A mold supporting member of upper slab for bridge Download PDF

Info

Publication number
KR200351728Y1
KR200351728Y1 KR20-2004-0001994U KR20040001994U KR200351728Y1 KR 200351728 Y1 KR200351728 Y1 KR 200351728Y1 KR 20040001994 U KR20040001994 U KR 20040001994U KR 200351728 Y1 KR200351728 Y1 KR 200351728Y1
Authority
KR
South Korea
Prior art keywords
horizontal beam
fixed
bridge
horizontal
coupled
Prior art date
Application number
KR20-2004-0001994U
Other languages
Korean (ko)
Inventor
민영은
Original Assignee
이종현
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이종현 filed Critical 이종현
Priority to KR20-2004-0001994U priority Critical patent/KR200351728Y1/en
Application granted granted Critical
Publication of KR200351728Y1 publication Critical patent/KR200351728Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 고안은 스틸박스 공법으로 시공되는 교량의 상부 슬라브를 타설하기 위하여 상판을 받쳐주는 받침부재에 관한 것으로, 상세히는 길이조절빔이 결합되어 길이가 조절되면서 상면에 고정판이 부착된 가로빔과 상기 가로빔의 상부에 위치되는 세로빔이 상기 가로빔의 상면에 부착된 고정판에 의해 유동되지 않게 고정되도록 가로빔과 세로빔으로 받침부재를 구성함으로써 교량용 상부 슬라브의 거푸집 설치 및 해체 작업이 용이한 교량용 상부 슬라브의 거푸집 받침부재에 관한 것이다.The present invention relates to a support member for supporting the upper plate for placing the upper slab of the bridge to be constructed by the steel box method, in detail, the horizontal beam and the horizontal beam is fixed to the upper surface while the length is adjusted by the combined length adjustment beam The bridge is easy to install and dismantle the formwork of the upper slab for the bridge by configuring the supporting member with the horizontal beam and the vertical beam so that the vertical beam located on the upper part of the beam is fixed so as not to flow by the fixing plate attached to the upper surface of the horizontal beam. It relates to a formwork member of an upper slab.

본 고안은 스틸박스 공법이 적용되는 교량의 상부 슬라브를 타설하기 위하여 상판을 받쳐주는 받침부재를 구성함에 있어서,The present invention is to construct a support member for supporting the upper plate for placing the upper slab of the bridge to which the steel box method is applied,

일단면에서 돌출되어 체결공이 형성된 체결구를 구비한 길이조절빔이 선단 내부로 결합되어 길이 조절이 되는 가로빔과, 내부에 각재가 결합된 세로빔과, 상기 가로빔의 상면에 부착되고, 세로빔의 폭에 맞는 간격마다 상부로 돌출된 걸림턱이 길이방향으로 연속적으로 형성된 고정판으로 이루어져,The length adjusting beam having a fastener formed by a fastening hole protruding from one end surface is coupled to the inside of the front end of the horizontal beam to adjust the length, the longitudinal beam is coupled to the inner material, and is attached to the upper surface of the horizontal beam, The locking projection protruding upward at intervals corresponding to the width of the beam consists of a fixed plate that is continuously formed in the longitudinal direction,

상기 고정판의 걸림턱 사이에 세로빔이 올려져서 고정되도록 한 것을 특징으로 한다.It is characterized in that the vertical beam is fixed to be raised between the locking jaw of the fixing plate.

Description

교량용 상부 슬라브의 거푸집 받침부재{A MOLD SUPPORTING MEMBER OF UPPER SLAB FOR BRIDGE}Formwork for upper slabs for bridges {A MOLD SUPPORTING MEMBER OF UPPER SLAB FOR BRIDGE}

본 고안은 스틸박스 공법으로 시공되는 교량의 상부 슬라브를 타설하기 위하여 상판을 받쳐주는 받침부재에 관한 것으로, 상세히는 길이조절빔이 결합되어 길이가 조절되면서 상면에 고정판이 부착된 가로빔과 상기 가로빔의 상부에 위치되는 세로빔이 상기 가로빔의 상면에 부착된 고정판에 의해 유동되지 않게 고정되도록 가로빔과 세로빔으로 받침부재를 구성함으로써 교량용 상부 슬라브의 거푸집 설치 및 해체 작업이 용이한 교량용 상부 슬라브의 거푸집 받침부재에 관한 것이다.The present invention relates to a support member for supporting the upper plate for placing the upper slab of the bridge to be constructed by the steel box method, in detail, the horizontal beam and the horizontal beam is fixed to the upper surface while the length is adjusted by the combined length adjustment beam The bridge is easy to install and dismantle the formwork of the upper slab for the bridge by configuring the supporting member with the horizontal beam and the vertical beam so that the vertical beam located on the upper part of the beam is fixed so as not to flow by the fixing plate attached to the upper surface of the horizontal beam. It relates to a formwork member of an upper slab.

일반적으로 교량의 상부 구조물의 시공법에 있어서, 다수의 교각 상에 일정한 규격의 스틸박스를 서로 연결시켜서 정렬하고 이와 같이 서로 연결된 스틸박스의 상부에 콘크리트를 타설함으로써 상부 슬라브를 완성하는 스틸박스 공법이 널리 실시되고 있다.In general, in the construction method of the upper structure of the bridge, the steel box method of completing the upper slab by arranging by connecting the steel box of a certain standard on a plurality of bridges to each other and placing the concrete on top of the steel box connected to each other is widely used It is carried out.

이러한 스틸박스 공법에 사용되고 있는 거푸집은, 스틸박스에 설치되어 있는 스터드볼트에 고정된 고정구에 가로빔이 볼트와 너트를 이용하여 상호 결합되고, 상기 가로빔의 상부에는 목재로 된 각재를 올려놓고 상기 가로빔과 그 상부에 위치한 각재를 철사로 함께 결속시켜서 각재를 가로빔에 고정시키고, 상기 각재 상부에는 콘크리트 타설시 슬라브 바닥면이 되도록 하는 상판을 위치시켜서 거푸집을 설치하고 있다.The formwork used in the steel box method, the horizontal beams are coupled to each other using bolts and nuts to a fixture fixed to the stud bolts installed in the steel box, the wooden beams on top of the horizontal beams The beams are bound together with wires on top of the horizontal beams to fix them on the horizontal beams, and the tops are placed on top of the beams so that the slabs are placed on the floor when concrete is placed.

이와 같이, 거푸집 설치시에 일일이 가로빔을 고정구에 볼트로 고정하고, 각재를 위치시키고 철사로 결속시켜야 했으므로 작업성이 떨어지는 문제점이 있었다.As such, when installing the formwork, the horizontal beam was fixed to the fixture by bolts, and the work pieces had to be inferior because the angles were to be positioned and bound by wires.

또, 스틸박스의 사각공간 양측에 고정된 고정구에 가로빔을 고정함에 있어서, 가로빔의 길이를 사각공간의 길이에 맞게 매번 새로 가로빔을 제작해야 하는 작업상의 불편이 있었다.In addition, in fixing the horizontal beam to the fixture fixed to both sides of the rectangular space of the steel box, there was an inconvenience in the work to produce a horizontal beam each time to match the length of the horizontal beam to the length of the rectangular space.

또, 이렇게 설치되어 콘크리트 타설,양생 후 고정구에 고정된 가로빔을 해체시키기 위해서는 상기 고정구에 결합된 볼트 또는 너트를 일일이 풀어주어야 했으므로 설치시와 마찬가지로 작업성이 떨어지게 되고, 가로빔과 각재를 결속시킨 철사도 일일이 절단시켜야 했으므로 그 위치상 작업자세가 불안정하고 순차적으로 결속된 철사를 절단시키면서 마지막으로 결속된 철사를 절단시킬 경우, 간혹, 일순간에 가로빔이 낙하하게 되어 안전사고가 발생하게 되는 문제점이 있었다.In addition, in order to dismantle the horizontal beam fixed to the fixture after concrete installation and curing, the bolt or nut coupled to the fixture had to be released one by one, so workability is reduced as in the installation. Since the wires had to be cut by hand, the work posture was unstable in the position, and when cutting the wires that were finally tied while cutting the wires that were sequentially tied, sometimes the horizontal beam dropped in an instant, causing a safety accident. there was.

또한, 고정구에 결합된 볼트가 잘 풀리지 않을 경우에는 볼트가 결합된 부위를 망치등의 공구로 가격하여 분리시키게 됨으로써 가로빔이 휘어지거나 파손되고, 통상 2~3회 정도 사용된 각재는 변형이 이루어져서 재사용할 수 없었기 때문에 자재낭비로 인한 시공비용이 상승하게 되는 비경제적인 문제점이 있었다.In addition, when the bolts are not loosely coupled to the fixture, by separating the bolts with a tool such as a hammer to separate them, the horizontal beam is bent or broken, and the corner material used two or three times is deformed. Since it could not be reused, there was an uneconomical problem that the construction cost is increased due to waste of materials.

