KR20040039063A - Mobile bridge inspection device and construction method - Google Patents

Mobile bridge inspection device and construction method Download PDF

Info

Publication number
KR20040039063A
KR20040039063A KR1020020066706A KR20020066706A KR20040039063A KR 20040039063 A KR20040039063 A KR 20040039063A KR 1020020066706 A KR1020020066706 A KR 1020020066706A KR 20020066706 A KR20020066706 A KR 20020066706A KR 20040039063 A KR20040039063 A KR 20040039063A
Authority
KR
South Korea
Prior art keywords
bridge
ladder
mobile
rail
inspection device
Prior art date
Application number
KR1020020066706A
Other languages
Korean (ko)
Inventor
방성순
최성문
Original Assignee
방성순
최성문
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 방성순, 최성문 filed Critical 방성순
Priority to KR1020020066706A priority Critical patent/KR20040039063A/en
Publication of KR20040039063A publication Critical patent/KR20040039063A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/106Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: A movable bridge inspection device is provided to execute repair and inspection works conveniently by reciprocating the whole length of a bridge. CONSTITUTION: The movable bridge inspection device comprises an inspection stand reciprocated along the whole length of a bridge(10), a pair of movable ladders(30) formed to make workers move toward the inspection stand, and a pair of rail fences moving the movable ladder(30) along the bridge(10).

Description

이동식 교량 점검 장치 및 그 시공방법{omitted}Mobile bridge inspection device and its construction method {omitted}

본 발명은 이동식 교량 점검 장치 및 그 시공방법에 관한 것으로, 특히, 교량의 하부에 가로질러 설치되게 하는 한편 교량의 전체 길이를 따라 왕복되게 하고, 교각이 위치하는 곳에서는 점검대가 2개로 분리되어 교각을 피해 이동되게 함으로써, 보다 편리하게 보수 점검 작업을 수행할 수 있도록 하는 이동식 교량 점검 장치 및 그 시공방법에 관한 것이다.The present invention relates to a mobile bridge inspection device and a construction method thereof, and in particular, to be installed across the lower portion of the bridge while being reciprocated along the entire length of the bridge, where the bridge is located in two separate inspection platform It is related to a mobile bridge inspection apparatus and its construction method that can be carried out to make it more convenient to perform maintenance inspection work.

종래의 교량 점검대는 발판, 발판 고정용 브래킷, 안전난간, 낙하방지구 및 기타 부자재(앵커볼트, 조임용 볼트, 너트 및 클램프)등이 구비된 상태에서 지상으로부터 타워크레인을 이용하여 설치토록 하고 있으며, 교각의 상단 둘레면에 일정한 간격으로 미리 앵커볼트를 매입한 상태에서 시공 작업이 수행되었다.Conventional bridge inspection platform is installed from the ground using tower cranes with scaffolding, scaffolding brackets, safety railings, drop protection and other subsidiary materials (anchor bolts, fastening bolts, nuts and clamps). The construction work was performed with anchor bolts pre-loaded at regular intervals on the upper circumferential surface of the piers.

그런데 상기와 같은 경우 구성 부품들 및 원자재들을 시공현장에서 교각의 형상에 맞추어 그 규격대로 성형 조립한 후 교각에 미리 매입된 앵커볼트에 고정용 브래킷을 조립하고, 이어서 이 고정용 브래킷에 구성 부품들을 볼트 조임 또는 용접작업으로 조립되게 함으로써, 시공 작업 시간이 지체되는 등의 문제점이 있었다.However, in the case described above, the component parts and raw materials are molded and assembled to the shape of the pier at the construction site, and then the fixing bracket is assembled to the anchor bolts pre-embedded in the pier, and then the components are fixed to the fixing bracket. By assembling by bolt tightening or welding, there was a problem such as delay in construction work time.

또한 교각에 상시 설치되는 점검대는 교각의 상단 둘레면에 미리 설치되는 다수개의 "L"자형 브래킷에 조립되어 설치되는데, 상기 브래킷은 교각의 중심에까지 박히게 되는 앵커볼트에 의해 교각의 측면에 고정된다. 그런데 상기와 같이 앵커볼트에 의한 시공과 상시 설치되어 있는 점검대 자체의 무게에 의해 교각의 상단에 심한 균열이 발생하게 됨으로써, 진행성 균열로 확산되어 교각의 내하력을 저하시키는 원인을 제공하게 되고, 교량의 공용수명을 저하시키게 되는 문제점이 있었다.In addition, the inspection platform is always installed on the pier is assembled and installed in a plurality of "L" shaped bracket that is pre-installed on the upper circumferential surface of the pier, the bracket is fixed to the side of the pier by an anchor bolt that is driven to the center of the pier. However, as described above, due to the construction of the anchor bolt and the weight of the check table itself, which is always installed, severe cracking occurs at the top of the pier, thereby providing a cause of spreading into the progressive crack and lowering the load capacity of the pier. There was a problem that reduces the public life of the.

또한 교각마다 둘레면 전체에 걸쳐 점검대가 설치되게 함으로써, 설치 시공상 상당한 작업기간과 많은 양의 설비자재 및 작업인원이 투입되어야 하는 등의 비경제적인 문제점이 있었다.In addition, by having the inspection platform installed on the entire circumferential surface of each pier, there was an uneconomical problem, such as a significant working period and a large amount of equipment materials and working personnel should be put into the installation.

본 발명은 상기와 같은 문제점을 개선하기 위한 것으로, 그 목적은 교량의 하부에 가로질러 설치되게 하는 한편 교량의 전체 길이를 따라 왕복되게 하고, 교각이 위치하는 곳에서는 점검대가 2개로 분리되어 교각을 피해 이동되게 함으로써, 보다 편리하게 보수 점검 작업을 수행할 수 있도록 하는 이동식 교량 점검 장치 및 그 시공방법을 제공하는 것이다.The present invention is to solve the above problems, the object is to be installed across the lower portion of the bridge while being reciprocated along the entire length of the bridge, where the pier is located in the two inspection stand is separated into two piers It is to provide a mobile bridge inspection apparatus and its construction method that can be more easily carried out by the maintenance inspection work by causing damage to be moved.

본 발명은 상기와 같은 목적을 달성하기 위해 교각이 다수개 설치되는 교량에 점검 장치를 시공함에 있어서, 상기 교량의 양측 난간 하부에 "ㅗ"자 형상의 레일펜스가 각각 설치되게 하되, 서로에 대해 평행하게 설치되게 하는 한편, 교각의 상면에 레일펜스브래킷이 설치되게 하여 그 단부에 상기 레일펜스가 고정되게 하는 단계와; 작업자가 오르내릴 수 있게 되는 사다리체로, 중단부의 하부에 상기 레일펜스의 레일을 따라 구르게되는 휠이 설치되며, 상기 교량의 양측 난간에 수직으로 각각 설치되는 이동사다리가 설치되게 하는 단계와; 상기 각각의 이동사다리의 내측에 수평상태로 설치되는 한편, 스윙기어에 의해 서로 연결되거나 또는 분리되며, 작업자가 이동할 수 있는 통로를 제공하게 되는 점검대를 설치하는 단계와; 상기교량의 양쪽에 각각 설치되는 한편, 상기 이동사다리의 하부에 설치되는 휠에 와이어로 연결되어 이동사다리가 교량을 따라 왕복 이동되게 하는 단계로 되는 이동식 교량 점검 장치의 시공방법을 제공하는 한편, 상기 교량의 양측 난간 하부에 "ㅗ"자 형상의 레일펜스가 각각 설치되게 하되, 서로에 대해 평행하게 설치되게 하는 한편, 교각의 상면에 레일펜스브래킷이 설치되게 하여 그 단부에 상기 레일펜스가 고정되게 하고; 작업자가 오르내릴 수 있게 되는 사다리체로, 중단부의 하부에 상기 레일펜스의 레일을 따라 구르게되는 휠이 설치되며, 상기 교량의 양측 난간에 수직으로 각각 설치되는 이동사다리가 설치되게 하고; 상기 각각의 이동사다리의 내측에 수평상태로 설치되는 한편, 스윙기어에 의해 서로 연결되거나 또는 분리되며, 작업자가 이동할 수 있는 통로를 제공하게 되는 점검대를 설치되게 하고; 상기 교량의 양쪽에 각각 설치되는 한편, 상기 이동사다리의 하부에 설치되는 휠에 와이어로 연결되어 이동사다리가 교량을 따라 왕복 이동되게 하는 이동식 교량 점검 장치를 제공함에 있다.The present invention in the construction of the inspection device on the bridge is installed a plurality of bridges to achieve the above object, the rail fence of the "펜" shape to each of the lower rails of the bridge is installed, but with respect to each other Allowing the rail fence bracket to be installed on the upper surface of the piers so that the rail fence is fixed at an end thereof; A ladder that allows the operator to move up and down, and a wheel rolled along the rail of the rail fence at a lower portion of the suspension portion, and allowing the mobile ladders to be vertically installed on both side rails of the bridge; Installing a check table installed horizontally inside each moving ladder, connected to or separated from each other by a swing gear, and providing a passage through which an operator can move; While installed on both sides of the bridge, while providing a method for the construction of a mobile bridge inspection device which is connected to a wire installed on the lower portion of the mobile ladder to the step of allowing the mobile ladder to reciprocate along the bridge, The rail fences having a "ㅗ" shape are respectively installed in the lower part of the railings of the bridge, and are installed in parallel with each other, while the rail fence brackets are installed on the upper surface of the bridge so that the rail fences are fixed at the ends thereof. and; A ladder body that allows the operator to move up and down, and a wheel rolled along the rail of the rail fence at a lower portion of the suspension portion, and a moving ladder installed vertically on both side rails of the bridge; Installed in the horizontal state inside each of the moving ladders, while being connected or separated from each other by a swing gear, a check table is provided to provide a passage through which an operator can move; It is provided on both sides of the bridge, while being provided with a wire connected to the wheel installed in the lower portion of the mobile ladder to provide a mobile bridge inspection device for the mobile ladder to reciprocate along the bridge.

도 1은 본 발명 장치가 설치된 교량의 측면도,1 is a side view of a bridge in which the apparatus of the present invention is installed;

도 2는 본 발명 장치가 설치된 상태의 교량의 정면도,2 is a front view of the bridge in a state where the present invention device is installed,

도 3은 본 발명에 따른 점검대가 분리된 상태의 정면도,3 is a front view of a check stand separated state according to the invention,

도 4은 도 2의 평단면도,4 is a plan sectional view of FIG. 2;

도 5는 본 발명에 따른 레일펜스의 일부 사시도 이다.5 is a partial perspective view of the rail fence according to the present invention.

*도면의주요부분에대한부호의설명** Explanation of symbols on the main parts of the drawings *

10 : 교량 11 : 가이드10: the bridge 11: guide

12 : 슈(shoe) 13 : 교각12: shoe 13: pier

20 : 레일펜스 21 : 레일20: rail fence 21: rail

22 : 레일펜스브래킷 30 : 이동사다리22: rail fence bracket 30: moving ladder

31 : 내측수직판 32,34 : 휠31: inner vertical plate 32, 34: wheel

33 : 외측수직판 40 : 풀리33: outer vertical plate 40: pulley

41 : 와이어 50 : 점검대41: wire 50: check table

51 : 제1점검대 52 : 제2점검대51: first checkpoint 52: second checkpoint

53 : 안전핀53: safety pin

다음 본 발명을 도면에 의거하여 구체적으로 설명하겠다.Next, the present invention will be described in detail with reference to the drawings.

도 1 및 도 2 에는 본 발명에 따른 이동식 교량 점검 장치가 도시되어 있는데, 이 이동식 교량 점검 장치는 교량(10)의 전 길이를 따라 왕복 이동하게 되는 점검대(50)와, 이 점검대(50)로 작업자가 이동할 수 있게 하는 두 개 한 쌍의 이동사다리(30) 및 이 이동사다리(30)를 교량(10)을 따라 이동되게 하는 두 개 한 쌍의 레일펜스(20)로 구성된다.1 and 2, there is shown a mobile bridge inspection apparatus according to the present invention, the mobile bridge inspection device is a check table 50 to reciprocate along the entire length of the bridge 10, and the check table (50) It consists of two pairs of moving ladders (30) for allowing the worker to move and two pairs of rail fences (20) for moving the moving ladders (30) along the bridge (10).

상기 교량(10)은 다수개의 교각(13)의 상부에 설치되고, 교각(13)과 교량(10)의 사이에는 교좌장치(shoe)인 슈(12)가 설치되며, 난간에는 가이드(11)가 설치된다. 그리고 상기 교량(10)이 시작되는 곳과 끝나는 곳의 난간에는 와이어(41)를 감거나 풀리게 하는 풀리(40)가 설치되는데, 이 풀리(40)는 교량(10)이 시작되는 곳의 난간 양쪽 및 교량(10)이 끝나는 곳의 나간 양쪽에 각각 설치된다. 즉, 모두 4개의 풀리(40)가 설치되며, 정역모터(도시 없음)의 동작에 따라 정역 회전되면서 와이어(41)가 풀리게 하거나 또는 감기게 하여 상기 이동사다리(30) 및 점검대(50)가 교량(10)을 따라 왕복 이동되게 한다.The bridge 10 is installed on the upper portion of the plurality of bridges 13, between the bridge 13 and the bridge 10 is provided with a shoe 12 as a shoe (shoe), the guide 11 on the railing Is installed. And there is a pulley 40 is installed on the railing of the place where the bridge 10 begins and ends, the wire 41 is wound or unwinded, the pulley 40 is both sides of the railing where the bridge 10 begins And both ends of the place where the bridge 10 ends. That is, all four pulleys 40 are installed, and the mobile ladder 30 and the check table 50 are rotated or reversed in accordance with the operation of the stationary motor (not shown) so that the wire 41 is released or wound. To reciprocate along bridge 10.

상기 레일펜스(20)는 "ㅗ"자의 형상을 이루면서 형성되는데, 상기 교량(10)의 난간 양쪽의 하부에 전 길이에 걸쳐 설치되고, 서로에 대해 평행하게 설치되며, 측면에서 보면 원호가 연속되는 형상을 이루면서 형성된다. 그리고 가운데 위치하게 되는 수직의 레일펜스(20)의 바닥면에는 레일(21)이 설치되는데, 이 레일(21)에는 이동사다리(30)의 휠(32)(34)이 구를 수 있게 된다. 상기 레일펜스(20)는 상기 이동사다리(30) 및 점검대(50)의 무게, 이동함에 따른 진동 및 충격에 충분히 견딜 수 있는 강도를 지니면서 형성되고, 도 4 도시와 같이 각 교각(13)의 상부면에 설치되는 레일펜스브래킷(22)의 양측단부에 고정되어 설치된다. 상기 레일펜스브래킷(22)은 교각(13)의 슈(12)를 피해 설치되며, 레일펜스(20)를 견고하게 위치되게 할 수 있는 강도를 지니면서 설치된다.The rail fence 20 is formed while forming the shape of the "ㅗ", is installed over the entire length on both sides of the railings of the bridge 10, are installed parallel to each other, the circular arc is continuous in side view It is formed while forming a shape. And the rail 21 is installed on the bottom surface of the vertical rail fence 20 to be located in the middle, the wheels 32, 34 of the moving ladder 30 can be rolled on the rail 21. The rail fence 20 is formed while having a strength that can sufficiently withstand the weight of the moving ladder 30 and the check table 50, vibration and impact of the movement, as shown in Figure 4 each bridge 13 It is fixed to both ends of the rail fence bracket 22 is installed on the upper surface of the. The rail fence bracket 22 is installed to avoid the shoe 12 of the piers 13, and is installed while having the strength to firmly position the rail fence 20.

상기 이동사다리(30)는 두 개 한 쌍으로 상기 교량(10)의 양쪽 난간에 각각 수직으로 설치되는데, 내측수직판(31)에 설치되는 휠(32)과, 외측수직판(33)에 설치되는 휠(34)이 각각 레일펜스(20)의 레일(21)에 설치되고, 교량(10)에 위치하는 작업자가 안전하게 점검대(50)로 이동할 수 있게 입구를 갖는 사다리체로 형성되며, 하부에는 상기 풀리(40)의 와이어(41)가 감기게 되는 철(39)이 설치된다. 상기 내측수직판(31)의 내측면에도 와이어(38)가 감기게 하거나 또는 풀리게 하는 풀리(35)가 설치되는데, 이 풀리(35) 역시 모터(도시 없음)의 동작에 의해 연동하게 된다.The mobile ladders 30 are installed in two pairs of rails 10 vertically on both sides of the bridge 10, and are installed on the wheel 32 and the outer vertical plate 33. Wheels 34 to be respectively installed on the rail 21 of the rail fence 20, the operator is located in the bridge 10 is formed of a ladder body having an inlet so that it can safely move to the inspection table 50, Iron 39 to which the wire 41 of the pulley 40 is wound is installed. The inner surface of the inner vertical plate 31 is provided with a pulley 35 for winding or releasing the wire 38, which is also linked by the operation of a motor (not shown).

상기 점검대(50)는 제1점검대(51)와 제2점검대(52)로 양분되는 한편, 가운데 부분이 안전핀(53)에 의해 결합되어 하나의 이동통로를 이루게 되는데, 각각의 점검대(51)(52)는 각각의 이동사다리(30)에 일단부가 스윙기어(36)에 의해 결합된다.The check table 50 is divided into a first check table 51 and a second check table 52, while the middle portion is coupled by the safety pin 53 to form a single moving passage, each check table 51 and 52 have one end coupled to each moving ladder 30 by a swing gear 36.

즉, 점검대(50)는 교량(10)을 따라 이동하게 되는 도중 교각(13)에 위치하게 되면, 스윙기어(36)를 동작시켜 도 3 및 도 4 도시와 같이 이동되게 함으로써, 교각(13)을 피해서 이동할 수 있게 되고, 이동 후에는 다시 스윙기어(36)를 동작시켜 도 2 도시와 같이 수평의 통로가 되게 하며, 안전핀(53)에 의해 2개의 점검대(51)(52)가 보다 견고하게 고정되게 할 수 있다.That is, when the inspection table 50 is positioned in the bridge 13 while moving along the bridge 10, the swing table 36 is moved to move as shown in FIGS. 3 and 4 by moving the swing gear 36. ), And after the movement, the swing gear 36 is operated again to be a horizontal passage as shown in FIG. 2, and the two inspection stands 51 and 52 are more secured by the safety pins 53. It can be fixed firmly.

이렇게 구성되는 본 발명은 각각의 교각(13) 상부면에 레일펜스브래킷(22)이 설치되게 하고, 레일펜스브래킷(22)에 양쪽에 레일펜스(20)가 설치되게 하고, 각 레일펜스(20)에 이동사다리(30)가 설치되게 하되, 휠(32)(34)이 레일(21)의 상부면에 위치되게 하고, 이동사다리(30) 각각에 점검대(51)(52)가 각각 설치되게 하고, 교량(10)의 풀리(40)에 감겨져 있는 와이어(41)를 이동사다리(30)의 휠(39)에 감겨지게 하고, 스윙기어(36)에 의해 점검대(51)(52)와 이동사다리(30)가 결합되게 하면 되는 것으로, 이동사다리(30)는 교량(10)의 작업자가 안전하게 이동될 수 있게 가이드(11)의 일측에 까지 연장되어 설치된다.The present invention is configured so that the rail fence bracket 22 is installed on the upper surface of each pier 13, the rail fence 20 is installed on both sides of the rail fence bracket 22, each rail fence 20 The mobile ladder 30 is installed in the above, but the wheels 32 and 34 are positioned on the upper surface of the rail 21, and the check tables 51 and 52 are respectively installed on the mobile ladders 30, respectively. The wires 41 wound on the pulleys 40 of the bridge 10 and wound on the wheels 39 of the moving ladder 30, and are checked by the swing gears 36 and 52. And the mobile ladder 30 is to be coupled, the mobile ladder 30 is installed to extend to one side of the guide 11 so that the worker of the bridge 10 can be moved safely.

교각(13)과 이에 인접한 교각(13)의 사이로의 이동시에는 도 2의 상태로 이동하게 되고, 교각(13)을 피해 이동할 때는 도 3의 상태로 점검대(51)(52)가 분리되게 한 상태로 이동하여 다시 도 2의 상태로 하나의 점검대(50)가 되게 하면 되는 것으로, 작업자는 교량(10)에서 이동사다리(30)를 통해 점검대(50)가 이동할 수 있게 된다.When moving between the pier 13 and the adjacent pier 13 is moved to the state of FIG. 2, when moving away from the pier 13, the inspection stand 51, 52 is separated in the state of FIG. What is necessary is to have one check stand 50 in the state of FIG. 2 again by moving to a state, the operator can move the check stand 50 through the moving ladder 30 in the bridge (10).

이상과 같이 본 발명에 의하면, 교각을 피해 이동되는 점검대가 교량의 하부에 설치되는 한편, 교량의 전체 길이를 따라 왕복됨으로써, 보다 편리하게 보수 점검 작업을 수행할 수 있게 되는 효과가 있는 것이다.According to the present invention as described above, while the inspection platform to move away from the bridge is installed in the lower portion of the bridge, and reciprocated along the entire length of the bridge, there is an effect that can be more easily performed maintenance inspection work.

Claims (2)

교각(13)이 다수개 설치되는 교량(10)에 점검 장치를 시공함에 있어서,In constructing the inspection device on the bridge 10 in which a plurality of bridges 13 are installed, 상기 교량(10)의 양측 난간 하부에 "ㅗ"자 형상의 레일펜스(21)가 각각 설치되게 하되, 서로에 대해 평행하게 설치되게 하는 한편, 교각(13)의 상면에 레일펜스브래킷(22)이 설치되게 하여 그 단부에 상기 레일펜스(21)가 고정되게 하는 단계와;The rail fences 21 having a “ㅗ” shape are respectively installed at both sides of the lower rails of the bridge 10, and are installed to be parallel to each other, while the rail fence brackets 22 are formed on the upper surface of the bridges 13. Allowing the rail fence (21) to be fixed to an end thereof so as to be installed; 작업자가 오르내릴 수 있게 되는 사다리체로, 중단부의 하부에 상기 레일펜스(20)의 레일(21)을 따라 구르게되는 휠(32)(34)이 설치되며, 상기 교량(10)의 양측 난간에 수직으로 각각 설치되는 이동사다리(30)가 설치되게 하는 단계와;As a ladder body that allows the operator to move up and down, wheels 32 and 34 rolled along the rails 21 of the rail fence 20 are installed in the lower part of the suspension portion, and on both handrails of the bridge 10. Allowing the mobile ladders 30 to be installed vertically to each other; 상기 각각의 이동사다리(30)의 내측에 수평상태로 설치되는 한편, 스윙기어(36)에 의해 서로 연결되거나 또는 분리되며, 작업자가 이동할 수 있는 통로를 제공하게 되는 점검대(50)를 설치하는 단계와;While installed in the horizontal state on the inside of each of the moving ladder 30, connected to or separated from each other by the swing gear 36, to install the check table 50 to provide a passage for the operator to move Steps; 상기 교량(10)의 양쪽에 각각 설치되는 한편, 상기 이동사다리(30)의 하부에 설치되는 휠(39)에 와이어(41)로 연결되어 이동사다리(30)가 교량(10)을 따라 왕복이동되게 하는 단계로 됨을 특징으로 하는 이동식 교량 점검 장치의 시공방법.It is installed on both sides of the bridge 10, respectively, the wire 39 is connected to the wheel 39 is installed on the lower portion of the mobile ladder 30, the mobile ladder 30 reciprocating along the bridge 10 Construction method of a mobile bridge inspection device, characterized in that the step of making. 교각(13)이 다수개 설치되는 교량(10)에 점검 장치를 시공함에 있어서,In constructing the inspection device on the bridge 10 in which a plurality of bridges 13 are installed, 상기 교량(10)의 양측 난간 하부에 "ㅗ"자 형상의 레일펜스(21)가 각각 설치되게 하되, 서로에 대해 평행하게 설치되게 하는 한편, 교각(13)의 상면에 레일펜스브래킷(22)이 설치되게 하여 그 단부에 상기 레일펜스(21)가 고정되게 하고; 작업자가 오르내릴 수 있게 되는 사다리체로, 중단부의 하부에 상기 레일펜스(20)의 레일(21)을 따라 구르게되는 휠(32)(34)이 설치되며, 상기 교량(10)의 양측 난간에 수직으로 각각 설치되는 이동사다리(30)가 설치되게 하고; 상기 각각의 이동사다리(30)의 내측에 수평상태로 설치되는 한편, 스윙기어(36)에 의해 서로 연결되거나 또는 분리되며, 작업자가 이동할 수 있는 통로를 제공하게 되는 점검대(50)를 설치되게 하고; 상기 교량(10)의 양쪽에 각각 설치되는 한편, 상기 이동사다리(30)의 하부에 설치되는 휠(39)에 와이어(41)로 연결되어 이동사다리(30)가 교량(10)을 따라 왕복이동되게 하는 이동식 교량 점검 장치.The rail fences 21 having a “ㅗ” shape are respectively installed at both sides of the lower rails of the bridge 10, and are installed to be parallel to each other, while the rail fence brackets 22 are formed on the upper surface of the bridges 13. To be installed so that the rail fence 21 is fixed to an end thereof; As a ladder body that allows the operator to move up and down, wheels 32 and 34 rolled along the rails 21 of the rail fence 20 are installed in the lower part of the suspension portion, and on both handrails of the bridge 10. Mobile ladders 30 respectively installed vertically are installed; While being installed in the horizontal state on the inside of each of the moving ladder 30, connected to or separated from each other by the swing gear 36, to install a check table 50 to provide a passage for the operator to move and; It is installed on both sides of the bridge 10, respectively, the wire 39 is connected to the wheel 39 is installed on the lower portion of the mobile ladder 30, the mobile ladder 30 reciprocating along the bridge 10 Removable bridge inspection device.
KR1020020066706A 2002-10-30 2002-10-30 Mobile bridge inspection device and construction method KR20040039063A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020020066706A KR20040039063A (en) 2002-10-30 2002-10-30 Mobile bridge inspection device and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020020066706A KR20040039063A (en) 2002-10-30 2002-10-30 Mobile bridge inspection device and construction method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2002-0032661U Division KR200302139Y1 (en) 2002-10-31 2002-10-31 Movable Bridge Inspection Device

Publications (1)

Publication Number Publication Date
KR20040039063A true KR20040039063A (en) 2004-05-10

Family

ID=37336913

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020020066706A KR20040039063A (en) 2002-10-30 2002-10-30 Mobile bridge inspection device and construction method

Country Status (1)

Country Link
KR (1) KR20040039063A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100823859B1 (en) * 2006-12-07 2008-04-21 정재룡 Inspection & repair method and the device for an elevated road
KR101019505B1 (en) * 2010-11-01 2011-03-07 변지수 An inside check method of the steel box which uses the bicycle

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61141314U (en) * 1985-02-21 1986-09-01
JPH0726516A (en) * 1993-07-07 1995-01-27 Hitachi Zosen Corp Maintenance device of bridge girder and fitting device thereof
KR0182383B1 (en) * 1996-11-20 1999-04-01 이성희 Inner working table
KR19990017465U (en) * 1998-12-31 1999-05-25 이석원 Support structure of bridge inspection car
KR20000049885A (en) * 2000-05-04 2000-08-05 이석원 Working automobile for check and maintenance of bridges
KR200197359Y1 (en) * 2000-05-04 2000-09-15 영신기공주식회사 Moving facility for check, maintenance and construction of bridges
KR20020054259A (en) * 2000-12-27 2002-07-06 최성문 Bridge inspection device and construction method
KR20030088624A (en) * 2002-05-13 2003-11-20 최성문 Mobile bridge inspection device and construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61141314U (en) * 1985-02-21 1986-09-01
JPH0726516A (en) * 1993-07-07 1995-01-27 Hitachi Zosen Corp Maintenance device of bridge girder and fitting device thereof
KR0182383B1 (en) * 1996-11-20 1999-04-01 이성희 Inner working table
KR19990017465U (en) * 1998-12-31 1999-05-25 이석원 Support structure of bridge inspection car
KR20000049885A (en) * 2000-05-04 2000-08-05 이석원 Working automobile for check and maintenance of bridges
KR200197359Y1 (en) * 2000-05-04 2000-09-15 영신기공주식회사 Moving facility for check, maintenance and construction of bridges
KR20020054259A (en) * 2000-12-27 2002-07-06 최성문 Bridge inspection device and construction method
KR20030088624A (en) * 2002-05-13 2003-11-20 최성문 Mobile bridge inspection device and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100823859B1 (en) * 2006-12-07 2008-04-21 정재룡 Inspection & repair method and the device for an elevated road
KR101019505B1 (en) * 2010-11-01 2011-03-07 변지수 An inside check method of the steel box which uses the bicycle

Similar Documents

Publication Publication Date Title
CN201506699U (en) Electric lifting bridge rack for construction
CN207609153U (en) A kind of elevator liftable construction operation platform
CN206707237U (en) Cable-stayed type top layer construction platform for elevator installation
KR20190041189A (en) Modular work platform of a long span bridge main tower rebar and construction method using the same
KR100504426B1 (en) Movable Bridge Inspection Device
KR20160109081A (en) Carriage for Bridge
CN110714611A (en) Light climbing formwork steel frame system
KR100823859B1 (en) Inspection & repair method and the device for an elevated road
CN109279480A (en) A kind of steel structure lift shaft splicing apparatus and method
KR200302139Y1 (en) Movable Bridge Inspection Device
KR20040039063A (en) Mobile bridge inspection device and construction method
CN108118885B (en) vertical moving type protection platform and application thereof in steel structure column butt joint construction
KR200286028Y1 (en) Movable Bridge Inspection Device
CN212532065U (en) Gantry crane capable of being used in different height difference places
KR20020054259A (en) Bridge inspection device and construction method
JP5356091B2 (en) Crane girder exchanging method and crane girder exchanging apparatus
CN209924407U (en) Combined working platform for steel structure high-altitude installation
CN219297995U (en) Working platform for large cantilever bent cap prestress secondary tensioning and grouting
RU2334068C2 (en) Method of repair and reconstruction of high-rise reinforced concrete structures with variable taper, for instance, cooling towers and industrial pipes
CN214144632U (en) Novel hanging basket capable of being installed quickly
KR100534072B1 (en) Mobile inspection stand for bridge and construction method
CN114104939B (en) Steel framework hoisting process, hoisting equipment and auxiliary device
CN214570540U (en) Lifting platform device capable of being used movably
CN213681766U (en) Arch bridge arch ring overhauls lift work platform
CN211447691U (en) Construction platform special for steel structure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application