KR20030003808A - Installing Method with Instrument for Rolled Rebar on Reinforced Concrete Wall - Google Patents

Installing Method with Instrument for Rolled Rebar on Reinforced Concrete Wall Download PDF

Info

Publication number
KR20030003808A
KR20030003808A KR1020010039624A KR20010039624A KR20030003808A KR 20030003808 A KR20030003808 A KR 20030003808A KR 1020010039624 A KR1020010039624 A KR 1020010039624A KR 20010039624 A KR20010039624 A KR 20010039624A KR 20030003808 A KR20030003808 A KR 20030003808A
Authority
KR
South Korea
Prior art keywords
reinforcing bar
reinforcing
reinforced concrete
reinforcement
concrete wall
Prior art date
Application number
KR1020010039624A
Other languages
Korean (ko)
Inventor
김미자
Original Assignee
김미자
정지철
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김미자, 정지철 filed Critical 김미자
Priority to KR1020010039624A priority Critical patent/KR20030003808A/en
Publication of KR20030003808A publication Critical patent/KR20030003808A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/02Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance
    • E04C5/04Mats
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

PURPOSE: A method and unit for constructing a reinforced concrete wall using a web reinforcing bar is provided to rapidly and easily arrange the bar vertically and horizontally using the web reinforcing bar. CONSTITUTION: A web reinforcing bar feeder is disposed in a first step. One end of a web reinforcing bar(10) is fixed in a second step. A vertical reinforcing bar is arranged in a third step. The other end of the web reinforcing bar is fixed in a fourth step. The upper end of a transverse reinforcing bar is fixed in a fifth step. The transverse reinforcing bar is developed in a sixth step. A form is installed in a seventh step. Concrete is cast in an eighth step. The concrete is cured in a ninth step. The form is disassembled in a tenth step.

Description

두루마리 철근을 이용한 철근 콘크리트 벽체의 시공방법 및 그 시공수단 {Installing Method with Instrument for Rolled Rebar on Reinforced Concrete Wall}Construction Method of Reinforced Concrete Wall Using Reinforcing Bars and Construction Method {Installing Method with Instrument for Rolled Rebar on Reinforced Concrete Wall}

본 발명은 철근 콘크리트 벽체의 시공방법 및 그 시공수단에 관한 것으로, 특히 강철 밴드에 일정간격으로 철근을 고정시킨 두루마리 철근을 이용하여 철근콘크리트 벽체를 시공할 수 있도록 한 두루마리 철근을 이용한 철근 콘크리트 벽체의 시공방법 및 그 시공수단에 관한 것이다.The present invention relates to a method of constructing a reinforced concrete wall and its construction method, and in particular, to a reinforced concrete wall using a reinforced concrete reinforcement for constructing a reinforced concrete wall by using a reinforcement reinforcing steel reinforcement at a predetermined interval on a steel band. It relates to a construction method and its construction means.

주지하는 바와 같이 대부분의 경우 현장에서 철근을 여러 규격으로 절단하고 하나씩 종,횡으로 세우거나 걸쳐 놓고 용접하거나 철사로 묶어 벽체용 철근을 형성한후 거푸집을 설치한 다음 콘크리트를 타설하고 양생시키도록 하는 방법을 사용하였다. 그러나, 벽체는 특히 대부분 4면을 시공하여야 하는 것이므로 이러한 방법으로 철근을 조립 설치하기 위하여 많은 시간이 소모되는 것이어서 공기를 지연시키게 되고 막대한 인력이 소모되는 것이어서 인건비 부담을 가중시키게 되는 문제점이 있다. 또한, 이와 같이 일일이 작업자가 철근 하나 하나를 절단, 운반,결착시키는 과정으로는 철근간의 간격이나 길이등을 설계에 따라 정확하게 시공하기란 사실상 불가능한 것이므로 시공 품질이 불균일하게 되었던 문제점이 있는 것이다.As is well known, in most cases, the rebars are cut to various specifications at the site, and one by one, vertically or horizontally, are laid, welded or bundled with wires to form reinforcing walls, and then formwork is installed and cured. Method was used. However, since most of the walls have to be installed on most four surfaces, it takes a lot of time to assemble and install the rebar in this way, which delays the air and consumes a lot of manpower, thus increasing the labor cost. In addition, the worker cuts, transports, and binds each one of the rebars in this manner, and thus it is virtually impossible to accurately construct the spacing or length between the rebars according to the design, resulting in uneven construction quality.

아울러, 철근 콘크리트 벽체를 시공하기 위하여 철근을 종,횡 그리고 수직상으로 용접하여 도1로 보인 바와 같이 종,횡상 철근(100,101)을 철사(102)로 묶거나 용접하여 소위 케이지(cage)를 제작하여 현장으로 운반하고, 이를 기초면 위에 돌출된 철근에 고정한 다음 양측에 거푸집을 설치하여 콘크리트를 타설하고 양생시킴으로써 벽체를 시공 완료하는 방식도 사용되었다.In addition, in order to construct a reinforced concrete wall, the reinforcing bars are longitudinally, horizontally and vertically welded to produce a so-called cage by tying or welding the longitudinal and transverse rebars 100 and 101 with a wire 102 as shown in FIG. It was also used to transport it to the site, fix it to the reinforcing bars on the foundation surface, and install the formwork on both sides to pour concrete and cure to finish the walls.

이러한 시공 방법에 의하면 케이지를 제작하기 위하여 여러 규격으로 절단된 철근을 종,횡 그리고 수직상으로 용접하는 등의 과정에서 많은 인력이 소모되는 작업이므로 인건비가 많이 들게 될 뿐만 아니라, 이를 현장으로 운반하고 정확한 위치에 세우기 위하여 상당한 경비를 부담하여야 하는 문제점이 있다.According to this construction method, a lot of manpower is consumed in the process of vertically, horizontally and vertically welding rebars cut to various specifications to manufacture cages, which not only increases labor costs but also transports them to the site. There is a problem in that a significant cost must be paid in order to establish the correct position.

본 발명의 목적은 상기와 같은 문제를 해결하기 위하여 두루마리 철근을 이용하여 신속하고 용이하게 수직, 수평상으로 배근할 수 있도록 한 두루마리 철근을 이용한 철근 콘크리트 벽체의 시공방법 및 그 시공수단을 제공함에 있다.SUMMARY OF THE INVENTION An object of the present invention is to provide a method for constructing a reinforced concrete wall using reinforcing steel bars and a means for constructing the same to reinforce vertically and horizontally using reinforcing steel bars in order to solve the above problems. .

도1은 종래 철근 배근 상태를 도시한 사시도.1 is a perspective view showing a conventional reinforcement state.

도2는 본 발명에 사용되는 두루마리 철근을 보인 사시도.Figure 2 is a perspective view showing a reinforcing steel bar used in the present invention.

도3은 본 발명에 의한 철근 콘크리트 벽체 시공 방법을 보인 흐름도.Figure 3 is a flow chart showing a reinforced concrete wall construction method according to the present invention.

도4는 본 발명에 의한 종상 철근 배근방법을 도시한 구성도.Figure 4 is a block diagram showing a longitudinal reinforcement method according to the present invention.

도5는 본 발명에 의해 종상 철근이 배근된 상태를 도시한 구성도.Figure 5 is a configuration diagram showing a state in which the longitudinal reinforcement bars are reinforced by the present invention.

도6은 본 발명에 의한 횡상 철근 배근방법을 도시한 구성도.Figure 6 is a block diagram showing a transverse reinforcement method according to the present invention.

도7은 본 발명에 의해 종,횡으로 철근을 교차시킨 상태 설명도.7 is an explanatory view of a state where rebars are crossed vertically and horizontally according to the present invention;

도8은 본 발명에 의해 시공된 벽체의 단면도.8 is a sectional view of a wall constructed according to the present invention.

도9는 본 발명의 다른 실시예로서 가이드를 구비한 이송구를 보인 설명도.9 is an explanatory view showing a conveying hole provided with a guide as another embodiment of the present invention.

도10은 본 발명의 다른 실시예로서 가이드의 바퀴를 보인 사시도.Figure 10 is a perspective view showing a wheel of the guide as another embodiment of the present invention.

도11은 본 발명의 다른 실시예로서 레일을 사용하는 예를 보인 사시도.Figure 11 is a perspective view showing an example of using a rail as another embodiment of the present invention.

도12는 본 발명의 다른 실시예로 횡상 철근을 먼저 시공하는 예를 보인 설명도.Figure 12 is an explanatory diagram showing an example of constructing the transverse rebar first in another embodiment of the present invention.

*도면의 주요 부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

10 : 두루마리 철근 11 : 강철밴드10: rebar reinforcement 11: steel band

12 : 철근 13: 회전구조12: rebar 13: rotation structure

14 : 기초면 15 : 지주14: foundation surface 15: prop

16:가이드 17 : 걸고리16: Guide 17: Hooks

18 : 거푸집 19 : 간격재18: formwork 19: spacer

20:배출구 21 : 이송구20: outlet 21: transfer port

22 : 원반 23 : 바퀴22: disc 23: wheels

24:요홈 25:레일24: groove 25: rail

이러한 목적을 달성하기 위하여 본 발명은 설계에 상응하여 강철밴드에 일정간격으로 용접 또는 결속하여서 된 철근으로 두루마리 철근을 준비하고, 회전 및 이동이가능한 이송구에 두루마리 철근을 올려 놓고, 기초면 일측에 위치한 지주에 두루마리 철근의 일단을 철사등으로 결속시킨 다음 이송구를 회전시키면서 타측으로 이동시켜 두루마리 철근이 풀려지면서 하강하여 종상 철근 배치가 완료되도록 하며, 두루마리 철근의 타단을 기초면 타측에 세워진 지주에 결속시켜 종상 철근 배치를 완료한다.In order to achieve the above object, the present invention prepares reinforcing reinforcing bars with reinforcing bars made by welding or binding to steel bands at predetermined intervals according to the design, and places reinforcing reinforcing bars on a revolving and movable feeder, and on one side of the foundation surface. Tie one end of the reinforcing bar to the post, and then move it to the other side while rotating the feeder.The reinforcing bar is released while descending to complete the placement of the longitudinal reinforcing bar.The other end of the reinforcing bar is placed on the other side of the foundation. Bind to complete placement of the rebar.

이러한 상태에서 종상 철근의 상방에 걸림구를 용접 또는 기타 방법으로 고정한 다음 걸림구에 미리 준비된 다른 두루마리 철근의 일단을 걸어 자중에 의하여 풀려 내려가도록 하면 이번에는 횡상 철근 배치가 완료되는 것이며, 이러한 일련의 과정은 매우 신속하게 이루어 지는 것일 뿐만 아니라, 별다른 숙련을 요하는 것이 아니어서 누구나 쉽게 시공할수 있다.In this state, if the latch is fixed by welding or other method above the rod, then one end of the other reinforcing bar which is prepared in the hanger is released by self-weight, and this time, the horizontal rebar arrangement is completed. The process is not only very quick but also requires no skill and can be easily constructed by anyone.

더구나 이러한 본 발명에 의한 종,횡상의 철근 배치는 그 간격이 매우 균일하며, 철근의 규격 및 길이도 주문에 의하여 제작된 것이어서 설계에 부합되도록 철근 조립 및 설치를 완성되는 것이다. 이에 따라 거푸집의 설치와 콘크리트 타설에 의하여 제작되는 본 발명에 의한 벽체는 시공 품질이 안정되고 우수하게 된다.Moreover, the longitudinal and horizontal rebar arrangement according to the present invention is very uniform in the spacing, the rebar specification and length is also made to order to complete the assembly and installation of rebar to meet the design. Accordingly, the wall according to the present invention produced by the installation of formwork and concrete pouring is stable and excellent construction quality.

이러한 본 발명을 첨부된 도면에 따라 더욱 상세히 설명하면 다음과 같다.Referring to the present invention in more detail according to the accompanying drawings as follows.

먼저, 본 발명은 도2로 보인 바와 같이 강철 밴드(11)에 일정 간격으로 고정된 철근(12)으로 구성된 두루마리 철근(10)과,First, the present invention, as shown in Figure 2, the reinforcing bars 10 consisting of reinforcing bars 12 fixed to the steel band 11 at a predetermined interval, and

도2로 보인 바와 같은 두루마리 철근(10)을 재치할수 있는 원반(22) 및 원반(22) 중심에 설치된 베어링에 의한 회전구조(13), 그리고 이동가능한 바퀴(23)가 하방에 고정된 이송구(21)가 준비되어야 한다.2 is a disc 22 capable of mounting the reinforcing bar 10 as shown in FIG. 2, a rotary structure 13 by a bearing installed at the center of the disc 22, and a transfer hole having a movable wheel 23 fixed downward. (21) is to be prepared.

이러한 이송구(21)의 바퀴(23)는 복수개로 함으로써 자립하여 두루마리 철근(10)을 세워 둘수 있어야 한다.The wheels 23 of the transfer port 21 should be able to stand by holding the reinforcing bar 10 to be independent by making a plurality.

아울러 본 발명에서는 벽체 시공면의 폭에 일치하도록 양측에 지주(15)를 세워 고정하여야 한다. 이러한 지주(15)의 시공을 위하여 기초면(14)에서 상방으로 돌출되는 하층으로 부터의 철근 상부(15')를 이용할수도 있고, 별도로 세워 고정시킨 형태의 것일수도 있다.In addition, in the present invention, the struts 15 should be fixed on both sides so as to match the width of the wall construction surface. For the construction of the support (15) may be the upper reinforcement (15 ') from the lower layer protruding upward from the base surface 14, or may be of the form fixed separately.

이와 같이 한후 먼저 이송구(21)의 원반(22)위에 두루마리 철근(10)을 재치하는 두루마리 철근(10)의 이송구(21) 재치 단계와,After doing this, the transfer port 21 placing step of the reinforcing bar 10 is first mounted on the disc 22 of the conveying port 21;

두루마리 철근(10)의 일단을 풀어 기초면(14) 일측의 지주(15)에 고정하는 두루마리 철근(10) 일단 고정 단계와,A step of fixing the reinforcing bar 10 once to unwind one end of the reinforcing bar 10 and fixing it to the support 15 on one side of the base surface 14,

이송구(21)를 회전시키면서 이동시켜 두루마리 철근(10)이 하강하면서 종상 철근 배치가 실시되는 종상 철근 배근 단계와, 두루마리 철근(10)이 모두 풀려 그 타단을 기초면(14) 타측의 지주(15)에 고정하는 두루마리 철근(10) 타단 고정 단계와, 이러한 과정으로 종상 철근의 배근이 완료된 후 종상 철근 상방에 다른 횡상 두루마리 철근(10)의 일단을 고정시키는 횡상 철근 상단 고정 단계와, 두루마리 철근(10)의 일단이 걸린후 하방으로 펼쳐지면서 적절한 속도로 전개되도록 하는 횡상 철근 전개 단계와, 이러한 과정으로 종,횡상 철근 배근이 완료된후 실시하는 거푸집 설치단계와, 콘크리트 타설 단계와, 양생 단계와, 거푸집 해체 단계를 순차로 실시함으로써 철근 콘크리트 벽체의 시공이 완료되는 것이다.The reinforcing bar reinforcement step in which the reinforcing bar arrangement is performed while the reinforcing bar 10 is lowered while the conveying port 21 is rotated, and the reinforcing bar 10 is released, and the other end of the post reinforcing bar ( 15) the other end fixing step of reinforcing reinforcing bars (10), and the reinforcing bar upper fixing step of fixing one end of another reinforcing reinforcing bar (10) above the reinforcing bars after the reinforcement of the longitudinal reinforcing bars is completed by this process; After the one end of (10) is caught, the horizontal rebar deployment step to be deployed at an appropriate speed while expanding downward, the form installation step, concrete placing step, curing step and carried out after the longitudinal, horizontal rebar reinforcement is completed in this process The construction of the reinforced concrete walls is completed by sequentially performing the formwork dismantling step.

이러한 본 발명은 도4로 도시한 바와 같이 전술한 바의 종상 철근 배근 과정에서기초면(14)에 돌출된 철근 상방(15')과 종상 철근(12) 하단을 상호 체결하여 줌으로써 종상 철근이 기초면(14) 양측의 지지와 그 사이의 돌출부에 의하여 더욱 견고하게 고정되어 높은 시공 품질을 얻을수 있음은 물론이다.In the present invention, as shown in FIG. 4, the longitudinal reinforcing bar is formed by fastening the upper bar 15 'protruding from the base surface 14 and the lower end of the longitudinal bar 12 in the longitudinal reinforcement process as described above. Of course, the support 14 on both sides and the projections therebetween are more firmly fixed to obtain a high construction quality.

아울러 본 발명은 도6의 확대도로 보인 바와 같이 횡상 철근의 배열을 위하여 그 일단을 종상 철근에 용접 또는 결속시킨 걸고리(17)에 걸게 되는 것이며, 이러한 걸고리(17)의 형상은 단순한 "ㄴ"형상으로 된 것일 수도 있고, 걸고리(17)를 사용하지 않는 경우에는 금속재 밴드를 이용하여 체결할수도 있고, 철사를 이용하여 결속할수도 있다.In addition, the present invention, as shown in the enlarged view of Figure 6 is to be hooked to the hook (17) welded or bound to one end of the longitudinal reinforcement for the arrangement of the transverse reinforcement, the shape of the hook 17 is a simple "b" shape It may be made of, or when not using the hook 17 may be fastened using a metal band, it may be bound using a wire.

이와 같이 된 본 발명의 종상 철근과 횡상 철근 배근 상태를 도7로 보였다. 이에서 볼수 있는 바와 같이 본 발명은 종,횡의 일정간격으로 철근이 배열된 것이어서 철근 콘크리트 벽체의 내하중, 강도, 내충격력등의 물성이 목표치를 충족시킬수 있는 것이며, 아울러 강철 밴드(11)에 의하여 종래의 철근을 사용하는 콘크리트 벽체에 비하여 개선된 물성을 얻을수 있게 됨은 물론이다. 이러한 본 발명에 의한 시공 상태를 도8로 도시하였다.The longitudinal and rebar reinforcement states of the present invention thus obtained are shown in FIG. 7. As can be seen from the present invention is that the reinforcing bar is arranged at a constant interval of longitudinal and horizontal, so that the physical properties such as load-bearing strength, strength, impact resistance of the reinforced concrete wall can meet the target value, and also in the steel band 11 As a result, it is possible to obtain improved properties compared to concrete walls using conventional reinforcing bars. 8 shows a construction state according to the present invention.

이에서 보인 실시예에서는 본 발명에 의한 배근 작업을 2회 실시한 다음 거푸집을 설치하고 콘크리트를 타설하여 양생시켰으며, 그 양측에 내,외장재를 부착하여서 된 실시예를 보이고 있다. 이와 같이 해당 벽체에서 요구되는 물성에 따라 1회 또는 2회, 3회등 선택적으로 시공할 수 있다.In the embodiment shown in this embodiment, the reinforcement work according to the present invention was carried out twice, and then the formwork was installed and cured by pouring concrete, showing the embodiment by attaching the interior, exterior material on both sides. In this way, depending on the properties required in the wall can be selectively constructed once, twice, three times.

그리고 거푸집(18)과 철근 사이 또는 거푸집(18)과 거푸집(18) 사이의 간격을 유지시키기 위하여 간격재(19)를 사용할 수 있음은 물론이다.And the spacer 19 may be used to maintain the gap between the formwork 18 and the reinforcement or between the formwork 18 and the formwork 18.

또한, 본 발명은 이송구(21)의 두루마리 철근(10)을 재치하기 위한 원반(22)이 이동중 안정된 상태로 이동될수 있도록 하기 위하여 가이드(16)를 설치할수도 있으며, 이러한 가이드(16)는 일측에만 배출구(20)가 형성되고 두루마리 철근(10)의 상당 부분까지 감싸는 형상으로 되도록 할수 있으며, 이러한 상태를 보인 것이 도 8이다. 또한, 본 발명에 의한 이송구(21)는 이동시 특히 기초면(14)의 지주(15) 사이를 잇는 선상에서 진행하여야 할 필요가 있으며, 이를 위하여 바퀴(23)의 형상이 원판상의 것이 되도록 할수도 있고, 경우에 따라서는 바퀴(23)에 요홈(24)이 형성되고, 이러한 요홈(24)에 맞물리는 레일(25)을 기초면(14)에 설치하여 사용할수도 있는 것이며, 이러한 상태를 도9로 도시하였다.In addition, the present invention may be provided with a guide 16 to allow the disk 22 for mounting the reinforcing rod 10 of the conveying port 21 to be moved in a stable state during the movement, such a guide 16 is one side Only the outlet 20 is formed and can be configured to wrap up to a substantial portion of the reinforcing bar 10, it is shown in FIG. In addition, the conveying port 21 according to the present invention needs to proceed in particular on the line connecting between the struts 15 of the base surface 14 during movement, and for this purpose, the shape of the wheels 23 can be disc-shaped. In some cases, grooves 24 are formed in the wheels 23, and rails 25 engaged with the grooves 24 may be installed on the base surface 14 to be used. 9 is shown.

또한, 본 발명은 전술한 실시예에서 종상으로 철근을 배열시키고 난후 횡상으로 철근을 배열하는 과정을 예시하였으나, 반대로 횡상 철근을 먼저 배열하고 종상 철근을 배열하여도 같은 결과를 얻을수 있다. 즉, 도12로 보인 바와 같이 기초면(14)의 양측에 지주(15)를 세우고 이에 걸고리(17)를 형성시킨후 두루마리 철근(10)의 일단을 걸어 내려 뜨리고, 이어서 전술한 도4로 보인 바와 같이 이송구(21)를 이용하여 두루마리 철근(10)을 풀어 냄으로써 종상 철근이 설치되도록 함으로써 종,횡 으로 배근이 완료되도록 할수도 있음은 물론이다.In addition, although the present invention exemplifies a process of arranging rebars longitudinally and then rebars laterally in the above embodiment, the same result can be obtained by arranging transverse rebars first and arranging longitudinal rebars. That is, as shown in FIG. 12, the struts 15 are placed on both sides of the base surface 14, and the hooks 17 are formed thereon, and then one end of the reinforcing bar 10 is lowered, and then shown in FIG. As described above, by removing the reinforcing bar 10 using the conveying port 21, the longitudinal reinforcing bar may be installed so that the reinforcing bar may be completed vertically and horizontally.

상기와 같이 본 발명은 두루마리 철근(10)을 이용하여 콘크리트 벽체용 철근을 조립 및 설치할수 있는 것이며, 일련의 시공 과정에 의하여 종상, 또는 횡상 배근이 신속하고 용이하게 이루어 지는 것이어서 작업능률을 크게 향상 시킬수 있게 되어인건비 절감에 크게 기여할수 있으므로 공사비를 절감할수 있게 되는 것일 뿐만 아니라 공기 단축에 크게 기여할 수 있게 되는 것이고 강우등에 의한 기후에 거의 영향을 받지 않으므로 공기(工期)를 준수할수 있게 되는 잇점이 있다.As described above, the present invention is to be able to assemble and install the reinforcing bar for the concrete wall using the reinforcing bar 10, the vertical or horizontal reinforcement is made quickly and easily by a series of construction process to greatly improve the work efficiency It is possible to reduce the construction cost as it can greatly contribute to labor cost savings, and it can contribute greatly to the reduction of air, and has the advantage of being able to comply with the air as it is hardly affected by the weather caused by rainfall. .

더욱이 이러한 본 발명에 의하면 두루마리 철근(10)은 설계 사양에 따라 철근 배열 간격, 규격등이 지정되어 제작된 것이므로 이를 활용한 본 발명에 의한 철근 배근은 설계 사양을 정확히 충족시키는 정밀시공이 가능하게 되는 것이어서 높은 시공 품질을 얻게 되는 효과가 있다.Furthermore, according to the present invention, the reinforcing bar 10 is designed and made according to the reinforcing bar spacing, specifications, etc. according to the design specification, and the reinforcing bar according to the present invention utilizing the same enables precise construction to exactly meet the design specification. It is effective to obtain high construction quality.

Claims (5)

이송구(21)의 원반(22)위에 두루마리 철근(10)을 재치하는 두루마리 철근(10) 이송구(21) 재치 단계와,A step of placing the reinforcing bar 10 and the conveying port 21 for placing the reinforcing bar 10 on the disc 22 of the conveying port 21; 두루마리 철근(10)의 일단을 풀어 기초면(14) 일측의 지주(15)에 고정하는 두루마리 철근(10) 일단 고정 단계와,A step of fixing the reinforcing bar 10 once to unwind one end of the reinforcing bar 10 and fixing it to the support 15 on one side of the base surface 14, 이송구(21)를 회전시키면서 이동시켜 두루마리 철근(10)이 하강하면서 종상 철근 배치가 실시되는 종상 철근 배근 단계와, 두루마리 철근(10)이 모두 풀려 그 타단을 기초면(14) 타측의 지주(15)에 고정하는 두루마리 철근(10) 타단 고정 단계와, 이러한 과정으로 종상 철근의 배근이 완료된 후 종상 철근 상방에 다른 횡상 두루마리 철근(10)의 일단을 고정시키는 횡상 철근 상단 고정 단계와, 두루마리 철근(10)의 일단이 걸린후 하방으로 펼쳐지면서 적절한 속도로 전개되도록 하는 횡상 철근 전개 단계와, 이러한 과정으로 종,횡상 철근 배근이 완료된후 실시하는 거푸집 설치단계와, 콘크리트 타설 단계와, 양생 단계와, 거푸집 해체 단계를 구비함을 특징으로 하는 두루마리 철근을 이용한 철근 콘크리트 벽체의 시공방법.The reinforcing bar reinforcement step in which the reinforcing bar arrangement is performed while the reinforcing bar 10 is lowered while the conveying port 21 is rotated, and the reinforcing bar 10 is released, and the other end of the post reinforcing bar ( 15) the other end fixing step of reinforcing reinforcing bars (10), and the reinforcing bar upper fixing step of fixing one end of another reinforcing reinforcing bar (10) above the reinforcing bars after the reinforcement of the longitudinal reinforcing bars is completed by this process; After the one end of (10) is caught, the horizontal rebar deployment step to be deployed at an appropriate speed while expanding downward, the form installation step, concrete placing step, curing step and carried out after the longitudinal, horizontal rebar reinforcement is completed in this process Construction method of reinforced concrete walls using reinforcing steel reinforcement, characterized in that it comprises a formwork dismantling step. 두루마리 철근(10)이 올려지는 원반(22)이 형성되고 그 하측에 회전구조(13) 및 바퀴(23)가 구비된 이송구(21)임을 특징으로 하는 두루마리 철근(10)을 이용한 철근 콘크리트 벽체의 시공수단.Reinforced concrete wall using the reinforcing rod 10, characterized in that the reel 10 is a disk 22 is formed to be raised and the transfer port 21 is provided with a rotary structure 13 and the wheel 23 on the lower side Construction means. 제2항에 있어서, 이송구(21)의 원반(22)상방에 가이드(16)를 설치하되, 일측에 배출구(16)가 구비됨을 특징으로 하는 철근 콘크리트 벽체의 시공수단.According to claim 2, The installation means of the reinforced concrete wall, characterized in that the guide (16) is installed above the disk (22) of the conveying port (21), the discharge port (16) is provided on one side. 제2항에 있어서, 이송구(21)의 바퀴(23)가 고정된 위치에서 회전하는 원판형의 것임을 특징으로 하는 철근 콘크리트 벽체의 시공수단.3. The means for constructing a reinforced concrete wall according to claim 2, wherein the wheels (23) of the conveying port (21) are of a disk shape rotating at a fixed position. 제2항에 있어서,The method of claim 2, 이송구(21)의 바퀴(23)에 지주(15) 사이에 설치된 레일(25)에 상응하는 요홈(24)이 형성됨을 특징으로 하는 철근 콘크리트 벽체의 시공수단.Construction means for reinforced concrete walls, characterized in that the groove (24) corresponding to the rail (25) provided between the support (15) is formed on the wheel (23) of the conveying port (21).
KR1020010039624A 2001-07-04 2001-07-04 Installing Method with Instrument for Rolled Rebar on Reinforced Concrete Wall KR20030003808A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020010039624A KR20030003808A (en) 2001-07-04 2001-07-04 Installing Method with Instrument for Rolled Rebar on Reinforced Concrete Wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020010039624A KR20030003808A (en) 2001-07-04 2001-07-04 Installing Method with Instrument for Rolled Rebar on Reinforced Concrete Wall

Publications (1)

Publication Number Publication Date
KR20030003808A true KR20030003808A (en) 2003-01-14

Family

ID=27713270

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020010039624A KR20030003808A (en) 2001-07-04 2001-07-04 Installing Method with Instrument for Rolled Rebar on Reinforced Concrete Wall

Country Status (1)

Country Link
KR (1) KR20030003808A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR920019707U (en) * 1991-04-15 1992-11-17 이재경 Prefab building panel
JPH0657882A (en) * 1992-08-07 1994-03-01 Fujita Corp Arrangement method of slab bar
JPH06316986A (en) * 1993-05-06 1994-11-15 Hiroshi Nakamura Arrangement method of wind-up type bundle of reinforcing bar and floor slab bar
JPH08135195A (en) * 1994-11-07 1996-05-28 Kugiman Kk Bar arrangement embedded in building and bar arranging method
JPH08144525A (en) * 1994-11-28 1996-06-04 Kazuhisa Yamashita Steel bar assembly for bar arrangement
JPH08239846A (en) * 1995-03-07 1996-09-17 Toda Constr Co Ltd Arranging method for reinforcing bar of underground outer wall skeleton
KR970011225A (en) * 1996-12-13 1997-03-27 기승철 Prefab Formwork Assembly for Construction
KR19980058501U (en) * 1997-02-24 1998-10-26 전주한 Prefabricated PC Concrete Wall Panels

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR920019707U (en) * 1991-04-15 1992-11-17 이재경 Prefab building panel
JPH0657882A (en) * 1992-08-07 1994-03-01 Fujita Corp Arrangement method of slab bar
JPH06316986A (en) * 1993-05-06 1994-11-15 Hiroshi Nakamura Arrangement method of wind-up type bundle of reinforcing bar and floor slab bar
JPH08135195A (en) * 1994-11-07 1996-05-28 Kugiman Kk Bar arrangement embedded in building and bar arranging method
JPH08144525A (en) * 1994-11-28 1996-06-04 Kazuhisa Yamashita Steel bar assembly for bar arrangement
JPH08239846A (en) * 1995-03-07 1996-09-17 Toda Constr Co Ltd Arranging method for reinforcing bar of underground outer wall skeleton
KR970011225A (en) * 1996-12-13 1997-03-27 기승철 Prefab Formwork Assembly for Construction
KR19980058501U (en) * 1997-02-24 1998-10-26 전주한 Prefabricated PC Concrete Wall Panels

Similar Documents

Publication Publication Date Title
US20130014458A1 (en) Wall structure having prefabricated, permanent form
CN103410269B (en) Prestressing without bondn cast-in-place reinforced concrete hollow slab constructing structure and construction method
CN114482529A (en) Back-jacking construction method for post-cast strip galvanized steel pipe support frame
KR200407092Y1 (en) Support Structure for PC Panel of Cantilever Part
CN108316150B (en) Construction system and construction method for main tower and steel anchor beam of cable-stayed bridge
CN110258927A (en) A kind of production method of orthogonal bar frame superimposed sheet
KR200393006Y1 (en) Connection structure of precast concrete using fiber reinforced plastics construction
KR20030003808A (en) Installing Method with Instrument for Rolled Rebar on Reinforced Concrete Wall
KR101126131B1 (en) Structure for reinforcing head of a steel pipe pile for a construction
KR100665246B1 (en) Precast concrete connection structure using Fiber Reinforced Plastics construction
JP3180681U (en) Reinforcing bar structure and precast plate by the reinforcing bar structure
KR101948026B1 (en) Pre-stressed concrete (psc) beam producing method for forming steel reinforcement assembly by connecting prefabricated segments of steel reinforcement assembly in construction field
JP2000320142A (en) Device and method for reinforcement assembly in construction work
KR100650444B1 (en) Cantilever part construction method of bridge
JP7453837B2 (en) Reinforcement structure and reinforcement construction method for concrete structures
WO2002077391A2 (en) Manufactured reinforced concrete system
KR20060062915A (en) Pre-stress precast box making method
CN220058881U (en) Quick easy binding off net activity back of body is stupefied structure
KR102409371B1 (en) Rib-type PC slab having welded wire mesh with upper end hook and method for manufacturing and construction of the rib-type PC slab
JP2538528B2 (en) Slope stabilization method
KR200342730Y1 (en) Concrete form using expanded metal
KR101229555B1 (en) Incremental launching apparatus for constructing concrete slab of composite bridge using air wheel
JP2017075492A (en) Installation method for reinforcing bar in concrete pavement
JPH08232270A (en) Method for stabilizing slope
KR100546514B1 (en) Pre-stress precast fabrication a steel wire make use the box making method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application