KR20130004798A - Earth pressure supporting method of walls trench applying construction of none- excavation underground structure - Google Patents

Earth pressure supporting method of walls trench applying construction of none- excavation underground structure Download PDF

Info

Publication number
KR20130004798A
KR20130004798A KR1020110066078A KR20110066078A KR20130004798A KR 20130004798 A KR20130004798 A KR 20130004798A KR 1020110066078 A KR1020110066078 A KR 1020110066078A KR 20110066078 A KR20110066078 A KR 20110066078A KR 20130004798 A KR20130004798 A KR 20130004798A
Authority
KR
South Korea
Prior art keywords
earth pressure
support
construction
underground structure
panel
Prior art date
Application number
KR1020110066078A
Other languages
Korean (ko)
Other versions
KR101249660B1 (en
Inventor
김선권
윤기철
Original Assignee
신일씨엔아이(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=47836311&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR20130004798(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 신일씨엔아이(주) filed Critical 신일씨엔아이(주)
Priority to KR1020110066078A priority Critical patent/KR101249660B1/en
Publication of KR20130004798A publication Critical patent/KR20130004798A/en
Application granted granted Critical
Publication of KR101249660B1 publication Critical patent/KR101249660B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/04Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PURPOSE: An earth pressure supporting method of a wall trench for the construction of a trenchless underground structure is provided to safely support earth pressure even after a support for supporting a precast panel is removed. CONSTITUTION: An earth pressure supporting method of a wall trench for the construction of a trenchless underground structure is as follows. Precast panels(20) are arranged and assembled on both sides of an excavated wall trench(10) to support earth pressure. Horizontal supports(30) for a panel are installed in a height direction and support the precast panels. A pair of vertical piles(40A,40B) facing each other are arranged in the longitudinal direction of the wall trench. Horizontal supports(30a) for a pile are installed in a height direction and support the vertical piles. The top and bottom ends of the vertical piles are supported in a horizontal direction through upper and lower horizontal struts(50A,50B), and the installed horizontal supports are removed.

Description

비개착 지하구조물의 시공에 적용되는 벽체 트렌치 토압 지지 방법{Earth pressure supporting method of walls trench applying construction of none- excavation underground structure}Earth pressure supporting method of walls trench applying construction of none- excavation underground structure

본 발명은 비개착 지하구조물의 벽체를 시공하는데 있어 토압을 지지하는 방법에 관한 것으로, 특히 프리캐스트 판넬을 지지하기 위해 사용되는 강봉 스트러트의 제거 후에도 토압이 지지되도록 하여 작업자의 수월한 이동통로가 확보되고 철근 배근이 용이토록 한 비개착 지하구조물의 시공에 적용되는 벽체 트렌치 토압 지지 방법에 관한 것이다.The present invention relates to a method for supporting earth pressure in the construction of walls of non-adherent underground structures, and in particular, the earth pressure is supported even after removal of the steel bar struts used to support the precast panel, thereby ensuring an easy movement path for the worker. The present invention relates to a wall trench earth pressure support method applied to the construction of non-adherent underground structures for easy reinforcement.

지하구조물을 시공하기 위한 비개착공법 중의 하나인 TRCM(Tubular Roof Construction Method) 공법은 작업구에서 종,횡단 구배에 따라 선형을 조정할 수 있도록 선도관과 후속관 사이에 유압식 조정장치를 장착한 강관을 가압잭으로 압입한 후 강관 내부 굴착, 철근배근 및 콘크리트를 타설하여 상부슬래브를 완성시키고, 프리캐스트 및 서포트 잭을 이용하여 지중 수직벽을 설치한 후 터널 내부를 굴착하여 구조물의 터널을 축조하는 공법이다.The Tubular Roof Construction Method (TRCM) method, one of the non-opening methods for the construction of underground structures, uses steel pipes equipped with hydraulic controls between the leading pipe and subsequent pipes to adjust the linearity according to the longitudinal and transverse gradients in the work area. After press-fitting with pressurized jack, drilling the inside of steel pipe, reinforcing reinforcement and concrete to complete the upper slab, and installing underground vertical walls using precast and support jacks, and excavating the inside of the tunnel to build the tunnel of the structure to be.

이 공법은 작업구 및 반력벽 설치, 갤러리관 추진 및 굴착, 슬래브관 추진 및 굴착, 거더굴착 및 거푸집설치, 상부 슬래브 콘크리트 타설, 벽체 설치 및 콘크리트 타설, 터널 굴착 및 구조물 설치의 순으로 시공된다.This method is installed in the order of installation of work tools and reaction walls, propulsion and excavation of gallery pipe, propulsion and excavation of slab pipe, girder excavation and formwork installation, upper slab concrete placement, wall installation and concrete installation, tunnel excavation and structure installation.

이 공법은 토질변화에 대한 대처 능력이 우수하고, 강관을 본 구조물로 사용하므로 공사비가 저렴하고 공기 단축이 가능한 이점을 갖는다.This method is excellent in coping with soil changes, and because steel pipes are used as the structure, the construction cost is low and the air can be shortened.

여기서, 벽체 시공을 위해 굴착 후 종래는 도 1에서와 같이 프리캐스트 판넬(20)을 지지대(22)로 버팀시켜 토압을 지지한다. 이때 지지대(22)는 프리캐스트 판넬(20)의 높이 방향과 길이 방향으로 일정 간격을 가지고 설치된다. 따라서 서로 마주하는 프리캐스트(20,20) 사이의 공간은 좁을 뿐만 아니라 설치된 지지대(22)들에 의해 작업자의 이동을 어렵게 한다. 또한 작업자는 이동 중에 지지대(22)에 충돌하여 안전사고를 당할 수 있다. 실제적으로 프리캐스트(20)의 높이가 40cm인 경우 이웃한 지지대(22)들 사이의 간격이 35cm로 좁아져 철근 배근 작업이 어려워져 작업 효율도 떨어진다. 또한 지지대(22)가 콘크리트 타설시 매설되게 되므로 재사용할 수가 없어져 비경제적인 문제로 남는다.Here, after excavation for wall construction, as shown in FIG. 1, the precast panel 20 is supported by the support 22 to support the earth pressure. At this time, the support 22 is installed with a predetermined interval in the height direction and the longitudinal direction of the precast panel 20. Therefore, the space between the precasts 20 and 20 facing each other is not only narrow but also makes it difficult for the worker to move by the installed supports 22. In addition, the worker may collide with the support 22 during the movement may cause a safety accident. In practice, when the height of the precast 20 is 40cm, the spacing between neighboring supports 22 is narrowed to 35cm, making rebar reinforcement difficult, resulting in poor work efficiency. In addition, since the support 22 is buried at the time of placing concrete, it can not be reused and remains an uneconomical problem.

따라서 본 발명은 상기와 같은 문제를 해결하기 위한 것으로, 프리캐스트 판넬을 지지하기 위해 사용되는 지지대의 제거 후에도 토압을 안전되게 지지되도록 하여 작업자의 수월한 이동통로가 확보되고 철근 배근이 용이토록 한 비개착 지하구조물의 시공에 적용되는 벽체 트렌치 토압 지지 방법을 제공함에 그 목적이 있다.Therefore, the present invention is to solve the above problems, to ensure that the earth pressure is securely supported even after the removal of the support used to support the precast panel to ensure an easy moving passage of the operator and the non-adhesive to facilitate reinforcement The purpose is to provide a wall trench earth pressure support method applied to the construction of underground structures.

본 발명의 적절한 실시 형태에 따르면,According to a suitable embodiment of the present invention,

굴착된 벽체 트렌치의 양쪽 벽면측에 토압을 지지하기 위해 프리캐스트 판넬을 배치 조립시켜 놓고 높이 및 길이 방향으로 판넬용 수평지지대를 설치해 나가면서 프리캐스트 판넬을 지지하여 놓는 단계와;Arranging and arranging precast panels to support earth pressure on both wall sides of the excavated wall trenches, and supporting the precast panels while installing horizontal supports for the panels in height and length directions;

벽체 트렌치의 길이 방향으로 중간 중간에 일정 간격마다 한 쌍의 마주하는 수직말뚝을 배치하되 프리캐스트 판넬에 접하여 높이 방향으로 입설시시키고 말뚝용 수평지지대로 한 쌍의 수직말뚝을 지지하여 놓는 단계와;Arranging a pair of opposing vertical piles at regular intervals in the middle of the wall trench at regular intervals, and entering the height pile in contact with the precast panel and supporting the pair of vertical piles with a horizontal support for piles;

한 쌍의 수직말뚝의 상단과 하단을 상,하부 수평버팀보를 통해 수평 방향으로 지지시켜 놓은 후 기 설치된 판넬용 수평지지대 및 말뚝용 수평지지대를 제거하는 단계;를 거처서 이루어지는 것을 특징으로 한다.After the upper and lower ends of the pair of vertical piles are supported in the horizontal direction through the upper and lower horizontal braces, removing the horizontal support for the panel installed and the horizontal support for the pile; characterized by consisting of.

본 발명의 다른 적절한 실시 형태에 따르면, 수직말뚝은 길이 방향으로 'H'형 단면을 갖는 강재로 제작된 것을 특징으로 한다.According to another suitable embodiment of the present invention, the vertical pile is characterized in that it is made of steel having a 'H' cross-section in the longitudinal direction.

본 발명의 또 다른 적절한 실시 형태에 따르면, 수직말뚝은 이웃한 프리캐스트 판넬의 수직 접합부를 따라 배치된 것을 특징으로 한다.According to another suitable embodiment of the invention, the vertical pile is characterized in that it is disposed along the vertical joint of the neighboring precast panel.

본 발명의 또 다른 적절한 실시 형태에 따르면, 판넬용 수평지지대와 말뚝용 수평지지대는 길이 조절되는 잭 스크류를 갖기 갖는 것을 특징으로 한다.According to another suitable embodiment of the present invention, the horizontal support for the panel and the horizontal support for the pile is characterized by having a jack screw length adjustable.

본 발명의 또 다른 적절한 실시 형태에 따르면, 상,하부 수평버팀보는 'H'형 단면을 갖는 강재로 제작된 것을 특징으로 한다.According to another suitable embodiment of the present invention, the upper and lower horizontal braces are characterized in that made of steel having a 'H' cross-section.

본 발명의 또 다른 적절한 실시 형태에 따르면, 상,하부 수평버팀보는 각기 일개소에 길이 조절되는 스크류 잭이 포함되어 있는 것을 특징으로 한다.According to another suitable embodiment of the present invention, the upper and lower horizontal braces are characterized in that the screw jacks are adjustable in length at each one location.

본 발명에 따른 철근 배근이 용이토록 한 비개착 지하구조물의 시공에 적용되는 벽체 트렌치 토압 지지 방법에 의하면, 프리캐스트 판넬을 지지하기 위해 사용되는 지지대의 제거 후에도 일정 간격마다 설치된 수직말뚝과 상,하부 수평버팀보가 프리캐스트 판넬을 계속적으로 지지하게 되기 때문에 장애물이 없는 이동통로의 확보가 가능하다. 따라서 철근 배근작업이 용이하여 작업 효율이 향상되고, 작업자의 안전한 이동 확보가 가능하며, 수평지지대의 재사용으로 경제적인 이점을 갖는다.According to the wall trench earth pressure support method applied to the construction of the non-adhesive underground structure for easy reinforcement according to the present invention, the vertical pile and the upper and lower parts are installed at regular intervals even after removal of the support used to support the precast panel. Since the horizontal brace continuously supports the precast panel, it is possible to secure an obstacle-free moving passage. Therefore, the rebar reinforcement work is easy to improve the work efficiency, it is possible to secure a safe movement of the worker, has an economic advantage by reusing the horizontal support.

본 명세서에서 첨부되는 다음의 도면들은 본 발명의 바람직한 실시 예를 예시하는 것이며, 발명의 상세한 설명과 함께 본 발명의 기술사상을 더욱 이해시키는 역할을 하는 것이므로, 본 발명은 첨부한 도면에 기재된 사항에만 한정되어서 해석되어서는 아니된다.
도 1은 종래 벽체 트렌치에 시공된 토압 지지 구조물을 나타낸 입면도이고,
도 2는 본 발명의 바람직한 실시 예에 따른 비개착 지하구조물의 시공에 적용되는 벽체 트렌치 토압 지지 구조물을 사시도로 나타낸 도면이고,
도 3은 도 2를 평면도를 나타낸 도면이고,
도 4는 도 2를 입면도로 나타낸 도면이고,
도 5는 도 2에서 지지대의 제거 후 작업자의 통로 및 철근 배근 할 수 있는 공간 확보가 용이하게 이루어져 있음은 나타내는 사시도이다.
The following drawings, which are attached in the present specification, illustrate exemplary embodiments of the present invention, and together with the detailed description of the present invention, serve to further understand the technical spirit of the present invention. It should not be construed as limited.
1 is an elevation view showing a earth pressure supporting structure constructed in a conventional wall trench,
Figure 2 is a view showing a perspective view of the wall trench earth pressure supporting structure applied to the construction of the non-adhesive underground structure according to a preferred embodiment of the present invention,
3 is a plan view of FIG.
4 is an elevation view of FIG. 2;
Figure 5 is a perspective view showing that it is easy to ensure the space for the reinforcement of the worker's passage and reinforcement after removal of the support in FIG.

아래에서 본 발명은 첨부된 도면에 제시된 실시 예를 참조하여 상세하게 설명이 되지만 제시된 실시 예는 본 발명의 명확한 이해를 위한 예시적인 것으로 본 발명은 이에 제한되지 않는다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below with reference to the embodiments shown in the accompanying drawings, but the present invention is not limited thereto.

본 발명은 예로, 비개착 공법으로 지하에 강관 루프 구조물을 시공하는데 있어 상부 슬래브를 콘크리트로 타설한 후 벽체 구조물을 시공하는데 적용된다. 즉, 도 2에 도시된 바와 같이 굴착된 벽체 트렌치(10)에 콘크리트를 타설하기에 앞서 시행되는 토압 지지공법이다.The present invention is applied to the construction of a wall structure after pouring the upper slab into concrete, for example, in constructing a steel pipe loop structure underground by a non-adhesive method. That is, the earth pressure supporting method is carried out before the concrete is poured into the excavated wall trench 10 as shown in FIG.

먼저, 도 2 내지 도 4와 같이 벽체 트렌치(10)의 양쪽 벽면측에 토압을 지지하기 위해 프리캐스트 판넬(20)을 조립시켜 놓는다. 이때 프리캐스트(pc) 판넬(20)은 하부에서 상부로 수직 단을 쌓아가는데 있어 테두리에 형성된 요철홈을 이용하여 조립된다.First, the precast panel 20 is assembled to support the earth pressure on both wall surfaces of the wall trench 10 as shown in FIGS. 2 to 4. At this time, the precast (pc) panel 20 is assembled using the uneven groove formed in the rim in stacking the vertical stage from the bottom to the top.

이때 서로 대향하는 프리캐스트 판넬(20,20)은 판넬용 수평지지대(30)를 사용하여 버팀시켜 놓는다. 판넬용 수평지지대(30)는 일단에 잭 스크류(130)가 연결된 것이 사용될 수 있다. 따라서 잭 스크류(130)의 가압에 의해 마주하는 프리캐스트 판넬(20,20)은 벽체 트렌치(10)의 양쪽 벽면측에 밀착된다.At this time, the precast panels 20 and 20 facing each other are supported using the horizontal support panel 30 for the panels. Horizontal support 30 for the panel may be used that is connected to the jack screw 130 at one end. Therefore, the precast panels 20 and 20 facing each other by pressing the jack screw 130 are in close contact with both wall surfaces of the wall trench 10.

따라서 판넬용 수평지지대(30)는 프리캐스트 판넬(20)이 조립되는 상방을 따라 높이 방향으로 다수개가 설치된다. 또한 판넬용 수평지지대(30)는 프리캐스트 판넬(20)의 길이 방향으로도 설치되어 양쪽의 높이 방향으로 배치된 다수 개의 프리캐스트 판넬(20)을 확고하게 지지하게 된다.Therefore, the panel horizontal support 30 is installed in the height direction along the upper direction in which the precast panel 20 is assembled. In addition, the panel horizontal support 30 is also installed in the longitudinal direction of the precast panel 20 to firmly support the plurality of precast panels 20 arranged in both height directions.

다음, 벽체 트렌치(10)의 길이 방향으로 중간 중간에 일정 간격마다 한 쌍의 마주하는 수직말뚝(40A,40B)을 배치한다. 이때 수직말뚝(40A,40B)은 서로 마주하는 프리캐스트 판넬(20,20)의 안쪽에 접하여 높이 방향으로 세워지고, 말뚝용 수평지지대(30a)로 한 쌍의 수직말뚝(40A,40B)을 지지하여 놓는다. 말뚝용 수평지지대(30a)는 판넬용 수평지지대(30)와 동일한 구조로서 잭 스크류(130a)를 갖는다.Next, a pair of opposing vertical piles 40A and 40B is disposed at regular intervals in the middle of the wall trenches 10 in the longitudinal direction. At this time, the vertical pile (40A, 40B) is in contact with the inner side of the precast panel (20, 20) facing each other and is erected in the height direction, and supports a pair of vertical pile (40A, 40B) with the horizontal support (30a) for the pile Place it. The pile horizontal support 30a has the same structure as the panel horizontal support 30 and has a jack screw 130a.

바람직하게 수직말뚝(40A,40B)은 길이 방향으로 'H'형 단면을 갖는 강재로 제작되어 있다. 또한 수직말뚝(40A,40B)은 도 2 및 도 3에서와 같이 이웃한 프리캐스트 판넬(20,20)의 수직 접합(결합)부를 따라 입설됨이 바람직하다. 즉 프리캐스트 판넬(20,20)의 수직 접합선이 수직말뚝(40A,40B)의 플랜지 중앙에 위치되도록 함이 좋다. 이는 이웃한 프리캐스트 판넬(20,20)의 수직 접합(결합)부를 강도 있게 지지할 수 있기 때문이다.Preferably the vertical pile (40A, 40B) is made of steel having a 'H' cross-section in the longitudinal direction. In addition, the vertical pile 40A, 40B is preferably placed along the vertical junction (coupling) of the neighboring precast panels 20, 20 as shown in FIG. That is, it is preferable that the vertical joint lines of the precast panels 20 and 20 are positioned at the flange centers of the vertical piles 40A and 40B. This is because the vertical joints (joins) of neighboring precast panels 20 and 20 can be strongly supported.

그 다음, 한 쌍의 수직말뚝(40A,40B)의 상단과 하단을 상,하부 수평버팀보(50A,50B)를 통해 수평 방향으로 지지시켜 놓는다. 상,하부 수평버팀보(50A,50B)는 'H'형 단면을 갖는 강재로 제작되어 있다. 이때 상,하부 수평버팀보(50A,50B)는 각기 일개소에 길이 방향으로 신축 조절이 이루어지는 스크류 잭(150)이 구비됨이 바람직하다.Then, the upper and lower ends of the pair of vertical piles 40A and 40B are supported in the horizontal direction through the upper and lower horizontal braces 50A and 50B. Upper and lower horizontal braces (50A, 50B) are made of steel having a 'H' cross section. At this time, the upper and lower horizontal braces (50A, 50B) is preferably provided with a screw jack 150 is made to stretch in the longitudinal direction in each one place.

이와 같이 본 발명은 벽체 트렌치(10)를 따라 프리캐스트 판넬(20)과 수직말뚝(40A,40B) 그리고 상,하부 수평버팀보(50A,50B)를 설치해 나가면서 토압을 지지시켜 놓는다.As described above, the present invention supports the earth pressure while installing the precast panel 20, the vertical piles 40A and 40B, and the upper and lower horizontal braces 50A and 50B along the wall trenches 10.

그 다음, 판넬용 수평지지대(30)와 말뚝용 수평지지대(30a)를 철거하여 제거시킨다. 이렇게 되면, 프리캐스트 판넬(20)들은 도 5에 나타난 바와 같이 수직말뚝(40A,40B)과 상,하부 수평버팀보(50A,50B)를 통하여 안전하게 지지된다. Next, the panel horizontal support 30 and the pile horizontal support 30a are removed by removal. In this case, the precast panels 20 are securely supported through the vertical piles 40A and 40B and the upper and lower horizontal braces 50A and 50B as shown in FIG. 5.

이후, 양쪽 프리캐스트 판넬(20,20)의 빈 공간 사이에 철근(도시안됨)을 배근한 후 콘크리트를 타설하여 지하구조물의 벽체 시공이 완성된다. 철근 배근시 서로 대향하는 프리캐스트 판넬(20,20)의 사이에는 종래와 달리 이동 장애물(판넬용 수평지지대와 말뚝용 수평지지대)이 제거되어 작업자의 이동이 수월하고 안전하게 된다. Subsequently, reinforcing bars (not shown) are disposed between empty spaces of both precast panels 20 and 20, and concrete is poured to complete wall construction of the underground structure. Unlike precast panels 20 and 20 facing each other when reinforcing bars, moving obstacles (horizontal supports for panels and horizontal supports for piles) are removed, which makes the worker's movement easier and safer.

또한 철근 배근 작업성이 좋아져 작업의 효율성이 향상된다. 또한 제거된 판넬용 수평지지대(30)와 말뚝용 수평지지대(30a)는 재사용이 가능하므로 시공비가 절감되어 경제적으로 유리하다.In addition, rebar reinforcement workability is improved, the work efficiency is improved. In addition, the removed panel horizontal support 30 and the pile horizontal support 30a is economically advantageous because the construction cost can be reused.

위에서 본 발명은 제시된 실시 예를 참조하여 상세하게 설명이 되었지만 이 분야에서 통상의 지식을 가진 자는 제시된 실시 예를 참조하여 본 발명의 기술적 사상을 벗어나지 않는 범위에서 다양한 변형 및 수정 발명을 만들 수 있을 것이다. 본 발명은 이와 같은 변형 및 수정 발명에 의하여 제한되지 않으며 다만 아래에 첨부된 청구범위에 의하여 제한된다. While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it will be understood by those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention . The invention is not limited by these variations and modifications, but is limited only by the claims appended hereto.

20: 프리캐스트 판넬
30: 판넬용 수평지지대
30a: 말뚝용 수평지지대
40A,40B: 수직말뚝
50A: 상부 수평버팀보
50B: 하부 수평버팀보
20: Precast Panel
30: Horizontal support for panel
30a: Horizontal support for piles
40A, 40B: Vertical Pile
50A: Upper horizontal brace
50B: Lower horizontal brace

Claims (6)

굴착된 벽체 트렌치(10)의 양쪽 벽면측에 토압을 지지하기 위해 프리캐스트 판넬(20)을 배치 조립시켜 놓고 높이 및 길이 방향으로 판넬용 수평지지대(30)를 설치해 나가면서 프리캐스트 판넬(20)을 지지하여 놓는 단계와;
벽체 트렌치(10)의 길이 방향으로 중간 중간에 일정 간격마다 한 쌍의 마주하는 수직말뚝(40A,40B)을 배치하되 프리캐스트 판넬(20)에 접하여 높이 방향으로 입설시시키고 말뚝용 수평지지대(30a)로 한 쌍의 수직말뚝(40A,40B)을 지지하여 놓는 단계와;
한 쌍의 수직말뚝(40A,40B)의 상단과 하단을 상,하부 수평버팀보(50A,50B)를 통해 수평 방향으로 지지시켜 놓은 후 기 설치된 판넬용 수평지지대(30) 및 말뚝용 수평지지대(30a)를 제거하는 단계;를 거처서 이루어지는 것을 특징으로 하는 비개착 지하구조물의 시공에 적용되는 벽체 트렌치 토압 지지 방법.
The precast panel 20 is assembled by arranging the precast panel 20 to support earth pressure on both wall sides of the excavated wall trench 10 and installing the panel horizontal support 30 in the height and length directions. Supporting the step;
Place a pair of vertical piles (40A, 40B) facing each other at regular intervals in the middle of the wall trench (10) in the middle direction, but in contact with the precast panel (20) to be placed in the height direction and horizontal support for the pile (30a) Supporting a pair of vertical piles 40A and 40B);
After the upper and lower ends of the pair of vertical piles 40A and 40B are supported in the horizontal direction through the upper and lower horizontal braces 50A and 50B, the horizontal support 30 for the panel and the horizontal support 30 for the pile are installed. Wall trench earth pressure support method applied to the construction of the non-adhesive underground structure, characterized in that the step;
제 1항에 있어서,
수직말뚝(40A,40B)은 길이 방향으로 'H'형 단면을 갖는 강재로 제작된 것을 특징으로 하는 비개착 지하구조물의 시공에 적용되는 벽체 트렌치 토압 지지 방법.
The method of claim 1,
Vertical pile (40A, 40B) is a wall trench earth pressure support method applied to the construction of the non-attached underground structure, characterized in that made of steel having a 'H'-shaped cross-section in the longitudinal direction.
제 1항에 있어서,
수직말뚝(40A,40B)은 이웃한 프리캐스트 판넬(20,20)의 수직 접합부를 따라 배치된 것을 특징으로 하는 비개착 지하구조물의 시공에 적용되는 벽체 트렌치 토압 지지 방법.
The method of claim 1,
Vertical piles (40A, 40B) is a wall trench earth pressure support method applied to the construction of the unopened underground structure, characterized in that disposed along the vertical junction of the neighboring precast panel (20, 20).
제 1항에 있어서,
판넬용 수평지지대(30)와 말뚝용 수평지지대(30a)는 잭 스크류(30a,130a)를 갖기 갖는 것을 특징으로 하는 비개착 지하구조물의 시공에 적용되는 벽체 트렌치 토압 지지 방법.
The method of claim 1,
Horizontal support for the panel 30 and horizontal support for the pile (30a) has a jack screw (30a, 130a) having a wall trench earth pressure support method applied to the construction of the non-attached underground structure.
제 1항에 있어서,
상,하부 수평버팀보(50A,50B)는 'H'형 단면을 갖는 강재로 제작된 것을 특징으로 하는 비개착 지하구조물의 시공에 적용되는 벽체 트렌치 토압 지지 방법.
The method of claim 1,
Upper and lower horizontal braces (50A, 50B) is a wall trench earth pressure supporting method applied to the construction of the non-attached underground structure, characterized in that made of steel having a 'H' cross-section.
제 5항에 있어서,
상,하부 수평버팀보(50A,50B)는 각기 일개소에 길이 방향으로 신축 조절이 이루어지는 스크류 잭(150)이 포함되어 있는 것을 특징으로 하는 비개착 지하구조물의 시공에 적용되는 벽체 트렌치 토압 지지 방법.
6. The method of claim 5,
Upper and lower horizontal braces (50A, 50B) is a wall trench earth pressure support method applied to the construction of the non-attached underground structure, characterized in that each one includes a screw jack 150 is made in the longitudinal direction stretch control.
KR1020110066078A 2011-07-04 2011-07-04 Earth pressure supporting method of walls trench applying construction of none- excavation underground structure KR101249660B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110066078A KR101249660B1 (en) 2011-07-04 2011-07-04 Earth pressure supporting method of walls trench applying construction of none- excavation underground structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110066078A KR101249660B1 (en) 2011-07-04 2011-07-04 Earth pressure supporting method of walls trench applying construction of none- excavation underground structure

Publications (2)

Publication Number Publication Date
KR20130004798A true KR20130004798A (en) 2013-01-14
KR101249660B1 KR101249660B1 (en) 2013-04-08

Family

ID=47836311

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110066078A KR101249660B1 (en) 2011-07-04 2011-07-04 Earth pressure supporting method of walls trench applying construction of none- excavation underground structure

Country Status (1)

Country Link
KR (1) KR101249660B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200491728Y1 (en) 2019-10-28 2020-06-05 김형수 Axe Apparatus For Firewood Having Function Of Compressing Can

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101447382B1 (en) * 2013-07-19 2014-10-06 윤기철 Underground structure building method of vertical core type
KR101836926B1 (en) 2017-12-05 2018-04-19 한국지질자원연구원 Trench section baseline setting device and trench section analysis method using the same

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3406370B2 (en) * 1994-04-08 2003-05-12 前田建設工業株式会社 Horizontal shaft construction method
KR200446787Y1 (en) * 2007-11-30 2009-12-03 최진용 Sk panel
KR100970959B1 (en) * 2008-06-30 2010-07-20 김은하 Method for Construction of Extension Culvert in State Guarantying Footway and Driveway
KR101022382B1 (en) * 2010-08-16 2011-03-22 (주)정토지오텍 Precast horizontality tubular roof and tunnel construction method using the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200491728Y1 (en) 2019-10-28 2020-06-05 김형수 Axe Apparatus For Firewood Having Function Of Compressing Can

Also Published As

Publication number Publication date
KR101249660B1 (en) 2013-04-08

Similar Documents

Publication Publication Date Title
KR101111594B1 (en) Method for constructing underground structure
KR100634726B1 (en) Form system for construction of underground slab and method for constructing underground slab and breast wall using the same
CN103485360A (en) Steel platform tower crane foundation and construction method thereof
CN104452812A (en) Construction method of basement outer wall
KR101221970B1 (en) Construction Method for Basement Structure without Temporary Structure
KR20090114863A (en) Parallelly connected iron tube and construction method for underground structure using the same
KR20090029993A (en) Underground structure and its construction method with retaining wall supported by rigid diaphragm
KR20200032316A (en) Method for Forming Top-down-typed Underground Strucutre using Trus-typed Support
KR100562158B1 (en) Steel pipe roof construction method for building underground structure, roof structure therefor, and structure of steel pipe therefor
KR101249660B1 (en) Earth pressure supporting method of walls trench applying construction of none- excavation underground structure
KR101479267B1 (en) Method for constructing tunnel by using pipe
KR101169462B1 (en) Top-down construction method using post member
KR101187170B1 (en) Application of under pinning method in remodeling
KR101296857B1 (en) Underground structure having slab beam with enhanced bearing power against earth pressure and construction methods of the same
CN103132465A (en) Underground box culvert constructing method closely attached to pile foundation bearing platform
KR101011805B1 (en) Method of constructing underground structure crossing pile bases in a pile-based ground and underground structure constructed using the same
JP6422084B2 (en) Underground space construction method
KR101358471B1 (en) architecture using a complex steel pile
KR101426511B1 (en) A temporary skeleton system used in constructuring a underground structure of a building and a top down underground construction method using a temporary skeleton system
KR20130021949A (en) Reinforcement structure for wall of underground structure and construction method of underground structure using the same
KR102310091B1 (en) Underground structure installation method that does not require the installation of temporary pillars
KR102358570B1 (en) Method for reinforcing slopes
KR101545713B1 (en) Composite type cutoff wall of steel temporary facility and construction method of the same
KR101304659B1 (en) Vertical column construction method of none-excavation underground structure
CN113073683A (en) Temporary suspension device for existing pipeline and construction method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
FPAY Annual fee payment
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160324

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20170320

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180410

Year of fee payment: 6

J204 Request for invalidation trial [patent]
FPAY Annual fee payment

Payment date: 20190527

Year of fee payment: 7