CN211647357U - Tool type chute - Google Patents
Tool type chute Download PDFInfo
- Publication number
- CN211647357U CN211647357U CN201921547232.3U CN201921547232U CN211647357U CN 211647357 U CN211647357 U CN 211647357U CN 201921547232 U CN201921547232 U CN 201921547232U CN 211647357 U CN211647357 U CN 211647357U
- Authority
- CN
- China
- Prior art keywords
- chute
- elephant trunk
- hopper
- pouring
- angle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses an instrument formula elephant trunk belongs to the construction field. The tool type chute is arranged at the position of a foundation pit enclosure structure, a support and a trestle in the foundation pit enclosure structure are used as supporting points of the tool type chute, and a trestle plate is provided with a trestle opening for hoisting the chute. The tool type chute comprises: elephant trunk, lower hopper, activity are hopper and small-size chute down. The elephant trunk passes through the channel-section steel and the staple bolt is fixed in the support department that corresponds, and the elephant trunk has inclination. The chute is formed by welding two iron pipes, and an included angle is formed between the two iron pipes. The discharging hopper is arranged at the opening of the bridge. The movable blanking hopper is arranged at the lower opening of the chute. The small chute is arranged at the lower opening of the chute and freely rotates along with the movable discharging hopper. The utility model discloses not only saved the consumption of setting up the required manual work of framed bent and material for construction speed has still guaranteed the security of work progress to increased the scope of pouring of elephant trunk, improved the flexibility of elephant trunk, noise abatement pollutes, satisfies the requirement of green construction.
Description
Technical Field
The utility model relates to an instrument formula elephant trunk belongs to the construction field.
Background
With the development of cities, high-rise and super high-rise buildings are increasing day by day, the concrete volume of the foundation slab is also increasing, however, the number of roads which can be used for arrangement and construction is less and less. When large-volume concrete is poured, in order to avoid construction joints between new and old concrete, the pouring and tamping time interval is not required to be too long, so that the site arrangement and the pouring efficiency are particularly important.
The traditional construction method has two types: the other is to adopt an automobile pump for pouring, and the automobile pump is convenient to construct and flexible to pour, so that the concrete pump is one of the most common pouring modes for current concrete pouring. However, the car pump needs enough parking space when pouring, which limits the number of car pumps arranged in the field, so that the pouring efficiency is greatly reduced, and the noise is very loud when the car pump is poured, which is not beneficial to construction at night in downtown. The other method is to adopt a chute or a chute which is opposite to the automobile pump, so that the chute does not need a large space during pouring, the pouring speed is high, and no noise is generated during pouring of the automobile pump. The traditional method of the chute is to firstly erect a bent frame and place the chute or a chute on the bent frame. The bent frame is required to be erected on the cushion layer until reaching a natural terrace and is connected with the trestle outside the plane so as to ensure the stability of the bent frame. Then a chute or a chute is arranged on the bent frame, and a discharging funnel is arranged at the upper part of the bent frame. For a deep foundation pit, the height of the bent is very large, and the impact force of concrete on the pipe wall of the chute is also very large, so that the workload of erecting the bent is large, and the danger during erecting and concrete pouring construction is also very high. And the elephant trunk is erected, so that the elephant trunk cannot move and only a fixed small area can be poured. Therefore, the traditional chute construction method needs to set up bent frames, so that the workload is large in the early stage of casting, certain danger is caused during construction, the casting position is inflexible, and only a fixed small area can be cast.
Even when the above two methods are combined, the effect is not satisfactory. Because the pouring range of the elephant trunk is too small, most of concrete is still poured by adopting an automobile pump.
SUMMERY OF THE UTILITY MODEL
Aiming at the characteristics that a bent needs to be erected for a traditional chute or a chute, the erecting time of the bent is long, the danger of high bent is large, the pouring flexibility of the chute is poor and the like, the invention provides the tool type chute, which can optimize the components and erecting mode of the chute, reduce the processing procedure and the processing time of the chute, accelerate the installation speed of the chute, greatly reduce the danger of chute construction, increase the pouring range of the chute and accelerate the pouring speed of large-volume concrete construction. Meanwhile, the material cost and the labor cost are reduced, the construction noise is reduced, and the development requirement of green construction is met.
For solving the technical problem, the utility model discloses a following technical scheme:
the utility model provides an instrument formula elephant trunk for concreting, install in foundation ditch enclosure department, utilize support and landing stage among the foundation ditch enclosure as the strong point of instrument formula elephant trunk, landing stage board department is equipped with the landing stage entrance to a cave for lift by crane the elephant trunk, instrument formula elephant trunk includes:
the chute is formed by welding two iron pipes with equal diameter and length, an included angle is formed between the two iron pipes, the included angle is an obtuse angle, and a lifting lug is arranged at the upper end of the chute and used for lifting and mounting;
the discharging hopper is arranged at the trestle opening, communicated with the chute and used for pouring;
the movable blanking hopper is arranged at the lower opening of the chute, communicated with the lower opening of the chute and used for pouring; and
the small chute is arranged at the lower opening of the chute, is communicated with the movable blanking hopper and freely rotates along with the movable blanking hopper so as to increase the pouring range of the chute;
the chute is fixed at the corresponding support position through the channel steel and the hoop, and the chute is provided with an inclination angle.
Preferably, the iron pipe arranged at the opening of the bridge is a first iron pipe, and the included angle between the first iron pipe and the blanking hopper is an obtuse angle.
Preferably, the included angle between the first iron pipe and the blanking hopper is about 150 degrees.
Preferably, the included angle between the two iron pipes is about 120 degrees.
Preferably, the two conveying pipes of the movable blanking hopper form an included angle of about 105 degrees.
The utility model discloses owing to adopt above technical scheme, make it compare with prior art, have following advantage and positive effect: the utility model discloses utilize support and landing stage among the foundation ditch retaining structure as the strong point of elephant trunk to set up small-size chute at the elephant trunk end opening, not only saved the consumption of setting up the required manual work of framed bent and material, accelerated construction speed, still guaranteed the security of work progress, and increased the scope of pouring of elephant trunk, improved the flexibility of elephant trunk, noise abatement pollutes, satisfies the requirement of green construction.
Furthermore, the utility model is suitable for a: the construction period is short, the field arrangement is difficult, the noise control requirement is high, and the method is particularly suitable for the large-volume concrete pouring construction of the deep foundation pit.
Drawings
Fig. 1 is a schematic structural view of a tool-type chute according to an embodiment of the present invention;
fig. 2 is a schematic structural view of a tool-type chute and a second support connection node according to an embodiment of the present invention;
fig. 3 is a schematic structural view of a tool-type chute and a third supporting connection node according to an embodiment of the present invention.
The numbers in the figures are as follows:
1 bridge plate, 2 second supports, 3 third supports, 4 channel steel, 5 expansion bolts,
100 tool-type chute;
10 chute, 11 first iron pipe, 12 second iron pipe, 13 chute lower opening,
20, discharging the materials from a hopper, wherein,
30 of the movable material discharging hopper, the material discharging hopper,
40 small size chutes.
Detailed Description
The tool type chute and the construction method provided by the invention are further described in detail with reference to the accompanying drawings and specific embodiments. The advantages and features of the present invention will become more apparent in conjunction with the following description. It should be noted that the drawings are in simplified form and are not to precise scale, and are provided for convenience and clarity in order to facilitate the description of the embodiments of the present invention.
Example one
As shown in fig. 1 to fig. 3, the tool chute 100 provided in this embodiment is used for casting concrete, and is installed at a foundation pit enclosure, and supports and trestles in the foundation pit enclosure are used as support points of the tool chute 100. That is, in the embodiment, the supports and the trestle are used as the supports of the chute 10, so that the labor and material cost for setting and removing the bent are saved, the time for setting the chute 10 is greatly shortened, the construction speed can be increased, the danger of setting a high bent is avoided, and the construction safety is ensured. Wherein, trestle board 1 department is equipped with the trestle entrance to a cave for lift by crane elephant trunk 10. The tool chute 100 may generally comprise: a chute 10, a lower hopper 20, a movable lower hopper 30 and a small chute 40. The chute 10 is formed by welding two iron pipes with equal diameter and length, an included angle is formed between the two iron pipes, the included angle is an obtuse angle, and a lifting lug is arranged at the upper end of the chute and used for lifting and mounting. The chute 10 is fixed at the corresponding support position through the channel steel 4 and the hoop. The tool type chute 100 is connected with the support and trestle by the channel steel 4 and the anchor ear, so that the chute 10 can not move or even fall due to concrete impact when concrete is poured. The chute 10 has an inclined angle. The inclined angle of the chute 10 can meet the design requirement, prevent the concrete from segregating in the pouring process and ensure the pouring quality of the concrete. The discharging hopper 20 is arranged at the trestle opening, communicated with the chute 10 and used for pouring. The movable blanking hopper 30 is arranged at the lower opening 13 of the chute 10, communicated with the lower opening 13 of the chute and used for pouring. The small chute 40 is arranged at the lower opening 13 of the chute, is communicated with the movable blanking hopper 30 and freely rotates along with the movable blanking hopper 30 so as to increase the pouring range of the chute 10. The small chute 40 is arranged at the lower opening 13 of the chute, so that the pouring range of the chute 10 is enlarged, the pouring limitation of the chute 10 is improved, the flexibility of the chute 10 is increased, and the pouring efficiency is improved. Use the utility model discloses, reduce the use of car pump, save the cost, alleviate the noise, satisfy green construction requirement. Furthermore, the utility model discloses the component part is few, and processing is convenient, recoverable recycling.
The utility model provides an utilize support and landing stage among the foundation ditch envelope to regard as the strong point of elephant trunk 10 to mouth 13 sets up small-size chute 40 under the elephant trunk. Not only saves the labor and material consumption for setting up the bent, accelerates the construction speed, but also ensures the safety of the construction process, increases the pouring range of the chute 10, improves the flexibility of the chute 10, reduces the noise pollution and meets the requirement of green construction.
Further, the utility model is suitable for a construction period is tight, and the on-the-spot difficulty of arranging, noise control requirement are high, and the specially adapted deep basal pit bulky concrete placement construction.
Preferably, in this embodiment, the iron pipe installed at the opening of the bridge in the chute 10 is a first iron pipe 11, and the other iron pipe is a second iron pipe 12. The included angle between the first iron pipe 11 and the blanking hopper 20 is an obtuse angle, that is, the included angle between the center line of the first iron pipe 11 and the center line of the blanking hopper 20.
Preferably, in this embodiment, the included angle between the first iron pipe 11 and the blanking hopper 20 is about 150 degrees. Preferably, the angle between the first iron pipe 11 and the central line of the lower hopper 20 is about 150 degrees.
Preferably, the included angle between the two iron pipes is about 120 degrees, that is, the included angle between the center lines of the first iron pipe 11 and the second iron pipe 12 is preferably 127 degrees, so that no segregation occurs during concrete pouring. More specifically, in this practical example, the diameters of two iron pipes are 273mm, and the inner diameter of the trestle opening is 300 mm.
Preferably, the two transfer pipes of the movable hopper 30 form an angle of about 105 degrees. I.e. the movable blanking hopper 30 has a vertical duct and an inclined duct, the angle between the centre lines of which is preferably 107 degrees.
Example two
Referring to fig. 1 to 3, the embodiment further provides a construction method using the tool type chute 100, which is used for pouring large-volume concrete in a deep foundation pit, and the construction is performed according to the following steps:
and 5, the concrete flows into the chute 10 through the discharging hopper 20, and the pouring direction is adjusted through the movable discharging hopper 30 and the small chute 40 to finish the pouring of the concrete.
The construction method of the embodiment is simple and convenient, the construction speed is accelerated, and the construction period is shortened.
As shown in fig. 1-3, in this embodiment, the foundation pit enclosure structure has a trestle, a second support 2 and a third support 3. In specific implementation, two iron pipes with the diameter of 273mm and the same length are welded at an included angle of 120 degrees to serve as the main body part of the chute 10, and a lifting lug is arranged at the upper end part of the chute 10, so that the chute 10 can be conveniently lifted and installed. A reasonable position is selected on the trestle plate 1, and a hole with the diameter of about 300mm, namely a trestle hole opening, is formed. The chute 10 is hoisted from the trestle opening to reach a preset position, and the chute 10 is fixed with the second support 2 and the third support 3 by using channel steel 4, expansion bolts 5 and anchor ears to form a whole. The trestle opening and the chute lower opening 13 are respectively provided with a lower hopper 20 and a movable lower hopper 30, and a small chute 40 is arranged below the chute lower opening 13 and can rotate freely so as to increase the pouring range of the chute 10.
Transmission elephant trunk construction scheme and the utility model discloses construction scheme economic nature contrast:
firstly, the construction scheme of the traditional chute:
material cost of the steel pipe fastener: (2560m × 0.0085 yuan/m +680 × 0.0044 yuan/m) × 7 days 173.26 yuan
Chute material cost: 93.4 mx 210 yuan/m 19614.00 yuan
Erecting a chute bracket manually: 185.4X 58-10753.20 yuan
Section steel support material and installation cost: 7t × 9512.715 yuan/t 66589.005 yuan
Pouring time: about 40 hours
Secondly, the utility model discloses the scheme:
material cost of the chute: 46.24X 183.62 ═ 8490.59 yuan
Section steel support material and installation cost: 0.36t × 9512.715 yuan/t 3424.58 yuan
The construction of the chute is manual: 185.4X 16-2966.40
Pouring time: about 34 hours
Through the contrast, the utility model discloses save the expense and be 84917.99 yuan, save chute support and set up about 7 days of time, pour the time and save 6 hours.
The technical features of the embodiments described above may be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the embodiments described above are not described, but should be considered as being within the scope of the present specification as long as there is no contradiction between the combinations of the technical features.
The above-mentioned embodiments only represent some embodiments of the present invention, and the description thereof is specific and detailed, but not to be construed as limiting the scope of the present invention. It should be noted that, for those skilled in the art, without departing from the spirit of the present invention, several variations and modifications can be made, which are within the scope of the present invention. Therefore, the protection scope of the present invention should be subject to the appended claims.
Claims (5)
1. The utility model provides an instrument formula elephant trunk for concreting, its characterized in that installs in foundation ditch enclosure structure department, utilizes support and landing stage among the foundation ditch enclosure structure as the strong point of instrument formula elephant trunk, and landing stage board department is equipped with the landing stage entrance to a cave for lift by crane the elephant trunk, instrument formula elephant trunk includes:
the chute is formed by welding two iron pipes with equal diameter and length, an included angle is formed between the two iron pipes, the included angle is an obtuse angle, and a lifting lug is arranged at the upper end of the chute and used for lifting and mounting;
the discharging hopper is arranged at the trestle opening, communicated with the chute and used for pouring;
the movable blanking hopper is arranged at the lower opening of the chute, communicated with the lower opening of the chute and used for pouring; and
the small chute is arranged at the lower opening of the chute, is communicated with the movable blanking hopper and freely rotates along with the movable blanking hopper so as to increase the pouring range of the chute;
the chute is fixed at the corresponding support position through the channel steel and the hoop, and the chute is provided with an inclination angle.
2. The tool chute of claim 1 wherein the iron pipe of said chute mounted at said opening of said bridge is a first iron pipe at an obtuse angle to said hopper.
3. The tool-type chute of claim 2 wherein said first iron pipe is at an angle of 150 degrees to said blanking hopper.
4. The tool slide according to claim 1, wherein the angle between the two iron pipes is 120 degrees.
5. The tool chute according to any one of claims 1 to 4 wherein the two ducts of said movable blanking hopper form an angle of 105 degrees.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921547232.3U CN211647357U (en) | 2019-09-18 | 2019-09-18 | Tool type chute |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921547232.3U CN211647357U (en) | 2019-09-18 | 2019-09-18 | Tool type chute |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211647357U true CN211647357U (en) | 2020-10-09 |
Family
ID=72680929
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921547232.3U Active CN211647357U (en) | 2019-09-18 | 2019-09-18 | Tool type chute |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211647357U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110565962A (en) * | 2019-09-18 | 2019-12-13 | 上海建工一建集团有限公司 | Tool type chute and construction method |
-
2019
- 2019-09-18 CN CN201921547232.3U patent/CN211647357U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110565962A (en) * | 2019-09-18 | 2019-12-13 | 上海建工一建集团有限公司 | Tool type chute and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105908777A (en) | Comprehensive pipe gallery sliding mold and application method thereof | |
CN110565962A (en) | Tool type chute and construction method | |
CN101845889A (en) | Concrete casting and tamping method of steel tube concrete structure column | |
CN108118901B (en) | Reverse pumping concrete device for basement and construction method | |
CN105569242A (en) | Assembling method for composite floor slabs | |
CN105133754A (en) | Prefabricated concrete shear wallboard counterbore guide type mounting device and method | |
CN219410871U (en) | Pile forming operation platform based on telescopic and integrated type | |
CN104531931B (en) | Method for installing dust removal pipeline at lower part of blast furnace casting house | |
CN211647357U (en) | Tool type chute | |
CN108468348B (en) | The porous piping lane construction technology of box quick assembly and disassembly mould | |
CN207775938U (en) | A kind of monoblock type walling crib construction formwork removing device of inspection shaft | |
CN213328682U (en) | Mounting structure suitable for heavy scattered cable saddle | |
CN201915638U (en) | Hyperbolic steel funnel construction equipment | |
CN109914476A (en) | Construction process of cast-in-place urban comprehensive pipe gallery | |
CN216275702U (en) | Slip form device suitable for steep slope concrete construction | |
CN109098395A (en) | A kind of installation method of the prefabricated piping lane of assembly concrete | |
CN207862787U (en) | A kind of pin-connected panel slideway | |
CN114197526A (en) | Formwork system with vertical structure by reverse construction method and construction method | |
CN103334590A (en) | Large-size steel pipe column concrete construction device and construction method | |
CN110714438B (en) | Long-distance concrete pouring construction method for high pile wharf | |
CN207160052U (en) | A kind of skewback for connecting arcuate bead steel construction | |
CN109838087A (en) | Reusable assembled architecture support device | |
CN219710997U (en) | Assembly suitable for self-compacting concrete pouring in steel pipe column | |
CN109056816A (en) | A kind of underground multi-compartment tube corridor open cut monolithic construction method | |
CN217557161U (en) | Novel basement support column construction structure system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |