, 상기 제1,2연결철근(413)(423)이 수용되는 내부 공간이 형성된 트러스 받침대(500)를 상기 제1,2PC패널(410)(420)의 하단부에 고정시킨다.3B, a truss brace 500 having an internal space for accommodating the first and second connecting bars 413 and 423 is disposed at a lower end of the first and second PC panels 410 and 420, .

이어서 바닥에 버림콘크리트(60)를 타설하여 양생시키고, 상기 제1,2PC패널(410)(420) 및 트러스 받침대(500)를 기립시켜서 상기 트러스 받침대(500)를 상기 버림콘크리트(60)에 수평레벨을 맞추고 고정와이어(710)(720)를 이용하여 풍하중에 안정하도록 고정시킨다.Then, the truncated concretes 60 are placed on the floor for curing, and the first and second PC panels 410 and 420 and the truss base 500 are erected so that the truss base 500 is horizontally The level is fixed and fixed with the fixed wire 710 (720) to stabilize the wind load.

이어서 도 3c에 도시된 바와 같이, 상기 트러스 받침대(500) 내부에 기초철근(610)의 일부가 수용되도록 상기 버림콘크리트(60) 상에 상기 기초철근(610)을 배치하고, 도 3d에 도시된 바와 같이 상기 트러스 받침대(500) 및 기초철근(610)이 매몰되도록 콘크리트를 현장 타설하여 기초 콘크리트바닥(600)을 형성한다.3C, the foundation reinforcing bars 610 are disposed on the trash concrete 60 so that a part of the foundation reinforcing bars 610 are accommodated in the truss base 500, and as shown in FIG. 3D, The foundation concrete floor 600 is formed by casting the concrete so that the truss base 500 and the foundation reinforcing bars 610 are buried.

상기와 같이 시공된 기초 트윈 월(400)에는 제1,2PC패널(410)(420) 사이의 공간이 충전되도록 상기 제1,2PC패널(410)(420) 사이의 공간을 통하여 콘크리트를 타설하여 트윈월을 완성시킨다.The concrete is laid through the space between the first and second PC panels 410 and 420 so that the space between the first and second PC panels 410 and 420 is filled in the basic twinwall 400 constructed as described above Complete the twin month.

상기와 같은 제작방법은 상기 제1,2연결철근(413)(423)을 트러스 받침대(500)에 수용하여서 기초 콘크리트바닥(600)을 형성하므로, 제1,2PC패널(410)(420)의 내력근인 제1,2연결철근(413)(423)을 기초 콘크리트바닥(600)의 보강근으로서 활용을 수월하게 한다.The first and second connecting bars 413 and 423 are received in the truss base 500 to form the base concrete floor 600. The first and second connecting bars 413 and 423 The first and second connecting reinforcing bars 413 and 423, which are the reinforced concrete reinforcing bars, are used as the reinforcing bars of the foundation concrete floor 600.

미설명부호 700은 견인용 브라켓이다.Reference numeral 700 denotes a bracket for towing.

400...기초 트윈월 410,420...제1,2PC패널
500...트러스 받침대 600...기초 콘크리트 바닥
700...견인 브라켓
400 ... basis Twin month 410,420 ... 1st and 2nd PC panels
500 ... truss base 600 ... foundation concrete floor
700 ... Traction bracket

Claims (6)

