KR20220049720A - Rapid Construction Structure of Core Part Using Multi-Story Precast Wall - Google Patents

Rapid Construction Structure of Core Part Using Multi-Story Precast Wall Download PDF

Info

Publication number
KR20220049720A
KR20220049720A KR1020200133164A KR20200133164A KR20220049720A KR 20220049720 A KR20220049720 A KR 20220049720A KR 1020200133164 A KR1020200133164 A KR 1020200133164A KR 20200133164 A KR20200133164 A KR 20200133164A KR 20220049720 A KR20220049720 A KR 20220049720A
Authority
KR
South Korea
Prior art keywords
wall
wall member
reinforcing bar
precast
casting groove
Prior art date
Application number
KR1020200133164A
Other languages
Korean (ko)
Other versions
KR102484159B1 (en
Inventor
전진수
최익준
김준삼
송우석
김용남
장수연
Original Assignee
삼성물산 주식회사
한성피씨건설 주식회사
(주)미래구조엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성물산 주식회사, 한성피씨건설 주식회사, (주)미래구조엔지니어링 filed Critical 삼성물산 주식회사
Priority to KR1020200133164A priority Critical patent/KR102484159B1/en
Publication of KR20220049720A publication Critical patent/KR20220049720A/en
Application granted granted Critical
Publication of KR102484159B1 publication Critical patent/KR102484159B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/34Extraordinary structures, e.g. with suspended or cantilever parts supported by masts or tower-like structures enclosing elevators or stairs; Features relating to the elastic stability
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • E04B1/34321Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Panels For Use In Building Construction (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to a rapid construction structure of a core part using a multi-story precast wall. A purpose of the present invention is to provide the rapid construction structure of a core part using a multi-story precast wall, which is capable of improving durability of a connection part between constructed precast concrete (PC) wall members and enabling a rapid and easy construction work by a connection method, thereby obtaining a vertical traffic line for a site work in advance and reducing construction periods at the same time. Therefore, to achieve the purpose of the present invention, an uneven placement groove is formed on one side of the PC wall member, and an auxiliary binding groove and a horizontal steel bar are formed on the other side of the PC wall member. After then, the two or more PC wall members are installed and connected. The horizontal steel bar formed as a PC wall in one of the two or more PC wall members connected is inserted into the uneven placement groove formed as another PC wall member by a contact closing method. A vertical steel bar is additionally inserted and installed in the closed uneven placement groove in which the horizontal steel bar is inserted. At the same time, non-shrinkage mortar is placed, and the two or more PC walls are fixed and connected by the placed non-shrinkage mortar.

Description

다층높이의 프리캐스트 벽체를 활용한 코어부 급속시공구조{Rapid Construction Structure of Core Part Using Multi-Story Precast Wall}Rapid Construction Structure of Core Part Using Multi-Story Precast Wall

본 발명은 공동주택 시공기술에 관한 것으로, 더욱 상세하게는, 계단실 또는 엘리베이터 등과 같은 공동주택의 지하층 코어를 시공함에 있어, 기존 RC(Reinforced Concrete) 공법에 의존하던 시공방식을 프리캐스트(PC : Precast Concrete) 공법으로 전환하여 적용하되, 그 전환된 프리캐스트 공법으로 시공되는 PC부재, 예컨대, PC벽체부재와 PC슬래브부재 등의 상호 유기적인 결합방식과 구조를 새롭게 개선하여 현장작업을 위한 수직 동선을 조기에 확보할 수 있도록 하고, 그에 따라 공기를 보다 효율적으로 단축할 수 있도록 한 다층높이의 프리캐스트 벽체를 활용한 코어부 급속시공구조에 관한 것이다. The present invention relates to apartment building construction technology, and more specifically, in constructing the basement core of an apartment house such as a stairwell or an elevator, a construction method that relied on the existing RC (Reinforced Concrete) method is precast (PC: Precast). Concrete) method and applied, but with the converted precast method, the mutual organic coupling method and structure of PC members, such as PC wall members and PC slab members, are newly improved to provide vertical movement lines for field work. It relates to a core part rapid construction structure using a precast wall having a multi-layer height so that it can be secured at an early stage and, accordingly, the air can be shortened more efficiently.

급속한 경제발전에 따른 인구의 도시집중 현상 및 그에 따른 지가 상승의 요인으로 인해 사람들이 생활을 영위하는 공간. 예컨대 주거 구조물에 있어서 또한 아파트와 같은 공동주택의 보급이 확대되며 그 수요가 급증하는 현실이다 A space where people lead their lives due to the urban concentration of the population following rapid economic development and the consequent rise in land prices. For example, in the case of residential structures, the supply of multi-unit housing such as apartments is expanding, and the demand for them is rapidly increasing.

공동주택은 한 채의 건물 안에 다세대가 입주할 수 있는 층별 공간구조를 취함에 따라 건축 대지와 건축공사비를 절약할 수 있고, 특히, 제한된 면적의 토지를 집약적으로 이용할 수 있음에 따라 주택 부족의 문제를 효율적으로 해결할 수 있는 장점이 있다.As the apartment house adopts a spatial structure for each floor that can accommodate multiple households in one building, it is possible to save the construction site and construction cost, and in particular, the problem of housing shortage due to the intensive use of land in a limited area. It has the advantage of being able to solve the problem efficiently.

한편, 아파트와 같은 고층 공동주택을 시공함에 있어, 중요하게 고려되어야 할 부분의 하나는 코어의 설계라 할 수 있다. On the other hand, when constructing a high-rise apartment house such as an apartment, one of the important parts to be considered is the design of the core.

예컨대, 코어라 함은 계단이나 엘리베이터, 화장실, 급배관용 샤프트 등 건물 내에서 사용자의 수직 동선을 담당하고, 각종기계, 전기, 통신의 공급을 원활하기 위하여 다양한 기능을 집중시켜 놓은 일정한 공간을 의미하는 것으로, 이러한 코어의 위치에 따라 건물의 쓰임새가 결정됨으로 인해 다층 구조물의 시공에 있어 코어설비의 크기 및 위치에 대한 계획과 설계는 매우 중요 부분을 차지한다.For example, the core refers to a certain space in which various functions are concentrated in order to provide a smooth supply of various machines, electricity, and communications while in charge of the vertical movement of users within a building, such as stairs, elevators, toilets, and shafts for supply and plumbing. Because the use of the building is determined according to the location of the core, planning and design of the size and location of the core facility is a very important part in the construction of a multi-story structure.

다층 공통주택의 코어 시공에 있어, 일반적으로 널리 이용되는 종래 시공방법을 살펴보면, 통상 RC(Reinforced Concrete) 공법에 의존하는 실정임을 알 수 있다.In the core construction of a multi-storey common house, looking at the conventional construction method that is generally widely used, it can be seen that the situation usually depends on the RC (Reinforced Concrete) construction method.

여기서, RC(Reinforced Concrete) 공법이라 함은" 철근가공 - 거푸집설치 - 콘크리트 타설 - 양생 - 거푸집 해체 "의 과정을 통해 기둥과 보, 내력벽, 슬래브 등의 구조부를 일체화된 형태로 시공하는 가장 보편화된 건축공법, 예컨대, 철근 콘크리트 공법을 말한다.Here, the RC (Reinforced Concrete) method is the most common method of constructing structural parts such as columns, beams, load-bearing walls, and slabs in an integrated form through the process of "reinforcement processing - formwork installation - concrete pouring - curing - formwork dismantling". It refers to a construction method, for example, a reinforced concrete construction method.

하지만, 전술한 철근 콘크리트 공법은 내구성과 내화성이 우수하고 재료의 수급이 용이한 특징이 있는 반면, 양생공정 및 거푸집 해체작업 등에 따른 시공기간의 과다소요로 인해 공사비가 상승하고, 또한, 주택의 개조 또는 철거시 작업이 용이하지 못함은 물론 다량의 폐기물을 발생시키며, 특히, 동절기 시공이 어려운 단점이 있다.However, while the above-described reinforced concrete construction method has excellent durability and fire resistance, and easy supply and demand of materials, construction cost increases due to excessive construction period required for curing process and formwork dismantling work, etc. Alternatively, it is not easy to work during demolition and generates a large amount of waste, and in particular, there is a disadvantage in that construction is difficult in winter.

또 다르게, 전술한 바와 같은, 철근 콘크리트 공법은 노무 의존적인 방식, 예컨대, 많은 공사인력을 필요로하는 방식을 취함에 따라 상대적으로 신속한 공정진행을 기대하기 어렵고, 그로 인해 후속 공정에까지 영향을 미쳐 전체 공기를 지연시키며 인건비 또한 과다 지출하게 하는 문제점이 상존한다.Alternatively, as described above, as the reinforced concrete construction method takes a labor-dependent method, for example, a method that requires a large number of construction workers, it is difficult to expect a relatively rapid process progress, thereby affecting the subsequent process, There are still problems that delay the construction period and overspend labor costs.

대한민국 특허공개 제10-2020-0098239호(2020.08.20.공개)Korean Patent Publication No. 10-2020-0098239 (published on 20.08.2020) 대한민국 특허등록 제0768081호(2007.10.11.등록)Republic of Korea Patent Registration No. 0768081 (Registered on October 11, 2007)

따라서, 본 발명은 종래 공동주택 지하층 코어 시공구조의 제반적인 문제점을 해결하고자 창안된 것으로;Therefore, the present invention was devised to solve the general problems of the conventional apartment building basement core construction structure;

본 발명의 목적은, 공동주택의 지하층 코어를 시공함에 있어, 프리캐스트(PC : Precast Concrete) 공법, 예컨대, 콘크리트 구조물을 주조작업에 의해 재사용 가능한 조형부재(PC벽체부재)로 성형하고, 성형된 조형부재(PC벽체부재)를 작업현장으로 운반하여 틸드업(Tilt-up)하는 방식의 공법을 이용하되, 상기 프리캐스트 공법으로 시공되는 PC벽체부재에 요철타설홈과 수평철근을 형성하고, 요철타설홈과 수평철근이 형성된 PC벽체부재를 2개 이상의 구성으로 설치 연결함에 있어, 일측 PC벽체부재로 형성된 수평철근을 타측 PC벽체부재로 형성된 요철타설홈에 밀착 닫힘방식으로 삽입시키고, 수평철근이 삽입되며 닫힘된 요철타설홈에 재차 수직철근을 부가구성으로 삽입 설치하며, 이후, 수평철근과 수직철근이 삽입된 요철타설홈에 무수축 몰탈을 타설하여, 그 타설된 무수축 몰탈에 의해 2개 이상의 PC벽체부재를 고정 접합되게 함으로써, PC벽체부재간 연결부위의 내구성을 증대시키고, 아울러, 그와 같은, 접합방식에 의해 신속하고 용이한 시공작업 또한 행할 수 있도록 하여 현장작업을 위한 수직동선을 조기에 확보할 수 있도록 하며, 그에 따라 공기 단축은 물론 작업인력의 감축까지도 기대할 수 있도록 하는 등, 작업효율성과 경제성, 그리고, 시공안전성을 극히 증대시킬 수 있도록 한 다층높이의 프리캐스트 벽체를 활용한 코어부 급속시공구조를 제공함에 있다. An object of the present invention is, in the construction of the basement core of an apartment house, a precast (PC: Precast Concrete) method, for example, a concrete structure is molded into a reusable molding member (PC wall member) by a casting operation, and the molded A method of tilting-up by transporting a molding member (PC wall member) to a work site is used, but an uneven casting groove and horizontal reinforcing bar are formed in the PC wall member constructed by the precast method, and unevenness In installing and connecting the pouring groove and the PC wall member having the horizontal reinforcement in two or more configurations, the horizontal reinforcement formed by the PC wall member on one side is inserted into the uneven casting groove formed by the PC wall member on the other side in a close-close manner, and the horizontal reinforcement is Insert and install vertical reinforcing bars again as an additional configuration into the inserted and closed concavo-convex casting grooves, and then pour non-shrinkage mortar into the concavo-convex casting grooves into which horizontal and vertical reinforcing bars are inserted. By making the above PC wall members fixedly joined, the durability of the connection part between the PC wall members is increased, and at the same time, it is possible to quickly and easily perform construction work by such a joining method, thereby providing a vertical flow line for field work. By using multi-layered precast walls that can greatly increase work efficiency, economic feasibility, and construction safety, such as to ensure that it can be secured early, as well as to shorten the construction period as well as reduce the number of workers. To provide a core part rapid construction structure.

또한, 본 발명의 목적은, PC벽체부재를 주조 성형함에 있어, 그 PC벽체부재로 형성되는 요철타설홈을 파손방지형틀에 의해 성형하고, 성형이 완료된 이후, 파손방지형틀이 결합된 형태 그대로 PC벽체부재를 작업현장으로 운반하며, 운반된 PC벽체로부터 시공직전에 파손방지형틀을 탈거하는 방식으로 그들 PC벽체부재간 접합 설치작업을 행하게 함으로써, 운반 등의 취급과정에 있어 요철타설홈의 파손 및 균열 손상을 원천 방지할 수 있도록 한 다층높이의 프리캐스트 벽체를 활용한 코어부 급속시공구조를 제공함에 있다. In addition, an object of the present invention is, in casting and molding a PC wall member, the uneven casting groove formed of the PC wall member is molded by a breakage prevention mold, and after the molding is completed, the PC wall member is combined as it is. By transporting the wall members to the work site and performing the joint installation work between the PC wall members in a way that removes the damage-preventing mold from the transported PC wall just before construction, It is to provide a core part rapid construction structure using a multi-layered precast wall to prevent crack damage at the source.

상기 목적을 달성하기 위한 본 발명에 따른 다층높이의 프리캐스트 벽체를 활용한 코어부 급속시공구조를 살펴보면, 이는, 프리캐스트 공법으로 주조 성형되는 PC벽체부재와 PC슬래브 부재를 포함하는 구성으로 형성하되;Looking at the core part rapid construction structure using the multi-layered precast wall according to the present invention for achieving the above object, it is formed in a configuration including a PC wall member and a PC slab member cast and molded by a precast method. ;

상기 PC벽체부재는 일측면에 요철타설홈과 타측면에 보조결착홈 및 수평철근을 형성하고; The PC wall member forms an uneven casting groove on one side and an auxiliary fastening groove and horizontal reinforcement on the other side;

이후, 상기 PC벽체부재를 2개 이상의 구성으로 설치 연결하되, 상기 2개 이상의 구성으로 연결되는 PC벽체부재 중, 어느 하나의 PC벽체로 형성된 수평철근을 다른 하나의 PC벽체부재로 형성된 요철타설홈에 밀착 닫힘방식으로 삽입시키고, 상기 수평철근이 삽입되며 닫힘된 요철타설홈에 수직철근을 부가구성으로 더 삽입 설치함과 동시에 무수축 몰탈을 타설하여, 그 타설된 무수축 몰탈에 의해 2개 이상의 PC벽체를 고정 접합되게 하여 달성한다.Thereafter, the PC wall member is installed and connected in two or more configurations, and among the PC wall members connected in the two or more configurations, a horizontal reinforcing bar formed from one PC wall is used as a concave-convex casting groove formed by the other PC wall member In a close-close manner, the horizontal reinforcing bars are inserted and vertical reinforcing bars are additionally inserted and installed in the closed concavo-convex casting grooves, and at the same time pouring non-shrinkage mortar, It is achieved by making the PC wall fixedly joined.

이상, 본 발명에 따른 다층높이의 프리캐스트 벽체를 활용한 코어부 급속시공구조는, PC벽체부재에 요철타설홈과 수평철근을 형성하고, 이후, 요철타설홈과 수평철근이 형성된 PC벽체부재를 2개 이상의 구성으로 설치 연결함에 있어, 일측 PC벽체부재로 형성된 수평철근을 타측 PC벽체부재로 형성된 요철타설홈에 밀착 닫힘방식으로 삽입시키고, 수평철근이 삽입되며 닫힘된 요철타설홈에 재차 수직철근을 부가구성으로 삽입 설치함과 동시에 무수축 몰탈을 타설하여, 그 타설된 무수축 몰탈에 의해 2개 이상의 PC벽체를 고정 접합되게 한 것으로, 이는, PC벽체부재간 연결부위의 내구성을 증대시킴과 동시에 신속하고 용이한 시공작업 또한 행할 수 있도록 하여 현장작업을 위한 수직동선을 조기에 확보할 수 있도록 하고, 그에 따라 공기 단축은 물론 작업인력의 감축까지도 기대할 수 있도록 하여 작업효율성과, 경제성과, 시공안전성 등을 증대되게 한 효과를 제공한다. Above, the core part rapid construction structure using the multi-layer height precast wall according to the present invention forms an uneven casting groove and horizontal reinforcement in the PC wall member, and then, the PC wall member in which the uneven casting groove and horizontal reinforcement are formed. In installing and connecting two or more components, the horizontal reinforcing bar formed by one PC wall member is inserted into the concave-convex casting groove formed by the other side PC wall member in a close-close manner, and the horizontal reinforcing bar is inserted and vertical reinforcing bar again in the closed concave-convex casting groove is inserted and installed as an additional configuration and the non-shrink mortar is poured at the same time, and two or more PC walls are fixedly joined by the poured non-shrink mortar, which increases the durability of the connection part between the PC wall members and At the same time, it enables quick and easy construction work to be carried out so that a vertical movement line for on-site work can be secured at an early stage. It provides the effect of increasing safety, etc.

또 다르게, 본 발명에 따른 다층높이의 프리캐스트 벽체를 활용한 코어부 급속시공구조는, PC벽체부재로 형성되는 요철타설홈을 파손방지형틀에 의해 성형하고, 파손방지형틀이 결합된 형태 그대로 PC벽체부재를 작업현장으로 운반하여 시공직전에 파손방지형틀을 탈거시킨 이후, PC벽체부재 상호간 접합 설치작업을 행하게 한 것으로, 이는, 운반 등의 취급과정에 있어 요철타설홈의 파손 및 균열 손상을 원천 방지되게 한 것으로, 매우 유용한 기대효과를 제공한다. Alternatively, the core part rapid construction structure using the multi-layered precast wall according to the present invention is formed by molding the uneven casting groove formed of the PC wall member by a breakage prevention mold, and PC as it is in the form in which the breakage prevention mold is combined After transporting the wall members to the work site and removing the breakage prevention mold just before construction, the joint installation work between the PC wall members was performed. It is prevented, and provides a very useful expected effect.

도 1은 본 발명에 적용되는 PC벽체부재와 PC슬래브부재의 분해사시도
도 2는 본 발명에 적용되는 PC벽체부재의 시공상태 단면도
도 3은 본 발명에 적용되는 PC벽체부재와 PC슬래브부재의 시공상태 단면도
도 4는 본 발명에 적용되는 파손방지형틀의 요부확대 단면도
도5는 본 발명에 적용되는 PC벽체부재와 PC슬래브부재의 이실시예 분해사시도
도 6은 본 발명에 적용되는 PC벽체부재의 이실시예 시공상태 단면도
1 is an exploded perspective view of a PC wall member and a PC slab member applied to the present invention;
Figure 2 is a cross-sectional view of the construction state of the PC wall member applied to the present invention;
3 is a cross-sectional view of the construction state of the PC wall member and the PC slab member applied to the present invention;
4 is an enlarged cross-sectional view of the main part of the breakage prevention mold applied to the present invention;
5 is an exploded perspective view of this embodiment of a PC wall member and a PC slab member applied to the present invention;
6 is a cross-sectional view of the construction state of this embodiment of the PC wall member applied to the present invention;

이하의 상세한 설명은 본 명세서에서 기술된 방법, 장치 및/또는 시스템, 구조에 대한 포괄적인 이해를 돕기 위해 제공된다. 그러나 이는 예시에 불과하며 본 발명은 이에 제한되지 않는다.DETAILED DESCRIPTION The following detailed description is provided to provide a comprehensive understanding of the methods, apparatus and/or systems, structures described herein. However, this is merely an example, and the present invention is not limited thereto.

본 발명의 실시예들을 설명함에 있어서, 본 발명과 관련된 공지기술에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명을 생략하기로 한다. 그리고, 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례 등에 따라 달라질 수 있다. 그러므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다. 상세한 설명에서 사용되는 용어는 단지 본 발명의 실시예들을 기술하기 위한 것이며, 결코 제한적이어서는 안 된다. In describing the embodiments of the present invention, if it is determined that the detailed description of the known technology related to the present invention may unnecessarily obscure the gist of the present invention, the detailed description thereof will be omitted. And, the terms to be described later are terms defined in consideration of functions in the present invention, which may vary according to intentions or customs of users and operators. Therefore, the definition should be made based on the content throughout this specification. The terminology used in the detailed description is for the purpose of describing embodiments of the present invention only, and should in no way be limiting.

명확하게 달리 사용되지 않는 한, 단수 형태의 표현은 복수 형태의 의미를 포함한다. 본 설명에서, “포함” 또는 “구비”와 같은 표현은 어떤 특성들, 숫자들, 단계들, 동작들, 요소들, 이들의 일부 또는 조합을 가리키기 위한 것이며, 기술된 것 이외에 하나 또는 그 이상의 다른 특성, 숫자, 단계, 동작, 요소, 이들의 일부 또는 조합의 존재 또는 가능성을 배제하도록 해석되어서는 안 된다.Unless explicitly used otherwise, expressions in the singular include the meaning of the plural. In this description, expressions such as “comprising” or “comprising” are intended to indicate certain features, numbers, steps, operations, elements, some or a combination thereof, and one or more other than those described. It should not be construed to exclude the presence or possibility of other features, numbers, steps, acts, elements, or any part or combination thereof.

이하, 본 발명에 따른 다층높이의 프리캐스트 벽체를 활용한 코어부 급속시공구조의 바람직한 실시예 구성을 첨부도면에 의거하여 상세히 설명하기로 한다Hereinafter, a preferred embodiment configuration of a core part rapid construction structure using a multi-layered precast wall according to the present invention will be described in detail based on the accompanying drawings.

첨부도면을 참고로하여 본 발명에 따른 다층높이의 프리캐스트 벽체를 활용한 코어부 급속시공구조의 개략적인 구성을 살펴보면, 이는, 프리캐스트 공법으로 주조 성형되는 PC벽체부재(1)와 PC슬래브부재(2)로 구성된다.Looking at the schematic configuration of the core part rapid construction structure using the multi-layered precast wall according to the present invention with reference to the accompanying drawings, this is a PC wall member (1) and a PC slab member cast and molded by a precast method It is composed of (2).

여기서, 먼저, 상기 PC벽체부재(1)는, 공동주택의 지하층 코어를 시공함에 있어 그 지하층 코어의 벽체 구조물을 형성하기 위한 일종의 조립부품이며, 이는, 성형철근(도시생략)이 매설된 형태로 콘크리트에 의해 주조 성형된 판상의 구조를 취하는 것인바, 이와 같은, PC벽체부재(1)를 본 발명에 적용함에 있어서는, 도 1로 도시된 바와 같이, 일측단부에 내측면을 향해 점진적으로 간격이 좁아지는 사다리꼴 형상의 요철타설홈(11)을 형성하고, 타측단부에 소정깊이를 갖는 보조결착홈(12)을 형성하며, 상기 보조결착홈(12) 내측면에 다수개의 일렬 간격 배열구성을 이루며 돌출되는 수평철근(13)을 매설구조로 형성하고, 재차, PC벽체부재(1) 내측 상부면에 도 1로 도시된 바와 같이, 가변철근(141)이 수용된 할펜박스(14)를 설치 형성하고, 상기 할펜박스(14) 설치부위 하부면에 소정간격 이격된 배치구성으로 앵커볼트(15)를 형성하며, 상기 앵커볼트(15)에 탈부착 구조로 체결되는 조립앵글(16)을 마련하여 형성함이 바람직하다. Here, first, the PC wall member 1 is a kind of assembly part for forming the wall structure of the basement core in the construction of the basement core of the apartment house, which is a form in which molded reinforcing bars (not shown) are embedded. It takes a plate-shaped structure cast and molded by concrete. In applying such a PC wall member 1 to the present invention, as shown in FIG. 1, the gap is gradually increased toward the inner surface at one end. A narrow trapezoidal-shaped concave-convex casting groove 11 is formed, an auxiliary fastening groove 12 having a predetermined depth is formed at the other end, and a plurality of line spacing arrangement is formed on the inner surface of the auxiliary fastening groove 12, The protruding horizontal reinforcing bar 13 is formed into a buried structure, and again, as shown in FIG. 1 on the inner upper surface of the PC wall member 1, a half pen box 14 in which the variable reinforcing bar 141 is accommodated is installed and formed. , Anchor bolts 15 are formed on the lower surface of the half pen box 14 installation part spaced apart from each other by a predetermined interval, and an assembly angle 16 that is fastened to the anchor bolt 15 in a detachable structure is provided. This is preferable.

이때, 전술한 PC벽체부재(1)에 있어, 상기 요철타설홈(11)은, 그 내측면에 접합마찰력 증대 및 그에 따른 수평전단력 향상을 위해 도 2의 부분확대도로 도시된 바와 같은 요철 돌기, 예컨대, 전단보강요철키(111)를 더 형성하고, 아울러, 그와 같은 형상적 특성에 따라 별도 마련된 파손방지형틀(300)에 의해 주조 성형되는 특징을 갖는 것인바, 여기서 이용되는 파손방지형틀(300)은, 도 4로 도시된 바와 같이, 사다리꼴 형상의 단면을 갖는 소정길이의 블록체 구성을 취하며, 그 내측면 중앙에 다수개의 형틀고정볼트(301)를 규칙적이고 반복적인 간격 배열구성으로 설치 형성하고, 상기 형틀고정볼트(301)에 탈,부착 구조로 체결되는 이탈방지편(302)을 더 결합 형성한다.At this time, in the above-described PC wall member (1), the concave-convex casting groove (11), the concave-convex projection as shown in the partially enlarged view of FIG. For example, it further forms the shear reinforcement concave-convex key 111, and in addition, it has a feature of being cast and molded by a separately provided breakage prevention mold 300 according to such shape characteristics, and the breakage prevention mold used here ( 300), as shown in FIG. 4, takes a block body configuration of a predetermined length having a trapezoidal cross section, and a plurality of frame fixing bolts 301 in the center of the inner surface are arranged at regular and repetitive intervals. After the installation and formation, the separation prevention piece 302 fastened to the formwork fixing bolt 301 in a detachable and attachable structure is further coupled and formed.

또 다른 부연설명으로, 전술한 PC벽체부재(1)에 있어, 상기 할펜박스(14)는 철근의 합리적인 설치 연결, 예컨대, 직각으로 절곡 수용된 철근을 펼침시켜 구조물을 연결하는데 사용하는 통상의 콘크리트 철근 이음용 철판상자를 의미하는 것이고, 본 발명에 적용되는 할펜박스(14) 역시, 그러한 통상의 콘크리트 철근 이음용 철판상자를 그대로 이용하는 것으로, 그에 대한 구체적인 구성 및 기능 설명은 생략하기로 한다.As another supplementary explanation, in the above-described PC wall member 1, the halfpen box 14 is a reasonable installation connection of reinforcing bars, for example, ordinary concrete reinforcing bars used to connect structures by unfolding rebars bent at right angles. It means an iron plate box for joints, and the halfpen box 14 applied to the present invention also uses such a conventional iron plate box for reinforcing steel bars as it is, and detailed configuration and function descriptions thereof will be omitted.

또한, 상기 PC슬래브부재(2)는, 공동주택의 지하층 코어를 시공함에 있어 그 지하층 코어의 바닥 또는 천정 구조물을 형성하기 위한 일종의 조립부품인바, 이와 같은, PC슬래브부재(2)는, 도 1 또는 도 3으로 도시된 바와 같이, 성형철근(도시생략)이 매설된 형태로 콘크리트에 의해 주조 성형된 판상의 구조로 형성함이 바람직하다.In addition, the PC slab member 2 is a kind of assembly part for forming the floor or ceiling structure of the basement core in the construction of the basement core of the apartment house. As such, the PC slab member 2 is shown in FIG. 1 Or, as shown in FIG. 3, it is preferable to form a plate-shaped structure cast and molded by concrete in a form in which a forming reinforcing bar (not shown) is embedded.

따라서, 전술한 바와 같은, 구성으로 이루어진 본 발명에 따른 다층높이의 프리캐스트 벽체를 활용한 코어부 급속시공구조에 이용되는 부품. 예컨대, PC벽체부재(1)와 PC슬래브부재(2)의 조립관계 및 그들 PC벽체부재(1)와 PC슬래브부재(2)를 이용한 공동주택 지하층 코어 시공구조를 살펴보면 다음과 같다.Therefore, the part used for the core part rapid construction structure utilizing the multi-layer height precast wall according to the present invention having the configuration as described above. For example, the assembly relationship between the PC wall member (1) and the PC slab member (2) and the construction structure of the basement floor core of an apartment building using the PC wall member (1) and the PC slab member (2) are as follows.

먼저, 구축하고자 하는 지하층 코어 구조물의 벽체 면적에 맞추어 2개 이상의 PC벽체부재(1)를 마련한 상태하에, 상기 2개 이상의 구성으로 마련된 PC벽체부재(1) 중, 어느 하나의 PC벽체부재(1)로 형성된 수평철근(13)을 도 2로 도시된 바와 같이, 다른 하나의 PC벽체부재(1)로 형성된 요철타설홈(11)에 밀착 닫힘방식으로 삽입시킨다. First, under the condition that two or more PC wall members 1 are prepared according to the wall area of the basement core structure to be built, any one PC wall member 1 among the PC wall members 1 provided with the two or more configurations As shown in FIG. 2, the horizontal reinforcing bar 13 formed of ) is inserted into the concave-convex casting groove 11 formed of the other PC wall member 1 in a close-close manner.

이어, 상기 수평철근(13)이 삽입되며 닫힘된 요철타설홈(11)에 별도 부가적 보강수단으로 마련된 수직철근(S)을 도 1 또는 도 2로 도시된 바와 같이, 직립된 삽입구조로 설치하고, 그와 같이, 수평철근(13)과 수직철근(S)이 삽입된 요철타설홈(11)에 무수축 몰탈(100), 예컨대, 경화과정에서 수축하지 않는 기능의 몰탈을 타설하며, 그 타설된 무수축 몰탈(100)의 경화작용에 의해 2개 이상의 PC벽체부재(1)를 고정구조로 접합시켜, 구축하고자 하는 면적범위로 공동주택 지하층 코어의 벽체구조물을 형성한다.Next, as shown in Fig. 1 or 2, the vertical reinforcing bar (S) provided as a separate additional reinforcing means in the concave-convex casting groove 11 in which the horizontal reinforcing bar 13 is inserted is installed in an upright insertion structure. And, in this way, a non-shrinkable mortar 100, for example, a mortar with a function that does not shrink in the curing process, is poured into the uneven casting groove 11 into which the horizontal reinforcing bar 13 and the vertical reinforcing bar S are inserted, and the Two or more PC wall members 1 are joined as a fixed structure by the hardening action of the poured non-shrink mortar 100 to form the wall structure of the basement core of the apartment building in the area to be built.

이후, 도 3으로 도시된 바와 같이, 조립앵글(16)을 받침수단으로 하여, 상기 벽체구조물로 형성된 PC벽체부재(1) 상부면에 PC슬래브부재(2)를 거치시키고, 상기와 같이 PC슬래브부재(2)가 거치된 상태하에 할펜박스(14)의 가변철근(141)을 PC슬래브부재(2) 상부면에 위치하도록 수평구조로 펼침시킨다.Thereafter, as shown in FIG. 3 , the PC slab member 2 is mounted on the upper surface of the PC wall member 1 formed of the wall structure using the assembly angle 16 as a supporting means, and the PC slab is as described above. Under the state in which the member 2 is mounted, the variable reinforcing bars 141 of the half pen box 14 are spread out in a horizontal structure to be located on the upper surface of the PC slab member 2 .

연속하여, 상기 가변철근(141)이 펼침된 PC슬래브부재(2) 상부면에 토핑콘크리트(400)를 소정 두께로 타설하고, 상기 타설된 토핑콘크리트(400)의 경화작용에 의해 PC벽체부재(1) 상부면에 PC슬래브부재(2)를 고정구조로 접합시키며;Continuously, the topping concrete 400 is poured to a predetermined thickness on the upper surface of the PC slab member 2 in which the variable reinforcing bar 141 is spread, and the PC wall member ( 1) bonding the PC slab member 2 to the upper surface in a fixed structure;

재차, 마무리 과정으로, 상기 토핑콘크리드(400)에 의해 PC벽체부재(1)와 PC슬래브부재(2)가 상호 견고히 고정 접합되었음을 확인한 이후, PC슬래브부재(2)를 받침하고 있는 앵커볼트(15)와 조립앵글(16)을 분리 제거함으로써, 본 발명에 따른 다층높이의 프리캐스트 벽체를 활용한 코어부 급속시공구조를 구현한다.Again, as a finishing process, after confirming that the PC wall member 1 and the PC slab member 2 are firmly fixed to each other by the topping concrete 400, the anchor bolt supporting the PC slab member 2 ( 15) and the assembly angle 16 are separated and removed to implement a core part rapid construction structure utilizing the multi-layered precast wall according to the present invention.

이때, 전술한 바와 같은, 일련의 시공과정에 있어, 상기 PC벽체부재(1)로 형성된 요철타설홈(11)은, 형상적 특성에 따라 내구성이 취약하여 운반 등의 취급과정에 있어, 파손 및 손상의 우려가 있는 것인바, 따라서, 요철타설홈(11)을 성형하기 위해 사용된 파손방지형틀(300)이 요철타설홈(11)에 결합되어 있는 상태 그대로 PC벽체부재(1)를 작업현장으로 운반하고, 구조물 시공직전 상기 파손방지형틀(300)의 이탈을 방지하기 위해 결합된 이탈방지편(302)의 풀림작업을 통해 상기 파손방지형틀(300)을 탈거시킨 이후, PC벽체부재(1)를 2개 이상의 구성으로 설치 연결한다.At this time, as described above, in a series of construction processes, the uneven casting groove 11 formed of the PC wall member 1 has poor durability depending on the shape characteristics, so in the handling process such as transportation, damage and There is a risk of damage. Therefore, the breakage prevention mold 300 used to form the uneven casting groove 11 is coupled to the uneven casting groove 11, and the PC wall member 1 is installed at the work site. After removing the breakage prevention mold 300 through the loosening operation of the detachment prevention piece 302 coupled to prevent the breakage prevention mold 300 from being separated just before the construction of the structure, the PC wall member (1) ) is installed and connected in two or more configurations.

한편, 도 5는 본 발명의 이실시예로 적용되는 PC벽체부재와 PC슬래브부재의 분해사시도이고, 도 6은 본 발명의 이실시예로 적용되는 PC벽체부재의 시공상태 단면도를 나타낸다.Meanwhile, FIG. 5 is an exploded perspective view of a PC wall member and a PC slab member applied to this embodiment of the present invention, and FIG. 6 is a cross-sectional view showing a construction state of the PC wall member applied to this embodiment of the present invention.

이하, 본 발명의 이실시예에 따른 다층높이의 프리캐스트 벽체를 활용한 코어부 급속시공구조를 설명함에 있어, 전술한 일실시예와 동일한 기능을 갖는 동일구성에 대하여는 설명의 편의를 위해 동일명칭과 동일부호를 사용하기로 한다.Hereinafter, in describing the core part rapid construction structure using the multi-layer height precast wall according to this embodiment of the present invention, the same configuration having the same function as the above-described embodiment has the same name for convenience of explanation. to use the same code as

이에, 이실시예로서의 본 발명은 전술한 일실시예 구성에 있어, PC벽체부재(1)로 형성되는 요철타설홈(11)의 구성을 도 5 및 도 6으로 도시된 바와 같이, 일측면이 개방된 오픈타설홈(17)으로 변환 형성함이 바람직하다.Accordingly, in the present invention as this embodiment, as shown in FIGS. 5 and 6, the configuration of the concave-convex casting groove 11 formed of the PC wall member 1 in the above-described embodiment configuration is shown in FIGS. 5 and 6, one side is open. It is preferable to convert it into an open pouring groove 17 that has been used.

따라서, 상기 오픈타설홈(17)을 형성한 이실시예로서의 PC벽체부재(1)를 2개 이상의 구성으로 설치 연결하여 시공함에 있어서는, 먼저, 2개 이상의 구성으로 연결되는 PC벽체부재(1) 중, 어느 하나의 PC벽체부재(1)로 형성된 수평철근(13)을 다른 하나의 PC벽체부재(1)로 형성된 오픈타설홈(17)에 삽입 수용시킨다.Therefore, in installing and connecting the PC wall member 1 according to this embodiment in which the open pouring groove 17 is formed in two or more configurations, first, among the PC wall members 1 connected in two or more configurations , the horizontal reinforcing bar 13 formed of one PC wall member (1) is inserted and accommodated in the open casting groove (17) formed of the other PC wall member (1).

이어, 상기 수평철근(13)이 삽입된 오픈타설홈(17) 내측면에 별도 부가적 보강수단으로 마련된 수직철근(S)을 도 5 또는 도 6으로 도시된 바와 같이, 직립된 삽입구조로 설치하고, 그와 같이, 수평철근(13)과 수직철근(S)이 삽입된 오픈타설홈(17)의 개방된 일측면을 폼타이 체결방식, 예컨대, 간격유지볼트(B)에 의해 밀착 가설되는 거푸집(200)에 의해 닫힘구조로 마감처리한다.Next, as shown in Fig. 5 or 6, a vertical reinforcing bar (S) provided as a separate additional reinforcement means on the inner surface of the open casting groove 17 into which the horizontal reinforcing bar 13 is inserted is installed in an upright insertion structure. And, as such, the open side of the open casting groove 17 in which the horizontal reinforcing bar 13 and the vertical reinforcing bar (S) are inserted is installed in close contact with the form tie fastening method, for example, the spacing bolt (B). It is finished in a closed structure by the formwork (200).

재차, 상기 거푸집(200)에 의해 닫힘구조로 마감처리된 오픈타설홈(17)에 무수축 몰탈(100)을 타설하고, 그 타설된 무수축 몰탈(100)에 의해 2개 이상의 PC벽체부재(1)를 고정 접합한 이후, 상기 거푸집(200)을 분리 제거함으로써, 본 발명에 따른 이실시로서의 다층높이의 프리캐스트 벽체를 활용한 코어부 급속시공구조를 구현한다.Again, pour the non-shrinkable mortar 100 into the open pouring groove 17 finished with a closed structure by the formwork 200, and two or more PC wall members ( After fixing and bonding 1), by separating and removing the formwork 200, the core part rapid construction structure utilizing the multi-layer height precast wall according to the present invention is implemented.

1 : PC벽체부재 2 : PC슬래브부재
11 : 요철타설홈 12 : 보조결착홈
13 : 수평철근 15 : 할펜박스
15 : 앵커볼트 16 : 조립앵글
17 : 오픈타설홈 100 : 무수축 몰탈
151 : 거푸집 300 : 파손방지형틀
400 : 토핑콘크리트 S : 수직철근
1: PC wall member 2: PC slab member
11: Concave-convex casting groove 12: Auxiliary fastening groove
13: horizontal reinforcing bar 15: half pen box
15: anchor bolt 16: assembly angle
17: open pouring groove 100: non-shrink mortar
151: formwork 300: damage prevention mold
400: topping concrete S: vertical reinforcement

Claims (5)

프리캐스트 공법으로 주조 성형되는 PC벽체부재(1)와 PC슬래브부재(2)를 포함하되;
상기 PC벽체부재(1)는, 일측단부에 내측면을 향해 점진적으로 좁아지며 그 좁아지는 내측면에 전단보강요철키(111)를 일체화 구성으로 마련한 사다리꼴 형상의 요철타설홈(11)을 형성하고, 타측단부에 보조결착홈(12)과 그 보조결착홈(12) 내측면에 다수개의 일렬 간격 배열구성을 이루며 돌출된 수평철근(13)을 형성하며;
상기 형성된 PC벽체부재(1)를 2개 이상의 구성으로 설치 연결하되, 상기 2개 이상의 구성으로 연결되는 PC벽체부재(1) 중, 어느 하나의 PC벽체부재(1)로 형성된 수평철근(13)을 다른 하나의 PC벽체부재(1)로 형성된 요철타설홈(11)에 밀착 닫힘방식으로 삽입시키고, 상기 수평철근(13)이 삽입되며 닫힘된 요철타설홈(11)에 수직철근(S)을 직립 삽입구조로 부가 설치하며, 상기 수평철근(13)과 수직철근(S)이 삽입되며 닫힘된 요철타설홈(11)에 무수축 몰탈(100)을 타설하여, 그 타설된 무수축 몰탈(100)에 의해 2개 이상의 PC벽체부재(1)를 고정 접합함을 특징으로 하는 다층높이의 프리캐스트 벽체를 활용한 코어부 급속시공구조
including a PC wall member (1) and a PC slab member (2) cast and molded by a precast method;
The PC wall member (1) is gradually narrowed toward the inner surface at one end, and a trapezoidal concavo-convex casting groove (11) is formed with a shear reinforcement concave-convex key (111) on the narrow inner surface in an integrated configuration. , forming an auxiliary fastening groove 12 at the other end and a plurality of horizontal reinforcing bars 13 protruding in a line spacing arrangement on the inner surface of the auxiliary fastening groove 12;
Installed and connected the formed PC wall member (1) in two or more configurations, but among the PC wall members (1) connected in the two or more configurations, horizontal reinforcing bars (13) formed of any one PC wall member (1) is inserted into the concave-convex casting groove 11 formed of the other PC wall member 1 in a close-close manner, and the horizontal reinforcing bar 13 is inserted and the vertical reinforcing bar (S) is inserted into the closed concave-convex casting groove 11 It is additionally installed with an upright insertion structure, and the non-shrinkage mortar 100 is poured into the concavo-convex casting groove 11 that is closed with the horizontal reinforcing bar 13 and the vertical reinforcing bar (S) inserted, and the poured non-shrinkage mortar 100 ), a core part rapid construction structure using a precast wall of multi-layer height, characterized in that two or more PC wall members (1) are fixedly joined by
제 1항에 있어서;
PC슬래브부재(2)는, 성형철근이 매설된 판상의 구조로 형성되는 것을 포함하고;
2개 이상의 구성으로 설치 연결되는 PC벽체부재(1)는, 내측 상부면에 가변철근(141)이 수용된 할펜박스(14)와, 할펜박스(14) 설치부위 하부면에 앵커볼트(15)와, 앵커볼트(15)로 체결되는 조립앵글(16)을 더 결합 형성하며;
상기 형성된 PC벽체부재(1)와 PC슬래브부재(2)를 결합 설치하여 구조물을 구축하되, 그 설치구조는 조립앵글(16)을 받침수단으로 하여 PC벽체부재(1) 상부면에 PC슬래브부재(2)를 거치시키고;
상기 PC슬래브부재(2)가 거치된 상태하에, 상기 할펜박스(14)의 가변철근(141)을 PC슬래브부재(2)의 상부면에 수평구조로 펼침시키며;
상기 가변철근(141)이 펼침된 PC슬래브부재(2) 상부면에 토핑콘크리트(400)를 타설하여, 그 토핑콘크리트(400)에 의해 PC벽체부재(1) 상부면에 PC슬래브부재(2)를 고정 접합함을 특징으로 하는 다층높이의 프리캐스트 벽체를 활용한 코어부 급속시공구조.
The method of claim 1 ;
The PC slab member 2 includes those formed in a plate-like structure in which forming reinforcing bars are embedded;
The PC wall member 1 installed and connected in two or more configurations includes a half pen box 14 in which a variable reinforcing bar 141 is accommodated on the inner upper surface, and an anchor bolt 15 on the lower surface of the half pen box 14 installation site. , to further combine the assembly angle 16 fastened to the anchor bolt 15;
The PC wall member (1) and the PC slab member (2) formed above are combined and installed to construct a structure, but the installation structure uses the assembly angle (16) as a supporting means and a PC slab member on the upper surface of the PC wall member (1) (2) mounted;
Expanding the variable reinforcing bar 141 of the half pen box 14 in a horizontal structure on the upper surface of the PC slab member 2 under the state in which the PC slab member 2 is mounted;
The topping concrete 400 is poured on the upper surface of the PC slab member 2 in which the variable reinforcing bars 141 are spread out, and the PC slab member 2 is placed on the upper surface of the PC wall member 1 by the topping concrete 400. A core part rapid construction structure using a multi-layered high precast wall, characterized by fixing and bonding the
제 1항에 있어서;
PC벽체부재(1)의 요철타설홈(11)은, 일측면이 개방된 오픈타설홈(17)으로 형성되고;
상기 오픈타설홈(17)을 형성한 PC벽체부재(1)를 2개 이상의 구성으로 설치 연결하되, 상기 2개 이상의 구성으로 연결되는 PC벽체부재(1) 중, 어느 하나의 PC벽체부재(1)로 형성된 수평철근(13)을 다른 하나의 PC벽체부재(1)로 형성된 오픈타설홈(17)에 삽입 수용시키고;
상기 수평철근(13)이 삽입된 오픈타설홈(17) 내측면에 수직철근(S)을 직립 삽입구조로 설치시키며;
상기 수평철근(13)과 수직철근(S)이 삽입된 오픈타설홈(17)의 개방된 일측면을 폼타이 체결방식을 갖는 거푸집(200)에 의해 닫힘구조로 마감처리하고;
상기 거푸집(200)에 의해 닫힘구조로 마감처리된 오픈타설홈(17)에 무수축 몰탈(100)을 타설하여, 그 타설된 무수축 몰탈(100)에 의해 2개 이상의 PC벽체부재(1)를 고정 접합함을 특징으로 하는 프리캐스트 공법을 이용한 공동주택 지하층 코어 시공구조.
The method of claim 1 ;
The uneven casting groove 11 of the PC wall member 1 is formed as an open casting groove 17 with one side open;
Any one of the PC wall members (1) among the PC wall members (1) connected to the two or more configurations, but the PC wall member (1) having the open pouring groove (17) formed therein is installed and connected in two or more configurations ) and insert the horizontal reinforcing bar 13 formed of the other PC wall member 1 into the open casting groove 17 formed of;
Installing the vertical reinforcement (S) in an upright insertion structure on the inner surface of the open casting groove (17) into which the horizontal reinforcement (13) is inserted;
finishing the open side of the open casting groove 17 into which the horizontal reinforcing bar 13 and the vertical reinforcing bar S are inserted into a closed structure by the formwork 200 having a form tie fastening method;
The non-shrinkable mortar 100 is poured into the open pouring groove 17 finished in a closed structure by the formwork 200, and two or more PC wall members (1) by the poured non-shrinkable mortar 100 Basement core construction structure of an apartment building using a precast method, characterized by fixing and bonding the
제 1항에 있어서;
PC벽체부재(1)로 형성되는 요철타설홈(11)은, 파손방지형틀(300)에 의해 주조 성형되어지되, 상기 파손방지형틀(300)은 사다리꼴 형상의 단면을 갖는 블록체 구성을 취하며, 내측면에 형틀고정볼트(301)와, 형틀고정볼트(301)에 체결되며 파손방지형틀(300)의 이탈을 방지하는 이탈방지편(302)을 더 결합 형성하고;
상기 파손방지형틀(300)이 결합된 상태로 PC벽체부재(1)를 작업현장으로 운반하여 구조물 시공직전, 상기 파손방지형틀(300)을 탈거시킨 이후, PC벽체부재(1)를 2개 이상의 구성으로 설치 연결함을 특징으로 하는 다층높이의 프리캐스트 벽체를 활용한 코어부 급속시공구조.
The method of claim 1 ;
The uneven casting groove 11 formed of the PC wall member 1 is cast and molded by a breakage prevention mold 300, and the breakage prevention mold 300 takes a block body configuration having a trapezoidal cross section, , The form fixing bolt 301 and the form fixing bolt 301 on the inner surface is fastened to the breakage-preventing mold 300, the separation prevention piece 302 to prevent the separation further coupled to form;
Immediately before construction of the structure by transporting the PC wall member 1 to the work site in a state in which the breakage prevention mold 300 is coupled, the PC wall member 1 is removed from two or more A core part rapid construction structure using a multi-story precast wall characterized by installation and connection in the configuration.
제 2항에 있어서;
앵커볼트(15)와 조립앵글(16)은, 토핑콘크리트(400)에 의해 PC벽체부재(1) 상부면에 PC슬래브부재(2)가 접합구조로 고정 설치된 이후, 분리 제거됨을 특징으로 하는다층높이의 프리캐스트 벽체를 활용한 코어부 급속시공구조.
3. The method of claim 2;
The anchor bolt 15 and the assembly angle 16 are separated and removed after the PC slab member 2 is fixedly installed on the upper surface of the PC wall member 1 by the topping concrete 400 in a joint structure. Core part rapid construction structure using high precast wall.
KR1020200133164A 2020-10-15 2020-10-15 Rapid Construction Structure of Core Part Using Multi-Story Precast Wall KR102484159B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200133164A KR102484159B1 (en) 2020-10-15 2020-10-15 Rapid Construction Structure of Core Part Using Multi-Story Precast Wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200133164A KR102484159B1 (en) 2020-10-15 2020-10-15 Rapid Construction Structure of Core Part Using Multi-Story Precast Wall

Publications (2)

Publication Number Publication Date
KR20220049720A true KR20220049720A (en) 2022-04-22
KR102484159B1 KR102484159B1 (en) 2023-01-16

Family

ID=81452374

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200133164A KR102484159B1 (en) 2020-10-15 2020-10-15 Rapid Construction Structure of Core Part Using Multi-Story Precast Wall

Country Status (1)

Country Link
KR (1) KR102484159B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114961017A (en) * 2022-05-31 2022-08-30 中国建筑第五工程局有限公司 Prefabricated component for assembly type green building
CN117758863A (en) * 2024-01-05 2024-03-26 深圳市鹏翔建筑科技有限公司 Prefabricated steel frame plate structure fast-assembling house

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070056331A (en) * 2005-11-29 2007-06-04 재단법인 포항산업과학연구원 Extending system for wall-type structural apartment and method for constructing the same
KR100768081B1 (en) 2005-12-29 2007-10-17 문종기 Columnless structure of apartment buildings
KR20130083100A (en) * 2012-01-12 2013-07-22 김현묵 Prefabricated construction using half slab
KR101867300B1 (en) * 2017-08-30 2018-06-14 동서 피, 씨, 씨 주식회사 Joining structure of prefabricated shear wall
KR20200098239A (en) 2019-02-12 2020-08-20 손인실 Functional building structure using core space of apartment houses

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070056331A (en) * 2005-11-29 2007-06-04 재단법인 포항산업과학연구원 Extending system for wall-type structural apartment and method for constructing the same
KR100768081B1 (en) 2005-12-29 2007-10-17 문종기 Columnless structure of apartment buildings
KR20130083100A (en) * 2012-01-12 2013-07-22 김현묵 Prefabricated construction using half slab
KR101867300B1 (en) * 2017-08-30 2018-06-14 동서 피, 씨, 씨 주식회사 Joining structure of prefabricated shear wall
KR20200098239A (en) 2019-02-12 2020-08-20 손인실 Functional building structure using core space of apartment houses

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114961017A (en) * 2022-05-31 2022-08-30 中国建筑第五工程局有限公司 Prefabricated component for assembly type green building
CN114961017B (en) * 2022-05-31 2024-01-26 中国建筑第五工程局有限公司 Prefabricated component for assembled green building
CN117758863A (en) * 2024-01-05 2024-03-26 深圳市鹏翔建筑科技有限公司 Prefabricated steel frame plate structure fast-assembling house

Also Published As

Publication number Publication date
KR102484159B1 (en) 2023-01-16

Similar Documents

Publication Publication Date Title
CN110439137B (en) Prefabricated wall board, wall body, prefabricated wall board production method and prefabricated wall body construction method
KR101182536B1 (en) Prefabricated double wall precast concrete pannel having surface material, reinforcing rod according to the purpose
WO2019206194A1 (en) Prefabricated floor slab, connection structure thereof and construction method therefor
US20150013255A1 (en) Hybrid cementitious buildings for a multi-level habitat
CN107989228B (en) Prefabricated steel reinforced concrete shear wall structure and preparation and installation methods thereof
SG187296A1 (en) A multi-storey building with prefabricated members and a semi-prefabricating construction method thereof
WO2017219063A1 (en) Method for constructing a concrete floor in a multistorey building
KR20220049720A (en) Rapid Construction Structure of Core Part Using Multi-Story Precast Wall
KR100760232B1 (en) Precast stairs and the unit structure thereof, and constructing method for stairway using the same
KR20060127632A (en) Wall structure using precast concrete panel with multi rib rows
KR100579440B1 (en) Mold-Reinforcing Rod One Body Type Precast Concrete Pannel and Fabrication Structure of The Same
CN212453065U (en) Assembled building frame structure member
KR100226168B1 (en) Architecture and method for making a stair using a precast concrete
CN218374567U (en) Can fix a position ALC wallboard reinforced structure that can exempt from to plaster
KR20070009061A (en) Simultaneous working type installation method for stair hall equipped prefabricated stair using pc form
KR100864211B1 (en) Precast concrete unit structure having inverted triangular sectional shape for stairs, fabricated stairway using the same
KR20050079301A (en) Precast concrete slab panel with lateral load resistancy and slab structure using the same
CN104047381A (en) Assembly integrated type lightly reinforced concrete shear wall structure
CN210421398U (en) Assembled house system
KR101315946B1 (en) Rc construction method for concrete lining in parallel
KR20070035184A (en) Truss Wall with Finish Plate
KR100557334B1 (en) A Dismonuting Stair Form
KR20200132159A (en) Slim transfer mat structure and construction method with reverse drop panel
KR101576224B1 (en) Prefabricated precast concrete girder for building construction
KR100654822B1 (en) A system and method of constructing the concret structure which is harded the buttom and wall

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant