KR200406381Y1 - The girder deferment equipment of having used the temporary vent and pully for high piers - Google Patents

The girder deferment equipment of having used the temporary vent and pully for high piers Download PDF

Info

Publication number
KR200406381Y1
KR200406381Y1 KR2020050030047U KR20050030047U KR200406381Y1 KR 200406381 Y1 KR200406381 Y1 KR 200406381Y1 KR 2020050030047 U KR2020050030047 U KR 2020050030047U KR 20050030047 U KR20050030047 U KR 20050030047U KR 200406381 Y1 KR200406381 Y1 KR 200406381Y1
Authority
KR
South Korea
Prior art keywords
pier
mold
pulley
temporary
piers
Prior art date
Application number
KR2020050030047U
Other languages
Korean (ko)
Inventor
정해철
Original Assignee
주식회사 진화기술공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 진화기술공사 filed Critical 주식회사 진화기술공사
Priority to KR2020050030047U priority Critical patent/KR200406381Y1/en
Application granted granted Critical
Publication of KR200406381Y1 publication Critical patent/KR200406381Y1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/04Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 고안은 일정높이 이상의 교각에서도 주형을 거치할 수 있도록 인접한 교각에 가설벤트 및 도르래를 설치하고, 크레인이나 윈치를 이용하여 경제적으로 주형을 거치하도록 한 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치를 제공하는데 그 목적이 있다.The present invention is to install the temporary vents and pulleys in the adjacent pier to mount the mold even in the piers above a certain height, and to use the crane or winch to mount the mold economically, The purpose is to provide.

상기한 목적을 달성하기 위한 본 고안에 따른 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치는 교각의 상단에 고정 설치되는 가설벤트와; 상기 가설벤트의 소정의 위치에 다수 개가 고정 설치되는 도르래와; 상기 도르래에 권취되는 강선과; 상기 강선의 일측에 고정 설치되는 윈치 또는 크레인으로 구성됨을 특징으로 한다.Mold piercing apparatus using a high pier construction tent and pulley according to the present invention for achieving the above object is a temporary installation fixed to the top of the pier; A pulley in which a plurality of pulleys are fixedly installed at a predetermined position of the temporary vent; A steel wire wound around the pulley; It is characterized by consisting of a winch or a crane fixed to one side of the steel wire.

고 교각, 주형 거치, 장치, 방법, 가설벤트, 도르래 High Pier, Mold Mounting, Device

Description

고 교각용 가설벤트와 도르래를 이용한 주형 거치장치{The girder deferment equipment of having used the temporary vent and pully for high piers}Girder deferment equipment of having used the temporary vent and pully for high piers}

도 1은 본 고안에 따른 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치를 도시한 개략도,1 is a schematic view showing a mold mounting apparatus using a high pier construction tent and pulley according to the present invention,

도 2는 본 고안에 따른 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치를 도시한 정면도,Figure 2 is a front view showing a mold mounting device using a high pier construction tent and pulley according to the present invention,

도 3은 본 고안에 따른 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치를 도시한 측면도,Figure 3 is a side view showing a mold mounting device using a high pier construction tent and pulley according to the present invention,

도 4는 본 고안에 따른 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치를 도시한 평면도.Figure 4 is a plan view showing a mold mounting device using a high duct construction tent and pulley according to the present invention.

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

10: 교각 20: 가설벤트10: pier 20: temporary construction

30: 도르래 40: 강선30: pulley 40: liner

50: 윈치 또는 크레인 60: 주형50: winch or crane 60: mold

70: 지지구70: support

본 고안은 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치에 관한 것으로, 특히 인접한 교각에 가설벤트 및 도르래를 설치하고, 크레인이나 윈치를 이용하여 주형을 거치하도록 한 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치에 관한 것이다.The present invention relates to a mold mounting device using a temporary pier and pulley for high piers, and in particular to a temporary pier and pulley for installing a temporary vent and pulley in adjacent piers, and to mount the mold using a crane or winch It relates to a mold mounting device used.

일반적으로 교각에 강재나 프리스트레스트 콘크리트 주형을 거치시에는 크레인을 이용하여 주형을 거치하였다.In general, when the steel pier or prestressed concrete molds to the piers were mounted by using a crane.

상기한 바와 같은 크레인을 이용한 주형 거치는 교각이 저 교각인 경우에는 공사비가 저렴하고, 시공성이 양호한 장점이 있다.In the case of a pier using a crane as described above, when the pier is a low pier, the construction cost is low and the workability is good.

그러나 교각의 높이가 대략 50m 이상이면 크레인 용량 및 붐대 길이의 제한으로 인하여 일정높이 이상의 크레인을 이용한 주형 거치가 곤란한 문제가 있다.However, if the height of the pier is approximately 50m or more, due to the limitation of the crane capacity and the length of the boom, it is difficult to mount the mold using a crane of a certain height.

따라서, 상기한 크레인 사용의 제한으로 인하여 종래에는 고 교각에서의 주형 가설을 위해 압출공법(ILM), 이동식 비계공법(MSS), 외팔보공법(FCM) 등의 특수공법을 이용하므로 공사비가 많이 소요되는 문제점이 있다. Therefore, due to the limitation of the above-mentioned crane, special construction methods such as extrusion method (ILM), mobile scaffolding (MSS), and cantilevering method (FCM) are conventionally used for the construction of molds in high piers, which requires a lot of construction cost. There is a problem.

이에, 본 고안은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로서, 일정높이 이상의 교각에서도 주형을 거치할 수 있도록 인접한 교각에 가설벤트 및 도르래를 설치하고, 크레인이나 윈치를 이용하여 경제적으로 주형을 거치하도록 한 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치를 제공하는데 그 목적이 있다.Thus, the present invention was devised to solve the problems described above, and install a temporary vent and pulley in the adjacent piers to mount the mold even in the piers above a certain height, economical mold using a crane or winch The purpose of the present invention is to provide a mold mounting device using a temporary duct and pulley for mounting a piers.

상기한 목적을 달성하기 위한 본 고안에 따른 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치는 교각의 상단에 고정 설치되는 가설벤트와; 상기 가설벤트의 소정의 위치에 다수 개가 고정 설치되는 도르래와; 상기 도르래에 권취되는 강선과; 상기 강선의 일측에 고정 설치되는 윈치 또는 크레인으로 구성됨을 특징으로 한다.Mold piercing apparatus using a high pier construction tent and pulley according to the present invention for achieving the above object is a temporary installation fixed to the top of the pier; A pulley in which a plurality of pulleys are fixedly installed at a predetermined position of the temporary vent; A steel wire wound around the pulley; It is characterized by consisting of a winch or a crane fixed to one side of the steel wire.

이하, 본 고안을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings of the present invention will be described in detail.

도 1은 본 고안에 따른 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치를 도시한 개략도이며, 도 2는 본 고안에 따른 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치를 도시한 정면도이며, 도 3은 본 고안에 따른 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치를 도시한 측면도이며, 도 4는 본 고안에 따른 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치를 도시한 평면도이다.1 is a schematic view showing a mold mounting apparatus using a high pier construction tent and pulley according to the present invention, Figure 2 is a front view showing a mold mounting apparatus using a high pier hypothesis vent and pulley according to the present invention, Figure 3 is a side view showing a mold mounting apparatus using a high pier temporary fitting and pulley according to the present invention, Figure 4 is a plan view showing a mold mounting apparatus using a high pier temporary installation and pulley according to the present invention.

이들 도면에 도시된 바와 같이, 본 고안에 따른 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치는 교각(10)의 상단에 고정 설치되는 가설벤트(20)와; 상기 가설벤트(20)의 소정의 위치에 다수 개가 고정 설치되는 도르래(30)와; 상기 도르래(30)에 권취되는 강선(40)과; 상기 강선(40)의 일측에 고정 설치되는 윈치 또는 크레인(50)으로 구성된다.As shown in these figures, the mold mounting device using a high pier construction tent and pulley according to the present invention is a temporary installation 20 fixed to the top of the pier 10; A pulley 30 having a plurality fixedly installed at a predetermined position of the temporary vent 20; A steel wire 40 wound around the pulley 30; It consists of a winch or crane 50 is fixedly installed on one side of the steel wire (40).

여기서, 상기 교각(10)에는 그 상단의 일정한 위치에 강선(40)을 지지하기 위한 지지구(70)가 고정 설치된 구조이다.Here, the pier 10 is a structure in which a support 70 for fixing the steel wire 40 at a fixed position of the upper end is fixed.

즉, 본 고안에 따른 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치는 도르래의 원리를 교각(10)에 적용하여 적은 힘(윈치 또는 크레인(50)의 용량)으로 큰 중량물(거더60)을 높은 곳(고 교각(10) 상단)까지 용이하게 들어올리는 것을 본 고안의 기술적 사상의 특징으로 한다.That is, the mold mounting device using the high pier construction tent and pulley according to the present invention by applying the principle of the pulley to the pier 10, a large weight (girder 60) with a small force (the capacity of the winch or crane 50) Easily lifting up to a high place (top of the high piers 10) is a feature of the technical idea of the present invention.

상기한 바와 같은 구성으로 이루어진 본 고안에 따른 고 교각용 가설벤트와 도르래를 이용한 주형 거치에 대해 설명한다.It describes a mold holder using the high pier construction tent and pulley according to the present invention made of a configuration as described above.

본 고안에 따른 고 교각용 가설벤트와 도르래를 이용한 주형 거치방법은 교각(10) 상단 내에 가설벤트용 앵커를 매입한 상태로 교각(10)을 시공하는 단계; 상기 교각(10) 옆에서 교각(10)에 거치할 주형(60)을 제작하는 단계; 상기 교각(10)에 가설벤트(20)와 도르래(30) 및 강선(40)을 설치하는 단계; 상기 강선(40)의 일측에 윈치 또는 크레인(50)을 연결하는 단계; 상기 윈치 또는 크레인(50)으로 타측의 강선(40)에 고정된 주형(60)을 교각(10) 위로 인상하는 단계; 상기 주형(60)을 교각(10) 상의 적절한 위치에 거치 후 가설벤트(20)와 도르래(30) 및 강선(30)을 해체하는 단계로 이루어진다.Mold mounting method using the high pier construction tent and pulley according to the present invention comprises the steps of constructing the pier 10 in the state of embedding the anchor for the construction vent in the top of the pier (10); Manufacturing a mold (60) to be mounted on the pier (10) next to the pier (10); Installing a temporary vent (20), a pulley (30) and a steel wire (40) on the piers (10); Connecting the winch or the crane 50 to one side of the steel wire 40; Lifting the mold 60 fixed to the steel wire 40 on the other side by the winch or the crane 50 onto the piers 10; After disposing the mold 60 in the appropriate position on the piers 10 consists of dismantling the temporary construction 20, the pulley 30 and the steel wire (30).

여기서, 상기 교각(10)에는 필요에 따라 그 상단의 일정한 위치에 강선(40)을 지지하기 위한 지지구(70)를 고정 설치하여, 사용할 수도 있음을 밝혀둔다.Here, it is clear that the pier 10 may be fixedly installed by using a supporter 70 for supporting the steel wire 40 at a predetermined position of an upper end thereof as necessary.

즉, 본 고안에 따른 고 교각용 가설벤트와 도르래를 이용한 주형 거치방법은 교각(10) 시공시 교각(10) 내에 가설벤트용 앵커를 매입하고, 상기 교각(10) 옆에서 주형(60)을 조립하며, 교각(10)에 가설벤트(20) 및 도르래(30)를 설치하며, 교 각(10) 위 충분한 높이까지 윈치 또는 크레인(50)으로 주형(60)을 인상하며, 상기 주형(60)을 교각(10)에 내리면서 주어진 위치로 이동시켜 주형(60)을 거치 후 가설벤트(20)를 해체하면 일련의 고 교각(10) 상에 주형(60)을 거치하는 일련의 과정은 종료된다.That is, in the mold mounting method using the high pier construction tent and pulley according to the present invention is to purchase the anchor for the construction vent in the pier 10 during construction of the pier (10), the mold (60) next to the pier (10) Assemble, install a temporary vent (20) and pulley (30) on the pier 10, raise the mold (60) with a winch or crane 50 to a sufficient height above the pier (10), the mold (60) ) Move down to the pier (10) to a given position, go through the mold (60), and then dismantle the temporary vent (20) a series of processes to mount the mold (60) on a series of high piers (10) ends do.

이상에서 설명한 바와 같이, 본 고안에 따른 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치는 다음과 같은 효과가 있다.As described above, the mold holding device using the high pier construction tent and pulley according to the present invention has the following effects.

첫째, 본 고안은 고 교각에서 주형 가설을 위해 그동안 사용하던 압출공법, 이동식 비계공법, 외팔보 공법 등의 특수공법을 이용하지 않고도 교각에 가설벤트 및 도르래를 설치하고, 크레인이나 윈치를 이용하여 주형을 거치함으로써, 경제적으로 주형을 거치시킬 수 있는 이점이 있다.First, the present invention does not use special methods such as extrusion method, mobile scaffolding method, cantilever method, etc., which have been used for mold construction in high piers, and installs temporary vents and pulleys in piers, and uses a crane or winch to By mounting, there is an advantage that the mold can be economically mounted.

둘째, 본 고안은 저 교각이던 고 교각이던 교각의 높이에 제한을 받지 않고, 교각에 주형 거치가 가능한 이점이 있다.Second, the present invention is not limited to the height of the piers, whether low or high piers, there is an advantage that can be mounted on the piers.

Claims (2)

교각(10)의 상단에 고정 설치되는 가설벤트(20)와; 상기 가설벤트(20)의 소정의 위치에 다수 개가 고정 설치되는 도르래(30)와; 상기 도르래(30)에 권취되는 강선(40)과; 상기 강선(40)의 일측에 고정 설치되는 윈치 또는 크레인(50)으로 구성됨을 특징으로 하는 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치. A temporary vent 20 fixedly installed at an upper end of the piers 10; A pulley 30 having a plurality fixedly installed at a predetermined position of the temporary vent 20; A steel wire 40 wound around the pulley 30; Mold mounting device using a temporary pier and pulley for pier, characterized in that consisting of a winch or crane 50 is fixed to one side of the steel wire (40). 제 1항에 있어서,The method of claim 1, 상기 교각(10)에는 그 상단의 일정한 위치에 강선(40)을 지지하기 위한 지지구(70)가 고정 설치됨을 특징으로 하는 고 교각용 가설벤트와 도르래를 이용한 주형 거치장치.The pier 10 is a mold mounting device using a high pier construction tent and pulley, characterized in that the support 70 is fixed to support the steel wire 40 at a predetermined position of the upper end.
KR2020050030047U 2005-10-22 2005-10-22 The girder deferment equipment of having used the temporary vent and pully for high piers KR200406381Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020050030047U KR200406381Y1 (en) 2005-10-22 2005-10-22 The girder deferment equipment of having used the temporary vent and pully for high piers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020050030047U KR200406381Y1 (en) 2005-10-22 2005-10-22 The girder deferment equipment of having used the temporary vent and pully for high piers

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020050099934A Division KR100586313B1 (en) 2005-10-22 2005-10-22 The girder deferment equipment and the method of having used the temporary vent and pully for high piers

Publications (1)

Publication Number Publication Date
KR200406381Y1 true KR200406381Y1 (en) 2006-01-20

Family

ID=41758111

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020050030047U KR200406381Y1 (en) 2005-10-22 2005-10-22 The girder deferment equipment of having used the temporary vent and pully for high piers

Country Status (1)

Country Link
KR (1) KR200406381Y1 (en)

Similar Documents

Publication Publication Date Title
KR101028868B1 (en) Lifting and moving apparatus temporary structure end segment of bridge and end segment for bridge structure method using the same
KR100968068B1 (en) Multi-Horizontal Structure Member Forming Method
BRPI1101612B1 (en) Construction method of a hybrid tower
KR101153779B1 (en) Device for bridge dismantle using the strand jack and its methode
JP6483177B2 (en) Floor slab replacement device and installation method of floor slab replacement device
KR101325223B1 (en) Repair apparatus for manhole and repair method using the same
KR20100088822A (en) Eco automatic building demolition method and demolition device
KR101095449B1 (en) Bridge deck dismembering method and its equipment
JP2010242429A (en) Demolition method for steel tower
JP4796411B2 (en) Bridge removal method
CN104531931B (en) Blast furnace discharge yard bottom cleaning shaft installation method
KR200406381Y1 (en) The girder deferment equipment of having used the temporary vent and pully for high piers
JP2008106569A (en) Rope type repairing scaffold and floating body type repairing scaffold
KR100944458B1 (en) Apparatus preventing separation of cage for construction
JP6099993B2 (en) Method of constructing outer wall membrane for tower
KR100586313B1 (en) The girder deferment equipment and the method of having used the temporary vent and pully for high piers
JP2011162298A (en) Installing construction method and device for overhead crane
KR101775014B1 (en) Rolling method of girder using the rolling apparatus
JP2016089601A (en) Apparatus for installing suspended scaffold and curing net used in painting work of communications steel tower
JP3149454U (en) Temporary column for handrail
CN202023149U (en) Hanging basket used in construction
JP2011208419A (en) Erection method of bridge girder
JP3182710B2 (en) Outer sheath and method of refilling it
CN211647357U (en) Tool type chute
JP2004084322A (en) Method of constructing concrete pier

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
T201 Request for technology evaluation of utility model
EXTG Extinguishment
T601 Decision on revocation of utility model registration