본 고안은 상기한 바와 같은 문제점을 해결하기 위해서 고안한 것으로서, 본 고안에 따른 교량용 상부 슬라브의 거푸집 받침부재는,The present invention is devised to solve the above problems, the formwork supporting member of the upper slab for bridges according to the present invention,

가로빔과 세로빔으로 구성하되, 가로빔은 길이 조절이 가능하게 그 선단에 길이조절빔을 결합하여 스틸박스의 사각공간에 맞추어서 스틸박스의 스터드볼트에고정되어 있는 고정구에 간편하게 고정시킬 수 있고, 상기 가로빔의 상면에서 세로빔이 유동되지 않게 하여 교량용 상부 슬라부의 거푸집 설치 작업이 간편함과 동시에 해체 작업도 용이하여 안전하게 해체작업을 할 수 있으며, 해체된 가로빔과 세로빔을 재활용할 수 있는 교량용 상부 슬라브의 거푸집 받침부재를 제공하는 데 그 목적이 있다.Composed of horizontal beam and vertical beam, the horizontal beam can be easily fixed to the fixture fixed to the stud bolt of the steel box in accordance with the square space of the steel box by combining the length adjustment beam at the tip to enable the length adjustment, Since the vertical beam does not flow on the upper surface of the horizontal beam, the formwork of the upper slab for bridges is easy to install, and the dismantling operation is easy, so that the dismantling work can be safely performed, and the disassembled horizontal and vertical beams can be recycled. It is an object of the present invention to provide a formwork member for an upper slab for a bridge.

상기한 바와 같은 목적을 달성하기 위해 본 고안은,The present invention to achieve the object as described above,

스틸박스 공법이 적용되는 교량의 상부 슬라브를 타설하기 위하여 상판을 받쳐주는 받침부재를 구성함에 있어서,In constructing the supporting member supporting the upper plate for placing the upper slab of the bridge to which the steel box method is applied,

일단면에서 돌출되어 체결공이 형성된 체결구를 구비한 길이조절빔이 선단 내부로 결합되어 길이 조절이 되는 가로빔과;A horizontal beam having a fastener formed by a fastening hole protruding from one end of the horizontal beam, the length of the horizontal beam being coupled to the inside of the distal end;

내부에 각재가 결합된 세로빔과;A longitudinal beam coupled with a lumber inside;

상기 가로빔의 상면에 부착되고, 세로빔의 폭에 맞는 간격마다 상부로 돌출된 걸림턱이 길이방향으로 연속적으로 형성된 고정판으로 이루어져,It is attached to the upper surface of the horizontal beam, the locking projection protruding upward at intervals corresponding to the width of the vertical beam consists of a fixed plate continuously formed in the longitudinal direction,

상기 고정판의 걸림턱 사이에 세로빔이 올려져서 고정되도록 한 것을 특징으로 한다.It is characterized in that the vertical beam is fixed to be raised between the locking jaw of the fixing plate.

또, 상기 길이조절빔 일단면의 체결구 하측에는 일부가 절개된 삽입부를 더 포함하는 것을 특징으로 한다.In addition, the lower side of the fastener of the one end of the length adjustment beam is characterized in that it further comprises an insert portion cut off.

또한, 상기 길이조절빔은 체결공에 체결하여 고정되도록 하는 고정핀을 더 포함하되, 상기 고정핀은 외주연의 일부가 평면으로 절개된 절개면이 형성되어 상기 체결공에 결합되어 회전시켜서 고정되도록 한 것을 특징으로 한다.In addition, the length adjustment beam further comprises a fixing pin to be fixed to the fastening hole, the fixing pin is formed by the incision surface cut into a portion of the outer periphery plane is coupled to the fastening hole to be fixed by rotating It is characterized by one.

도 1은 본 고안에 따른 받침부재의 구성을 보인 분리사시도이고,1 is an exploded perspective view showing the configuration of the support member according to the present invention,

도 2는 본 고안에 따른 받침부재의 결합상태 단면도이고,2 is a cross-sectional view of the coupling state of the support member according to the present invention,

도 3은 본 고안에 따른 받침부재의 설치상태 단면도이다.3 is a cross-sectional view of the installation state of the support member according to the present invention.

*도면의 주요 부분에 대한 부호의 설명* Explanation of symbols for the main parts of the drawings

1 : 받침부재 10 : 가로빔1: support member 10: horizontal beam

11 : 개구부 12 : 결합공11 opening 12 engaging hole

13 : 고정볼트 14 : 길이조절빔13: fixed bolt 14: length adjustment beam

15 : 단턱부 16 : 체결구15: stepped portion 16: fastener

16a : 체결공 17 : 삽입부16a: fastening hole 17: insert

18 : 체결핀 20 : 고정판18: fastening pin 20: fixed plate

21 : 걸림턱 22 : 절곡부21: engaging jaw 22: bent portion

23 : 세로빔 24 : 각재23: vertical beam 24: angle

25 : 오목홈 26 : 보강대25: concave groove 26: reinforcement

100 : 스틸박스 101 : 스터드볼트100: steel box 101: stud bolt

102 : 상판 103 : 슬라브102: the top plate 103: slab

이하, 첨부된 도면을 참조하여 본 고안에 따른 교량용 상부 슬라브의 거푸집 받침부재에 대한 일 실시예를 상세히 설명한다. 우선, 도면들중, 동일한 구성요소 또는 부품들은 가능한 한 동일한 참조부호를 나타내고 있음에 유의하여야 한다. 본 고안을 설명함에 있어, 관련된 공지기능 혹은 구성에 대한 구체적인 설명은 본 고안의 요지를 모호하지 않게 하기 위하여 생략한다.Hereinafter, with reference to the accompanying drawings will be described in detail an embodiment of the formwork receiving member of the upper slab for bridges according to the present invention. First of all, it should be noted that in the drawings, the same components or parts denote the same reference numerals as much as possible. In describing the present invention, detailed descriptions of related well-known functions or configurations are omitted so as not to obscure the subject matter of the present invention.

도 1은 본 고안에 따른 받침부재의 구성을 보인 분리사시도로서, 도시한 바와 같이,1 is an exploded perspective view showing the configuration of the support member according to the present invention, as shown,

본 고안에 따른 받침부재(1)는 길이조절빔(14)이 선단에 결합된 가로빔(10)과 상기 가로빔(10)의 상부에 설치되며 내부에 각재(24)가 결합된 세로빔(23)과 상기 가로빔(10)의 상부에 설치되는 세로빔(23)이 유동되지 않게 고정시키는 고정판(20)으로 구성된다.The supporting member 1 according to the present invention is installed on the horizontal beam 10 having the length control beam 14 coupled to the tip and the vertical beam having the horn 24 coupled therein. 23 and a fixed plate 20 for fixing the vertical beam 23 installed on the upper portion of the horizontal beam 10 does not flow.

상기 가로빔(10)은 내부가 비어있는 사각빔 형태로 길게 형성되고, 선단이 개방된 개구부(11)를 통해 길이조절빔(14)이 결합되어 있는 데, 이와 동일한 구조로 상기 가로빔(10)의 타측 선단부(도면에서 생략된 부분)에도 길이조절빔(14)이 결합되어 있다.The horizontal beam 10 is formed to be long in the form of a hollow square beam, the length control beam 14 is coupled through the opening 11 with the tip open, the horizontal beam 10 in the same structure The length adjusting beam 14 is also coupled to the other end portion () of the drawing).

상기 길이조절빔(14)은 가로빔(10)의 개구부(11)와 동일한 크기인 사각빔 형태로 일정길이 형성되어 있는 데, 그 일단면은 막혀진 구조로서, 상기 개구부(11)에 삽입될 때에 가로빔(10)의 내부로 완전히 삽입되지 않게 단턱부(15)가 형성되어 있고, 체결공(16a)이 천공된 체결구(16)가 돌출,형성되어 있으며, 체결구(16)의 하측은 일부분이 절개되어 삽입부(17)가 형성되어 있다.The length adjusting beam 14 has a predetermined length in the form of a square beam having the same size as the opening 11 of the horizontal beam 10, one end of which is a blocked structure, to be inserted into the opening 11 At the time, the stepped portion 15 is formed so as not to be completely inserted into the horizontal beam 10, and the fastener 16 in which the fastening hole 16a is drilled is formed, and the lower side of the fastener 16 is formed. A portion of the silver is cut off so that the insertion part 17 is formed.

그리고, 길이조절빔(14)은 가로빔(10)의 개구부(11)를 통해 삽입되어 좌,우 이동시켜 가로빔(10)의 길이를 조절할 수 있는 데, 상기 가로빔(10)의 선단부 일면에는 내부로 관통된 결합공(12)에 고정볼트(13)를 결합시켜서 길이조절빔(14)이 소정길이로 조절된 상태를 고정볼트(13)의 조임에 의해 고정시키게 된다.In addition, the length adjustment beam 14 is inserted through the opening 11 of the horizontal beam 10 to move left and right to adjust the length of the horizontal beam 10, one end of the horizontal beam 10 The fixing bolt 13 is coupled to the coupling hole 12 penetrated thereinto to fix the length adjustment beam 14 to a predetermined length by tightening the fixing bolt 13.

한편, 상기 길이조절빔(14)의 체결공(16a)에 결합되어 가로빔(10)을 스틸박스(100)의 스터드볼트(101)에 고정된 고정구(30)에 고정시키는 고정핀(18)은 외주연의 일부가 평면으로 절개된 절개면(18a) 형성되어 있다. 그리고, 상기 절개면(18a)의 일측 모서리에는 고정구(30)의 평판 폭만큼 홈(18b)이 형성되어 있다.On the other hand, the fixing pin 18 is coupled to the fastening hole 16a of the length adjustment beam 14 to fix the horizontal beam 10 to the fixture 30 fixed to the stud bolt 101 of the steel box 100 The incision surface 18a by which a part of outer periphery was cut | disconnected in plane is formed. In addition, a groove 18b is formed at one side edge of the cut surface 18a by the width of the flat plate 30 of the fixture 30.

상기 가로빔(10)의 상부에 설치되는 세로빔(23)은 상부가 개방된 사각빔 형태로 형성되고, 양측면의 중간부위에는 내측으로 오목하게 들어간 오목홈(25)이 길이방향으로 형성되어, 내측으로 돌출된 오목홈(25)의 상부에 각재(24)가 결합되고, 오목홈(25)의 하부에는 상기 세로빔(23)의 지지력을 보강할 수 있도록 보강대(26)가 고정되어 있다.The vertical beam 23 installed on the upper portion of the horizontal beam 10 is formed in the shape of a square beam with an open upper portion, and the concave groove 25 recessed inwardly in the middle portion of both sides is formed in the longitudinal direction, The horn 24 is coupled to the upper portion of the concave groove 25 protruding inward, and the reinforcing table 26 is fixed to the lower portion of the concave groove 25 so as to reinforce the supporting force of the vertical beam 23.

상기 세로빔(23)을 가로빔(10)의 상부에 고정시키는 고정판(20)은 세로빔(23)의 폭에 맞는 간격마다 상부로 돌출된 걸림턱(21)이 길이방향으로 연속적으로 형성되어 있어 상기 걸림턱(21)과 걸림턱(21) 사이에 세로빔(24)이 올려져서 좌,우 유동되지 않게 고정된다. 상기 걸림턱(21)은 세로빔(23)의 폭에 맞는 간격마다 연속적으로 형성하여 세로빔(23)을 가로빔(10)의 상부 어느 위치에서도 고정시킬 수 있게 하거나, 세로빔(23)이 설치되는 정도의 길이에 맞춰 좌,우 걸림턱(21)이 형성될 수도 있다.The fixing plate 20 for fixing the vertical beam 23 to the upper portion of the horizontal beam 10 has a latching jaw 21 protruding upward at intervals corresponding to the width of the vertical beam 23 is continuously formed in the longitudinal direction. The vertical beam 24 is raised between the locking jaw 21 and the locking jaw 21 so that it is fixed not to flow left and right. The latching jaw 21 may be continuously formed at intervals corresponding to the width of the vertical beams 23 so that the vertical beams 23 may be fixed at any position above the horizontal beams 10, or the vertical beams 23 may be fixed. Left and right locking jaw 21 may be formed in accordance with the length of the installation.

상기 고정판(20)은 상부에 걸림턱(22)이 돌출된 평판으로 형성하여 가로빔(10)의 상면에 맞대어져 스폿용접하여 부착하거나, 평판의 전,후측을 하측으로 절곡시켜서 가로빔(10)의 전,후면 상부에서 걸려질 수 있는 절곡부(22)를 형성하여 가로빔(10)과 스폿용접하여 가로빔(10)의 상면에 견고하게 부착시킬 수 있다.The fixing plate 20 is formed as a flat plate protruding from the upper end of the horizontal beam 10 to form a flat plate protruding the engaging projection 22, or by bending the front and rear sides of the flat plate downward to the horizontal beam 10 By forming a bent portion 22 that can be caught in the upper, front, rear of the can be spot welded to the horizontal beam 10 can be firmly attached to the upper surface of the horizontal beam (10).

도 2는 본 고안에 따른 받침부재의 결합상태 단면도로서, 도시한 바와 같이,2 is a cross-sectional view of the coupling state of the support member according to the present invention, as shown,

가로빔(10)의 선단부 내부에 결합된 길이조절빔(14)을 고정구(30)측으로 이동시켜서 체결구(16)가 고정구(30)의 고정공(32)에 체결시키고, 고정핀(18)을 체결구(16)에 형성된 체결공(16a)에 결합하여 가로빔(10)을 고정구(30)에 고정시키는 데, 이 때, 고정핀(18)의 절개면(18a)이 고정구(30)의 배면에 맞대어지게 삽입한 후 회전시키면 고정핀(18)의 절개면(18a) 일측 모서리 고정구(30)의 평판 폭정도로 형성되어 있는 홈(18b)부위에 고정구(30)가 밀착되면서 고정핀(18)이 체결공(16a)에서 쉽게 빠지지 않게 고정된다.The fastener 16 is fastened to the fastening hole 32 of the fastener 30 by moving the length adjustment beam 14 coupled to the inside of the distal end of the horizontal beam 10 to the fastener 30, and the fastening pin 18. Is coupled to the fastening hole 16a formed in the fastener 16 to fix the horizontal beam 10 to the fastener 30. At this time, the cutting surface 18a of the fastening pin 18 is fixed to the fastener 30. Inserted so as to be opposed to the back surface of the fixing pin (18) of the incision surface (18a) of the fixing pin 18, the fixing pin (30) is in close contact with the groove (18b) is formed to the flat plate width of about one side 18) is fixed to the fastening hole (16a) not to be easily removed.

그리고, 가로빔(10)의 일면에 결합되어 있는 고정볼트(13)를 조여서 길이조절빔(14)이 가로빔(10) 선단에서 좌,우 이동되지 않게 고정되고, 가로빔(10)의 상면에 고정된 고정판(20)의 걸림턱(21) 사이에 세로빔(23)이 올려져서 걸림턱(22)에 의해 좌,우 유동되지 않고 고정된다.Then, by tightening the fixing bolt 13 coupled to one surface of the horizontal beam 10, the length adjustment beam 14 is fixed so as not to move left and right at the front end of the horizontal beam 10, the upper surface of the horizontal beam 10 The vertical beams 23 are raised between the locking jaws 21 of the fixing plate 20 fixed to the fixed plates 20 so that the vertical beams 23 do not flow left and right by the locking jaws 22.

도 3은 본 고안에 따른 받침부재의 설치상태 단면도로서, 도 3을 참조하여 본 고안에 따른 받침부재(1)의 설치 및 해체 작업을 설명하면 다음과 같다.3 is a cross-sectional view of the installation state of the support member according to the present invention, the installation and dismantling operation of the support member 1 according to the present invention with reference to FIG.

스틸박스(100)의 스터드볼트(101)에 고정되어 있는 고정구(30)의 고정공(32)에 길이조절빔(14)의 체결구(16)가 삽입되어 고정핀(18)으로 고정되고, 가로빔(10)의 상면에 부착된 고정판(20)의 걸림턱(21) 사이에 세로빔(24)이 설치되는 데, 상기 세로빔(23)은 다수개가 고정판(20)의 길이방향으로 연속적으로 형성된 걸림턱(21) 사이에 위치되어 설치되고, 상기 세로빔(23)의 상부에는 콘크리트가 타설되어 슬라브(103) 바닥면이 되도록 하는 상판(102)을 위치시켜서 거푸집의 설치 작업을 마치게 된다.The fastener 16 of the length adjustment beam 14 is inserted into the fixing hole 32 of the fixing tool 30 fixed to the stud bolt 101 of the steel box 100 and fixed with the fixing pin 18, Vertical beams 24 are installed between the latching jaws 21 of the fixed plate 20 attached to the upper surface of the horizontal beam 10, the plurality of vertical beams 23 are continuous in the longitudinal direction of the fixed plate 20 Located between and installed between the engaging jaw 21, the upper portion of the vertical beam 23 is placed on top of the slab 103 to place the concrete slab 103 to finish the installation work of the formwork .

그리고, 설치된 거푸집에 콘크리트를 타설, 양생한 후 거푸집을 해체할 때에는 길이조절빔(14)의 체결구(16)에 체결되어 있는 고정핀(18)을 회전시켜서 분리시키고, 상기 길이조절빔(14)의 선단 하측에 형성된 삽입부(17)를 통해 지렛대의 원리를 이용한 공구인 레바를 삽입하여 고정구(30)를 제껴주면 길이조절빔(14)이 결합된 상태로 가로빔(10)과 상기 가로빔(10)의 상부에 설치된 세로빔(23)과 상기 세로빔(23)의 상부에 설치된 상판(102)이 함께 낙하되면서 해체된다.And, after pouring and curing concrete in the installed formwork to dismantle the formwork by rotating the fixing pin 18 is fastened to the fastener 16 of the length control beam 14, the length control beam 14 When the lever 30, which is a tool using the principle of the lever, is inserted through the insertion part 17 formed at the lower end of the front end, the horizontal adjustment beam 14 and the horizontal beam 10 are coupled to each other. The vertical beam 23 installed on the upper portion of the beam 10 and the upper plate 102 provided on the upper portion of the vertical beam 23 fall together to be disassembled.

미설명 부호 31은 거푸집 해체시에 고정구(30)를 레바로 제껴줄 때 파단되도록 하는 절개홈이다.Reference numeral 31 is an incision groove to be broken when the fixture 30 is removed with a lever at the time of dismantling the formwork.

이와 같이, 본 고안에 따른 받침부재(1)는 가로빔(10)의 길이를 조절할 수 있도록 길이조절빔(14)이 결합되어 스틸박스(100)의 설치된 폭에 맞추어서 고정시킬 수 있고, 고정판(20)의 걸림턱(21)에 의해 세로빔(23)이 가로빔(10)의 상부에서 유동되지 않게 고정되며, 상호 결합되는 구조가 간단하여 거푸집의 설치 작업이 간편함과 동시에 해체 작업시에는 가로빔과 세로빔이 손상되지 않으므로 재활용할 수있다.As such, the support member 1 according to the present invention is coupled to the length adjustment beam 14 to adjust the length of the horizontal beam 10 can be fixed in accordance with the installed width of the steel box 100, fixed plate ( The vertical beam 23 is fixed to the upper part of the horizontal beam 10 by the locking step 21 of the horizontal beam 10, and the structure is easily coupled to each other, thereby simplifying the installation work of the formwork and the horizontal part at the time of dismantling. The beam and longitudinal beam are not damaged and can be recycled.

이상에서 설명한 본 고안은 전술한 실시예 및 첨부된 도면에 의해 한정되는 것은 아니고, 본 고안의 기술적 사상을 벗어나지 않는 범위 내에서 여러 가지 치환, 변형 및 변경이 가능함은 본 고안이 속하는 기술 분야에서 통상의 지식을 가진 자에게 있어서 명백할 것이다.The present invention described above is not limited to the above-described embodiments and the accompanying drawings, and various substitutions, modifications, and changes are possible within the scope without departing from the technical spirit of the present invention. It will be evident to those who have knowledge of.

상기한 바와 같은 목적과 구성으로 이루어진 본 고안에 따른 교량용 상부 슬라브의 거푸집 받침부재에 의하면,According to the formwork receiving member of the upper slab for bridges according to the present invention made of the object and configuration as described above,

받침부재를 구성하는 가로빔에 결합된 길이조절빔에 의해 가로빔의 길이를 조절할 수 있으므로 스틸박스의 설치된 폭에 맞추어서 고정시킬 수 있고, 가로빔의 상면에 부착된 고정판에 의해 세로빔을 간편하게 고정시킬 수 있으므로 작업시간이 단축되며, 상호 결합되는 구조가 간단하여 교량용 상부 슬라부의 거푸집 설치 작업이 간편함과 동시에 해체 작업도 용이하여 안전하게 해체작업을 할 수 있으며, 해체된 가로빔과 세로빔을 재활용할 수 있기 때문에 시공비용이 절감되는 효과가 있다.Since the length of the horizontal beam can be adjusted by the length adjustment beam coupled to the horizontal beam constituting the supporting member, it can be fixed according to the installed width of the steel box, and the vertical beam is easily fixed by the fixing plate attached to the upper surface of the horizontal beam. The work time is shortened because it can be combined with each other, and the structure is easily combined with each other, so that the formwork of the upper slab for the bridge is easy to install, and the dismantling work is also easy to dismantle. Since the construction cost can be reduced.

Claims (3)

스틸박스 공법이 적용되는 교량의 상부 슬라브를 타설하기 위하여 상판을 받쳐주는 받침부재를 구성함에 있어서,In constructing the supporting member supporting the upper plate for placing the upper slab of the bridge to which the steel box method is applied, 일단면에서 돌출되어 체결공이 형성된 체결구를 구비한 길이조절빔이 선단 내부로 결합되어 길이 조절이 되는 가로빔과;A horizontal beam having a fastener formed by a fastening hole protruding from one end of the horizontal beam, the length of the horizontal beam being coupled to the inside of the distal end; 내부에 각재가 결합된 세로빔과;A longitudinal beam coupled with a lumber inside; 상기 가로빔의 상면에 부착되고, 세로빔의 폭에 맞는 간격마다 상부로 돌출된 걸림턱이 길이방향으로 연속적으로 형성된 고정판으로 이루어져,It is attached to the upper surface of the horizontal beam, the locking projection protruding upward at intervals corresponding to the width of the vertical beam consists of a fixed plate continuously formed in the longitudinal direction, 상기 고정판의 걸림턱 사이에 세로빔이 올려져서 고정되도록 한 것을 특징으로 하는 교량용 상부 슬라브의 거푸집 받침부재.The formwork receiving member of the upper slab for bridges, characterized in that the vertical beam is raised between the locking jaw of the fixing plate to be fixed. 제 1항에 있어서, 상기 길이조절빔 일단면의 체결구 하측에는 일부가 절개된 삽입부를 더 포함하는 것을 특징으로 하는 교량용 상부 슬라브의 거푸집 받침부재.The formwork receiving member of the upper slab for a bridge according to claim 1, further comprising an insertion portion partially cut in a lower side of the fastener of one end of the length adjusting beam. 제 1항에 있어서, 상기 길이조절빔은 체결공에 체결하여 고정되도록 하는 고정핀을 더 포함하되, 상기 고정핀은 외주연의 일부가 평면으로 절개된 절개면이 형성되어 상기 체결공에 결합되어 회전시켜서 고정되도록 한 것을 특징으로 하는 교량용 상부 슬라브의 거푸집 받침부재.The method of claim 1, wherein the length adjustment beam further comprises a fixing pin to be fixed to the fastening hole, the fixing pin is formed in the incision surface cut in a portion of the outer periphery is coupled to the fastening hole Formwork receiving member of the upper slab for bridges, characterized in that it is fixed by rotating.
KR20-2004-0001994U 2004-01-28 2004-01-28 A mold supporting member of upper slab for bridge KR200351728Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2004-0001994U KR200351728Y1 (en) 2004-01-28 2004-01-28 A mold supporting member of upper slab for bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2004-0001994U KR200351728Y1 (en) 2004-01-28 2004-01-28 A mold supporting member of upper slab for bridge

Publications (1)

Publication Number Publication Date
KR200351728Y1 true KR200351728Y1 (en) 2004-05-31

Family

ID=49430970

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0001994U KR200351728Y1 (en) 2004-01-28 2004-01-28 A mold supporting member of upper slab for bridge

Country Status (1)

Country Link
KR (1) KR200351728Y1 (en)

Similar Documents

Publication Publication Date Title
AU2015200377B2 (en) Stripping deck spacer, and stripping deck plate using thereof
KR200351728Y1 (en) A mold supporting member of upper slab for bridge
KR20070027431A (en) A fastener for fixing a reinforcing bar assembly, a mold panel, and a ceiling panel by spot welding
KR100737841B1 (en) Clamp for fixing a concrete form
KR20100000854U (en) Handling tool of clip clamp for al mould panel
KR100946192B1 (en) Apparatus for removing and coupling forms
KR100619466B1 (en) the side reinforcement equipment of steel forming for building construction work
KR101057551B1 (en) Pillar formwork
KR20100010579U (en) Supporting apparatus for beam form
WO2008060138A1 (en) A system of formwork and connecting means
KR200298117Y1 (en) framable set mold for construction
KR102189982B1 (en) Tie bar fixing apparatus for maintain spacing a foam
KR20060071525A (en) Beam connections on street structure
KR20150039954A (en) Form panel equipped with distance maintenance implement for concrete
KR200222611Y1 (en) Steel form for slab concrete applicable to P.C. beam or Steel Box methods
JP5430483B2 (en) Connecting bracket
JPH0726731A (en) Adjusting jig for joint part of steel frame pillar
JPH11148226A (en) Concrete form and its fastening bracket
KR101615270B1 (en) Form and integrated with concrete and method for constructing thereof
KR200346435Y1 (en) Truss Girder Attached Deck Plate Equiped with End Fixture
KR100433700B1 (en) Mold system for slab concrete of bridge
JP2008179944A (en) Construction method of steel beam of beam end rc construction to column
KR200189909Y1 (en) Panel for steel concrete
KR200347093Y1 (en) Mold system for slab concrete of bridge
KR102209501B1 (en) Stepped prevention plate and construction method for building deck plate

Legal Events

Date Code Title Description
REGI Registration of establishment
LAPS Lapse due to unpaid annual fee