KR20130140238A - Method of paving road using dyke - Google Patents
Method of paving road using dyke Download PDFInfo
- Publication number
- KR20130140238A KR20130140238A KR1020120063430A KR20120063430A KR20130140238A KR 20130140238 A KR20130140238 A KR 20130140238A KR 1020120063430 A KR1020120063430 A KR 1020120063430A KR 20120063430 A KR20120063430 A KR 20120063430A KR 20130140238 A KR20130140238 A KR 20130140238A
- Authority
- KR
- South Korea
- Prior art keywords
- construction
- dyke
- collection
- dike
- road
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/221—Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
- E01C11/223—Kerb-and-gutter structures; Kerbs with drainage openings channel or conduits, e.g. with out- or inlets, with integral gutter or with channel formed into the kerb ; Kerbs adapted to house cables or pipes, or to form conduits
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/227—Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F5/00—Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F1/00—Methods, systems, or installations for draining-off sewage or storm water
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C2201/00—Paving elements
- E01C2201/20—Drainage details
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Road Paving Structures (AREA)
Abstract
Description
The present invention relates to a pavement construction method using the collection of the dyke, and after the construction of the main pavement of the road, before the construction of the road pavement, the excellent flow to the shoulder part generated by the rainy season through the collection of the dike to the drainage side of the road The present invention relates to a pavement construction method using dyke collection that can prevent scour and loss of earthwork by draining.
In general, the road pavement is a pavement body made of impermeable asphalt concrete or cement concrete, and the dike is installed as a drainage system for draining water at both edge regions of the main package body spaced apart from the main pavement body. The padding is done between and Dyke.
That is, the dike is installed at a boundary point between a sidewalk and a driveway to determine the division of the road so that the pedestrian and the vehicle can be safely protected. The dike is to be grounded before the construction of the auxiliary base of the main package. After placing wood on the left and right of the position, base concrete is placed in between, and when the base concrete is hardened to a certain degree of strength, the dike is placed on it, and then additional concrete is added on the left and right sides of the dike and the base concrete. By reinforcing and releasing the wood, it is constructed so that the dyke is located at a certain height from the ground.
After the dike is constructed as described above, when the main ship auxiliary base and the concrete base are constructed to complete the construction of the main package, the outdoor packing is made on the shoulder between the main package and the dike.
Conventionally, when the rainy season comes after the construction of the dike and the main package and before the construction of the outdoor package, the road surface is dense before pavement. All of them are concentrated on the shoulder, and the rainwater concentrated on the shoulder due to the height difference between the main package and the dyke located on both sides of the shoulder is not led to the raceway, but it forms one storm flow in the shoulder. Will generate a flow.
However, in the conventional construction method, the rainwater flowing after the pavement or along the main pavement and the pavement is discharged through the raceway. Could not be derived. That is, when rainwater flows from the hillside, the rainwater flowing along the hillside is concentrated in the weak spots, causing scour and loss of the earthworking surface. There were various problems such as weakening the fill part itself.
An object of the present invention is to provide a road pavement construction method using the collection of the dyke collection can be smoothly discharged to the raceway in the rain prior to the construction of the pavement, when the road paving according to the installation of the dyke.
The present invention is a furnace body and roadbed construction step, a dike construction step for constructing a dike collection, the base hole is formed in the dike and the wall, a mainline construction step for constructing the main body package, and after the mainline construction step, The main clearing step of draining water or rainwater flowing along the road through the reference hole to the collection of dikes, and after the clearing step, 0-15 cm from the top of the reference hole as the construction reference point. It includes the stage of construction of the paving body to connect from the package to the construction reference point at the top of the reference hole, and before the construction stage, the rainwater and the deceased water flowing in the shoulder part are drained to the raceway through the reference hole. .
According to the present invention, a reference hole is formed in the collection wall of the dyke to lead to the collection of the dike, and even if the rainwater is concentrated in the pretreatment before the construction of the package, the dike is collected through the reference hole serving as a guide drain. The flow of furnace rainwater is generated, and the rainwater in the shoulder part is smoothly drained to the raceway through the collection of dykes.
In the present invention, when the construction of the dog package, the construction of the dog package using the reference hole formed in the collection wall of the dyke as a construction reference point, it is possible to construct the dog package by making the inclination angle uniform and drainage of the road through this It can improve performance.
In the present invention, because the rainwater in the shoulder part is smoothly discharged to the raceway through the collection of dykes, the flow of rainwater does not occur in the shoulder part, and thus, the loss and scour of the road fill part during the rainy season do not occur, There are many effects such as to improve the quality of civil construction by suppressing.
1 is a construction example showing the configuration according to the present invention (notch packaging before construction)
Figure 2 is an exemplary view showing a road paving construction state according to the present invention
Figure 3 is an exemplary view showing the drainage process of the excellent rain in accordance with the present invention
1 is a construction example showing the configuration according to the present invention (notch paving body construction), Figure 2 is an exemplary view showing a road paving construction state according to the present invention, Figure 3 of the excellent road part according to the present invention As an exemplary view showing a drainage process, the present invention provides a dike construction step of constructing a
The hearth and hearth construction step is to compact the hearth, and by laying the soil to a thickness of about 1 m to compact the hearth.
The dike construction step is a step of installing the
As shown in FIG. 3, the
FIG. 3A illustrates a configuration in which an L-
The
The main ship construction step is a step for construction of the main
The cleanup step is to remove the rainwater flowing along the water or the
The dog construction step is a step of constructing the
That is, the present invention is to set the construction reference point of the dog package using the reference hole formed in the collection of dyke, not only facilitates the construction of the dog package, but also the constructed dog package from the main package Since the construction is provided with a predetermined downward inclination angle up to the dike, a road pavement body having smooth road drainage is constructed.
In addition, it is preferable that the dog package is constructed with a dog package with the upper 10 cm point as a construction reference point based on the upper end of the reference hole, and by the construction of such a
In addition, the
It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined in the appended claims and their equivalents. Of course, such modifications are within the scope of the claims.
10: Dyke 20: Dyke Collection
(21): reference hole (22): wall
(23): Drainage pipe (30): Main ship packaging
(40): shoulder part (50): shoulder packaging
(51): Construction reference point (60): Raceway
Claims (4)
A dike construction step of constructing a dike collection unit having a reference hole formed on a dike and a wall;
A main stage construction step of constructing the main ship packaging body, and a rearranging step of draining the water accumulated in the head part or the rainwater flowing along the head part to the Dike collection through the reference hole after the main part construction step;
After the cleanup stage, the construction includes the construction of the reference point (Construction reference point), and the construction step for the construction of the dog package to connect from the main package to the construction reference point;
Before pavement construction step, road pavement construction method using the collection of dyke collection, characterized in that the rainwater and sewage water flowing in the shoulder part is drained to the raceway through the reference hole.
Dyke collection is a pavement construction method using the collection of dikes, characterized in that the lower end of the reference hole is installed so as to contact the ground surface of the shoulder.
Road pavement construction method using the dyke collection, characterized in that the drainage pipe is further installed integrally with the dyke collection in the standard hole.
The construction reference point is a road pavement construction method using a dike collection, characterized in that it is set to be located within the point of 0-15 cm from the top of the reference hole formed in the dike collection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120063430A KR20130140238A (en) | 2012-06-14 | 2012-06-14 | Method of paving road using dyke |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120063430A KR20130140238A (en) | 2012-06-14 | 2012-06-14 | Method of paving road using dyke |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20130140238A true KR20130140238A (en) | 2013-12-24 |
Family
ID=49984888
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020120063430A KR20130140238A (en) | 2012-06-14 | 2012-06-14 | Method of paving road using dyke |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20130140238A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105926396A (en) * | 2016-04-29 | 2016-09-07 | 中冶南方工程技术有限公司 | Roadbed drainage structure for municipal administration road and construction method of roadbed drainage structure |
CN106836432A (en) * | 2016-12-02 | 2017-06-13 | 浙江水利水电学院 | Flood Pondage Action rainwater recycling system in sponge city |
-
2012
- 2012-06-14 KR KR1020120063430A patent/KR20130140238A/en not_active Application Discontinuation
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105926396A (en) * | 2016-04-29 | 2016-09-07 | 中冶南方工程技术有限公司 | Roadbed drainage structure for municipal administration road and construction method of roadbed drainage structure |
CN105926396B (en) * | 2016-04-29 | 2018-12-07 | 中冶南方工程技术有限公司 | A kind of town road subgrade drainage structure and its construction method |
CN106836432A (en) * | 2016-12-02 | 2017-06-13 | 浙江水利水电学院 | Flood Pondage Action rainwater recycling system in sponge city |
CN106836432B (en) * | 2016-12-02 | 2019-09-17 | 浙江水利水电学院 | Flood Pondage Action rainwater recycling system in sponge city |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105256876A (en) | Siphon type draining system of superhigh excavation section of road | |
CN111042293A (en) | Construction process of road central green belt seepage-proofing drainage structure | |
CN103981785A (en) | Pervious concrete paving system with penetration and drainage guide tubes | |
CN106065656A (en) | Guard system and construction method is oozed under the regularization of Collapsible Loess District rainwater | |
CN210177294U (en) | Mountain area highway subgrade | |
KR101728128B1 (en) | Road drainage facility and construction methods accordingly | |
CN205134481U (en) | Highway superelevation excavation highway section hydrocone type drainage system | |
CN106759778A (en) | For the scattered collection mating type waterproof and water drainage system of highway median strip | |
CN109826065A (en) | A kind of high-fill roadbed guard system and its construction method | |
CN211228269U (en) | High-grade highway central separation strip structure | |
RU170257U1 (en) | The device for waterproofing the dividing strip of road pavement on a subsiding ground | |
CN110172884B (en) | Mountain highway subgrade and construction method | |
CN210507029U (en) | Road drainage structure | |
US20120269573A1 (en) | Systems and Methods for Diverting Sub-surface Water | |
KR20130140238A (en) | Method of paving road using dyke | |
CN204898464U (en) | Highway curb drainage device | |
KR20080080840A (en) | Drainage system of pavement | |
CN206503213U (en) | Scattered collection mating type waterproof and water drainage system for highway median strip | |
CN207469190U (en) | A kind of infitration galleries structure of efficient draining | |
CN211079810U (en) | Avoid pitch highway of ponding | |
CN209010891U (en) | A kind of multi-functional lobby drainage facility | |
JPS6022153Y2 (en) | Device for storing, irrigating, and infiltrating rainwater from roadside gutters | |
KR20140098583A (en) | Flood reduction and penetration for promoting the penetration type road system | |
CN113550397A (en) | Road water storage and drainage system and road construction method | |
CN206616658U (en) | Filter closure works system in a kind of Mountainous City |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WITN | Withdrawal due to no request for examination |