KR100619466B1 - the side reinforcement equipment of steel forming for building construction work - Google Patents

the side reinforcement equipment of steel forming for building construction work Download PDF

Info

Publication number
KR100619466B1
KR100619466B1 KR1020050073503A KR20050073503A KR100619466B1 KR 100619466 B1 KR100619466 B1 KR 100619466B1 KR 1020050073503 A KR1020050073503 A KR 1020050073503A KR 20050073503 A KR20050073503 A KR 20050073503A KR 100619466 B1 KR100619466 B1 KR 100619466B1
Authority
KR
South Korea
Prior art keywords
steel formwork
reinforcement
fixing ring
construction
formwork
Prior art date
Application number
KR1020050073503A
Other languages
Korean (ko)
Other versions
KR20050110579A (en
Inventor
이판중
조현일
이연재
Original Assignee
(주) 에이엔에스건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주) 에이엔에스건축사사무소 filed Critical (주) 에이엔에스건축사사무소
Priority to KR1020050073503A priority Critical patent/KR100619466B1/en
Publication of KR20050110579A publication Critical patent/KR20050110579A/en
Application granted granted Critical
Publication of KR100619466B1 publication Critical patent/KR100619466B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/04Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements
    • E04G17/042Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements being tensioned by threaded elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
    • E04G17/0657Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts fully recoverable
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/02Forming boards or similar elements
    • E04G9/06Forming boards or similar elements the form surface being of metal

Abstract

본 발명은 강재 거푸집 간의 연결 설치를 신속 용이하고도 안정되게 이룰 수 있고, 해체시 거푸집의 탈형을 손쉽게 이룰 수 있으며, 타설되는 콘크리트 구조물 표면을 균일하게 형성할 수 있도록 한 건축구조물 시공을 위한 것으로, 특히 후방과 좌,우측이 개구되는 형태로 절곡 형성되어 있되, 상,하부에는 내측 상,하부에 위치한 접지판의 폭조절을 가능하게 하는 수개의 레버가 설치 형성되어 있고, 중앙지점에는 개구된 후방으로부터 삽입 거치홈이 연장 형성되어 있으며, 상부면에 등간격으로 수개 배치 형성되어 있는 돌기부에는 수직 승,하강 작동이 가능토록 연결 설치되어 있되, 탄성 스프링의 탄지력에 의해 항상 일정 상태가 유지되도록 하는 "u"형 고정 고리가 설치되어 있고, 하부면에는 상기 "u"형 고정 고리의 출몰을 가능하게 하는 출몰공이 수개 형성되어 있고, 이 각 출몰공의 인접 부위에는 탄성 스프링의 탄성 복원력에 의해 항상 일정 상태를 유지할 수 있되, 상기 "u"형 고정 고리의 걸림 고정을 이룰 수 있도록 하는 걸림 고정구가 형성되어 있으며, 상,하부면의 양측에는 2조 한쌍의 고정공이 일체로 형성되어 있는 가로 보강빔과; 상기 보강빔의 상,하부면 양측에 형성되어 있는 2조 한쌍의 고정공에 연결할 수 있도록 절곡 형성되어 있는 세로 보강바를 일체로 포함하여 구성된 강재거푸집 측면 보강시설에 관한 것이다. The present invention can be achieved quickly and easily and stably connected between the steel formwork, can easily achieve the demoulding of the formwork during dismantling, and for the construction of the building structure to uniformly form the surface of the cast concrete, Particularly, the rear, left and right sides are bent to form an opening, and upper and lower parts of the inner and upper and lower parts of the ground plate which allow the width adjustment of the ground plate are formed and formed, and the center of the rear opening The insertion mounting groove is formed from the extension, and the projections are formed to be arranged at equal intervals on the upper surface is connected to enable the vertical lifting, lowering operation, so that the constant state is always maintained by the spring force of the elastic spring "u" -type fixing ring is installed, the bottom surface has a hole to enable the appearance of the "u" -type fixing ring Is formed in the dog, the adjacent portion of each of the hole is able to maintain a constant state at all times by the elastic restoring force of the elastic spring, but the locking fastener is formed to achieve the locking of the "u" type fixing ring, A horizontal reinforcement beam having two pairs of fixing holes integrally formed at both sides of the upper and lower surfaces thereof; It relates to a steel formwork side reinforcement system including a vertical reinforcement bar integrally formed to be connected to a pair of fixed holes formed on both sides of the upper and lower surfaces of the reinforcement beam.

가로 보강빔,"U"형 고정 고리,걸림고정구,세로 보강바 Horizontal reinforcement beam, "U" fixed hook, locking fixture, vertical reinforcement bar

Description

건축구조물 시공을 위한 강재 거푸집 측면 보강시설{the side reinforcement equipment of steel forming for building construction work}The side reinforcement equipment of steel forming for building construction work}

도 1은 본 발명인 건축구조물 시공을 위한 강재거푸집 측면 보강시설의 구성 상태를 도시한 분해 사시도.1 is an exploded perspective view showing the configuration of the steel formwork side reinforcement facility for the present inventors building construction.

도 2는 본 발명인 건축구조물 시공을 위한 강재거푸집 측면 보강시설의 연결 설치 상태를 도시한 사시도.Figure 2 is a perspective view showing a connection installation state of the steel formwork side reinforcement facility for the present inventors building construction.

도 3a, 도 3b는 본 발명인 건축구조물 시공을 위한 강재거푸집 측면 보강시설의 구성 상태를 도시한 평면도와 저면도.Figure 3a, Figure 3b is a plan view and a bottom view showing the configuration state of the steel formwork side reinforcement facility for the construction of the present inventors construction.

도 4는 본 발명인 건축구조물 시공을 위한 강재거푸집 측면 보강시설의 요부 구성 상태를 확대 도시한 단면도.Figure 4 is an enlarged cross-sectional view showing the main portion configuration state of the steel formwork side reinforcement for the inventors building construction.

<도면중 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

1 : 거푸집 2a,2b : 가로,세로 테두리1: formwork 2a, 2b: horizontal, vertical border

3 : 클립 체결공3: clip fastener

10 : 가로 보강빔 11 : 접지판10: horizontal reinforcement beam 11: ground plate

12 : 레버 13 : 삽입 거치홈12: lever 13: insertion groove

14 : 돌기부 15a,15b : 탄성 스프링14 projections 15a, 15b elastic spring

16 : "U"형 고정 고리 17 : 출몰공16: "U" -type fixed ring 17: hole

18 : 걸림 고정구 19 : 고정공18: locking fixture 19: fixing hole

20 : 세로 보강바 22 : 고무 판넬 20: vertical reinforcement bar 22: rubber panel

본 발명은 건축구조물 시공을 위한 강재거푸집 측면 보강시설에 관한 것으로, 더욱 상세하게는 강재 거푸집 간의 연결 설치를 신속 용이하고도 안정되게 이룰 수 있고, 해체시 거푸집의 탈형을 손쉽게 이룰 수 있으며, 타설되는 콘크리트 구조물 표면을 균일하게 형성할 수 있도록 한 건축구조물 시공을 위한 강재거푸집 측면 보강시설에 관한 것이다.The present invention relates to a steel formwork side reinforcement facility for the construction of construction, more specifically, can be quickly and easily and securely set up the connection between the steel formwork, can be easily demoulded form during disassembly, The present invention relates to a steel formwork side reinforcement facility for the construction of a building structure to uniformly form a concrete structure surface.

일반적으로 거푸집에는 융용 금속을 소정의 모양과 치수로 응고시켜 원하는 물건으로 만드는 주형 거푸집과 토목공사나 건축공사시에 다수개를 연결 설치하여 구축할 구조물의 외형을 만들고 콘크리트를 포설하여 원하는 구조물의 형상으로 양생시키는 콘크리트 거푸집이 사용된다.In general, molds are formed by solidifying the molten metal into predetermined shapes and dimensions to form a desired product, and forming the appearance of the structure to be constructed by connecting a plurality of structures in civil engineering or building construction, and laying concrete to form the desired structure. Curing concrete formwork is used.

상기한 콘크리트 거푸집은 통상적으로 한쪽 끝부분에 조립홈이 형성되는 테두리와, 상기한 테두리의 조립홈에 끼워지고 포설되는 콘크리트와 접촉하는 판재와, 상기한 판재를 지지하고 테두리간에 고정 연결되는 보강부재로 구성된다.The concrete formwork is typically a frame in which an assembling groove is formed at one end, a plate member contacting concrete installed and installed in the assembly groove of the edge, and a reinforcing member supporting the plate and fixedly connected between the edges. It consists of.

상기와 같이 구성되는 콘크리트 거푸집의 판재 및 테두리 그리고 보강부재는 주로 일정한 강도를 가진 금속재나 목재 등으로 형성된다.The plate and the frame and the reinforcing member of the concrete formwork configured as described above are mainly formed of metal or wood having a certain strength.

그러나, 상기와 같이 이루어지는 종래의 콘크리트 거푸집은 테두리의 조립홈 에 판재를 조립하면서 보강부재와 함께 용접등으로 고정 연결하도록 구성되므로 제작이 어렵고 복잡하다.However, the conventional concrete formwork made as described above is difficult to manufacture and complicated because it is configured to be fixed by welding and the like with the reinforcing member while assembling the plate in the assembly groove of the rim.

그리고, 실사용시 거푸집 패널 간의 연결 부분이 매우 취약하여 옹벽 및 벽체 구조물을 구축시 주입된 미경화 콘크리트의 측압에 의해 부분 탈거되는 현상이 자주 초래되는 비안전한 문제점이 있었고, 이러한 문제점으로 인해 연결된 거푸집 패널 간의 연결부위에 접합줄눈이 형성되어 벽체를 구축한 후, 탈형시 그 접합줄눈을 일일이 갈아내어 벽면을 매끄럽게 해야 하는 작업상의 불편한 문제점이 있었다. In addition, the connection part between the formwork panel is very fragile in actual use, so there is an unsafe problem that is often partly removed by the side pressure of the unhardened concrete injected when building the retaining wall and the wall structure, due to this problem connected formwork panel After the joints are formed at the joints to form a wall, there is an inconvenient problem in that the joint joints must be changed to smooth the wall when demolding.

본 발명은 상술한 바와 같은 종래의 문제들을 감안하여 이를 해결하고자 안출한 것으로, 그 목적은 강재 거푸집 간의 연결 설치를 신속 용이하고도 안정되게 이룰 수 있고, 해체시 거푸집의 탈형을 손쉽게 이룰 수 있으며, 타설되는 콘크리트 구조물 표면을 균일하게 형성할 수 있도록 한 건축구조물 시공을 위한 강재거푸집 측면 보강시설을 제공하는 데 있다.The present invention has been made in view of the conventional problems as described above, the object of which is to achieve a quick and easy and stable connection between the steel formwork, can easily achieve the demolding of the formwork during dismantling, It is to provide a steel formwork side reinforcement facility for the construction of the building structure to uniformly form the surface of the concrete structure to be poured.

상기의 목적을 달성하기 위한 본 고안의 구체적인 수단은,Specific means of the present invention for achieving the above object,

후방과 좌,우측이 개구되는 형태로 절곡 형성되어 있되, 상,하부에는 내측 상,하부에 위치한 접지판의 폭조절을 가능하게 하는 수개의 레버가 설치 형성되어 있고, 중앙지점에는 개구된 후방으로부터 삽입 거치홈이 연장 형성되어 있으며, 상부면에 등간격으로 수개 배치 형성되어 있는 돌기부에는 수직 승,하강 작동이 가능토록 연결 설치되어 있되, 탄성 스프링의 탄지력에 의해 항상 일정 상태가 유지되도록 하는 "u"형 고정 고리가 설치되어 있고, 하부면에는 상기 "u"형 고정 고리의 출몰을 가능하게 하는 출몰공이 수개 형성되어 있고, 이 각 출몰공의 인접 부위에는 탄성 스프링의 탄성 복원력에 의해 항상 일정 상태를 유지할 수 있되, 상기 "u"형 고정 고리의 걸림 고정을 이룰 수 있도록 하는 걸림 고정구가 형성되어 있으며, 상,하부면의 양측에는 2조 한쌍의 고정공이 일체로 형성되어 있는 가로 보강빔과;The rear and left and right sides are bent to form an opening, and the upper and lower parts are provided with a plurality of levers which allow the width adjustment of the ground plate located on the inner upper and lower parts, and the central point is provided from the rear which is opened. The insertion mounting groove is formed to extend, and the protrusions, which are formed at equal intervals on the upper surface, are connected and installed to enable vertical lifting and lowering operation, but are always maintained by the elastic force of the elastic spring. The u "type fixing ring is provided, and the lower surface is provided with several recessed holes which enable the appearance of the" u "type fixing ring, and it is always fixed by the elastic restoring force of the elastic spring in the adjacent part of each of the entering holes. It can maintain the state, but the locking fixture is formed to achieve the locking of the "u" -type fastening ring is formed, the upper and lower surfaces on both sides 2 A horizontal reinforcement beam having a pair of fixing holes integrally formed therein;

상기 보강빔의 상,하부면 양측에 형성되어 있는 2조 한쌍의 고정공에 연결할 수 있도록 절곡 형성되어 있는 세로 보강바를 일체로 포함하여 구성됨을 특징으로 한다. The reinforcing beam is characterized in that it comprises a vertical reinforcement bar integrally formed to be connected to the pair of fixing holes formed on both sides of the upper, lower surfaces.

이하, 본 발명의 구성을 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, the configuration of the present invention in detail with reference to the drawings.

도 1은 본 발명인 건축구조물 시공을 위한 강재거푸집 측면 보강시설의 구성 상태를 도시한 분해 사시도이고, 도 2는 본 발명인 건축구조물 시공을 위한 강재거푸집 측면 보강시설의 연결 설치 상태를 도시한 사시도이며, 도 3a, 도 3b는 본 발명인 건축구조물 시공을 위한 강재거푸집 측면 보강시설의 구성 상태를 도시한 좌,우측면도와 평면도이고, 도 4는 본 발명인 건축구조물 시공을 위한 강재거푸집 측면 보강시설의 요부 구성 상태를 확대 도시한 단면도이다.1 is an exploded perspective view showing the configuration of the steel formwork side reinforcement structure for the construction of the present inventors, Figure 2 is a perspective view showing a connection installation state of the steel formwork side reinforcement for the construction of the present invention, Figure 3a, 3b is a left, right side view and a plan view showing the configuration state of the steel formwork side reinforcement for the construction of the present inventors construction, Figure 4 is a main configuration state of the steel formwork side reinforcement for the construction of the present invention A cross-sectional view showing an enlarged view.

참고로, 본 발명을 설명함에 있어 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단될 경우에는 그 상세한 설명을 생략하였다.For reference, in describing the present invention, when it is determined that a detailed description of related known functions or configurations may unnecessarily obscure the gist of the present invention, the detailed description thereof is omitted.

또한, 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자와 운영자의 의도 또는 관례 등에 따라 달라질 수 있다.In addition, terms to be described below are terms defined in consideration of functions in the present invention, which may vary according to intentions or customs of users and operators.

그러므로, 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.Therefore, the definition should be made based on the contents throughout the specification.

도시된 바와 같이 후방과 좌,우측이 개구되는 형태로 절곡 형성되어 있되, 상,하부에는 내측 상,하부에 위치한 접지판(11)의 폭조절을 가능하게 하는 수개의 레버(12)가 설치 형성되어 있고, 중앙지점에는 개구된 후방으로부터 삽입 거치홈(13)이 연장 형성되어 있으며, 상부면에 등간격으로 수개 배치 형성되어 있는 돌기부(14)에는 수직 승,하강 작동이 가능토록 연결 설치되어 있되, 탄성 스프링(15a)의 탄지력에 의해 항상 일정 상태가 유지되도록 하는 "u"형 고정 고리(16)가 설치되어 있고, 하부면에는 상기 "u"형 고정 고리(16)의 출몰을 가능하게 하는 출몰공(17)이 수개 형성되어 있고, 이 각 출몰공(17)의 인접 부위에는 탄성 스프링(15b)의 탄성 복원력에 의해 항상 일정 상태를 유지할 수 있되, 상기 "u"형 고정 고리(16)의 걸림 고정을 이룰 수 있도록 하는 걸림 고정구(18)가 형성되어 있으며, 상,하부면의 양측에는 2조 한쌍의 고정공(19)이 일체로 형성되어 있는 가로 보강빔(10)이 형성되어 있다.As shown in the figure, the rear, left, and right sides are bent to form an opening, and upper and lower portions of the lever 12 are formed to allow adjustment of the width of the ground plate 11 located on the inner upper and lower portions. In the central point, the insertion mounting groove 13 extends from the rear of the opening, and the protrusions 14 formed on the upper surface at a plurality of equal intervals are connected to the vertical lifting and lowering operations. , “U” type fixing ring 16 is installed to maintain a constant state at all times by the holding force of the elastic spring 15a, and the bottom surface enables the appearance of the “u” type fixing ring 16. A plurality of haunting holes 17 are formed, and adjacent portions of each of the hauling holes 17 can be always maintained at a constant state by the elastic restoring force of the elastic spring 15b, but the “u” type fixing ring 16 ) Jams to help lock A fastener 18 is formed, and on both sides of the upper and lower surfaces, a horizontal reinforcement beam 10 in which two pairs of fixing holes 19 are integrally formed is formed.

그리고, 상기 가로 보강빔(10)의 상,하부면 양측에 형성되어 있는 2조 한쌍의 고정공(19)에는 별도의 세로 보강바(20)가 연결 설치되어 있다. In addition, a pair of fixing holes 19 formed on both sides of the upper and lower surfaces of the horizontal reinforcement beam 10 is provided with a separate vertical reinforcement bar 20.

한편, 상기 접지판(11)의 전면에는 강재 거푸집(1)과의 마찰력을 증대 시켜 줄 수 있는 고무 판넬(21) 접착 설치되어 있다.On the other hand, the front surface of the ground plate 11 is provided with a rubber panel 21 adhesive that can increase the friction force with the steel formwork (1).

이와 같은 구성 요소로 이루어진 본 발명의 작용 효과를 도면을 참조하여 설명하면 다음과 같다. Referring to the drawings the operation and effect of the present invention made of such components as follows.

도 5는 본 발명인 건축구조물 시공을 위한 강재거푸집 측면 보강시설의 설치 상태를 도시한 정면도이다.Figure 5 is a front view showing the installation state of the steel formwork side reinforcement facility for the present inventors building construction.

건물 내,외벽 및 옹벽 등과 같은 콘크리트 구조물을 타설하고자 구조물의 면적에 상응하는 크기로 연결 조립된 강재 거푸집(1)의 가로 테두리(2a)에 먼저 상기 가로 보강빔(10)을 연결 설치하면 된다.In order to pour concrete structures such as inner walls, retaining walls, and the like, the horizontal reinforcement beams 10 may be first connected to the horizontal edges 2a of the steel formwork 1 assembled to have a size corresponding to the area of the structure.

이때 연결 설치는 도면에 도시되어 있는 바와 같이 강재 거푸집(1)의 가로, 세로 테두리(2a),(2b)가 교차 접지되는 지점에 가로 보강빔(10)의 중앙이 위치되도록 정위치시킨 상태에서 이를 테두리(2a),(2b)에 삽입 고정하고 뒤이어 탄성 스프링(15a)의 탄지력에 의해 상부에 돌출 위치된 상태로 정 위치해 있던 "u"형 고정 고리(16)를 강제로 하향 이동시켜 이 "u"형 고정 고리(16)의 선단이 하부에 위치한 거푸집(1) 가로 테두리(2a)의 클립 체결공(3)과 출몰공(17)을 차례대로 경유하여 외부로 관통 위치되도록 하면 된다.At this time, the connection installation is in a state in which the center of the horizontal reinforcement beam 10 is positioned at the point where the horizontal, vertical rim (2a), (2b) of the steel formwork (1) intersects and grounds. This is inserted into and fixed to the edges 2a and 2b, followed by a downward movement of the " u " fixing ring 16, which is fixedly positioned in a protruding position at the top by the holding force of the elastic spring 15a. The front end of the "u" -type fixing ring 16 may be positioned to penetrate outwardly via the clip fastening hole 3 and the gushing hole 17 of the formwork 1 horizontal rim 2a located at the bottom in order.

이때 이러한 "u"형 고정 고리(16)의 하향 이동 전에 하부 전방에 위치된 걸림 고정구(18)의 머리부를 잡아당겨야 상술한 "u"형 고정 고리(16)의 하향 이동이 가능해지고, "u"형 고정 고리(16)의 하향 이동이 완료된 이후 걸림 고정구(18)의 머리부를 놓아주면 이는 "u"형 고정 고리(16)를 걸림 고정시켜 결과적으로 거푸집(1)의 접지된 가로 테두리(2a) 간의 결속을 견고히 이룰 수 있게 된다.At this time, the downward movement of the above-described "u" -type fixing ring 16 is possible by pulling the head of the locking fixture 18 located in the lower front before the downward movement of the "u" -type fixing ring 16, and "u When the head of the catching fixture 18 is released after the downward movement of the "type retaining ring 16" is completed, this locks the "u" type retaining ring 16 and consequently the grounded horizontal edge 2a of the formwork 1a. Solidarity between) can be achieved.

그리고 뒤이어 상,하부에 위치한 레버(12) 모두를 일방향으로 돌려 내측에 위치된 접지판(11)이 거푸집(1) 가로 테두리(2a)의 상,하부를 견고히 조이도록 하면 되고 상술한 바와 같은 식으로 거푸집(1) 가로 테두리(2a)간의 결속을 이룬 이 후에는 가로 보강빔(10)의 상,하부면 중앙부위에 형성되어 있는 2조 한쌍의 고정공(19)에 별도의 세로 보강바(20)를 연결시켜 가로 보강빔(10)간의 결속력을 증대시켜 줄 수 있도록 할 뿐만 아니라 거푸집(1) 세로 테두리(2b)간의 결속을 도모할 수 있게 된다.Then, the upper and lower levers 12 located in both directions are rotated in one direction so that the ground plate 11 located inwardly tightens the upper and lower portions of the formwork 1 horizontal frame 2a. After forming the die (1) between the horizontal rim (2a) by a separate vertical reinforcement bar in a pair of fixing holes (19) formed in the upper and lower center surface of the horizontal reinforcement beam (10) ( 20 can be connected not only to increase the binding force between the horizontal reinforcement beam 10, but also to form the binding between the formwork (1) vertical frame (2b).

즉, 상기 가로 보강빔(10)의 상,하부면 양측에 형성되어 있는 2조 한쌍의 고정공(19)에 연결 설치되는 세로 보강바(20)는 도시된 바와 같이 상,하부에 연결 설치된 가로 보강빔(10) 사이에 "X"자 형태로 연결 설치되게 된다. That is, the vertical reinforcement bar 20 connected to the pair of fixing holes 19 formed on both sides of the upper and lower surfaces of the horizontal reinforcement beam 10 is horizontally connected to the upper and lower portions as shown. The reinforcing beams 10 are connected to each other in a "X" shape.

이때 세로 보강빔(20)의 교차하는 지점이 강재 거푸집(1) 세로 테두리(2b)에 형성되어 있는 클립 체결공(3) 내에 위치되도록 하여야 강재 거푸집(1) 세로 테두리(2b) 간의 견고한 결속이 도모된다.At this time, the intersection point of the longitudinal reinforcement beam 20 should be located in the clip fastening hole 3 formed in the steel formwork 1 vertical rim 2b, so that solid binding between the steel formwork 1 and the vertical rim 2b is achieved. It is planned.

이에 따라 강재 거푸집(1) 간의 연결 고정을 가로,세로 방향에서 이룰 수 있음에도 불구하고 설치를 신속 용이하고도 안정되게 이룰 수 있게 된다.Accordingly, although the connection fixing between the steel formwork 1 can be achieved in the horizontal and vertical directions, the installation can be quickly and easily and stably achieved.

이에 따라 시공상의 편의성과 향상과 공기의 대폭적인 단축을 도모할 수 있게 됨과 더불어 주입된 미경화 콘크리트의 측압에 의해 강재 거푸집(1)이 부분 탈거되는 현상을 미연에 방지할 수 있음에 따라 현장 안전성의 향상을 도모할 수 있게 된다. As a result, construction convenience and improvement can be greatly reduced, and the safety of the site can be prevented due to the partial removal of the steel formwork 1 due to the lateral pressure of the injected unhardened concrete. The improvement can be achieved.

그리고, 해체 작업 역시 비교적 손 쉬어 거푸집(1)간의 탈형을 손쉽게 이룰 수 있으므로 공기의 단축을 도모할 수 있게 된다.In addition, the dismantling operation is also relatively easy, and thus demolding between the dies 1 can be easily achieved, thereby shortening the air.

즉, 해체시에는 상술한 연결 순서와는 역순으로 이루면 되기 때문이다. That is, when dismantling, the connection order may be performed in the reverse order.

또한, 상술한 바와 같이 강재 거푸집(1) 간의 연결 고정을 가로,세로 방향에 서 견고히 이룰 수 있기 때문에 타설되는 콘크리트 구조물 표면을 균일하게 형성할 수 있게 된다.In addition, as described above, since the connection fixing between the steel formwork 1 can be made firmly in the horizontal and vertical directions, the surface of the concrete structure to be poured can be uniformly formed.

이에 따라 주입된 미경화 콘크리트의 측압에 의해 강재 거푸집(1)이 부분 탈거되는 현상에 의해 연결된 거푸집 패널 간의 연결부위에 접합줄눈이 형성되어 벽체를 구축한 후, 탈형시 그 접합줄눈을 일일이 갈아내어 벽면을 매끄럽게 해야 하는 작업상의 불편한 문제점을 미연에 방지할 수 있게 된다.Accordingly, joint joints are formed at the joints between the formwork panels connected by the partial removal of the steel formwork 1 due to the lateral pressure of the non-hardened concrete injected, and the walls are constructed. It is possible to prevent the uncomfortable work problem of having to smooth the wall.

참고로 본 발명은 다양하게 변형 실시될 수 있고, 여러 가지의 형태를 취할 수 있으나 상기 발명의 상세한 설명에서는 그에 따른 특별한 실시 예에 대해서만 기술하였다.For reference, the present invention may be variously modified and may take various forms. However, in the detailed description of the present invention, only specific embodiments thereof are described.

그러므로, 본 발명은 상세한 설명에서 언급되는 특별한 형태로 한정되는 것이 아닌 것으로 인정되어야 하며, 오히려 첨부된 청구범위에 의해 정의되는 본 발명의 정신과 범위 내에 있는 모든 변형물과 균등물 및 대체물을 포함하는 것으로 이해되어야 한다. Therefore, it is to be understood that the invention is not to be limited to the specific forms referred to in the description, but rather to include all modifications, equivalents and alternatives falling within the spirit and scope of the invention as defined by the appended claims. It must be understood.

이상에서 살펴 본 바와 같이 본 발명은 설치시 거푸집 간의 연결 설치를 신속 용이하고도 안정되게 이룰 수 있고, 해체시 거푸집의 탈형을 손쉽게 이룰 수 있으며, 타설되는 콘크리트 구조물 표면을 균일하게 형성할 수 있어, 조립 설치 및 시공상의 편의성과 구조적인 안정성 향상에 따른 작업상의 안전성 그리고, 시공 대상물의 품질성을 향상시켜 줄 수 있도록 한 효과가 있다.As described above, the present invention can achieve a quick and easy and stable installation of the connection between the formwork during installation, can easily achieve the demoulding of the formwork during dismantling, it is possible to uniformly form the surface of the concrete structure to be poured, There is an effect to improve the safety of the operation and the quality of the construction object by the convenience of assembly installation and construction and the improvement of structural stability.

Claims (2)

건물 내,외벽 및 옹벽 등과 같은 콘크리트 구조물을 타설하고자 구조물의 면적에 상응하는 크기로 연결 조립되는 강재 거푸집(1)을 결속 시키는 수단에 있어서, In the means for binding the steel formwork (1) which is connected and assembled in a size corresponding to the area of the structure in order to pour concrete structures, such as the inner wall, outer wall and retaining wall, 후방과 좌,우측이 개구되는 형태로 절곡 형성되어 있되, 상,하부에는 내측 상,하부에 위치한 접지판(11)의 폭조절을 가능하게 하는 수개의 레버(12)가 설치 형성되어 있고, 중앙지점에는 개구된 후방으로부터 삽입 거치홈(13)이 연장 형성되어 있으며, 상부면에 등간격으로 수개 배치 형성되어 있는 돌기부(14)에는 수직 승,하강 작동이 가능토록 연결 설치되어 있되, 탄성 스프링(15a)의 탄지력에 의해 항상 일정 상태가 유지되도록 하는 "u"형 고정 고리(16)가 설치되어 있고, 하부면에는 상기 "u"형 고정 고리(16)의 출몰을 가능하게 하는 출몰공(17)이 수개 형성되어 있고, 이 각 출몰공(17)의 인접 부위에는 탄성 스프링(15b)의 탄성 복원력에 의해 항상 일정 상태를 유지할 수 있되, 상기 "u"형 고정 고리(16)의 걸림 고정을 이룰 수 있도록 하는 걸림 고정구(18)가 형성되어 있으며, 상,하부면의 중앙부위에는 2조 한쌍의 고정공(19)이 일체로 형성되어 있는 가로 보강빔(10)과;The rear and left and right sides are bent to form an opening, and upper and lower portions of the lever 12 are provided to enable the width adjustment of the ground plate 11 located on the inner upper and lower portions. The insertion mounting groove 13 extends from the opened rear at the point, and the protrusions 14 which are arranged at equal intervals on the upper surface thereof are connected to each other so that vertical lifting and lowering operations are possible. The “u” type fixing ring 16 is installed to maintain a constant state at all times by the holding force of 15a). A plurality of 17) are formed, and the adjacent portions of each of the holes 17 can always be kept constant by the elastic restoring force of the elastic spring 15b, but the locking of the " u " Hanging fixture 18 is formed to achieve this A horizontal reinforcement beam 10 having a pair of fixing holes 19 integrally formed at a central portion of the upper and lower surfaces thereof; 상기 가로 보강빔(10)의 상,하부면 양측에 형성되어 있는 2조 한쌍의 고정공(19)에 연결할 수 있도록 절곡 형성되어 있는 세로 보강바(20)를 일체로 포함하여 구성됨을 특징으로 하는 건축구조물 시공을 위한 강재거푸집 측면 보강시설.Characterized in that it comprises a vertical reinforcement bar 20 is integrally formed to be connected to the pair of fixing holes 19 formed on both sides of the upper, lower surfaces of the horizontal reinforcement beam (10) Steel formwork side reinforcement system for building structure construction. 제 1항에 있어서, 상기 접지판(11)의 전면에는 강재 거푸집(1)과의 마찰력을 증대 시켜 줄 수 있는 고무 판넬(22)이 접착 설치됨을 특징으로 하는 건축구조물 시공을 위한 강재거푸집 측면 보강시설.The steel formwork side reinforcement for construction of a building structure according to claim 1, wherein a rubber panel (22) capable of increasing friction with the steel formwork (1) is attached to the front surface of the ground plate (11). facility.
KR1020050073503A 2005-08-10 2005-08-10 the side reinforcement equipment of steel forming for building construction work KR100619466B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050073503A KR100619466B1 (en) 2005-08-10 2005-08-10 the side reinforcement equipment of steel forming for building construction work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050073503A KR100619466B1 (en) 2005-08-10 2005-08-10 the side reinforcement equipment of steel forming for building construction work

Publications (2)

Publication Number Publication Date
KR20050110579A KR20050110579A (en) 2005-11-23
KR100619466B1 true KR100619466B1 (en) 2006-09-06

Family

ID=37286086

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050073503A KR100619466B1 (en) 2005-08-10 2005-08-10 the side reinforcement equipment of steel forming for building construction work

Country Status (1)

Country Link
KR (1) KR100619466B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100653379B1 (en) 2006-08-21 2006-12-04 (주)토인종합건축사사무소 Structure for supporting mold for wall of building
KR100950258B1 (en) 2010-01-11 2010-03-31 금강종합감리 주식회사 A mold for construction

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112359727B (en) * 2020-11-30 2022-07-19 中铁建大桥工程局集团第五工程有限公司 Bridge building templates link for civil engineering
CN113323387A (en) * 2021-06-29 2021-08-31 重庆瑞鑫科五金制品有限公司 Anti-floating fixture for pouring low wall or bay window

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52143223U (en) 1976-04-26 1977-10-29
JPS57164302U (en) 1981-04-10 1982-10-16
JPS6070134U (en) 1983-10-20 1985-05-17 株式会社神戸製鋼所 concrete formwork equipment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52143223U (en) 1976-04-26 1977-10-29
JPS57164302U (en) 1981-04-10 1982-10-16
JPS6070134U (en) 1983-10-20 1985-05-17 株式会社神戸製鋼所 concrete formwork equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100653379B1 (en) 2006-08-21 2006-12-04 (주)토인종합건축사사무소 Structure for supporting mold for wall of building
KR100950258B1 (en) 2010-01-11 2010-03-31 금강종합감리 주식회사 A mold for construction

Also Published As

Publication number Publication date
KR20050110579A (en) 2005-11-23

Similar Documents

Publication Publication Date Title
KR101860299B1 (en) Baseplate seperatable deckplate construction method
KR100619466B1 (en) the side reinforcement equipment of steel forming for building construction work
KR20120037696A (en) Slab form device using drophead separable head and using method thereof
KR100826556B1 (en) Panel structure for slab
KR101558992B1 (en) Reinforcement facilities for mold for building structure
JP2020016144A (en) Temporary floor material
KR100512075B1 (en) Steel forming of assemble type for construction
KR101142879B1 (en) Support structure for slab foam panel
KR101978804B1 (en) Safety railing
KR200414945Y1 (en) A slab panel for euro form of deck panel construct
JP3891210B1 (en) Inner formwork structure
JP3862707B2 (en) Construction method of overpass slab and precast concrete plate for overhang slab
JP3180246B2 (en) Construction method and construction member for reinforced concrete structure
KR102137171B1 (en) Side tie for use of interval maintenance device of mold
KR20070043641A (en) Angle-adjusted forming board
KR102106106B1 (en) Distance maintenance apparatus for mold
KR20050021416A (en) Steel forming of caught type for construction
WO2021246157A1 (en) Foundation mold
KR102106107B1 (en) Distance maintenance apparatus for mold
KR200342749Y1 (en) Device For Connecting Concrete Form
JP3321670B2 (en) Mold setting equipment for ready-mixed concrete
KR200339870Y1 (en) support to uphold a slab mold
KR200419767Y1 (en) a spacer having an anchor bolt mounting portion thereon
JPH10266428A (en) Permanent form
JP3290882B2 (en) How to lay grating on the groove

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
A302 Request for accelerated examination
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120821

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20130826

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140808

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee