KR20120068986A - 유틸리티 서비스 영역 내의 전기 서비스의 제어형 재개 - Google Patents
유틸리티 서비스 영역 내의 전기 서비스의 제어형 재개Info
- Publication number
- KR20120068986A KR20120068986A KR1020127012538A KR20127012538A KR20120068986A KR 20120068986 A KR20120068986 A KR 20120068986A KR 1020127012538 A KR1020127012538 A KR 1020127012538A KR 20127012538 A KR20127012538 A KR 20127012538A KR 20120068986 A KR20120068986 A KR 20120068986A
- Authority
- KR
- South Korea
- Prior art keywords
- service
- power
- point
- random number
- service point
- Prior art date
Links
- 230000002596 correlated effect Effects 0.000 claims abstract description 13
- 238000000034 method Methods 0.000 claims description 80
- 238000004891 communication Methods 0.000 claims description 20
- 238000007726 management method Methods 0.000 claims description 12
- 230000008569 process Effects 0.000 claims description 11
- 230000000875 corresponding effect Effects 0.000 claims description 8
- 230000000977 initiatory effect Effects 0.000 claims description 7
- 230000001276 controlling effect Effects 0.000 claims description 2
- 230000006870 function Effects 0.000 description 10
- 238000010586 diagram Methods 0.000 description 8
- 238000010248 power generation Methods 0.000 description 7
- 230000005611 electricity Effects 0.000 description 6
- 230000004044 response Effects 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 238000009826 distribution Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 5
- 238000011084 recovery Methods 0.000 description 4
- 230000007613 environmental effect Effects 0.000 description 3
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 230000002411 adverse Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 229910052799 carbon Inorganic materials 0.000 description 2
- 230000000295 complement effect Effects 0.000 description 2
- 238000004590 computer program Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000000446 fuel Substances 0.000 description 2
- 230000014509 gene expression Effects 0.000 description 2
- 230000005802 health problem Effects 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- 238000010295 mobile communication Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 238000009987 spinning Methods 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 230000009182 swimming Effects 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- 230000002776 aggregation Effects 0.000 description 1
- 238000004220 aggregation Methods 0.000 description 1
- 238000004378 air conditioning Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000006227 byproduct Substances 0.000 description 1
- 230000003197 catalytic effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000001627 detrimental effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000001939 inductive effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J9/00—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
- H02J9/04—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Abstract
능동 부하 관리 시스템(ALMS: Active Load Management System)은 전력 단전 후 유틸리티 서비스 영역 내 서비스 포인트에 대한 전기 서비스를 제어가능하게 재개한다. ALMS는 서비스 포인트에 설치된 클라이언트 장치와, 중앙 컨트롤러를 포함한다. 각각의 서비스 포인트는 고유 수치와 상관될 수 있고, 또는 일 그룹의 서비스 포인트들이 하나의 수치를 공유할 수 있다. 전력이 가용하다는 통지를 수신한 후, 컨트롤러는 수치를 결정하고 클라이언트 장치 중 하나 이상에 수치를 전달한다. 수치가 무작위적으로 결정되는 경우에, 수치와 상관된 클라이언트 장치는 수치 수신에 따라 전기 서비스를 재개할 수 있다. 수치가 순차적으로 결정될 경우, 클라이언트 장치는 자체 난수를 결정하여 이를 수신한 수치와 비교할 수 있다. 일치할 경우, 전기 서비스가 복원될 수 있다.
Description
본 발명은 일반적으로 전력 발생 및 분배 시스템의 분야에 관한 것으로서, 특히, 전력 단전 후 유틸리티의 서비스 영역 전체를 통해 전기 서비스의 제어된 재개를 이행하기 위한 방법 및 장치에 관한 것이다.
전력 시스템에서, 다양한 이유로 단전이 발생된다. 일부 단전은 피크 부하 주기 중 시스템 부하를 일시적으로 감소시키기 위해, 또는, 인프러스트럭처 서비싱 또는 개선을 수용하기 위해 계획된다. 그러나, 대부분의 단전은 계획되지 않은 것이며, 가혹한 날씨, 예기치않은 과도한 수요, 또는 시스템 제어 오류로부터 발생한다.
추가적으로, 전력 품질 또는 공급 문제를 오프셋시키거나 대응하기 위해 시스템 부하가 차단되었을 때 브라운-아웃(brown-outs)이 발생할 수 있다. 브라운 아웃은 발전 또는 분배 유틸리티에 대한 그리드 영역의 촉매적 고장을 갖거나 "드로핑"(dropping)을 방지하는 데 사용된다. 각 유틸리티의 그리드 영역은 차단기 및 하나 이상의 인접 유틸리티들 간의 타이 라인과 상호연결되어, 문제가 되는 그리드 영역이 전체 시스템을 다운시키지 않도록 그리드의 나머지 부분으로부터 분리될 수 있다.
블랫아웃 또는 브라운 아웃 이후 유틸리티 고객에 대한 전력의 복원은 고객에게 좋은 것으로 일반적으로 간주된다. 그러나, 여러 고객에 대해 동시에 또는 매우 짧은 시간 주기 내에 전력을 복원하는 것은 추가적인 문제를 야기시킬 수 있다. 예를 들어, 계획된 또는 계획되지 않은 단전 이후의 전력 복원은 발전 및 분배 측면으로부터 유틸리티 그리드 상에서의 전력의, 일시적이고 해로운 "스파이크" 또는 "서지"(surge)를 야기하는 경우가 종종 있다.
전력 복원 주기 중 시간에 대한 전력 수요를 나타내는 예시적인 그래프(100)가 도 1에 도시된다. 그래프(100)에 제시된 바와 같이, 유틸리티의 서비스 영역 내의 여러 서비스 포인트들에 대한 전력의 동시 복원은 유틸리티에 대한 매우 높은 레벨 또는 피크로 일시적으로 서지나 스파이크를 일으키는 에너지 수요(101)를 야기할 수 있다. 전력 스파이크는 도 1에 예시적인 형태로 제시되는 바와 같이, 유틸리티의 수용가능한 피크 전력 공급(103)을 일시적으로 넘어설 수 있다. 복원 중 전력 스파이크가 유틸리티의 수용가능한 피크 전력 공급(103)을 넘어설 경우, 유틸리티는 일반적으로 "발전 예비력"이라 불리는 예비 전력 중 일부를 이용할 것을 요구받을 수 있다. 도 2는 유틸리티의 전형적인 에너지 용량을 나타내는 표 또는 차트다. 도 2에 도시되는 바와 같이, 발전 예비력은 통상적으로 세 타입의 전력 - 소위, "조정 예비력"(regulating reserve), "운전 예비력"(spinning reserve), 및 "비-운전 예비력"(non-spinning reserve) 또는 "보완 예비력"을 포함한다. 운전 예비력 및 비-운전 예비력은 집합적으로 "상황적 예비력"(contingency reserve)이라 불린다. 따라서, 발전 예비력은 일반적으로 조정 예비력과 상황적 예비력으로 구성된다. 발전 예비력의 타입은 본 발명에 관련됨에 따라 아래에서 더욱 상세하게 논의된다.
수요의 전형적인 변화는 유틸리티의 전기 그리드 내의 라인 주파수의 실질적 변동을 야기하도록 급격하게 발생될 수 있다. 이러한 라인 주파수 변화에 대응하고 이를 교정하기 위해, 유틸리티는 통상적으로 자동 발전 제어(AGC: Automatic Generation Control) 프로세스 또는 서브시스템을 이용하여 유틸리티의 조정 예비력을 제어한다. 따라서, 유틸리티의 발전 예비력의 조정 예비력 성분은 라인 주파수의 변화를 교정하도록 제한되는 것이 일반적이다. 다시 말해서, 조정 예비력은 라인 주파수 조정에 통상적으로 사용된다.
다른 한편, 라인 주파수에 일반적으로 영향을 미치지 않는 수요의 정규 변동은, 기존 발전기의 출력을 증가 또는 감소시킴으로써, 또는, 새로운 발전 용량을 추가하는 등의 소정의 활동을 통해 응답하거나 수용될 수 있다. 이러한 수용은 일반적으로 "경제적 급전"(economic dispatch)이라 불린다. 유틸리티의 발전 예비력 중 상황적 예비력 성분(즉, 운전 예비력 및 비-운전 예비력)은 변화하는 (증가하는) 수요를 충족시키기 위해 경제적 급전으로 이용하기 위해 가용한 추가적인 발전 용량을 제공한다.
도 2에 도시되는 바와 같이, 운전 예비력은 이미 온라인 상태인(즉, 전력 시스템에 연결된), 그래서, 필요성이 결정된 후 즉각적으로 가용하거나 짧은 시간 주기 내에(가령, NERC(North Americal Electric Reliability Corporation) 규약에 의해 규정된 바와 같이, 10분 내지 15분 이내) 가용한 추가적인 발전 용량이다. 비-운전 예비력(소위 보완 예비력이라고 함)은, 온라인 상에 있지 않으나 운전 예비력과 동일 시간 주기 내에 응답할 것이 요구되는 추가적인 발전 용량이다. 일반적으로, 경제적 급전으로 이용하기 위해 추가적인 전력이 필요할 때, 전력 유틸리티는 운전 예비력을 생성하는 데 사용되는 발전 방법이 비-운전 예비력을 생성하는 데 사용되는 방법보다 저렴한 경향이 있기 때문에, 또는, 비-운전 예비력의 생성으로부터 나타나는 인지된 환경적 영향이 운전 예비력의 생성으로부터 나타나는 인지된 환경적 영향보다 바람직하지 않을 수 있기 때문에, 전력 유틸리티는 비-운전 예비력을 이용하기 전에 운전 예비력을 이용할 것이다. 예를 들어, 운전 예비력은 유틸리티의 전력 그리드에 이미 연결된 터빈의 로터 토크를 증가시킴으로써, 또는, 유틸리티의 전력 그리드에 연결된 연료 전지를 이용함으로써 생성될 수 있고, 반면에, 비-운전 예비력은 소비자 위치에 부착된 가열/냉각 시스템과 같은 저항성 및 유도형 부하를 오프시킴으로써, 또는, 스탠바이 발전소(가령, 핵발전소 또는 화력 발전소)를 작동시킴으로써, 생성될 수 있다. 그러나, 운전 예비력 또는 비-운전 예비력(즉, 상황적 예비력)을 이용하면, 연료의 비용, 종래의 수요 응답, 관리, 등을 위해 소비자에게 지출되는 인센티브, 등으로 인해 유틸리티에 추가적인 비용이 발생한다. 그 결과, 유틸리티는 절대적으로 필요할 때만 이러한 상황적 예비력을 이용한다. 상황적 예비력의 이용은 "저온 부하 픽업"으로 일반적으로 불리며, 초 단위에서 수 분까지 지속될 수 있다.
상황적 예비력 이용과 관련한 추가적인 비용이 일반적으로 바람직하지 않으나 이러한 비용은, 과부하를 일으켜 유틸리티 그리드의 일부분을 손상시킬 수 있는 재개 스파이크의 성가신 결과를 뛰어넘을 수 있다. 손상된 그리드는 재개 직후 그리드에 의해 공급받는 서비스 영역에 대한 추가적인 전력 문제를 야기할 수 있다. 따라서, 단전 이후 전기 서비스를 재개할 때, 유틸리티는 그리드에 대한 손상 가능성의 대가와, 상황적 예비력 이용의 대가에 균형을 맞추도록 현재 요구받고 있다.
따라서, 유틸리티의 상황적 예비력 이용을 요구하지 않으면서 재개 스파이크 가능성을 완화시키는 유틸리티 서비스 영역 내의 제어된 재개를 행하기 위한 장치 및 방법이 필요하다.
도 1은 전력 단전 후 종래의 재개 중 에너지 수요가 어떻게 스파이크를 일으키는 지를 도시하는 예시적인 그래프다.
도 2는 유틸리티에 가용한 다양한 종래의 전력 예비력을 나타내는 차트다.
도 3은 본 발명의 일 실시예에 따른 예시적인 IP-기반, 능동 부하 관리 시스템의 블록도다.
도 4는 도 3의 능동 부하 관리 시스템에서 도시되고 사용되는, 예시적인 능동 부하 디렉터를 나타내는 블록도다.
도 5는 도 3의 능동 부하 관리 시스템에 도시 및 사용되는 예시적인 능동 부하 클라이언트 및 스마트 차단기 모듈을 나타내는 블록도다.
도 6은 본 발명의 일 실시예에 따라, 유틸리티 서비스 영역 내 서비스 포인트에 전기 서비스의 제어된 재개를 중앙 컨트롤러로 하여금 개시하게 하는 방법을 나타내는 순서도다.
도 7은 본 발명의 다른 실시예에 따라, 능동 부하 디렉터로부터 구체적 명령없이, 능동 부하 클라이언트로 하여금 재개를 개시하게 하는 방법을 나타내는 순서도다.
도 8은 본 발명의 다른 실시예에 따라, 서비스 포인트에 위치한 제어 장치로 하여금, 중앙 컨트롤러의 도움으로 서비스 포인트에서 전기 서비스의 재개를 개시하게 하는 방법을 나타내는 순서도다.
도 9는 본 발명의 추가적인 실시예에 따라, 서비스 영역 내 단전을 유틸리티 조작자가 볼 수 있는 예시적인 컴퓨터 디스플레이의 스크린 샷이다.
도 10은 본 발명의 또 다른 실시예에 따라, 중앙 컨트롤러로 하여금, 고객 프로파일에 기초하여 유틸리티 서비스 영역 내 서비스 포인트에 대한 전기 서비스의 재개를 개시하게 하는 방법을 나타내는 순서도다.
도 11은 본 발명의 일 실시예에 따라 제어된 재개 중 에너지 수요가 어떻게 상승하는 지를 도시하는 예시적인 그래프다.
도 2는 유틸리티에 가용한 다양한 종래의 전력 예비력을 나타내는 차트다.
도 3은 본 발명의 일 실시예에 따른 예시적인 IP-기반, 능동 부하 관리 시스템의 블록도다.
도 4는 도 3의 능동 부하 관리 시스템에서 도시되고 사용되는, 예시적인 능동 부하 디렉터를 나타내는 블록도다.
도 5는 도 3의 능동 부하 관리 시스템에 도시 및 사용되는 예시적인 능동 부하 클라이언트 및 스마트 차단기 모듈을 나타내는 블록도다.
도 6은 본 발명의 일 실시예에 따라, 유틸리티 서비스 영역 내 서비스 포인트에 전기 서비스의 제어된 재개를 중앙 컨트롤러로 하여금 개시하게 하는 방법을 나타내는 순서도다.
도 7은 본 발명의 다른 실시예에 따라, 능동 부하 디렉터로부터 구체적 명령없이, 능동 부하 클라이언트로 하여금 재개를 개시하게 하는 방법을 나타내는 순서도다.
도 8은 본 발명의 다른 실시예에 따라, 서비스 포인트에 위치한 제어 장치로 하여금, 중앙 컨트롤러의 도움으로 서비스 포인트에서 전기 서비스의 재개를 개시하게 하는 방법을 나타내는 순서도다.
도 9는 본 발명의 추가적인 실시예에 따라, 서비스 영역 내 단전을 유틸리티 조작자가 볼 수 있는 예시적인 컴퓨터 디스플레이의 스크린 샷이다.
도 10은 본 발명의 또 다른 실시예에 따라, 중앙 컨트롤러로 하여금, 고객 프로파일에 기초하여 유틸리티 서비스 영역 내 서비스 포인트에 대한 전기 서비스의 재개를 개시하게 하는 방법을 나타내는 순서도다.
도 11은 본 발명의 일 실시예에 따라 제어된 재개 중 에너지 수요가 어떻게 상승하는 지를 도시하는 예시적인 그래프다.
본 발명에 따른 예시적인 실시예들을 구체적으로 설명하기 전에, 유틸리티의 상황적 예비력 이용을 요구하지 않으면서 저온 재개 전력 스파이크 가능성을 완화시키도록 전기 유틸리티의 서비스 영역 내의 서비스 영역에 대한 전기 서비스의 제어된 재개를 행함과 관련된 장치 구성요소 및 공정 단계들의 조합을 주로 하여 발명의 실시예들이 제시된다. 따라서, 장치 및 방법 구성요소들은 도면에서 종래의 부호에 의해 적절한 위치에 표시되었고, 도면은 발명의 이해를 돕기 위해 필수적인 구체적 사항만을 도시하였다.
본 문서에서, "제 1" 및 "제 2", "상부" 및 "하부", 등은 일 실체 또는 요소를 다른 실체 또는 요소와 구분하기 위해 사용되며, 이러한 실체 또는 요소 간의 물리적 또는 논리적 관계 또는 순서를 의미하는 것이 아니다. "포함한다" 및 "포함하는", "지닌다" 및 "지닌", "구비한다" 및 "구비하는", "갖는다" 및 "갖는"과, 그외 유사 표현들은, 배타적이지 않은 포함사항을 커버하고자 하는 것으로서, 요소들의 리스트를 포함하거나, 지니거나, 구비하거나, 갖는 프로세스, 방법, 품목, 장치, 또는 그외 다른 사항은 이러한 요소들만을 포함하는 것이 아니며, 이러한 프로세스, 방법, 품목, 장치, 또는 다른 사항에 내재적이거나 명백하게 적시되지 않은 다른 요소들을 포함할 수 있다. 임의의 대상이나 액션과 연계하여 사용되는 "복수의"는 이러한 대상 또는 액션이 2개 이상임을 의미한다. "일", "하나의"라는 표현은 복수의 대상을 배제하지 않는다.
"지그비"(ZigBee)는 802.15.4 표준에 따른 IEEE에서 채택한 무선 통신 프로토콜을 의미하고, "블루투스"(Bluetooth)는 IEEE 802.15.1 표준을 구현하는 단거리 무선 통신 프로토콜을 의미한다. "HSPA"(High Speed Packet Data Access)는 GSM 표준이 3세대 UMTS(Universal Mobile Telecommunications System) 프로토콜을 넘어 발전하는 것을 나타내는 다른 모바일 통신 표준 또는 ITU(International Telecommunication Union)에서 채택한 임의의 통신 프로토콜을 의미한다. "CDMA EVDO Rev. A"(Code Division Multiple Access Evolution Date-Optimized Revision A)는 TIA-856 Rev. A 표준 번호 하에 ITU에서 채택한 통신 프로토콜을 의미한다. "LTE"(Long Term Evolution)는 3GPP(Thired Generation Partnership Project) 릴리스 8(ITU 채택)에 기초한 임의의 통신 프로토콜 또는, HSPA 및 EVDO를 위한 대체 프로토콜이 될 것으로 예상되는 음성, 비디오, 및 데이터 표준으로의 GSM-기반 네트워크의 발전을 의미하는 다른 모바일 통신 표준에 기초한 통신 프로토콜을 의미한다.
"유틸리티", "전기 유틸리티", "전력 유틸리티", "전기 전력 유틸리티" 등은 전력을 발생시켜 소비자에게 분배하는 임의의 실체로서, 전력 발생 실체로부터 전력을 구매하고, 구매한 전력을 소비자에게 분배하며, 또는, 태양열, 풍력, 등과 같은 대체 에너지원에 의해 실제로 또는 가상으로 생성된 전기를 FERC(Federal Energy Regulatory Commission) 전기 그리드, 등을 통해 전력 발생 또는 분배 실체에 공급한다. "에너지" 및 "전력"은 여기서 상호혼용가능하게 사용된다. "유틸리티 서비스 영역", "유틸리티의 서비스 영역", 및 "서비스 영역은 특정 유틸리티로부터 전력을 공급받는 전체 지리 영역, 또는 이러한 지리 영역의 일부분을 의미할 수 있다.
여기서 설명되는 시스템의 실시예나 구성요소는 여기서 설명되는 전기 유틸리티의 서비스 영역 내의 서비스 포인트에 대한 전기 서비스의 제어된 재개를 행하기 위한 일부, 대부분, 또는 모든 기능을 소정의 비-프로세서 회로와 연계하여 구현하기 위해 하나 이상의 프로세서를 제어하는 독자적으로 조장된 프로그램 명령과, 하나 이상의 종래의 프로세서로 구성된다. 비-프로세서 회로는 전파 수신기, 전파 송신기, 안테나, 모뎀, 신호 구동기, 클럭 회로, 전력 공급원 회로, 릴레이, 계측기, 스마트 차단기, 전류 센서, 및 사용자 입력 장치 등을 포함할 수 있으나, 이에 제한되지 않는다. 이와 같이, 이러한 기능들은 전기 서비스의 제어형 재개를 행하도록 전력 부하 관리 시스템 내 장치들 간의 정보 및 제어 신호의 저장 및 분배 방법의 단계로 해석될 수 있다. 대안으로서, 이 기능들 중 일부 또는 전부가 프로그램 명령을 저장하지 않은 상태 머신에 의해 구현될 수 있고, 또는 하나 이상의 ASIC에 의해 구현될 수 있으며, 각각의 기능이나 이러한 기능들의 일부 조합이 주문형 로직으로 구현된다. 물론, 상술한 방식들의 조합이 사용될 수도 있다. 따라서, 이러한 기능들을 위한 방법 및 수단이 여기서 설명되어 있다. 더욱이, 여기서 개시되는 개념 및 원리에 의해 안내될 때, 가용 시간, 현재 기술, 및 경제적 고려사항에 의해 동기유발되는 여러 설계 선택사항 및 현저한 효과에도 불구하고, 당 업자라면 이러한 소프트웨어 명령, 프로그램, 및 집적 회로(IC)를 쉽게 발생시킬 수 있을 것이고, 부적절한 시행착오없이, 이러한 비-프로세서 회로를 적절히 배열하고 기능적으로 통합할 수 있을 것이다.
일반적으로, 본 발명은 전력의 단전 또는 다른 중단 이후 전기 유틸리티의 서비스 영역 내의 서비스 포인트에 대한 전기 서비스의 제어형 재개를 행하기 위한 방법 및 장치를 포괄한다. 일 실시예에 따르면, 난수가 결정되어, 서비스 영역 내 단일 서비스 포인트 또는 서비스 포인트들의 그룹과 연계된다. 난수가 서비스 포인트의 그룹과 연계되는 경우에, 그룹 내 서비스 포인트의 양은 단전으로 영향받는 유틸리티 서비스 영역 내 서비스 포인트들의 총 양보다 작다. 난수는 서비스 포인트에 위치한 제어 장치에 의해(가령, 능동 부하 클라이언트), 또는 서비스 포인트로부터 원격으로 위치하는 중앙 컨트롤러에 의해(가령, 능동 부하 디렉터) 결정될 수 있다. 제어 장치는 서비스 포인트에 위치한 전력 소모 장치(가령, 가열, 배기, 및 공조(HVAC) 유닛, 온수기, 온수기, 수영장용 온수기, 수영장용 펌프, 연수기, 세탁기, 건조기, 기기, 장비, 조명, 등)에 대한 전력의 흐름을 제어한다. 예를 들어, 난수가 발생되어 중앙 컨트롤러에 의해 보유되거나, 서비스 포인트의 제어 장치에(가령, 서비스 포인트의 제어 장치가 배터리 백업과 함께 작동하거나 전력을 재개시켰을 경우) 또는 서비스 포인트 그룹의 제어 장치에 (가령, 인터넷 프로토콜(IP) 데이터 패킷의 형태로) 통신전달될 수 있다. 더욱이, 난수는 각 서비스 포인트의 제어 장치에 의해 발생될 수 있다.
난수 결정 후, 서비스 포인트에서 또는 서비스 포인트 그룹에서 전기 서비스를 재개하기 위한 시간이 난수에 기초하여 결정된다. 예를 들어, 중앙 컨트롤러가 난수를 발생시킬 때, 중앙 컨트롤러는, 서비스 포인트 또는 서비스 포인트의 그룹에 연계된 수치가 난수와 부합할 때, 특정 서비스 포인트 또는 서비스 포인트의 그룹에 대한 전기 서비스가 복원되거나 재개됨을 또한 결정할 수 있다. 이러한 경우에, 난수는 단전으로 영향받는 서비스 영역 내 서비스 포인트 또는 서비스 포인트 그룹의 총 양과, 1 사이에서 임의적으로 선택되는 수치일 수 있다. 재개가 이루어지는 시간은, 순간적이거나, 난수와의 부합이 검출된 직후일 수 있다. 전력 재개 시간에 관하여 서비스 포인트 재개 장치에 알리기 위해, 중앙 컨트롤러는 전력 흐름이 허용될 수 있는 시간을 제공하거나 제어되는 전력 소모 장치에 대한 전력의 흐름을 즉시 허용하도록 제어 장치에 지시하는 재개 메시지 또는 명령을 제어 장치에 송신할 수 있다.
대안으로서, 서비스 포인트의 제어 장치가 난수를 발생시킬 때, 발생된 난수가 중앙 컨트롤러로부터 송신된 수치와 부합하는 지를 제어 장치가 또한 결정할 수 있다. 중앙 컨트롤러로부터 송신된 수치는 중앙 컨트롤러에 의해 발생된 난수이거나, 중앙 컨트롤러에 의해 전달되고 있는 수치 시퀀스 내의 수치일 수 있다. 부합할 경우, 전기 서비스가 서비스 포인트에서 즉시 재개될 수 있다. 부합하지 않을 경우, 전기 서비스의 재개는 부합시까지 지연된다. 이러한 경우에, 서비스 포인트의 제어 장치에 의해 발생된 원래의 난수는 중앙 컨트롤러에 의해 시간에 따라 전송된 수치와 비교될 수 있고, 또는, 중앙 컨트롤러로부터 새로운 수치를 수신하기 전에 제어 장치에 의해 새 난수가 발생될 수 있다.
대안으로서, 서비스 포인트의 제어 장치는 중앙 컨트롤러로부터 수치 또는 재개 메시지를 수신함과 관계없이 자체 재개 시간을 결정할 수 있다. 이러한 경우에, 제어 장치는 단전으로 영향받는 유틸리티 서비스 영역에서 전기 서비스의 재개를 완료하는 데 요구되는 시간의 양을 추정할 수 있다. 일 실시예에서, 재개에 요구되는 시간의 양은 제어 장치의 메모리에 미리 저장되거나 중앙 컨트롤러로부터 수신할 수 있다. 제어 장치는 유틸리티 서비스 영역에서 전기 서비스의 재개를 개시하기 위한 시작 시간을 또한 결정할 수 있다. 시작 시간은 제어 장치가 유틸리티로부터 전력을 수신하기 시작하는 시간일 수 있고, 또는 중앙 컨트롤러로부터 수신한 메시지에 표시될 수 있다. 시작 시간과 재개 완료에 요구되는 시간의 양에 기초하여, 제어 장치는 유틸리티 서비스 영역에서 전기 서비스의 재개를 완료하기 위한 완료 시간을 추정한다. 예를 들어, 추정된 완료 시간은 시작 시간 더하기 재개를 완료하는 데 요구되는 시간의 길이일 수 있다.
제어 하에 전력 소모 장치에 전력을 공급하기 위한 자체 시작 시간을 결정하기 위해, 서비스 포인트 제어 장치는 대안으로서 난수를 발생시킬 수 있고, 유틸리티 서비스 영역 내 전기 서비스의 복원을 개시하기 위한 앞서 결정한 전체 시작 시간과 난수에 기초하여 서비스 포인트에서 전기 서비스를 재개하기 위한 임의적 시작 시간을 결정할 수 있다. 예를 들어, 임의적 시작 시간은 시작 시간 더하기 난수일 수 있고, 난수는 시간 단위이며, 0과, 유틸리티 서비스 영역에서 전기 서비스 재개의 완료에 요구되는 시간의 양 사이에 있다. 임의적 시작 시간을 발생시킨 후, 제어 장치는 임의적 시작 시간을 현재의 시간에 비교한다. 임의적 시작 시간이 현재의 시간보다 이를 경우, 제어 장치는 임의적 시작 시간에서 서비스 포인트의 전기 서비스를 재개한다. 임의적 시작 시간이 현재 시간보다 나중일 경우, 제어 장치는 프로세스를 다시 반복할 수 있다. 다시 말해서, 제어 장치는 새로운 난수를 발생시켜서, 새로운 난수 및 시작 시간에 기초하여 새로운 임의적 시작 시간을 결정할 수 있고, 새로운 임의적 시작 시간을 현재 시간에 비교하여, 새로운 임의적 시작 시간이 현재의 시간보다 이르도록 새로운 임의적 시작 시간에서 서비스 포인트의 전기 서비스를 재개할 수 있다.
적절한 재개 시간이 결정되면, 전력이 재개 시간에 전력 소모 장치 또는 서비스 포인트 또는 서비스 포인트 그룹에 위치한 장치에 공급된다. 예를 들어, 재개될 서비스 포인트의 제어 장치는 스마트 기기 제어 모듈 또는 스마트 차단기와 같은 제어형 장치에 메시지를 송신하며, 상기 메시지는 제어형 장치로 하여금 관련 전력 소모 장치에 대한 전류의 흐름을 허용하도록(가령, 스위치를 닫음으로써) 지시하는 메시지다.
또 다른 실시예에서, 중앙 컨트롤러에 의해 액세스가능한 데이터베이스에 고객 프로파일이 저장될 수 있고, 이러한 고객 프로파일을 이용하여 특정 고객 서비스 포인트에서의 전기 서비스를 재개하기 위한 시간을 결정할 수 있다. 예를 들어, 중앙 컨트롤러는 서비스 포인트에 설치된 제어 장치와 같이, 데이터베이스로부터 고객 프로파일을 불러들임으로써 또는 이를 다른 소스로부터 요청함으로써, 특정 서비스 포인트에 관련된 고객 프로파일을 결정할 수 있다. 일 실시예에서, 고객 프로파일은 전력 손실 발생시 고객에게 부정적 영향을 미칠 수 있는 고객에 의해 사용되는 전력 소모 장치(가령, 의료 관련 장치)에 관한 정보, 서비스 포인트에 대한 서비스 우선순위 표시, 및 고객에 관한 다른 연결/분리 정보를 포함하는 연결/분리 프로파일을 포함한다. 그 후 중앙 컨트롤러는 고객 프로파일에 기초하여, 또는 다른 정보나 과정과 조합하여, 예를 들어, 상술한 난수 발생 및 분석 과정과 조합하여, 서비스 포인트에 대한 재개 시간을 결정할 수 있다. 예를 들어, 중앙 컨트롤러가 난수를 발생시키고 난수가 특정 서비스 포인트에 관련된 수치와 부합한다고 결정한 후, 중앙 컨트롤러는 서비스 포인트에 대한 고객 프로파일을 불러들여서, 서비스 포인트에 대한 서비스 우선순위를 결정할 수 있다. 서비스의 우선순위가 높을 경우(가령, 서비스 포인트가 의료 장비를 포함하거나 건강 문제가 있는 사람에 의해 사용될 경우), 중앙 컨트롤러는 서비스 포인트의 제어 장치에 재개 명령을 전송할 수 있다. 다른 한편, 서비스의 우선순위가 낮고 더 높은 서비스 우선순위를 갖는 서비스 포인트만이 재개되고 있을 경우, 중앙 컨트롤러는 재개 메시지를 보류하여, 서비스 포인트를 완전히 또는 실질적으로 전력없는 상태로 남겨둘 것이다(예를 들어, 제어 장치에 공급하기 위해 서비스 포인트에 충분한 전력이 공급될 수 있다 하더라도).
다른 실시예에서, 중앙 컨트롤러는 서비스 포인트에 연계된 저장된 고객 프로파일에 기초하여 서비스 영역 내 하나 이상의 서비스 포인트에 대한 서비스 우선순위를 결정할 수 있다. 예를 들어, 상술한 바와 같이, 각각의 고객 프로파일은 데이터베이스에 저장될 수 있고, 서비스 포인트의 서비스 우선순위의 표시를 포함한다. 그 후 중앙 컨트롤러는 데이터베이스로부터 서비스 포인트에 대한 서비스 우선순위 표시를 불러들일 수 있다. 중앙 컨트롤러는 서비스 우선순위에 기초하여 서비스 포인트에 대한 전기 서비스 개시를 위한 우선순위화된 순서를 또한 결정할 수 있다. 예를 들어, 우선순위화된 순서는 가장 높은 서비스 우선순위를 갖는 서비스 포인트가 가장 먼저 재개될 것을 요구하고, 두번째 높은 서비스 우선순위를 갖는 서비스 포인트가 두번째로 재개될 것을 요구하고, 등등일 수 있다. 서비스 포인트의 서비스 우선순위가 우선순위화된 순서에 따라 전기 서비스가 재개되고 있는 서비스 우선순위와 부합할 경우, 중앙 컨트롤러는 서비스 포인트에서의 전력 복원을 개시하도록 특정 서비스 포인트에 설치된 제어 장치에 재개 명령을 송신한다. 동일한 서비스 우선순위를 갖는 서비스 포인트의 양이 유틸리티의 발전 예비력의 이용 또는 재개 전력 스파이크를 방지하도록 구축된 지정 임계치를 넘어설 경우, 중앙 컨트롤러는 동일한 서비스 우선순위를 갖는 서비스 포인트의 그룹 내 각각의 서비스 포인트에 대해 난수를 발생시킬 수 있다. 그 후 중앙 컨트롤러는 특정 서비스 포인트에 대한 난수에 기초하여 그룹의 특정 서비스 포인트에 재개 명령을 송신할 수 있다. 예를 들어, 중앙 컨트롤러는 서비스 포인트에 앞서 연계된 수치에 난수를 비교할 수 있고, 상술한 바와 같이 부합이 이루어졌는 지 여부를 결정할 수 있다.
추가적인 실시예에서, 서비스 포인트 특성이 중앙 컨트롤러에 의해 액세스가능한 데이터베이스에 저장될 수 있고, 이러한 서비스 포인트 특성은 특정 고객의 서비스 포인트에서 전기 서비스를 재개하기 위한 시간을 결정하는 데 사용될 수 있다. 예를 들어, 중앙 컨트롤러는 서비스 포인트에 설치된 제어 장치와 같은 다른 소스로부터 데이터를 요청하거나 데이터베이스로부터 이 특성(서비스 우선순위, 전력 소모, 또는 지리적 위치)에 관련된 데이터를 불러들임으로써, 특정 서비스 포인트 또는 서비스 포인트 그룹과 연계된 서비스 우선순위, 전력 소모, 또는 지리적 위치와 같은 특성을 결정할 수 있다. 그 후 중앙 컨트롤러는 상술한 난수 발생 및 분석 과정과 조합하는 등의 방식으로, 다른 정보나 과정과 조합하여, 또는 단독으로 상기 특성에 기초하여, 서비스 포인트에 대한 재개 시간을 결정할 수 있다. 예를 들어, 중앙 컨트롤러가 난수를 발생시켜서, 난수가 특정 서비스 포인트(또는 특정 서비스 포인트를 포함하는 서비스 포인트 그룹)와 연계된 수치와 부합된다고 결정한 후, 중앙 컨트롤러는 서비스 포인트에 대한 서비스 우선순위를 결정하기 위해 서비스 포인트에 대한 고객 프로파일을 불러들일 수 있다. (예를 들어, 서비스 포인트가 의료 장비를 포함하거나 긴급 구호 인력, 의료 인력, 한 명 이상의 노인, 또는 건강 문제가 있는 분들에 의해 사용되기 때문에) 서비스 우선순위가 높을 경우, 중앙 컨트롤러는 서비스 포인트의 제어 장치에 재개 명령을 전송할 수 있다. 다른 한편, 서비스 우선순위가 낮고 이보다 높은 서비스 우선순위를 갖는 서비스 포인트만이 재개되고 있을 경우, 중앙 컨트롤러는 재개 메시지를 보류시켜서, (예를 들어, 제어 장치에 공급할 전력이 서비스 포인트에 공급될 수 있음에도) 서비스 포인트를 완전히 또는 실질적으로 전력없이, 남기게 될 것이다.
또 다른 실시예에서, 중앙 컨트롤러는 특정 그룹 내 서비스 포인트들에 공통인 적어도 하나의 특성(가령, 위치, 전력 소모, 비즈니스 타입, 등)에 기초하여 서비스 포인트를 복수의 그룹으로 논리적으로 나눌 수 있다. 이러한 경우에, 중앙 컨트롤러는 서비스 포인트 특징에 기초하여 서비스 포인트 각각에 대한 전기 서비스 재개를 위한 우선순위화된 순서를 결정할 수 있다. 예를 들어, 중앙 컨트롤러는 지정 임계치보다 높은 평균 전력 소모를 갖는, 또는 전력 발전소에 가장 가까운 서비스 포인트를 먼저 재개시키도록 프로그래밍될 수 있다. 우선순위화된 순서와 특정 서비스 포인트의 특성에 기초하여, 중앙 컨트롤러는 전기 서비스를 재개해야할 서비스 포인트의 그룹을 선택할 수 있고, 선택된 서비스 포인트 그룹에 설치될 제어 장치에 재개 명령을 송신할 수 있다.
또 다른 실시예에서, 중앙 컨트롤러 및 서비스 포인트에 설치된 제어 장치는 서로 협력하여 서비스 포인트에 대한 전기 서비스 재개를 위한 순서를 결정할 수 있다. 예를 들어, 중앙 컨트롤러는 지정된 수치 세트 내의 수치를 선택할 수 있다(가령, 1에서부터 단전에 의해 영향받는 서비스 영역 내 서비스 포인트들의 양까지). 그 후 중앙 컨트롤러는 제어 장치에 선택된 수치를 지닌 재개 메시지를 송신할 수 있다. 각각의 제어 장치는 지정 수치 세트 내의 각자의 난수를 발생시켜서 난수를 수신한(선택된) 수치에 비교할 수 있다. 부합이 이루어질 경우, 제어 장치는 제어 장치의 서비스 포인트에서 적어도 하나의 전력 소모 장치에 전력을 공급한다.
또 다른 실시예에서, 단전으로 영향받는 유틸리티 서비스 영역 내 서비스 포인트에 위치한 제어 장치는 지정 수치 세트 내에서 난수를 발생시킬 수 있다(가령, 1에서부터 서비스 영역 내 서비스 포인트의 양까지). 제어 장치는 서비스 포인트로부터 원격으로 위치한 중앙 컨트롤러로부터 재개 메시지를 또한 수신할 수 있다. 재개 메시지는 지정 수치 세트 내의 수치를 포함한다. 그 후 제어 장치는 재개 메시지 내 수치를 제어 장치에 의해 발생된 난수에 비교하여, 부합이 이루어질 경우, 전력을 서비스 포인트의 하나 이상의 전력 소모 장치에 공급하여, 서비스 포인트에 대한 전력 재개를 효과적으로 개시할 수 있다. 재개 메시지 내 수치가 난수와 부합하지 않을 경우, 제어 장치는 지정 수치 세트 내에 새로운 난수를 발생시켜서, 지정 수치 세트 내의 다른 수치를 포함하는 새로운 재개 메시지를 수신할 수 있다. 이러한 경우에, 제어 장치는 새로운 재개 메시지 내 수치를 새로운 난수와 비교하여, 부합이 이루어질 경우, 서비스 포인트에 위치한 전력 소모 장치에 전력을 공급한다. 대안으로서, 재개 메시지 내 수치가 난수와 부합하지 않을 경우, 제어 장치는 새로운 난수를 발생시키는 대신에 동일한 난수를 유지하고, 중앙 컨트롤러로부터 수신한 새 재개 메시지 내 수치에 난수를 비교한다. 난수가 새 재개 메시지 내 수치와 부합할 경우, 제어 장치는 서비스 포인트에 위치한 전력 소모 장치에 전력을 공급한다. 따라서, 본 실시예에서, 원래 발생된 난수가 수신한 재개 메시지 내 수치와 부합하지 않을 경우, 제어 장치는 새 난수를 발생시키거나, 원래 발생된 난수를 유지하여, 다음 재개 메시지 내 수치와 비교한다.
다른 실시예에서, 능동 부하 관리 시스템을 위한 중앙 컨트롤러(가령, 능동 부하 디렉터)는 데이터베이스, 이벤트 매니저(가령, 마스터 이벤트 매니저), 및 클라이언트 장치 매니저(가령, 능동 부하 클라이언트 매니저)를 포함한다. 데이터베이스는 유틸리티의 서비스 영역에 위치한 복수의 서비스 포인트와 연계된 복수의 수치를 저장하도록 작동할 수 있다. 이벤트 매니저는 데이터베이스에 연결되고, 다음과 같이 작동하도록 구성된다 - (i) 단전 발생 후 서비스 포인트에 대한 전력이 복원될 수 있는 지 여부를 결정하고, (ii) 전력이 복원될 수 있다는 결정에 따라 난수를 발생시키며, (iii) 데이터베이스에 저장된 각각의 수치에 난수를 비교하고, (iv) 난수가 저장된 수치 중 하나에 부합할 때 재개 메시지를 발생시킨다. 클라이언트 장치 매니저는 이벤트 매니저에 연결되고, 난수와 부합하는 수치와 관련된 서비스 포인트에 설치된 하나 이상의 능동 부하 클라이언트 또는 다른 유사 제어 장치에 재개 메시지를 송신하도록 작동한다. 예를 들어, 일 실시예에서, 각각의 서비스 포인트는 데이터베이스에 저장된 수치와 연계도니다(가령, 수치의 시퀀스 리스트가 데이터베이스에 저장되고 각각의 수치는 유틸리티 서비스 영역 내 서비스 포인트 중 하나에 대응한다). 이벤트 매니저는 1과, 서비스 영역 내 서비스 포인트들의 총 양(또는 단전으로 영향받는 그 일부분) 사이에서 난수를 발생시킨다. 난수가 서비스 포인트에 연계된 수치와 부합할 경우, 클라이언트 장치 매니저는 선택된 서비스 포인트에 재개 메시지를 송신한다. 부합이 이루어지지 않을 경우, 다른 난수가 발생되고 프로세스가 반복된다. 대안의 실시예에서, 데이터베이스에 저장된 수치 중 일부 또는 전부가 개별 서비스 포인트 대신에 서비스 포인트 그룹과 연계될 수 있다. 서비스 포인트 그룹은 도시 내 모든 서비스 포인트 또는 이웃 또는 하위 섹터의 주거 서비스 포인트에 대응할 수 있다. 이러한 경우에, 난수가 서비스 포인트 그룹에 대응하는 저장된 수치에 부합할 때, 클라이언트 장치 매니저는 그룹 내 모든 서비스 포인트에 재개 메시지를 송신한다.
유틸리티의 서비스 영역 전체를 통해 서비스 포인트에 설치된 능동 부하 클라이언트와 같은 제어 포인트와, 능동 부하 디렉터와 같은 중앙 컨트롤러 간의 통신을 통해 제어되는 방식으로 서비스 포인트에 대한 전기 서비스를 선택적으로 재개함으로써, 본 발명은 유틸리티의 전력 그리드에 대한 스파이크 손상 가능성과, 불안정성을 야기하는 시작 전력 스파이크 가능성을 감소시킨다. 추가적으로, 이러한 제어형 재개에 따라, 유틸리티는 그 출력을 수용가능한 피크 레벨 이하로 유지시킬 수 있고, 따라서, 발전 예비력 일부 또는 전부의 이용을 방지할 수 있다.
본 발명은 도 3-8을 참조하여 더욱 쉽게 이해될 것이다. 도 3은 본 발명에 따라, 종래의 전력 발생 유틸리티, 또는 가상 유틸리티일 수 있는, 전기 유틸리티에 의해 이용될 수 있는 예시적인 IP-기반 능동 부하 관리 시스템(ALMS: Active Load Management System)(10)을 도시한다. 아래 제공되는 ALMS(10)의 설명은 본 발명의 실시예에 관한 구체적 사항만으로 제한된다. ALMS(10)의 더욱 일반적이고 상세한 설명은 미국특허공보 제7,715,951 B2 호에 개시되어 있고, 그 내용은 본 발명에 포함된다. 미국특허공보 제7,715,951호의 개시내용은 주거지 및 회사와 같은 서비스 포인트에 위치한 장치에 대한 전력을 차단하거나 감소시키기 위한 제어 이벤트의 실행과 예시적인 작동 구현예에 관한 세부사항을 제공한다. 가상 유틸리티를 구현하기 위해 ALMS(10)를 이용하는 방안은 2007년 12월 13일자 미국특허출원 제12/001,819호에 세부적으로 설명되어 있고, 이 출원은 2009년 3월 5일자로 미국특허출원공보 제2009/0063228 A1호로 공개된 바 있으며, 그 내용은 본 발명에 포함된다.
예시적인 ALMS(10)는 하나 이상의 서비스 포인트(20)(하나만 도시됨)에 설치된 하나 이상의 능동 부하 클라이언트(ALC)(300)(하나만 도시됨) 또는 다른 제어 장치와, 하나 이상의 유틸리티 제어 센터(UCC)(200)(하나만 도시됨) 간에 연결되는 능동 부하 디렉터(ALD)(100) 또는 다른 중앙 컨트롤러를 통해 전력 분배를 모니터링 및 관리한다. ALD(100)는 인터넷 프로토콜(IP) 또는 그외 다른 어드레스 또는 연결-기반 프로토콜(가령, 이더넷)을 이용하여 네트워크(80)를 통해 또는 직접 각각의 능동 부하 클라이언트(300) 및 유틸리티 제어 센터(200)와 통신할 수 있다. 예를 들어, ALD(100)는 GSM, 개선형 데이터 GSM 환경(EDGE), ANSI C12.22, HSPA, LTE, TDMA, 또는 CDMA 데이터 표준(CDMA 2000, CDMA 리비전 A, CDMA 리비전 B, CDMA EVDO 리비전 A 포함)과 같은 하나 이상의 무선 통신 프로토콜을 이용하여 하나 이상의 기지국(90)(하나만 도시됨)을 통해 작동하는 RF 시스템을 이용하여 통신할 수 있다. 대안으로서, 또는 추가적으로, ALD(100)는 디지털 가입자 라인(DSL) 기술, 케이블 TV 기반 IP 가능 연결, 위성 연결, 또는 이들 간의 임의의 조합을 ㅌ통해 통신할 수 있다. 도 3에 도시되는 예시적인 실시예에서, ALD(100)는 기지국(90)으로부터 능동 부하 클라이언트(300)까지 HSPA 또는 EVDO 프로토콜을 구현하는 무선 채널과 기지국(90)까지 종래의 IP-기반 통신의 조합을 이용하여 하나 이상의 능동 부하 클라이언트(300)와 통신한다. 기지국(90)과 서비스 포인트(20) 또는 능동 부하 클라이언트(300) 사이의 거리는 "마지막 마일"(last mile)이라 통상적으로 불리지만, 이 거리가 실제 1마일이 될 수는 없다. ALD(100)는 분배 연산 환경에서, 또는 하드웨어 및 소프트웨어의 다른 조합으로, 개별 서버로, 또는, 서버 내의 블레이드로, 등등으로 다양한 방식으로 구현될 수 있다. 다음의 개시 내용에서, ALD(100)는 본 발명의 이해를 촉진시키기 위해 개별 서버에서 실시되는 것으로 설명된다.
각각의 능동 부하 클라이언트(300)는 지정된 어드레스(가령, IP 어드레스)를 통해 액세스가능하고, 능동 부하 클라이언트(300)가 연계되는(가령, 연결되거나 지지되는) 서비스 포인트(20)(가령, 회사 또는 주거지)에 설치된 개별 스마트 차단기 모듈 또는 지능형 기기(60)의 상태를 제어 및 모니터링한다. 각각의 능동 부하 클라이언트(300)는 단일한 주거형 또는 상업용 고객과 연계된다. 일 실시예에서, 능동 부하 클라이언트(300)는 능동 부하 클라이언트(300)로부터의 신호에 따라, 온(활성) 상태에서 오프(비활성) 상태로 전환될 수 있는, 그리고 그 역방향으로도 전환될 수 있는 스마트 차단기 모듈을 지닌 주거형 부하 센터(400)와 통신한다. 스마트 차단기 모듈은 예를 들어, 새로운 건축 중 설치를 위한 상표명 "Cutler-Hammer"의 Eaton Corporation 사와, 상표명 "Squard D"의 Schneider Electric SA 사에서 제작한 스마트 차단기 패널을 포함할 수 있다. 기존 건물을 개조(retrofitting)하기 위해, 개별 식별 및 제어 수단을 갖는 스마트 차단기가 사용될 수 있다. 일반적으로, 각각의 스마트 차단기는 단일 기기(예를 들어, 세탁기/건조기(30), 온수기(40), HVAC 유닛(50), 또는 수영장용 펌프(70))를 제어한다. 대안의 실시예에서, "스마트 차단기"와 유사하게 작동하는, IP 어드레싱가능 릴레이 또는 장치 컨트롤러가, 스마트 차단기 대신에 사용될 수 있으나, 제어 하에 부하와 동시에 설치될 수 있고, 개별 기기(60), HVAC 유닛(40), 수영장용 펌프(70), 온수기(40), 또는 (유틸리티 또는 최종 고객에 의해 결정되는) 그외 다른 제어가능한 부하의 시동 전력, 정상 상태 전력, 전력 품질, 듀티 사이클, 및/또는 에너지 부하 프로파일을 측정할 것이다.
추가적으로, 능동 부하 클라이언트(300)는 다양한 알려진 통신 프로토콜(가령, IP, BPL, 이더넷, 블루투스, 지그비, 와이-파이(IEEE 802.11 프로토콜), 와이맥스(IEEE 802.16 프로토콜), HSPA, EVDO, 등) 중 하나 이상을 통해 직접(가령, 주거용 부하 센터(400)와 통신없이) 개별 스마트 기기(60)를 제어할 수 있다. 통상적으로, 스마트 기기(60)는 통신 기능을 갖는 전력 제어 모듈(도시되지 않음)을 포함한다. 전력 제어 모듈은 실제 기기와 전력 공급원 사이에서, 상기 기기에 대해 전력 공급원과 일직선 상에서 설치된다(가령, 전력 제어 모듈은 가정이나 회사의 전력 콘센트에 꼽히고, 상기 기기에 대한 전력 코드는 전력 제어 모듈에 꼽힌다). 따라서, 전력 제어 모듈이 기기(60) 오프 명령을 수신할 때, 전력 제어 모듈은 상기 기기(6)에 공급되는 실제 전력을 단절시킨다. 대안으로서, 스마트 기기(60)는 기기 내에 직접 통합되는 전력 제어 모듈을 포함할 수 있고, 이는 명령을 수신하여 직접 기기(6)의 작동을 제어할 수 있다(가령, 스마트 온도계는 설정 온도 상승 또는 하강, HVAC 유닛의 온/오프 전환, 선풍기의 온/오프 전환, 등과 같은 기능을 수행할 수 있다).
능동 부하 클라이언트(300)는 하나 이상의 유효성 인자 센서(94)에 또한 연결될 수 있다. 이러한 센서(94)는 내부 및/또는 외부 온도, 내부 및/또는 외부 습도, 시간, 오염도, 강우량, 풍속, 및 그외 다른 인자나 파라미터와 같이, 장치의 작동에 영향을 미치는 다양한 변수 인자를 모니터링하는 데 사용될 수 있다. 서비스 포인트는 능동 부하 클라이언트(300) 및/또는 주거형 부하 센터(400)에 연결된 전력 저장 장치(62)를 또한 포함할 수 있다. 전력 저장 장치(62)는 본 출원과 공동 소유의 계류 중인 미국특허출원 제12/783,415호에 세부적으로 기재되어 있다.
도 4를 이제 참조하면, ALD(100)는 고객 뿐 아니라 서비스 인력에 대한 주 인터페이스로 기능할 수 있다. 도 4에 도시되는 예시적인 실시예에서, ALD(100)는 개별 서버로 구현되고, 유틸리티 제어 센터(UCC) 보안 인터페이스(102), UCC 명령 프로세서(104), 마스터 이벤트 매니저(106), ALC 매니저(108), ALC 보안 인터페이스(110), ALC 인터페이스(112), 웹 브라우저 인터페이스(114), 고객 서명 애플리케이션(116), 고객 인력 설정(138), 고객 보고 애플리케이션(118), 전력 절감 애플리케이션(120), ALC 진단 매니저(122), ALD 데이터베이스(124), 서비스 급전 매니저(126), 트러블 티켓 제너레이터(128), 콜 센터 매니저(130), 카본 절감 애플리케이션(132), 유틸리티 전력 및 카본(P&C) 데이터베이스(134), 판독 계측기 애플리케이션(136), 보안 장치 매니저(140), 및 장치 컨트롤러(144)를 포함한다. ALD(100)의 요소들 중 여러 가지의 작동 세부사항이 아래에서 설명된다. ALD(100)의 나머지 요소들의 작동 세부 사항은 미국특허공보 제7,715,951호 및 미국특허출원공보 제2009/0063228A1호에 기재되어 있으며, ALD(100)는 개별 서버 실시예의 범주에서 또한 설명되고 있다. 당 업자라면 ALD(100)의 다양한 응용 분야 및 여러 다른 구성요소가 실행될 수 있고 하나 이상의 프로세스(160)에 의해 수행되는 기능을 가짐을 이해할 수 있을 것이다.
일 실시예에서, 서비스 포인트(20)는 ALD(100)의 웹 브라우저 인터페이스(114) 내로의 웹-기반 사용자 인터페이스(가령, 인터넷-액세스가능 웹 포털)을 포함할 수 있다. 웹-기반 사용자 인터페이스는 "고객 대시보드"(98)라 불린다. 고객 대시보드(98)가 컴퓨터, 스마트폰, PDA, 또는 다른 필적가능한 장치를 통해 고객에 의해 액세스되면, 고객 대시보드(98)는 고객의 서비스 포인트(20)에서 장치를 제어하기 위해 ALMS(10)에 의한 사용을 위한 선호도를 명시하도록 고객에 의해 사용될 수 있다. 고객 대시보드(98)는 ALD(10) 내로의 액세스를 고객에게 제공한다. ALD(100)는 (가령, 웹 브라우저 인터페이스를 통해) 고객 대시보드(98)로부터 입력을 수용하여, 고객에게 디스플레이하기 위해 정보를 고객 대시보드(98)에 출력한다. 고객 대시보드(98)는 서비스 포인트(20)로부터 액세스될 수 있고, 또는 인터넷 액세스가능 장치로부터 원격으로 액세스될 수 있으며, 바람직하게는 사용자 명칭 및 비밀번호를 보안 용도로 이용하여 액세스될 수 있다. 따라서, 고객 대시보드(98)는 고객의 서비스 포인트(20)에 위치한, ALD(100)에 의해 제어되는 장치와 연계된 선호도를 명시하게 의해 고객에 의해 사용되는 안전한, 웹-기반 인터페이스인 것이 바람직하다. 고객 대시보드는 제어되는 장치 및/또는 서비스 포인트 또는 파라미터와 연계하여 ALD(100)에 의해 실행되는 고객 개인 설정 애플리케이션 또는 고객 서명 애플리케이션(116)에 의해 요청되는 정보를 제공하는 데 또한 사용될 수 있다. 고객 선호도는 예를 들어, 제어 이벤트 선호도(가령, 시간, 지속시간, 등), 과금 관리 선호도(가령, 최대 월 과금 비용에 대한 목표), 환경적 특성 또는 조건에 대한 최대 및 최소 경계 설정, 및 다양한 다른 고객 설정을 포함할 수 있다.
일 실시예에서, 고객은 고객 대시보드(98)를 이용하여 웹 브라우저 인터페이스(114)를 통해 ALD(100)와 상호작용하고, 고객 서명 애플리케이션(116)을 통해 ALMS(10)에 의해 제공되는 모든 서비스 또는 일부 서비스에 가입한다. 고객 서명 애플리케이션(116)에 따르면, 고객은 고객 및 고객의 서비스 포인트(20)(가령, 거지주 또는 회사)에 관한 정보를 지닌 고객 개인 설정(138)을 입력하고, 고객이 가압하고자 하는 서비스의 한도(extent)를 명시한다. 고객 대시보드(98)를 이용하여 고객 프로파일을 구축하는 기술과 관련된 추가적인 세부사항이 아래에서 논의된다. 고객은 고객 대시보드(98)를 이용하여 액세스할 수 있고, 이들이 구축된 후 기존 계좌에 관한 정보를 수정할 수 있다.
도 5는 본 발명의 일 실시예에 따른, 예시적인 능동 부하 클라이언트(ALC)(300)의 블록도를 도시한다. 도시되는 능동 부하 클라이언트(300)는 운영 체제(302), 상태 응답 발생기(304), 스마트 차단기 모듈 컨트롤러(306), 통신 인터페이스(308), 보안 인터페이스(310), IP-기반 통신 컨버터(312), 장치 제어 매니저(314), 스마트 차단기(B1-BN) 카운터 매니저(316), 보고 트리거 애플리케이션(318), IP 라우터(320), 스마트 미터 인터페이스(322), 스마트 장치 인터페이스(324), IP 장치 인터페이스(330), 및 전력 급전 장치 인터페이스(340), 및 이벤트 스케줄러(344)를 포함한다. 능동 부하 클라이언트(300)는 본 실시예에서, 서비스 포인트(20) 현지에 위치 및 설치된 컴퓨터 또는 프로세서-기반 시스템이다. 능동 부하 클라이언트(300)의 주 기능은, 서비스 포인트(20)에 위치한 제어가능한 전력 소모 장치의 전력 부하 레벨을 관리하는 것이고, 능동 부하 클라이언트(300)는 고객 대신에 이를 살피고 제어한다. 예시적인 실시예에서, 능동 부하 클라이언트(300)는 동적 호스트 구성 프로토콜(DHCP: Dynamic Host Configuration Protocol) 클라이언트 기능을 포함할 수 있어서, 능동 부하 클라이언트(300)로 하여금, 능동 부하 클라이언트(300)와 ALD(100) 사이의 통신을 촉진시키는 호스트 IP 네트워크 상에서 DHCP 서버로부터 관리되는 하나 이상의 제어가능한 장치(402-412, 60) 및/또는 그 자체에 대한 IP 어드레스를 동적으로 요청하게 할 수 있다. 능동 부하 클라이언트(300)는 라우터 기능을 추가로 포함하여, 능동 부하 클라이언트(300)로부터 제어가능한 장치(402-412, 60)까지 메시지의 전달을 촉진시키기 위해 능동 부하 클라이언트(300)의 메모리에 할당된 IP 어드레스의 라우팅 표를 관리한다. 마지막으로, 서비스 포인트(20)에서 전력 발생 장치(96)는, 포함될 때, 서비스 포인트(20)에서 발생되어 그리드에 전달되는 전력에 관한 데이터를 전력 급전 장치 인터페이스(340)로 전송한다. 능동 부하 클라이언트(300)에 관한 세부사항은 미국특허공보 제7,715,951호 및 미국특허출원공보 제2009/0063228 A1호에서 제공된다.
일 실시예에서, ALD(100)는 웹 브라우저 인터페이스(114)를 통해 고객 인력 설정(138)과 같은 고객 데이터와, 고객 서비스 포인트(20)에 위치한 제어가능한 전력 소모 장치에 관한 정보를 수집하여, 각각의 고객에 대한 프로파일을 발생시킨다. 고객 파일을 생성하는 정보는 고객 대시보드(98)를 통해 고객에 의해 입력되는 것이 바람직하고, 또는, 대안으로서, 유틸리티 고객 서비스 인력과의 전화 대화, 조사 응답, 이메일, 또는 유틸리티 웹사이트에서의 데이터 입력을 통해서와 같이, 다른 수단에 의해 제공될 수도 있다. 사용될 때, 고객 프로파일은 ALD 데이터베이스(124), 또는, ALD(100)에 의해 액세스가능한 다른 데이터베이스 내에 저장되는 것이 바람직하다. 고객 프로파일은 고객 서비스 포인트(20)에 설치된 능동 부하 클라이언트(300)에 의해 ALD(100)에 보고되는 전력 소모 데이터에 기초하여 고객의 에너지 소모 패턴을 포함하도록 시간에 따라 업데이트될 수 있다. 고객 프로파일 생성을 위한 세부사항은 함께 계류중인 2010년 2월 9일자 미국특허출원 제12/702,640호(발명의 명칭: "System and Method for Determining and Utilizing Customer Energy Profiles for Load Control for Individual Structures, Devices, and Aggregation of Same")에 개시되어 있고, 2010년 6월 10일자로 미국특허출원공보 제2010/0145534호로 공개되었으며, 그 내용은 본 발명에 포함된다.
ALMS(10)의 일체형 부분으로 서비스 포인트(20)에 설치되는 능동 부하 클라이언트(300) 또는 다른 제어 장치(가령, 게이트웨이)는, 서비스 포인트(20)의 전력 소모 장치가 전력 복원시 전기를 수신하거나 전기에 액세스하는 것이 허용되는 시기를 제어하는 기능과, 각자의 서비스 포인트(20)에서 소모되는 전력의 상태를 보고하는 기능을 갖는다. 따라서, 능동 부하 클라이언트(300) 및 ALD(100)는 유틸리티의 서비스 영역 내 서비스 포인트(20)의 제어형 재개를 행하기 위한 하나 이상의 실시예를 구현하도록 프로그래밍될 수 있다. 일 실시예에 따르면, 난수 발생기가 ALD(100) 및/또는 각각의 능동 부하 클라이언트(300)에서 이용되어, 일반적으로 임의적인 방식으로 각각의 서비스 포인트(20)를 시동시킬 수 있다. 대략 임의적인 방식으로 서비스 포인트(20)를 재개함으로써, 유틸리티는 유틸리티의 발전 예비력의 불필요한 사용이나 전력 스파이크로 인한 시스템 불안정성과 같이, 한번에 모든 서비스 포인트(20)를 재개하는 바람직하지 못한 효과를 방지하거나 적어도 완화시킨다.
도 6의 논리 순서도(600)에 도시되는 바와 같은 제 1 실시예에 따르면, ALD(100)의 마스터 이벤트 매니저(106)는 수치를 각각의 서비스 포인트(20)와 상관시키고(601) ALD 데이터베이스(124)에 상관 수치를 저장한다(603). 수치는 고객 수치일 수 있고, 바람직한 실시예에서, 주어진 유틸리티 서비스 영역 내 모든 서비스 포인트(20)와 상관된 수치는 순차적인 속성을 갖는다. 마스터 이벤트 매니저(106)는 1에서부터, 단전으로 고통받는 전체 서비스 영역의 서비스 포인트(20)의 총 양 또는 그 일부분에 대응하는 수치까지 수치를 임의적으로 발생시킬 수 있는 난수 발생기를 포함한다. 서비스 영역 내 서비스 포인트(20)에 대한 전력이 복원될 수 있다고 결정하면(605), 마스터 이벤트 매니저(106)는 난수를 발생시켜서(607), ALD 데이터베이스(124)에 저장된 서비스 포인트(20)와 상관된 수치에 비교한다(609). 난수가 아직 재개되지 않은 서비스 포인트(20)와 상관된 수치와 부합할 때, 마스터 이벤트 매니저(106)는 ALC 매니저(108)에 재개 메시지를 전송하고, ALC 매니저(108)는 메시지를 서비스 포인트(20)의 능동 부하 클라이언트(300)에 전송한다(611). 난수 발생, 저장도니 서비스 포인트 수치에 대한 난수 비교, 재개 메시지의 발급은, 영향받은 서비스 영역 내 모든 서비스 포인트(20)들이 재개되거나 그 전기가 복원될 때까지 계속된다(613).
대안의 실시예에서, 상술한 실시예의 난수 발생 및 비교 기법은 개별 서비스 포인트만이 아니라, 서비스 포인트들의 그룹에 적용될 수도 있다. 이러한 실시예에서, 마스터 이벤트 매니저(106)는 각 서비스 포인트 그룹을 수치와 상관시키고(601), ALD 데이터베이스(124)에 수치를 저장한다(603). 서비스 영역 내 서비스 포인트(20)에 대해 전력이 복원될 수 있다고 결정되면(605), 마스터 이벤트 매니저(106)는 1에서부터, 단전으로 고통받는 전체 서비스 영역 내 서비스 포인트 그룹의 총 양 또는 그 일부분에 대응하는 수치까지 난수를 발생시킬 수 있고(607), 난수를 ALD 데이터베이스(124)에 저장된 그룹 수치에 비교할 수 있다. 부합이 검출되면, 마스터 이벤트 매니저(106)는 ALC 매니저(108)에 재개 메시지를 전송할 수 있고, ALC 매니저(108)는 재개되고 있는 그룹 내 모든 서비스 포인트에 대해 능동 부하 클라이언트(300)에 메시지를 전송한다(611). 난수 발생, 저장된 서비스 포인트 그룹 멤버에 대한 난수 비교, 및 재개 메시지 발급은 영향받은 서비스 영역 내 모든 서비스 포인트(20)들이 재개되거나 그 전기가 복원될 때까지 계속된다(613).
추가적인 실시예에서, 능동 부하 클라이언트(300)는 ALD(100)에 접촉할 필요없이 재개를 개시할 수 있다. 본 실시예에서, 이벤트 스케줄러(344) 또는 각각의 능동 부하 클라이언트(300)의 등가 요소는 난수 발생기를 포함한다. 도 7은 본 발명의 본 실시예에 따라, ALD(100)로부터 구체적 명령없이, 능동 부하 클라이언트(300)가 재개를 개시하기 위한 방법을 설명하는 순서도(700)다. 도 7의 논리 흐름에 따르면, 능동 부하 클라이언트(300)(가령, 이벤트 스케줄러(344)를 통해)는 전체 서비스 영역 내 전기 서비스를 재개하는 데 요구되는 시간의 길이 또는 지속 시간(초 단위)를 추정하고(1904), 시작 시간을 현재 시간(초 단위)으로 설정한다(1906). 추정된 시간 길이는 능동 부하 클라이언트(300)의 메모리에 저장되어 후에 불러들여질 수 있고, 또는, 이벤트 스케줄러(344)에 의해 결정될 수 있다(예를 들어, 능동 부하 클라이언트(300)가 ALD(100)에 재개 요청을 전송하고, ALD(100)가 이 요청을 대기시켰다가, 큐의 능동 부하 클라이언트 위치를 이벤트 스케줄러(344)에 알린 후와 같이, ALD(100)로부터 제어 메시지 수신을 통해). 일 실시예에서, 이벤트 스케줄러(344)는 능동 부하 클라이언트(300)가 유틸리티로부터 전력을 수신하기 시작한 후 서비스 영역 재개에 대해 요구되는 시간의 길이를 추정한다(1904). 그 후, 이베트 스케줄러는 전체 서비스 영역 내 전기 서비스를 재개하는 데 요구되는 추정된 시간의 양 더하기 현재 시간으로 재개 완료 시간을 설정한다(1908). 추가적으로, 이벤트 스케줄러(344)는 난수를 시간 단위로 발생시킨다(1920). 일 실시예에서, 난수는 09과, 전체 서비스 영역에서 전기 서비스를 재개하는 데 요구되는 추정된 시간의 양 사이의 값이다. 그 후 이벤트 스케줄러(334)는 시작 시간 더하기 난수인 "임의적 시작 시간"을 연산한다(1922). 이벤트 스케줄러가 임의적 시작 시간이 현재 시간보다 크다고(즉, 현재 시간보다 나중의 시간이라고) 결정할 경우(1930), 이벤트 스케줄러(344)는 다른 난수를 발생시킨다(1920). 그렇지 않을 경우, 임의적 시작 시간이 현재 시간보다 이를 경우, 이벤트 스케줄러(344)는 능동 부하 클라이언트(300)의 제어 하에 전력 소모 장치(30, 40, 50, 60, 70, 402-412)를 통해 전기를 흐르게 함으로써 서비스 포인트(20)에서 전기 서비스의 재개를 개시한다(1940). 도 7의 논리 흐름은 이벤트 스케줄러(344) 대신에 능동 부하 클라이언트(300)의 다른 처리 구성요소에 의해 실행될 수 있음을 당 업자가 이해할 수 있을 것이다.
도 7의 실시예를 설명하기 위해, 다음의 예를 고려해보자. 단전 후, 서비스 포인트(20)의 능동 부하 클라이언트(300)는 ALD(100)에 재개 요청을 전송할 수 있다. 이 요청에 따라, ALD(100)는 서비스 포인트(20)가 위치한 유틸리티 서비스 영역에 대해 전력이 복원될 때까지의 개략적인 시간 길이를 능동 부하 클라이언트(300)에 알린다. 본 예의 목적을 위해, 서비스 복원까지의 추정 시간 길이가 6시간(21,600초)일 경우, 능동 부하 클라이언트(300)는 전기 서비스를 재개하는 데 요구되는 시간의 지속시간을 21,600초로 추정하고(1904), 리셋 시작 시간을 현재 시간(초 단위)으로 설정한다(1906). 능동 부하 클라이언트(300)가 ALD(100)로부터 통지를 수신하는 시간이 오전 10:30일 경우(24시간 시계 상에서 37,800초), 능동 부하 클라이언트는 현재 시간을 37,800초로 설정한다(1904). 그 후 능동 부하 클라이언트(300)는 재개 완료 시간을 59,400초 또는 오후 4:30으로 설정한다(1908)(즉, 현재 시간 더하기, 서비스 영역에서 전기 서비스를 재개하는 데 요구되는 추정 시간 양). 추가적으로, 능동 부하 클라이언트(300)는 난수를 시간 단위로 발생시킨다(1920). 예를 들어, 난수는 1,050초일 수 있고, 이는 0과, 전체 서비스 영역에서 전기 서비스를 재개하는 데 요구되는 추정 시간 양(가령, 21,600초) 사이에서 이루어진다. 그 후 능동 부하 클라이언트(300)는 시작 시간 더하기 난수인 "임의적 시작 시간"을 연산한다(1922). 본 예에서, 임의적 시작 시간은 37,800초(즉, 오전 10:30) 더하기 1,050초 또는 38,850초(즉, 오전 10:47:30)가 될 것이다. 그 후 능동 부하 클라이언트(300)는 임의적 시작 시간을 현재 시간에 비교한다(1930). 현재 시간이 임의적 시작 시간(가령, 오전 10:47:30) 이후일 경우, 능동 부하 클라이언트는 능동 부하 클라이언트(300)의 제어 하에 전력 소모 장치(30, 40, 50, 60, 70, 402-412)를 통해 전기를 흐르게 함으로써 서비스 포인트(20)의 전기 서비스의 재개를 개시한다(1940). 다른 한편, 현재 시간이 임의적 시작 시간보다 이른 경우(가령, 현재 시간 오전 10:35), 능동 부하 클라이언트는 다른 난수를 발생시키고(1920), 새로운 임의적 시작 시간을 결정하며(1920), 새 임의적 시작 시간을 현재 시간과 비교하여(1930), 서비스 포인트(20)에서 이제 전기 서비스가 시작될 수 있는 지 여부를 결정한다.
추가적인 실시예에서, ALD(100) 및 각각의 부하 클라이언트(300)는 도 8의 논리 순서도(800)에 도시되는 바와 같이, 협력하여 각자의 재시작 시간을 결정한다. 예를 들어, ALD(100)의 마스터 이벤트 매니저(106)는, 유틸리티의 서비스 영역 내 서비스 포인트(20)에 전력을 공급하는 전력 그리드가 적절하게 기능하고 있고 서비스 영역에 전력을 공급할 수 있다는 결정이 이루어진 후, 지정 수치 또는 지성 세트의 수치를 통해 순차적으로 나열된다. 각각의 능동 부하 클라이언트(300)는 동일한 지정 세트의 수치 내에서 난수를 발생시킨다(801). ALD(100)가 수치 세트를 통해 나열됨에 따라, ALD(100)는 유틸리티 서비스 영역 내의 서비스 포인트(20)의 모든 능동 부하 클라이언트(300)에 현 수치를 포함하는 재개 메시지를 송신한다. 재개 메시지 수신(803) 후, 능동 부하 클라이언트는 재개 메시지 내 수치를 능동 부하 클라이언트(300)에 의해 발생된 난수와 비교한다(805). 능동 부하 클라이언트가 자체적으로 수득한 수치가 ALD(100)에 의해 현재 송신되고 있는 수치와 동일할 경우, 능동 부하 클라이언트(300)는 재개되어, 능동 부하 클라이언트의 제어 하에 전력 소모 장치에 전력을 공급한다(807). 그렇지 않을 경우, 능동 부하 클라이언트(300)는 다른 난수를 발생시키거나(801), 또는 앞서 선택한 난수가 ALD(100)로부터 수신한 수치보다 클 경우, 앞서 선택한 난수를 유지하며(도 8의 "대안 없음" 경로 참조), ALD(100)로부터 다음 수치를 기다린다. ALD(100)로부터 수신한 새 수치가 새롭게 발생된 난수와 부합할 경우(또는 이러한 난수가 유지될 경우 앞서 발생한 난수와 부합할 경우), 능동 부하 클라이언트(300)는 능동 부하 클라이언트의 제어 하에 전력 소모 장치에 대해 전력을 재개 및 공급한다(807).
본 발명의 또 다른 실시예에 따르면, 유틸리티 조작자는 각각의 개별 서비스 포인트(20) 또는 서비스 포인트 그룹에 대해 전력 가용 상태를 수동으로 모니터링하고, 천이, 전압 및 전류 스파이크, 및 "저온" 재개의 다른 해로운 부산물을 감소시키거나 제거하도록 단전 후 정규적 방식으로 전력을 복원할 수 있다. 본 실시예에서, 유틸리티 조작자는 유틸리티 서비스 영역 내 다른 것 중에서도 단전을 디스플레이하기 위해 진단 및 모니터링 소프트웨어와 함께, ALD(100) 내에 저장되는 GIS(Geographic Information System) 맵을 이용할 수 있다. 유틸리티 조작자가 유틸리티 서비스 영역 내 전력 단전을 볼 수 있도록 하는 예시적인 컴퓨터 디스플레이의 스크린 샷이 도 9에 도시된다. 스크린 상에 디스플레이되는 단전 정보는 ALD(100) 또는 유틸리티 제어 센터(200)에서 구동되는 컴퓨터 프로그램에 의해 발생된다. 컴퓨터 프로그램은 미국특허공보 제7,715,951호에 세부적으로 개시된 바와 같이, ALD(100)에 의해 송신되는 질의 폴링에 따라, 또는 지정 구간 중(가령, 적어도 5분마다 한번씩) 유틸리티 서비스 영역 내의 능동 부하 클라이언트(300)로부터 (가령, ALD(100)를 통해) 수신되거나 수신되지 않는 정보에 기초하여 전력 단전을 결정한다. 예를 들어, 능동 부하 클라이언트(300)의 전부 또는 일부는 전력이 능동 부하 클라이언트(300)를 지닌 서비스 영역으로 소실되었을 때 전력 소모 또는 다른 상태 데이터의 송신을 계속하게 하는 백업 배터리를 포함할 수 있다. 대안으로서, 백업 배터리가 이용되지 않을 때, 능동 부하 클라이언트(300)는 ALD(100)로부터 폴(가령, 미터기 판독 명령)에 따라, 또는 지정 구간 중 상태 데이터를 송신하지 않을 것이다. 이러한 응답 실패는 특정 능동 부하 클라이언트(300)가 위치하는 서비스 포인트(20)로의 전력이 유지됨을 표시하는 것으로 간주될 수 있다(특히, ALD(100) 및/또는 유틸리티 제어 센터(200)에 의해 얻은 다른 정보가 전력 단전 발생을 표시할 경우). ADD(100)와 관련 능동 부하 클라이언트(300) 사이에서, 통신을 통해 전력 단전 위치를 결정함으로써, 그리고, 디스플레이 스크린 상에서 이러한 단전을 관찰함으로써, 유틸리티 발전 예비력의 이용을 요구하거나 유틸리티 인프러스트럭처를 손상시킬 수 있는 전력 스파이크 가능성을 최소화시키는 방식으로 단전으로 영향받은 서비스 포인트(20)의 전력 재개를 전력 유틸리티의 조작자가 제어할 수 있다.
본 발명의 다른 실시예는 미국특허출원공보 제2010/0145534 A1호에 세부적으로 설명된 고객 프로파일의 이용에 기초하여 성립된다. 도 10의 논리 순서도(1000)에 도시되는 본 실시예에 따르면, ALD(100)는 고객의 전체 고객 프로파일의 일부분으로 연결/분리 프로파일을 유지한다(1001). 연결/분리 프로파일은, 제한된 제어 이벤트를 수신해야 하는 또는 제어 이벤트를 전혀 수신하지 않아야 하는 서비스 포인트 내의 장치에 관한 정보와, 분리 시에 고객에 악영향을 미칠 수 있는 다른 장치(가령, 건강 관련 또는 의료 관련 장치)와, 상기 고객에 관한 다른 연결/분리 정보를 지닌다. 프로파일 내의 서비스 우선순위는 재개 우선순위를 결정하기 위한 가이드로 사용된다. 도 4에서, 연결/분리 프로파일은 ALD 데이터베이스(124)에 저장될 수 있는 고객 개인 설정(138)의 일부분일 수 있다.
본 실시예에서, 유틸리티는 서비스 우선순위에 기초하여 우선순위화된 순서에 따라 서비스 포인트(20)에 대한 전기 서비스를 재개할 것을 ALD(100)에게 지시하는(1003) 제어형 재개를 개시한다. 따라서, 이러한 경우에, 유틸리티 조작자 또는 ALD(100)에 의해 실행되는 서비스 재개/복원 소프트웨어 프로그램은 ALD 데이터베이스(124)에 문의하여, 서비스 우선순위에 의해 조정되거나 정렬된 모든 서비스 포인트의 리스트를 얻는다. 그 후, ALD(100)의 마스터 이벤트 매니저(106)는 서비스 우선순위에 기초하여 서비스 포인트(20)에 대한 능동 부하 클라이언트(300)로의 재개 명령의 전송을 스케줄링한다(1007). 예를 들어, 가장 높은 서비스 우선순위를 갖는 서비스 포인트(20)는 재개 명령을 가장 먼저 수신하도록 스케줄링되고, 두번째 높은 서비스 우선순위를 갖는 서비스 포인트(20)는 두번째로 재개 명령을 수신하도록 스케줄링되며, 등등과 같이 이어진다. 이러한 방식으로, 재개 이벤트는 각 서비스 포인트의 서비스 우선순위에 대해 마스터 이벤트 매니저(106) 내에서 스케줄링된다. 동일 서비스 우선순위를 갖는 서비스 포인트의 양이 지정 임계치를 넘는 경우(1009)(가령, 유틸리티 발전 예비력의 이용을 요구하거나 바람직하지 못한 전력 스파이크를 야기할 가능성이 높은 양), ALD(100)는 이 그룹 또는 그룹 내의 서브그룹 내 각각의 서비스 포인트에 대해 난수를 결정하거나 발생시키고(1011) 난수에 기초하여 재개 명령을 발급한다. 예를 들어, 상술한 바와 같이, 이러한 난수는 1에서부터, 동일 서비스 우선순위를 갖는 서비스 포인트 또는 서브그룹의 양 사이에서 임의적으로 발생될 수 있다. 난수는 서비스 포인트 또는 서브그룹에 할당될 것이고, 또는, ALD(100) 또는 다른 중앙 컨트롤러가 임의적으로 할당된 수치에 기초하여 서비스 포인트 또는 서브그룹에 재개 명령을 발급할 것이다(1013). 재개 명령은 지정 지연(가령, 5분)만큼 시간 상으로 이격되어, 서비스 포인트 또는 서브그룹이 시동 및 정상 상태 작동 도달에 걸리는 적절 시간을 제공할 수 있다.
또 다른 실시예에서, 유틸리티는 유틸리티에 의해 규정된 바와 같이, 그룹 내의 서비스 포인트에 대한 전력을 복원할 수 있다. 본 실시예에 따르면, ALD(100)는 위치(가령, 지리적 위치), 전력 소모(가령, 시간 평균, 일평균, 월평균 전력 소모), 서비스 포인트에서 작동되는 비즈니스의 종류와 같은 하나 이상의 공통 특성에 기초하여, 또는 다른 특성에 기초하여, 서비스 포인트(20)를 그룹으로 논리적으로 나눌 수 있다. 당 업자는 서비스 우선순위가 서비스 포인트(20)의 특성으로 또한 간주될 수 있음을 이해할 수 있을 것이다. 본 실시예에서, 유틸리티는 ALD 데이터베이스(124)를 이용하여 그룹 리스트를 얻는다. 그 후 유틸리티는 각 그룹의 특성(가령, 위치)을 이용하여 각 그룹 내 서비스 포인트(20)에 대한 재개를 스케줄링 및 우선순위화할 수 있다.
도 11은 본 발명에 따른 제어형 재개를 이용하여 전력 복원 주기 중 시간에 대한 전력 수요(MW 단위)를 제시하는 예시적 그래프(1100)다. 그래프(1100)에 도시되는 바와 같이, 유틸리티 서비스 영역 내 서비스 포인트에 대한 전력의 제어형 복원은 도 1에 도시되는 일시적 전력 서지 또는 스파이크를 제거하고, 재개 주기 중 시간 곡선에 대한 전력(1101)을 매끄럽게 하여, 소모되는 최대 전력을 수용가능한 피크 레벨(1103) 아래로 유지시킨다. 따라서, 제어형 재개는 전기 그리드 및 전기 그리드에 연결된 전력 소모 장치를 손상시킬 수 있는 저온 시작 천이를 제거하거나 적어도 실질적으로 완화시킨다.
상술한 바와 같이, 본 발명은 서비스 단전 후 서비스 포인트의 제어형 재개를 행하기 위한 장치 및 방법을 포괄한다. 본 발명을 이용하면, 저온 재개로부터 나타나는 전력 스파이크가 완화되어 유틸리티 전력 그리드의 안정성을 유지시킬 수 있고, 인프러스트럭처 손상 위험을 감소시킬 수 있다. 추가적으로, 본 발명에 의해 생성되는 제어형 재개는 유틸리티 발전 예비력을 이용할 필요없이 전력을 복원시킬 수 있다.
상술한 명세서에서, 본 발명은 구체적 실시예를 참조하여 설명되었다. 그러나, 본 발명의 범위 및 사상으로부터 벗어나지 않으면서 다양한 수정 및 변형이 이루어질 수 있다. 예를 들어, 유틸리티 제어 센터(20)에 의해 난수 발생이 수행될 수 있고, 이어서 난수가 ALD(100)에 전달될 수 있다. 따라서, 명세서 및 도면은 제한적 측면이라기보다는 예시적인 측면으로 이해되어야 하고, 모든 이러한 변형예는 본 발명의 범위 내에 포함된다고 간주된다.
본 발명의 구체적 실시예를 참조하여 문제점에 대한 이점, 장점, 및 해법을 살펴보았다. 본 발명은 본 출원의 계류 중 이루어지는 임의의 보정을 포함한 첨부 청구범위(및 등록 시의 청구범위)에 의해서만 규정된다.
Claims (28)
- 유틸리티 서비스 영역의 전력 단전 후 유틸리티 서비스 영역 내 서비스 포인트에서 전기 서비스를 재개하기 위한 방법에 있어서,
상기 서비스 포인트에 상관된 난수를, 상기 서비스 포인트에 위치한 제어 장치에 의해, 결정하는 단계로서, 상기 제어 장치는 상기 서비스 포인트에 위치한 적어도 하나의 전력 소모 장치에 대한 전력의 공급을 제어하는, 단계와,
적어도 상기 난수에 기초하여 상기 서비스 포인트에서 전기 서비스를 재개해야할 시간을, 상기 제어 장치에 의해, 결정하는 단계와,
결정된 서비스 포인트 재개 시간에서 상기 서비스 포인트에 위치한 상기 적어도 하나의 전력 소모 장치에 전력을, 상기 제어 장치의 제어 하에 공급하는 단계
를 포함하는 유틸리티 서비스 영역 내 서비스 포인트에서의 전기 서비스 재개 방법. - 제 1 항에 있어서, 난수를 결정하는 단계는, 상기 서비스 포인트로부터 원격으로 위치한 중앙 컨트롤러로부터 난수를, 상기 제어 장치에 의해, 수신하는 단계를 포함하는
유틸리티 서비스 영역 내 서비스 포인트에서의 전기 서비스 재개 방법. - 제 2 항에 있어서, 상기 난수는 상기 서비스 포인트의 그룹과 상관되고, 상기 그룹은 상기 유틸리티 서비스 영역 내 복수의 서비스 포인트 중 일부분만을 포함하며, 상기 서비스 포인트가 상기 그룹에 포함되는
유틸리티 서비스 영역 내 서비스 포인트에서의 전기 서비스 재개 방법. - 제 1 항에 있어서,
상기 방법은, 상기 서비스 포인트로부터 원격으로 위치한 중앙 컨트롤러로부터 수치를, 상기 제어 장치에 의해, 수신하는 단계를 더 포함하며,
상기 서비스 포인트에서 전기 서비스를 재개해야할 시간을 결정하는 단계는, 수신한 수치를 상기 난수에 비교하는 단계와, 수신한 수치가 상기 난수와 일치할 때 상기 서비스 포인트에서 상기 전기 서비스를 재개해야할 시간을 결정하는 단계를 포함하는
유틸리티 서비스 영역 내 서비스 포인트에서의 전기 서비스 재개 방법. - 제 1 항에 있어서,
상기 유틸리티 서비스 영역에서 전기 서비스의 재개를 완료하는 데 요구되는 시간의 양을 추정하는 단계와,
상기 유틸리티 서비스 영역에서 전기 서비스의 재개를 개시하기 위한 시작 시간을 결정하는 단계와,
상기 유틸리티 서비스 영역에서 전기 서비스의 재개를 완료하는 데 요구되는 추정된 시간 양과 상기 유틸리티 서비스 영역에서 전기 서비스의 재개를 개시하기 위한 시작 시간에 기초하여, 상기 유틸리티 서비스 영역에서 전기 서비스의 재개를 완료하기 위한 완료 시간을 추정하는 단계
를 더 포함하되,
상기 서비스 포인트에서 전기 서비스를 재개해야할 시간은 상기 유틸리티 서비스 영역에서 전기 서비스의 재개를 개시하기 위한 시작 시간과 상기 난수에 기초하여 결정되고, 상기 난수는 0과, 추정된 완료 시간 사이의 값이며, 결정된 서비스 포인트 재개 시간이 현재 시간보다 이를 경우 현재 시간에 적어도 하나의 전력 소모 장치에 전력이 공급되는
유틸리티 서비스 영역 내 서비스 포인트에서의 전기 서비스 재개 방법. - 제 1 항에 있어서, 적어도 하나의 전력 소모 장치에 전력을 공급하는 단계는,
적어도 하나의 전력 소모 장치에 대한 전력의 흐름을 제어하는 적어도 하나의 제어가능한 장치에 적어도 하나의 전력 제어 명령을 전달하는 단계로서, 상기 적어도 하나의 전력 제어 명령은 상기 적어도 하나의 전력 소모 장치로 전력을 흐르게 하도록 상기 적어도 하나의 제어가능한 장치에 지시하는, 단계를 포함하는
유틸리티 서비스 영역 내 서비스 포인트에서의 전기 서비스 재개 방법. - 제 1 항에 있어서, 서비스 포인트에서 전기 서비스를 재개해야할 시간을 결정하는 단계는,
상기 서비스 포인트로부터 원격으로 위치한 중앙 컨트롤러로부터 제어 메시지를, 상기 제어 장치에 의해, 수신하는 단계와,
상기 제어 메시지에 기초하여 상기 서비스 포인트에서 전기 서비스를 재개해야할 시간을, 상기 제어 장치에 의해, 결정하는 단계
를 포함하는 유틸리티 서비스 영역 내 서비스 포인트에서의 전기 서비스 재개 방법. - 유틸리티 서비스 영역의 전력 단전 후 유틸리티 서비스 영역 내 서비스 포인트에서 전기 서비스를 재개하기 위한 방법에 있어서, 상기 서비스 포인트에 위치한 적어도 하나의 전력 소모 장치에 대한 전력의 공급은 상기 서비스 포인트에 위치한 제어 장치에 의해 제어되고, 상기 제어 장치는, 상기 서비스 포인트로부터 원격으로 위치하고 전기 유틸리티와 복수의 서비스 포인트 사이에서 인터페이싱되는, 중앙 컨트롤러로부터 제어 메시지를 수신하며, 상기 방법은,
상기 서비스 포인트와 상관된 난수를, 상기 중앙 컨트롤러에 의해, 결정하는 단계와,
상기 서비스 포인트와 상관된 고객 프로파일을, 상기 중앙 컨트롤러에 의해, 결정하는 단계와,
적어도 상기 난수 및 고객 프로파일에 기초하여 상기 서비스 포인트에서 전기 서비스를 재개해야할 시간을, 상기 중앙 컨트롤러에 의해, 결정하는 단계와,
상기 제어 장치의 제어 하에, 결정된 서비스 포인트 재개 시간에 상기 적어도 하나의 전력 소모 장치에 전력을 공급하는 단계
를 포함하는 유틸리티 서비스 영역 내 서비스 포인트에서의 전기 서비스 재개 방법. - 제 8 항에 있어서, 상기 고객 프로파일은 상기 서비스 포인트에 대한 서비스 우선순위의 표시를 포함하는
유틸리티 서비스 영역 내 서비스 포인트에서의 전기 서비스 재개 방법. - 유틸리티 서비스 영역의 전력 단전 후 유틸리티 서비스 영역 내 서비스 포인트에서 전기 서비스를 재개하기 위한 방법에 있어서, 상기 서비스 포인트에 위치한 적어도 하나의 전력 소모 장치에 대한 전력의 공급은 상기 서비스 포인트에 위치한 제어 장치에 의해 제어되고, 상기 제어 장치는, 상기 서비스 포인트로부터 원격으로 위치하고 전기 유틸리티와 복수의 서비스 포인트 사이에서 인터페이싱되는, 중앙 컨트롤러로부터 제어 메시지를 수신하며, 상기 방법은,
상기 서비스 포인트와 상관된 난수를, 상기 중앙 컨트롤러에 의해, 결정하는 단계와,
상기 서비스 포인트의 특성을, 상기 중앙 컨트롤러에 의해, 결정하는 단계와
적어도 상기 난수 및 상기 특성에 기초하여 상기 서비스 포인트에서 전기 서비스를 재개해야할 시간을 , 상기 중앙 컨트롤러에 의해, 결정하는 단계와,
상기 제어 장치의 제어 하에, 결정된 서비스 포인트 재개 시간에 상기 적어도 하나의 전력 소모 장치에 전력을 공급하는 단계
를 포함하는 유틸리티 서비스 영역 내 서비스 포인트에서의 전기 서비스 재개 방법. - 제 10 항에 있어서, 상기 특성은 상기 서비스 포인트의 지리적 위치를 포함하는
유틸리티 서비스 영역 내 서비스 포인트에서의 전기 서비스 재개 방법. - 전력 단전 후 유틸리티 서비스 영역 내 서비스 포인트에서 제어 장치가 전기 서비스를 재개하기 위한 방법에 있어서, 상기 제어 장치는 상기 서비스 포인트에 설치되고, 상기 서비스 포인트에 위치한 적어도 하나의 전력 소모 장치에 대한 전력의 공급을 제어하며, 상기 방법은,
상기 유틸리티 서비스 영역에서 전기 서비스의 재개를 완료하는 데 요구되는 시간의 양을 추정하는 단계와,
상기 유틸리티 서비스 영역에서 전기 서비스의 재개를 개시하기 위한 시작 시간을 결정하는 단계와,
상기 유틸리티 서비스 영역에서 전기 서비스의 재개를 완료하는 데 요구되는 추정된 시간의 양과, 상기 유틸리티 서비스 영역에서 전기 서비스의 재개를 개시하기 위한 시작 시간에 기초하여, 상기 유틸리티 서비스 영역에서 전기 서비스의 재개를 완료하기 위한 완료 시간을 추정하는 단계와,
0과 추정된 완료 시간 사이의 값을 갖는 난수를 발생시키는 단계와,
상기 유틸리티 서비스 영역에서 전기 서비스의 재개를 개시하기 위한 시작 시간과 상기 난수에 기초하여 상기 서비스 포인트에서 전기 서비스를 재개하기 위한 임의적 시작 시간을 결정하는 단계와,
상기 임의적 시작 시간을 현 시간에 비교하는 단계와,
상기 임의적 시작 시간이 현재 시간보다 이른 경우에, 현재 시간에 상기 서비스 포인트에서 전기 서비스를 재개하는 단계
를 포함하는 제어 장치가 전력 서비스를 재개하기 위한 방법. - 제 12 항에 있어서,
상기 임의적 시작 시간이 현재 시간보다 늦은 경우에 다른 난수를 발생시키는 단계와,
상기 다른 난수 및 상기 시작 시간에 기초하여 상기 서비스 포인트에서 전기 서비스를 재개하기 위한 새로운 임의적 시작 시간을 결정하는 단계와,
상기 새로운 임의적 시작 시간을 현재 시간과 비교하는 단계와,
새로운 임의적 시작 시간이 현재 시간보다 이른 경우에 새로운 임의적 시작 시간에 상기 서비스 포인트에서 전기 서비스를 재개하는 단계
를 더 포함하는 제어 장치가 전력 서비스를 재개하기 위한 방법. - 전력 단전 후 유틸리티 서비스 영역 내 복수의 서비스 포인트에서 전기 서비스를 중앙 컨트롤러가 재개하기 위한 방법에 있어서, 상기 중앙 컨트롤러는 상기 복수의 서비스 포인트로부터 원격으로 위치하고, 상기 복수의 서비스 포인트의 각각의 서비스 포인트는 제어 장치를 포함하며, 각각의 제어 장치는 대응하는 서비스 포인트에 위치한 적어도 하나의 전력 소모 장치에 대한 전력의 공급을 제어하고, 상기 방법은,
상기 복수의 서비스 포인트 중 적어도 하나의 서비스 포인트에 수치를 상관시키는 단계와,
난수를 발생시키는 단계와,
상기 난수를, 상기 적어도 하나의 서비스 포인트와 상관된 수치에 비교하는 단계와,
상기 난수가 상기 적어도 하나의 서비스 포인트와 상관된 수치와 일치하고 상기 적어도 하나의 서비스 포인트가 아직 전기 서비스를 재개하지 않은 경우, 상기 적어도 하나의 서비스 포인트에 설치된 적어도 하나의 제어 장치에 재개 메시지를 전달하는 단계
를 포함하는 전기 서비스를 중앙 컨트롤러가 재개하기 위한 방법. - 제 14 항에 있어서, 상기 적어도 하나의 서비스 포인트는 서비스 포인트의 그룹이고, 전달하는 단계는, 상기 그룹 내 모든 서비스 포인트에 대한 제어 장치에 재개 메시지를 전달하는 단계를 포함하는
전기 서비스를 중앙 컨트롤러가 재개하기 위한 방법. - 전력 단전 후 유틸리티 서비스 영역 내 복수의 서비스 포인트에서 전기 서비스를 재개하기 위한 방법에 있어서, 상기 복수의 서비스 포인트의 각각의 서비스 포인트는 복수의 제어 장치의 하나의 제어 장치를 포함하고, 각각의 제어 장치는 대응하는 서비스 포인트에 위치한 하나 이상의 전력 소모 장치에 대한 전력의 공급을 제어하며, 상기 방법은,
상기 복수의 서비스 포인트로부터 원격으로 위치한 중앙 컨트롤러에 의해, 지정 수치 세트 내에서 수치를 선택하는 단계와,
상기 중앙 컨트롤러에 의해, 선택된 수치를 포함하는 제어 메시지를 복수의 제어 장치에 송신하는 단계와,
상기 복수의 제어 장치의 각각의 제어 장치에 의해, 지정 수치 세트 내에서 각자의 난수를 발생시키는 단계와,
상기 복수의 제어 장치의 각각의 제어 장치에 의해, 선택된 수치를 각자 발생된 난수에 비교하는 단계와,
상기 복수의 제어 장치 중 특정 제어 장치에 의해 발생된 난수가 선택된 수치와 일치할 때, 상기 복수의 제어 장치 중 특정 제어 장치에 의해, 적어도 하나의 전력 소모 장치에 전력을 공급하는 단계
를 포함하는 전기 서비스 재개 방법. - 제 16 항에 있어서,
적어도 하나의 전력 소모 장치에 전력을 공급하는 단계는,
상기 적어도 하나의 전력 소모 장치에 대한 전력의 흐름을 제어하는 적어도 하나의 제어가능한 장치에 적어도 하나의 전력 제어 명령을, 특정 제어 장치에 의해, 전달하는 단계로서, 상기 적어도 하나의 전력 제어 명령은 상기 적어도 하나의 전력 소모 장치로 전력을 흐르게 하도록 상기 적어도 하나의 제어가능한 장치에 지시하는, 단계
를 포함하는 전기 서비스 재개 방법. - 전력 단전 후 유틸리티 서비스 영역 내 서비스 포인트에서 전기 서비스를 제어 장치가 재개하기 위한 방법에 있어서, 상기 제어 장치는 상기 서비스 포인트에 설치되고, 상기 서비스 포인트에 위치한 적어도 하나의 전력 소모 장치에 대한 전력의 공급을 제어하며, 상기 방법은,
지정 수치 세트 내에서 난수를 발생시키는 단계와,
상기 서비스 포인트로부터 원격으로 위치한 중앙 컨트롤러로부터 제어 메시지를 수신하는 단계로서, 상기 제어 메시지는 지정 수치 세트 내의 수치를 포함하는, 단계와,
상기 난수에 상기 제어 메시지의 수치를 비교하는 단계와,
상기 난수가 상기 제어 메시지 내 수치와 일치할 때 상기 적어도 하나의 전력 소모 장치에 전력을 공급하는 단계
를 포함하는 제어 장치에 의한 전기 서비스 재개 방법. - 제 18 항에 있어서,
상기 제어 메시지 내 수치가 상기 난수와 일치하지 않을 경우 새로운 난수를 발생시키는 단계와,
상기 중앙 컨트롤러로부터 새로운 제어 메시지를 수신하는 단계로서, 상기 새로운 제어 메시지는 지정 수치 세트 내의 다른 수치를 포함하는, 단계와,
상기 새로운 제어 메시지 내의 수치를 새로운 난수와 비교하는 단계와,
상기 새로운 난수가 상기 새로운 제어 메시지 내 수치와 일치할 때 상기 적어도 하나의 전력 소모 장치에 전력을 공급하는 단계
를 더 포함하는 제어 장치에 의한 전기 서비스 재개 방법. - 제 18 항에 있어서,
상기 중앙 컨트롤러로부터 새로운 제어 메시지를 수신하는 단계로서, 상기 새로운 제어 메시지는 지정 수치 세트 내의 다른 수치를 포함하는, 단계와,
상기 난수가 앞선 제어 메시지 내의 수치보다 큰 경우, 상기 새로운 제어 메시지 내의 수치를 상기 난수에 비교하는 단계와,
상기 난수가 상기 새로운 제어 메시지 내의 수치와 일치할 때 상기 적어도 하나의 전력 소모 장치에 전력을 공급하는 단계
를 더 포함하는 제어 장치에 의한 전기 서비스 재개 방법. - 전력 단전 후 유틸리티 서비스 영역 내 복수의 서비스 포인트에서 전기 서비스를 중앙 컨트롤러가 재개하기 위한 방법에 있어서, 상기 중앙 컨트롤러는 상기 복수의 서비스 포인트로부터 원격으로 위치하고, 상기 복수의 서비스 포인트의 각각의 서비스 포인트는 제어 장치를 포함하며, 각각의 제어 장치는 대응하는 서비스 포인트에 위치한 적어도 하나의 전력 소모 장치에 대한 전력의 공급을 제어하고, 상기 방법은,
상기 복수의 서비스 포인트와 상관된 각자의 고객 프로파일에 기초하여 상기 복수의 서비스 포인트에 대한 서비스 우선순위를 결정하는 단계와,
상기 서비스 우선순위에 기초하여 상기 복수 서비스 포인트에 대한 전기 서비스를 재개하기 위한 우선순위화된 순서를 결정하는 단계와,
상기 적어도 하나의 제어 장치가 설치되는 적어도 하나의 서비스 포인트에 대한 서비스 우선순위가, 우선순위화된 순서에 따라 전기 서비스가 재개되고 있는 서비스 우선순위와 일치하는 경우에, 적어도 하나의 제어 장치에 재개 명령을 송신하는 단계
를 포함하는 중앙 컨트롤러에 의한 전기 서비스 재개 방법. - 제 21 항에 있어서, 상기 적어도 하나의 서비스 포인트는 서비스 포인트의 그룹이고, 상기 방법은
서비스 포인트의 그룹 내 각각의 서비스 포인트에 대해 난수를 발생시키는 단계와,
상기 서비스 포인트의 그룹의 특정 서비스 포인트에 대한 난수에 기초하여 상기 특정 서비스 포인트에 재개 명령을 송신하는 단계
를 더 는 중앙 컨트롤러에 의한 전기 서비스 재개 방법. - 제 21 항에 있어서, 상기 적어도 하나의 서비스 포인트는 서비스 포인트의 그룹이고, 상기 방법은,
서비스 포인트의 그룹 내 각각의 서비스 포인트에 대해 난수를 발생시키는 단계와,
상기 서비스 포인트의 그룹의 제 1 서비스 포인트에 대한 난수에 기초하여 상기 제 1 서비스 포인트에 제 1 재개 명령을 송신하는 단계와,
상기 서비스 포인트의 그룹의 제 2 서비스 포인트에 대한 난수에 기초하여 상기 제 2 서비스 포인트에 제 2 재개 명령을 송신하는 단계로서, 상기 제 2 재개 명령은 상기 제 1 서비스 포인트를 시동시키고 정상 상태 작동에 도달시키기에 충분한 지정 지연만큼 제 1 재개 명령으로부터 시간 상 분리되는, 단계
를 더 포함하는 중앙 컨트롤러에 의한 전기 서비스 재개 방법. - 전력 단전 후 유틸리티 서비스 영역 내 복수의 서비스 포인트에서 전기 서비스를 중앙 컨트롤러가 재개하기 위한 방법에 있어서, 상기 중앙 컨트롤러는 복수의 서비스 포인트로부터 원격으로 위치하고, 상기 복수의 서비스 포인트의 각각의 서비스 포인트는 제어 장치를 포함하며, 각각의 제어 장치는 대응하는 서비스 포인트에 위치한 적어도 하나의 전력 소모 장치에 대한 전력의 공급을 제어하고, 상기 방법은,
서비스 포인트 특성에 기초하여 상기 복수의 서비스 포인트를 복수의 그룹으로 논리적으로 나누는 단계로서, 특정 그룹 내의 서비스 포인트들은 적어도 하나의 공통 서비스 포인트 특성을 공유하는, 단계와,
상기 서비스 포인트 특성에 기초하여 상기 복수의 서비스 포인트에 대한 전기 서비스를 재개하기 위한 우선순위화된 순서를 결정하는 단계와,
상기 그룹에 대한 적어도 하나의 공통 서비스 포인트 특성 및 상기 우선순위화된 순서에 기초하여 상기 복수의 그룹으로부터 서비스 포인트의 그룹을 선택하는 단계와,
선택된 서비스 포인트의 그룹에 설치된 제어 장치의 그룹에 재개 명령을 송신하는 단계
를 포함하는 중앙 컨트롤러에 의한 전기 서비스 재개 방법. - 제 24 항에 있어서, 서비스 포인트 특성은 지리적 위치 및 전력 소모 중 적어도 하나를 포함하는
중앙 컨트롤러에 의한 전기 서비스 재개 방법. - 유틸리티의 서비스 영역에 위치한 복수의 서비스 포인트에 설치된 복수의 클라이언트 장치를 포함하는 능동 부하 관리 시스템에 사용하기 위한 중앙 컨트롤러에 있어서, 상기 중앙 컨트롤러는
복수의 수치를 상기 복수의 서비스 포인트와 상관시키도록 작동가능한 데이터베이스와,
상기 데이터베이스에 연결되는 이벤트 매니저와,
상기 이벤트 매니저에 연결되는 클라이언트 장치 매니저를 포함하고,
상기 이벤트 매니저는, 전력 단전 발생 후 복수의 서비스 포인트에 대한 전기 서비스가 복권될 수 있는 지 여부를 결정하도록 작동하고, 전기 서비스가 복원될 수 있다는 결정에 따라 난수를 발생시키도록 작동하며, 상기 복수의 수치 각각에 대해 상기 난수를 비교하도록 작동하고, 상기 난수가 상기 복수의 수치 중 한 수치와 일치할 때 재개 메시지를 발생시키도록 작동하며,
상기 클라이언트 매니저는 상기 복수의 서비스 포인트 중 하나 이상의 서비스 포인트에 설치된 적어도 하나의 클라이언트 장치에 재개 메시지를 송신하도록 작동하고, 상기 하나 이상의 서비스 포인트는 상기 난수와 일치한 수치와 상관되는
중앙 컨트롤러. - 제어 장치에 있어서, 상기 제어 장치는 상기 제어 장치로부터 원격으로 위치한 중앙 컨트롤러를 포함하는 능동 부하 관리 시스템에 사용되고, 상기 제어 장치는 상기 유틸리티의 서비스 영역에 위치한 서비스 포인트에 설치되고, 사기 제어 장치는 상기 서비스 포인트에 위치한 하나 이상의 전력 소모 장치에 대한 전력의 흐름을 제어하는 하나 이상의 제어가능한 장치에 전력 제어 명령을 제공하며, 상기 제어 장치는,
중앙 컨트롤러로부터 제어 메이시지를 수신하도록 작동가능한 통신 인터페이스와,
상기 통신 인터페이스에 연결되는 프로세서와,
상기 프로세스에 연결되는 적어도 하나의 제어가능한 장치 인터페이스를 포함하며,
상기 프로세서는, 제어 메시지가 수신되는 시간을 결정하도록 작동가능하고, 상기 제어 메시지는 상기 유틸리티 서비스 영역에 대한 전력의 복원을 위한 추정된 시간 길이를 포함하며,
상기 프로세서는, 제어 메시지가 구신된 시간 더하기 상기 유틸리티 서비스 영역에 대한 전력의 복원을 위한 추정된 시간 길이로 재개 완료 시간을 결정하도록 작동하며,
상기 프로세서는 난수를 시간 단위로 발생시키도록 작동하고,
상기 프로세서는 제어 메시지가 수신된 시간 더하기 난수로 임의적 시작 시간을 결정하도록 작동하며,
상기 프로세서는 상기 임의적 시작 시간을 현재 시간에 비교하도록 작동하고,
상기 임의적 시작 시간이 현재 시간보다 이를 때, 상기 프로세서는 상기 하나 이상의 전력 소모 장치에 대한 전기 서비스의 재개를 개시하기 위한 전력 제어 명령을 발생시키도록 작동가능하며,
상기 적어도 하나의 제어가능한 인터페이스 장치는 상기 적어도 하나의 제어가능한 장치에 대한 전력 제어 명령의 전달을 촉진시켜서, 상기 하나 이상의 전력 소모 장치에 대한 전력 서비스를 재개시키는
제어 장치. - 전력 단전 후 전기 유틸리티의 서비스 영역 내 복수의 서비스 포인트에 대한 전기 서비스를 제어가능하게 재개하도록 작동가능한 능동 부하 관리 시스템에 있어서,
상기 능동 부하 관리 시스템은 중앙 컨트롤러와, 상기 중앙 컨트롤러로부터 원격으로 위치하고 복수의 서비스 포인트에 설치되는 복수의 클라이언트 장치를 포함하고,
상기 중앙 컨트롤러는, 복수의 수치를 복수의 서비스 포인트와 상관시키도록 작동가능한 데이터베이스와, 상기 데이터베이스에 연결되는 이벤트 매니저와, 상기 이벤트 매니저에 연결되는 클라이언트 장치 매니저를 포함하며,
상기 이벤트 매니저는, 단전 발생 후 복수의 서비스 포인트에 대한 전력이 복원될 수 있는 지 여부를 결정하도록 작동가능하고, 전력이 복원될 수 있다는 결정에 따라 난수를 발생시키도록 작동하며, 상기 난수를 복수의 수치 각각에 비교하도록 작동가능하고, 상기 난수가 상기 복수의 수치 중 한 수치와 일치할 때 재개 제어 메시지를 발생시키도록 작동가능하며,
상기 클라이언트 장치 매니저는, 상기 복수의 서비스 포인트 중 하나 이상의 서비스 포인트에 설치된 적어도 하나의 클라이언트 장치에 재개 제어 메시지를 송신하도록 작동가능하고, 상기 하나 이상의 서비스 포인트는 상기 산수와 일치한 수치와 상관되며,
상기 복수의 클라이언트 장치는, 상기 중앙 컨트롤러로부터 제어 메시지를 수신하도록 작동가능한 통신 인터페이스와, 상기 통신 인터페이스에 연결된 프로세서와, 상기 프로세서에 연결된 적어도 하나의 제어가능한 장치 인터페이스를 포함하고,
상기 프로세서는 클라이언트 장치가 설치된 서비스 포인트에 대한 전기 서비스의 재개를 개시하기 위해 재개 제어 메시지의 수신에 따라 전력 제어 명령을 발생시키도록 작동가능하며,
상기 적어도 하나의 제어가능한 장치 인터페이스는 상기 서비스 포인트의 상기 하나 이상의 제어가능한 장치에 전력 제어 명령을 전달시켜서, 상기 서비스 포인트에서 전기 서비스를 재개시키는
능동 부하 관리 시스템.
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US27907209P | 2009-10-15 | 2009-10-15 | |
US61/279,072 | 2009-10-15 | ||
US12/896,307 | 2010-10-01 | ||
US12/896,307 US8527107B2 (en) | 2007-08-28 | 2010-10-01 | Method and apparatus for effecting controlled restart of electrical servcie with a utility service area |
PCT/US2010/002676 WO2011046589A1 (en) | 2009-10-15 | 2010-10-05 | Controlled restart of electrical service within a utility service area |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20120068986A true KR20120068986A (ko) | 2012-06-27 |
KR101345521B1 KR101345521B1 (ko) | 2014-01-15 |
Family
ID=43876410
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020127012538A KR101345521B1 (ko) | 2009-10-15 | 2010-10-05 | 유틸리티 서비스 영역 내의 전기 서비스의 제어형 재개 |
Country Status (8)
Country | Link |
---|---|
US (1) | US8527107B2 (ko) |
EP (2) | EP2488883B1 (ko) |
KR (1) | KR101345521B1 (ko) |
AU (1) | AU2010307299B2 (ko) |
CA (1) | CA2777147C (ko) |
ES (2) | ES2821451T3 (ko) |
MX (1) | MX2012004312A (ko) |
WO (1) | WO2011046589A1 (ko) |
Families Citing this family (207)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7715951B2 (en) | 2007-08-28 | 2010-05-11 | Consert, Inc. | System and method for managing consumption of power supplied by an electric utility |
US9130402B2 (en) | 2007-08-28 | 2015-09-08 | Causam Energy, Inc. | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US8527107B2 (en) | 2007-08-28 | 2013-09-03 | Consert Inc. | Method and apparatus for effecting controlled restart of electrical servcie with a utility service area |
US8145361B2 (en) * | 2007-08-28 | 2012-03-27 | Consert, Inc. | System and method for manipulating controlled energy using devices to manage customer bills |
US10295969B2 (en) | 2007-08-28 | 2019-05-21 | Causam Energy, Inc. | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US8260470B2 (en) * | 2007-08-28 | 2012-09-04 | Consert, Inc. | System and method for selective disconnection of electrical service to end customers |
US8806239B2 (en) | 2007-08-28 | 2014-08-12 | Causam Energy, Inc. | System, method, and apparatus for actively managing consumption of electric power supplied by one or more electric power grid operators |
US8890505B2 (en) | 2007-08-28 | 2014-11-18 | Causam Energy, Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US9177323B2 (en) | 2007-08-28 | 2015-11-03 | Causam Energy, Inc. | Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US8542685B2 (en) * | 2007-08-28 | 2013-09-24 | Consert, Inc. | System and method for priority delivery of load management messages on IP-based networks |
US8700187B2 (en) | 2007-08-28 | 2014-04-15 | Consert Inc. | Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities |
US8996183B2 (en) * | 2007-08-28 | 2015-03-31 | Consert Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US8131403B2 (en) * | 2007-08-28 | 2012-03-06 | Consert, Inc. | System and method for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US8805552B2 (en) | 2007-08-28 | 2014-08-12 | Causam Energy, Inc. | Method and apparatus for actively managing consumption of electric power over an electric power grid |
EP2427806A4 (en) | 2009-05-08 | 2014-07-30 | Consert Inc | SYSTEM AND METHOD FOR ESTIMATING AND DELIVERING OPERATING RESERVE ENERGY CAPABILITY THAT CAN BE AFFECTED BY USING ACTIVE LOAD MANAGEMENT |
US8626344B2 (en) | 2009-08-21 | 2014-01-07 | Allure Energy, Inc. | Energy management system and method |
US9838255B2 (en) | 2009-08-21 | 2017-12-05 | Samsung Electronics Co., Ltd. | Mobile demand response energy management system with proximity control |
US8498749B2 (en) | 2009-08-21 | 2013-07-30 | Allure Energy, Inc. | Method for zone based energy management system with scalable map interface |
US9209652B2 (en) | 2009-08-21 | 2015-12-08 | Allure Energy, Inc. | Mobile device with scalable map interface for zone based energy management |
EP2486707A4 (en) | 2009-10-09 | 2013-08-28 | Consert Inc | APPARATUS AND METHOD FOR CONTROLLING COMMUNICATIONS TO AND FROM PUBLIC SERVICE POINTS |
US8121743B2 (en) * | 2009-11-23 | 2012-02-21 | International Business Machines Corporation | Power restoration management method and system |
US8626348B2 (en) * | 2010-11-18 | 2014-01-07 | Sears Brands, L.L.C. | Methods and systems for community energy management |
BR112013014072A8 (pt) * | 2010-12-07 | 2018-04-17 | Siemens Ag | dispositivo central para um sistema de controle, sistema de controle para controlar um sistema de transmissão de energia, dispositivo de controle intermediário para um sistema de controle e método para controlar um sistema de transmissão. |
JP5665579B2 (ja) * | 2011-02-03 | 2015-02-04 | キヤノン株式会社 | 管理装置、管理方法およびプログラム |
US9293920B2 (en) * | 2011-03-30 | 2016-03-22 | General Electric Company | Systems and methods for synchronizing switching within a power distribution network |
JP5837322B2 (ja) * | 2011-04-18 | 2015-12-24 | 京セラ株式会社 | 制御装置、電力制御システム、及び電力制御方法 |
CA2847360C (en) | 2011-08-30 | 2020-03-24 | Allure Energy, Inc. | Resource manager, system, and method for communicating resource management information for smart energy and media resources |
US8992777B2 (en) * | 2011-11-18 | 2015-03-31 | Fresenius Medical Care Holdings, Inc. | Systems and methods for providing notifications in dialysis systems |
US20130151319A1 (en) * | 2011-12-07 | 2013-06-13 | Yang Pan | Predictable Method for Reducing Power Consumption during Peak Demand |
US20130173076A1 (en) * | 2012-01-02 | 2013-07-04 | Yang Pan | Power Management System and Method Using Power Limiter |
US9502898B2 (en) * | 2012-02-01 | 2016-11-22 | General Electric Company | Systems and methods for managing a power distribution system |
JP6071207B2 (ja) * | 2012-02-13 | 2017-02-01 | 三菱重工業株式会社 | 熱源システム及び熱源システムの復電時における起動台数制御方法 |
WO2013132872A1 (ja) * | 2012-03-08 | 2013-09-12 | パナソニック株式会社 | 周波数制御方法 |
US9113347B2 (en) | 2012-12-05 | 2015-08-18 | At&T Intellectual Property I, Lp | Backhaul link for distributed antenna system |
US10009065B2 (en) | 2012-12-05 | 2018-06-26 | At&T Intellectual Property I, L.P. | Backhaul link for distributed antenna system |
US10354520B2 (en) * | 2012-12-17 | 2019-07-16 | Itron, Inc. | Power line communication over disconnected service lines |
US9716530B2 (en) | 2013-01-07 | 2017-07-25 | Samsung Electronics Co., Ltd. | Home automation using near field communication |
US10063499B2 (en) | 2013-03-07 | 2018-08-28 | Samsung Electronics Co., Ltd. | Non-cloud based communication platform for an environment control system |
US10314077B2 (en) | 2013-05-20 | 2019-06-04 | Qualcomm Incorporated | Gating scheme for wireless communication over unlicensed spectrum |
US9999038B2 (en) | 2013-05-31 | 2018-06-12 | At&T Intellectual Property I, L.P. | Remote distributed antenna system |
US9525524B2 (en) | 2013-05-31 | 2016-12-20 | At&T Intellectual Property I, L.P. | Remote distributed antenna system |
EP3061303A4 (en) * | 2013-10-25 | 2017-06-28 | Telefonaktiebolaget LM Ericsson (publ) | Receiver channel reservation |
US8897697B1 (en) | 2013-11-06 | 2014-11-25 | At&T Intellectual Property I, Lp | Millimeter-wave surface-wave communications |
US9209902B2 (en) | 2013-12-10 | 2015-12-08 | At&T Intellectual Property I, L.P. | Quasi-optical coupler |
CN106464551A (zh) | 2014-01-06 | 2017-02-22 | 魅力能源公司 | 一种使用网络装置和基于遥感的信息来协调环境的系统、装置和设备 |
WO2015103637A1 (en) | 2014-01-06 | 2015-07-09 | Allure Energy, Inc. | System, device, and apparatus for coordinating environments using network devices and remote sensory information |
US9692101B2 (en) | 2014-08-26 | 2017-06-27 | At&T Intellectual Property I, L.P. | Guided wave couplers for coupling electromagnetic waves between a waveguide surface and a surface of a wire |
US9768833B2 (en) | 2014-09-15 | 2017-09-19 | At&T Intellectual Property I, L.P. | Method and apparatus for sensing a condition in a transmission medium of electromagnetic waves |
US10063280B2 (en) | 2014-09-17 | 2018-08-28 | At&T Intellectual Property I, L.P. | Monitoring and mitigating conditions in a communication network |
US9628854B2 (en) | 2014-09-29 | 2017-04-18 | At&T Intellectual Property I, L.P. | Method and apparatus for distributing content in a communication network |
US9615269B2 (en) | 2014-10-02 | 2017-04-04 | At&T Intellectual Property I, L.P. | Method and apparatus that provides fault tolerance in a communication network |
US9685992B2 (en) | 2014-10-03 | 2017-06-20 | At&T Intellectual Property I, L.P. | Circuit panel network and methods thereof |
US9503189B2 (en) | 2014-10-10 | 2016-11-22 | At&T Intellectual Property I, L.P. | Method and apparatus for arranging communication sessions in a communication system |
US9762289B2 (en) | 2014-10-14 | 2017-09-12 | At&T Intellectual Property I, L.P. | Method and apparatus for transmitting or receiving signals in a transportation system |
US9973299B2 (en) | 2014-10-14 | 2018-05-15 | At&T Intellectual Property I, L.P. | Method and apparatus for adjusting a mode of communication in a communication network |
US9780834B2 (en) | 2014-10-21 | 2017-10-03 | At&T Intellectual Property I, L.P. | Method and apparatus for transmitting electromagnetic waves |
US9769020B2 (en) | 2014-10-21 | 2017-09-19 | At&T Intellectual Property I, L.P. | Method and apparatus for responding to events affecting communications in a communication network |
US9577306B2 (en) | 2014-10-21 | 2017-02-21 | At&T Intellectual Property I, L.P. | Guided-wave transmission device and methods for use therewith |
US9520945B2 (en) | 2014-10-21 | 2016-12-13 | At&T Intellectual Property I, L.P. | Apparatus for providing communication services and methods thereof |
US9627768B2 (en) | 2014-10-21 | 2017-04-18 | At&T Intellectual Property I, L.P. | Guided-wave transmission device with non-fundamental mode propagation and methods for use therewith |
US9653770B2 (en) | 2014-10-21 | 2017-05-16 | At&T Intellectual Property I, L.P. | Guided wave coupler, coupling module and methods for use therewith |
US9564947B2 (en) | 2014-10-21 | 2017-02-07 | At&T Intellectual Property I, L.P. | Guided-wave transmission device with diversity and methods for use therewith |
US9312919B1 (en) | 2014-10-21 | 2016-04-12 | At&T Intellectual Property I, Lp | Transmission device with impairment compensation and methods for use therewith |
US9800327B2 (en) | 2014-11-20 | 2017-10-24 | At&T Intellectual Property I, L.P. | Apparatus for controlling operations of a communication device and methods thereof |
US9997819B2 (en) | 2015-06-09 | 2018-06-12 | At&T Intellectual Property I, L.P. | Transmission medium and method for facilitating propagation of electromagnetic waves via a core |
US9742462B2 (en) | 2014-12-04 | 2017-08-22 | At&T Intellectual Property I, L.P. | Transmission medium and communication interfaces and methods for use therewith |
US9461706B1 (en) | 2015-07-31 | 2016-10-04 | At&T Intellectual Property I, Lp | Method and apparatus for exchanging communication signals |
US9544006B2 (en) | 2014-11-20 | 2017-01-10 | At&T Intellectual Property I, L.P. | Transmission device with mode division multiplexing and methods for use therewith |
US10009067B2 (en) | 2014-12-04 | 2018-06-26 | At&T Intellectual Property I, L.P. | Method and apparatus for configuring a communication interface |
US9654173B2 (en) | 2014-11-20 | 2017-05-16 | At&T Intellectual Property I, L.P. | Apparatus for powering a communication device and methods thereof |
US10340573B2 (en) | 2016-10-26 | 2019-07-02 | At&T Intellectual Property I, L.P. | Launcher with cylindrical coupling device and methods for use therewith |
US9954287B2 (en) | 2014-11-20 | 2018-04-24 | At&T Intellectual Property I, L.P. | Apparatus for converting wireless signals and electromagnetic waves and methods thereof |
US10243784B2 (en) | 2014-11-20 | 2019-03-26 | At&T Intellectual Property I, L.P. | System for generating topology information and methods thereof |
US9680670B2 (en) | 2014-11-20 | 2017-06-13 | At&T Intellectual Property I, L.P. | Transmission device with channel equalization and control and methods for use therewith |
US10144036B2 (en) | 2015-01-30 | 2018-12-04 | At&T Intellectual Property I, L.P. | Method and apparatus for mitigating interference affecting a propagation of electromagnetic waves guided by a transmission medium |
US9876570B2 (en) | 2015-02-20 | 2018-01-23 | At&T Intellectual Property I, Lp | Guided-wave transmission device with non-fundamental mode propagation and methods for use therewith |
US9749013B2 (en) | 2015-03-17 | 2017-08-29 | At&T Intellectual Property I, L.P. | Method and apparatus for reducing attenuation of electromagnetic waves guided by a transmission medium |
CA2925977C (en) * | 2015-04-07 | 2019-10-29 | Michael A. Jones | Cold load pickup support through local condition detection |
US9705561B2 (en) | 2015-04-24 | 2017-07-11 | At&T Intellectual Property I, L.P. | Directional coupling device and methods for use therewith |
US10224981B2 (en) | 2015-04-24 | 2019-03-05 | At&T Intellectual Property I, Lp | Passive electrical coupling device and methods for use therewith |
US9948354B2 (en) | 2015-04-28 | 2018-04-17 | At&T Intellectual Property I, L.P. | Magnetic coupling device with reflective plate and methods for use therewith |
US9793954B2 (en) | 2015-04-28 | 2017-10-17 | At&T Intellectual Property I, L.P. | Magnetic coupling device and methods for use therewith |
US9490869B1 (en) | 2015-05-14 | 2016-11-08 | At&T Intellectual Property I, L.P. | Transmission medium having multiple cores and methods for use therewith |
US9871282B2 (en) | 2015-05-14 | 2018-01-16 | At&T Intellectual Property I, L.P. | At least one transmission medium having a dielectric surface that is covered at least in part by a second dielectric |
US9748626B2 (en) | 2015-05-14 | 2017-08-29 | At&T Intellectual Property I, L.P. | Plurality of cables having different cross-sectional shapes which are bundled together to form a transmission medium |
US10679767B2 (en) | 2015-05-15 | 2020-06-09 | At&T Intellectual Property I, L.P. | Transmission medium having a conductive material and methods for use therewith |
US10650940B2 (en) | 2015-05-15 | 2020-05-12 | At&T Intellectual Property I, L.P. | Transmission medium having a conductive material and methods for use therewith |
US9917341B2 (en) | 2015-05-27 | 2018-03-13 | At&T Intellectual Property I, L.P. | Apparatus and method for launching electromagnetic waves and for modifying radial dimensions of the propagating electromagnetic waves |
US9807624B2 (en) * | 2015-06-01 | 2017-10-31 | T-Mobile Usa, Inc. | Self-adjusting wireless in-band backhaul |
US10103801B2 (en) | 2015-06-03 | 2018-10-16 | At&T Intellectual Property I, L.P. | Host node device and methods for use therewith |
US10348391B2 (en) | 2015-06-03 | 2019-07-09 | At&T Intellectual Property I, L.P. | Client node device with frequency conversion and methods for use therewith |
US9912381B2 (en) | 2015-06-03 | 2018-03-06 | At&T Intellectual Property I, Lp | Network termination and methods for use therewith |
US10812174B2 (en) | 2015-06-03 | 2020-10-20 | At&T Intellectual Property I, L.P. | Client node device and methods for use therewith |
US10154493B2 (en) | 2015-06-03 | 2018-12-11 | At&T Intellectual Property I, L.P. | Network termination and methods for use therewith |
US9866309B2 (en) | 2015-06-03 | 2018-01-09 | At&T Intellectual Property I, Lp | Host node device and methods for use therewith |
US9913139B2 (en) | 2015-06-09 | 2018-03-06 | At&T Intellectual Property I, L.P. | Signal fingerprinting for authentication of communicating devices |
US10142086B2 (en) | 2015-06-11 | 2018-11-27 | At&T Intellectual Property I, L.P. | Repeater and methods for use therewith |
US9608692B2 (en) | 2015-06-11 | 2017-03-28 | At&T Intellectual Property I, L.P. | Repeater and methods for use therewith |
US9820146B2 (en) | 2015-06-12 | 2017-11-14 | At&T Intellectual Property I, L.P. | Method and apparatus for authentication and identity management of communicating devices |
US9667317B2 (en) | 2015-06-15 | 2017-05-30 | At&T Intellectual Property I, L.P. | Method and apparatus for providing security using network traffic adjustments |
US9865911B2 (en) | 2015-06-25 | 2018-01-09 | At&T Intellectual Property I, L.P. | Waveguide system for slot radiating first electromagnetic waves that are combined into a non-fundamental wave mode second electromagnetic wave on a transmission medium |
US9509415B1 (en) | 2015-06-25 | 2016-11-29 | At&T Intellectual Property I, L.P. | Methods and apparatus for inducing a fundamental wave mode on a transmission medium |
US9640850B2 (en) | 2015-06-25 | 2017-05-02 | At&T Intellectual Property I, L.P. | Methods and apparatus for inducing a non-fundamental wave mode on a transmission medium |
US10044409B2 (en) | 2015-07-14 | 2018-08-07 | At&T Intellectual Property I, L.P. | Transmission medium and methods for use therewith |
US9722318B2 (en) | 2015-07-14 | 2017-08-01 | At&T Intellectual Property I, L.P. | Method and apparatus for coupling an antenna to a device |
US10320586B2 (en) | 2015-07-14 | 2019-06-11 | At&T Intellectual Property I, L.P. | Apparatus and methods for generating non-interfering electromagnetic waves on an insulated transmission medium |
US9882257B2 (en) | 2015-07-14 | 2018-01-30 | At&T Intellectual Property I, L.P. | Method and apparatus for launching a wave mode that mitigates interference |
US9853342B2 (en) | 2015-07-14 | 2017-12-26 | At&T Intellectual Property I, L.P. | Dielectric transmission medium connector and methods for use therewith |
US10341142B2 (en) | 2015-07-14 | 2019-07-02 | At&T Intellectual Property I, L.P. | Apparatus and methods for generating non-interfering electromagnetic waves on an uninsulated conductor |
US10033107B2 (en) | 2015-07-14 | 2018-07-24 | At&T Intellectual Property I, L.P. | Method and apparatus for coupling an antenna to a device |
US9628116B2 (en) | 2015-07-14 | 2017-04-18 | At&T Intellectual Property I, L.P. | Apparatus and methods for transmitting wireless signals |
US10205655B2 (en) | 2015-07-14 | 2019-02-12 | At&T Intellectual Property I, L.P. | Apparatus and methods for communicating utilizing an antenna array and multiple communication paths |
US10170840B2 (en) | 2015-07-14 | 2019-01-01 | At&T Intellectual Property I, L.P. | Apparatus and methods for sending or receiving electromagnetic signals |
US9836957B2 (en) | 2015-07-14 | 2017-12-05 | At&T Intellectual Property I, L.P. | Method and apparatus for communicating with premises equipment |
US9847566B2 (en) | 2015-07-14 | 2017-12-19 | At&T Intellectual Property I, L.P. | Method and apparatus for adjusting a field of a signal to mitigate interference |
US10148016B2 (en) | 2015-07-14 | 2018-12-04 | At&T Intellectual Property I, L.P. | Apparatus and methods for communicating utilizing an antenna array |
US10090606B2 (en) | 2015-07-15 | 2018-10-02 | At&T Intellectual Property I, L.P. | Antenna system with dielectric array and methods for use therewith |
US9608740B2 (en) | 2015-07-15 | 2017-03-28 | At&T Intellectual Property I, L.P. | Method and apparatus for launching a wave mode that mitigates interference |
US9793951B2 (en) | 2015-07-15 | 2017-10-17 | At&T Intellectual Property I, L.P. | Method and apparatus for launching a wave mode that mitigates interference |
US9749053B2 (en) | 2015-07-23 | 2017-08-29 | At&T Intellectual Property I, L.P. | Node device, repeater and methods for use therewith |
US9871283B2 (en) | 2015-07-23 | 2018-01-16 | At&T Intellectual Property I, Lp | Transmission medium having a dielectric core comprised of plural members connected by a ball and socket configuration |
US10784670B2 (en) | 2015-07-23 | 2020-09-22 | At&T Intellectual Property I, L.P. | Antenna support for aligning an antenna |
US9912027B2 (en) | 2015-07-23 | 2018-03-06 | At&T Intellectual Property I, L.P. | Method and apparatus for exchanging communication signals |
US9948333B2 (en) | 2015-07-23 | 2018-04-17 | At&T Intellectual Property I, L.P. | Method and apparatus for wireless communications to mitigate interference |
US10020587B2 (en) | 2015-07-31 | 2018-07-10 | At&T Intellectual Property I, L.P. | Radial antenna and methods for use therewith |
US9967173B2 (en) | 2015-07-31 | 2018-05-08 | At&T Intellectual Property I, L.P. | Method and apparatus for authentication and identity management of communicating devices |
US9735833B2 (en) | 2015-07-31 | 2017-08-15 | At&T Intellectual Property I, L.P. | Method and apparatus for communications management in a neighborhood network |
US9904535B2 (en) | 2015-09-14 | 2018-02-27 | At&T Intellectual Property I, L.P. | Method and apparatus for distributing software |
US10079661B2 (en) | 2015-09-16 | 2018-09-18 | At&T Intellectual Property I, L.P. | Method and apparatus for use with a radio distributed antenna system having a clock reference |
US10009063B2 (en) | 2015-09-16 | 2018-06-26 | At&T Intellectual Property I, L.P. | Method and apparatus for use with a radio distributed antenna system having an out-of-band reference signal |
US10009901B2 (en) | 2015-09-16 | 2018-06-26 | At&T Intellectual Property I, L.P. | Method, apparatus, and computer-readable storage medium for managing utilization of wireless resources between base stations |
US10136434B2 (en) | 2015-09-16 | 2018-11-20 | At&T Intellectual Property I, L.P. | Method and apparatus for use with a radio distributed antenna system having an ultra-wideband control channel |
US9705571B2 (en) | 2015-09-16 | 2017-07-11 | At&T Intellectual Property I, L.P. | Method and apparatus for use with a radio distributed antenna system |
US10051629B2 (en) | 2015-09-16 | 2018-08-14 | At&T Intellectual Property I, L.P. | Method and apparatus for use with a radio distributed antenna system having an in-band reference signal |
US9769128B2 (en) | 2015-09-28 | 2017-09-19 | At&T Intellectual Property I, L.P. | Method and apparatus for encryption of communications over a network |
US9729197B2 (en) | 2015-10-01 | 2017-08-08 | At&T Intellectual Property I, L.P. | Method and apparatus for communicating network management traffic over a network |
US9876264B2 (en) | 2015-10-02 | 2018-01-23 | At&T Intellectual Property I, Lp | Communication system, guided wave switch and methods for use therewith |
US10074890B2 (en) | 2015-10-02 | 2018-09-11 | At&T Intellectual Property I, L.P. | Communication device and antenna with integrated light assembly |
US9882277B2 (en) | 2015-10-02 | 2018-01-30 | At&T Intellectual Property I, Lp | Communication device and antenna assembly with actuated gimbal mount |
US10665942B2 (en) | 2015-10-16 | 2020-05-26 | At&T Intellectual Property I, L.P. | Method and apparatus for adjusting wireless communications |
US10051483B2 (en) | 2015-10-16 | 2018-08-14 | At&T Intellectual Property I, L.P. | Method and apparatus for directing wireless signals |
US10355367B2 (en) | 2015-10-16 | 2019-07-16 | At&T Intellectual Property I, L.P. | Antenna structure for exchanging wireless signals |
US9912419B1 (en) | 2016-08-24 | 2018-03-06 | At&T Intellectual Property I, L.P. | Method and apparatus for managing a fault in a distributed antenna system |
US9860075B1 (en) | 2016-08-26 | 2018-01-02 | At&T Intellectual Property I, L.P. | Method and communication node for broadband distribution |
US10291311B2 (en) | 2016-09-09 | 2019-05-14 | At&T Intellectual Property I, L.P. | Method and apparatus for mitigating a fault in a distributed antenna system |
US11032819B2 (en) | 2016-09-15 | 2021-06-08 | At&T Intellectual Property I, L.P. | Method and apparatus for use with a radio distributed antenna system having a control channel reference signal |
US10135147B2 (en) | 2016-10-18 | 2018-11-20 | At&T Intellectual Property I, L.P. | Apparatus and methods for launching guided waves via an antenna |
US10135146B2 (en) | 2016-10-18 | 2018-11-20 | At&T Intellectual Property I, L.P. | Apparatus and methods for launching guided waves via circuits |
US10340600B2 (en) | 2016-10-18 | 2019-07-02 | At&T Intellectual Property I, L.P. | Apparatus and methods for launching guided waves via plural waveguide systems |
US10811767B2 (en) | 2016-10-21 | 2020-10-20 | At&T Intellectual Property I, L.P. | System and dielectric antenna with convex dielectric radome |
US9876605B1 (en) | 2016-10-21 | 2018-01-23 | At&T Intellectual Property I, L.P. | Launcher and coupling system to support desired guided wave mode |
US9991580B2 (en) | 2016-10-21 | 2018-06-05 | At&T Intellectual Property I, L.P. | Launcher and coupling system for guided wave mode cancellation |
US10374316B2 (en) | 2016-10-21 | 2019-08-06 | At&T Intellectual Property I, L.P. | System and dielectric antenna with non-uniform dielectric |
US10312567B2 (en) | 2016-10-26 | 2019-06-04 | At&T Intellectual Property I, L.P. | Launcher with planar strip antenna and methods for use therewith |
US10498044B2 (en) | 2016-11-03 | 2019-12-03 | At&T Intellectual Property I, L.P. | Apparatus for configuring a surface of an antenna |
US10224634B2 (en) | 2016-11-03 | 2019-03-05 | At&T Intellectual Property I, L.P. | Methods and apparatus for adjusting an operational characteristic of an antenna |
US10225025B2 (en) | 2016-11-03 | 2019-03-05 | At&T Intellectual Property I, L.P. | Method and apparatus for detecting a fault in a communication system |
US10291334B2 (en) | 2016-11-03 | 2019-05-14 | At&T Intellectual Property I, L.P. | System for detecting a fault in a communication system |
US10178445B2 (en) | 2016-11-23 | 2019-01-08 | At&T Intellectual Property I, L.P. | Methods, devices, and systems for load balancing between a plurality of waveguides |
US10090594B2 (en) | 2016-11-23 | 2018-10-02 | At&T Intellectual Property I, L.P. | Antenna system having structural configurations for assembly |
US10340603B2 (en) | 2016-11-23 | 2019-07-02 | At&T Intellectual Property I, L.P. | Antenna system having shielded structural configurations for assembly |
US10340601B2 (en) | 2016-11-23 | 2019-07-02 | At&T Intellectual Property I, L.P. | Multi-antenna system and methods for use therewith |
US10535928B2 (en) | 2016-11-23 | 2020-01-14 | At&T Intellectual Property I, L.P. | Antenna system and methods for use therewith |
US10305190B2 (en) | 2016-12-01 | 2019-05-28 | At&T Intellectual Property I, L.P. | Reflecting dielectric antenna system and methods for use therewith |
US10361489B2 (en) | 2016-12-01 | 2019-07-23 | At&T Intellectual Property I, L.P. | Dielectric dish antenna system and methods for use therewith |
US10135145B2 (en) | 2016-12-06 | 2018-11-20 | At&T Intellectual Property I, L.P. | Apparatus and methods for generating an electromagnetic wave along a transmission medium |
US10382976B2 (en) | 2016-12-06 | 2019-08-13 | At&T Intellectual Property I, L.P. | Method and apparatus for managing wireless communications based on communication paths and network device positions |
US10637149B2 (en) | 2016-12-06 | 2020-04-28 | At&T Intellectual Property I, L.P. | Injection molded dielectric antenna and methods for use therewith |
US10727599B2 (en) | 2016-12-06 | 2020-07-28 | At&T Intellectual Property I, L.P. | Launcher with slot antenna and methods for use therewith |
US10326494B2 (en) | 2016-12-06 | 2019-06-18 | At&T Intellectual Property I, L.P. | Apparatus for measurement de-embedding and methods for use therewith |
US9927517B1 (en) | 2016-12-06 | 2018-03-27 | At&T Intellectual Property I, L.P. | Apparatus and methods for sensing rainfall |
US10755542B2 (en) | 2016-12-06 | 2020-08-25 | At&T Intellectual Property I, L.P. | Method and apparatus for surveillance via guided wave communication |
US10439675B2 (en) | 2016-12-06 | 2019-10-08 | At&T Intellectual Property I, L.P. | Method and apparatus for repeating guided wave communication signals |
US10694379B2 (en) | 2016-12-06 | 2020-06-23 | At&T Intellectual Property I, L.P. | Waveguide system with device-based authentication and methods for use therewith |
US10020844B2 (en) | 2016-12-06 | 2018-07-10 | T&T Intellectual Property I, L.P. | Method and apparatus for broadcast communication via guided waves |
US10819035B2 (en) | 2016-12-06 | 2020-10-27 | At&T Intellectual Property I, L.P. | Launcher with helical antenna and methods for use therewith |
US10359749B2 (en) | 2016-12-07 | 2019-07-23 | At&T Intellectual Property I, L.P. | Method and apparatus for utilities management via guided wave communication |
US10027397B2 (en) | 2016-12-07 | 2018-07-17 | At&T Intellectual Property I, L.P. | Distributed antenna system and methods for use therewith |
US10446936B2 (en) | 2016-12-07 | 2019-10-15 | At&T Intellectual Property I, L.P. | Multi-feed dielectric antenna system and methods for use therewith |
US10139820B2 (en) | 2016-12-07 | 2018-11-27 | At&T Intellectual Property I, L.P. | Method and apparatus for deploying equipment of a communication system |
US10547348B2 (en) | 2016-12-07 | 2020-01-28 | At&T Intellectual Property I, L.P. | Method and apparatus for switching transmission mediums in a communication system |
US10168695B2 (en) | 2016-12-07 | 2019-01-01 | At&T Intellectual Property I, L.P. | Method and apparatus for controlling an unmanned aircraft |
US9893795B1 (en) | 2016-12-07 | 2018-02-13 | At&T Intellectual Property I, Lp | Method and repeater for broadband distribution |
US10243270B2 (en) | 2016-12-07 | 2019-03-26 | At&T Intellectual Property I, L.P. | Beam adaptive multi-feed dielectric antenna system and methods for use therewith |
US10389029B2 (en) | 2016-12-07 | 2019-08-20 | At&T Intellectual Property I, L.P. | Multi-feed dielectric antenna system with core selection and methods for use therewith |
US10069535B2 (en) | 2016-12-08 | 2018-09-04 | At&T Intellectual Property I, L.P. | Apparatus and methods for launching electromagnetic waves having a certain electric field structure |
US10411356B2 (en) | 2016-12-08 | 2019-09-10 | At&T Intellectual Property I, L.P. | Apparatus and methods for selectively targeting communication devices with an antenna array |
US10530505B2 (en) | 2016-12-08 | 2020-01-07 | At&T Intellectual Property I, L.P. | Apparatus and methods for launching electromagnetic waves along a transmission medium |
US10916969B2 (en) | 2016-12-08 | 2021-02-09 | At&T Intellectual Property I, L.P. | Method and apparatus for providing power using an inductive coupling |
US9911020B1 (en) | 2016-12-08 | 2018-03-06 | At&T Intellectual Property I, L.P. | Method and apparatus for tracking via a radio frequency identification device |
US10938108B2 (en) | 2016-12-08 | 2021-03-02 | At&T Intellectual Property I, L.P. | Frequency selective multi-feed dielectric antenna system and methods for use therewith |
US10777873B2 (en) | 2016-12-08 | 2020-09-15 | At&T Intellectual Property I, L.P. | Method and apparatus for mounting network devices |
US9998870B1 (en) | 2016-12-08 | 2018-06-12 | At&T Intellectual Property I, L.P. | Method and apparatus for proximity sensing |
US10326689B2 (en) | 2016-12-08 | 2019-06-18 | At&T Intellectual Property I, L.P. | Method and system for providing alternative communication paths |
US10103422B2 (en) | 2016-12-08 | 2018-10-16 | At&T Intellectual Property I, L.P. | Method and apparatus for mounting network devices |
US10389037B2 (en) | 2016-12-08 | 2019-08-20 | At&T Intellectual Property I, L.P. | Apparatus and methods for selecting sections of an antenna array and use therewith |
US10601494B2 (en) | 2016-12-08 | 2020-03-24 | At&T Intellectual Property I, L.P. | Dual-band communication device and method for use therewith |
US10340983B2 (en) | 2016-12-09 | 2019-07-02 | At&T Intellectual Property I, L.P. | Method and apparatus for surveying remote sites via guided wave communications |
US9838896B1 (en) | 2016-12-09 | 2017-12-05 | At&T Intellectual Property I, L.P. | Method and apparatus for assessing network coverage |
US10264586B2 (en) | 2016-12-09 | 2019-04-16 | At&T Mobility Ii Llc | Cloud-based packet controller and methods for use therewith |
US9973940B1 (en) | 2017-02-27 | 2018-05-15 | At&T Intellectual Property I, L.P. | Apparatus and methods for dynamic impedance matching of a guided wave launcher |
US10439433B2 (en) * | 2017-03-01 | 2019-10-08 | University Of Central Florida Research Foundation, Inc. | Adaptive power grid restoration |
KR20180101004A (ko) * | 2017-03-03 | 2018-09-12 | 현대자동차주식회사 | 차량 및 차량의 제어방법 |
US10298293B2 (en) | 2017-03-13 | 2019-05-21 | At&T Intellectual Property I, L.P. | Apparatus of communication utilizing wireless network devices |
CN108564257B (zh) * | 2018-03-23 | 2021-06-18 | 浙江工业大学 | 一种基于gis的城市共享单车回收方法 |
US11495993B1 (en) * | 2021-05-11 | 2022-11-08 | Kitu Systems, Inc. | System and method for facilitating autonomous operation of a smart energy device |
WO2023136938A1 (en) * | 2022-01-14 | 2023-07-20 | Ademco Inc. | Method for reducing inrush current |
Family Cites Families (264)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US663823A (en) * | 1900-07-02 | 1900-12-11 | Wesley Webber | Means for connecting vending-machines to meters. |
US3906242A (en) | 1974-08-16 | 1975-09-16 | Megatherm Corp | Computerized peak-shaving system for alleviating electric utility peak loads |
US4023043A (en) | 1974-08-16 | 1977-05-10 | Megatherm Corporation | Computerized peak-shaving system for alleviating electric utility peak loads |
US4077061A (en) * | 1977-03-25 | 1978-02-28 | Westinghouse Electric Corporation | Digital processing and calculating AC electric energy metering system |
US4589075A (en) | 1983-02-23 | 1986-05-13 | Buennagel James A | Remote load data acquisition and control system for a power network |
GB8606217D0 (en) * | 1986-03-13 | 1986-04-16 | Univ Strathclyde | Local area network priority control system |
US4799059A (en) | 1986-03-14 | 1989-01-17 | Enscan, Inc. | Automatic/remote RF instrument monitoring system |
US4819180A (en) | 1987-02-13 | 1989-04-04 | Dencor Energy Cost Controls, Inc. | Variable-limit demand controller for metering electrical energy |
US4868412A (en) * | 1988-10-28 | 1989-09-19 | Sundstrand Corporation | Distributed control system |
AU3150493A (en) | 1989-09-07 | 1994-06-22 | Lexington Power Management Corporation | Subscriber electric power load control system |
EP0430671A2 (en) * | 1989-12-01 | 1991-06-05 | International Business Machines Corporation | Power sequencing |
US5553094A (en) | 1990-02-15 | 1996-09-03 | Iris Systems, Inc. | Radio communication network for remote data generating stations |
US5237507A (en) | 1990-12-21 | 1993-08-17 | Chasek Norman E | System for developing real time economic incentives to encourage efficient use of the resources of a regulated electric utility |
US5544036A (en) | 1992-03-25 | 1996-08-06 | Brown, Jr.; Robert J. | Energy management and home automation system |
US5388101A (en) | 1992-10-26 | 1995-02-07 | Eon Corporation | Interactive nationwide data service communication system for stationary and mobile battery operated subscriber units |
US5361982A (en) | 1993-07-12 | 1994-11-08 | Johnson Service Company | Temperature control system having central control for thermostats |
US5542035A (en) | 1993-10-27 | 1996-07-30 | Elonex Technologies | Timer-controlled computer system shutdown and startup |
US5570002A (en) | 1994-02-18 | 1996-10-29 | Ergo Mechanical Systems, Incorporated | Universal power-supply connection system for multiple electronic devices |
US5675503A (en) | 1994-04-19 | 1997-10-07 | Denver Energy Cost Controls, Inc. | Adaptive load cycler for controlled reduction of energy use |
US5495239A (en) | 1994-08-02 | 1996-02-27 | General Electric Company | Method and apparatus for communicating with a plurality of electrical metering devices and a system control center with a mobile node |
US5644173A (en) | 1994-10-25 | 1997-07-01 | Elliason; Kurt L. | Real time and/shed load based on received tier pricing and direct load control with processors for each load |
US5640153A (en) | 1994-12-02 | 1997-06-17 | Excel Energy Technologies, Ltd. | Energy utilization controller and control system and method |
US6961641B1 (en) | 1994-12-30 | 2005-11-01 | Power Measurement Ltd. | Intra-device communications architecture for managing electrical power distribution and consumption |
US7188003B2 (en) | 1994-12-30 | 2007-03-06 | Power Measurement Ltd. | System and method for securing energy management systems |
US5572438A (en) | 1995-01-05 | 1996-11-05 | Teco Energy Management Services | Engery management and building automation system |
US5682422A (en) | 1995-08-25 | 1997-10-28 | International Teldata Corporation | Apparatus and method for on-demand activation of telephone line telemetry devices |
US6115676A (en) | 1996-04-09 | 2000-09-05 | General Electric Company | Methods and apparatus for performing load profile and load control |
NO302206B1 (no) | 1996-06-05 | 1998-02-02 | Kjell Oevreboe | Temperatur- og tidsstyring av elektrisk drevne varmeinnretninger |
US5748104A (en) | 1996-07-11 | 1998-05-05 | Qualcomm Incorporated | Wireless remote telemetry system |
JP3402953B2 (ja) | 1996-09-13 | 2003-05-06 | 株式会社東芝 | 通信方法、通信システムおよび通信装置 |
US6078785A (en) * | 1996-10-15 | 2000-06-20 | Bush; E. William | Demand reporting of electricity consumption by radio in relays to a base station, and demand relays wattmeters so reporting over a wide area |
US6374101B1 (en) | 1997-01-24 | 2002-04-16 | Keyspan Technologies, Inc. | Pager-based controller |
US7216043B2 (en) | 1997-02-12 | 2007-05-08 | Power Measurement Ltd. | Push communications architecture for intelligent electronic devices |
US6233327B1 (en) | 1997-02-14 | 2001-05-15 | Statsignal Systems, Inc. | Multi-function general purpose transceiver |
US6047274A (en) | 1997-02-24 | 2000-04-04 | Geophonic Networks, Inc. | Bidding for energy supply |
JPH114244A (ja) | 1997-04-15 | 1999-01-06 | Yazaki Corp | ネットワークの異常監視方法、及び異常監視システム |
US5926776A (en) | 1997-06-04 | 1999-07-20 | Gas Research Institute | Smart thermostat having a transceiver interface |
US5924486A (en) | 1997-10-29 | 1999-07-20 | Tecom, Inc. | Environmental condition control and energy management system and method |
US6185483B1 (en) | 1998-01-27 | 2001-02-06 | Johnson Controls, Inc. | Real-time pricing controller of an energy storage medium |
JP3591300B2 (ja) | 1998-04-24 | 2004-11-17 | 株式会社日立製作所 | 電力供給制御装置 |
US6778099B1 (en) | 1998-05-01 | 2004-08-17 | Elster Electricity, Llc | Wireless area network communications module for utility meters |
US6122603A (en) | 1998-05-29 | 2000-09-19 | Powerweb, Inc. | Multi-utility energy control system with dashboard |
US6914533B2 (en) | 1998-06-22 | 2005-07-05 | Statsignal Ipc Llc | System and method for accessing residential monitoring devices |
US6914893B2 (en) | 1998-06-22 | 2005-07-05 | Statsignal Ipc, Llc | System and method for monitoring and controlling remote devices |
US6437692B1 (en) | 1998-06-22 | 2002-08-20 | Statsignal Systems, Inc. | System and method for monitoring and controlling remote devices |
US6891838B1 (en) | 1998-06-22 | 2005-05-10 | Statsignal Ipc, Llc | System and method for monitoring and controlling residential devices |
JP2000078748A (ja) | 1998-09-02 | 2000-03-14 | Mitsubishi Electric Corp | 電力dsmシステム |
US6304552B1 (en) | 1998-09-11 | 2001-10-16 | Nortel Networks Limited | Memory and apparatus for input based control of discards in a lossy packet network |
US6178362B1 (en) * | 1998-09-24 | 2001-01-23 | Silicon Energy Corp. | Energy management system and method |
US7103511B2 (en) | 1998-10-14 | 2006-09-05 | Statsignal Ipc, Llc | Wireless communication networks for providing remote monitoring of devices |
US20040095237A1 (en) | 1999-01-09 | 2004-05-20 | Chen Kimball C. | Electronic message delivery system utilizable in the monitoring and control of remote equipment and method of same |
US7263073B2 (en) | 1999-03-18 | 2007-08-28 | Statsignal Ipc, Llc | Systems and methods for enabling a mobile user to notify an automated monitoring system of an emergency situation |
US7650425B2 (en) | 1999-03-18 | 2010-01-19 | Sipco, Llc | System and method for controlling communication between a host computer and communication devices associated with remote devices in an automated monitoring system |
JP3985390B2 (ja) | 1999-06-17 | 2007-10-03 | 日産自動車株式会社 | 電力マネジメントシステム |
US6785592B1 (en) * | 1999-07-16 | 2004-08-31 | Perot Systems Corporation | System and method for energy management |
US6254009B1 (en) | 1999-12-08 | 2001-07-03 | Carrier Corporation | Communicating thermostat |
US6388854B1 (en) * | 1999-12-09 | 2002-05-14 | International Business Machines Corporation | Load balancing and distributing switch-on control for a circuit breaker, an appliance, a device, or an apparatus |
US20010030468A1 (en) | 1999-12-16 | 2001-10-18 | Anderson George A. | Method and apparatus utilized for priority sequencing |
US6535797B1 (en) | 2000-02-01 | 2003-03-18 | Spectrum Engineering Corporation | Electrical distribution system and method of monitoring and/or controlling same |
US20020138176A1 (en) | 2000-02-01 | 2002-09-26 | Patrick Davis | Automated aggregation and management of distributed electric load reduction |
US6763250B1 (en) | 2000-02-23 | 2004-07-13 | Joseph W. Forbes, Jr. | Rapidly-deployable fixed wireless communication system and method of switching during operation of same |
JP2001306839A (ja) | 2000-04-17 | 2001-11-02 | Sanyo Electric Co Ltd | 二酸化炭素排出権の取引方法及び取引システム |
US6519509B1 (en) | 2000-06-22 | 2003-02-11 | Stonewater Software, Inc. | System and method for monitoring and controlling energy distribution |
US6633823B2 (en) | 2000-07-13 | 2003-10-14 | Nxegen, Inc. | System and method for monitoring and controlling energy usage |
WO2002008866A2 (en) | 2000-07-21 | 2002-01-31 | Itron, Inc. | Spread spectrum meter reading system utilizing low-speed/high-power frequency hopping |
AU2001284691B2 (en) | 2000-08-01 | 2005-09-22 | Itron, Inc. | Frequency hopping spread spectrum system with high sensitivity tracking and synchronization for frequency unstable signals |
US20020019802A1 (en) | 2000-08-07 | 2002-02-14 | Ross Malme | System and methods for aggregation and liquidation of curtailment energy resources |
WO2002013412A1 (en) | 2000-08-09 | 2002-02-14 | Statsignal Systems, Inc. | Systems and methods for providing remote monitoring of electricity consumption for an electric meter |
JP2002092098A (ja) | 2000-09-20 | 2002-03-29 | Hitachi Ltd | 省エネルギー設備費用の回収方法及び回収システム |
US6868293B1 (en) | 2000-09-28 | 2005-03-15 | Itron, Inc. | System and method for energy usage curtailment |
US6577962B1 (en) | 2000-09-28 | 2003-06-10 | Silicon Energy, Inc. | System and method for forecasting energy usage load |
JP2002133568A (ja) | 2000-10-20 | 2002-05-10 | Yokogawa Electric Corp | エネルギー・モニタ及び省エネルギー・システム |
US6601033B1 (en) | 2000-10-24 | 2003-07-29 | Richard F. Sowinski | Pollution credit method using electronic networks |
WO2002037433A2 (en) | 2000-11-01 | 2002-05-10 | International Carbon Bank And Exchange | Method and system for banking and exchanging emission reduction credits |
US6906617B1 (en) | 2000-11-17 | 2005-06-14 | Koninklijke Philips Electronics N.V. | Intelligent appliance home network |
JP3779151B2 (ja) | 2000-12-08 | 2006-05-24 | 株式会社日立製作所 | インセンティブ電力負荷制御方法およびシステム |
US6784807B2 (en) | 2001-02-09 | 2004-08-31 | Statsignal Systems, Inc. | System and method for accurate reading of rotating disk |
JP3884917B2 (ja) | 2001-03-15 | 2007-02-21 | 株式会社東芝 | 電力融通システム |
US6621179B1 (en) | 2001-04-05 | 2003-09-16 | John E. Howard | Device for curtailing electric demand |
US7366164B1 (en) | 2001-04-19 | 2008-04-29 | Cisco Technology, Inc. | Method for regulating power for voice over Internet Protocol telephones |
US6628113B2 (en) | 2001-05-09 | 2003-09-30 | Fluke Corporation | Surge current measurement |
US6778882B2 (en) | 2001-05-10 | 2004-08-17 | Siemens Westinghouse Power Corporation | Business management system and method for a deregulated electric power market with sharing of supply chain data |
US6732019B2 (en) | 2001-05-10 | 2004-05-04 | Siemens Westinghouse Power Corporation | Business management system and method for a deregulated electric power market using online diagnostic services |
US6865450B2 (en) | 2001-05-10 | 2005-03-08 | Siemens Westinghouse Power Corporation | Schedule-based load estimator and method for electric power and other utilities and resources |
US7051332B2 (en) * | 2001-05-21 | 2006-05-23 | Cyberscan Technology, Inc. | Controller having a restart engine configured to initiate a controller restart cycle upon receipt of a timeout signal from a watchdog timer |
JP2002368449A (ja) | 2001-06-04 | 2002-12-20 | Matsushita Electric Ind Co Ltd | 磁気記録再生装置 |
US6622097B2 (en) | 2001-06-28 | 2003-09-16 | Robert R. Hunter | Method and apparatus for reading and controlling electric power consumption |
US7039532B2 (en) | 2001-06-28 | 2006-05-02 | Hunter Robert R | Method and apparatus for reading and controlling utility consumption |
US6879059B2 (en) | 2001-07-05 | 2005-04-12 | Sleva Associates, Inc. | Interruptible power supply module |
US20030009705A1 (en) | 2001-07-09 | 2003-01-09 | Michael Thelander | Monitoring and synchronization of power use of computers in a network |
US7324876B2 (en) | 2001-07-10 | 2008-01-29 | Yingco Electronic Inc. | System for remotely controlling energy distribution at local sites |
US6832135B2 (en) | 2001-07-10 | 2004-12-14 | Yingco Electronic Inc. | System for remotely controlling energy distribution at local sites |
WO2003007120A2 (en) | 2001-07-11 | 2003-01-23 | Mazzarella Joseph R | A system and method for creating and operating an enhanced distributed energy network or virtual power plant |
US6990593B2 (en) | 2001-07-31 | 2006-01-24 | Hewlett-Packard Development Company, L.P. | Method for diverting power reserves and shifting activities according to activity priorities in a server cluster in the event of a power interruption |
US7346463B2 (en) | 2001-08-09 | 2008-03-18 | Hunt Technologies, Llc | System for controlling electrically-powered devices in an electrical network |
US20030036810A1 (en) | 2001-08-15 | 2003-02-20 | Petite Thomas D. | System and method for controlling generation over an integrated wireless network |
US6671586B2 (en) * | 2001-08-15 | 2003-12-30 | Statsignal Systems, Inc. | System and method for controlling power demand over an integrated wireless network |
US20030036820A1 (en) | 2001-08-16 | 2003-02-20 | International Business Machines Corporation | Method for optimizing energy consumption and cost |
US7188260B1 (en) | 2001-08-29 | 2007-03-06 | Cisco Technology, Inc. | Apparatus and method for centralized power management |
JP2003067457A (ja) | 2001-08-29 | 2003-03-07 | Kazunobu Ogiso | 電力販売システム及びその処理プログラム |
US20030083980A1 (en) | 2001-08-31 | 2003-05-01 | Tsukasa Satake | Greenhouse effect gas emission index monitoring and converting system |
US6745106B2 (en) | 2001-09-04 | 2004-06-01 | Emware, Inc. | Tone generating electronic device with paging module for verification of energy curtailment |
EP1436750A1 (en) | 2001-09-13 | 2004-07-14 | Abb Ab | Method and system to calculate a demand for energy |
US20030063723A1 (en) | 2001-09-28 | 2003-04-03 | Derek Booth | Interactive system for managing and remotely connecting customer utility loads |
US6622925B2 (en) | 2001-10-05 | 2003-09-23 | Enernet Corporation | Apparatus and method for wireless control |
JP2003122956A (ja) | 2001-10-12 | 2003-04-25 | Hitachi Ltd | 電力取引市場システム及び電力取引方法 |
US7480501B2 (en) | 2001-10-24 | 2009-01-20 | Statsignal Ipc, Llc | System and method for transmitting an emergency message over an integrated wireless network |
US7424527B2 (en) | 2001-10-30 | 2008-09-09 | Sipco, Llc | System and method for transmitting pollution information over an integrated wireless network |
US6687574B2 (en) | 2001-11-01 | 2004-02-03 | Telcordia Technologies, Inc. | System and method for surveying utility outages |
US6732055B2 (en) | 2001-11-06 | 2004-05-04 | General Electric Company | Methods and systems for energy and emissions monitoring |
US6904336B2 (en) | 2001-12-28 | 2005-06-07 | Fannie Mae | System and method for residential emissions trading |
US20030229572A1 (en) | 2001-12-28 | 2003-12-11 | Icf Consulting | Measurement and verification protocol for tradable residential emissions reductions |
US6909942B2 (en) | 2002-02-25 | 2005-06-21 | General Electric Company | Method for power distribution system components identification, characterization and rating |
US20030171851A1 (en) | 2002-03-08 | 2003-09-11 | Peter J. Brickfield | Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems |
KR100701110B1 (ko) * | 2002-03-28 | 2007-03-30 | 로버트쇼 컨트롤즈 캄파니 | 에너지 관리 시스템 및 방법 |
AU2003220520A1 (en) | 2002-04-01 | 2003-10-20 | Battelle Memorial Institute | Energy management system |
EP1367685A1 (en) | 2002-05-31 | 2003-12-03 | Whirlpool Corporation | Electronic system for power consumption management of appliances |
EP1372238B1 (en) | 2002-06-13 | 2018-06-06 | Whirlpool Corporation | Total home energy management system |
US7343341B2 (en) | 2002-07-20 | 2008-03-11 | Chicago Climate Exchange, Inc. | Systems and methods for trading emission reductions |
JP3980980B2 (ja) | 2002-09-13 | 2007-09-26 | 株式会社東芝 | 電力管理システムおよび電力管理方法 |
AU2003274965A1 (en) | 2002-10-01 | 2004-04-23 | Widefi, Inc. | Wireless local area network with repeater for enhancing network coverage |
US7463986B2 (en) | 2002-10-25 | 2008-12-09 | Hudson Bay Wireless Llc | Electrical power metering system |
JP2004180412A (ja) | 2002-11-26 | 2004-06-24 | Matsushita Electric Works Ltd | 負荷制御システムおよびマネジメントシステム |
US7440871B2 (en) | 2002-12-09 | 2008-10-21 | Verisae, Inc. | Method and system for tracking and reporting emissions |
US7877235B2 (en) | 2003-01-31 | 2011-01-25 | Verisae, Inc. | Method and system for tracking and managing various operating parameters of enterprise assets |
US7333880B2 (en) | 2002-12-09 | 2008-02-19 | Enernoc, Inc. | Aggregation of distributed energy resources |
ES2538484T3 (es) | 2003-01-21 | 2015-06-22 | Whirlpool Corporation | Un proceso para gestionar y reducir la demanda de potencia de electrodomésticos y componentes de los mismos, y sistema que utiliza dicho proceso |
US7457758B2 (en) | 2003-02-10 | 2008-11-25 | South Dakota School Of Mines And Technology | Method and apparatus for generating standardized carbon emission reduction credits |
US6909941B2 (en) | 2003-02-13 | 2005-06-21 | Iso New England Inc. | Methods for the management of a bulk electric power market |
JP2004248174A (ja) | 2003-02-17 | 2004-09-02 | Canon Inc | 通信ネットワーク及びそこで用いるノード装置及びそこで用いる伝送制御方法 |
DE10309164A1 (de) | 2003-02-28 | 2004-09-09 | Siemens Ag | Scheduling von Echtzeitkommunikation in geschalteten Netzwerken |
US7089089B2 (en) | 2003-03-31 | 2006-08-08 | Power Measurement Ltd. | Methods and apparatus for retrieving energy readings from an energy monitoring device |
US6834811B1 (en) | 2003-04-01 | 2004-12-28 | Hewlett-Packard Development Company, L.P. | Market-based temperature control system and method |
US7305282B2 (en) | 2003-05-13 | 2007-12-04 | Siemens Power Transmission & Distribution, Inc. | Very short term load prediction in an energy management system |
US20040230533A1 (en) | 2003-05-16 | 2004-11-18 | Benco David S. | Pro-rated consumable resource governor |
EA009685B1 (ru) | 2003-06-05 | 2008-02-28 | Энфо Бродкаст Ас | Способ и система для автоматического регулирования спроса на товары кратковременного пользования |
US7003640B2 (en) | 2003-07-28 | 2006-02-21 | Hewlett-Packard Development Company, L.P. | Power-aware adaptation in an information server |
WO2005015366A2 (en) | 2003-08-08 | 2005-02-17 | Electric Power Group, Llc | Real-time performance monitoring and management system |
US20050055432A1 (en) | 2003-09-08 | 2005-03-10 | Smart Synch, Inc. | Systems and methods for remote power management using 802.11 wireless protocols |
US7289887B2 (en) | 2003-09-08 | 2007-10-30 | Smartsynch, Inc. | Systems and methods for remote power management using IEEE 802 based wireless communication links |
US7313465B1 (en) | 2003-09-11 | 2007-12-25 | Dte Energy Technologies, Inc. | System and method for managing energy generation equipment |
US7395444B2 (en) | 2003-09-23 | 2008-07-01 | American Power Conversion Corporation | Power status notification |
WO2005036281A2 (en) | 2003-10-06 | 2005-04-21 | Power Monitors Incorporated | System for monitoring a power distribution or power transmission device |
US7089125B2 (en) | 2003-10-27 | 2006-08-08 | Itron, Inc. | Distributed asset optimization (DAO) system and method |
US7010437B2 (en) | 2003-11-03 | 2006-03-07 | Abb Research Ltd. | Electric utility storm outage management |
US7167777B2 (en) | 2003-11-04 | 2007-01-23 | Powerweb Technologies | Wireless internet lighting control system |
KR100560747B1 (ko) | 2003-11-10 | 2006-03-13 | 삼성전자주식회사 | 메디칼 라벨을 이용한 의료 데이터 전송 방법 |
CA2450984C (en) | 2003-11-26 | 2007-02-13 | Triacta Power Technologies Inc. | Method and apparatus for monitoring power consumption on power distribution circuits for centralized analysis |
US20050125243A1 (en) | 2003-12-09 | 2005-06-09 | Villalobos Victor M. | Electric power shuttling and management system, and method |
US20060142961A1 (en) | 2003-12-12 | 2006-06-29 | Verisae, Inc. | Enterprise energy management system |
US7177728B2 (en) | 2003-12-30 | 2007-02-13 | Jay Warren Gardner | System and methods for maintaining power usage within a set allocation |
EP1571745A1 (en) | 2004-03-01 | 2005-09-07 | Alcatel | Power consumption management method |
US7711796B2 (en) | 2006-06-12 | 2010-05-04 | Icontrol Networks, Inc. | Gateway registry methods and systems |
WO2005091218A2 (en) | 2004-03-16 | 2005-09-29 | Icontrol Networks, Inc | Premises management system |
US8635350B2 (en) | 2006-06-12 | 2014-01-21 | Icontrol Networks, Inc. | IP device discovery systems and methods |
CN1934761A (zh) | 2004-03-25 | 2007-03-21 | Ipps株式会社 | 多个电力需求者集合区域的电力系统 |
US20050234600A1 (en) | 2004-04-16 | 2005-10-20 | Energyconnect, Inc. | Enterprise energy automation |
US20050240314A1 (en) | 2004-04-27 | 2005-10-27 | Martinez Edwin A | Method and apparatus for controlling and monitoring electrical power consumption |
US7181320B2 (en) | 2004-05-12 | 2007-02-20 | General Electric Company | Systems, methods and computer program products for continuous emissions monitoring on-line |
US20050276222A1 (en) | 2004-06-10 | 2005-12-15 | Kumar Gopal N | Platform level overload control |
US20060020544A1 (en) | 2004-07-23 | 2006-01-26 | Johnson Controls Technology Company | System and method for tracking emissions |
US7283062B2 (en) | 2004-07-28 | 2007-10-16 | Itron, Inc. | Mapping in mobile data collection systems, such as for utility meter reading and related applications |
JP2004301505A (ja) | 2004-07-30 | 2004-10-28 | Matsushita Electric Ind Co Ltd | 空調制御装置 |
US20060031934A1 (en) | 2004-08-04 | 2006-02-09 | Stonewater Control Systems, Inc. | Monitoring system |
JP2006060911A (ja) | 2004-08-19 | 2006-03-02 | Osaka Gas Co Ltd | デマンド管理システム |
KR20060036171A (ko) | 2004-10-25 | 2006-04-28 | 주식회사인티마햅 | 네트워크상에서 사용자단말기를 통한 서비스 차단/제어처리 방법 |
US6914553B1 (en) | 2004-11-09 | 2005-07-05 | Harris Corporation | Synthetic aperture radar (SAR) compensating for ionospheric distortion based upon measurement of the Faraday rotation, and associated methods |
FR2878106A1 (fr) | 2004-11-15 | 2006-05-19 | France Telecom | Procede et dispositif d'ordonnancement de paquets pour leur routage dans un reseau avec determination implicite des paquets a traiter en priorite |
US20060195334A1 (en) | 2004-11-17 | 2006-08-31 | Reeb Shayne A | Integrated environmental emission reduction data management system and method |
US20060106635A1 (en) | 2004-11-18 | 2006-05-18 | Karl Ulrich | Emission remediation |
US7231281B2 (en) | 2004-12-14 | 2007-06-12 | Costa Enterprises, L.L.C. | Dynamic control system for power sub-network |
US7231280B2 (en) | 2004-12-14 | 2007-06-12 | Costa Enterprises, L.L.C. | Dynamic control system for power sub-network |
US7345998B2 (en) | 2004-12-15 | 2008-03-18 | Smart Labs, Inc. | Mesh network of intelligent devices communicating via powerline and radio frequency |
US7181293B2 (en) | 2004-12-27 | 2007-02-20 | Intel Corporation | System and method for enabling home power management |
EP1854064A4 (en) | 2005-01-18 | 2009-03-25 | Mc Energy Inc | METHOD AND SYSTEM FOR TRACKING AND BUDGETING ENERGY UTILIZATION |
JP4676800B2 (ja) | 2005-03-30 | 2011-04-27 | 大阪瓦斯株式会社 | 炭酸ガス排出削減クレジット利用システム |
EP1729223A3 (en) | 2005-06-01 | 2011-12-14 | Sanyo Electric Co., Ltd. | Demand control apparatus, electric power consumption prediction method, and program therefor |
US7274975B2 (en) | 2005-06-06 | 2007-09-25 | Gridpoint, Inc. | Optimized energy management system |
KR100728279B1 (ko) | 2005-07-13 | 2007-06-13 | 삼성전자주식회사 | 브이오아이피 네트워크에서 큐오에스 보장을 위한 대역폭관리 시스템 및 그 방법 |
US7536240B2 (en) | 2005-07-22 | 2009-05-19 | Ut-Battelle, Llc | Real power regulation for the utility power grid via responsive loads |
US7528503B2 (en) | 2005-07-22 | 2009-05-05 | Cannon Technologies, Inc. | Load shedding control for cycled or variable load appliances |
US7719995B2 (en) | 2005-09-09 | 2010-05-18 | Zeugma Systems Inc. | Application driven fast unicast flow replication |
CA2559182C (en) | 2005-09-12 | 2017-05-09 | Acuity Brands, Inc. | Network operation center for a light management system having networked intelligent luminaire managers |
US20070070895A1 (en) | 2005-09-26 | 2007-03-29 | Paolo Narvaez | Scaleable channel scheduler system and method |
US20070091900A1 (en) | 2005-10-20 | 2007-04-26 | Nokia Corporation | Prioritized control packet delivery for transmission control protocol (TCP) |
US7315769B2 (en) | 2005-10-31 | 2008-01-01 | General Electric Company | Multi-tier benefit optimization for operating the power systems including renewable and traditional generation, energy storage, and controllable loads |
JP2007132553A (ja) | 2005-11-08 | 2007-05-31 | Denso Corp | 貯湯式給湯装置 |
US8131401B2 (en) | 2006-07-19 | 2012-03-06 | Power Analytics Corporation | Real-time stability indexing for intelligent energy monitoring and management of electrical power network system |
US7545285B2 (en) | 2006-02-16 | 2009-06-09 | Elster Electricity, Llc | Load control unit in communication with a fixed network meter reading system |
US20070203722A1 (en) | 2006-02-28 | 2007-08-30 | Richards Randall R | Method for determining a future value of greenhouse gas credits |
US7660640B2 (en) | 2006-03-07 | 2010-02-09 | Siemens Aktiengesellschaft | Apparatus and method for predictive control of a power generation system |
CA2644353A1 (en) | 2006-03-24 | 2007-11-29 | Rtp Controls | Method and apparatus for controlling power consumption |
US8829799B2 (en) | 2006-03-28 | 2014-09-09 | Wireless Environment, Llc | Autonomous grid shifting lighting device |
KR20070098172A (ko) | 2006-03-31 | 2007-10-05 | 주식회사 대우일렉트로닉스 | 홈 네트워크 시스템 및 가전기기 제어 방법 |
US20070255457A1 (en) | 2006-04-28 | 2007-11-01 | Bright Planet Network, Inc. | Consumer Pollution Impact Profile System and Method |
US20070299562A1 (en) | 2006-06-26 | 2007-12-27 | Lawrence Kates | Method and apparatus for temperature-based load management metering in an electric power system |
WO2008002615A2 (en) | 2006-06-28 | 2008-01-03 | Andrew Ivchenko | Method and system for determining mobile emissions reduction credits |
KR100701298B1 (ko) | 2006-07-07 | 2007-03-29 | 주식회사 실버크리너 | 홈오토메이션 시스템을 이용한 유비쿼터스 원격 검침 및차단 시스템과 그 방법 |
US20090043519A1 (en) | 2006-08-10 | 2009-02-12 | V2Green, Inc. | Electric Resource Power Meter in a Power Aggregation System for Distributed Electric Resources |
US20090043520A1 (en) | 2006-08-10 | 2009-02-12 | V2Green, Inc. | User Interface and User Control in a Power Aggregation System for Distributed Electric Resources |
US7873441B2 (en) | 2006-09-25 | 2011-01-18 | Andreas Joanni Synesiou | System for execution of a load operating plan for load control |
US7890436B2 (en) | 2006-10-17 | 2011-02-15 | Clean Power Finance, Inc. | Billing and payment methods and systems enabling consumer premises equipment |
US7787405B2 (en) | 2007-01-08 | 2010-08-31 | International Business Machines Corporation | Method for utilization of active power profiles used in prediction of power reserves for remote devices |
US20080183523A1 (en) | 2007-01-22 | 2008-07-31 | Carbon Flow, Inc. | Carbon credit workflow system |
US20080177678A1 (en) | 2007-01-24 | 2008-07-24 | Paul Di Martini | Method of communicating between a utility and its customer locations |
US20080201255A1 (en) | 2007-02-16 | 2008-08-21 | Green Mark L | Facilitating creation and sale of carbon credits |
US20090171975A1 (en) | 2007-03-06 | 2009-07-02 | Mcconnell Robert S | Method and system for tracking carbon credits and other carbon valuation units |
US20080228629A1 (en) | 2007-03-12 | 2008-09-18 | Philip Gotthelf | System and method for valuating items as tradable environmental commodities |
US7541941B2 (en) | 2007-03-16 | 2009-06-02 | Greenbox Technology Inc. | System and method for monitoring and estimating energy resource consumption |
EP2143061A4 (en) | 2007-03-23 | 2015-05-13 | Bpl Global Ltd | SYSTEM AND METHOD FOR ADAPTIVE ISLANDING FOR STORED / DISTRIBUTED ENERGY ARRANGEMENTS |
EP2143062A4 (en) | 2007-03-23 | 2012-10-17 | Bpl Global Ltd | SYSTEM AND METHODS FOR EXPIRY OF CUSTOMS AND LOAD MANAGEMENT |
US20080275810A1 (en) | 2007-04-03 | 2008-11-06 | Musier Reiner F H | Market depository for environmentally relevant items |
WO2008124185A1 (en) | 2007-04-09 | 2008-10-16 | Live Data Systems, Inc. | System and method for monitoring and managing energy performance |
IE20080293A1 (en) | 2007-04-17 | 2008-10-29 | Timothy Patrick Cooper | A load management controller |
US7991513B2 (en) | 2007-05-08 | 2011-08-02 | Ecodog, Inc. | Electric energy bill reduction in dynamic pricing environments |
KR20080112692A (ko) | 2007-06-22 | 2008-12-26 | 신성델타테크 주식회사 | 원격 검침 시스템 |
US7565227B2 (en) | 2007-08-15 | 2009-07-21 | Constellation Energy Group, Inc. | Multi-building control for demand response power usage control |
US7877169B2 (en) | 2007-08-21 | 2011-01-25 | Electro Industries/ Gauge Tech | System and method for synchronizing an auxiliary electrical generator to an electrical system |
US8527107B2 (en) | 2007-08-28 | 2013-09-03 | Consert Inc. | Method and apparatus for effecting controlled restart of electrical servcie with a utility service area |
US7715951B2 (en) | 2007-08-28 | 2010-05-11 | Consert, Inc. | System and method for managing consumption of power supplied by an electric utility |
US8996183B2 (en) | 2007-08-28 | 2015-03-31 | Consert Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US8260470B2 (en) | 2007-08-28 | 2012-09-04 | Consert, Inc. | System and method for selective disconnection of electrical service to end customers |
US8131403B2 (en) | 2007-08-28 | 2012-03-06 | Consert, Inc. | System and method for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US8542685B2 (en) | 2007-08-28 | 2013-09-24 | Consert, Inc. | System and method for priority delivery of load management messages on IP-based networks |
US20100235008A1 (en) | 2007-08-28 | 2010-09-16 | Forbes Jr Joseph W | System and method for determining carbon credits utilizing two-way devices that report power usage data |
US8145361B2 (en) | 2007-08-28 | 2012-03-27 | Consert, Inc. | System and method for manipulating controlled energy using devices to manage customer bills |
US20090063228A1 (en) | 2007-08-28 | 2009-03-05 | Forbes Jr Joseph W | Method and apparatus for providing a virtual electric utility |
US8700187B2 (en) | 2007-08-28 | 2014-04-15 | Consert Inc. | Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities |
US7917251B2 (en) | 2007-09-05 | 2011-03-29 | Consolidated Edison Company Of New York, Inc. | Metering system and method of operation |
BRPI0705569A2 (pt) | 2007-09-11 | 2009-05-05 | Univ Minas Gerais | método para medição e monitoramento |
CA2699309A1 (en) | 2007-10-21 | 2009-04-30 | Citrix Systems, Inc. | Systems and methods to adaptively load balance user sessions to reduce energy consumption |
US7706990B2 (en) | 2007-10-30 | 2010-04-27 | Michael Herzig | Systems and methods for measuring utilized generation of at-premise renewable power systems |
US20090157510A1 (en) | 2007-11-07 | 2009-06-18 | Ken Pridmore | Method of Tracking and Redeeming Consumer Carbon Emission Credits |
US20090138617A1 (en) | 2007-11-25 | 2009-05-28 | Michel Veillette | Method and system for creating and managing association and balancing of a mesh device in a mesh network |
US20090177505A1 (en) | 2008-01-04 | 2009-07-09 | Dietrich Brenda L | Supply and Distribution Method and System Which Considers Environmental or "Green" Practices |
US20090187499A1 (en) | 2008-01-21 | 2009-07-23 | David Mulder | System, Method and Computer Program Product for Providing Demand Response Functionality |
US20090192894A1 (en) | 2008-01-24 | 2009-07-30 | Carbon Flow, Inc. | Methods and apparatus for creating and managing green micro credits |
US20110063126A1 (en) | 2008-02-01 | 2011-03-17 | Energyhub | Communications hub for resource consumption management |
US20110061014A1 (en) | 2008-02-01 | 2011-03-10 | Energyhub | Interfacing to resource consumption management devices |
US20090210295A1 (en) | 2008-02-11 | 2009-08-20 | Yorgen Edholm | System and Method for Enabling Carbon Credit Rewards for Select Activities |
US8412643B2 (en) | 2008-03-07 | 2013-04-02 | Eqs, Inc. | Apparatus, system, and method for quantifying, bundling, and applying credits and incentives to financial transactions |
US8266076B2 (en) | 2008-03-07 | 2012-09-11 | Eqs, Inc. | Apparatus, system, and method for quantifying energy usage and savings |
AU2008355092A1 (en) | 2008-04-21 | 2009-10-29 | Adaptive Computing Enterprises, Inc. | System and method for managing energy consumption in a compute environment |
US9751416B2 (en) | 2008-06-16 | 2017-09-05 | International Business Machines Corporation | Generating energy transaction plans |
US20090319091A1 (en) * | 2008-06-20 | 2009-12-24 | Sequentric Energy Systems, Llc | Methods, circuits, and computer program products for disabling of electrical appliances during cold load pickup |
US20100023376A1 (en) | 2008-07-28 | 2010-01-28 | Brown Stephen J | Iterative real-time auction for resource management with user rules |
US20100042420A1 (en) | 2008-08-15 | 2010-02-18 | Hutchinson Douglas C | Environmental resource management system and method |
US20100063832A1 (en) | 2008-09-09 | 2010-03-11 | Brown Stephen J | Incentive allocation based on thermostat settings |
JP4713623B2 (ja) | 2008-09-25 | 2011-06-29 | 株式会社日立製作所 | 充放電管理装置 |
CA2739267A1 (en) | 2008-10-01 | 2010-04-08 | Silver Spring Networks, Inc. | Method and system of applying environmental incentives |
AU2009308899A1 (en) | 2008-10-28 | 2010-05-06 | Earth Aid Enterprises Llc | Methods and systems for determining the environmental impact of a consumer's actual resource consumption |
JP5219754B2 (ja) | 2008-11-14 | 2013-06-26 | 三菱電機株式会社 | 電力予備力供給装置 |
US9020769B2 (en) | 2009-01-26 | 2015-04-28 | Geneva Cleantech Inc. | Automatic detection of appliances |
JP2010183760A (ja) | 2009-02-06 | 2010-08-19 | Toshiba Corp | 発電機の負荷配分装置及び方法 |
US8224496B2 (en) | 2009-02-20 | 2012-07-17 | International Business Machines Corporation | Modular power control system to manage power consumption |
US8793365B2 (en) | 2009-03-04 | 2014-07-29 | International Business Machines Corporation | Environmental and computing cost reduction with improved reliability in workload assignment to distributed computing nodes |
US8149750B2 (en) | 2009-04-07 | 2012-04-03 | Intel Corporation | Device power management in a wireless network |
EP2427806A4 (en) | 2009-05-08 | 2014-07-30 | Consert Inc | SYSTEM AND METHOD FOR ESTIMATING AND DELIVERING OPERATING RESERVE ENERGY CAPABILITY THAT CAN BE AFFECTED BY USING ACTIVE LOAD MANAGEMENT |
WO2010132469A2 (en) | 2009-05-11 | 2010-11-18 | Consert, Inc. | System and method for selective disconnection of electrical service to end customers |
US8209062B2 (en) | 2009-12-16 | 2012-06-26 | Robert Bosch Gmbh | Method for non-intrusive load monitoring using a hybrid systems state estimation approach |
US20110082598A1 (en) | 2009-10-02 | 2011-04-07 | Tod Boretto | Electrical Power Time Shifting |
EP2486707A4 (en) | 2009-10-09 | 2013-08-28 | Consert Inc | APPARATUS AND METHOD FOR CONTROLLING COMMUNICATIONS TO AND FROM PUBLIC SERVICE POINTS |
US20110231320A1 (en) | 2009-12-22 | 2011-09-22 | Irving Gary W | Energy management systems and methods |
US8390221B2 (en) * | 2010-09-27 | 2013-03-05 | Emerson Climate Technology, Inc. | Systems and methods for protecting three-phase motors |
-
2010
- 2010-10-01 US US12/896,307 patent/US8527107B2/en active Active
- 2010-10-05 MX MX2012004312A patent/MX2012004312A/es active IP Right Grant
- 2010-10-05 CA CA2777147A patent/CA2777147C/en active Active
- 2010-10-05 KR KR1020127012538A patent/KR101345521B1/ko active IP Right Grant
- 2010-10-05 AU AU2010307299A patent/AU2010307299B2/en active Active
- 2010-10-05 ES ES10823723T patent/ES2821451T3/es active Active
- 2010-10-05 ES ES19156633T patent/ES2823553T3/es active Active
- 2010-10-05 EP EP10823723.1A patent/EP2488883B1/en active Active
- 2010-10-05 EP EP19156633.0A patent/EP3506176B1/en active Active
- 2010-10-05 WO PCT/US2010/002676 patent/WO2011046589A1/en active Application Filing
Also Published As
Publication number | Publication date |
---|---|
EP2488883A1 (en) | 2012-08-22 |
US8527107B2 (en) | 2013-09-03 |
WO2011046589A8 (en) | 2012-05-10 |
CA2777147A1 (en) | 2011-04-21 |
US20110022239A1 (en) | 2011-01-27 |
AU2010307299B2 (en) | 2014-10-16 |
ES2821451T3 (es) | 2021-04-26 |
ES2823553T3 (es) | 2021-05-07 |
EP3506176B1 (en) | 2020-07-29 |
EP2488883B1 (en) | 2020-07-29 |
KR101345521B1 (ko) | 2014-01-15 |
EP2488883A4 (en) | 2014-01-08 |
CA2777147C (en) | 2016-08-09 |
AU2010307299A1 (en) | 2012-06-07 |
WO2011046589A1 (en) | 2011-04-21 |
EP3506176A1 (en) | 2019-07-03 |
MX2012004312A (es) | 2012-05-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101345521B1 (ko) | 유틸리티 서비스 영역 내의 전기 서비스의 제어형 재개 | |
US11733726B2 (en) | System, method, and apparatus for actively managing consumption of electric power supplied by one or more electric power grid operators | |
US11650612B2 (en) | Method and apparatus for actively managing consumption of electric power over an electric power grid | |
JP5807073B2 (ja) | 一つ以上の電気施設から供給される電力の消費量を能動管理するための方法及び装置 | |
JP5671285B2 (ja) | 配電ネットワークにおける需要反応のための方法およびシステム | |
US8307225B2 (en) | Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20160920 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20181115 Year of fee payment: 6 |