제1보강근(411)이 매립되며, 제1보강근(411)에 일단이 고정되고 타단이 외부로 돌출된 복수의 제1브라켓트(412)를 가지는 제1PC패널(410)과;
제2보강근(421)이 매립되며, 제2보강근(421)에 일단이 고정되고 타단이 외부로 돌출된 복수의 제2브라켓트(422)를 가지는제2PC패널(420)과;
수평상으로 배치되어 상기 제1PC패널(410)과 제2PC패널(420)이 일정간격 유지되도록 상호 마주하는 상기 제1브라켓트(412)와 제2브라켓트(422)를 연결하는 연결바(430)를 구비하여 된 것을 특징으로 하는 PC패널을 이용한 기초 트윈 월 구조체.
A first PC panel 410 having a first reinforcing bar 411 embedded therein and a plurality of first brackets 412 having one end fixed to the first reinforcing bars 411 and the other end protruding to the outside;
A second PC panel 420 having a second reinforcing bar 421 embedded therein and having a plurality of second brackets 422 having one end fixed to the second reinforcing bars 421 and the other end protruding to the outside;
A connection bar 430 connecting the first bracket 412 and the second bracket 422 facing each other so that the first PC panel 410 and the second PC panel 420 are spaced apart from each other, Wherein the base panel is made of a metal.
청구항 1에 있어서, 경사상으로 배치되어 상기 제1PC패널(410)과 제2PC패널(420)이 일정간격 유지되도록 상기 제1브라켓트(412)와 제2브라켓트(422)를 연결하는 경사바(440)를 더 구비하여 된 것을 특징으로 하는 PC패널을 이용한 기초 트윈 월 구조체.The first bracket 412 and the second bracket 422 are connected to each other by a tilting bar 440 which connects the first bracket 412 and the second bracket 422 so that the first PC panel 410 and the second PC panel 420 are spaced apart from each other by a predetermined distance, The present invention relates to a twin wall structure using a PC panel. 청구항 2에 있어서, 상기 제1PC패널(410)의 하단부에는 제1연결철근(413)이 돌출되도록 배근되고,
상기 제2PC패널(420)의 하단부에는 제2연결철근(423)이 돌출되도록 배근되며,
상기 제1,2PC패널(410)(420)의 하단부에는 상기 제1,2연결철근(413)(423)이 수용되는 내부 공간이 형성된 트러스 받침대(500)가 고정된 것을 특징으로 하는 PC패널을 이용한 기초 트윈 월 구조체.
[4] The method of claim 2, wherein a first connection reinforcing bar (413) protrudes from the lower end of the first PC panel (410)
A second connection reinforcing bar 423 is projected from the lower end of the second PC panel 420,
The truss base 500 is fixed to the lower end of the first and second PC panels 410 and 420 with an internal space for receiving the first and second connection reinforcing bars 413 and 423. [ Used basic twin wall structure.
a) 제1보강근이 매립되며, 제1보강근에 일단이 고정되고 타단이 외부로 돌출된 복수의 제1브라켓트를 가지는 제1PC패널을 공장 제작하는 단계와;
b) 제2보강근이 매립되며, 제2보강근에 일단이 고정되고 타단이 외부로 돌출된 복수의 제2브라켓트를 가지는 제2PC패널을 공장 제작하는 단계와;
c) 상기 제1PC패널과 제2PC패널을 공사 현장으로 운반하여서, 상기 제1PC패널과 제2PC패널이 일정간격 유지되도록 연결바를 수평상으로 배치하여 상호 마주하는 상기 제1브라켓트와 제2브라켓트를 연결하는 단계와;
d) 상기 c)단계 이후에 상기 제1PC패널과 제2PC패널 사이에 경사바를 경사상으로 배치하여 제1브라켓트와 제2브라켓트를 연결하는 단계;를 포하하여 된 것을 특징으로 하는 PC패널을 이용한 기초 트윈 월 구조체의 제작방법.
a) fabricating a first PC panel having a first reinforcing bar embedded therein, a first PC panel having a plurality of first brackets whose one ends are fixed to the first reinforcing bars and whose other ends are projected to the outside;
b) planting a second PC panel having a second reinforcing bar embedded therein, the second PC panel having a plurality of second brackets one end of which is fixed to the second reinforcement and the other end of which is projected to the outside;
c) The first PC panel and the second PC panel are transported to a construction site so that the first PC panel and the second PC panel are vertically arranged so that the first PC panel and the second PC panel are spaced apart from each other to connect the first and second brackets facing each other ;
and d) connecting the first bracket and the second bracket by arranging a tilting bar between the first PC panel and the second PC panel after the step c) Fabrication method of twin wall structure.
청구항 4에 있어서, 상기 a)단계에서 제1PC패널의 하단부에 제1연결철근이 돌출되도록 배근하고, 상기 b)단계에서 제2PC패널의 하단부에 제2연결철근이 돌출되도록 배근하는 단계를 더 포함하고,
상기 d)단계 이후에 상기 제1,2연결철근이 수용되는 내부 공간이 형성된 트러스 받침대를 상기 제1,2PC패널의 하단부에 고정시키는 e)단계를 더 포함하여 된 것을 특징으로 하는 PC패널을 이용한 기초 트윈 월 구조체의 제작방법.
[6] The method of claim 4, further comprising: disposing a first connection reinforcing bar so as to protrude from a lower end of the first PC panel in step a), and arranging the second connection reinforcing bar to protrude from a lower end of the second PC panel in step b) and,
Further comprising the step of fixing the truss support having the internal space in which the first and second connection bars are received to the lower end of the first and second PC panels after step d) Fabrication method of basic twinwall structure.
청구항 5에 있어서, 상기 e)단계 이후에 바닥에 버림콘크리트를 타설하여 양생하는 단계와;
상기 제1,2PC패널 및 트러스 받침대를 기립시켜서 상기 트러스 받침대를 상기 버림콘크리트에 수평레벨을 맞추면서 고정와이어를 이용하여 안정하도록 고정시키는 단계와;
상기 트러스 받침대 내부에 기초철근의 일부가 수용되도록 상기 버림콘크리트 상에 상기 기초철근을 배치하는 단계와;
상기 트러스 받침대 및 기초철근이 매몰되도록 콘크리트를 현장 타설하여 기초 콘크리트바닥을 형성하는 단계와;
상기 제1,2PC패널 사이의 공간이 충전되도록 상기 제1,2PC패널 사이에 콘크리트를 타설하는 단계;를 포함하여 된 것을 특징으로 하는 PC패널을 이용한 기초 트윈월 구조물의 제작방법.





[7] The method of claim 5, further comprising the step of curing and dumping the abandoned concrete on the floor after step e);
Fixing the first and second PC panels and the truss bracket so that the truss bracket is stably fixed using the fixing wire while adjusting the truss bracket to the horizontal level;
Disposing the foundation reinforcement on the abandoned concrete so that a portion of the foundation reinforcement is accommodated in the truss base;
Forming a foundation concrete floor by casting the concrete so that the truss base and the foundation steel are buried;
And placing the concrete between the first and second panels so that a space between the first and second panels is filled with the concrete.





KR1020150153298A 2015-11-02 2015-11-02 A twin wall structure using a PC panel and method for manufacturing of it KR20170051018A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020150153298A KR20170051018A (en) 2015-11-02 2015-11-02 A twin wall structure using a PC panel and method for manufacturing of it
KR1020230072897A KR20230090300A (en) 2015-11-02 2023-06-07 A twin wall structure using a PC panel and method for manufacturing of it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020150153298A KR20170051018A (en) 2015-11-02 2015-11-02 A twin wall structure using a PC panel and method for manufacturing of it

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR1020230072897A Division KR20230090300A (en) 2015-11-02 2023-06-07 A twin wall structure using a PC panel and method for manufacturing of it

Publications (1)

Publication Number Publication Date
KR20170051018A true KR20170051018A (en) 2017-05-11

Family

ID=58741499

Family Applications (2)

Application Number Title Priority Date Filing Date
KR1020150153298A KR20170051018A (en) 2015-11-02 2015-11-02 A twin wall structure using a PC panel and method for manufacturing of it
KR1020230072897A KR20230090300A (en) 2015-11-02 2023-06-07 A twin wall structure using a PC panel and method for manufacturing of it

Family Applications After (1)

Application Number Title Priority Date Filing Date
KR1020230072897A KR20230090300A (en) 2015-11-02 2023-06-07 A twin wall structure using a PC panel and method for manufacturing of it

Country Status (1)

Country Link
KR (2) KR20170051018A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109594688A (en) * 2019-01-16 2019-04-09 中建局集团建设发展有限公司 A kind of double skin wall constructions of steel truss and its construction method
CN112177041A (en) * 2020-08-24 2021-01-05 福建建中建设科技有限责任公司 Underground space prefabricated and assembled integral structure and construction method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060024850A (en) 2004-09-15 2006-03-20 삼성물산 주식회사 Steel-concrete sandwitch type hybrid beam and high strength hybrid structure system using the same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109594688A (en) * 2019-01-16 2019-04-09 中建局集团建设发展有限公司 A kind of double skin wall constructions of steel truss and its construction method
CN112177041A (en) * 2020-08-24 2021-01-05 福建建中建设科技有限责任公司 Underground space prefabricated and assembled integral structure and construction method thereof
CN112177041B (en) * 2020-08-24 2021-11-05 福建建中建设科技有限责任公司 Underground space prefabricated and assembled integral structure and construction method thereof

Also Published As

Publication number Publication date
KR20230090300A (en) 2023-06-21

Similar Documents

Publication Publication Date Title
KR101574253B1 (en) A method for construction using a twin wall structure using a PC panel
KR101556545B1 (en) Method for constructing using a double wall Precast Concrete
KR20130143097A (en) Mounting base
KR20230090300A (en) A twin wall structure using a PC panel and method for manufacturing of it
KR101663132B1 (en) Self-supporting type column structure
KR20170032826A (en) Precast concrete dual wall structure and construction method thereof
KR101459003B1 (en) The wide PC girder and construction method thereof
JP2012140848A (en) Construction method for installation foundation
KR101186053B1 (en) Method of Constructing Insitu Concrete Beam Using Preinstalled Precast Concrete Slab
KR20100125652A (en) A mold for apartment
KR100901766B1 (en) 2 way slab using 1 way half precast concrete and construction method for the same
KR101750404B1 (en) Structure using same time pouring process for wall and foundation concrete and construction method therefor
KR100304861B1 (en) Insulation Precast Concrete Panel
KR102130000B1 (en) Construction method of PC structure using Precast Concrete Column Space Reinforce
KR101105883B1 (en) Basic mat constructing method of high rise concrete structure
JP5865567B2 (en) Connecting slab and its construction method
KR200387408Y1 (en) Knockdown basic-block
KR101880813B1 (en) A sandwitch pc pannel structure and construction method of structure using thereof
KR20200075600A (en) Method for constructing transfer layer of building using precast concrete slab
KR20100121865A (en) Method for constructing building using prc integrating method
KR101677431B1 (en) Large concrete retaining wall and method of construction
CN114263206A (en) Fabricated concrete foundation and construction method thereof
JP2018123537A (en) Method of constructing mat foundation, tubular formwork and mat foundation structure
KR101612637B1 (en) Hollow PC column for saving construction period, SRC column with the hollow PC, joint structure of SRC and beam and method for constructing frame of buildings
KR101616483B1 (en) Construction Method Of Underground Parking Lot Using Precast Concrete Beam With Changing Cross Section

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
X091 Application refused [patent]