KR101576224B1 - Prefabricated precast concrete girder for building construction - Google Patents
Prefabricated precast concrete girder for building construction Download PDFInfo
- Publication number
- KR101576224B1 KR101576224B1 KR1020140071573A KR20140071573A KR101576224B1 KR 101576224 B1 KR101576224 B1 KR 101576224B1 KR 1020140071573 A KR1020140071573 A KR 1020140071573A KR 20140071573 A KR20140071573 A KR 20140071573A KR 101576224 B1 KR101576224 B1 KR 101576224B1
- Authority
- KR
- South Korea
- Prior art keywords
- girder
- girder block
- building
- block
- construction
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/20—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
- E04B5/23—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
본 발명은 건축물 시공용 조립식 프리캐스트 콘크리트 거더에 관한 것으로서, 더욱 상세하게는 조립식으로 현장에서 조립 시공할 수 있도록 제1거더블록 및 일측에 상기 제1거더블록과 연결조립되는 연결편이 돌출 형성되는 제2거더블록을 포함하는 구성으로 분할 제작됨으로써 건축물의 시공을 위한 현장으로 운송하기 위한 운송이 용이하게 이루어져 운송비용을 현저히 절감시킬 수 있도록 함과 동시에, 건축물의 시공 현장에서 분할 제작된 블록들을 용이하게 안착시킨 후 조립하여 시공의 용이성을 증대시킴으로써 건축물 시공의 공기를 단축할 수 있도록 한 건축물 시공용 조립식 프리캐스트 콘크리트 거더에 관한 것이다.
The present invention relates to a prefabricated prefabricated concrete girder for building construction, and more particularly to a prefabricated prefabricated concrete girder for building construction, in which a first girder block and a connecting piece connected to and assembled with the first girder block are protruded 2 girder block, it is possible to facilitate transportation for transportation to the site for the construction of the building, thereby remarkably reducing the transportation cost, and at the same time, To a prefabricated prefabricated concrete girder for constructing a building, which is capable of shortening the construction air by increasing the ease of construction.
일반적으로 건축물의 축조는 먼저, 대략 건축물의 기초 바닥을 양생시킨 후에 상기 기초 바닥 상에 벽면을 시공하고 상기 기초 바닥의 면적에 대하여 일정간격을 가지고 가로 및 세로 방향으로 다수의 기둥을 설치 시공한다.Generally, the construction of the building is performed by first curing the foundation floor of the building, then installing the wall surface on the foundation floor, and installing a plurality of pillars in the horizontal and vertical directions at regular intervals with respect to the area of the foundation floor.
그리고 나서, 피씨 기둥(Precast Concrete Column)으로 적용되는 상기 기둥의 확장부 상면에 프리캐스트 콘크리트 거더(Precast Concrete Girder)의 각 단부를 안착시키며, 이러한 상기 프리캐스트 콘크리트 거더 간에 프리캐스트 콘크리트 슬래브를 안착시킨 후 현장 타설 콘크리트에 의해 층간 슬래브를 축조한다.Then, each end of the precast concrete girder is seated on the upper surface of the extension part of the column, which is applied as a precast concrete column, and a precast concrete slab is placed between the precast concrete girders After that, the interlayer slab is constructed by cast concrete.
상기와 같은 과정을 통하여 건축물의 축조가 이루어지고 있는 실정이다.The building is constructed through the above process.
도 1은 종래기술에 따른 건축물 시공용 프리캐스트 콘크리트 거더를 나타낸 사시구성도이고, 도 2a는 종래기술에 따른 건축물 시공용 프리캐스트 콘크리트 거더가 적용된 건축물의 시공구조에서 피씨슬래브가 안착시공되는 상태를 나타낸 정단면예시도이며, 도 2b는 종래기술에 따른 건축물 시공용 프리캐스트 콘크리트 거더가 적용된 건축물의 시공구조에서 피씨슬래브가 안착시공되는 상태를 나타낸 측단면구성도이다.FIG. 1 is a perspective view showing a pre-cast concrete girder for building construction according to the prior art, FIG. 2a is a perspective view showing a state in which a PC slab is seated in a construction structure in which a precast concrete girder for building construction according to the related art is applied And FIG. 2B is a side cross-sectional view showing a state in which the PC slab is seated in a construction structure of a building to which a precast concrete girder for building construction according to the related art is applied.
도 3은 종래기술에 따른 건축물 시공용 프리캐스트 콘크리트 거더가 적용된 건축물의 시공구조를 나타낸 측면예시도이며, 도 4는 종래기술에 따른 건축물 시공용 프리캐스트 콘크리트 거더가 적용된 건축물의 시공구조를 나타낸 평면예시도이다.FIG. 3 is a side view showing a construction structure of a building to which a precast concrete girder for building construction according to the related art is applied, and FIG. 4 is a plan view showing a construction of a structure to which a precast concrete girder for building construction according to the related art is applied. Fig.
도 1 내지 4를 참조하면, 종래기술에 따른 건축물 시공용 프리캐스트 콘크리트 거더(50)는 건축물의 기초바닥(10) 상에 일정간격을 가지고 직립 시공되는 피씨기둥(20)의 상부에 형성된 확장부(21) 상에 단부가 안착시공되는 것이다.1 to 4, a
이러한 종래의 프리캐스트 콘크리트 거더(50)는 상면에 폭 방향으로 일정간격을 가지고 상부보강리브(51)가 돌출형성되고 상기 상부보강리브(51)의 길이방향으로 일정간격을 가지고 전단철근(52)이 상향 돌출 형성되며, 하면에 상기 상부보강리브(51)와 대향되어 전단으로부터 일정거리 떨어진 위치로부터 후단으로부터 일정거리 떨어진 위치에 걸쳐 하부보강리브(55)가 하향 돌출 형성되는 구성으로 이루어진다.The conventional
상기와 같이 구성되는 종래의 프리캐스트 콘크리트 거더(50)는 건축물의 시공시에, 도 3에서 보는 바와 같이 기초바닥(10) 상에 직립 시공된 피씨기둥(20)의 확장부(21) 상면 테두리 부분에 전단부 또는 후단부의 하면이 안착 시공된다.3, the conventional
또한, 도 4를 참조하면, 상술한 바와 같은 종래의 프리캐스트 콘크리트 거더(50)는 피씨기둥(20)의 확장부(21) 테두리 상면에 전단부 또는 후단부의 하면이 안착 시공되며, 이와 같이 안착 시공되는 프리캐스트 콘크리트 거더(50) 간에 피씨슬래브(60)의 양단을 안착시킨 후 현장 콘크리트를 타설 양생함으로써, 도 3에서 보는 바와 같은 층간슬래브(S)를 시공완료하게 되는 것이다.4, in the conventional
그러나, 전술한 바와 같은 건축물의 시공시 적용되는 종래의 프리캐스트 콘크리트 거더는 피씨기둥들의 확장부 상에 전단부 또는 후단부가 안착시공되는 것으로서 비대한 크기로 공장에서 제작되어 건축물 시공을 위한 현장으로 운송됨으로써 운송비용이 과다지출되는 문제가 있었다.However, the conventional precast concrete girder which is applied at the time of construction of the above-mentioned structure is constructed by placing the front end or the rear end on the expanded part of the PC columns, There is a problem that the transportation cost is excessively spent.
더욱이, 현장에 운송된 후에도 비대한 크기로 제공됨에 따라 건축물의 시공을 위해 피씨기둥의 확장부 상에 안착시공시에 크레인이나 기중기 등의 거대한 중장비를 필수적으로 사용하여야만 하므로 시공에 어려움이 있으며, 아울러 중장비 사용에 따른 시공의 불편함으로 인하여 건축물 시공의 공기 지연을 초래하는 문제가 있었다.In addition, since it is supplied in a bloated size even after it is shipped to the site, it is difficult to construct a building because it must use a huge heavy equipment such as a crane or a crane for its installation on the extension part of a PC column for construction of a building. There has been a problem that air delay of construction is caused due to inconvenience of construction due to use of heavy equipment.
그러므로, 프리캐스트 콘크리트 거더를 조립식으로 현장에서 조립 시공할 수 있도록 제1거더블록과, 일측에 상기 제1거더블록과 연결조립되는 연결편이 돌출 형성되는 제2거더블록을 포함하는 구성으로 분할 제작함으로써 건축물의 시공을 위한 현장으로 운송하기 위한 운송이 용이하게 이루어져 운송비용을 현저히 절감시킬 수 있도록 함과 동시에, 건축물의 시공 현장에서 분할 제작된 블록들을 용이하게 안착시킨 후 조립하여 시공의 용이성을 증대시킴으로써 건축물 시공의 공기를 단축할 수 있도록 한 분할 제작방식이 적용되는 건축물 시공용 조립식 프리캐스트 콘크리트 거더에 대한 연구 및 개발이 요구되는 실정이다.
Therefore, the pre-cast concrete girder can be assembled and assembled in the field, and a first girder block and a second girder block protruding from a connecting piece connected to the first girder block can be manufactured The transportation for transportation to the site for the construction of the building can be made easy and the transportation cost can be remarkably reduced. At the same time, the divided blocks can be easily seated on the construction site of the building and assembled, It is required to research and develop a prefabricated concrete prefabricated concrete girder for building construction to which a split manufacturing method is applied so as to shorten the air of building construction.
상기와 같은 문제점을 해결하기 위하여, 본 발명은 조립식으로 현장에서 조립 시공할 수 있도록 제1거더블록 및 일측에 상기 제1거더블록과 연결조립되는 연결편이 돌출 형성되는 제2거더블록을 포함하도록 분할 제작되는 구성으로 이루어짐으로써 건축물의 시공을 위한 현장으로 운송하기 위한 운송이 용이하게 이루어져 운송비용을 현저히 절감시킬 수 있도록 한 건축물 시공용 조립식 프리캐스트 콘크리트 거더를 제공하는 것을 목적으로 한다.In order to solve the above problems, the present invention provides a girder block including a first girder block and a second girder block protruding from one side of the first girder block, The present invention provides a prefabricated prefabricated concrete girder for constructing a building which can be easily transported for transportation to a site for construction of a building, thereby significantly reducing transportation costs.
본 발명에 따른 기술의 다른 목적은 조립식으로 현장에서 조립 시공할 수 있도록 제1거더블록 및 일측에 상기 제1거더블록과 연결조립되는 연결편이 돌출 형성되는 제2거더블록을 포함하도록 분할 제작되는 구성으로 이루어져 건축물의 시공 현장에서 분할 제작된 블록들을 용이하게 안착시킨 후 조립하여 시공의 용이성을 증대시킴으로써 건축물 시공의 공기를 단축할 수 있도록 함에 있다.
Another object of the present invention is to provide a structure in which a first girder block and a second girder block protruding from one side of the first girder block are formed so as to be assembled in the field, So that the divided blocks can be easily seated on the construction site of the building and assembled to increase the ease of construction, thereby reducing the air for building construction.
전술한 목적을 달성하기 위한 본 발명은 다음과 같다. 즉, 본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더는 건축물의 축조를 위하여 터파기 처리된 터에 콘크리트를 양생하여 형성되는 기초바닥의 상부 면적에 대하여 일정간격을 가지고 가로 및 세로방향으로 설치 시공되는 피씨기둥의 확장부 상면에 전단부 또는 후단부 하면이 안착 시공되는 건축물 시공용 조립식 프리캐스트 콘크리트 거더에 있어서, 상기 피씨기둥의 확장부 상면에 전단부 또는 후단부 하면이 안착 시공되며, 단면이 상광하협의 형상을 가지고 길게 연장 형성되어 상면에 길이방향으로 일정간격을 가지고 제1전단철근이 상향 돌출 형성되되, 일측 상면 모서리부분에 조립홈이 함몰 형성되며, 상기 조립홈 상면에 길이방향으로 일정간격을 가지고 앵커볼트가 돌출 형성되는 제1거더블록; 및 상기 피씨기둥의 확장부 상면에 상기 제1거더블록과 일정거리를 가지고 전단부 또는 후단부 하면이 안착 시공되며, 단면이 상광하협의 형상을 가지고 길게 연장 형성되어 상면에 일정간격을 가지고 제2전단철근이 상향 돌출 형성되되, 일측 상면 모서리부분에 상기 제1거더블록의 조립홈과 대응되는 높이를 가지고 연결편이 외향 일정길이 돌출 형성되며, 상기 연결편이 상기 조립홈 상에 안착되어 상기 제1거더블록과 마주하는 상태로 연결고정될 수 있도록, 상기 연결편의 길이방향으로 상기 앵커볼트와 대응되어 삽입공이 관통형성되며, 상기 앵커볼트가 상기 삽입공에 삽입된 후 상기 앵커볼트의 상단부에 체결너트를 체결하여 상기 제1거더블록과 연결고정되도록 조립설치되는 제2거더블록을 포함하는 구성으로 이루어진다.The present invention for achieving the above-mentioned objects is as follows. That is, the prefabricated prefabricated concrete girder for building construction according to the present invention is installed in a horizontal direction and a vertical direction with a predetermined interval with respect to the upper surface area of a foundation floor formed by curing concrete in a terraced- Wherein a front end portion or a rear end bottom portion is seated on an upper surface of an extension portion of the PC column, wherein a front end portion or a rear end portion is seated on the upper surface of the expanded portion of the PC column, And the first shearing reinforcing bars are protruded upwardly at regular intervals in the longitudinal direction on the upper surface of the upper surface of the upper surface of the assembly groove, A first girder block having an anchor bolt protruded therefrom; And a second girder block disposed on the upper surface of the extension part of the PC column and having a predetermined distance from the first girder block and having a front end or a rear end lower surface, A connecting piece is protruded to a predetermined length outward with a height corresponding to an assembling groove of the first girder block at one corner of a top surface of the first girder block and the connecting piece is seated on the assembling groove, And an insertion hole is formed to correspond to the anchor bolt in a longitudinal direction of the connecting piece so that the connecting bolt can be connected and fixed in a state of being opposed to the block. After the anchor bolt is inserted into the insertion hole, And a second girder block assembled to be fixedly connected to the first girder block.
여기서, 상기 제1전단철근은 상기 제1거더블록의 상면에 길이방향으로 일정간격을 가지고 상향 돌출 형성되되, 라운드진 모서리를 가지는 장방형의 철근 타입으로 제공되며, 역 "U"자 형상의 상측 부분이 상기 제1거더블록의 상면으로부터 일정길이 상향 돌출 형성되도록 중앙부분으로부터 하단에 이르기까지 다수의 제1보강철근과 교차하여 매설 고정됨이 바람직하다.Here, the first shear reinforcing bars are provided on the upper surface of the first girder block so as to protrude upwards at regular intervals in the longitudinal direction, and are provided in a rectangular reinforcing bar type having rounded corners, The first girder block may be embedded and fixed to the first girder block so as to intersect with a plurality of first reinforcing bars from a center portion to a bottom portion so as to protrude upward from the upper surface of the first girder block by a predetermined length.
또한, 상기 제2전단철근은 상기 제2거더블록의 상면에 길이방향으로 일정간격을 가지고 상향 돌출 형성되되, 라운드진 모서리를 가지는 장방형의 철근 타입으로 제공되며, 역 "U"자 형상의 상측 부분이 상기 제2거더블록의 상면으로부터 일정길이 상향 돌출 형성되도록 중앙부분으로부터 하단에 이르기까지 다수의 제2보강철근과 교차하여 매설 고정됨이 양호하다.In addition, the second shear reinforcing bars are provided on the upper surface of the second girder block and protrude upwards at regular intervals in the longitudinal direction, and are provided in a rectangular reinforcing bar type having rounded corners, And a plurality of second reinforcing bars from the center portion to the bottom portion so as to protrude upward from the upper surface of the second girder block by a predetermined length.
더욱이, 상기 연결편의 삽입공은 상단부 지름이 상기 앵커볼트의 지름과 대응되되, 내면이 하단으로부터 상측으로 하광상협의 형상으로 내향 경사지게 형성됨이 바람직하다.
Further, it is preferable that the insertion hole of the connecting piece is formed such that the diameter of the upper end corresponds to the diameter of the anchor bolt, and the inner surface thereof is inclined inwardly from the lower end toward the upper side in a downwardly projecting shape.
본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더의 효과를 설명하면 다음과 같다.The effect of the prefabricated precast concrete girder for building construction according to the present invention will be described as follows.
첫째, 조립식으로 현장에서 조립 시공할 수 있도록 제1거더블록 및 일측에 상기 제1거더블록과 연결조립되는 연결편이 돌출 형성되는 제2거더블록을 포함하도록 분할 제작되는 구성으로 이루어짐으로써 건축물의 시공을 위한 현장으로 운송하기 위한 운송이 용이하게 이루어져 운송비용을 현저히 절감시킬 수 있다.The first girder block is divided and manufactured so as to include a first girder block and a second girder block protruding from the first girder block so that a connection piece connected to the first girder block is protruded. The transportation for transporting to the site can be facilitated and the transportation cost can be remarkably reduced.
둘째, 조립식으로 현장에서 조립 시공할 수 있도록 제1거더블록 및 일측에 상기 제1거더블록과 연결조립되는 연결편이 돌출 형성되는 제2거더블록을 포함하도록 분할 제작되는 구성으로 이루어져 건축물의 시공 현장에서 분할 제작된 블록들을 용이하게 안착시킨 후 조립하여 시공의 용이성을 증대시킴으로써 건축물의 시공이 간편하게 이루어짐과 동시에 건축물 시공의 공기를 단축할 수 있다.
The second girder block includes a first girder block and a second girder block protruding from the first girder block to connect the first girder block to the first girder block. The divided blocks can be easily seated and assembled to increase the ease of construction, so that the construction of the building can be simplified and the air for building construction can be shortened.
도 1은 종래기술에 따른 건축물 시공용 프리캐스트 콘크리트 거더를 나타낸 사시구성도.
도 2a는 종래기술에 따른 건축물 시공용 프리캐스트 콘크리트 거더가 적용된 건축물의 시공구조에서 피씨슬래브가 안착시공되는 상태를 나타낸 정단면예시도.
도 2b는 종래기술에 따른 건축물 시공용 프리캐스트 콘크리트 거더가 적용된 건축물의 시공구조에서 피씨슬래브가 안착시공되는 상태를 나타낸 측단면구성도.
도 3은 종래기술에 따른 건축물 시공용 프리캐스트 콘크리트 거더가 적용된 건축물의 시공구조를 나타낸 측면예시도.
도 4는 종래기술에 따른 건축물 시공용 프리캐스트 콘크리트 거더가 적용된 건축물의 시공구조를 나타낸 평면예시도.
도 5는 본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더를 나타낸 분리 사시구성도.
도 6은 본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더를 나타낸 결합 사시구성도.
도 7은 본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더를 나타낸 결합 단면구성도.
도 8은 본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더가 적용된 건축물의 시공구조에서 피씨슬래브가 안착시공되는 상태를 나타낸 정단면예시도.
도 9는 본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더가 적용된 건축물의 시공구조를 나타낸 측단면예시도.
도 10은 본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더가 적용된 건축물의 시공구조를 나타낸 평면예시도.1 is a perspective view showing a precast concrete girder for building construction according to the prior art.
FIG. 2A is a front sectional view showing a state in which a PC slab is seated in a construction structure of a building to which a precast concrete girder for building construction according to the prior art is applied; FIG.
FIG. 2B is a side cross-sectional view showing a state in which a PC slab is seated in a construction structure of a building to which a precast concrete girder for building construction according to the related art is applied.
3 is a side view showing a construction structure of a building to which a precast concrete girder for building construction according to the prior art is applied.
Fig. 4 is a plan view showing a construction structure of a building to which a precast concrete girder for building construction according to the prior art is applied. Fig.
5 is a perspective view showing a separated pre-cast concrete girder for building construction according to the present invention.
6 is a perspective view of a combined pre-cast concrete girder for building construction according to the present invention.
FIG. 7 is a sectional view showing a combined pre-cast concrete girder for building construction according to the present invention. FIG.
8 is a front sectional view illustrating a state in which a PC slab is seated in a construction structure of a building to which a prefabricated precast concrete girder for building construction according to the present invention is applied.
9 is a side sectional view showing a construction of a building to which a prefabricated precast concrete girder for building construction according to the present invention is applied.
10 is a plan view showing a construction structure of a building to which a prefabricated precast concrete girder for building construction according to the present invention is applied.
이하, 첨부된 도면을 참조하여 본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더의 바람직한 실시예를 상세히 설명한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of a prefabricated prefabricated concrete girder for building construction according to the present invention will be described in detail with reference to the accompanying drawings.
도 5는 본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더를 나타낸 분리 사시구성도이고, 도 6은 본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더를 나타낸 결합 사시구성도이며, 도 7은 본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더를 나타낸 결합 단면구성도이다.FIG. 5 is a perspective view showing a separated pre-cast concrete girder for building construction according to the present invention, FIG. 6 is a perspective view showing a combined pre-cast concrete girder for building construction according to the present invention, FIG. Fig. 3 is a sectional view showing an assembled precast concrete girder for building construction according to the invention.
도 8은 본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더가 적용된 건축물의 시공구조에서 피씨슬래브가 안착시공되는 상태를 나타낸 정단면예시도이고, 도 9는 본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더가 적용된 건축물의 시공구조를 나타낸 측단면예시도이며, 도 10은 본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더가 적용된 건축물의 시공구조를 나타낸 평면예시도이다.FIG. 8 is a front view showing a state in which a PC slab is seated in a construction structure of a building to which a prefabricated precast concrete girder for building construction according to the present invention is applied, and FIG. 9 is a front view of the prefabricated precast for building construction according to the present invention 10 is a plan view illustrating a construction structure of a building to which a prefabricated concrete precast concrete girder for building construction according to the present invention is applied. FIG. 10 is a side sectional view illustrating a construction structure of a concrete girder.
도 5 내지 10에서 보는 바와 같이, 본 발명의 바람직한 실시예에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더(500)는 건축물의 축조를 위하여 터파기 처리된 터에 콘크리트를 양생하여 형성되는 기초바닥(100)의 상부 면적에 대하여 일정간격을 가지고 가로 및 세로방향으로 설치 시공되는 피씨기둥(200)의 확장부(210) 상면에 전단부 또는 후단부 하면이 안착 시공되는 것이다.5 to 10, the prefabricated concrete
이러한 본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더(500)는 제1거더블록(510)과 제2거더블록(550)을 포함하여 이루어진다.The prefabricated
여기서, 상기 제1거더블록(510)은 상기 피씨기둥(200)의 확장부(210) 상면에 전단부 또는 후단부 하면이 안착 시공되며, 단면이 상광하협의 형상을 가지고 길게 연장 형성되어 상면에 길이방향으로 일정간격을 가지고 제1전단철근(511)이 상향 돌출 형성된다.The
이러한 제1거더블록(510)은 특히, 일측 상면 모서리부분에 조립홈(520)이 함몰 형성되며, 상기 조립홈(520) 상면에 길이방향으로 일정간격을 가지고 앵커볼트(530)가 돌출 형성된다.Particularly, the
또한, 상기와 같은 제1거더블록(510)에서, 특히 상기 제1전단철근(511)은 상기 제1거더블록(510)의 상면에 길이방향으로 일정간격을 가지고 상향 돌출 형성되되, 라운드진 모서리를 가지는 장방형의 철근 타입으로 제공됨이 바람직하다.In addition, in the
더욱이, 상기 제1전단철근(511)은 역 "U"자 형상의 상측 부분이 상기 제1거더블록(510)의 상면으로부터 일정길이 상향 돌출 형성되도록 중앙부분으로부터 하단에 이르기까지 다수의 제1보강철근(513)과 교차하여 매설 고정됨이 바람직한 것이다.Further, the first
한편, 상기 제2거더블록(550)은 상기 피씨기둥(200)의 확장부(210) 상면에 상기 제1거더블록(510)과 일정거리를 가지고 전단부 또는 후단부 하면이 안착 시공되며, 단면이 상광하협의 형상을 가지고 길게 연장 형성되어 상면에 일정간격을 가지고 제2전단철근(551)이 상향 돌출 형성된다.The
이때, 상기 제2전단철근(551)은 상기 제2거더블록(550)의 상면에 길이방향으로 일정간격을 가지고 상향 돌출 형성되되, 라운드진 모서리를 가지는 장방형의 철근 타입으로 제공됨이 바람직하다.At this time, the second
또한, 상기 제2전단철근(551)은 역 "U"자 형상의 상측 부분이 상기 제2거더블록(550)의 상면으로부터 일정길이 상향 돌출 형성되도록 중앙부분으로부터 하단에 이르기까지 다수의 제2보강철근(553)과 교차하여 매설 고정됨이 바람직한 것이다.In addition, the second
전술한 바와 같은 상기 제2거더블록(550)은 특히, 일측 상면 모서리부분에 상기 제1거더블록(510)의 조립홈(520)과 대응되는 높이를 가지고 연결편(560)이 외향 일정길이 돌출 형성된다.The
또한, 상기 제2거더블록(550)은 상기 연결편(560)이 상기 조립홈(520) 상에 안착되어 상기 제1거더블록(510)과 마주하는 상태로 연결고정될 수 있도록, 상기 연결편(560)의 길이방향으로 상기 앵커볼트(530)와 대응되어 삽입공(561)이 관통형성된다.The
이때, 상기 연결편(560)의 삽입공(561)은 상단부 지름이 상기 앵커볼트(530)의 지름과 대응되되, 내면이 하단으로부터 상측으로 하광상협의 형상으로 내향 경사지게 형성됨이 바람직하다.At this time, the
한편, 상술한 바와 같은 제2거더블록(550)은 상기 앵커볼트(530)가 상기 삽입공(561)에 삽입된 후 상기 앵커볼트(530)의 상단부에 체결너트(590)를 체결하여 상기 제1거더블록(510)과 연결고정되도록 조립설치된다.The
다시 말하면, 본 발명에 따른 건축물 시공용 프리캐스트 콘크리트 거더(500)는 상기 제1거더블록(510)과 상기 제2거더블록(550)으로 구성되며, 이와 같이 구성되는 상기 제1거더블록(510)과 상기 제2거더블록(550)이 상기 연결편(560)에 의해 상호 연결될 수 있으며, 특히 상기 앵커볼트(530)가 상기 삽입공(561)을 통하여 삽입된 후에 상기 체결너트(590)를 통해 조립 설치됨이 바람직한 것이다.In other words, the pre-cast
전술한 바와 같은 본 발명에 따른 건축물 시공용 프리캐스트 콘크리트 거더(500)를 이루는 상기 제1거더블록(510)과 상기 제2거더블록(550)은 프리캐스트 공법으로 공장에서 기 제작됨이 바람직하며, 이와 같이 기제작된 상기 제1거더블록(510) 및 제2거더블록(550)은 건축물이 시공될 현장으로 운송하여 건축물 시공에 적용되는 것이다.It is preferable that the
한편, 도 8 내지 10을 참조하여 전술한 바와 같은 본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더(500)가 적용된 건축물의 시공과정을 살펴보면, 먼저 건축물의 기초바닥(100) 상에 직립 시공된 피씨기둥(200)의 확장부(210) 상면 테두리 부분에 제1거더블록(510)의 전단부 또는 후단부 하면을 안착시킨다.8 to 10, a construction method of a building to which a prefabricated
이후, 제2거더블록(550)을 상기 피씨기둥(200)의 확장부(210) 상면 테두리 부분에 전단부 또는 후단부 하면이 안착되도록 하며, 이때 상기 제2거더블록(550)은 상기 제1거더블록(510)과 연결되도록 안착시킴이 바람직하다.The
다시 말하면, 상기 제2거더블록(550)의 연결편(560) 단부가 상기 제1거더블록(510)의 조립홈(520) 상에 안착되도록 하되, 상기 연결편(560) 상에 관통 형성된 삽입공(561)을 통하여 상기 조립홈(520) 상에 돌출된 앵커볼트(530)가 삽입되도록 하여 상기 연결편(560)이 상기 조립홈(520) 상에 안착되도록 함이 바람직한 것이다.In other words, the end of the connecting
그리고나서, 상기 피씨기둥(200)의 확장부(210) 상면 중 일측 변에 대하여 상호 마주하여 안착된 상기 제1거더블록(510)과 제2거더블록(550)이 상호 조립고정될 수 있도록, 상기 앵커볼트(530) 상단부에 체결너트(590)를 체결한다.The
이때, 상기 체결너트(590)는 와셔(미부호) 등이 개재되어 상기 앵커볼트(530)의 상단부에 체결고정됨이 바람직한 것이다.At this time, it is preferable that the
상기와 같은 과정을 통하여, 각각의 전단부 또는 후단부 하면이 상기 피씨기둥(200)의 확장부(210) 상면에 안착 고정되도록, 상기 제1거더블록(510)과 제2거더블록(550)을 조립고정한 후에는 상기 피씨기둥(200)의 배열에 따라 상호 일정간격을 가지고 이웃하게 되는 상기 제1거더블록(510)과 제2거더블록(550)가 조립고정되어 구성된 다른 조립식 프리캐스트 콘크리트 거더(500)의 마주하는 각 측방향 상면에 피씨슬래브(600)의 양단을 각기 안착시킨다.The
마지막으로, 상기 피씨기둥(200)의 확장부(210) 상면과, 상기 제1거더블록(510)과 제2거더블록(550)가 조립고정되어 구성되는 조립식 프리캐스트 콘크리트 거더(500)의 상면 및 상기 피씨슬래브(600)의 상면에 대하여 현장에서 콘크리트를 타설한 후 양생시켜 층간슬래브(S)를 시공하게 된다.The upper surface of the
이때, 상기 피씨기둥(200)의 확장부(210) 상면과, 상기 조립식 프리캐스트 콘크리트 거더(500)의 상면 및 상기 피씨슬래브(600)의 상면에는 배력근(700)이 교차 고정됨이 바람직하며, 물론 상기 피씨슬래브(600)는 통상의 피씨슬래브와 마찬가지로 상면에 철근 트러스(610)가 돌출 형성되는 구성으로 이루어짐이 바람직한 것이다.At this time, an
또한, 상기 피씨기둥(200)의 확장부(210) 상면에는 돌출근(250)이 다수 개로 돌출 형성되어 상기 배력근(700)이 상기 조립식 프리캐스트 콘크리트 거더(500)에서 상기 제1거더블록(510)의 제1전단철근(511), 제2거더블록(550)의 제2전단철근(551) 및 상기 피씨슬래브(600)의 철근 트러스(610)와 상기 돌츨근(250)에 걸쳐 교차 고정된 후에 현장에서 콘크리트를 타설한 후 양생시켜 상기 층간슬래브(S)를 시공함이 바람직한 것이다.A plurality of
전술한 바와 같은 과정을 거쳐 건축물의 시공에서의 시공과정 중 층간슬래브(S)의 시공이 이루어지게 되는 것이다.The construction of the interlayer slab S is performed during the construction process of the building through the process as described above.
전술한 바와 같은 본 발명에 따른 건축물 시공용 조립식 프리캐스트 콘크리트 거더(500)에 의하면, 조립식으로 현장에서 조립 시공할 수 있도록 제1거더블록(510) 및 일측에 상기 제1거더블록(510)과 연결조립되는 연결편(560)이 돌출 형성되는 제2거더블록(550)을 포함하도록 분할 제작되는 구성으로 이루어짐으로써 건축물의 시공을 위한 현장으로 운송하기 위한 운송이 용이하게 이루어져 운송비용을 현저히 절감시킬 수 있다.According to the prefabricated prefabricated
아울러, 조립식으로 현장에서 조립 시공할 수 있도록 제1거더블록(510) 및 일측에 상기 제1거더블록(510)과 연결조립되는 연결편(560)이 돌출 형성되는 제2거더블록(550)을 포함하도록 분할 제작되는 구성으로 이루어져 건축물의 시공 현장에서 분할 제작된 블록들을 용이하게 안착시킨 후 조립하여 시공의 용이성을 증대시킴으로써 건축물의 시공이 간편하게 이루어짐과 동시에 건축물 시공의 공기를 단축할 수 있는 것이다.In addition, a
이상에서 본 발명의 구체적인 실시예를 상세히 설명하였으나, 본 발명은 이에 한정되는 것은 아니며, 본 발명은 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자에 의해 다양한 변형의 실시가 가능하며, 이러한 변형은 본 발명의 범위에 포함된다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, the invention is not limited thereto. Various modifications may be made by those skilled in the art. Are included in the scope of the present invention.
100: 기초바닥 200: 피씨기둥
210: 확장부 250: 돌출근
500: 조립식 프리캐스트 콘크리트 거더
510: 제1거더블록 511: 제1전단철근
513: 제1보강철근 520: 조립홈
530: 앵커볼트 550: 제2거더블록
551: 제2전단철근 553: 제2보강철근
560: 연결편 561: 삽입공
590: 체결너트
600: 피씨슬래브 610: 철근트러스
700: 배력근 S: 층간슬래브100: foundation floor 200: PC column
210: extension part 250: stone work
500: prefabricated precast concrete girder
510: first girder block 511: first shear reinforcement
513: first rebar 520: assembly groove
530: Anchor bolt 550: Second girder block
551: second shear reinforcement 553: second reinforcing steel
560: Connecting piece 561: Insertion hole
590: Clamping nut
600: PC Slab 610: Reinforced Truss
700: Line width S: Interlayer slab
Claims (4)
상기 제1전단철근(511)은 상기 제1거더블록(510)의 상면에 길이방향으로 일정간격을 가지고 상향 돌출 형성되되, 라운드진 모서리를 가지는 장방형의 철근 타입으로 제공되며, 역 "U"자 형상의 상측 부분이 상기 제1거더블록(510)의 상면으로부터 일정길이 상향 돌출 형성되도록 중앙부분으로부터 하단에 이르기까지 다수의 제1보강철근(513)과 교차하여 매설 고정되고, 상기 제2전단철근(551)은 상기 제2거더블록(550)의 상면에 길이방향으로 일정간격을 가지고 상향 돌출 형성되되, 라운드진 모서리를 가지는 장방형의 철근 타입으로 제공되며, 역 "U"자 형상의 상측 부분이 상기 제2거더블록(550)의 상면으로부터 일정길이 상향 돌출 형성되도록 중앙부분으로부터 하단에 이르기까지 다수의 제2보강철근(553)과 교차하여 매설 고정되며, 상기 연결편(560)의 삽입공(561)은 상단부 지름이 상기 앵커볼트(530)의 지름과 대응되되, 내면이 하단으로부터 상측으로 하광상협의 형상으로 내향 경사지게 형성됨을 특징으로 하는 건축물 시공용 조립식 프리캐스트 콘크리트 거더.
The extension part 210 of the PC column 200 installed at a predetermined interval with respect to the upper surface area of the foundation floor 100 formed by curing the concrete in the terraced place to construct the building, A front end or a rear end lower surface is seated on the upper surface of the extension part 210 of the PC column 200 and is formed into a long extended shape The first shearing reinforcing bars 511 are upwardly protruded at regular intervals in the longitudinal direction on the upper surface. An assembling groove 520 is formed at one corner of the upper surface of the upper portion. A first girder block 510 having an anchor bolt 530 protruded therefrom; And the first girder block (510) is formed on the upper surface of the extension part (210) of the PC column (200) by a predetermined distance and the front end or the rear end lower surface is seated, And a connecting piece 560 having a height corresponding to the assembly groove 520 of the first girder block 510 is formed at one corner of the upper surface of the second shear reinforcing bar 551 at a predetermined interval on the upper surface, And the connecting piece 560 is mounted on the mounting groove 520 so as to be connected and fixed in a state of facing the first girder block 510. The length of the connecting piece 560 in the longitudinal direction The anchor bolt 530 is inserted into the insertion hole 561 and is inserted into the upper end of the anchor bolt 530 with a fastening nut 590 And is assembled and fixed so as to be connected and fixed to the first girder block 510 A prefabricated precast concrete girder (500) for building construction, comprising a second girder block (550)
The first shear reinforcement 511 is provided on the upper surface of the first girder block 510 at a predetermined interval in the longitudinal direction and is provided as a rectangular reinforcing bar type having rounded corners, The upper portion of the first girder block 510 is embedded in and fixed to a plurality of first reinforcing bars 513 from the center portion to the lower portion so as to protrude upward from the upper surface of the first girder block 510, (551) is provided on the upper surface of the second girder block (550) with a predetermined interval in the longitudinal direction, and is provided as a rectangular reinforcing bar type having rounded corners. An upper portion of the inverted & And a plurality of second reinforcing bars 553 are embedded and fixed so as to protrude upward from the upper surface of the second girder block 550 so as to protrude upwards from the center portion to the lower end of the second girder block 550, 61) has an upper end diameter corresponding to a diameter of the anchor bolt (530), and an inner surface inclined inwardly from a lower end toward a lower end in a downwardly projecting shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020140071573A KR101576224B1 (en) | 2014-06-12 | 2014-06-12 | Prefabricated precast concrete girder for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020140071573A KR101576224B1 (en) | 2014-06-12 | 2014-06-12 | Prefabricated precast concrete girder for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101576224B1 true KR101576224B1 (en) | 2015-12-11 |
Family
ID=55020705
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020140071573A KR101576224B1 (en) | 2014-06-12 | 2014-06-12 | Prefabricated precast concrete girder for building construction |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101576224B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111945765A (en) * | 2020-08-31 | 2020-11-17 | 广州建筑产业研究院有限公司 | Emergency type prefabricated strip-shaped foundation for building |
CN113389272A (en) * | 2021-07-21 | 2021-09-14 | 曾侃衎 | Modular prefabricated combined type space connection masonry and structure building method |
CN113802866A (en) * | 2021-11-02 | 2021-12-17 | 沈阳建筑大学 | Hoisting structure for prefabricated bottom plate with medium and long ribs and construction method of hoisting structure |
-
2014
- 2014-06-12 KR KR1020140071573A patent/KR101576224B1/en active IP Right Grant
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111945765A (en) * | 2020-08-31 | 2020-11-17 | 广州建筑产业研究院有限公司 | Emergency type prefabricated strip-shaped foundation for building |
CN113389272A (en) * | 2021-07-21 | 2021-09-14 | 曾侃衎 | Modular prefabricated combined type space connection masonry and structure building method |
CN113802866A (en) * | 2021-11-02 | 2021-12-17 | 沈阳建筑大学 | Hoisting structure for prefabricated bottom plate with medium and long ribs and construction method of hoisting structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101379305B1 (en) | Wall structure manufacturing method using precast front wall panel and precast back wall panel | |
KR101937680B1 (en) | Prefabricated Precast Structure and Construction Method Thereof | |
KR101301076B1 (en) | Wall structure construction method using precast front wall panel and precast back wall panel | |
KR102243984B1 (en) | Non-supporting formwork system for retaining wall using self-supporting form and construction method thereof | |
KR101614842B1 (en) | frame system of buildings using the pc-column with overhanging beam applicable various span without increase of story-height | |
KR101429430B1 (en) | Double PC girder and construction method thereof | |
KR102387052B1 (en) | End Reinforced half preecast concrete beam and construction method of the same | |
KR101576224B1 (en) | Prefabricated precast concrete girder for building construction | |
KR20100125652A (en) | A mold for apartment | |
KR101216126B1 (en) | Arch structure construction method using axial and longitudinal connection rebar | |
KR20160073795A (en) | Retaining wall construction method in which the vertical precast structures utilizing this structure | |
KR101576215B1 (en) | Prefabricated precast concrete girder for building construction | |
KR102197107B1 (en) | Slab unit implanted with means for pressing pile and the method for carrying out the construction of the reinforced concrete column using it | |
KR101036177B1 (en) | Method for constructing building using PRC integrating method | |
KR102296982B1 (en) | Transfer Structure Construction Method Using U-shaped Steel Girder | |
KR101324884B1 (en) | Hybrid building construction method combining dry type and wet type | |
KR101282243B1 (en) | A construction method using the column cap for permanent beam form | |
KR101880813B1 (en) | A sandwitch pc pannel structure and construction method of structure using thereof | |
KR101482523B1 (en) | Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof | |
KR100712354B1 (en) | PC Integrating Construction Method of an Underground Parking Lot and PC Column-Beam Joint System for Long Span PC Beam therein | |
KR100557334B1 (en) | A Dismonuting Stair Form | |
KR102242175B1 (en) | Mold for prefabricated double wall precast concrete | |
TWI822635B (en) | Construction structure | |
KR102546703B1 (en) | Construction method of underground structure using large form | |
KR100561081B1 (en) | A Dismonuting Stair Form |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20181204 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20190923 Year of fee payment: 5 |